S06 RFI Responses 07202022.pdf

PDF 101 KB Posted

Attached to
Y1NB--650-19-100 Replace Boilers in Bldg 10
Solicitation number
36C24122R0084
Issued by

About this file

This document contains responses to requests for information (RFI) related to Solicitation Number 36C24122R0084 to replace boilers in Building 10 for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The responses clarify that specification section 33 16 15 issued with Amendment 0005 contained errors and has been amended in Amendment 0006. Drawing P601 and P502 have also been amended. Additionally, Amendment 0006 extends the response due date as requested in RFI Question 118.

View the file

Other files

File Type Posted
S06 RFI Responses 07262022.pdf PDF
36C24122R0084 0008.docx DOCX document
36C24122R0084 0007.docx DOCX document
S06 RFI Response 07212022.pdf PDF
S06 AMENDED Drawing P-502.pdf PDF
S06 AMENDED Spec Section 33 16 15 07202022.pdf PDF
S06 AMENDED Drawing P-601.pdf PDF
36C24122R0084 0006.docx DOCX document
S06 EXHIBIT C Past Performance Questionnaire Revised.pdf PDF
36C24122R0084 0005.docx DOCX document
S06 IMG_3850.pdf PDF
S06 RFI Responses 07192022.pdf PDF
S06 AMENDED Spec Section 33 16 15.pdf PDF
S06 AMENDED Spec Section 03 52 00.pdf PDF
S06 ARCHITECTURAL DRAWINGS BULLETIN 2.pdf PDF
S06 IMG_0098.pdf PDF
S06 IMG_4044.pdf PDF
S06 IMG_4037.pdf PDF
S06 GE- Roofs.pdf PDF
36C24122R0084 0004.docx DOCX document
S06 IMG_4010.pdf PDF
S06 RFI Responses 07142022.pdf PDF
S06 IMG_0094.pdf PDF
S06 ELECTRICAL DRAWINGS BULLETIN 1.pdf PDF
S06 EXHIBIT D Calculation of Self Performed Work Amended.pdf PDF
S06 Bldg 10 Boiler Plant REGULATED BLDG MATERIALS SURVEY REPORT.pdf PDF
S06 RFI Responses.pdf PDF
36C24122R0084 0003.docx DOCX document
S06 MECHANICAL DRAWINGS BULLETIN 1.pdf PDF
S06 JA CCTV System Boilers 650-19-100.pdf PDF
S06 STRUCTURAL DRAWINGS BULLETIN 1.pdf PDF
S06 EXHIBIT A Project Information Sheet for Contractors Amended.pdf PDF
S06 EXHIBIT C Past Performance Questionnaire.pdf PDF
36C24122R0084 0002.docx DOCX document
36C24122R0084 0001.docx DOCX document
Site Visit Sign-In Sheet.pdf PDF
S02 BD03252022 Drawings - 2b_Civil - Part 2.pdf PDF
S02 BD03252022 Drawings - 9_Security Electronics.pdf PDF
S02 BD03252022 Drawings - 7b_Mechanical - Part 2.pdf PDF
S02 BD03252022 Drawings - 6_Plumbing.pdf PDF
S02 BD03252022 Drawings - 1_Hazardous Materials.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol I.pdf PDF
S02 BD03252022 Drawings - 0_General.pdf PDF
S02 BD03252022 Drawings - 8a_Electrical - Part 1.pdf PDF
S02 BD03252022 Drawings - 3_Structural.pdf PDF
S02 BD03252022 Drawings - 4_Architecture.pdf PDF
S02 BD03252022 Drawings - 8b_Electrical - Part 2.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol III.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol II.pdf PDF
S02 BD03252022 Drawings - 5_Fire Protection.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e 1 | 1

Amendment 0006 Responses to RFI.

Question 117: The specification (33 16 15) that was issued with this latest amendment 0005 has not been edited to correct the mistakes clarified in the RFI’s. Was the original specification issued by mistake? Regardless, I think we are comfortable now knowing that that an all welded 50,000‐gallon tank is desired from the reading the RFI answers, but just letting you know the specification that was issued has not been edited to correct the clarifications issued in the RFI’s.

VA Response: Attached S06 AMENDED Specification Section 36 16 15 WATER STORAGE STEEL TANKS is attached in Amendment 0006. See Amended Drawings P‐601 and P‐502.

Question 118: Is there any way we could get a Time Extension on the Due Date?

VA Response: See Amendment 0006, Block 14.