S06 EXHIBIT D Calculation of Self Performed Work Amended.pdf
PDF 121 KB Posted
- Attached to
- Y1NB--650-19-100 Replace Boilers in Bldg 10 Federal contract opportunity
- Solicitation number
- 36C24122R0084
About this file
This document is an exhibit outlining the calculation of self-performed work submitted in response to solicitation number 36C24122R0084 to replace boilers in Building 10 of the VA Medical Center in Providence, Rhode Island. Offerors must clearly describe the work to be self-performed, comprising at least 15% of the total contract value, including owned or rented equipment operated by the prime contractor's employees, materials purchased and installed by its own forces, associated labor and supplies, and its own job overhead costs. The calculation shows the total offer price, amount of self-performed work, subtraction of G&A and other costs to determine the total work value under the contract, and percentage of self-performed work.
View the file
Other files for this federal contract opportunity
Show all 50
Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT D: CALCULATION OF SELF-PERFORMED WORK AMENDED
SUBMITTED IN RESPONSE TO RFP 36C24122R0084 – Replace Boilers in Building 10, VA Medical Center, Providence, RI, Project Number 650-19-100
Use a format similar to the following to identify and calculate cost of the work to be self-performed.
Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% General Contractor (GC)) with your own resources. Note: An offeror who has the capability to perform both as a general contractor and self-perform a major element of construction, for example, prefabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work: __________________________________
B.1 Total Offer Price: $_________________
B.2 If applying for consideration as a General Contractor (multi-discipline projects) work must be self-performed $_____________
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc.
B.4 Remainder is “Total amount of work to be performed under the Contract” = $__________________
B.5 “Work to be self-performed”: = $ _________________________________ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”? (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = ________________________%