S02 BD03252022 Drawings - 5_Fire Protection.pdf

PDF 452 KB Posted

Attached to
Y1NB--650-19-100 Replace Boilers in Bldg 10 Federal contract opportunity
Solicitation number
36C24122R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This set of construction documents includes drawings and specifications for a fire suppression system replacement project at a Department of Veterans Affairs medical center. The project involves demolishing the existing fire protection system and installing a new sprinkler system throughout Building 10 and its annex to protect over 10,000 square feet of space housing maintenance areas, offices, and mechanical rooms. Detailed drawings show sprinkler locations, pipe routing and sizing, and fire protection equipment such as backflow preventers, fire department connections, and valves. Specifications require NFPA and VA code compliance and list design criteria, materials, testing and inspection requirements. The solicitation seeks bids to design, install, test, and commission the new fire suppression system according to the drawings and specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--650-19-100 Replace Boilers in Bldg 10, newest first.
File Type Posted
S06 RFI Responses 07262022.pdf PDF
36C24122R0084 0008.docx DOCX document
S06 RFI Response 07212022.pdf PDF
S06 AMENDED Drawing P-601.pdf PDF
36C24122R0084 0006.docx DOCX document
S06 EXHIBIT C Past Performance Questionnaire Revised.pdf PDF
S06 RFI Responses 07192022.pdf PDF
S06 AMENDED Spec Section 33 16 15.pdf PDF
S06 IMG_4044.pdf PDF
36C24122R0084 0004.docx DOCX document
S06 AMENDED Spec Section 03 52 00.pdf PDF
S06 IMG_0094.pdf PDF
S06 RFI Responses 07142022.pdf PDF
S06 RFI Responses.pdf PDF
S06 EXHIBIT A Project Information Sheet for Contractors Amended.pdf PDF
S06 STRUCTURAL DRAWINGS BULLETIN 1.pdf PDF
S06 ELECTRICAL DRAWINGS BULLETIN 1.pdf PDF
S06 MECHANICAL DRAWINGS BULLETIN 1.pdf PDF
S06 EXHIBIT D Calculation of Self Performed Work Amended.pdf PDF
36C24122R0084 0002.docx DOCX document
S06 EXHIBIT C Past Performance Questionnaire.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
36C24122R0084 0001.docx DOCX document
S02 BD03252022 Drawings - 7b_Mechanical - Part 2.pdf PDF
S02 BD03252022 Drawings - 8a_Electrical - Part 1.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol II.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol III.pdf PDF
S02 BD03252022 Drawings - 2a_Civil - Part 1.pdf PDF
S02 BD03252022 Drawings - 6_Plumbing.pdf PDF
S02 BD03252022 Drawings - 7a_Mechanical - Part 1.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol I.pdf PDF
S02 BD03252022 Drawings - 1_Hazardous Materials.pdf PDF
S02 BD03252022 Drawings - 2b_Civil - Part 2.pdf PDF
S02 BD03252022 Drawings - 3_Structural.pdf PDF
S02 BD03252022 Drawings - 4_Architecture.pdf PDF
S02 BD03252022 Drawings - 8b_Electrical - Part 2.pdf PDF
S02 BD03252022 Drawings - 9_Security Electronics.pdf PDF
S02 BD03252022 -Slope Stability Report.pdf PDF
S02 BD03252022 - Soil Erosion and Sediment Control Plan.pdf PDF
S02 JA Lockset Boilers 650-19-100.pdf PDF
S02 36C24122R0084 Solicitation.pdf PDF
S02 JA Fire Alarm System Boilers 650-19-100.pdf PDF
S02 JA Utility Plant Boilers 650-19-100.pdf PDF
S02 RI20220001 Wage Determinations.pdf PDF
S02 VHA Supplemental Contract Requirements for Combatting COVID-19.pdf PDF
S02 EXHIBIT E VAAR Clause 852.219-77 Certificate of Compliance.pdf PDF
S02 EXHIBIT B Subcontractor Information and Consent Form.pdf PDF
S02 EXHIBIT D Calculation of Self Performed Work.pdf PDF
S02 EXHIBIT C Past Performance Questionnaire.pdf PDF
S02 EXHIBIT A Project Information Sheet for Contractors.pdf PDF
Show all 50

Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SUPPRESSION ABBREVIATIONS

ABD AUTOMATIC BALL DRIP

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

AS AUTOMATIC SPRINKLER

ATR ALL THREAD ROD

BFP BACKFLOW PREVENTER

BOB BOTTOM OF BEAM

CB CONCRETE BEAM

COL COLUMN

CONC CONCRETE

DI DUCTILE IRON

DN DOWN

DP DRY PENDENT (SPRINKLER)

