Set 10 Drawings Fire Alarm New Building 1A.pdf

PDF 11 MB Posted

Attached to
Project 614-19-111, Replace Fire Alarm System Federal contract opportunity
Solicitation number
36C24921R0070
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document provides details for a federal contract opportunity to replace a fire alarm system at the Memphis VA Medical Center. The solicitation seeks a construction contractor to provide all labor, materials, equipment, supervision and quality control for a complete replacement of the existing Notifier 3300 fire alarm system with a new code compliant system. The replacement project will include new control panels, initiating devices, notification devices, control modules and any other components necessary. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. Interested offerors should reference solicitation number 36C24921R0070 for the project titled "Project 614-19-111, Replace Fire Alarm System."

View the file

Other files for this federal contract opportunity

Other files attached to Project 614-19-111, Replace Fire Alarm System, newest first.
File Type Posted
P07-General Decision Number TN20210111 02.12.2021 (Shelby Cty).pdf PDF
36C24921R0070 0006.pdf PDF
S02-Price Schedule (Proj 614-19-111).xlsx XLSX spreadsheet
36C24921R0070 0005.pdf PDF
P07-General Decision Number TN20210111 01.01.2021.pdf PDF
RFI 1 Memphis TN -rev.pdf PDF
36C24921R0070 0004.pdf PDF
S06-36C24921R0070 0003.pdf PDF
RFI 1 Memphis TN.pdf PDF
Govt Response_21-B-042 Memphis Fire Alarm Repairs RFIs.pdf PDF
Govt Response_ISS Estimating.pdf PDF
Govt Response_ Project 614-19-111 Memphis VA Fire Alarm Replacement.pdf PDF
Govt Response _ RFI Fire Alarm Soc. 36C24921R0070.pdf PDF
S06-36C24921R0070 0002.pdf PDF
S06-36C24921R0070 0001.pdf PDF
Set 6 Drawings Fire Alarm Demo Site and Building 1.pdf PDF
Set 12 Drawings Electrical Power.pdf PDF
Set 1 Drawings General.pdf PDF
C28-Project Specifications 614-19-111 (Repl Fire Alarm).pdf PDF
S02-36C24921R0070 (Repl Fire Alarm)_04.05.2021.pdf PDF
Set 11 Drawings Fire Alarm New B5 B6 B7 B10 and PG.pdf PDF
Set 9 Drawings Fire Alarm New Site and Building 1.pdf PDF
Set 7 Drawings Fire Alarm Demo Building 1A.pdf PDF
Set 3 Drawings Electrical Photos_Part2.pdf PDF
Set 4 Drawings Fire Alarm General and Risers_Part1.pdf PDF
Set 2 Drawings Electrical Photos_Part1.pdf PDF
36C24921R0070_1 (presolicitation notice).pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 43 5

H

J

K

L

M

L.5

UP

ESCORT

NURSE

MANAGER

ESCORT

DISPATCH

SUPV -

INTAKE

SUPV -

TOWER

TRAVEL

CHIEF

EXIT

STAFF

CORRIDOR

ESCORT

MULTI

PURPOSE

ROOM

VOLUNTEER

STORAGE

TN

DEPT

OF VA

TN

DEPT

OF VA

MS

DEPT

OF VA

V.S.O.

OFFICE

D.A.V.

SHARED

BREAK

ROOM /

CONFERENCE

SPACE

VOLUNTEERS

LOUNGE

V.S.O.

WAITING

TN

DEPT

OF VAI.T.

COFFEE

CART

STORAGE

VOLUNTEERS

SHARED

OFFICEVOLUNTEERS

CHIEF

VOLUNTEERS

SECRETARY

VOL

CALL

RM ESCORT

PHLEB

CART

STOR H.K.

