This document outlines a federal contract opportunity to replace the fire alarm system at the Memphis VA Medical Center. The project involves a complete replacement of the existing Notifier 3300 system with a new, code-compliant system including all necessary control panels, initiating devices, notification devices, control modules, and other components. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. Responses for the pre-solicitation are due under solicitation number 36C24921R0070 for Project 614-19-111. The work will be performed at the Memphis VA Medical Center campus and is categorized as a construction project.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
L
M
J
K
P5
P4
P2
P1
P
P3
ELEC SHOP STORAGE
BWG 25
STORAGE
CORRIDOR
BW-C6
CORRIDOR
BW-C22
FITNESS CENTER
AWG 3
AWG 10A
CORRIDOR
BW C 31A
WOMENS LOCKER RM
AWG 13
TOILETS AND
SHOWERS
AWG 11A
FEMALE
LOUNGE
AWG 11
STAIR 5
LOCK SMITH
STORAGE
AWG 9
OFFICE
CWG 15A
OFFICE
CWG 20A
OFFICE
CWG 20
HAC
CWG 14
OFFICE
BWG 4A
BWG 4D
ELEC
CLOSET
BWG 4E
ELEV LOBBY
ELEVATOR
RADIOLOGY / X-RAY FILE RM
BWG 2
X-RAY
STORAGE
BWG 2A
GRAPHIC CONTROL
BWG 1A
MECH RM
BWG 1
MECH RM
BWG 1
SCREENING
CWG 7A
OFFICE
CWG 7B
CYTOLOGY
CWG 7
CORRIDOR
BW C 2
CORRIDOR
BW C 28
CORRIDOR
BW C 29
CORRIDOR
BW C 30
CLERICAL
SEC/WAIT
BW G 33
CHIEF
BW G 33B
ASST
BW G 33A
WORK RM
BW G 33C
CONSULT
BW G 32
PHARM
BW G 31
OFFICE
BW G 30
OFFICE
BW G 29
STUDY
BW G 26
CARE OFFICE
BW G 27
CONF
BW G 28
OFFICE
CWG 6B
SHAFT
FRAM
STOR
CWG 6A
REFRIGERANT
STORAGE
BWG 24B
REFRIGERANT
STORAGE
BWG 24A
AC SHOP STORAGE
BWG 24
PARAFFIN
STORAGE
CWG 4
AUTOPSY
CWG 2
NAC
PS6
FACP
F1
SERVER ROOM
BWG 2A
BIO MED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
"EALA"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
"EALA"
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
1.EP100C
AutoCAD SHX Text
KMB
AutoCAD SHX Text
WLM
AutoCAD SHX Text F3
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F3
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "C"
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA C
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
AutoCAD SHX Text KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EALA" IN ROOM NO. AEG1.
W D
J
K
L
M
N
P.2
P.1
P.4
P.5
P
TOOLS / FLOOR
CLEANING EQUIPS
BEG 26A
TOILET
AEG 9T
WASHER/DRYER
BWG 6A
BECEG 12
BECE-C4
CORRIDOR
BECE-C2
EUTH
BWG 12
CONTAINMENT LAB
BWG 11C
POLISE
TRAINING
CWG 20C
CORRIDOR
CE C2 CORRIDOR
CE C8
CORRIDOR
CE C3
CORRIDOR
BE C2
HSRD OFFICE
CEG 35
HSRD CONFERENCE
CEG 38
HSRD OFFICE
CEG 40
HSRD OFFICE
CEG 39
HSRD OFFICE
CEG 34
CLEAN CAGE
BEDDING/STAGING
BWG 13
CORRIDOR
BEG 8
CORRIDOR
CE C3
PROCEDURE
BEG 9
ANIMAL RM 10
BEG 10
ANIMAL RM 9
BEG 11
ANIMAL RM 8
BEG 12
ANIMAL RM 7