DS DRY SIDEWALL (SPRINKLER)

EC EXTENDED COVERAGE (SPRINKLER)

EXP EXPOSED (NO CEILING)

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FHV FIRE HOSE VALVE

FS FLOW SWITCH

GALV GALVANIZED

GYP GYPSUM WALL BOARD

(SHEETROCK)

HT HIGH TEMPERATURE (SPRINKLER)

ITC INSPECTORS TEST CONNECTION

MAX MAXIMUM

MIN MINIMUM

MT METAL TILE

NIC NOT IN CONTRACT

NS NON-SPRINKLERED

NTS NOT TO SCALE

OSJ OPEN STEEL JOIST

PL PLASTER (CEILING)

POC POINT OF CONNECTION

PRV PRESSURE RELIEF VALVE

QR QUICK RESPONSE (SPRINKLER)

SCH SCHEDULE

SPL HIDDEN SPLINE (CEILING)

STL STEEL

TYP TYPICAL

TS TAMPER SWITCH

UNO UNLESS NOTED OTHERWISE

FIRE SUPPRESSION GENERAL NOTES:

1. PROVIDE DETAILED DESIGN, INSTALLATION, AND TESTING FOR A NEW FIRE SPRINKLER SYSTEM TO SERVE BUILDING 10, THE BOILER PLANT, AT THE VA MEDICAL CENTER IN PROVIDENCE, RI. THE SYSTEM IS SERVED BY

EXISTING WATER MAINS NEAR THE BUILDING.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SPRINKLER WORK. CONTRACTOR IS TO DEMOLISH EXISTING FIRE PROTECTION APPARATUS. CONTRACTOR SHALL PERFORM A SITE VISIT DURING BIDDING AND INCLUDE

REMOVAL OF ALL EXISTING FIRE PROTECTION MATERIAL IN THEIR BID.

3. PROVIDE ALL NECESSARY MATERIALS AND LABOR TO FURNISH AND INSTALL THE SYSTEM AS DESCRIBED IN THE PROJECT SPECIFICATIONS AND CONTRACT DRAWINGS AND AS REQUIRED BY ALL APPLICABLE CODES AND

STANDARDS.

4. PRELIMINARY HYDRANT FLOW TEST RESULTS INDICATE A WATER SUPPLY WITH A STATIC PRESSURE OF 80 PSI AT HYDRANT #6 AT THE NORTH CORNER OF BUILDING 10 AND A RESIDUAL PRESSURE OF 55 PSI FLOWING 1,130 GPM. CONTRACTOR SHALL OBTAIN CURRENT FLOW TEST DATA FOR DESIGN AND CALCULATIONS PURPOSES. CONTRACTOR SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DECREASE IN WATER SUPPLY THAT MAY IMPACT THE PROJECT WITHIN 10 BUSINESS DAYS OF CONTRACTOR RECEIPT OF CURRENT FLOW

TEST DATA. CONTRACTOR MAY BE REQUIRED TO PERFORM A HYDRANT FLOW TEST.

5. PIPE AND EQUIPMENT SIZES AND LOCATIONS SHOWN ARE DIAGRAMMATIC AND ARE FOR REFERENCE ONLY.

CONTRACTOR IS RESPONSIBLE FOR ALL DETAILED HYDRAULIC CALCULATIONS, SIZING AND LOCATION OF ALL

PIPING, EQUIPMENT LAYOUT, ETC.

6. ALL REFERENCES TO THE AUTHORITY HAVING JURISDICTION (AHJ) SHALL MEAN THE DEPARTMENT OF VA

REGIONAL FIRE PROTECTION ENGINEER.

7. ALL REFERENCES TO THE ENGINEER SHALL MEAN KOFFEL ASSOCIATES, INC.

8. ALL REFERENCES TO THE OWNER SHALL MEAN THE DEPARTMENT OF VETERANS AFFAIRS (THE VA).

9. INSTALLATION OF THE FIRE SPRINKLER SYSTEM AND ASSOCIATED COMPONENTS SHALL BE IN ACCORDANCE

WITH THE FOLLOWING:

• VA FIRE PROTECTION DESIGN MANUAL (VAFPDM) - 2021 EDITION

• NFPA 101®, LIFE SAFETY CODE® (LSC) - 2021 EDITION

• NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS - 2019 EDITION

• NFPA 70, NATIONAL ELECTRICAL CODE - 2020 EDITION

• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE - 2019 EDITION

• INTERNATIONAL BUILDING CODE (IBC) - 2021 EDITION (AS AMMENDED)

• OTHER RELEVANT NFPA DOCUMENTS AND MANUFACTURER REQUIREMENTS, AS APPLICABLE.

10. THE FOLLOWING DESIGN CRITERIA APPLIES:

ꞏ ORDINARY HAZARD GROUP 2 (OH2): 0.20 GPM/SQ FT OVER 1,500 SQ FT (8.2 MM/MIN OVER 140 SQ M) ꞏ EXTRA HAZARD GROUP 1 (EH1): 0.30 GPM/SQ FT OVER 2,500 SQ FT (12.2 MM/MIN OVER 230 SQ M) PER VA BASE SPECIFICATIONS, BOILER PLANTS ARE CONSIDERED TO BE OH2 OCCUPANCIES. THE ENTIRE AREA OF THE BOILER PLANT SHALL BE CONSIDERED OH2 EXCEPT FOR THE GENERATOR ROOM, WHICH SHALL BE CONSIDERED EH1. SPRINKLER SPACING SHALL BE IN ACCORDANCE WITH NFPA 13 REQUIREMENTS.

11. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES, INCLUDING COORDINATION WITH

STRUCTURAL LIMITATIONS.

12. ALL HYDRAULIC CALCULATIONS SHALL YIELD AT LEAST A 10 PERCENT SAFETY FACTOR FOR EACH

SPRINKLER DESIGN AREA, INCLUDING REQUIRED HOSE STREAMS, AS PER THE VAFPDM.

13. ALL NEW MATERIALS SHALL BE LISTED BY UNDERWRITERS LABORATORIES, INC. (U.L.) FOR USE ON COMMERCIAL FIRE PROTECTION SYSTEMS. UNO, SPRINKLERS SHALL ALSO BE FACTORY MUTUAL (FM)

APPROVED, PER SECTION 6.1.K OF THE VAFPDM.

14. SPRINKLER TYPES SHALL BE AS DESCRIBED IN THE PROJECT SPECIFICATIONS.

15. NEW SPRINKLERS IN AREAS WITH FINISHED CEILINGS SHALL BE LOCATED IN SUSPENDED CEILING TILES AS INDICATED ON THE DESIGN DRAWINGS. ARMOVERS AND DROPS TO INDIVIDUAL SPRINKLERS SHALL BE FIELD

CUT TO ENSURE PROPER SPRINKLER PLACEMENT.

16. NEW SPRINKLER PIPE SHALL MEET THE FOLLOWING CRITERIA:

ꞏ PIPE SIZES 2" (50 MM) AND SMALLER: SCHEDULE 40, BLACK STEEL, MEETING ASTM A53 (TYPE E GRADE B) OR

A795 (TYPE E GRADE A) SPECIFICATIONS, CONNECTED WITH THREADED FITTINGS.

ꞏ PIPE SIZES 2½" (63 MM) AND LARGER: SCHEDULE 10, BLACK STEEL, MEETING ASTM A135 OR A795 TYPE E

GRADE A SPECIFICATIONS, CONNECTED WITH LISTED GROOVED COUPLINGS.

17. NEW PIPE FITTINGS SHALL INCLUDE:

ꞏ THREADED FITTINGS FOR SCHEDULE 40 PIPE SHALL CONFORM TO SECTION 6.4 OF NFPA 13.

ꞏ ROLL GROOVED FITTINGS FOR SCHEDULE 10 PIPE SHALL BE UL LISTED. COUPLINGS SHALL COMPLY WITH ASTM A536, AND A183 SPECFICIATIONS WITH GRADE E, TYPE A GASKETS. ALL COMPONENTS SHALL BE FROM A

SINGLE MANUFACTURER.

18. ALL NECESSARY CONNECTIONS TO THE FIRE ALARM SYSTEM SHALL BE MADE BY AND COORDINATED WITH THE FIRE ALARM CONTRACTOR. SYSTEM ACCEPTANCE TESTS SHALL BE COORDINATED WITH THE FIRE ALARM

CONTRACTOR AND WITNESSED BY THE OWNER AND/OR AHJ.

19. ALL HANGERS SHALL BE U.L. LISTED FOR USE WITH FIRE SPRINKLER SYSTEMS. HANGER INSTALLATION AND SPACING SHALL BE IN ACCORDANCE WITH NFPA 13. SEISMIC BRACING OF ALL PIPING AND EQUIPMENT SHALL BE PROVIDED. LOCATION OF SEISMIC BRACES AND OTHER PIPE SUPPORTS IS THE RESPONSIBILITY OF THE

CONTRACTOR.

20. ALL SPRINKLER SYSTEM PIPING AND HANGERS SHALL BE CONCEALED WHEREVER POSSIBLE. PROVIDE ACCESS PANELS FOR ALL VALVES, WHERE REQUIRED. DO NOT INSTALL SPRINKLER PIPE NEAR HOT

EQUIPMENT.

21. NEW FIRE SPRINKLER PIPE PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE SEALED WITH A U.L.

CERTIFIED THROUGH-PENETRATION SYSTEM APPROPRIATE FOR THE MATERIALS INVOLVED AND THE FIRE

RATING OF THE WALL PENETRATED. REFER TO ARCHITECTURAL DRAWINGS FOR WALL RATINGS.

22. ALL CONTRACTORS PREPARING BIDS FOR THE PROJECT ARE EXPECTED TO VISIT THE SITE PRIOR TO

SUBMITTING BIDS.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPMENT OF SHOP DRAWINGS, HYDRAULIC

CALCULATIONS, PERMIT FEES, APPROVAL OF SHOP DRAWINGS, AND ACCEPTANCE OF THE SPRINKLER SYSTEM

BY THE AHJ.

24. PRIOR TO SUBMITTING AN APPLICATION FOR SPRINKLER PERMIT TO THE AHJ, PROVIDE TWO COPIES OF ALL SHOP DRAWINGS, HYDRAULIC CALCULATIONS (WHERE REQUIRED), AND PRODUCT DATA SHEETS TO THE OWNER FOR REVIEW AND COMMENT. PERMIT APPLICATION SHALL NOT BE MADE UNTIL SUCH TIME THAT THE

ENGINEER HAS COMPLETED A REVIEW OF THE SHOP DRAWING PACKAGE.

25. UPON COMPLETION OF WORK, TESTING SHALL BE PERFORMED IN ACCORDANCE WITH VA, NFPA 13, AND NFPA 25 REQUIREMENTS. ALL TESTING SHALL BE WITNESSED BY THE AHJ AND THE OWNER’S DESIGNATED

REPRESENTATIVE.

26. PROVIDE AUTOMATIC AIR VENTS AT ALL HIGH POINTS IN THE SPRINKLER SYSTEM IN ACCORDANCE WITH

NFPA 13 REQUIREMENTS. AIR VENTS SHALL NOT REQUIRE MANUAL DRAINING OF WATER.

27. THIS PROJECT IS PHASED. COORDINATE ALL WORK WITH PHASING AS NECESSARY. SEE ARCHITECTURAL

DRAWINGS FOR PHASING INFORMATION.

28. DRAIN LOCATIONS ARE NOT INDICATED ON DRAWINGS. CONTRACTOR SHALL PROVIDE ALL DRAINS AS REQUIRED BY NFPA 13 AND THE VAFPDM. DRAINS SHALL BE PIPED TO THE EXTERIOR. CONTRACTOR SHALL PROVIDE AUXILIARY DRAINS AT ALL SYSTEM LOW POINTS AND AT ALL TRAPPED SECTIONS OF PIPING.

29. CONTRACTOR SHALL FIELD-COORDINATE WITH OTHER TRADES AND PROVIDE SPRINKLERS UNDER ALL

OBSTRUCTIONS AND OVERHANGS AS REQUIRED BY NFPA 13, INCLUDING UNDER STAIRS.

30. SPRINKLERS PROVIDED BELOW CEILING LEVEL IN THE BOILER ROOM AREA AND ALL AREAS WITH HIGH TEMPERATURE STEAM PIPING AND EQUIPMENT SHALL BE STANDARD-RESPONSE, ULTRA-HIGH TEMPERATURE RATED. NOT ALL OBSTRUCTIONS ARE SHOWN ON THE DRAWINGS. NOTE THAT THE CATWALKS SHALL BE CONSIDERED OBSTRUCTIONS WHEN OVER THE SIZE LIMITATIONS IMPOSED BY NFPA 13 OR WHEN THEY POSE

AN OBSTRUCTION TO SPRINKLER DISCHARGE OR SPRAY.

31. SPRINKLERS AT THE CEILING LEVEL IN THE BOILER PLANT AREA AND ALL AREAS WITH HIGH TEMPERATURE

STEAM PIPING AND EQUIPMENT SHALL BE QUICK-RESPONSE, HIGH TEMPERATURE RATED.

32. GUARDS SHALL BE PROVIDED ON ALL SPRINKLERS IN AREAS WITHOUT FINISHED CEILINGS. ALL GUARDS SHALL BE APPROVED BY THE SPRINKLER MANUFACTURER FOR USE WITH THE SELECTED SPRINKLERS.