F1A:N13:17 EOL

F1A:S13:16 EOL

30cd 0.5w

F1A:L2:037

F1A:N14:06 F1A:S14:05 15cd 0.5w

F1A:N14:07 F1A:S14:06 15cd 0.5w

F1A:N14:08 F1A:S14:07 15cd 0.5w

F1A:N14:11 F1A:S14:11 15cd 0.5w

F1A:N14:10 F1A:S14:09 15cd 0.5w

F1A:N14:17 F1A:S14:16 15cd 0.5w

F1A:N14:18

F1A:S14:17 EOL

15cd 0.5w

F1A:N14:15 F1A:S14:15 15cd 0.5w

F1A:N14:12 F1A:S14:12 15cd 0.5w

F1A:N14:13 F1A:S14:14 15cd 0.5w

F1A:N14:19 EOL

15cd

F1A:N14:14 15cd

F1A:N14:16 15cd

F1A:N14:09 F1A:S14:08 15cd 0.5w

F1A:N13:16 F1A:S13:15 30cd 0.5w

F1A:N13:15 F1A:S13:14 30cd 0.5w

S

F1A:S14:13 0.5w

S F1A:S14:10 0.5w

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text

1A.FA100A

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A GROUND FLOOR AREA A

AutoCAD SHX Text

WLM

AutoCAD SHX Text F2

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - GROUND FLOOR AREA "A"

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100D

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100B

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100D

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100B

AutoCAD SHX Text F2

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

AutoCAD SHX Text SCOPE OF WORK: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

10 11 1211.5 13

K 3

N

O

AREAWAY

OPEN

TO BELOW

(OPEN TO BELOW)

BOILER ROOM

(OPEN TO BELOW)

UP

COURTYARD

PICK-UP

WINDOW

PICK-UP

WINDOW

OUT SIDE

CARTS CARTS

CARTS CARTS

CARTS CARTS CARTS

WK.STATION WK.STATIONPRINTER

FAX

CARTS CARTS CARTS DESK DESK WK.STATION

PICK

PICK

PICK

PICK

CARTS

CARTS

CARTS

H

J

K

SOAP DISP.

TRANS.

