Attachment - II - Renovate Bldg 16 - Drawing Set.pdf

PDF 33 MB Posted

Attached to
Renovate Building 16, 610-20-103 Federal contract opportunity
Solicitation number
36C25025B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This is a drawing set attachment for the renovation of Building 16 at the Marion VA Medical Center. The architectural drawings show plans for renovating the building to accommodate the VA Northern Indiana Health Care System's Director, Executive Leadership Team, and administrative departments. The drawings appear to include technical specifications and architectural plans for modifying the existing structure while maintaining connections to adjacent Buildings 15 and 17, with phasing considerations to allow continued circulation between the connected buildings during construction.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Building 16, 610-20-103, newest first.
File Type Posted
36C25025B0005 - Provision and Clauses Section 1.pdf PDF
36C25025B0005 0008.pdf PDF
36C25025B0005 0007.pdf PDF
36C25025B0005 0006.pdf PDF
36C25025B0005 0005.pdf PDF
Amend 4.pdf PDF
RFI 20.pdf PDF
RFI 36.pdf PDF
RFI 19.pdf PDF
RFI 33.pdf PDF
RFI 37.pdf PDF
RFI 13.pdf PDF
36C25025B0005 0003.pdf PDF
RFI 35.pdf PDF
RFI 32.pdf PDF
RFI 1.pdf PDF
RFI 28 - RESPONSE - VADI - 2025.01.23.pdf PDF
RFI 21.pdf PDF
RFI 25.pdf PDF
RFI 29 - RESPONSE - VADI - 2025.01.23.pdf PDF
RFI 7 - RESPONSE - VA - 2025.01.08.pdf PDF
RFI 27 - RESPONSE - VADI - 2025.01.23.pdf PDF
RFI 11 RESPONSE - VA - 2025.01.08.pdf PDF
RFI 43.pdf PDF
RFI 24 - RESPONSE - VADI - 2025.01.23.pdf PDF
RFI 30 - RESPONSE - VADI - 2025.01.23.pdf PDF
Amendment 2 B0005.pdf PDF
RFI 20 - jah response - 2025.01.30.pdf PDF
RFI 26 - RESPONSE - VADI - 2025.01.23.pdf PDF
RFI 34 - jah response - 2025.01.30.pdf PDF
RFI 5 - RESPONSE - VA - 2025.01.08.pdf PDF
RFI 4 - RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 15 - RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 14 - RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 16 - RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 12 - RESPONSE - VADI - 2024.12.24.pdf PDF
Marion VA Building 16 Abestos Lead Paint Hazardous Materials Inspection Final Report with attachments.pdf PDF
36C25025B0005 Amend 1.pdf PDF
RFI 3 - RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 5 - RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 6 -RESPONSE - VADI - 2024.12.24.pdf PDF
RFI 2 - RESPONSE - VADI - 2024.12.24.pdf PDF
Reno Bldg 16 Sign In.pdf PDF
Attachment - I - Renovate Bldg 16 - Combined Specifications.pdf PDF
36C25025B0005.pdf PDF
Attachment - IV - RFI Form Solicitaton.docx DOCX document
Attachment - VI - VHA Directive 1192 01.pdf PDF
Attachment - III - Contractor EMR Certification Form.docx DOCX document
Attachment - V - Wage Determination.pdf PDF
36C25025B0005.docx DOCX document
Show all 50

Renovate Building 16, 610-20-103 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design, Inc. and shall not be used for any purpose without prior expressed written consent.

The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

NORTH

REFERENCE

PROJECT # SIGNATURE DATE

Director Associate Director Chief of Staff Associate Director for Patient Services Associcate C.O.S. for Mental Health Chief, FMS Chief, Engineering Section Chief, Environmental Management Section Infectious Control Officer Patient Safety Manager GEMS Coordinator Safety Specialist Chief, Police Service Chief, Fire Station Union Safety Representative Contracting Officer Contracting Officer Representative

VA PROJECT NO.:

FINAL BID

DOCUMENTS

01 114OF

LOCATION MAP VICINITY MAP

Fire Protection Consultant:

Fire Protection & Code Consultants, LLC 1520 Main Street, Indianapolis, Indiana 46224

Mechanical Consultant:

SCO Engineering, LLC 6534 Constitution Drive Fort Wayne, Indiana 46804

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 0-

3_

C

EN

TR

AL

_R

_a m or ta ki s.

rv t

6/

/2

8:

:4

AM

GI001

COVER SHEET RENOVATE BUILDING 16 610-20-103

Building 16

05/18/2022 TWT AKM

RENOVATE BUILDING 16

610-20-103

610-20-103

Marion VAMC

VA NORTHERN INDIANA HEALTH CARE SYSTEM: MARION, INDIANA

VA NORTHERING INDIANA HEALTH

CARE SYSTEM

1700 E 38th Street Marion, Indiana 46953

S LINCO

LN BLVD

S HOME AVE

M C

M

AR

IO

N

AV

E

38TH STREET

S LINCO

LN BLVD

38TH STREET

S HOM

E AVE

LOCATION

OF PROJECT

VA INDEX OF WORKING DRAWINGS

SHEET

NO DRAWING TITLE

DRAWING

NO

EP103 ELECTRICAL - THIRD FLOOR POWER PLAN 101

ES100 ELECTRICAL - SINGLE LINE DIAGRAM 102

ES101 ELECTRICAL - SCHEDULE AND DETAILS 103

EY201 ELECTRICAL - TECHNOLOGY DETAILS 104

FIRE PROTECTION

FD100 DEMOLITION - BASEMENT FLOOR FIRE PROTECTION PLAN 105

FD101 DEMOLITION - FIRST FLOOR FIRE PROTECTION PLAN 106

FD102 DEMOLITION - SECOND FLOOR FIRE PROTECTION PLAN 107

FD103 DEMOLITION - THIRD FLOOR FIRE PROTECTION PLAN 108

FD104 DEMOLITION - ATTIC FIRE PROTECTION PLAN 109

FX100 FIRE PROTECTION - BASEMENT FLOOR PLAN 110

FX101 FIRE PROTECTION - FIRST FLOOR PLAN 111

FX102 FIRE PROTECTION - SECOND FLOOR PLAN 112

FX103 FIRE PROTECTION - THIRD FLOOR PLAN 113

FX104 FIRE PROTECTION - ATTIC FLOOR PLAN 114

VA INDEX OF WORKING DRAWINGS

SHEET

NO DRAWING TITLE

DRAWING

NO

MH100 MECHANICAL HVAC - BASEMENT FLOOR PLAN 68

MH101 MECHANICAL HVAC - FIRST FLOOR PLAN 69

MH102 MECHANICAL HVAC - SECOND FLOOR PLAN 70

MH103 MECHANICAL HVAC - THIRD FLOOR PLAN 71

MH104 MECHANICAL HVAC - ATTIC PLAN 72

MI401 MECHANICAL DETAILS 73

MI402 MECHANICAL DETAILS 74

MI501 MECHANICAL SCHEDULES 75

PLUMBING

PGI001 PLUMBING GENERAL INFORMATION 76

PD100 DEMOLITION - BASEMENT FLOOR PLUMBING PLAN 77

PD101 DEMOLITION - FIRST FLOOR PLUMBING PLAN 78

PD102 DEMOLITION - SECOND FLOOR PLUMBING PLAN 79

PD103 DEMOLITION - THIRD FLOOR PLUMBING PLAN 80

PS100 UNDERGROUND PLUMBING PLAN 81

PL100 PLUMBING - BASEMENT FLOOR PLAN 82

PL101 PLUMBING - FIRST FLOOR PLAN 83

PL102 PLUMBING - SECOND FLOOR PLAN 84

PL103 PLUMBING - THIRD FLOOR PLAN 85

PL401 PLUMBING DETAILS 86

PL501 PLUMBING SCHEDULES 87

ELECTRICAL

EGI001 ELECTRICAL - ABBREVIATIONS AND SYMBOLS 88

ED100 ELECTRICAL DEMOLITION - BASEMENT FLOOR PLAN 89

ED101 ELECTRICAL DEMOLITION - FIRST FLOOR PLAN 90

ED102 ELECTRICAL DEMOLITION - SECOND FLOOR PLAN 91

ED103 ELECTRICAL DEMOLITION - THIRD FLOOR PLAN 92

EL100 ELECTRICAL - BASEMENT FLOOR LIGHTING PLAN 93

EL101 ELECTRICAL - FIRST FLOOR LIGHTING PLAN 94

EL102 ELECTRICAL - SECOND FLOOR LIGHTING PLAN 95

EL103 ELECTRICAL - THIRD FLOOR LIGHTING PLAN 96

EL104 ELECTRICAL - ATTIC FLOOR LIGHTING PLAN 97

EP100 ELECTRICAL - BASEMENT FLOOR POWER PLAN 98

EP101 ELECTRICAL - FIRST FLOOR POWER PLAN 99

EP102 ELECTRICAL - SECOND FLOOR POWER PLAN 100

VA INDEX OF WORKING DRAWINGS

SHEET

NO DRAWING TITLE

DRAWING

NO

AS200 ARCHITECTURAL - ATTIC PLAN 34

AS300 ARCHITECTURAL - ENLARGED TOILET PLANS AND ELEVATIONS 35

AS301 ARCHITECTURAL - ENLARGED PLANS, ELEVATIONS, AND CASEWORK

DETAILS

AS400 ARCHITECTURAL - EXTERIOR ELEVATIONS 37

AS401 ARCHITECTURAL - EXTERIOR ELEVATIONS 38

AS700 ARCHITECTURAL - DOOR SCHEDULE AND DETAILS 39

AS701 ARCHITECTURAL - WINDOW ELEVATIONS AND DETAILS 40

AS702 ARCHITECTURAL - SIGNAGE SCHEDULE, ELEVATIONS, AND DETAILS 41

AS703 ARCHITECTURAL - SIGNAGE ELEVATIONS AND DETAILS 42

AS704 ARCHITECTURAL - SIGNAGE PLANS 43

AS900 ARCHITECTURAL - BASEMENT FLOOR REFLECTED CEILING PLAN 44

AS901 ARCHITECTURAL - FIRST FLOOR REFLECTED CEILING PLAN 45

AS902 ARCHITECTURAL - SECOND FLOOR REFLECTED CEILING PLAN 46

AS903 ARCHITECTURAL - THIRD FLOOR REFLECTED CEILING PLAN 47

AS1100 ARCHITECTURAL - BASEMENT FLOOR FINISH PLAN 48

AS1101 ARCHITECTURAL - FIRST FLOOR FINISH PLAN 49

AS1102 ARCHITECTURAL - SECOND FLOOR FINISH PLAN 50

AS1103 ARCHITECTURAL - THIRD FLOOR FINISH PLAN 51

AS1201 ARCHITECTURAL - FIRST FLOOR FURNITURE PLAN (FOR REF. ONLY) 52

AS1202 ARCHITECTURAL - SECOND FLOOR FURNITURE PLAN (FOR REF. ONLY) 53

AS1203 ARCHITECTURAL - THIRD FLOOR FURNITURE PLAN (FOR REF. ONLY) 54

MECHANICAL

MGI001 MECHANICAL GENERAL INFORMATION 55

MD100 DEMOLITION - BASEMENT FLOOR MECHANICAL PLAN 56

MD101 DEMOLITION - FIRST FLOOR MECHANICAL PLAN 57

MD102 DEMOLITION - SECOND FLOOR MECHANICAL PLAN 58

MD103 DEMOLITION - THIRD FLOOR MECHANICAL PLAN 59

MD104 DEMOLITION - ATTIC MECHANICAL / PLUMBING PLAN 60

MD105 DEMOLITION - BASEMENT FLOOR MECHANICAL PIPING PLAN (BUILDING

174)

MP100 MECHANICAL PIPING - BASEMENT FLOOR PLAN 62

MP101 MECHANICAL PIPING - FIRST FLOOR PLAN 63

MP102 MECHANICAL PIPING - SECOND FLOOR PLAN 64

MP103 MECHANICAL PIPING - THIRD FLOOR PLAN 65

MP104 MECHANICAL PIPING - BASEMENT FLOOR PLAN (BUILDING 174) 66

MP200 MECHANICAL PIPING - ENLARGED BASEMENT FLOOR PLANS 67

VA INDEX OF WORKING DRAWINGS

SHEET

NO DRAWING TITLE

DRAWING

NO

GENERAL

GI001 COVER SHEET 01

GI002 INFECTION CONTROL RISK CLASS IV ASSESSMENT (ICRA) REQUIREMENTS 02

GI003 INFECTION CONTROL AND PHASING PLANS 03

GI004 HAZARDOUS MATERIAL - BASEMENT FLOOR PLAN 04

GI005 HAZARDOUS MATERIAL - FIRST FLOOR PLAN 05

GI006 HAZARDOUS MATERIAL - SECOND FLOOR PLAN 06

GI007 HAZARDOUS MATERIAL - THIRD FLOOR PLAN 07

GI008 LIFE SAFETY GENERAL INFORMATION AND CODE ANALYSIS 08

GI009 LIFE SAFETY - BASEMENT FLOOR PLAN 09

GI010 LIFE SAFETY - FIRST FLOOR PLAN 10

GI011 LIFE SAFETY - SECOND FLOOR PLAN 11

GI012 LIFE SAFETY - THIRD FLOOR PLAN 12

GI013 LIFE SAFETY - ATTIC FLOOR PLAN 13

DEMOLITION

AD100 DEMOLITION - BASEMENT FLOOR PLAN 14

AD101 DEMOLITION - FIRST FLOOR PLAN 15

AD102 DEMOLITION - SECOND FLOOR PLAN 16

AD103 DEMOLITION - THIRD FLOOR PLAN 17

AD200 DEMOLITION - ATTIC PLAN 18

AD400 DEMOLITION - EXTERIOR ELEVATIONS 19

AD401 DEMOLITION - EXTERIOR ELEVATIONS 20

AD900 DEMOLITION - BASEMENT REFLECTED CEILING PLAN 21

AD901 DEMOLITION - FIRST FLOOR REFLECTED CEILING PLAN 22

AD902 DEMOLITION - SECOND FLOOR REFLECTED CEILING PLAN 23

AD903 DEMOLITION - THIRD FLOOR REFLECTED CEILING PLAN 24

ARCHITECTURAL

AGI001 ARCHITECTURAL - ABBREVATIONS AND SYMBOLS 25

AS100 ARCHITECTURAL - BASEMENT FLOOR PLAN 26

AS100.1 ARCHITECTURAL - BASEMENT FLOOR CONSTRUCTION PLAN 27

AS101 ARCHITECTURAL - FIRST FLOOR PLAN 28

AS101.1 ARCHITECTURAL - FIRST FLOOR CONSTRUCTION PLAN 29

AS102 ARCHITECTURAL - SECOND FLOOR PLAN 30

AS102.1 ARCHITECTURAL - SECOND FLOOR CONSTRUCTION PLAN 31

AS103 ARCHITECTURAL - THIRD FLOOR PLAN 32

AS103.1 ARCHITECTURAL - THIRD FLOOR CONSTRUCTION PLAN 33

Revisions: Date:

SYMBOLS LEGEND

TEMPORARY PARTITION (CONTAIN

OR MINIMIZE SPREAD OF DUST)

DIRECTION OF DEMOLITION /

TRASH REMOVAL,

CONSTRUCTION TRAVEL

EXISTING AREAS

(NOT IN PROJECT)

CONTRACTOR STAGING

COORDINATE WITH COR

CONSTRUCTION BOUNDARY

EXIT

CLOSED FOR

CONSTRUCTION

PROVIDE AND DISPLAY ICRA REQUIREMENT

DOCUMENTATION. COORDINATE WITH COR.

5-PLY SOLID CORE FLUSH DOORS SHALL BE

SECURED, AND HAVE LIMITED, ZIPPERED ACCESS,

& MASKED OFF / SEALED & PROTECTED PER

INFECTION CONTROL REQUIREMENTS PRIOR TO

DEMOLITION & FOR DURATION OF

CONSTRUCTION. COORDINATE EGRESS

REQUIREMENTS WITH COR. SEE SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

USE ALTERNATIVE

EXITS

CAUTION

THIS AREA CLOSED

OFF

ICRA

REQUIREMENTS

NO ENTRY

DUST BARRIER

PROVIDE AND DISPLAY ICRA REQUIREMENT

DOCUMENTATION. COORDINATE WITH COR.

5-PLY SOLID CORE FLUSH DOORS SHALL BE

SECURED, AND HAVE LIMITED, ZIPPERED ACCESS,

& MASKED OFF / SEALED & PROTECTED PER

INFECTION CONTROL REQUIREMENTS PRIOR TO

DEMOLITION & FOR DURATION OF CONSTRUCTION.

COORDINATE EGRESS REQUIREMENTS WITH COR.

SEE SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

TYPE A TYPE B

4" RUBBER COVE

TO MATCH EXISTING AREA

BASE AT BOTH SIDES

4" RUBBER COVE

TO MATCH EXISTING AREA

BASE AT BOTH SIDES

SUSPENDED

ACOUSTICAL CEILING

AS SCHEDULED

ON FLOOR PLAN.

ALL TEMPORARY CONSTRUCTION

BARRIER - INFECTION/ DUST CONTROL

PARTITION(S) SHALL BE SEALED TO EXISTING

FLOOR, CEILING, WALL, & DOOR/ WINDOW

FRAME CONSTRUCTION AS APPLICABLE, PER

INFECTION CONTROL REQUIREMENTS PRIOR

TO DEMOLITION & FOR DURATION OF

CONSTRUCTION. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

TEMPORARY CONSTRUCTION "1-HOUR"

BARRIER - INFECTION / DUST

CONTROL PARTITION: 3-1/2" MIN. WITH WITH

1-1/2" MIN. LEGS, , 20 GA.

METAL STUDS @ 16" O.C., SECURED

TO FLOOR, CEILING, WALL W/ 5/8" (UL TYPE

ULIX) GYP. BD. EA. SIDE, W/ ALL JOINTS

TAPED AND SEALED FOR INFECTION /

DUST CONTROL (NOT MUDDED), AND 3-1/2"

GLASSS FIBER BATT INSULATION (REFERENCE

UL U423; UL U 425).

SUSPENDED

ACOUSTICAL CEILING

AS SCHEDULED

ON FLOOR PLAN.

ALL TEMPORARY CONSTRUCTION

BARRIER - INFECTION / DUST CONTROL

PARTITION(S) SHALL BE SEALED TO

EXISTING FLOOR, CEILING, WALL, &

DOOR / WINDOW FRAME

CONSTRUCTION AS APPLICABLE, PER

INFECTION CONTROL REQUIREMENTS

PRIOR TO DEMOLITION & FOR

DURATION OF CONSTRUCTION. SEE

SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

4 7/8"

W

AL

L H

EI

GH

T

VE

RI

ES

F

IEL

D

VE

RI

FY

CE

ILI

NG

H

EI

GH

T 8'

-0

" 3 5/8" 16 GA. METAL

STUDS AT 16" O.C.

WITH 5/8" GYPSUM

BOARD EACH SIDE.

4 3/4"

CE

ILI

NG

H

EI

GH

T 8'

-0

W

AL

L H

EI

GH

T

VE

RI

ES

F

IEL

D

VE

RI

FY

XXXXX

XXXXX

XXXXX

XXXXX

INDICATOR MUST MAINTAIN -0.01 INCHES OF WATER

GAUGE (VERIFY DAILY) AIR PRESSURE, IF NOT VERIFY

ALL OPENING SUCH AS DOORS ARE CLOSED AND/OR

CHANGE OUT NEGATIVE AIR PRE-FILTER.

INDICATOR

(REFER TO

PLAN &

ELEVATION)

POST ICRA, ILSM,

FIRE INSPECTION

SHEETS VISIBLE

TO PUBLIC

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

COMING SOON!!!

ICRA, ILSM

FIRE WATCH

MISC. FORMS

PAPER

CADDY

PERSONNEL ENTERING MUST HAVE: HARD HAT,

SAFETY GLASSES AND PROPER I.D.

-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY-

THIS IS A

RESTRICTED AREA

AREA UNDER CONSTRUCTION

CONST. SUPERVISOR

NAME AND

CELL PHONE

CONTACT PHONE #####

FIRE EMERGENCY DIAL 911

XXXXXX

XXXX

FRAMED

PICTURE

OF

C.O.R.

WITH CONTACT

INFORMATION

AP

PR

OX

. 4

8" A

.F .F

TEMP. ANTE

ROOM

HARD BARRIER

A

O V

MONTHLY CHANGED HEPA

FILTER

FL

EX

D

UC

T

E

BLUE CORE LOCKSET

(LOCKED AT ALL TIMES)

TYPE B

TYPE A

PROVIDE STICKY

MATS (CHANGED

END OF SHIFT OR

MORE IF NECESSARY

TO MAINTAIN

CLEANLINESS)

POST ICRA, ILSM,

FIRE INSPECTION

SHEETS VISIBLE TO

PUBLIC

INDICATOR MUST BE AT -0.01 W.C. OR MORE

NEGATIVE DAILY, IF NOT VERIFY ALL OPENING

SUCH AS DOORS ARE CLOSED AND/OR

CHANGE OUT NEGATIVE AIR PRE-FILTER.

ABC TYPE FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET (ISLM MAY

REQ. MORE THAN ONE OR WALL MOUNTED)

NEED INSPECTION TAG AND MONTHLY

INSPECTION; INITIALS AND DATED.

TAPE ALL SERVICES

TO PROTECT

AGAINST

CONTAMINATION

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE

DIFFUSERS).

COVER ALL RETURNS AT

THE GRATE / DIFFUSERS

WITH FIRE RATED PLASTIC

SHEETING AND SECURE

WITH DUCT TAPE.

SUPPLY DUCTS EITHER KEEP RUNNING

OR COVER WITH FIRE RATED PLASTIC

SHEETING AND SECURE WITH DUCT

TAPE TO KEEP DUST OUT.

HEPA NEGATIVE AIR UNIT

WEEKLY CHANGED (OR

MORE AS NEEDED PRE-

FILTER)

FIRE RATED

PLYWOOD

AA

EXISTING CONCRETE SLAB FLOORING

FIRE / U.L. RATED PLASTIC

TO PREVENT DUST (INSTALL

PRIOR TO CONSTRUCTION).

FIRE / U.L. RATED PLASTIC

TO PREVENT DUST (INSTALL

PRIOR TO CONSTRUCTION).

EXISTING WALL

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING

REPLACED SHALL BE PROTECTED

OR COVERED WITH ROSEN PAPER /

FIRE TREATED PLYWOOD.

HEPA NEGATIVE AIR UNIT.

EXISTING WALL

EXISTING FIRE

SPRINKLER SYSTEM

FIRE RATED PLYWOOD

(TEMP. REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

FLEX DUCT

PLASTIC WINDOW

(ON ALL SIDES)

HEPA NEGATIVE AIR UNIT

MOBILE CONTAINMENT

CART WITH CANVAS /

1-1/4" SQUARE STEEL

TUBULAR FRAME

FLEX DUCT

SWIVEL CASTERS

ZIPPER SIDE ENTRY

AD

JU

ST

AB

LE

HE

IG

HT

UNIT SHALL BE VENTED

TO OUTSIDE

AD

JU

ST

AB

LE

HE

IG

HT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF02 114

Fire Protection Consultant:

Fire Protection & Code Consultants, LLC 1520 Main Street, Indianapolis, Indiana 46224

Mechanical Consultant:

SCO Engineering, LLC 6534 Constitution Drive Fort Wayne, Indiana 46804

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 0-

3_

C

EN

TR

AL

_R

_a m or ta ki s.

rv t

6/

/2

4:

:0

PM

GI002

INFECTION CONTROL RISK CLASS IV

ASSESSMENT (ICRA) REQUIREMENTS

RENOVATE BUILDING 16

Marion VAMC

610-20-103

Building 16

05/18/2022 TWT AKM

APPLICABILITY OF GENERAL CONSTRUCTION NOTES:

THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE DRAWINGS AND SPECIFICATIONS AND TO ALL CONTRACTORS AND / OR SUBCONTRACTORS THAT WORK IN, ON, OR AROUND THIS BUILDING OR THE ADJACENT SITE. FOR ADDITIONAL SCOPE OF WORK DESCRIBED IN DETAIL, SEE THE RESPECTIVE DISCIPLINE DRAWINGS AND

SPECIFICATIONS.

1. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY / ALL WORK, VERIFY THE LOCATION AND INSURE THE OBVIOUS MARKING OF ALL EXISTING UTILITIES (PRIVATE / PUBLIC) AND RELATED EQUIPMENT ON, ABOVE, OR BENEATH THE ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR TO BE REMOVED. COORDINATE ALL VERIFICATION AND MARKING WORK WITH THE COR.

2. BUILDING DUST AND INFECTION CONTROL: THE BUILDING WILL NOT BE OCCUPIED DURING ALL PHASES OF THIS WORK. PROVIDE, INSTALL, AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL MEASURES OUTLINED. SEE INFECTION CONTROL PLAN AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION. COORDINATE SPECIFIC INFORMATION WITH THE COR.

3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL NOT BE OCCUPIED DURING ALL PHASES OF THIS WORK.

PROVIDE, INSTALL, AND MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION OF THE CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH THE COR. SEE SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

4. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE, INSTALL, AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK, AT NO ADDITIONAL COST TO THE VA.

SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. EXITS TO BE MAINTAINED: MAINTAIN A MINIMUM OF 3' OF MAIN WARD ACCESS / EXIT THROUGHOUT THE

CONSTRUCTION PERIOD.

6. GENERAL DEMOLITION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION INCLUDING DISPOSAL AND / OR SALVAGE OF DEMOLISHED

MATERIALS. COORDINATE SPECIFIC INFORMATION WITH THE COR.

7. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS

FOR GENERAL CONSTRUCTION NOTES AND INFORMATION INCLUDING STORAGE AND STAGING OF

CONSTRUCTION MATERIALS. COORDINATE SPECIFIC INFORMATION WITH THE COR.

8. EXISTING PLUMBING SUPPLY AND DWV SYSTEMS AND EQUIPMENT: THE BUILDING WILL NOT BE OCCUPIED DURING CONSTRUCTION. COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING, MODIFICATIONS TO, REROUTING OF, AND RECONNECTING OF EXISTING PLUMBING SUPPLY AND DRAIN WASTE VENT SYSTEMS (DWV) AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE BUILDING WILL NOT BE OCCUPIED DURING CONSTRUCTION. COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING MECHANICAL SYSTEMS, STEAM PIPING AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

10.EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL NOT BE OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING POWER SUPPLIES AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

11.FIRE-PROTECTION SYSTEMS AND EQUIPMENT: THE BUILDING WILL NOT BE OCCUPIED DURING CONSTRUCTION. COORDINATE ALL NEW ROUTING OF FIRE-PROTECTION SYSTEMS AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

GENERAL CONSTRUCTION AND PHASING NOTES

COORDINATE WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT. SEE

ITEMS LISTED BELOW AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK ASSESSMENT MATRIX OF

PRECAUTIONS FOR CONSTRUCTION & RENOVATION" FOR INFECTION CONTROL INFORMATION AND

REQUIREMENTS.

2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION &

RENOVATION" COORDINATE WITH COR TO DETERMINE THE FOLLOWING PROJECT CONDITIONS:

· PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)

· TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)

· CLASS OF PRECAUTION/ LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (CLASS II REQUIRED)

3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED WITH DEMOLITION AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN AUTHORIZED BY THE COR. ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT AS DIRECTED BY THE COR.

4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS" AS OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT AND APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS. PRECAUTIONS LISTED BELOW ARE TO BE

CONFIRMED WITH THE COR:

1.1. DURING CONSTRUCTION PROJECT PHASE:

1.1.1. ISOLATE THE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

1.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK AREA BEFORE

DEMOLITION OR CONSTRUCTION BEGINS.

1.1.3. MAINTAIN NEGATIVE AIR PRESSURE OF -0.1" W.C. WITHIN WORK SITE UTILIZING HEPA EQUIPPED

AIR FILTRATION UNITS. CONTRACTOR SHALL PROVIDE MAGNOMETER TO MEASURE AIR

PRESSURE.

1.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

1.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY

CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN

WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

1.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE EXCHANGED EACH TIME WORKER EXITS THE WORK AREA.

1.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE

SAFETY OFFICE AND INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT SERVICE.

1.2. UPON COMPLETION OF PROJECT PHASE:

1.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

1.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

1.2.3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1.2.4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

1.2.5. WET MOP AREA WITH DISINFECTANT.

1.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN PERFORMED.

5. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, & MAINTAIN THE SPECIFIC INFECTION

CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

6. UPON COMPLETION OF THE CONSTRUCTION PROJECT PHASE, REMOVE THE SPECIFIC INFECTION CONTROL

PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

7. IAQ (INDOOR AIR QUALITY) CONTROL MEASURES DURING CONSTRUCTION NOTES:

INFECTION CONTROL PLAN GENERAL NOTES

SCALE: 1/2" = 1'-0"

GI002

EXIST CLOSED FOR CONSTRUCTION

SCALE: 1/2" = 1'-0"

GI002

INFECTION / DUST CONTROL DOOR

SCALE: 1/2" = 1'-0"

GI002

WALL CONSTRUCTION TYPES - DETAILS

SCALE: 1/2" = 1'-0"

GI002

ROOM ELEVATION

CL

AS

S

IV

CLASS IV WORK ITEMS NOTES:

1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS INDICATED.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTE ROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA

VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER OVERALLS THAT ARE REMOVED EACH TIME

THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA SITE OR THEY CAN WEAR CLOTH OR PAPER OVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE

THE WORK SITE.

7. DO NOT REMOVE BARRIERS FROM WORK UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER’S SAFETY DEPARTMENT AND

INFECTION CONTROL.

PRIOR TO ANY CONSTRUCTION:

1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

6. WET MOP AREA WITH DISINFECTANT.

7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

8. ROOMS SHALL BE THOROUGHLY CLEANED BY THE OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT.

POST CONSTRUCTION:

SCALE: 1/4" = 1'-0"

GI002

TYICAL IDEAL CONSTRUCTION LAYOUT CLASS IV

SCALE: 3/8" = 1'-0"

GI002

TYPICAL IDEAL CONSTRUCTION CROSS SECTION CLASS IV

SCALE: 3/8" = 1'-0"

GI002

ICRA MOBILE CART

FD

FD

CONSTRUCTION BOUNDRY

CONSTRUCTION BOUNDRY

CONSTRUCTION BOUNDRY

CONSTRUCTION BOUNDRY

CO

NS

TR

UC

TI

O

N

BO

UN

DR

Y

CONSTRUCTION BOUNDRY

4 4PHASE 11

CONSTRUCTION BOUNDRY

CO

NS

TR

UC

TI

O

N

BO

UN

DR

Y

4STAIRS

S001

ELEVATOR

LOBBY

DUMPSTER

EXISTING

ELEVATOR

STAIRS

S100

STAIR

S101

EXISTING

GARAGE

EXISTING

STORAGE

CONSTRUCTION BOUNDRY

CONSTRUCTION BOUNDRY

CONSTRUCTION BOUNDRY

DRUG CASHE

TOILET

ELEVATOR

LOBBY

EXISTING

CORRIDOR

C104

EXISTING

CORRIDOR

C103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF03 114

Fire Protection Consultant:

Fire Protection & Code Consultants, LLC 1520 Main Street, Indianapolis, Indiana 46224

Mechanical Consultant:

SCO Engineering, LLC 6534 Constitution Drive Fort Wayne, Indiana 46804

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 0-

3_

C

EN

TR

AL

_R

_a m or ta ki s.

rv t

6/

/2

4:

:1

PM

GI003

INFECTION CONTROL AND PHASING

PLANS

RENOVATE BUILDING 16

Marion VAMC

610-20-103

Building 16

05/18/2022 TWT AKM

SCALE: 1/16" = 1'-0"

GI003

SECOND FLOOR - ICRA AND PHASE II PLAN

SCALE: 1/16" = 1'-0"

GI003

THIRD FLOOR - ICRA AND PHASE II PLAN

SCALE: 1/16" = 1'-0"

GI003

BASEMENT - ICRA AND PHASE I PLAN

SCALE: 1/16" = 1'-0"

GI003

FIRST FLOOR - ICRA AND PHASE I PLAN

INFECTION CONTROL PLAN NOTES

1 INFECTION / DUST CONTROL PARTITION. PARTITION SHALL BE SECURED, SEALED, & PROTECTED

FOR THE DURATION OF CONSTRUCTION. COORDINATE INFECTION CONTROL RISK ASSESSMENT

AND EGRESS REQUIREMENTS WITH COR. COORDINATE ADDITIONAL REQUIREMENTS WITH COR.

SEE DETAIL 3/GI002 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2 INFECTION / DUST CONTROL PARTITION EGRESS DOOR. EGRESS DOOR SHALL BE SECURED,

SEALED, AND PROTECTION FOR THE DURATION OF CONSTRUCTION. COORDINATE INFECTION

CONTROL RISK ASSESSMENT (ICRA) AND EGRESS REQUIREMENTS WITH COR. COORDINATE

ADDITIONAL REQUIREMENTS WITH COR. SEE DETAIL 1/GI002, 2/GI002, AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

3 CONTRACTOR TO PROVIDE "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE ALL INFECTION /

DUST CONTROL PARTITION TO ENSURE THAT FLOOR CLEANLINESS IS MAINTAINED

THROUGHOUT THE DURATION OF CONSTRUCTION.

4 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL CONSTRUCTION

DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE REMOVED IN ENCLOSED / SEALED

CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS

AS COORDINATED WITH THE COR.

5 GENERAL CONTRACTOR TO PROVIDE DEMOLITION CHUTE THRU WINDOW [PROTECT OPENING

FROM DAMAGE] IN THE LOCATION INDICATED. GENERAL CONTRACTOR TO PROVIDE DUMPSTER

ENCLOSED WITHIN SECURED FENCE AT GROUND LEVEL. GENERAL CONTRACTOR TO

COORDINATE FINAL LOCATION WITH COR.

NOT TO SCALE

FIRST FLOOR

BUILDING 16 KEY PLAN

N

DN

UP

UP

UP

UP

RENOVATION

AREA

NOT TO SCALE

SECOND FLOOR

BUILDING 16 KEY PLAN

N

CORRIDOR TO

BUILDING 15

CORRIDOR TO

BUILDING 17

DN

RENOVATION

AREA

NOT TO SCALE

THIRD FLOOR

BUILDING 16 KEY PLAN

N

DN

RENOVATION

AREA

NOT TO SCALE

BASEMENT

BUILDING 16 KEY PLAN

N

UP

RENOVATION

AREA

NORTHNORTH

NORTHNORTH

THE FOLLOWING PHASING PLAN IS BASED ON THE NEED TO ALLOW STAFF TO CIRCULATE BETWEEN BUILDINGS 15 AND 17, AWAY FROM CONSTRUCTION ACTIVITY. THIS PHASING PLAN IS INTENDED AS A CONCEPT RATHER THAN A DIRECTIVE; HOWEVER, THE CONTRACTOR IT IS ULTIMATELY RESPONSIBLE, AS HIS / HER MEANS AND METHODS, TO COORDINATE, WITH THE COR, FINALIZE, AND IMPLEMENT A PHASING PLAN THAT WILL PROVIDE SAFE CIRCULATION, AWAY FROM CONSTRUCTION ACTIVITY, THAT IS ACCEPTABLE

TO THE VA.

PHASE I: BASEMENT AND FIRST FLOOR (INCLUDING EXTERIOR AREAWAYS) AS INDICATED ON THE

CONSTRUCTION DRAWINGS:

• CONSTRUCTION BARRIERS / BARRICADES, TEMPORARY SIGNAGE, INFECTIOUS CONTROL.

• ACM ABATEMENT.

• DEMOLITION.

• RENOVATION.

PHASE II: SECOND AND THIRD FLOORS AND ATTIC AS INDICATED ON THE CONSTRUCTION DRAWINGS:

• CONSTRUCTION BARRIERS / BARRICADES, TEMPORARY SIGNAGE, INFECTIOUS CONTROL.

• ACM ABATEMENT.

• DEMOLITION.

• RENOVATION.

PHASING PLAN NOTES

1. CONTRACTOR TO OMIT DEMOLITION OF EXISTING NORTH AND SOUTH AREAWAYS, INCLUDING, BUT

NOT LIMITED TO ALL EXCAVATION, BREAKING UP AND / OR REMOVAL EXISTING AREAWAY MUD SLABS, NEW DAMP-PROOFING AND COMPACTED BACKFILL AND SEEDING, DEMOLITION OF EXISTING

WINDOWS, REMOVAL OF EXISTING, NON-FUNCTIONING HVAC CONDENSING UNITS, INSTALLATION OF GROUTED CMU WALLS AND NEW WINDOW SILLS ASSOCIATED WITH NEW WINDOWS, INSTALLATION OF

NEW WINDOWS AND SECURITY SCREENS, NEW PIPE GUARDRAIL.

PROJECT DEDUCT ALTERNATE(S)

EQUIPMENT

STORAGE

ROOM

002A

ELEVATOR

CONTROLS

MECH

CORRIDOR

C002

STORAGE

BATH

003ABATH

004A

ELEVATOR

DRUG CACHE

DRUG CACHE

ELEVATOR

CONTROLS

014A

ELEVATOR

LOBBY

SUMP ROOM

BOILER ROOM

ELECTRICAL

STAIRS

S001

EQUIPMENT

STORAGE

ROOM

002A

ELEVATOR

CONTROLS

MECH

CORRIDOR

C002

STORAGE

BATH

003ABATH

004A

ELEVATOR

DRUG CACHE

DRUG CACHE

ELEVATOR

CONTROLS

014A

ELEVATOR

LOBBY

SUMP ROOM

BOILER ROOM

ELECTRICAL

STAIRS

S001

ASBESTOS PLAN LEGEND

NOTES:

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM) PRESENT

IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR FUTURE

RENOVATION OR DEMOLITION PROJECTS. ABATEMENT SPECIFICATIONS, ETC. XXX COMPANY

SURVEY WAS PERFORMED WITH LIMITATION INHERENT TO NON-DESTRUCTIVE VISUAL

INSPECTIONS IN OCCUPIED SPACES, ANY SUSPECT MATERIAL ENCOUNTERED DURING

RENOVATION / DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD BE ASSUMED

TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.

2. FINDING DESCRIBED HEREIN DO NOT MEET THE REGULATORY PROVISIONS AND RENOVATION / DEMOLITION INSPECTION REQUIREMENTS OF THE CLEAN AIR ACT NATIONAL EMISSION STANDARD FOR ASBESTOS (ASBESTOS NESHAP). PRIOR TO ANY RENOVATION / DEMOLITION ACTIVITIES, THE

FACILITY OR THE AFFECTED PART OF THE FACILITY MUST BE THOROUGHLY INSPECTED TO

DETERMINE WHETHER ASBESTOS IS PRESENT.

ACM NOTES:

1. ACM MASTIC ASSUMED UNDER NON-ACM FLOORING THROUGHOUT THE BUILDING.

2. ACM PIPE AND FITTING INSULATION ASSUMED IN WALL CHASES AND ABOVE CEILINGS

THROUGHOUT THE BUILDING.

LEGEND

HATCH AREAS INDICATE POSITIVE DETECTION OF ASBESTOS CONTAINING BUILDING COMPONENTS

12" x 12" FLOOR TILE AND FLOOR TILE MASTIC

FLOOR TILE MASTIC

CARPET ADHESIVE

LEAD PLAN LEGEND

NOTES:

1. COMPONENTS SIMILAR TO THOSE LISTED IN THE TABLE ABOVE FOUND IN THE HATCHED AREAS

SHOULD BE ASSUMED TO CONTAIN LCP FOR WORKER PROTECTION, MAINTENANCE, RENOVATION,

DISPOSAL, ETC. PURPOSES UNLESS OTHERWISE DETERMINED BY AN APPROVED METHOD.

2. LEAD-CONTAINING PAINT (LCP) SCREENING MEASUREMENTS WERE COLLECTED USING AN XRF

ANALYZER. FOR ADDITIONAL INFORMATION AND FULL SCREENING RESULTS REFER TO THE

MABBETT ASBESTOS & LEAD SURVEY REPORT.

3. USERS OF THIS INFORMATION SHOULD NOT RELY ON COLOR ALONE TO DECIDE WHETHER SIMILAR

BUILDING COMPONENTS CONTAIN LCP.

4. EQUIPMENT, FURNITURE, NON STRUCTURAL ITEMS, AND NON-PAINTED BUILDING COMPONENTS SUCH AS GLAZED TILE, GLAZED BLOCK, STAINED OR LEAD GLASS, UNPAINTED PIPING, ETC. WERE NOT INCLUDED IN THE SURVEY AND ARE NOT INCLUDED IN THE TABLE BUT MAY CONTAIN LEAD.

PLEASE SEE THE SAFETY OFFICE PRIOR TO PERFORMING MAINTENANCE / RENOVATION ACTIVITIES ON

ANY OF THE FOLLOWING COMPONENTS IN HATCHED AREAS.

DOOR FRAME

THESE BUILDING COMPONENTS DEPICTED IN RED ARE ASSUMED TO CONTAIN LEAD CONTAINING PAINT

(LCP) AT GREATER THAT 1.0 MG/CM2 UNLESS OTHERWISE DETERMINED.

COMPONENT SUBSTRATE

SYMBOL

METAL

WINDOW FRAME, SILL AND SASH

METAL

STAIRS, NEWELL POST, RISER,

STRINGER, LADDER

IF PRESENT IN THE HATCHED AREA THESE OTHER BUILDING

COMPONENTS ARE ASSUMED TO BE LEAD CONTAINING PAINT (LCP) AT

GREATER THAN 1.0 MG/CM2 UNLESS OTHERWISE DETERMINED.

WALL (HALLWAY C001) TILE

BASEBOARD (HALLWAY C002)

WOOD

SYMBOL

METAL

BUILDING 16 - ASBESTOS CONTAINING MATERIAL

ASBESTOS MATERIAL:

BLACK MASTIC AND ASSOCIATED FLOOR TILES

FIRE DOOR INFILL (OLD ELEVATOR)

LINOLEUM (OLD ELEVATOR)

VIBRATION CLOTH (ATTIC HVAC DUCTS)

EXTERIOR WINDOW CAULK (ALUMINUM FRAME WINDOWS)

LEAD PAINT MATERIAL:

GREEN CEILING PLASTER - APPROXIMATELY 3,600 SQUARE FEET (F.V.)

INTERIOR AND EXTERIOR WHITE WOOD WINDOWS - APPROXIMATELY 420 SQUARE FEET (F.V.)

WHITE CERAMIC TILE WALLS - APPROXIMATELY 300 SQUARE FEET (F.V.)

GRAY DOORS AND FRAMES THROUGHOUT BUILDING - APPROXIMATELY 100 UNITS (F.V.)

BLUE/GREEN COLUMNS AND WALLS - APPROXIMATELY 550 SQAURE FEET (F.V.)

FIRE SUSPENSION PIPING - APPROXIMATELY 550 LINEAR FEET (F.V.)

OFF/WHITE PLASTER WALLS THROUGHOUT BUILDING - APPROXIMATELY 24,000 SQUARE FEET (F.V.)

WHITE PANELS ABOVE EXTERIOR WINDOWS - APPROXIMATELY 640 SQUARE FEET (F.V.)

EXTERIOR BLACK STAIR RAILINGS - APPROXIMATELY 100 LINEAR FEET (F.V.)

EXTERIOR SMALL RED WINDOW GATE - APPROXIMATELY 20 LINEAR FEET (F.V.)

EXTERIOR GUTTER RED DOWNSPOUT - APPROXIMATELY 100 LINEAR FEET (F.V.)

EXTERIOR WHITE TRIM ON ROOF AND FRONT ENTRANCE - APPROXIMATELY 600 SQUARE FEET (F.V.)

HAZARDOUS MATERIAL:

BALLASTS - APPROXIMATELY 640 UNITS (F.V.)

COMPRESSORS REQUIRING POSSIBLE REFRIGERANT RECOVERY - APPROXIMATELY 50 UNITS (F.V.)

ELECTRIC WASTE - APPROXIMATELY 315 UNITS (F.V.)

EXIT SIGNS - APPROXIMATELY 40 UNITS (F.V.)

FLORESCENT BULBS - APPROXIMATELY 1,280 UNITS (F.V.)

HYDRAULIC DOOR OPENERS - APPROXIMATELY 74 UNITS (F.V.)

ELEVATOR HYDRAULIC FLUID - APPROXIMATELY 60 CUBIC FEET (F.V.)

SMOKE DETECTORS - APPROXIMATELY 16 UNITS (F.V.)

SWITCHES WHICH MAY CONTAIN MERCURY - APPROXIMATELY 2 UNITS (F.V.)

PCB MATERIAL:

POSSIBLY OUT OF SERVICE ELEVATOR - (F.V.)

NOTES:

1. FOR ALL INCLUSIVE REPORT, PLEASE REFERENCE ENVIROMENTAL LIABILITES ASSESSMENT - ASBESTOS ASSESSMENT REPORT

PREPARED BY ALLIANCE ENVIROMENTAL GROUP, INC. DATED AUGUST 10, 2020 WHICH WILL BE MADE AVAILABLE THROUGH THE

COR. CONTRACTOR TO COORDINATE WITH COR FOR COPY OF FULL REPORT.

2. ALL ADDITIONAL ITEMS ASSUMED ASBESTOS CONTAINING MATERIALS SHALL BE TESTED / SAMPLED BY CONTRACTOR PRIOR TO

CONSTRUCTION.

3. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3

NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF04 114

Fire Protection Consultant:

Fire Protection & Code Consultants, LLC 1520 Main Street, Indianapolis, Indiana 46224

Mechanical Consultant:

SCO Engineering, LLC 6534 Constitution Drive Fort Wayne, Indiana 46804

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 0-

3_

C

EN

TR

AL

_R

_a m or ta ki s.

rv t

6/

/2

4:

:2

PM

GI004

HAZARDOUS MATERIAL - BASEMENT

FLOOR PLAN

RENOVATE BUILDING 16

Marion VAMC

610-20-103

Building 16

05/18/2022 TWT AKM

SCALE: 1" = 10'-0"

GI004

BASEMENT ASBESTOS PLAN

SCALE: 1" = 10'-0"

GI004

BASEMENT FLOOR LEAD PLAN

NOT TO SCALE

BASEMENT

BUILDING 16 KEY PLAN

N

UP

RENOVATION

AREA

NORTH

NORTH

NOTE:

THIS SHEET TO BE PRINTED IN COLOR.

NOTE:

SEE DEMOLITION SHEETS AND SPECIFICATIONS FOR ABATEMENT

INFORMATION.

ASBESTOS PLAN LEGEND

NOTES:

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM) PRESENT

IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR FUTURE

RENOVATION OR DEMOLITION PROJECTS. ABATEMENT SPECIFICATIONS, ETC. XXX COMPANY

SURVEY WAS PERFORMED WITH LIMITATION INHERENT TO NON-DESTRUCTIVE VISUAL

INSPECTIONS IN OCCUPIED SPACES, ANY SUSPECT MATERIAL ENCOUNTERED DURING

RENOVATION / DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD BE ASSUMED

TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.

2. FINDING DESCRIBED HEREIN DO NOT MEET THE REGULATORY PROVISIONS AND RENOVATION / DEMOLITION INSPECTION REQUIREMENTS OF THE CLEAN AIR ACT NATIONAL EMISSION STANDARD FOR ASBESTOS (ASBESTOS NESHAP). PRIOR TO ANY RENOVATION / DEMOLITION ACTIVITIES, THE

FACILITY OR THE AFFECTED PART OF THE FACILITY MUST BE THOROUGHLY INSPECTED TO

DETERMINE WHETHER ASBESTOS IS PRESENT.

ACM NOTES:

1. ACM MASTIC ASSUMED UNDER NON-ACM FLOORING THROUGHOUT THE BUILDING.

2. ACM PIPE AND FITTING INSULATION ASSUMED IN WALL CHASES AND ABOVE CEILINGS

THROUGHOUT THE BUILDING.

LEGEND

HATCH AREAS INDICATE POSITIVE DETECTION OF ASBESTOS CONTAINING BUILDING COMPONENTS

12" x 12" FLOOR TILE AND FLOOR TILE MASTIC

FLOOR TILE MASTIC

CARPET ADHESIVE

LEAD PLAN LEGEND

NOTES:

1. COMPONENTS SIMILAR TO THOSE LISTED IN THE TABLE ABOVE FOUND IN THE HATCHED AREAS

SHOULD BE ASSUMED TO CONTAIN LCP FOR WORKER PROTECTION, MAINTENANCE, RENOVATION,

DISPOSAL, ETC. PURPOSES UNLESS OTHERWISE DETERMINED BY AN APPROVED METHOD.

2. LEAD-CONTAINING PAINT (LCP) SCREENING MEASUREMENTS WERE COLLECTED USING AN XRF

ANALYZER. FOR ADDITIONAL INFORMATION AND FULL SCREENING RESULTS REFER TO THE

MABBETT ASBESTOS & LEAD SURVEY REPORT.

3. USERS OF THIS INFORMATION SHOULD NOT RELY ON COLOR ALONE TO DECIDE WHETHER SIMILAR

BUILDING COMPONENTS CONTAIN LCP.

4. EQUIPMENT, FURNITURE, NON STRUCTURAL ITEMS, AND NON-PAINTED BUILDING COMPONENTS SUCH AS GLAZED TILE, GLAZED BLOCK, STAINED OR LEAD GLASS, UNPAINTED PIPING, ETC. WERE NOT INCLUDED IN THE SURVEY AND ARE NOT INCLUDED IN THE TABLE BUT MAY CONTAIN LEAD.

PLEASE SEE THE SAFETY OFFICE PRIOR TO PERFORMING MAINTENANCE / RENOVATION ACTIVITIES ON

ANY OF THE FOLLOWING COMPONENTS IN HATCHED AREAS.

DOOR FRAME

THESE BUILDING COMPONENTS DEPICTED IN RED ARE ASSUMED TO CONTAIN LEAD CONTAINING PAINT

(LCP) AT GREATER THAT 1.0 MG/CM2 UNLESS OTHERWISE DETERMINED.

COMPONENT SUBSTRATE

SYMBOL

METAL

WINDOW FRAME, SILL AND SASH

METAL

STAIRS, NEWELL POST, RISER,

STRINGER, LADDER

IF PRESENT IN THE HATCHED AREA THESE OTHER BUILDING

COMPONENTS ARE ASSUMED TO BE LEAD CONTAINING PAINT (LCP) AT

GREATER THAN 1.0 MG/CM2 UNLESS OTHERWISE DETERMINED.

WALL (HALLWAY C001) TILE

BASEBOARD (HALLWAY C002)

WOOD

SYMBOL

METAL

ELEVATOR

LOBBY

STORAGE

100A

H.A.C.

ELEC

OFFICE

DATA

OFFICE

COPY

104a OFFICE

OFFICE

WOMENS

TOILET

MECH

CHASE

118a

DATA

100B

OFFICE

OFFICE

OFFICE

TOILET

OFFICE

ROOM

WORKROOM

OFFICE

ANTE

BATH

114a

BATH

115a

TRAINING

ROOM

MENS TOILET

STORAGE

STORAGE

117a

ROOM

ROOM

CORRIDOR

C101

CORRIDOR

C100

ELEVATOR

TRASH

DRUG CASHE

TOILET

ELEVATOR

LOBBY

EXISTING

CORRIDOR

C104

EXISTING

CORRIDOR

C103

STAIRS

S101

STAIRS

S100

ELEVATOR

LOBBY

STORAGE

100A

H.A.C.

ELEC

OFFICE

DATA

OFFICE

COPY

104a OFFICE

OFFICE

WOMENS

TOILET

MECH

CHASE

118a

DATA

100B

OFFICE

OFFICE

OFFICE

TOILET

OFFICE

ROOM

WORKROOM

OFFICE

ANTE

BATH

114a

BATH

115a

TRAINING

ROOM

MENS TOILET

STORAGE

STORAGE

117a

ROOM

ROOM

CORRIDOR

C101

CORRIDOR

C100

ELEVATOR

TRASH

DRUG CASHE

TOILET

ELEVATOR

LOBBY

EXISTING

CORRIDOR

C104

EXISTING

CORRIDOR

C103

STAIRS

S101

STAIRS

S100

BUILDING 16 - ASBESTOS CONTAINING MATERIAL

ASBESTOS MATERIAL:

BLACK MASTIC AND ASSOCIATED FLOOR TILES

FIRE DOOR INFILL (OLD ELEVATOR)

LINOLEUM (OLD ELEVATOR)

VIBRATION CLOTH (ATTIC HVAC DUCTS)

EXTERIOR WINDOW CAULK (ALUMINUM FRAME WINDOWS)

LEAD PAINT MATERIAL:

GREEN CEILING PLASTER - APPROXIMATELY 3,600 SQUARE FEET (F.V.)

INTERIOR AND EXTERIOR WHITE WOOD WINDOWS - APPROXIMATELY 420 SQUARE FEET (F.V.)

WHITE CERAMIC TILE WALLS - APPROXIMATELY 300 SQUARE FEET (F.V.)

GRAY DOORS AND FRAMES THROUGHOUT BUILDING - APPROXIMATELY 100 UNITS (F.V.)

BLUE/GREEN COLUMNS AND WALLS - APPROXIMATELY 550 SQAURE FEET (F.V.)

FIRE SUSPENSION PIPING - APPROXIMATELY 550 LINEAR FEET (F.V.)

OFF/WHITE PLASTER WALLS THROUGHOUT BUILDING - APPROXIMATELY 24,000 SQUARE FEET (F.V.)

WHITE PANELS ABOVE EXTERIOR WINDOWS - APPROXIMATELY 640 SQUARE FEET (F.V.)

EXTERIOR BLACK STAIR RAILINGS - APPROXIMATELY 100 LINEAR FEET (F.V.)

EXTERIOR SMALL RED WINDOW GATE - APPROXIMATELY 20 LINEAR FEET (F.V.)

EXTERIOR GUTTER RED DOWNSPOUT - APPROXIMATELY 100 LINEAR FEET (F.V.)

EXTERIOR WHITE TRIM ON ROOF AND FRONT ENTRANCE - APPROXIMATELY 600 SQUARE FEET (F.V.)

HAZARDOUS MATERIAL:

BALLASTS - APPROXIMATELY 640 UNITS (F.V.)

COMPRESSORS REQUIRING POSSIBLE REFRIGERANT RECOVERY - APPROXIMATELY 50 UNITS (F.V.)

ELECTRIC WASTE - APPROXIMATELY 315 UNITS (F.V.)

EXIT SIGNS - APPROXIMATELY 40 UNITS (F.V.)

FLORESCENT BULBS - APPROXIMATELY 1,280 UNITS (F.V.)

HYDRAULIC DOOR OPENERS - APPROXIMATELY 74 UNITS (F.V.)

ELEVATOR HYDRAULIC FLUID - APPROXIMATELY 60 CUBIC FEET (F.V.)

SMOKE DETECTORS - APPROXIMATELY 16 UNITS (F.V.)

SWITCHES WHICH MAY CONTAIN MERCURY - APPROXIMATELY 2 UNITS (F.V.)

PCB MATERIAL:

POSSIBLY OUT OF SERVICE ELEVATOR - (F.V.)

NOTES:

1. FOR ALL INCLUSIVE REPORT, PLEASE REFERENCE ENVIROMENTAL LIABILITES ASSESSMENT - ASBESTOS ASSESSMENT REPORT

PREPARED BY ALLIANCE ENVIROMENTAL GROUP, INC. DATED AUGUST 10, 2020 WHICH WILL BE MADE AVAILABLE THROUGH THE

COR. CONTRACTOR TO COORDINATE WITH COR FOR COPY OF FULL REPORT.

2. ALL ADDITIONAL ITEMS ASSUMED ASBESTOS CONTAINING MATERIALS SHALL BE TESTED / SAMPLED BY CONTRACTOR PRIOR TO

CONSTRUCTION.

3. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3

NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF05 114

Fire Protection Consultant:

Fire Protection & Code Consultants, LLC 1520 Main Street, Indianapolis, Indiana 46224

Mechanical Consultant:

SCO Engineering, LLC 6534 Constitution Drive Fort Wayne, Indiana 46804

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 0-

3_

C

EN

TR

AL

_R

_a m or ta ki s.

rv t

6/

/2

4:

:4

PM

GI005

HAZARDOUS MATERIAL - FIRST FLOOR

PLAN

RENOVATE BUILDING 16

Marion VAMC

610-20-103

Building 16

05/18/2022 TWT AKM

NOT TO SCALE

FIRST FLOOR

BUILDING 16 KEY PLAN

N

DN

UP

UP

UP

UP

RENOVATION

AREA

SCALE: 1" = 10'-0"

GI005

FIRST FLOOR ASBESTOS PLAN

SCALE: 1" = 10'-0"

GI005

FIRST FLOOR LEAD PLAN

NORTH

NORTH

NOTE:

THIS SHEET TO BE PRINTED IN COLOR.

NOTE:

SEE DEMOLITION SHEETS AND SPECIFICATIONS FOR ABATEMENT

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM) PRESENT

IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR FUTURE

RENOVATION OR DEMOLITION PROJECTS. ABATEMENT SPECIFICATIONS, ETC. XXX COMPANY

SURVEY WAS PERFORMED WITH LIMITATION INHERENT TO NON-DESTRUCTIVE VISUAL

INSPECTIONS IN OCCUPIED SPACES, ANY SUSPECT MATERIAL ENCOUNTERED DURING

RENOVATION / DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD BE ASSUMED

TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.

2. FINDING DESCRIBED HEREIN DO NOT MEET THE REGULATORY PROVISIONS AND RENOVATION / DEMOLITION INSPECTION REQUIREMENTS OF THE CLEAN AIR ACT NATIONAL EMISSION STANDARD FOR ASBESTOS (ASBESTOS NESHAP). PRIOR TO ANY RENOVATION / DEMOLITION ACTIVITIES, THE

FACILITY OR THE AFFECTED PART OF THE FACILITY MUST BE THOROUGHLY INSPECTED TO

DETERMINE WHETHER ASBESTOS IS PRESENT.

ACM NOTES:

1. ACM MASTIC ASSUMED UNDER NON-ACM FLOORING THROUGHOUT THE BUILDING.

2. ACM PIPE AND FITTING INSULATION ASSUMED IN WALL CHASES AND ABOVE CEILINGS

THROUGHOUT THE BUILDING.

LEGEND

HATCH AREAS INDICATE POSITIVE DETECTION OF ASBESTOS CONTAINING BUILDING COMPONENTS

12" x 12" FLOOR TILE AND FLOOR TILE MASTIC

FLOOR TILE MASTIC

CARPET ADHESIVE

LEAD PLAN LEGEND

NOTES:

1. COMPONENTS SIMILAR TO THOSE LISTED IN THE TABLE ABOVE FOUND IN THE HATCHED AREAS

SHOULD BE ASSUMED TO CONTAIN LCP FOR WORKER PROTECTION, MAINTENANCE, RENOVATION,

DISPOSAL, ETC. PURPOSES UNLESS OTHERWISE DETERMINED BY AN APPROVED METHOD.

2. LEAD-CONTAINING PAINT (LCP) SCREENING MEASUREMENTS WERE COLLECTED USING AN XRF

ANALYZER. FOR ADDITIONAL INFORMATION AND FULL SCREENING RESULTS REFER TO THE

MABBETT ASBESTOS & LEAD SURVEY REPORT.

3. USERS OF THIS INFORMATION SHOULD NOT RELY ON COLOR ALONE TO DECIDE WHETHER SIMILAR

BUILDING COMPONENTS CONTAIN LCP.

4. EQUIPMENT, FURNITURE, NON STRUCTURAL ITEMS, AND NON-PAINTED BUILDING COMPONENTS SUCH AS GLAZED TILE, GLAZED BLOCK, STAINED OR LEAD GLASS, UNPAINTED PIPING, ETC. WERE NOT INCLUDED IN THE SURVEY AND ARE NOT INCLUDED IN THE TABLE BUT MAY CONTAIN LEAD.

PLEASE SEE THE SAFETY OFFICE PRIOR TO PERFORMING MAINTENANCE / RENOVATION ACTIVITIES ON

ANY OF THE FOLLOWING COMPONENTS IN HATCHED AREAS.

DOOR FRAME

THESE BUILDING COMPONENTS DEPICTED IN RED ARE ASSUMED TO CONTAIN LEAD CONTAINING PAINT

(LCP) AT GREATER THAT 1.0 MG/CM2 UNLESS OTHERWISE DETERMINED.

COMPONENT SUBSTRATE

SYMBOL

METAL

WINDOW FRAME, SILL AND SASH

METAL

STAIRS, NEWELL POST, RISER,

STRINGER, LADDER

IF PRESENT IN THE HATCHED AREA THESE OTHER BUILDING

COMPONENTS ARE ASSUMED TO BE LEAD CONTAINING PAINT (LCP) AT

GREATER THAN 1.0 MG/CM2 UNLESS OTHERWISE DETERMINED.

WALL (HALLWAY C001) TILE

BASEBOARD (HALLWAY C002)

WOOD

SYMBOL

METAL

ELEVATOR

LOBBY

STORAGE

200A

ELEC

STORAGE

ROOM

ROOM

CONFERENCE

ROOM

WOMENS

TOILET

MECH

CHASE

219A

CLOSET

200B

OFFICE

OFFICE

WORKROOM

OFFICE

WORKROOM

OFFICE

OFFICE

MENS

TOILET

STORAGE

STORAGE

217A

CLASSROOM

ROOM

ROOM

TRASH

ROOM

LOUNGE

210CORRIDOR

C201

CORRIDOR

C200

STAIRS

S201

STAIR

S200

ELEVATOR

LOBBY

STORAGE

200A

ELEC

STORAGE

ROOM

ROOM

CONFERENCE

ROOM

WOMENS

TOILET

MECH

CHASE

219A

CLOSET

200B

OFFICE

OFFICE

WORKROOM

OFFICE

WORKROOM

OFFICE

OFFICE

MENS

TOILET

STORAGE

STORAGE

217A

CLASSROOM

ROOM

ROOM

TRASH

ROOM

LOUNGE

210CORRIDOR

C201

CORRIDOR

C200

STAIR

S201

STAIR

S200

BUILDING 16 - ASBESTOS CONTAINING MATERIAL

ASBESTOS MATERIAL:

BLACK MASTIC AND ASSOCIATED FLOOR TILES

FIRE DOOR INFILL (OLD ELEVATOR)

LINOLEUM (OLD ELEVATOR)

VIBRATION CLOTH (ATTIC HVAC DUCTS)

EXTERIOR WINDOW CAULK (ALUMINUM FRAME WINDOWS)

LEAD PAINT MATERIAL:

GREEN CEILING PLASTER - APPROXIMATELY 3,600 SQUARE FEET (F.V.)

INTERIOR AND EXTERIOR WHITE WOOD WINDOWS - APPROXIMATELY 420 SQUARE FEET (F.V.)

WHITE CERAMIC TILE WALLS - APPROXIMATELY 300 SQUARE FEET (F.V.)

GRAY DOORS AND FRAMES THROUGHOUT BUILDING - APPROXIMATELY 100 UNITS (F.V.)

BLUE/GREEN COLUMNS AND WALLS - APPROXIMATELY 550 SQAURE FEET (F.V.)

FIRE SUSPENSION PIPING - APPROXIMATELY 550 LINEAR FEET (F.V.)

OFF/WHITE PLASTER WALLS THROUGHOUT BUILDING - APPROXIMATELY 24,000 SQUARE FEET (F.V.)

WHITE PANELS ABOVE EXTERIOR WINDOWS - APPROXIMATELY 640 SQUARE FEET (F.V.)

EXTERIOR BLACK STAIR RAILINGS - APPROXIMATELY 100 LINEAR FEET (F.V.)

EXTERIOR SMALL RED WINDOW GATE - APPROXIMATELY 20 LINEAR FEET (F.V.)

EXTERIOR GUTTER RED DOWNSPOUT - APPROXIMATELY 100 LINEAR FEET (F.V.)

EXTERIOR WHITE TRIM ON ROOF AND FRONT ENTRANCE - APPROXIMATELY 600 SQUARE FEET (F.V.)

HAZARDOUS MATERIAL:

BALLASTS - APPROXIMATELY 640 UNITS (F.V.)

COMPRESSORS REQUIRING POSSIBLE REFRIGERANT RECOVERY - APPROXIMATELY 50 UNITS (F.V.)

ELECTRIC WASTE - APPROXIMATELY 315 UNITS (F.V.)

EXIT SIGNS - APPROXIMATELY 40 UNITS (F.V.)

FLORESCENT BULBS - APPROXIMATELY 1,280 UNITS (F.V.)

HYDRAULIC DOOR OPENERS - APPROXIMATELY 74 UNITS (F.V.)

ELEVATOR HYDRAULIC FLUID - APPROXIMATELY 60 CUBIC FEET (F.V.)

SMOKE DETECTORS - APPROXIMATELY 16 UNITS (F.V.)

SWITCHES WHICH MAY CONTAIN MERCURY - APPROXIMATELY 2 UNITS (F.V.)

PCB MATERIAL:

POSSIBLY OUT OF SERVICE ELEVATOR - (F.V.)

NOTES:

1. FOR ALL INCLUSIVE REPORT, PLEASE REFERENCE ENVIROMENTAL LIABILITES ASSESSMENT - ASBESTOS ASSESSMENT REPORT

PREPARED BY ALLIANCE ENVIROMENTAL GROUP, INC. DATED AUGUST 10, 2020 WHICH WILL BE MADE AVAILABLE THROUGH THE

COR. CONTRACTOR TO COORDINATE WITH COR FOR COPY OF FULL REPORT.

2. ALL ADDITIONAL ITEMS ASSUMED ASBESTOS CONTAINING MATERIALS SHALL BE TESTED / SAMPLED BY CONTRACTOR PRIOR TO

CONSTRUCTION.

3. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3

1, 2, 3

NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF06 114

Fire Protection Consultant:

Fire Protection & Code Consultants, LLC 1520 Main Street, Indianapolis, Indiana 46224

Mechanical Consultant:

SCO Engineering, LLC 6534 Constitution Drive Fort Wayne, Indiana 46804

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 0-

3_

C

EN

TR

AL

_R

_a m or ta ki s.

rv t

6/

/2

4:

:0

PM

GI006

HAZARDOUS MATERIAL - SECOND

FLOOR PLAN

RENOVATE BUILDING 16

Marion VAMC

610-20-103

Building 16

05/18/2022 TWT AKM

NOT TO SCALE

SECOND FLOOR

BUILDING 16 KEY PLAN

N

CORRIDOR TO

BUILDING 15

CORRIDOR TO

BUILDING 17

DN

RENOVATION

AREA

SCALE: 1" = 10'-0"

GI006

SECOND FLOOR ASBESTOS PLAN

SCALE: 1" = 10'-0"

GI006

SECOND FLOOR LEAD PLAN

NORTH

NORTH

NOTE:

THIS SHEET TO BE PRINTED IN COLOR.

NOTE:

SEE DEMOLITION SHEETS AND SPECIFICATIONS FOR ABATEMENT

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM) PRESENT

IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR FUTURE

RENOVATION OR DEMOLITION PROJECTS. ABATEMENT SPECIFICATIONS, ETC. XXX COMPANY

SURVEY WAS PERFORMED WITH LIMITATION INHERENT TO NON-DESTRUCTIVE VISUAL

INSPECTIONS IN OCCUPIED SPACES, ANY SUSPECT MATERIAL ENCOUNTERED DURING

RENOVATION / DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD BE ASSUMED

TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.

2. FINDING DESCRIBED HEREIN DO NOT MEET THE REGULATORY PROVISIONS AND RENOVATION / DEMOLITION INSPECTION REQUIREMENTS OF THE CLEAN AIR ACT NATIONAL EMISSION STANDARD FOR ASBESTOS (ASBESTOS NESHAP). PRIOR TO ANY RENOVATION / DEMOLITION ACTIVITIES, THE

FACILITY OR THE AFFECTED PART OF THE FACILITY MUST BE THOROUGHLY INSPECTED TO

DETERMINE WHETHER ASBESTOS IS PRESENT.

ACM NOTES:

1. ACM MASTIC ASSUMED UNDER NON-ACM FLOORING THROUGHOUT THE BUILDING.

2. ACM PIPE AND FITTING INSULATION ASSUMED IN WALL CHASES AND ABOVE CEILINGS

THROUGHOUT THE BUILDING.

LEGEND

HATCH AREAS INDICATE POSITIVE…