33. PROVIDE A WALL-MOUNTED SPARE SPRINKLER CABINET IN THE EQUIPMENT ROOM NEAR THE SPRINKLER

WATER RISER, ALONG WITH ALL REQUIRED SPARE SPRINKLERS AND SPRINKLER TOOLS.

34. INSPECTION IS REQUIRED OF ALL CONSTRUCTION DELINEATED WITHIN THE FIRE SUPPRESSION DRAWINGS AND SPECIFICATIONS. PROVIDE TESTS AND INSPECTIONS IN COMPLIANCE WITH IBC REQUIREMENTS AND THE PROJECT SPECIFICATIONS. SPECIAL INSPECTIONS MUST BE PERFORMED FOR THE SPRINKLER SYSTEM AND

SEISMIC BRACING IN ACCORDANCE WITH SPECIFICATION REQUIREMENTS.

35. DO NOT PROVIDE SPRINKLERS OR PIPING IN THE AREA ENCOMPASSED BY A VERTICALLY ORIENTED CYLINDER OF SIX FEET IN DIAMETER EXTENDING DIRECTLY ABOVE BOILER STEAM RELEASE VENTS. SEE MECHANICAL DRAWINGS AND DETAILS FOR MORE INFORMATION REGARDING LOCATIONS OF THESE VENTS.

WHILE SPRINKLERS THEMSELVES SHALL NOT BE LOCATED IN THE AREA NOTED ABOVE, SPRINKLER COVERAGE

MUST STILL BE PROVIDED FOR THIS AREA.

36. DO NOT PROVIDE SPRINKLERS OR PIPING IN THE AREA DIRECTLY BELOW ROOF VENTS, INTAKES, AND OTHER SIMILAR FEATURES THAT ARE DIRECTLY OPEN TO THE EXTERIOR. WHILE SPRINKLERS THEMSELVES SHALL NOT BE LOCATED IN THE AREA NOTED ABOVE, SPRINKLER COVERAGE MUST STILL BE PROVIDED FOR THE AREA BELOW THESE ROOF OPENINGS. SEE MECHANICAL AND ARCHITECTURAL DRAWINGS FOR MORE

INFORMATION.

37. SPRINKLER PIPING SIZE AND LOCATION IS FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR APPROPRIATELY SIZING AND LAYING OUT THE SPRINKLER SYSTEM AT NO ADDITIONAL COST TO THE OWNER. A

LOOPED OR GRIDDED SPRINKLER SYSTEM MAY BE NECESSARY.

38. ALL FIRE SPRINKLER VALVES AND EQUIPMENT SHALL BE CLEARLY ANNOTATED ON THE CONTRACTOR AS- BUILT DRAWINGS. TAGS SHALL BE AFFIXED TO ALL VALVES AND EQUIPMENT. THE CONTRACTOR IS REQUIRED TO PROVIDE A VALVE LIST IN A 3-RING BINDER, AND TO PLACE LAMINATED VALVE LISTS INTO PICTURE FRAMES AND ATTACH THEM TO THE WALLS IN EACH SPACE. AS-BUILT DRAWINGS INCLUDING ALL FIELD MODIFICATIONS

SHALL BE PROVIDED IN REVIT AND AUTOCAD FORMAT.

39. ALL AREAS BELOW THE NEW MEZZANINE FLOORS MUST BE SPRINKLERED. IF THE FIRE SUPPRESSION PIPING IS INSTALLED TIGHT TO THE STEEL, UPRIGHT SPRINKLERS WILL BE REQUIRED IN EACH STRUCTURAL BAY. 18” (450 MM) CLEARANCE MUST BE MAINTAINED BELOW THE SPRINKLER HEADS TO ITEMS BELOW.

40. INSTALLATION OF SPRINKLERS AND PIPING SO AS TO BE PROTECTED FROM EXPOSURE TO TEMPERATURES BELOW 40 DEGREES F IS THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR IS ALSO RESPONSIBLE FOR INSTALLING SPRINKLERS IN LOCATIONS THAT ARE NOT SUBJECT TO EXCESSIVE HEAT. COORDINATE WITH OTHER TRADES AS NECESSARY. ANY RELATED CONCERNS MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND THE AHJ DURING THE SHOP DRAWING DEVELOPMENT PROCESS SUCH THAT THESE CONCERNS

MAY BE ADDRESSED.

41. SEE SPECIFICATIONS FOR SAMPLE HYDRANT FLOW TEST DATA. CONTRACTOR IS RESPONSIBLE FOR PROCURING CURRENT FLOW TEST DATA THAT IS LESS THAN SIX MONTHS OLD FOR SHOP DRAWING DEVELOPMENT AND HYDRAULIC CALCULATION PURPOSES. NOTIFY THE OWNER AND ENGINEER WITHIN FIVE BUSINESS DAYS IF WATER SUPPLY HAS DEGRADED TO THE POINT THAT THE WATER SUPPLY CANNOT MEET

THE SYSTEM DEMAND.

UPRIGHT SPRINKLER

(SUBSCRIPT DENOTES

INTERMEDIATE OR HIGH

TEMPERATURE)

DRY PENDENT

EXTENDED COVERAGE

UPRIGHT SPRINKLER

PENDENT SPRINKLER;

ON DROP NIPPLE

SPRINKLER GUARD;

SHOWN ON UPRIGHT

SPRINKLER

UPRIGHT SPRINKLER

EXTENDED COVERAGE

PENDENT SPRINKLER;

ON DROP NIPPLE

NS

EC

NEW SYSTEM PIPING

EXISTING PIPING TO REMAIN

POINT OF CONNECTION

PIPE HANGER

SYSTEM RISER

HOSE VALVE

PIPE TEE DOWN

CONCENTRIC REDUCER

ECCENTRIC REDUCER

FLUSHING CONNECTION OR

CAP

CONTROL VALVE

CHECK VALVE

OS&Y GATE VALVE

BUTTERFLY VALVE

NON-INDICATING CONTROL

VALVE

PRESSURE REDUCING

BACKFLOW

PREVENTER; DOUBLE CHECK

TYPE

POST-INDICATING VALVE

ALARM CHECK VALVE

FIRE DEPARTMENT

CONNECTION

CALCULATED REMOTE AREA

SPRINKLER ZONE BOUNDARY

HYDRAULIC REFERENCE NODE

AREA NOT PART OF SPRINKLER

ZONE

NON-SPRINKLERED AREA

LOGITUDINAL SWAY BRACES

4-WAY SWAY BRACES

FIRE SUPPRESSION LEGEND:

XX

HT,IT

EC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD KOFFEL ASSOCIATES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

01-07-2022

2/

/2

:0 3:

A

M

FX001

FIRE SUPPRESSION

NOTES, SYMBOLS, AND ABBREVIATIONS

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 MLD KLC0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

4321 5

A

D

6.7 8 9

B

C

E

D.1

A.1

B.1

B.4

C.7

4.9

A.4

1.1 1.31.2 2.1

SPRINKLER ZONE 1-1

10,350 SQ. FT.

MAINTENANCE

101LOCKERS

RESTROOM

SHOWER

OFFICE

BREAK ROOM

MAINTENANCE -

ADDITION

ANNEX

TRANSFORMER

FX301

1 1

6" 6"6"6"6"6"

6"

FX301

4 56

KEY NOTES:

6" UP TO FLOOR ABOVE.

6" INCOMING WATER WITH 6" AMES MODEL COLT

SERIES 2000SS DOUBLE CHECK BACKFLOW

PREVENTER ASSEMBLY, OR APPROVED EQUAL

INSTALLED IN VERTICAL (FLOW UP) WITH OS&Y

VALVES WITH SUPERVISORY SWITCHES, OR

APPROVED EQUAL.

2" DRAIN TO EXTERIOR.

PROVIDE MONITORED WALL-MOUNTED POST

INDICATOR VALVE.

4"x2-1/2"x2-1/2" BFP TEST HEADER. PROVIDE SIGNAGE

ALONG EXTERIOR WALL THAT READS 'BFP TEST

HEADER' ABOVE TEST HEADER.

4"x2-1/2"x2-1/2" FDC. PROVIDE SIGNAGE ALONG

EXTERIOR WALL THAT READS 'FDC' ABOVE FDC.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

1.

2.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD KOFFEL ASSOCIATES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH ACTUAL

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

01-07-2022

2/

/2

:0 3:

A

M

FX101

FIRE SUPPRESSION

FLOOR PLAN - MAIN LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 MLD KLC0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

3/16" = 1'-0"FX101

FIRE SUPPRESSION - FLOOR PLAN - MAIN LEVEL1

D

6.7 8 9

B

C

E

D.1

A.1

B.1

B.4

C.7

4.9

A.4

1.1 1.31.2 2.1

SPRINKLER ZONE 1

10,350 SQ. FT.

BOILER LEVEL

CONTROL ROOM

GENERATOR

ROOM

MAINTENACE

ADDITION

ANNEX

6" 6"

6"6"6"

6"

(ROOF)

KEY NOTES:

6" SPRINKLER PIPE UP AND DOWN.

GENERATOR ROOM SHALL BE DESIGNED AS AN

EXTRA HAZARD GROUP 1 OCCUPANCY.

SPRINKLER PIPING UP AND DOWN.

6" SPRINKLER PIPING DOWN.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED IN ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

1.

2.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD KOFFEL ASSOCIATES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

01-07-2022

2/

/2

:0 3:

A

M

FX102

FIRE SUPPRESSION

FLOOR PLAN - MAIN LEVEL 2

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 MLD KLC0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

3/16" = 1'-0"FX102

FIRE SUPPRESSION - FLOOR PLAN - MAIN LEVEL 21

D

6.7

B

C

E

D.1

A.1

B.1

B.4

C.7

4.9

A.4

1.1 1.31.2 2.1

CATWALK LEVEL

6"6"

1 1

1 1

SPRINKLER ZONE 1-1

10,350 SQ. FT.

KEY NOTES:

PROVIDE SPRINKLER PROTECTION UNDER CATWALKS

GREATER THAN 4 FEET WIDE IN TWO DIRECTIONS, IN

ACCORDANCE WITH NFPA 13 SPRINKLER

OBSTRUCTION REQUIREMENTS.

6" SPRINKLER PIPE DOWN.

SPRINKLER PIPE DOWN TO CONTROL ROOM.

SHEET NOTES:

PROVIDE SPRINKLER PROTECTION UNDER ALL

STAIRS.

SPRINKLERS AND SPRINKLER PIPING SHALL NOT BE

INSTALLED DIRECTLY ABOVE ELECTRICAL EQUIPMENT.

SPRINKLERS AND PIPING INSTALLED ELECTRICAL

EQUIPMENT AREAS SHALL BE INSTALLED IN

ACCORDANCE WITH NFPA 70 CLEARANCE

REQUIREMENTS. DRIP PANS AND OTHER SIMILAR

FEATURES SHALL BE PROVIDED WHEN REQUIRED BY

NFPA 70.

1.

2.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD KOFFEL ASSOCIATES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

01-07-2022

2/

/2

:0 3:

A

M

FX103

FIRE SUPPRESSION

FLOOR PLAN - NEW CATWALK LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 MLD KLC0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

3/16" = 1'-0"FX103

FIRE SUPPRESSION - NEW WORK PLAN - NEW CATWALK1

ANNEX LEVEL 1

-4' - 0"

ANNEX LEVEL 2

5' - 5 9/16"

4"

4"

6"

C.7

ANNEX LEVEL 1

-4' - 0"

ANNEX LEVEL 2

5' - 5 9/16"

6"

6" 4"

6"

6"

4"

KEY NOTES:

6" INCOMING WATER. REFER TO CIVL DRAWINGS FOR

CONTINUATION.

6" OS&Y VALVE WITH SUPERVISORY SWITCH.

4"x2-1/2"x2-1/2" BFP TEST HEADER. PROVIDE SIGNAGE

ALONG EXTERIOR WALL THAT READS 'BFP TEST

HEADER' ABOVE TEST HEADER.

6" AMES MODEL COLT SERIES 2000SS DOUBLE CHECK

BACKFLOW PREVENTER ASSEMBLY, OR APPROVED

EQUAL INSTALLED IN VERTICAL (FLOW UP) WITH OS&Y

VALVES WITH SUPERVISORY SWITCHES, OR

APPROVED EQUAL.

2" TEST AND DRAIN WITH 1/2" PRESSURE RELIEF

VALVE. PIPE TO EXTERIOR.

6" TO SYSTEM.

4" OS&Y VALVE (NORMALLY CLOSED) WITH

SUPERVISORY SWITCH FOR BFP TEST HEADER.

MONITORED WALL MOUNTED POST INDICATOR VALVE.

4"x2-1/2"x2-1/2" FDC. PROVIDE SIGNAGE ALONG

EXTERIOR WALL THAT READS 'FDC' ABOVE FDC.

FLOW SWITCH.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD KOFFEL ASSOCIATES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

01-07-2022

2/

/2

:0 3:

A

M

FX301

FIRE SUPPRESSION

SECTIONS

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 MLD KLC0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

1/2" = 1'-0"FX301

INCOMING WATER SERVICE DETAIL 11

1/2" = 1'-0"FX301

INCOMING WATER SERVICE DETAIL 22

3 9

STEEL PIPE

LATERAL BRACE

TOLCO FIG. 4L

LONGITUDINAL "IN-LINE"

SWAY BRACE ATTACHMENT

TOLCO FIG. 980

UNIVERSAL SWIVEL SWAY

BRACE ATTACHMENT

TYP.

TOLCO FIG. 980

UNIVERSAL SWIVEL SWAY

BRACE ATTACHMENT

TYP.

STEEL PIPE

LATERAL BRACE

TOLCO FIG. 1001

SWAY BRACE

ATTACHMENT

NOTE: PROVIDE A SIGN READING 'AUTOSPRK' IN

ACCORDANCE WITH SECTION 8.17.2.4.7 OF NFPA 13.

4" CHECK VALVE

WITH 1/2" BALL

DRIP

4" FROM

SPRINKLER

ROOM 128

FLUSH MOUNT 2x2-1/2" FDC

MIN 18"

MAX 48"

NOTE:

TYPICAL ACOUSTIC CEILING PANEL.

LOCATE SPRINKLER WITHIN AREA

INDICATED.

6"

6" 20"

9"

48"

24"

2F T x 4F

T

TI

LE

2F

T x

2F T

TI

LE

9"

9"

24"

24"

6"

6"

6"

6" 9"

9"

48"

24"

6"

9"

9"2F T x 4F

T

TI

LE

THROUGH PENETRANT: ONE PIPE INSTALLED

CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP

SYSTEM. PIPE TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF

WALL ASSEMBLY.

FILL MATERIAL: SEALANT - FILL MATERIAL (NOT SHOWN)

APPLIED WITHIN THE ANNULUS, FLUSH WITH BOTH SURFACES

OF WALL. BEAD OF FILL MATERIAL SHALL ALSO BE APPLIED

AT THE PIPE/WALL INTERFACE.

SPRINKLER SYSTEM PIPING

FIRE-RATED BARRIER/WALL

FILL MATERIAL

SCHEDULE 40 BLACK STEEL

PIPE SLEEVE

NOTE: PROVIDE U.L. LISTED

THROUGH-PENETRATION FIRESTOP

SYSTEM AT ALL RATED ASSEMBLIES.

REFER TO CS-SERIES DRAWINGS FOR

WALL RATINGS.

MAX DISTANCE BETWEEN HANGERS

D

IA

M

ET

ER 1" 12'-0"

1-1/4" 12'-0"

1-1/2" 15'-0"

2" 15-0"

2-1/2" 15'-0"

> 3" 15'-0"

ALL THREAD ROD

C-CLAMP WITH

LOCKNUT

ADJUSTABLE

SWIVEL RING

HANGER NOTES:

1. MAXIMUM UNSUPPORTED ARMOVER LENGTH SHALL NOT BE GREATER

THAN 24". WHERE SYSTEM PRESSURES EXCEED 100 PSI, MAXIMUM

UNSUPPORTED LENGTH SHALL NOT EXCEED 12".

MIN 3/8" ALL THREAD ROD FOR PIPE DIAMETERS 4" AND SMALLER.

DO NOT SUPPORT SPRINKLER PIPE FROM BOTTOM CHORDS OF BAR

JOIST OR FROM ROOF DECKING.

WHERE TRAPEZE HANGERS ARE USED, THEY SHALL BE INSTALLED

IN ACCORDANCE WITH NFPA 13, SECTION 9.1.1.6.

2.

3.

4.

I-BEAM

SWAY BRACING PATTERN FOR SINGLE HANGER PIPING

= TRANSVERSE (LATERAL) SWAY BRACE

= LONGITUDINAL SWAY BRACE

= 4-WAY (TRANSVERSE & LONGITUDINAL) SWAY BRACE

2 1/2" AND LARGER

BRACED COMPONENT DESCRIPTION

TRAPEZE SUPPORTED EQUIPMENT 40' 40'

MAX. "S"

40'

PLAN VIEW

MAX. "X" + "Y"

40'

HORIZONTAL OFFSETS

STRAIGHT RUNS

S S

VERTICAL OFFSETS

Y

X S Z Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD KOFFEL ASSOCIATES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

01-07-2022

2/

/2

:0 3:

A

M

FX501

FIRE SUPPRESSION

DETAILS

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 MLD KLC0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

12" = 1'-0"

FIRE DEPARTMENT CONNECTION DETAIL

12" = 1'-0"

SPRINKLER PLACEMENT DETAIL

12" = 1'-0"

THROUGH WALL PENETRATION DETAIL

12" = 1'-0"

TYPICAL HANGER PLACEMENT DETAIL

FX501

FX501

FX501

FX501 12" = 1'-0"

SWAY BRACING SPACING

12" = 1'-0"

LOGITUDINAL SWAY BRACE

12" = 1'-0"

LATERAL SWAY BRACE5

FX501

FX501

FX501

File details come from the government source that posted it. Updated .