VAULT

GB1101

GB110 F

CONSULT

GB110

A

CONSULT

GB110

B

CONSULT

GB110

C

CONSULT

GB110

D

WAITING

RM

GB110

TOILET

GB110 LCORRIDOR

CB1-4

CORRIDOR

CB1-3

OFFICE

RM

GB110 I

VAULT

GB110

G

SW

GEAR

FB1100

CORRIDOR

CB1-19A

CORRIDOR

CB1-19

STAIR

ELECTRICAL

RM

GB110 H

GB110

E

HAC

GB1111

COMM

GB1110

ELEC

GB1109 RESIDENT

GB1108

LOCKERS

GB110 K

BREAK

RM

GB1100

J

SW

GEAR

GB1105A

OFFICE

GB1105B

MECH

MEZZ

GB1105

STAIR

GB1102

LOCKER

ROOM

INTAKE/REGISTRATION

WAITING

LOBBY

F1A:L3:072

F1A:L3:074

F1A:L3:075

F1A:L3:076

S F1A:L3:062

S F1A:L3:064

F1A:N16:08 F1A:S16:08 75cd 0.5w

F1A:N16:10 F1A:S16:10 75cd 0.5w

F1A:N16:09 F1A:S16:09 75cd 0.5w

F1A:N16:11 F1A:S16:11 15cd 0.5w

F1A:N16:13 EOL

F1A:S16:13 EOL

75cd 0.5w

F1A:N16:12 F1A:S16:12 30cd 0.5w

F1A:N15:11 F1A:S15:10 15cd 0.5w

F1A:N15:12 F1A:S15:11 15cd 0.5w

F1A:N15:13 F1A:S15:12 75cd 0.5w

F1A:N15:14 EOL

F1A:S15:13 EOL

75cd 0.5w

F1A:N15:10 F1A:S15:09 15cd 0.5w

F1A:N15:08 F1A:S15:07 75cd 0.5w

F1A:N15:07 F1A:S15:06 75cd 0.5wF1A:N15:09

F1A:S15:08 75cd 0.5w

F1A:N13:13 F1A:S13:12 30cd 0.5w

F1A:N15:01 F1A:S15:01 15cd 0.5w

F1A:N15:02 F1A:S15:03 15cd 0.5w

F1A:N15:03 15cd

F1A:N15:04 15cd

F1A:N16:04 F1A:S16:04 75cd 0.5w

F1A:N16:01 F1A:S16:01 75cd 0.5w

F1A:N16:02 F1A:S16:02 75cd 0.5w

F1A:N16:03 F1A:S16:03 110cd 0.5w

F1A:N14:05 F1A:S14:04 110cd 0.5w

F1A:N14:01 F1A:S14:01 15cd 0.5w

F1A:N14:02 F1A:S14:02 15cd 0.5w

F1A:N14:04 15cd

F1A:N14:03 15cd

F1A:N15:06 F1A:S15:05 15cd 0.5w

F1A:N15:05 F1A:S15:04 15cd 0.5w

S F1A:L3:070

S F1A:L3:068

S F1A:L3:069

S F1A:L3:067

S F1A:L3:066

S

F1A:L3:061

S F1A:L3:071

DH

F1A:L3:063

F1A:L3:077

S

F1A:S15:02 0.5w

S F1A:S14:03 0.5w

TS AIM

F1A:L3:081

TS

FS

AIM

F1A:L3:078 4-I/0

HI

LO AIM F1A:L3:079

D

DEVICES LOCATED IN BASEMENT

TS

FS

AIM

F1A:L3:089 D

TS

FS

AIM

F1A:L3:073 D

TOILET

GB110 M

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

1A.FA100B

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A GROUND FLOOR AREA B

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100C

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - GROUND FLOOR AREA "B"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

SCOPE OF WORK:: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

87 98.7 9.5

N

P

Q

O

9.7

TRANS

VAULT

GB1102

GENERATORS

GB1103

STAIR

F1A:L3:083

F1A:L3:084

F1A:L3:085

F1A:L3:088

F1A:N16:08 F1A:S16:08 75cd 0.5w

F1A:N16:05 F1A:S16:05 75cd 0.5w

F1A:N16:07 F1A:S16:07 75cd 0.5w

F1A:N16:06 F1A:S16:06 75cd 0.5w

F1A:N16:04 F1A:S16:04 75cd 0.5w

S F1A:L3:082

TS

FS

TS

FS

AIM

F1A:L3:080 D

AIM

F1A:L3:086 4-I/0

HI

LO AIM

F1A:L3:087 D

TS AIM

F1A:L3:081

TS

FS

AIM

F1A:L3:078 4-I/0

HI

LO AIM F1A:L3:079

D

DEVICES LOCATED IN BASEMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

1A.FA100C

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A GROUND FLOOR AREA C

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100B

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - GROUND FLOOR AREA "C"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA514.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA514.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

SCOPE OF WORK: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

A

B

C

D

E

F

G

1 2 3 4 5

A 5

E 5

D 5

A 7

UP

HAC

EB1101D

DECONTAM

EB1101

PREPARATION

EB1112E

CORRIDOR

CB1-17

EQUIP.

CART

PROCESS

EB1112B

CART

WASH

EB1101B

EQUIPMENT

SERVICE

ACCESS

EB1101A

STAGING

EB1112H

MEDEVATOR

EB1112I

MANUAL

WASH

EB1101C

SPD

OFFICE

EB1112

CHIEF

SPD

EB1106A

HAC

EB1112A

SPD

STERILE

STORAGE

EB1112D

GAS

STER

EB1112F

SERVICE

ACCESS

EB1112G

COMM

EB1113AELEC

EB1113

VEST

CB1-18

STAIR

STORAGE

EB1112C

SUPPLY

RM

DISPATCH

EB1110

MECH

EB1109

SUPPLY

STORAGE

EB1111

SEC

EB1106

FILE RM

EB1106C

VOL. &

TRAINING

EB1107

OFFICE

1112C

F1A:L1:010

F1A:N9:14 F1A:S9:10 15cd 0.5w

F1A:N9:10 F1A:S9:07 75cd 0.5w

F1A:N9:13 75cd 0.5w

F1A:N9:16 EOL

F1A:S9:12 EOL

75cd 0.5w

F1A:N9:15 F1A:S9:11 75cd 0.5w

F1A:N9:12 F1A:S9:09 75cd 0.5w

F1A:N10:08 F1A:S10:09 75cd 0.5w

F1A:N10:06 F1A:S10:07 75cd 0.5w

F1A:N10:09 EOL

F1A:S10:10 EOL

15cd 0.5w

F1A:N10:07 F1A:S10:08 15cd 0.5w

F1A:N10:04 F1A:S10:05 75cd 0.5w

F1A:N10:05 F1A:S10:06 15cd 0.5w

F1A:N10:03 F1A:S10:04 75cd 0.5w

F1A:N10:01 F1A:S10:01 75cd 0.5w

F1A:N10:02 F1A:S10:03 75cd 0.5w

F1A:N9:07 F1A:S9:03 15cd 0.5w

F1A:L2:038

S F1A:L1:009

TS AIM

F1A:L1:011

AOM

F1A:L1:090

S

F1A:S9:04 0.5w

FAA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

1A.FA100D

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A GROUND FLOOR AREA D

AutoCAD SHX Text

WLM

AutoCAD SHX Text F2

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100E

AutoCAD SHX Text F2

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - GROUND FLOOR AREA "D"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