BEG 13
VMU STORAGE
BEG 14
HSRD BREAK
BEG 15 BEG 16 ELECTRICAL
BEG 21
IRR
BEG 22
BRU OFFICE
BEG 26C
BRU OFFICE
BEG 26B
CORRIDOR
BEG 26
HSK
BG 25
AUTO WATER
BEG 24
BRU OFFICE
BE C3
STORAGE
BEG 23
EXIST COMM
BEG 23A
ANIMAL RM 6
BEG 8
ANIMAL RM 5
BEG 7
ANIMAL RM 4
BEG 6
ANIMAL RM 3
BEG 5
ANIMAL RM 2
BEG 4
ANIMAL RM 1
BEG 3
CONTAINMENT
BWG 11A
QUARANTINE
BEG 2
CORRIDOR
BW C20
BREAK RM
CWG 16C
CWG 16A
CWG 15B
CWG 16B
STORAGE
BWG 16
BW-C20
DIRTY CAGE STAGING
BWG 14
CORRIDOR
BE C1
BULK FEED AND
GENERAL STORAGE
BWG 10
ANTE
BWG 11
ELECTRICAL
BWG 9
OFFICE
CWG 20B
CONTAINMENT LAB
BWG 11D
OFFICE
CWG 20C OFFICE
CWG 20D
AIR COND SHOP
BWG 4B
AIR CONDITIONING
BWG 4
MED ADMIN
GENERAL STORAGE
BWG 4C
VMU BREAK
BWG 6
MENS LOCKER/TOILET
BWG 8
WOMENS
LOCKER/TOILET
BWG 7
CORRIDOR
BW-C25
ELEV LOBBY
STORAGE
AEG 5
STORAGE
STORAGE
STORAGE
IRM
AEG 4A
IRM STAGING
AEG 4
OFFICE
BWG 5A
VMU OFFICE
BWG 5
EQUIP
POOL SVC
RM
BECEG 1
HAC
BECEG 0
LOBBY
STAIR 6
ELEC
AEG 76
PAT
TOILET
AEG 52
STOR
AEG
AEG 9B
OFFICE
RM
AEG 3
BATTERY
RM
AEG 2
LINEN
RM
AEG 1B
ECEC
AEG 1
ECELEVATOR
P8
ELEVATOR
P9
NA
CPS7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
AutoCAD SHX Text
"ECLA"
AutoCAD SHX Text
1.EP100D
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA D
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "D"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "ECLA" IN ROOM NO. BEG21.
H
G
F
E
D
C
B
A
4 5 6 7 8 91 2 3
A.1
B.1
C.1
D.1
E.1
TEL
CLOS
SIGN
CLOS
FAC
RESTROOM
CWG32T
CWG32B
ELEVATOR
MACH RM
CWG36A
BW-C2
CORRIDOR
BW-C1
WAREHOUSE
CWG 32
SVC ELEVATOR LOBBY
CWC 44
CORRIDOR
CW-C3
CORRIDOR
CW-C5
CWG32
PASSENGER ELEVATOR LOBBY
CWC 45
CONFERENCE RM
CWG 15D
ELEC CLOSET
ELEVATOR
P6
GA
ELECTRIC
CWG 47A
FAC
STORAGE
CWG 31
HISTOLOGY
CWG 6
WET
TISSUE
CWG 4A
VEST
CWG 1
COLD RM
CWG 3
SHWR
CWG 4B
BREAK
AREA
CWG 5
TOILET
CWG9
CWG12
STORAGE
PATHOLOGY /
LAB
ELEVATOR
S3
ELEVATOR
S2
STAIR
NO - 1
LAUNDRY
CWG39
UNIFORM ISSUE
CWG 39B
WRAPPING RM
CWG 39A
OFFICE
CWG43
BREAK RM
CWG 42CWG41
CWG 40
WASH
RM
CWG 51
TELECOM
MED
WASH
CWG 53
UNIFORM
STORAGE
CWG 52
LAUNDRY
CWG 51B
EMS
CWG 46
BREAK RM / STORAGE
CWG 48
EC
STORAGE
CWG 32H
WAREHOUSE STORAGE
CWG 32D
CWG 39ACAN WASH
CWG38
CANTEEN
REFG
CWG31
STAIR 3
COOLER
CWG 32C
BREAK RM
RESTROOM
FREIGHT
ELEVATOR
OFFICE
CW G35
STOR
CWG31D
CWG 32GWAREHOUSE STORAGE
CWG 32F
PHARMACY STORAGE
CWG 32ENARCOTICS
AND ALCOHOL
VAULT
CWG32A
NITROUS OXIDES
CWG33
RECEIVING AND ISSUE
CW G36
LAUNDRY
CWG 51A
NAC PS5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
"EALA"
AutoCAD SHX Text
1.EP100E
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA E
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "E"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EALA" IN ROOM NO. AEG1.
2018 191716151412 131110
MENS TOILET
CWG28
FEMALE
TOILET
CWG 29
FIRE EXTINGUISHER
CEG 12
BECEG 13
BECEG 14
FUTURE TOXICO LAB
BECEG 15
TISSUE CULTURE
BECEG 16
BECE-C1
OFFICE
CEG 24C
INFO
SYSTEMS
SECURITY
CWG 16
STORAGE
CEG 22G
CORRIDOR
CE C1
EVIDENCE
CEG 4
CEG 5A
CEG 5
CEG 1
EXAM RM
CEG 54C
CLINICAL
CEG 54
EXAM RM
CEG 54B
RECEPT OFFICE
CEG 53
COMM
CEG 52
EXAM RM
CEG 54D
EXAM RM
CEG 54ARECEPTION
CEG 51
HSRD OFFICE
CEG 49
HSRD OFFICE
CEG 50HSRD OFFICE
CEG 37TRAINEE
CEG 31CEG 30
HSRD OFFICE
CEG 36
PASSENGER ELEVATOR LOBBY
CWC 45
CW-C8
POLISE
TRAINING
CWG 20D
CWG 20B
CWG 20A
ISS
OFFICE
CWG 16D
CWG 20
OFFICE
CWG 15C
OFFICE
ECSTORAGE
CEG 3
CEG 7
CEG 6 CEG 5B
CEG 5C
OFFICE
CEG 16D
POLICE
OFFICE
CEG 16A
POLICE
CEG 16
OFFICE
CEG 16B CHIEF
OFFICE
CEG 16C
FIRE CONTROL
CEG 18
STAIR 4
OFFICE
CONTRACT
CEG 19B
CEG 19
CEG 20A
CEG 19A
COPY
CEG 20
VENDING RM
CEG 21
RELEASE OF INFO
GENERAL OFFICE
CORRIDOR
60-C2
OFFICE
OFFICE
6005A
OFFICE
OFFICE
CEG 22A
OFFICE
CEG 22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22E
FILE RM
CEG 22
C AND P EXAM
AND RATING
CEG 23
OFFICE
CEG 23E
OFFICE
CEG 22F
EXAM
OFFICE
CEG 23D
EXAM
OFFICE
CEG 23C
EXAM
OFFICE
CEG 23B
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC
OFFICE
CEG 24B
OFFICE
CEG 24D
HOUSEKEEPING
CEG 24
CEG 26C
CEG 24E
CEG 26B
CEG 27
POLICE
INVESTIGATION
CEG 28
LOCKSMITH
OFFICE
CEG 29A
SUPV
CEG 26A
CEG 29
OFFICE
CWG 26
OFFICE
CWG 27
MAIL RM
CWG 30
OFFICE
CWG47A
CWG 30A
BED WASHING
CWG 47
ELEVATOR
P7
OFFICE
CWG 30C
UPS TRACKING
SYSTEM
CWG 30B
STORAGE
CWG 31A
CWG 31B
CWG 31C
MCCR INSURANCE AND BILLING
CEG 26
FA
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
AutoCAD SHX Text
UPS
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
1.EP100F
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 GROUND FLOOR AREA F
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - GROUND FLOOR AREA "F"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO THE UPS SYSTEM PANEL IN POLICE-DISPATCH/CONTROL ROOM.
J
K
L
M
N
P.2
P.1
P.4
P.5
P
SOIL
UTILITY
CW111HA
STORAGE
DENTAL
STORAGE
BE1E2
EQUIPMENT
EXAM
CW109
GLASSES
CW111B
NURSE
OFFICE
CW111D
OPERATION
BE124
UT-STUDENTS
BE106A SOIL
BE116A
OFFICE
BE116
EXAM
BE114
EXAM
BE115
OPERATORY
CE106
OPERATORY
CE105
WAITING
CE101
STO
STORAGE
BE106C
STORAGE
BE106B
WORK
ROOM
BE126
WAITING
BE 135B
TOILET
CW111M
OPHTHALMOLOGY
CW111F
CHIEF
CW111G
REHAB
BE 126A
BE 126B
OFFICE
CW111J
OPHTHALMIC
IMAGING
CW111K
OPHTHALMOLOGY
EXAM
CW111N
EXAM
CW111P
BE132
WOMEN
BE131EXAM
CW111Q
VISUAL FIELD
CW111R
CORRIDOR
EXAM
CW111U
TOILET
BW135T
EXAM
CW111T
EXAM
CW111S
BW135A
COPY
BW135
PH RS
OFFICE
BW130A
EXAM
CW112EXAM
CW110
CORRIDOR
CW106A
PH RS
OFFICE
BW136
EYE CENTER
CORRIDOR
RECEPTION
CE102
THERAPY
BE135
PHYSICAL THERAPY
CLINIC
BE 125
DENTAL
BE111
PORCELAIN
LAB
BE110EXAM
BE109
ORAL
SURGY
BE108
ORAL
SURGY
BE107
BE1E1
SUPPLY
RM
BE106
EXAM
PERIODONTOLOGY
BE122
MEN
BE121
WOMEN
BE120
EXAM
BE117
EXAM
BE118
EXAM
BE119
PERIODONTIST
OPERATION
BE123
CLEAN
BE112
EXAM
CE107
EXAM
CE108
EXAM
CE103
OFFICE
BE133
CW111
RECEPTION
CW111A
LASER
CW111E
MINOR OR
CW111H
WORK RM
CW111C
OT
BW137
OCCUPATIONAL
THERAPY
BW130
EXAM
CW108
ELECTRICAL WORK RM
AE110E
FILE RM
AE110F BREAK RM
AE110G CONFERENCE RM
AE110
MENTAL
HEALTH
TOILET
AE168
WAITING RM
AE111
BATH
AE166OFFICE
AE110A
OFFICE
AE110B
OFFICE
AE110C
OFFICE
AE110D
OFFICE
AE106
OFFICE
AE105
OFFICE
AE104
AE102
AE100
POOL
BE105
LAUNDRY
BE102
STORAGE
BE101
HAC
BE105A
BE103
BE104
KINESIOTHERAPY CLINIC
BW128
WORK
RM
BW127
OT CLINIC
BW125
ELEVATORELEVATOR
STAIR
NO. 11
ELECT
PH
YS
IC
AL
T
HE
RA
PY
REHAB
OFFICE
ELECTRICAL
P8 P9
VACANT
TRAINING
AE100AAW1E2
NA
C
PS8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
EMLA-15
AutoCAD SHX Text
AutoCAD SHX Text
1.EP101D
AutoCAD SHX Text
KMB
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - FIRST FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F1
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 FIRST FLOOR AREA D
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - FIRST FLOOR AREA "D"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EMLA" CIRCUIT NO. 15 IN ROOM NO. AE100A.
FUME CUPBOARD
CO
UN
TE
R
H
G
F
E
D
C
B
A
4 5 6 7 8 91 2 3
D110C
BIO MED LAB
STORAGE
D111
MICROSCOPE
RM
CW150
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
IMMUNOLOGY
CW149
LOBBY
SUPPLY
CW126B
OFFICE
CW126C
TELE OPERATOR
CW126E
E C
CW173
ELEVATOR
P-7
ELEVATOR
P-6
T CE C
ELEVATORELEVATOR
CW105
HAC
CW171
WOMENS
TOILET
CW172
OFFICE
CW126A
TELECOM
STORAGE
126D
PATIENT ADVOCATE
CORRIDOR
TOILET
CW102GCW101B
CORRIDOR
STORAGE
CW196
CLINICAL PHARMACY
EDUCATIONAL
CO-ORDINATOR
CW163
OPTOMETRY
OFFICE
CW164
TC
TC
ELECTRICAL
CW197
STAIR
NO 1
ELEVATORELEVATOR
STORAGE
CW196A
CASE LAB
HEMATOLOGY
CW183
CASE LAB
CW191
CHEMISTRY
SUPV
CW191A
WOMENS
TOILET
CW187
CARE LAB
CW186
ANCILLARY TESTING
CW185
OFFICE
CW185A
OFFICE
CW185B
NIGHT
SUPV
CW190
SUPV
CW189
TELECOM
CW184
SHAFT
SPECIAL
CARE LAB
CW182
CARE/PED TECH
OFFICE
CW181
HAC
CW174
SHAFT
SUPPLY
CW175
OFFICE
CW176
OFFICE
CW177
MICROSCOPIC
TEACHING
CW178
RESIDENTS
CW179FROZEN
SECTION
CW180
CLOSET
BREAK RM
CW195
EXAM
CW194BELEVATOR
WAITING
CW194
ACCESSION AREA
CW192
TOILET
CW194B
TOILET
CW194C
BLOOD DWG
CW193
STORAGE
CW140D
STORAGE
CW140C
RECEPTION
OFFICE
CW140COPY
CW140B
PGM
ASST
CW140A
ADMINISTRATIVE
CLERKS-4
CW140SECY
CW141
CHIEF
CW142OFFICE-1
CW143
PATHOLOGY
OFFICE-2
CW144
OFFICE-3
CW145
OFFICE-4
CW146OFFICE-5
CW147
OFFICE
CW160A
ELECTRICAL
FILE
CW160C
BREAK RM
CW160D
BREAK RM
CW160B
MENS TOILET
CW154
BLOOD BANK
CW160
TB
CW152C
REF
CW152B
MYC
CW152A
OFFICE
CW152E
MICROBIOLOGY
CW152
STAIR
NO 3
LOCKER
CW151
FLOW
CYTOMETER
CW149B
OFFICE
CW149A
CW149EPCR RM
CW149C
CONFERENCE
CW148
RECEPTION
CW194A
LA
BO
RA
TO
RY
CW174A
FA
A
FA
A
FACP X1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
"IB1C"
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
"IB1C"
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
"IB1C"
AutoCAD SHX Text
1.EP101E
AutoCAD SHX Text
KMB
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - FIRST FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F1
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 FIRST FLOOR AREA E
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - FIRST FLOOR AREA "E"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "IB1C" IN ROOM NO. CW197.
J
K
L
M
N
P.2
P.1
P.4
P.5
P
CORRIDOR
BW C15
BE 212F
OFFICE
BE 211B
CORRIDOR
CE C34
CORRIDOR
BE C34
CORRIDOR
BW C16
CORRIDOR
BE C36
CONFERENCE RM
BE 202C
LOBBY
AW 200
CORRIDOR
AE C1
CORRIDOR
BWC-13
TELE COMM
AE270AE 69C
STAIR
NO 6
TOILET
AE 268
TOILET
AE 266
MENTAL HEALTH
SOCIAL WORK
AE 212
MENTAL HEALTH
MED STUDENTS
OFFICE
AE 212AUNIVERSITY OF
TENN 2C WARD
PSYC
AE 210
EC
BH-R STORAGE
BE 202D
MENTAL HEALTH
SOCIAL WORKER
AE208
THEATER
BW 218
TELL COM
BW 219
SOUND RM
BW 218A
STORAGE
218B
STORAGE
AE206
DIETITIAN
AE204
AE200
AE 202
EC
STAGE
STOR
BW 217
CORRIDOR
BWC-14
OFFICE
BW 216
CONFERENCE
ELEVATOR
P 9
ELEVATOR
P 8
HVAC
BW 220
BW 221
BW 222
CHAPLINS OFFICE
BW 225
BW 206
MECHANICAL SPACE
CW 208A
CW 207
MECHANICAL
CW 208
BOWLING
BE 212E
BE212E
MECH SPACE
BE 205
VOLUNTEER
CE208
CORRIDOR
BE C35
CONFERENCE RM
BE 202B
CONFERENCE RM
BE 202A
KITCHEN
BE 201
CONFERENCE RM
BE 202
BREAK
BE 211A
OFFICE
BE 212
OFFICE
BE 212A
LIBRARY
BE 206C
ART THERAPY
BE 212D
OFFICE
BE 212C
OFFICE
BE 212B
CREDIT UNION
BE 211
MED LIBRARY
BE 206
STORAGE
BE 206D
AV RM
BE206B
STORAGE
CE207
OFFICE
CE208A AMB CARE
CE217
CE216
CE217T
AMB CARE
CO
NF
ER
EN
CE
R
M
LIB
RA
RY
OFFICE
ELECT
OPEN
SHAFTAIRWAY
CHAPLIN
WORKROOM
FA
CPX2
AE200A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
EMLA-4
AutoCAD SHX Text
AutoCAD SHX Text
1.EP102D
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 SECOND FLOOR AREA D
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - SECOND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - SECOND FLOOR AREA "D"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "EMLA" CIRCUIT NO. 14 ON FLOOR DIRECTLY BELOW.
125 6 7 8 9 10 11 12.1
C
D
E
F
G
H
C
UP
DN
UP
DN
RD
ICE MACHINE
C3-4A
C3-4C
C3-4B
RECOVERY
CW301
CW301B
CW301C
BREAK
CW301D
SOILED
CW301E
CORRIDOR
CW358
CORRIDOR
CW-C3
CORRIDOR
CW360
CORRIDOR
CW-C8
CORRIDOR
CW-C6
SOILED
HOLDING
CW357
CORRIDOR
CW3-2
ELEVATOR ELEVATOR
ISOLATION
CW301A
CORRIDOR
CW-C5
SURGY
CONFERENCE
CW345
ANEST
OFFICE
CW324
ANES
SUPPLY
CW324B
ELECT
CW344
ELEVATOR
STORAGE
CW345A
WOMEN TOILET
CW349
CW
MENS TOILET
CW351
ELECTRIC
ELEVATOR
ANEST
OFFICE
CW324A
TOILET
CW325
STORAGE
CW 326
STRETCHERS
CW356
MED GAS
CYLINDERS
CW356A
SURGY
OFFICE
CW342
CORRIDOR
CW-C4
RECOVERY
CW301F
CORRIDOR
CW3-8
RECOVERY
SUPPLY
CW343
OFFICE
CW342C
SURGY
OFFICE
CW342B
SURGY
OFFICE
CW342A
SURGY
OFFICE
CW352
SURGY
CHIEF
CW354
SURGY
SECY
CW353
SURGY
BREAK
RM
CW348
CORRIDOR
OFFICE
CW342D OFFICE
CW342E
SURGY
OFFICE
CW338
SURGY
OFFICE
CW337
SURGY
OFFICE
CW336
NURSE SUPV
OFFICE
CW335
SURGY
OFFICE
CW334
SURGY
OFFICE
CW347
COPIER
CW346
SUPPLY
CW327
SURGY
ADPAC
CW328
SURGY
STORAGE
CW333
SURGY
OFFICE
CW332
SURGY
OFFICE
CW331
OFFICE
CW330
OFFICE
CW329
SC
RU
BE
X
CYSTO
CYSTO
PREP
CW303
CYSTO
SUPPLY CW302A
CW303B
CHARGE
NURSE
CW309
CW303A
PPE
CASE CART
SUPPLY
CW310
CW311
SCHEDULER
CW304
OR SUPPLY
STAFF
TOILET
CW305 STORAGE
CW3-3
CW306
COPIER
INSTRUMENT
TRAYS
CW307
CW312
EMERGENCY
CASE CARTS
CW3-4
CW308 HAC
CE301
SCRUBS
DISP
CE302
CE3-1
CORRIDOR
CW3-1
CORRIDOR
CORRIDOR
CORRIDOR
STAIR
NO 2
STAIR
NO 1
8 OR 9
P-6 P-7
S-2 S-3
ROOF
SHAFT
SHAFT
SH
AF
T
SH
AF
T
FACPX3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
AutoCAD SHX Text
"3AEL"
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
1.EP103B
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1 THIRD FLOOR AREA B
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1 - THIRD FLOOR AREA "B"
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text F1
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - THIRD FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "3AEL" IN ROOM NO. CW344.
5 6
10 11 1211.5 13
K 3
N
O
AREAWAY
OPEN
TO BELOW
(OPEN TO BELOW)
BOILER ROOM
(OPEN TO BELOW)
UP
COURTYARD
PICK-UP
WINDOW
PICK-UP
WINDOW
OUT SIDE
CARTS CARTS
CARTS CARTS
CARTS CARTS CARTS
WK.STATION WK.STATIONPRINTER
FAX
CARTS CARTS CARTS DESK DESK WK.STATION
PICK
PICK
PICK
PICK
CARTS
CARTS
CARTS
UP
H
J
K
SOAP DISP.
TRANS.
VAULT
GB1101
GB110 F
CONSULT
GB110
A
CONSULT
GB110
B
CONSULT
GB110
C
CONSULT
GB110
D
WAITING
RM
GB110
TOILET
GB110 L
CORRIDOR
CB1-4
CORRIDOR
CB1-3
OFFICE
RM
GB110 I
VAULT
GB110
G
SW
GEAR
FB1100
CORRIDOR
CB1-19A
CORRIDOR
CB1-19
STAIR
ELECTRICAL
RM
GB110 H
GB110
E
HAC
GB1111
COMM
GB1110
ELEC
GB1109 RESIDENT
GB1108
TOILET
GB1106
TOILET
GB110
M
LOCKERS
GB110
K
BREAK
RM
GB1100
J
SW
GEAR
GB1105A
OFFICE
GB1105B
MECH
MEZZ
GB1105
STAIR
GB1102
TRAVEL
CHIEF
EXIT
STAFF
CORRIDOR
LOCKER
ROOM
INTAKE/REGISTRATION
WAITING
LOBBY
FACPF1A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
REG1-7
AutoCAD SHX Text
AutoCAD SHX Text
1A.EP100B
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1A GROUND FLOOR AREA B
AutoCAD SHX Text
WLM
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text 1A
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1A - GROUND FLOOR AREA "B"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. . E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "REG1" CIRCUIT NO. 7 IN ROOM NO. GB1109.
A
B
C
D
E
F
G
1 2 3 4 5
A 5
E 5
D 5
A 7
UP
HAC
EB1101D
DECONTAM
EB1101
PREPARATION
EB1112E
CORRIDOR
CB1-17
EQUIP.
CART
PROCESS
EB1112B
CART
WASH
EB1101B
EQUIPMENT
SERVICE
ACCESS
EB1101A
STAGING
EB1112H
MEDEVATOR
EB1112I
MANUAL
WASH
EB1101C
SPD
OFFICE
EB1112
CHIEF
SPD
EB1106A
HAC
EB1112A
SPD
STERILE
STORAGE
EB1112D
GAS
STER
EB1112F
SERVICE
ACCESS
EB1112G
COMM
EB1113AELEC
EB1113
VEST
CB1-18
STAIR
STORAGE
EB1112C
SUPPLY
RM
DISPATCH
EB1110
MECH
EB1109
SUPPLY
STORAGE
EB1111
SEC
EB1106
FILE RM
EB1106C
VOL. &
TRAINING
EB1107
OFFICE
1112C
FAA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
"REG1"
AutoCAD SHX Text
1A.EP100D
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING 1A GROUND FLOOR AREA D
AutoCAD SHX Text
WLM
AutoCAD SHX Text F2
AutoCAD SHX Text N
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text 1A
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F2
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
ELECTRICAL POWER PLAN BUILDING NO. 1A - GROUND FLOOR AREA "D"
AutoCAD SHX Text GENERAL NOTES A. REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, REFER TO E-001 FOR ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS. B. NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED NOT ALL SYMBOLS INDICATED IN THE LEGEND, OR LISTED ABBREVIATIONS, APPEAR ON THE DRAWINGS. COORDINATE WORK ACCORDINGLY. COMPLY WITH SPECIFICATIONS AND NOTES BELOW AS APPLICABLE. C. ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, ALL WORK SHALL COMPLY WITH LATEST EDITION OF NFPA70, NFPA72, NFPA99, NFPA101, NEC & ALL FEDERAL, STATE & LOCAL REGULATIONS. D. ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND ALL PENETRATIONS THROUGH FLOORS, RATED WALLS AND PARTITIONS SHALL BE SEALED WITH UL APPROVED FIRE SEALANT MATERIAL TO MAINTAIN FIRE RATING FOR THE SEPARATION.. E. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. ALL CONDUIT USED SHALL BE 3/4" MINIMUM. F. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES, DISRUPTION OF SERVICES, EXTREME NOISE AND / OR VIBRATION, CUTTING AND PATCHING OF CONCRETE AND DELIVERIES OF EQUIPMENT. G. SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SOME CIRCUITS AFFECTED BY THE WORK INDICATED ON THIS SHEET MAY FEED OTHER AREAS OUTSIDE THE SCOPE OF THIS PROJECT. THE CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY AT ALL TIMES TO AREAS OUTSIDE THE SCOPE OF WORK. H. THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE THE CONTRACTOR SHALL CONNECT TO EXISTING 120 VOLT FIRE ALARM CIRCUIT IN ROOM, THE CONNECTION SHALL BE MADE WITH CIRCUIT ENERGIZED. I. CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE CIRCUIT BREAKER FEEDING FIRE ALARM EQUIPMENT SHALL BE RED IN COLOR. J. THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, THE CONTRACTOR SHALL LABEL EACH CONTROL PANEL, NAC, AND FAA WITH A LABEL SPECIFYING WHICH ELECTRICAL PANEL IS FEEDING IT AND WHAT ROOM THE ELECTRICAL PANEL IS IN.
KEYED NOTES: : 1. THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT THE CONTRACTOR SHALL CONNECT NEW FIRE ALARM EQUIPMENT TO EXISTING 120 VOLT CIRCUIT PRESENTLY CONNECTED TO EXISTING FIRE ALARM EQUIPMENT. THE EXISTING CIRCUIT IS CONNECTED TO PANEL "REG1" IN ROOM NO. GB1109.
11.786 7 9
11 128.7 9.5 11.9
UP
UP
G
L1R47
DB1102B
PASSAGE
CB1-13
CORRIDOR
CB1-2
PHARMACY
DB1102
SERVICE
ELEVATOR
LOBBY
CB1-11
DW
DB1108
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
DW
STAIR
CORRIDOR
CB1-10
CORRIDOR
CB1-9
OFFICE
DB1102A
VESTIBULE
I.V.
ADMIXTURE
CLEAN
RM.
DB1102C
VAULT
DB1102H
FLAM
STORAGE
DB1102G
BMSA STORAGE
DB1103HAC
DB1104
CORRIDOR
CB1-15
CORRIDOR
CB1-14
CORRIDOR
CB1-16
CORRIDOR
CB1-16A
CORRIDOR
CB1-12
PASS
ELEVATOR
LOBBY
CB1-1A
COMM
GB1110 TOILET
GB1106
ELEVATOR
P2
ELEVATOR
P1
ELEVATOR
P3
ELEVATOR
P4SECURITY
DB1101TOILET
DB1100
CB1-1B
TOILET
EB1100
SCHEDULED
ADMISSION
OFFICE
FB1103C
CENTRALIZED
CHECK
IN
FB1103B
CLEAN
LINEN
DB1107
BREAK
RM
DB1112
CORRIDOR
CB1-14A
TOILET
EB1103ALKR
EB1103
LKR
EB1102
TOILET
EB1102A
TOILET
EB1104A
LKR
EB1104
LKR
EB1105
TOILET
EB1105A
ELEC
DB1109
MECH
DB1105
EMS
DB1110
BATTERY
CHARGING
DB1110A
SOILED
LINEN
DB1106
TRANSPORT
DB1111
STAIR
RECEIVING/
BREAKOUT
EB1108
OFFICE
EB1106D
ASST
CHIEF
SPD
EB1106B
OPEN
DOOR
SH
AF
T
MORGUE
AGENT
CASHIER
CUEING
EB1114
SW
ISS
LO
G R
OB
OT
N.I .C.
COMPOUNDING
OUT PATIENT
FILLING
MOBILE ROBOT
CHARGING AREA
CHARGING
DOCK
FACP
CAMPUS FACP
FACPF1A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
"REG1"
AutoCAD SHX Text
AutoCAD SHX Text
REG1-7
AutoCAD SHX Text
1A.EP100E
AutoCAD SHX Text
KMB
AutoCAD SHX Text
WLM
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .