Set 12 Drawings Electrical Power.pdf

PDF 6 MB Posted

Attached to
Project 614-19-111, Replace Fire Alarm System Federal contract opportunity
Solicitation number
36C24921R0070
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document outlines a federal contract opportunity to replace the fire alarm system at the Memphis VA Medical Center. The project involves a complete replacement of the existing Notifier 3300 system with a new, code-compliant system including all necessary control panels, initiating devices, notification devices, control modules, and other components. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. Responses for the pre-solicitation are due under solicitation number 36C24921R0070 for Project 614-19-111. The work will be performed at the Memphis VA Medical Center campus and is categorized as a construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Project 614-19-111, Replace Fire Alarm System, newest first.
File Type Posted
36C24921R0070 0006.pdf PDF
P07-General Decision Number TN20210111 02.12.2021 (Shelby Cty).pdf PDF
P07-General Decision Number TN20210111 01.01.2021.pdf PDF
S02-Price Schedule (Proj 614-19-111).xlsx XLSX spreadsheet
36C24921R0070 0005.pdf PDF
RFI 1 Memphis TN -rev.pdf PDF
36C24921R0070 0004.pdf PDF
RFI 1 Memphis TN.pdf PDF
S06-36C24921R0070 0003.pdf PDF
Govt Response_ Project 614-19-111 Memphis VA Fire Alarm Replacement.pdf PDF
Govt Response _ RFI Fire Alarm Soc. 36C24921R0070.pdf PDF
S06-36C24921R0070 0002.pdf PDF
Govt Response_21-B-042 Memphis Fire Alarm Repairs RFIs.pdf PDF
Govt Response_ISS Estimating.pdf PDF
S06-36C24921R0070 0001.pdf PDF
Set 6 Drawings Fire Alarm Demo Site and Building 1.pdf PDF
Set 1 Drawings General.pdf PDF
C28-Project Specifications 614-19-111 (Repl Fire Alarm).pdf PDF
Set 2 Drawings Electrical Photos_Part1.pdf PDF
Set 10 Drawings Fire Alarm New Building 1A.pdf PDF
Set 7 Drawings Fire Alarm Demo Building 1A.pdf PDF
Set 3 Drawings Electrical Photos_Part2.pdf PDF
Set 4 Drawings Fire Alarm General and Risers_Part1.pdf PDF
S02-36C24921R0070 (Repl Fire Alarm)_04.05.2021.pdf PDF
Set 11 Drawings Fire Alarm New B5 B6 B7 B10 and PG.pdf PDF
Set 9 Drawings Fire Alarm New Site and Building 1.pdf PDF
36C24921R0070_1 (presolicitation notice).pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

L

M

J

K

P5

P4

P2

P1

P

P3

ELEC SHOP STORAGE

BWG 25

STORAGE

CORRIDOR

BW-C6

CORRIDOR

BW-C22

FITNESS CENTER

AWG 3

AWG 10A

CORRIDOR

BW C 31A

WOMENS LOCKER RM

AWG 13

TOILETS AND

SHOWERS

AWG 11A

FEMALE

LOUNGE

AWG 11

STAIR 5

LOCK SMITH

STORAGE

AWG 9

OFFICE

CWG 15A

OFFICE

CWG 20A

OFFICE

CWG 20

HAC

CWG 14

OFFICE

BWG 4A

BWG 4D

ELEC

CLOSET

BWG 4E

ELEV LOBBY

ELEVATOR

RADIOLOGY / X-RAY FILE RM

BWG 2

X-RAY

STORAGE

BWG 2A

GRAPHIC CONTROL

BWG 1A

MECH RM

BWG 1

MECH RM

BWG 1

SCREENING

CWG 7A

OFFICE

CWG 7B

CYTOLOGY

CWG 7

CORRIDOR

BW C 2

CORRIDOR

BW C 28

CORRIDOR

BW C 29

CORRIDOR

BW C 30

CLERICAL

SEC/WAIT

BW G 33

CHIEF

BW G 33B

ASST

BW G 33A

WORK RM

BW G 33C

CONSULT

BW G 32

PHARM

BW G 31

OFFICE

BW G 30

OFFICE

BW G 29

STUDY

BW G 26

CARE OFFICE

BW G 27

CONF

BW G 28

OFFICE

CWG 6B

SHAFT

FRAM

STOR

CWG 6A

REFRIGERANT

STORAGE

BWG 24B

REFRIGERANT

STORAGE

BWG 24A

AC SHOP STORAGE

BWG 24

PARAFFIN

STORAGE

CWG 4

AUTOPSY

CWG 2

NAC

PS6

FACP

F1

SERVER ROOM

BWG 2A

BIO MED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

"EALA"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

"EALA"

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

1.EP100C

AutoCAD SHX Text

KMB

AutoCAD SHX Text

WLM

AutoCAD SHX Text F3

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F3

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "C"

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA C

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

AutoCAD SHX Text KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EALA" IN ROOM NO. AEG1.

W D

J

K

L

M

N

P.2

P.1

P.4

P.5

P

TOOLS / FLOOR

CLEANING EQUIPS

BEG 26A

TOILET

AEG 9T

WASHER/DRYER

BWG 6A

BECEG 12

BECE-C4

CORRIDOR

BECE-C2

EUTH

BWG 12

CONTAINMENT LAB

BWG 11C

POLISE

TRAINING

CWG 20C

CORRIDOR

CE C2 CORRIDOR

CE C8

CORRIDOR

CE C3

CORRIDOR

BE C2

HSRD OFFICE

CEG 35

HSRD CONFERENCE

CEG 38

HSRD OFFICE

CEG 40

HSRD OFFICE

CEG 39

HSRD OFFICE

CEG 34

CLEAN CAGE

BEDDING/STAGING

BWG 13

CORRIDOR

BEG 8

CORRIDOR

CE C3

PROCEDURE

BEG 9

ANIMAL RM 10

BEG 10

ANIMAL RM 9

BEG 11

ANIMAL RM 8

BEG 12

ANIMAL RM 7

BEG 13

VMU STORAGE

BEG 14

HSRD BREAK

BEG 15 BEG 16 ELECTRICAL

BEG 21

IRR

BEG 22

BRU OFFICE

BEG 26C

BRU OFFICE

BEG 26B

CORRIDOR

BEG 26

HSK

BG 25

AUTO WATER

BEG 24

BRU OFFICE

BE C3

STORAGE

BEG 23

EXIST COMM

BEG 23A

ANIMAL RM 6

BEG 8

ANIMAL RM 5

BEG 7

ANIMAL RM 4

BEG 6

ANIMAL RM 3

BEG 5

ANIMAL RM 2

BEG 4

ANIMAL RM 1

BEG 3

CONTAINMENT

BWG 11A

QUARANTINE

BEG 2

CORRIDOR

BW C20

BREAK RM

CWG 16C

CWG 16A

CWG 15B

CWG 16B

STORAGE

BWG 16

BW-C20

DIRTY CAGE STAGING

BWG 14

CORRIDOR

BE C1

BULK FEED AND

GENERAL STORAGE

BWG 10

ANTE

BWG 11

ELECTRICAL

BWG 9

OFFICE

CWG 20B

CONTAINMENT LAB

BWG 11D

OFFICE

CWG 20C OFFICE

CWG 20D

AIR COND SHOP

BWG 4B

AIR CONDITIONING

BWG 4

MED ADMIN

GENERAL STORAGE

BWG 4C

VMU BREAK

BWG 6

MENS LOCKER/TOILET

BWG 8

WOMENS

LOCKER/TOILET

BWG 7

CORRIDOR

BW-C25

ELEV LOBBY

STORAGE

AEG 5

STORAGE

STORAGE

STORAGE

IRM

AEG 4A

IRM STAGING

AEG 4

OFFICE

BWG 5A

VMU OFFICE

BWG 5

EQUIP

POOL SVC

RM

BECEG 1

HAC

BECEG 0

LOBBY

STAIR 6

ELEC

AEG 76

PAT

TOILET

AEG 52

STOR

AEG

AEG 9B

OFFICE

RM

AEG 3

BATTERY

RM

AEG 2

LINEN

RM

AEG 1B

ECEC

AEG 1

ECELEVATOR

P8

ELEVATOR

P9

NA

CPS7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

AutoCAD SHX Text

"ECLA"

AutoCAD SHX Text

1.EP100D

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA D

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "D"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "ECLA" IN ROOM NO. BEG21.

H

G

F

E

D

C

B

A

4 5 6 7 8 91 2 3

A.1

B.1

C.1

D.1

E.1

TEL

CLOS

SIGN

CLOS

FAC

RESTROOM

CWG32T

CWG32B

ELEVATOR

MACH RM

CWG36A

BW-C2

CORRIDOR

BW-C1

WAREHOUSE

CWG 32

SVC ELEVATOR LOBBY

CWC 44

CORRIDOR

CW-C3

CORRIDOR

CW-C5

CWG32

PASSENGER ELEVATOR LOBBY

CWC 45

CONFERENCE RM

CWG 15D

ELEC CLOSET

ELEVATOR

P6

GA

ELECTRIC

CWG 47A

FAC

STORAGE

CWG 31

HISTOLOGY

CWG 6

WET

TISSUE

CWG 4A

VEST

CWG 1

COLD RM

CWG 3

SHWR

CWG 4B

BREAK

AREA

CWG 5

TOILET

CWG9

CWG12

STORAGE

PATHOLOGY /

LAB

ELEVATOR

S3

ELEVATOR

S2

STAIR

NO - 1

LAUNDRY

CWG39

UNIFORM ISSUE

CWG 39B

WRAPPING RM

CWG 39A

OFFICE

CWG43

BREAK RM

CWG 42CWG41

CWG 40

WASH

RM

CWG 51

TELECOM

MED

WASH

CWG 53

UNIFORM

STORAGE

CWG 52

LAUNDRY

CWG 51B

EMS

CWG 46

BREAK RM / STORAGE

CWG 48

EC

STORAGE

CWG 32H

WAREHOUSE STORAGE

CWG 32D

CWG 39ACAN WASH

CWG38

CANTEEN

REFG

CWG31

STAIR 3

COOLER

CWG 32C

BREAK RM

RESTROOM

FREIGHT

ELEVATOR

OFFICE

CW G35

STOR

CWG31D

CWG 32GWAREHOUSE STORAGE

CWG 32F

PHARMACY STORAGE

CWG 32ENARCOTICS

AND ALCOHOL

VAULT

CWG32A

NITROUS OXIDES

CWG33

RECEIVING AND ISSUE

CW G36

LAUNDRY

CWG 51A

NAC PS5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

"EALA"

AutoCAD SHX Text

1.EP100E

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA E

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "E"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EALA" IN ROOM NO. AEG1.

2018 191716151412 131110

MENS TOILET

CWG28

FEMALE

TOILET

CWG 29

FIRE EXTINGUISHER

CEG 12

BECEG 13

BECEG 14

FUTURE TOXICO LAB

BECEG 15

TISSUE CULTURE

BECEG 16

BECE-C1

OFFICE

CEG 24C

INFO

SYSTEMS

SECURITY

CWG 16

STORAGE

CEG 22G

CORRIDOR

CE C1

EVIDENCE

CEG 4

CEG 5A

CEG 5

CEG 1

EXAM RM

CEG 54C

CLINICAL

CEG 54

EXAM RM

CEG 54B

RECEPT OFFICE

CEG 53

COMM

CEG 52

EXAM RM

CEG 54D

EXAM RM

CEG 54ARECEPTION

CEG 51

HSRD OFFICE

CEG 49

HSRD OFFICE

CEG 50HSRD OFFICE

CEG 37TRAINEE

CEG 31CEG 30

HSRD OFFICE

CEG 36

PASSENGER ELEVATOR LOBBY

CWC 45

CW-C8

POLISE

TRAINING

CWG 20D

CWG 20B

CWG 20A

ISS

OFFICE

CWG 16D

CWG 20

OFFICE

CWG 15C

OFFICE

ECSTORAGE

CEG 3

CEG 7

CEG 6 CEG 5B

CEG 5C

OFFICE

CEG 16D

POLICE

OFFICE

CEG 16A

POLICE

CEG 16

OFFICE

CEG 16B CHIEF

OFFICE

CEG 16C

FIRE CONTROL

CEG 18

STAIR 4

OFFICE

CONTRACT

CEG 19B

CEG 19

CEG 20A

CEG 19A

COPY

CEG 20

VENDING RM

CEG 21

RELEASE OF INFO

GENERAL OFFICE

CORRIDOR

60-C2

OFFICE

OFFICE

6005A

OFFICE

OFFICE

CEG 22A

OFFICE

CEG 22B

OFFICE

CEG 22C

OFFICE

CEG 22D

OFFICE

CEG 22E

FILE RM

CEG 22

C AND P EXAM

AND RATING

CEG 23

OFFICE

CEG 23E

OFFICE

CEG 22F

EXAM

OFFICE

CEG 23D

EXAM

OFFICE

CEG 23C

EXAM

OFFICE

CEG 23B

CEG 23A

EMS WORK

LENDER

CEG 24A

HAC

OFFICE

CEG 24B

OFFICE

CEG 24D

HOUSEKEEPING

CEG 24

CEG 26C

CEG 24E

CEG 26B

CEG 27

POLICE

INVESTIGATION

CEG 28

LOCKSMITH

OFFICE

CEG 29A

SUPV

CEG 26A

CEG 29

OFFICE

CWG 26

OFFICE

CWG 27

MAIL RM

CWG 30

OFFICE

CWG47A

CWG 30A

BED WASHING

CWG 47

ELEVATOR

P7

OFFICE

CWG 30C

UPS TRACKING

SYSTEM

CWG 30B

STORAGE

CWG 31A

CWG 31B

CWG 31C

MCCR INSURANCE AND BILLING

CEG 26

FA

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

AutoCAD SHX Text

UPS

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

1.EP100F

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA F

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "F"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO THE UPS SYSTEM PANEL IN POLICE-DISPATCH/CONTROL ROOM.

J

K

L

M

N

P.2

P.1

P.4

P.5

P

SOIL

UTILITY

CW111HA

STORAGE

DENTAL

STORAGE

BE1E2

EQUIPMENT

EXAM

CW109

GLASSES

CW111B

NURSE

OFFICE

CW111D

OPERATION

BE124

UT-STUDENTS

BE106A SOIL

BE116A

OFFICE

BE116

EXAM

BE114

EXAM

BE115

OPERATORY

CE106

OPERATORY

CE105

WAITING

CE101

STO

STORAGE

BE106C

STORAGE

BE106B

WORK

ROOM

BE126

WAITING

BE 135B

TOILET

CW111M

OPHTHALMOLOGY

CW111F

CHIEF

CW111G

REHAB

BE 126A

BE 126B

OFFICE

CW111J

OPHTHALMIC

IMAGING

CW111K

OPHTHALMOLOGY

EXAM

CW111N

EXAM

CW111P

BE132

WOMEN

BE131EXAM

CW111Q

VISUAL FIELD

CW111R

CORRIDOR

EXAM

CW111U

TOILET

BW135T

EXAM

CW111T

EXAM

CW111S

BW135A

COPY

BW135

PH RS

OFFICE

BW130A

EXAM

CW112EXAM

CW110

CORRIDOR

CW106A

PH RS

OFFICE

BW136

EYE CENTER

CORRIDOR

RECEPTION

CE102

THERAPY

BE135

PHYSICAL THERAPY

CLINIC

BE 125

DENTAL

BE111

PORCELAIN

LAB

BE110EXAM

BE109

ORAL

SURGY

BE108

ORAL

SURGY

BE107

BE1E1

SUPPLY

RM

BE106

EXAM

PERIODONTOLOGY

BE122

MEN

BE121

WOMEN

BE120

EXAM

BE117

EXAM

BE118

EXAM

BE119

PERIODONTIST

OPERATION

BE123

CLEAN

BE112

EXAM

CE107

EXAM

CE108

EXAM

CE103

OFFICE

BE133

CW111

RECEPTION

CW111A

LASER

CW111E

MINOR OR

CW111H

WORK RM

CW111C

OT

BW137

OCCUPATIONAL

THERAPY

BW130

EXAM

CW108

ELECTRICAL WORK RM

AE110E

FILE RM

AE110F BREAK RM

AE110G CONFERENCE RM

AE110

MENTAL

HEALTH

TOILET

AE168

WAITING RM

AE111

BATH

AE166OFFICE

AE110A

OFFICE

AE110B

OFFICE

AE110C

OFFICE

AE110D

OFFICE

AE106

OFFICE

AE105

OFFICE

AE104

AE102

AE100

POOL

BE105

LAUNDRY

BE102

STORAGE

BE101

HAC

BE105A

BE103

BE104

KINESIOTHERAPY CLINIC

BW128

WORK

RM

BW127

OT CLINIC

BW125

ELEVATORELEVATOR

STAIR

NO. 11

ELECT

PH

YS

IC

AL

T

HE

RA

PY

REHAB

OFFICE

ELECTRICAL

P8 P9

VACANT

TRAINING

AE100AAW1E2

NA

C

PS8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

EMLA-15

AutoCAD SHX Text

AutoCAD SHX Text

1.EP101D

AutoCAD SHX Text

KMB

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - FIRST FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F1

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 FIRST FLOOR AREA D

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - FIRST FLOOR AREA "D"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EMLA" CIRCUIT NO. 15 IN ROOM NO. AE100A.

FUME CUPBOARD

CO

UN

TE

R

H

G

F

E

D

C

B

A

4 5 6 7 8 91 2 3

D110C

BIO MED LAB

STORAGE

D111

MICROSCOPE

RM

CW150

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

IMMUNOLOGY

CW149

LOBBY

SUPPLY

CW126B

OFFICE

CW126C

TELE OPERATOR

CW126E

E C

CW173

ELEVATOR

P-7

ELEVATOR

P-6

T CE C

ELEVATORELEVATOR

CW105

HAC

CW171

WOMENS

TOILET

CW172

OFFICE

CW126A

TELECOM

STORAGE

126D

PATIENT ADVOCATE

CORRIDOR

TOILET

CW102GCW101B

CORRIDOR

STORAGE

CW196

CLINICAL PHARMACY

EDUCATIONAL

CO-ORDINATOR

CW163

OPTOMETRY

OFFICE

CW164

TC

TC

ELECTRICAL

CW197

STAIR

NO 1

ELEVATORELEVATOR

STORAGE

CW196A

CASE LAB

HEMATOLOGY

CW183

CASE LAB

CW191

CHEMISTRY

SUPV

CW191A

WOMENS

TOILET

CW187

CARE LAB

CW186

ANCILLARY TESTING

CW185

OFFICE

CW185A

OFFICE

CW185B

NIGHT

SUPV

CW190

SUPV

CW189

TELECOM

CW184

SHAFT

SPECIAL

CARE LAB

CW182

CARE/PED TECH

OFFICE

CW181

HAC

CW174

SHAFT

SUPPLY

CW175

OFFICE

CW176

OFFICE

CW177

MICROSCOPIC

TEACHING

CW178

RESIDENTS

CW179FROZEN

SECTION

CW180

CLOSET

BREAK RM

CW195

EXAM

CW194BELEVATOR

WAITING

CW194

ACCESSION AREA

CW192

TOILET

CW194B

TOILET

CW194C

BLOOD DWG

CW193

STORAGE

CW140D

STORAGE

CW140C

RECEPTION

OFFICE

CW140COPY

CW140B

PGM

ASST

CW140A

ADMINISTRATIVE

CLERKS-4

CW140SECY

CW141

CHIEF

CW142OFFICE-1

CW143

PATHOLOGY

OFFICE-2

CW144

OFFICE-3

CW145

OFFICE-4

CW146OFFICE-5

CW147

OFFICE

CW160A

ELECTRICAL

FILE

CW160C

BREAK RM

CW160D

BREAK RM

CW160B

MENS TOILET

CW154

BLOOD BANK

CW160

TB

CW152C

REF

CW152B

MYC

CW152A

OFFICE

CW152E

MICROBIOLOGY

CW152

STAIR

NO 3

LOCKER

CW151

FLOW

CYTOMETER

CW149B

OFFICE

CW149A

CW149EPCR RM

CW149C

CONFERENCE

CW148

RECEPTION

CW194A

LA

BO

RA

TO

RY

CW174A

FA

A

FA

A

FACP X1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

"IB1C"

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

"IB1C"

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

"IB1C"

AutoCAD SHX Text

1.EP101E

AutoCAD SHX Text

KMB

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - FIRST FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F1

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 FIRST FLOOR AREA E

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - FIRST FLOOR AREA "E"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "IB1C" IN ROOM NO. CW197.

J

K

L

M

N

P.2

P.1

P.4

P.5

P

CORRIDOR

BW C15

BE 212F

OFFICE

BE 211B

CORRIDOR

CE C34

CORRIDOR

BE C34

CORRIDOR

BW C16

CORRIDOR

BE C36

CONFERENCE RM

BE 202C

LOBBY

AW 200

CORRIDOR

AE C1

CORRIDOR

BWC-13

TELE COMM

AE270AE 69C

STAIR

NO 6

TOILET

AE 268

TOILET

AE 266

MENTAL HEALTH

SOCIAL WORK

AE 212

MENTAL HEALTH

MED STUDENTS

OFFICE

AE 212AUNIVERSITY OF

TENN 2C WARD

PSYC

AE 210

EC

BH-R STORAGE

BE 202D

MENTAL HEALTH

SOCIAL WORKER

AE208

THEATER

BW 218

TELL COM

BW 219

SOUND RM

BW 218A

STORAGE

218B

STORAGE

AE206

DIETITIAN

AE204

AE200

AE 202

EC

STAGE

STOR

BW 217

CORRIDOR

BWC-14

OFFICE

BW 216

CONFERENCE

ELEVATOR

P 9

ELEVATOR

P 8

HVAC

BW 220

BW 221

BW 222

CHAPLINS OFFICE

BW 225

BW 206

MECHANICAL SPACE

CW 208A

CW 207

MECHANICAL

CW 208

BOWLING

BE 212E

BE212E

MECH SPACE

BE 205

VOLUNTEER

CE208

CORRIDOR

BE C35

CONFERENCE RM

BE 202B

CONFERENCE RM

BE 202A

KITCHEN

BE 201

CONFERENCE RM

BE 202

BREAK

BE 211A

OFFICE

BE 212

OFFICE

BE 212A

LIBRARY

BE 206C

ART THERAPY

BE 212D

OFFICE

BE 212C

OFFICE

BE 212B

CREDIT UNION

BE 211

MED LIBRARY

BE 206

STORAGE

BE 206D

AV RM

BE206B

STORAGE

CE207

OFFICE

CE208A AMB CARE

CE217

CE216

CE217T

AMB CARE

CO

NF

ER

EN

CE

R

M

LIB

RA

RY

OFFICE

ELECT

OPEN

SHAFTAIRWAY

CHAPLIN

WORKROOM

FA

CPX2

AE200A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

EMLA-4

AutoCAD SHX Text

AutoCAD SHX Text

1.EP102D

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 SECOND FLOOR AREA D

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - SECOND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - SECOND FLOOR AREA "D"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EMLA" CIRCUIT NO. 14 ON FLOOR DIRECTLY BELOW.

125 6 7 8 9 10 11 12.1

C

D

E

F

G

H

C

UP

DN

UP

DN

RD

ICE MACHINE

C3-4A

C3-4C

C3-4B

RECOVERY

CW301

CW301B

CW301C

BREAK

CW301D

SOILED

CW301E

CORRIDOR

CW358

CORRIDOR

CW-C3

CORRIDOR

CW360

CORRIDOR

CW-C8

CORRIDOR

CW-C6

SOILED

HOLDING

CW357

CORRIDOR

CW3-2

ELEVATOR ELEVATOR

ISOLATION

CW301A

CORRIDOR

CW-C5

SURGY

CONFERENCE

CW345

ANEST

OFFICE

CW324

ANES

SUPPLY

CW324B

ELECT

CW344

ELEVATOR

STORAGE

CW345A

WOMEN TOILET

CW349

CW

MENS TOILET

CW351

ELECTRIC

ELEVATOR

ANEST

OFFICE

CW324A

TOILET

CW325

STORAGE

CW 326

STRETCHERS

CW356

MED GAS

CYLINDERS

CW356A

SURGY

OFFICE

CW342

CORRIDOR

CW-C4

RECOVERY

CW301F

CORRIDOR

CW3-8

RECOVERY

SUPPLY

CW343

OFFICE

CW342C

SURGY

OFFICE

CW342B

SURGY

OFFICE

CW342A

SURGY

OFFICE

CW352

SURGY

CHIEF

CW354

SURGY

SECY

CW353

SURGY

BREAK

RM

CW348

CORRIDOR

OFFICE

CW342D OFFICE

CW342E

SURGY

OFFICE

CW338

SURGY

OFFICE

CW337

SURGY

OFFICE

CW336

NURSE SUPV

OFFICE

CW335

SURGY

OFFICE

CW334

SURGY

OFFICE

CW347

COPIER

CW346

SUPPLY

CW327

SURGY

ADPAC

CW328

SURGY

STORAGE

CW333

SURGY

OFFICE

CW332

SURGY

OFFICE

CW331

OFFICE

CW330

OFFICE

CW329

SC

RU

BE

X

CYSTO

CYSTO

PREP

CW303

CYSTO

SUPPLY CW302A

CW303B

CHARGE

NURSE

CW309

CW303A

PPE

CASE CART

SUPPLY

CW310

CW311

SCHEDULER

CW304

OR SUPPLY

STAFF

TOILET

CW305 STORAGE

CW3-3

CW306

COPIER

INSTRUMENT

TRAYS

CW307

CW312

EMERGENCY

CASE CARTS

CW3-4

CW308 HAC

CE301

SCRUBS

DISP

CE302

CE3-1

CORRIDOR

CW3-1

CORRIDOR

CORRIDOR

CORRIDOR

STAIR

NO 2

STAIR

NO 1

8 OR 9

P-6 P-7

S-2 S-3

ROOF

SHAFT

SHAFT

SH

AF

T

SH

AF

T

FACPX3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

AutoCAD SHX Text

"3AEL"

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

1.EP103B

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1 THIRD FLOOR AREA B

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1 - THIRD FLOOR AREA "B"

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text F1

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - THIRD FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "3AEL" IN ROOM NO. CW344.

5 6

10 11 1211.5 13

K 3

N

O

AREAWAY

OPEN

TO BELOW

(OPEN TO BELOW)

BOILER ROOM

(OPEN TO BELOW)

UP

COURTYARD

PICK-UP

WINDOW

PICK-UP

WINDOW

OUT SIDE

CARTS CARTS

CARTS CARTS

CARTS CARTS CARTS

WK.STATION WK.STATIONPRINTER

FAX

CARTS CARTS CARTS DESK DESK WK.STATION

PICK

PICK

PICK

PICK

CARTS

CARTS

CARTS

UP

H

J

K

SOAP DISP.

TRANS.

VAULT

GB1101

GB110 F

CONSULT

GB110

A

CONSULT

GB110

B

CONSULT

GB110

C

CONSULT

GB110

D

WAITING

RM

GB110

TOILET

GB110 L

CORRIDOR

CB1-4

CORRIDOR

CB1-3

OFFICE

RM

GB110 I

VAULT

GB110

G

SW

GEAR

FB1100

CORRIDOR

CB1-19A

CORRIDOR

CB1-19

STAIR

ELECTRICAL

RM

GB110 H

GB110

E

HAC

GB1111

COMM

GB1110

ELEC

GB1109 RESIDENT

GB1108

TOILET

GB1106

TOILET

GB110

M

LOCKERS

GB110

K

BREAK

RM

GB1100

J

SW

GEAR

GB1105A

OFFICE

GB1105B

MECH

MEZZ

GB1105

STAIR

GB1102

TRAVEL

CHIEF

EXIT

STAFF

CORRIDOR

LOCKER

ROOM

INTAKE/REGISTRATION

WAITING

LOBBY

FACPF1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

REG1-7

AutoCAD SHX Text

AutoCAD SHX Text

1A.EP100B

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1A GROUND FLOOR AREA B

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1A - GROUND FLOOR AREA "B"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "REG1" CIRCUIT NO. 7 IN ROOM NO. GB1109.

A

B

C

D

E

F

G

1 2 3 4 5

A 5

E 5

D 5

A 7

UP

HAC

EB1101D

DECONTAM

EB1101

PREPARATION

EB1112E

CORRIDOR

CB1-17

EQUIP.

CART

PROCESS

EB1112B

CART

WASH

EB1101B

EQUIPMENT

SERVICE

ACCESS

EB1101A

STAGING

EB1112H

MEDEVATOR

EB1112I

MANUAL

WASH

EB1101C

SPD

OFFICE

EB1112

CHIEF

SPD

EB1106A

HAC

EB1112A

SPD

STERILE

STORAGE

EB1112D

GAS

STER

EB1112F

SERVICE

ACCESS

EB1112G

COMM

EB1113AELEC

EB1113

VEST

CB1-18

STAIR

STORAGE

EB1112C

SUPPLY

RM

DISPATCH

EB1110

MECH

EB1109

SUPPLY

STORAGE

EB1111

SEC

EB1106

FILE RM

EB1106C

VOL. &

TRAINING

EB1107

OFFICE

1112C

FAA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

"REG1"

AutoCAD SHX Text

1A.EP100D

AutoCAD SHX Text

KMB

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING 1A GROUND FLOOR AREA D

AutoCAD SHX Text

WLM

AutoCAD SHX Text F2

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F2

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

ELECTRICAL POWER PLAN BUILDING NO. 1A - GROUND FLOOR AREA "D"

AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.

KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "REG1" IN ROOM NO. GB1109.

11.786 7 9

11 128.7 9.5 11.9

UP

UP

G

L1R47

DB1102B

PASSAGE

CB1-13

CORRIDOR

CB1-2

PHARMACY

DB1102

SERVICE

ELEVATOR

LOBBY

CB1-11

DW

DB1108

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

DW

STAIR

CORRIDOR

CB1-10

CORRIDOR

CB1-9

OFFICE

DB1102A

VESTIBULE

I.V.

ADMIXTURE

CLEAN

RM.

DB1102C

VAULT

DB1102H

FLAM

STORAGE

DB1102G

BMSA STORAGE

DB1103HAC

DB1104

CORRIDOR

CB1-15

CORRIDOR

CB1-14

CORRIDOR

CB1-16

CORRIDOR

CB1-16A

CORRIDOR

CB1-12

PASS

ELEVATOR

LOBBY

CB1-1A

COMM

GB1110 TOILET

GB1106

ELEVATOR

P2

ELEVATOR

P1

ELEVATOR

P3

ELEVATOR

P4SECURITY

DB1101TOILET

DB1100

CB1-1B

TOILET

EB1100

SCHEDULED

ADMISSION

OFFICE

FB1103C

CENTRALIZED

CHECK

IN

FB1103B

CLEAN

LINEN

DB1107

BREAK

RM

DB1112

CORRIDOR

CB1-14A

TOILET

EB1103ALKR

EB1103

LKR

EB1102

TOILET

EB1102A

TOILET

EB1104A

LKR

EB1104

LKR

EB1105

TOILET

EB1105A

ELEC

DB1109

MECH

DB1105

EMS

DB1110

BATTERY

CHARGING

DB1110A

SOILED

LINEN

DB1106

TRANSPORT

DB1111

STAIR

RECEIVING/

BREAKOUT

EB1108

OFFICE

EB1106D

ASST

CHIEF

SPD

EB1106B

OPEN

DOOR

SH

AF

T

MORGUE

AGENT

CASHIER

CUEING

EB1114

SW

ISS

LO

G R

OB

OT

N.I .C.

COMPOUNDING

OUT PATIENT

FILLING

MOBILE ROBOT

CHARGING AREA

CHARGING

DOCK

FACP

CAMPUS FACP

FACPF1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

"REG1"

AutoCAD SHX Text

AutoCAD SHX Text

REG1-7

AutoCAD SHX Text

1A.EP100E

AutoCAD SHX Text

KMB

AutoCAD SHX Text

WLM

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104