SCOPE OF WORK:: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

11.786 7 9

11 128.7 9.5 11.9

UP

UP

G

L1R47

DB1102B

PASSAGE

CB1-13

CORRIDOR

CB1-2

PHARMACY

DB1102

SERVICE

ELEVATOR

LOBBY

CB1-11

DW

DB1108

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

DW

STAIR

CORRIDOR

CB1-10

CORRIDOR

CB1-9

OFFICE

DB1102A

VESTIBULE

I.V.

ADMIXTURE

CLEAN

RM.

DB1102C

VAULT

DB1102H

FLAM

STORAGE

DB1102G

BMSA STORAGE

DB1103HAC

DB1104

CORRIDOR

CB1-15

CORRIDOR

CB1-14

CORRIDOR

CB1-16

CORRIDOR

CB1-16A

CORRIDOR

CB1-12

PASS

ELEVATOR

LOBBY

CB1-1A

COMM

GB1110 TOILET

GB1106

ELEVATOR

P2

ELEVATOR

P1

ELEVATOR

P3

ELEVATOR

P4SECURITY

DB1101TOILET

DB1100

CB1-1B

TOILET

EB1100

SCHEDULED

ADMISSION

OFFICE

FB1103C

CENTRALIZED

CHECK

IN

FB1103B

CLEAN

LINEN

DB1107

BREAK

RM

DB1112

CORRIDOR

CB1-14A

TOILET

EB1103ALKR

EB1103

LKR

EB1102

TOILET

EB1102A

TOILET

EB1104A

LKR

EB1104

LKR

EB1105

TOILET

EB1105A

ELEC

DB1109

MECH

DB1105

EMS

DB1110

BATTERY

CHARGING

DB1110A

SOILED

LINEN

DB1106

TRANSPORT

DB1111

STAIR

RECEIVING/

BREAKOUT

EB1108

OFFICE

EB1106D

ASST

CHIEF

SPD

EB1106B

OPEN

DOOR

SH

AF

T

MORGUE

AGENT

CASHIER

CUEING

EB1114

SW

ISS

LO

G R

OB

OT

N.I .C.

COMPOUNDING

OUT PATIENT

FILLING

MOBILE ROBOT

CHARGING AREA

CHARGING

DOCK

F1A:L1:007

F1A:L1:008 F1A:L1:004

F1A:L1:001

S F1A:L2:032

S F1A:L2:033

S

F1A:L2:031

S F1A:L2:036

S F1A:L2:035

F1A:N11:14 EOL

F1A:S11:16 EOL

15cd 0.5w

F1A:N11:12 F1A:S11:13 15cd 0.5w

F1A:N12:11 EOL

F1A:S12:10 EOL

15cd 0.5w

F1A:N12:10 F1A:S12:09 15cd 0.5w

F1A:N12:07 F1A:S12:06 75cd 0.5w

F1A:N12:06 F1A:S12:05 75cd 0.5w

F1A:N12:08 F1A:S12:07 75cd 0.5w

F1A:N12:09 F1A:S12:08 75cd 0.5w

F1A:N12:05 F1A:S12:04 75cd 0.5w

F1A:N12:04 F1A:S12:03 75cd 0.5w

F1A:N12:02 F1A:S12:01 75cd 0.5w

F1A:N12:03 F1A:S12:02 75cd 0.5w

F1A:N13:03 F1A:S13:03 15cd 0.5w

F1A:N11:11 F1A:S11:11 15cd 0.5w

F1A:N11:10 F1A:S11:10 15cd 0.5w

F1A:N11:08 F1A:S11:08 15cd 0.5w

F1A:N11:02 F1A:S11:02 15cd 0.5w

F1A:N11:05 F1A:S11:05 15cd 0.5w

F1A:N11:03 F1A:S11:03 15cd 0.5w

F1A:N9:08 F1A:S9:05 15cd 0.5w

F1A:N11:04 F1A:S11:04 75cd 0.5w

F1A:N11:06 F1A:S11:06 75cd 0.5w

F1A:N11:07 F1A:S11:07 15cd 0.5w

F1A:N9:09 F1A:S9:06 75cd 0.5w

F1A:N9:11 F1A:S9:08 75cd 0.5w

F1A:N9:01 F1A:S9:01 15cd 0.5w

F1A:N13:05 F1A:S13:06 15cd 0.5w

F1A:N13:04 F1A:S13:04 15cd 0.5w

F1A:N11:09 F1A:S11:09 15cd 0.5w

F1A:N11:01 F1A:S11:01 15cd 0.5w

F1A:N13:06 F1A:S13:07 15cd 0.5w

F1A:N13:12 F1A:S13:11 15cd 0.5w

F1A:N13:02 F1A:S13:02 15cd 0.5w

F1A:N13:01 F1A:S13:01 15cd 0.5w

F1A:N12:01 15cd

F1A:N9:03 15cd

F1A:N9:02 15cd

F1A:N13:08 15cd

F1A:N13:07 15cd

F1A:N9:06 15cd F1A:N9:05

15cd

F1A:N11:13 F1A:S11:14 75cd 0.5w

F1A:N9:04 F1A:S9:02 15cd 0.5w

F1A:N13:10 F1A:S13:09 15cd 0.5w

F1A:N13:09 F1A:S13:08 15cd 0.5w

F1A:N13:11 F1A:S13:10 15cd 0.5w

F1A:N13:14 F1A:S13:13 30cd 0.5w

S F1A:L1:003

S F1A:L1:005

TS

FS

TS

DH

F1A:L1:002

AIM

F1A:L1:006 4-I/0

AIM

F1A:L2:030 D

AOM

F1A:L3:060

S F1A:S11:15 0.5w

S

F1A:S13:05 0.5w

S

F1A:S11:12 0.5w

SF1A:S10:02

0.5w

FACP F1A

S F1A:L2:029

TS

FS

AIM

F1A:L2:034 D

TS

FACP

CP

U

CAMPUS FACP

LC

D

TS

MAGNETIC

LOCK

MAGNETIC

LOCK

MAGNETIC

LOCK

AOMF1A:L1:012

AOM F1A:L1:013

AOM

F1A:L1:014

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

1A.FA100E

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A GROUND FLOOR AREA E

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100B

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100D

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100B

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA100D

AutoCAD SHX Text F1

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - GROUND FLOOR AREA "E"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

SCOPE OF WORK:: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

1 2 43

H

J

K

L

M

L.5

DN

VACANT

SHELL

SPACE

MECHANICAL

I.T.

DRY-PIPE

VALVE

ELEV

MACHINE

ROOM

F1A:N5:12 EOL

F1A:S5:13 75cd 0.5w

F1A:N8:01 F1A:S8:01 110cd 0.5w

F1A:N8:02 F1A:S8:02 110cd 0.5w

F1A:N8:03 F1A:S8:03 110cd 0.5w

F1A:N8:05 EOL

F1A:S8:05 EOL

110cd 0.5w

F1A:N8:04 F1A:S8:04 110cd 0.5w

S

F1A:S5:14 EOL

0.5w

TS

FS

HI

LO

HI

LO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

1A.FA101A

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A FIRST FLOOR AREA A

AutoCAD SHX Text

WLM

AutoCAD SHX Text F2

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101C

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101B

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101C

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101B

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - FIRST FLOOR AREA "A"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

AutoCAD SHX Text SCOPE OF WORK:: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - FIRST FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

F1

5 6

10 11 1211.5 13

K 3

N

O

ROOF

ROOF

UP DN

DN H

J

K

IMAGE

G109

CORRIDOR

C1-30

STAIR

CORRIDOR

C1-2

CORRIDOR

C1-3

MECH

G119

G136

OFFICE

G137

OFFICE

G138

OFFICE

G139

CONFERENCE

G140

OFFICE

G148

OFFICE

G147G146

OFFICE

G142

OFFICE

G145

CORRIDOR

C1-28

CORRIDOR

C1-31

CORRIDOR

C1-32

OFFICE

G154

OFFICE

G151

OFFICE

G150

CORRIDOR

C1-27

CORRIDOR

C1-33

RECEPTION

G129

STG

G149COPIER

G152

OFFICE

G153

CLASSROOM

G149

CORRIDOR

C1-7

CLOSET

G121

ON-CALL

G122

BATH

G122A

OFFICE

G141

OFFICE

G135

OFFICE

G134

OFFICE

G130

OFFICE

G133

OFFICE

G132

OFFICE

G131

CORRIDOR

C1-4

ON-CALL

G123

ON-CALL

G125

BATH

G125A

ON-CALL

G127

CORRIDOR

C1-6

CORRIDOR

C1-5

BATH

G117A

BREAK

G117

LOUNGE

G114

LIN

G118

HAC

G120

ON-CALL

G124

ON-CALL

G116

BATH

G115A

BATH

G124A

ON-CALL

G126ON-CALL

G115

CORRIDOR

C1-8

NVT MED STORAGE

G105

RADW STOR

G104

RES OFFICE

G102

HAC

G100

COMM

ELECTRICAL

G108

IMAGE

G110LOUNGE

G103

STOR

G101

IMAGE

G112

RADIO PHARM

G111

CORRIDOR

C1-29

OFFICE

SHAFT

CHIEF

ASSIST

CHIEF SUPER SUPER SUPER

CLINICAL

STAIR /

ELEVATOR

LOBBY SHARED

CONFERENCE

ROOM

WAITING

BREAK

ROOM

CLINICAL

COMMON

WORK

ROOM

CLINICAL CLINICAL CLINICAL

STUDENT

STUDENT

ELECT

ELEV

MACHINE

ROOM

F1A:L6:182

S

F1A:L5:136

F1A:N4:05 F1A:S4:05 15cd 0.5w

F1A:N4:02 F1A:S4:02 15cd 0.5w

F1A:N5:01 F1A:S5:01 15cd 0.5w

F1A:N5:02 F1A:S5:02 15cd 0.5w

F1A:N5:03 F1A:S5:03 15cd 0.5w

F1A:N4:01 F1A:S4:01 15cd 0.5w

F1A:N7:02 F1A:S7:02 15cd 0.5w

F1A:N7:08 F1A:S7:09 15cd 0.5w

F1A:N7:03 F1A:S7:04 15cd 0.5w

F1A:N7:06 F1A:S7:07 15cd 0.5w

F1A:N7:04 F1A:S7:05 15cd 0.5w

F1A:N7:10 F1A:S7:11 15cd 0.5w

F1A:N7:01 F1A:S7:01 15cd 0.5w

F1A:N7:14 F1A:S7:15 15cd 0.5w

F1A:N7:18 F1A:S7:17 15cd 0.5w

F1A:N7:13 F1A:S7:14 15cd 0.5w

F1A:N7:20 F1A:S7:18 15cd 0.5w

F1A:N7:16 15cd

F1A:N7:17 15cd

F1A:N7:19 15cd

F1A:N7:21 15cd

F1A:N7:15 F1A:S7:16 15cd 0.5w

F1A:N7:11 15cd

F1A:N7:22 EOL

F1A:S7:19 EOL

75cd 0.5w

F1A:N7:07 F1A:S7:08 30cd 0.5w

F1A:N7:09 F1A:S7:10 15cd 0.5w

F1A:N6:05 15cd

F1A:N6:09 15cd

F1A:N6:10 F1A:S6:08 15cd 0.5w

F1A:N6:08 F1A:S6:07 15cd 0.5w

F1A:N6:02 F1A:S6:02 15cd 0.5w

F1A:N6:03 F1A:S6:03 15cd 0.5w

F1A:N7:05 F1A:S7:06 15cd 0.5w

F1A:N6:07 F1A:S6:06 15cd 0.5w

F1A:N6:11 F1A:S6:09 15cd 0.5w

F1A:N5:08 F1A:S5:08 30cd 0.5w

F1A:N5:09 F1A:S5:09 30cd 0.5w

F1A:N6:06 F1A:S6:05 15cd 0.5w

F1A:N6:04 F1A:S6:04 15cd 0.5w

F1A:N6:01 F1A:S6:01 15cd 0.5w

F1A:N6:12 EOL

F1A:S6:10 EOL

15cd 0.5w

S F1A:L6:185

SB

S F1A:L6:184

SB S F1A:L6:187

SB

S F1A:L6:186

SB

S

F1A:L6:188

SB

S

F1A:L6:189

SB

SF1A:L6:190

SB

S F1A:L6:192

S F1A:L6:193

TS

TS

FS

DH

DH

F1A:L5:137

S

F1A:L6:191

SB

AIM

F1A:L6:183 4-I/0

AOM

F1A:L5:138

S

F1A:S4:06 0.5w

S

F1A:S7:12 0.5w

S

F1A:S7:03 0.5w

F1A:N7:12 F1A:S7:13 15cd 0.5w

AOM

F1A:L5:135

MAGNETIC

LOCK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

1A.FA101B

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A FIRST FLOOR AREA B

AutoCAD SHX Text

WLM

AutoCAD SHX Text F1

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101D

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101D

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101C

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - FIRST FLOOR AREA "B"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.

AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.

AutoCAD SHX Text

CEILING WORK NOTE

AutoCAD SHX Text A7

AutoCAD SHX Text SCOPE OF WORK:: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.

AutoCAD SHX Text F1

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - FIRST FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

D

C

D

E

F

G

1 2 3 4

A 5

E 5

D 5

A 7

UP

DN

SEC

E108A

CORRIDOR

C1-26

CORRIDOR

C1-20

STAFF/ TECH

CLERICAL

E108

CORRIDOR

C1-25

CORRIDOR

C1-24

CORRIDOR

C1-23

CORRIDOR

C1-22

SOUND BOOTH

E122B

E122D E122C

E122A

AUDIO

STORAGE

E120

HAC

E138

SOUND SUITE

E118B

E118D

E118A

E118C

STOR

E136

AUDIO GT RM

E134E133

OFFICE

E132

COMM

E131

ELEC

E130

STAIR

AUDIOLOGY

E129

SPEECH GT RM

E129

SPEECH

E128

OFFICE EXAM

E127

OFFICE

E126

E125

AUDIO

E124

AUDIO

E123

AUDIO

E121

ACOUST IMP

E119

OFFICE EXAM

E117

OFFICE EXAM

E116

COMPUTER

E107

SUPPLY

E106

IRMS CHIEF

E108B

ASST CHIEF

E108C

CONFERENCE

E108DPROGRAM

E108E

OFFICE

OFFICE

F1A:L5:130

F1A:N1:12 F1A:S1:17 75cd 0.5w

F1A:N1:05 F1A:S1:07 15cd 0.5w

F1A:N1:01 F1A:S1:01 15cd 0.5w

F1A:N1:02 F1A:S1:03 15cd 0.5w

F1A:N1:03 F1A:S1:04 15cd 0.5w

F1A:N1:04 F1A:S1:05 15cd 0.5w

F1A:N1:08 F1A:S1:10 75cd 0.5w

F1A:N1:07 F1A:S1:09 75cd 0.5w

F1A:N1:11 F1A:S1:15 15cd 0.5w

F1A:N1:09 F1A:S1:12 15cd 0.5w

F1A:N5:11 F1A:S5:12 15cd 0.5wTS

FS

TS

FS

F1A:N1:10 F1A:S1:13 15cd 0.5w

AIM F1A:L5:131

4-I/0

F1A:L5:129

S

F1A:S1:02 0.5w

S F1A:S1:06 0.5w

S

F1A:S1:14 0.5w

S

F1A:S1:16 0.5w

S F1A:S5:11 0.5w

S

F1A:S1:11 0.5w

AIM

F1A:L4:100

FSCP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

(FUTURE)

AutoCAD SHX Text

CONTRACTOR SHALL PROVIDE RELAY MODULE FOR FUTURE FIRE SUPPRESSION CONTROL PANEL.

AutoCAD SHX Text

1A.FA101C

AutoCAD SHX Text

KMB

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING 1A FIRST FLOOR AREA C

AutoCAD SHX Text

WLM

AutoCAD SHX Text F2

AutoCAD SHX Text N

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE FIRE ALARM SYSTEM

AutoCAD SHX Text 614-19-111

AutoCAD SHX Text 06-24-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text 1A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101D

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101A

AutoCAD SHX Text

MATCHLINE - REFER TO 1A.FA101D

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text

NEW FIRE ALARM PLAN BUILDING NO. 1A - FIRST FLOOR AREA "C"

AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .