This request for proposal from the Department of Veterans Affairs seeks replacement of boilers in Building 10 at a VA medical center. Key requirements include removing existing boilers, deaerator, condensate surge tank and associated equipment; installing new boilers, deaerator, surge tank, condensate and fuel oil pumps; and installing new piping. The contractor must also demolish existing fuel oil tanks and install a new 4,000 gallon fuel oil tank and piping for an emergency generator. The work will be conducted in multiple phases to maintain steam utilities. The closing date for proposals is January 7, 2022, with award by February 16, 2022.
View the file
Other files for this federal contract opportunity
Show all 50
Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PULL
PULL
RADIOLOGY
RECORDS
RECOVERY
RECEPTION
M
MAINT
MECH
MACH MACHINE ROOM
MALE
MAINTENANCE
RECD
RECP
RECOV
RAD
ROOM
STAFF
REHABILITATION
SHOWER
SUPPLY
STAFF TOILET
SOILED UTILITY
SECRETARY
STAIRS
SUPPORT
STATION
STERILIZER
SERVICE
SWITCHGEAR
SUPERVISOR
SURGERY/ ICAL
STORAGE
MGR
MED
MRI
OFF
OR
ORTHO
OH
OB/GYN
OPERATING ROOM
MANAGER
OFFICE
MEDICATION/ MEDICAL
ORTHOPEDICS
OBSTETRICS/ GYNECOLOGY
ORAL HYGIENIST
MAGNETIC RESONANCE
IMAGING
SWGR
ST
STA
RM
S TLT
SVCE
SHR
S
STOR
SUPVR
SPRT
SPLY
SOIL
SECY
REHAB
STER
SURG
MECHANIC(AL)
EDUCATION
ELEVATOR
ELECTRIC(AL)
ED
ELEV
EMG
ELEC
ADMIN
ASSY
AUD
AMB
ASSEMBLY
ADMINISTRATION(OR)
AMBULATORY
AUDIOLOGY
"DN"
S
SIMILARSIM
SPEC
SF
SOUTH/ SINK
SQUARE FEET/ STOREFRONT
(NON - NCS ABBREVIATIONS ARE SHOWN
UNDERLINED) EXAMPLE:
ENDOSCOPY
EQUIPMENT
EXECUTIVE
ENDO
ENT
EQUIP
EXEC
FREEZER
FEMALE
FRZ
F
BALCONYBALC
CHEMICALCHEM
CHGN
CLASSCL
CHIRO CHIROPRACTOR
CHARGE NURSE
GENERAL
GYMNASIUM
GEN
GYM
HEAD
HOUSEKEEPINGHSKPG
HD
ICCU
HAZ MAT
CLERICAL
CLN
CLER
CLOSETCLO
CLRM CLASSROOM
CLEAN (ING)/ CLEAN UTILITY
COMM
CONF
CORRIDORCORR
COPY
COMMUNICATIONS
CONFERENCE
COPY/ WORK ROOM
COMMANDER/ COMMANDCMD
SQUARESQ
SST
STEEL
STC
STL
TREADT
THROUGHTHRU
TEMP
SOUND TRANSMISSION CLASS
STAINLESS STEEL
TEMPERATURE/ TEMPORARY
TOP OF
TOC
TO
TOF
TOM
TYPICALTYP
U
UC
TOS
HEAT TRANSFER COEFFICIENT
TOP OF FOOTING
TOP OF CONCRETE (CURB)
UNDERCUT
TOP OF MASONRY
TOP OF STEEL
SPECIFICATION(S)
HAZARDOUS MATERIALS
EAR NOSE THROAT
ELECTROMYOGRAPHY
INTENSIVE CARDIAC CARE UNIT
TECHNICIAN
TELEPHONE
TOILET
URINAL
TREATMENT
WAITING
WAREHOUSE
WATER CLOSET
WEIGHTS AND MEASURES
WEIGHT
WORK STATION, WORK ROOM
EXECUTIVE OFFICER
VESTIBULE
P
PHAR
PHYS
PEDS
PO
PYSCH
PRIN
PREP
POST OFFICE
PRINCIPAL
PHARMACY
PATIENT
PREPARATION
PEDIATRICS
PHYSICAL
PSYCHOLOGY
PROCTO
PROC
PUB
PT/OT
PULMO
PUBLIC
PHYSICAL / OCCUPATIONAL
THERAPY
PROCTOLOGY
PROCEDURE
PULMONARY
PARKINGPRKG
WT
WHSE
WAIT
VEST
UR
WORK
TRT
TECH
XO
WC
W & M
TEL
TLT
INFORMATION
ISOLATION
INJECTION
INFO
ICU
ISO
INJ
JANITOR
KITCHEN
JAN
JC
KIT
CSR
CT
CONTROLCTRL
CENTRAL STERILE ROOM
CAT SCAN
DRESSING
DEPT
D
DIRECTOR
DICTATION
DIR
DICT
DEPARTMENT
LAUNDRY
LABORATORY
LAU
LAB
LDRP
LCPO
LIBRARY
LOCKER
LIT/ FORMS
LIB
LPO
LKR
L/W
L/F
DOCTORDR
DOR
DRK
DTR
DARKROOM
DENTAL TREATMENT ROOM
DENTAL OPERATORY ROOM
DISP DISPENSING
UL
U/C/B
VACUUMV
U0N
VARIESVAR
VCT
VERTICAL
VTR
VERT
VENT THRU ROOF
UNLESS OTHERWISE NOTED
UNDERWRITERS LABORATORY
VINYL COMPOSITION TILE
UNDER COUNTER BASE
W
WITHW/
W
WITHOUT
WOOD
W/0
WD
WEIGHTWT
WP
WH WALL HUNG/ WATER HEATER
WEST /WATT
WATERPROOF / WORKING POINT
WIDTH /WIDE FLANGE
VWC VINYL WALL COVERING
WWF WELDED WIRE FABRIC
JANITOR'S CLOSET
LABOR DELIVERY RECOVERY POST PARTUM
LEADING CHIEF PETTY OFFICER
LEADING PETTY OFFICER
LITTER WHEELCHAIR
INTENSIVE CARE UNIT
KILOPASCAL
POUND
ANGLE
KPA
L
LB
EACH
ELEVATION
EACH END
EXPANSION JOINT
EA
EJ
EL
EE
AND&
DOLLAR (USD)
@ AT
NUMBER / POUND
NATIONAL CAD STANDARD ABBREVIATIONS
LINEAR FEET
METERS
MAXIMUM
LF
M
MAX
MINIMUM
MILLIMETERS
MISCELLANEOUS
MASONRY OPENING
MIN
MM
MISC
MO
ET CETERA
EQUAL
EYE WASH STATION
ELECTRIC WATER COOLER
EXISTING
FILLER
NORTH
NOT APPLICABLE
NUMBER
NOT IN CONTRACT
NA
N
NO
NIC
NOT TO SCALE
OXYGEN
ON CENTER
NTS
OC
O
NOMINALNOM
FACSIMILE
FIRE EXTINGUISHER
FINISHED FLOOR
FIRE EXTINGUISHER CABINET
FLOOR
FACE OF
FIBERGLASS REINFORCED POLYMER
FACE OF SLAB (STUD)
FIRE HOSE CABINET
EQ
F
A/C
A/E
ADA
ACT
AHJ
AHU
AFF
ALUM
AUTHORITY HAVING JURISDICTION
AMERICANS WITH DISABILITY ACT
ACOUSTICAL CEILING TILE
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ALUMINUM
ARCHITECT-ENGINEER
AIR CONDITIONED
FE
FF
FLR
FO
FRP
BEAM
BLDG
BM
BOS
BO
CG
CCT
CL
CJ
BUILDING
BOTTOM OF STEEL
CENTER LINE
CONTROL/ CONSTRUCTION JOINT
CORNER GUARD
BY OWNER/ BOTTOM OF
CUBICLE CURTAIN TRACK
FOS
FAX
EWS
ETC
FEC
FHC
EXIST
EWC
OPPOSITE HAND
OUTSIDE DIAMETER
PLATE
OPENING
OPH
OD
PL
OPNG
PAIR
PLASTIC LAMINATEPLAM
PR
PSI
PSF
GAS
GRAB BAR
GALVANIZED
GAGE
HIGH
GYPSUM BOARD
GENERAL CONTRACTOR
QUANTITY
PTS
QTY
RISER/RADIUS
REQUIRED
ROUGH OPENING
RENOVATE(TION)
R
RAL
RO
REQ
RENOHARDWARE
HOUR
HOLLOW METAL
INTERCOM
INTRAVENOUS
INCH(ES)
INSIDE DIAMETER
PT
HANDICAP
G
GB
GA
GC
H
CLL
CLG
CM
CMU
CLR CLEAR
CONC
CO2
CONT
CTJ
CENTIMETER
CONCRETE
COLUMN LINE
CONTINUED (OUS)
CONCRETE MASONRY UNIT
CEILING
CONTRACTION JOINT
CARBON DIOXIDE
HM
HR
ID
IC
IV
INCTR
DBA
D
DEG
DIA
DR
DWG
DN DOWN
DEGREE
UNIT OF SOUND
CENTER
DEEP/ DEPTH
DIAMETER
DOOR/
DRAWING(S)
COORDINATECOORD
HC
HDW
GALV
GYP BD
ROICC
JOINTJT
DWR DRAWER
PAINT
POUNDS/SQUARE FOOT
POUNDS/SQUARE INCH
RESIDENT OFFICER IN CHARGE
OF CONST
FEDERAL COLOR PALETTE
PNEUMATIC TUBE STATION VOL VOLUNTEER
ASSISTANTAST
COMPUTERCOMP
COORD COORDINATOR
CLIN CLINIC (AL)
PERSONNELPERS
MANAGEMENTMGNT
ANALYSISTANLST
COMPR COMPTROLLER
CUBICLESCBCL
DEGREE(S)°
AIR
A
/ DIVIDE BY, PER
EQUALS, EQUAL TO
' FOOT, FEET
> GREATER THAN
> GREATER THAN OR EQUAL TO
INCH(ES)"
MINUS, NEGATIVE
< LESS THAN
LESS THAN OR EQUAL TO
MULTIPLY BY, BYX
% PERCENT
PLUS
+/- PLUS OR MINUS
NATIONAL CAD STANDARD ROOM NAME ABBREVIATIONS
"DN"
(NON - NCS ABBREVIATIONS ARE SHOWN
UNDERLINED) EXAMPLE:
FOOT/FEETFT
TELEVISIONT.V.
P.T. PRESSURE TREATED
MOUNTEDMNTD
FIRE RETARDANTF.R.
SS STAINLESS STEEL
WHEELCHAIRW/C
FIRE TREATEDF.T.
ABA ARCHITECTURAL BARRIERS ACT
SAB SOUND ATTENUATION BATTS
EXPOSEDEXP
VERIFY IN FIELDVIF
VERIFY IN FIELDVIF
A101
SIM
A101
SIM
A101
SIM
BUILDING ELEVATION/SECTIONDetail No.
Sheet No.
Reference Label
Detail No.
Sheet No.
Reference Label
Detail No.
Sheet No.
Reference Label
Room No.
Room Area
Door/Room No.
Partition Configuration
Partition Configuration
Key Note No.
ALIGN
WALL SECTION
DETAIL SECTION/CALLOUT
ROOM TAG
DOOR TAG
PARTITION TAG
KEYNOTE
ALIGNED SURFACES
Room Name
Area
AREA TAG
Area NameArea Name
150 SF
WL_Type
2S 86
SCOPE OF PROJECT
Project Limit Line
Grid No.
CENTERLINE
COLUMN GRID LINE
SPOT ELEVATIONSpot Elevation AFF
Level/Datum Elevation AFF
LEVEL MARKER
Level/Datum Name
Window Type WINDOW TYPE TAG01
CL
Highpoint @ Tail SLOPE INDICATOR
Starting Point @ Center DIMENSION CROSSHAIR
Name Elevation
Revision Reference Number
Revision Cloud Depicting Area Revised
REVISION
CEILING TAG1'-0" Clg Height
? Finish FINISH TAG
Casework / Furniture
CASEWORK TAG1i
FURNITURE TAG
Room Name
150 SF
WAL-1
BAS-1
FLR-1
Room Wall Finish
Room Wall Base
Room Floor Finish
ROOM FINISH TAG
FIRE
EXTINGUISHER
WALL MOUNTED
CABINET
FIRE ALARM
PULL BOX
M A
X
IM
U M
M A
X
IM
U M
M A
X
IM
U M
FIRE
EXTINGUISHE
R WALL
HUNG
FIRE
EXTINGUISHER
IN RECESSED
CABINET
FIRE EXTINGUISHER
AND FIRE HOSE
VALVE IN RECESSED
CABINET
FIRE EXTINGUISHER,
FIRE HOSE VALVE
AND FIRE
DEPARTMENT VALVE
IN RECESSED
CABINET
FIRE DEPARTMENT
VALVE IN
RECESSED
CABINET
FIREFIGHTER'S
HANDSET
FH
0' - 10 1/2"
8" 8"7
AUDIO/VISUAL
FIRE ALARM
EXIT SIGN WALL
SWITCH
WALL
PHONE
JACK
FIRE ALARM
PULL STATION
(GENERALLY
LOCATE UNDER
A/V ALARM)
W
IT
H O
W N
E R
C O
O R
D
IN
A T
E
0' - 8"
COMBINATION
POWER/SIGNAL/OUTLET
FOR WALL MOUNTED
TELEVISION OR
MONITOR
CLOCK
(PLACED ON WALL
WITH NO VISUAL
BOARDS
MOUNTED BELOW)
DOUBLE-SIDED
PROJECTED
CLOCK
M
IN
C E
IL
IN
G H
E I G
H T
U
.N .O
S
P A
C E
S W
IT
H
T.V./DATA/
PHONE
POWER
RECEPTACLES
LIGHT
SWITCHES
DOME
LIGHT
OCCUPANCY
SENSOR
CARD
READER
THERMOSTAT
POWER
DISCONNECT
REMOTE DOOR
RELEASE
D/V L
TV
D/V
TV E
E
ED/V
L L OS CR T DR
AREA OF
REFUGE
INTERCOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AE001
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
NOTES, SYMBOLS,
ABBREVIATIONS
ABBREVIATIONS PLAN SYMBOLS
FIRE PROTECTION EQUIPMENT
ELECTRICAL CONTROL DEVICES
Revisions: Date:
M
UP
UP
DN
DN
DN
UP
DN
DN
DN
PATH
ID'S:
M1 M3 M4 C1
PATH
ID'S:
M1 M2
PATH
ID'S:
M3
PATH
ID'S:
M2
PATH
ID'S:
C1
PATH
ID'S:
M4
FE
FE
FE
FE
2 HR FIRE BARRIER
PATH
ID'S:
B1 C2
PATH
ID'S:
B1
PATH
ID'S:
B2
PATH
ID'S:
C2
PATH
ID'S:
B3
PATH
ID'S:
B2 B3
FE
FE
FE
PATH
ID'S:
C1
2 HR FIRE BARRIER
2 HR FIRE BARRIER
PATH
ID'S:
C1
PATH
ID'S:
C2
DN
PATH OF TRAVEL (FEET)
VOICE/ALARM SYSTEM THROUGHOUT
(COORDINATE W/ ELECTRICAL)
EXIT FLOW
EXIT SIGN
(COORDINATE W/ ELECTRICAL)
PORTABLE FIRE EXTINGUISHER
DRY-CHEMICAL ABC CLASSIFICATION
(COORDINATE W/ FIRE MARSHAL)
TWO HOUR FIRE BARRIER CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH ACTUAL
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:1
P
M
AE002
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL MT0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
LIFE SAFETY PLANS
3/32" = 1'-0"F3 MAIN LEVEL OCCUPANCY PLAN
3/32" = 1'-0"D3 BOILER LEVEL OCCUPANCY PLAN
3/32" = 1'-0"B3 MAIN CATWALK OCCUPANCY PLAN
GENERAL SHEET NOTES
LIFE SAFETY LEGEND
PROJECT CODE SUMMARY
PROJECT SUMMARY:
THIS PROJECT CONSISTS OF A BUILDING EXPANSION OF THE BOILER PLANT AND
RENOVATION OF INTERIOR ADMINISTRATIVE SPACE.
APPLICABLE CODES _________________
2015 INTERNATIONAL BUILDING CODE (IBC)(ONLY WHEN SPECIFICALLY REFERENCED IN
VA DESIGN DOCUMENTS)
2018 EDITION NFPA 101 LIFE SAFETY CODE
2015 VA FIRE PROTECTION DESIGN GUIDE 7TH EDITION
2015 NFPA NATIONAL FIRE CODE (EXCEPTION OF NFPA 5000 AND NFPA 900)
2017 NATIONAL ELECTRICAL CODE (NEC)
2015 INTERNATIONAL PLUMBING CODE (IPC)
VA PHYSICAL SECURITY & RESILIENCY DESIGN MANUAL JAN 2021
ENERGY POLICY ACT OF 2005 (EPACT)
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNAGE
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 -2004
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
NFPA 85: BOILER AND COMBUSTION SYSTEMS HAZARD CODE
ASME B31.1 POWER PIPING
NBB1 SECTION 1
BUILDING HEIGHT AND AREA LIMITATIONS (IBC CHAPTER 5):
USE & OCCUPANCY CLASSIFICATION: F1 - MOD. HZD. INDUSTRIAL
TYPE OF CONSTRUCTION: II-B
ALLOWABLE HT IN FEET (TABLE 504.3): 75' (S)
ACTUAL HEIGHT ABOVE GRADE: 36'-5"
ALLOWABLE STORIES ABOVE GRADE (TABLE 504.): 3 (S)
ACTUAL STORIES ABOVE GRADE: 1
ALOWABLE AREA (TABLE 506.2): 62,000 sqft (S1)
ACTUAL AREA: 10,060 sqft
PER IBC CHAPTER 5: TYPE 2B NON COMBUSTIBLE, FULLY SPRINKLERED BUILDING WITH
AN F1 MODERATE HAZARD INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 75’
TALL, THREE STORIES, WITH 62,000 SQFT OF ALLOWABLE AREA.
AS DEFINED BY TABLE 601 THE BUILDING ELEMENTS ARE REQUIRED TO CARRY
THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE II-B CONSTRUCTION:
PRIMARY STRUCTURAL FRAME: 0 HRS
EXTERIOR BEARING WALLS: 0 HRS
INTERIOR BEARING WALLS: 0 HRS
EXTERIOR NON-BEARING WALLS: 0 HRS
INTERIOR NON-BEARING WALLS: 0 HRS
FLOOR CONSTRUCTION AND
SECONDARY MEMBERS: 0 HRS
ROOF CONSTRUCTION AND
SECONDARY MEMBERS: 0 HRS
PER NFPA 5000 TABLE 7.4.1, A TYPE II, (000), FULLY SPRINKLERED, ORDINARY HAZARD
INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 75’ TALL, THREE STORIES, WITH
15,500 SQFT OF FOOTPRINT.
AS DEFINED BY TABLE 7.2.1.1, CONSTRUCTION ELEMENTS ARE REQUIRED TO
CARRY THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE-II (000)
CONSTRUCTION:
EXTERIOR BEARING WALLS:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
INTERIOR BEARING WALLS:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
COLUMNS:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
BEAMS, GIRDERS, TRUSSES, AND ARCHES:
SUPPORTING MORE THAN ONE FLOOR: 0 HRS
SUPPORTING ONLY ONE FLOOR: 0 HRS
SUPPORTING ROOF ONLY: 0 HRS
FLOOR/CEILING ASSEMBLIES: 0 HRS
ROOF/CEILING ASSEMBLIES: 0 HRS
INTERIOR NON-BEARING WALLS: 0 HRS
EXTERIOR NON-BEARING WALLS: 0 HRS
NFPA 101 OCCUPANCY & ASSOCIATED CHAPTER
• BOILER BUILDING, MAIN LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,
CHAPTER 40)
• BOILER BUILDING, BOILER LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,
CHAPTER 40)
• BOILER BUILDING, CATWALK LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2015,
CHAPTER 40)
• OFFICE / CONTROL AREAS ASSUMED TO BE NON-SEPARATED, ANCILLARY
FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)
40.2.5.3.1 INDUSTRIAL EQUIPMENT ACCESS DIMENSIONAL CRITERIA:
MINIMUM HORIZONTAL DIMENSION OF ANY WALKWAY: 22” CLEAR
MINIMUM STAIR OR RAMP WIDTH: 22” @ RAILS
MINIMUM TREAD WIDTH: 22” CLEAR
MINIMUM TREAD DEPTH: 10”
MAXIMUM RISER HEIGHT: 9”
MAX HT. BETWEEN LANDINGS: 12’-0”
MINIMUM HEADROOM: 6’-8”
MINIMUM WIDTH OF DOOR OPENINGS: 22”
1. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL
BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF
AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS
THAN 28 INCHES (EXISTING OPENINGS) OR 32 INCHES
(NEW OPENINGS). THE HEIGHT OF DOORS SHALL NOT
BE LESS THAN 80 INCHES.
2. EGRESS DOORS SHALL BE READILY OPERABLE FROM
THE EGRESS SIDE WITHOUT THE USE OF A KEY OR ANY
SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS
TO HAVE PANIC HARDWARE. PANIC HARDWARE SHALL
NOT REQUIRE TIGHT GRASPING, PINCHING, OR
TWISTING OF THE WRIST. FORCE REQUIRED TO
ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS.
REFERENCE SHEET AE-601 FOR ADDITIONAL
INFORMATION. (7.2.1.5)
3. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL
BE ILLUMINATED AT ANY TIME THE BUILDING IS
OCCUPIED WITH A LIGHT INTENSITY OF NOT LESS THAN
1 FOOT-CANDLE AT THE WALKING SURFACE LEVEL. (7.8)
4. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF
ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE IS
PERMITTED IN ANY EGRESS PATHS.
5. ALL NEW FIRE EXTINGUISHER LOCATIONS AS
INDICATED ARE PROPOSED, FINAL PLACEMENTS TO BE
DETERMINED/VERIFIED BY THE DIRECTION OF THE
LOCAL AUTHORITY.
6. CONTRACTOR TO SUBMIT TEMPORARY LIFE SAFETY
PLANS IN THE EVENT REQUIRED EXITS ARE BLOCKED
DURING CONSTRUCTION.
NAME AREA
MAIN LEVEL 5591 SF
BOILER LEVEL 5103 SF
TOTAL:: 2 10695 SF
AREA SCHEDULE (GROSS)
Level NAME AREA
MAIN LEVEL OFFICE 100 SF
MAIN LEVEL RESTROOM 60 SF
MAIN LEVEL LOCKERS 59 SF
MAIN LEVEL SHOWER 14 SF
MAIN LEVEL ANNEX MAIN LEVEL 900 SF
MAIN LEVEL BREAK ROOM 137 SF
MAIN LEVEL MAINTENANCE 3377 SF
BOILER LEVEL BOILER LEVEL 3490 SF
BOILER LEVEL CONTROL ROOM 288 SF
BOILER LEVEL ANNEX - BOILER LEVEL 903 SF
TOTAL:: 10 9327 SF
AREA SCHEDULE (NET)
PATH "M1"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
18' - 10" 87' - 5"
PATH "M2"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
18' - 10" 100' - 0" 86' - 4" 400' - 0"
PATH "M3"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
0' - 0" 79' - 2"
PATH "B1"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
5' - 3" 100' - 0" 110' - 7" 400' - 0"
PATH "B2"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
2' - 11" 100' - 0" 90' - 8" 400' - 0"
PATH "C1"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
0' - 0" 188' - 3"
PATH "C2"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
0' - 0" 100' - 0" 141' - 3" 400' - 0"
EGRESS TRAVEL DISTANCES:
EGRESS TRAVEL DISTANCES:
EGRESS TRAVEL DISTANCES:
PATH "B3"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
2' - 11" 100' - 0" 92' - 5" 400' - 0"
PATH "M4"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
0' - 0" 100' - 0" 64' - 6" 400' - 0"
PATH "T1"
COMMON
PATH
DISTANCE
ALLOWABLE
COMMON
PATH
ACTUAL
TRAVEL
DISTANCE
ALLOWABLE
TRAVEL
DISTANCE
OCCUPANT LOAD (40.1.7):
• "MAXIMUM PROBABLE NUMBER OF OCCUPANTS PRESENT
AT ANY TIME" PER TABLE 7.3.1.2 - NO PRESCRIPTIVE
OCCUPANCY CALCULATION BASED ON AREA:
• ASSUMED OCCUPANCY PER DIRECTION FROM END USER
IS NO GREATER THAN 10 OCCUPANTS.
TRAVEL DISTANCE (40.2.6.1) AND
COMMON PATH OF TRAVEL (40.2.5.1):
INDUSTRIAL (EXISTING):
MAX TRAVEL DISTANCE:
FULLY SPRINKLERED 400' - 0"
MAX COMMON PATH OF TRAVEL:
FULLY SPRINKLERED = 100' - 0"
C
UP
C
UP
C
UP
PHASE 1 - #7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:1
P
M
AE003
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
PHASING PLANS
PHASE 2 CONSISTS OF THE FOLLOWING WORK:
PHASE 2 – BOILER PLANT RENOVATION & ADDITION
1. DEMOLISH EXISTING BOILERS, DEAERATOR, CONDENSATE
SURGE TANK AND ASSOCIATED.
2. DEMOLISH PORTIONS OF EXISTING NORTH WALL AND INSTALL
NEW OVERHEAD DOORS.
3. INSTALL NEW ADDITION
4. INSTALL STRUCTURE FOR NEW BOILER LEVEL
5. INSTALL NEW MECHANICAL EQUIPMENT (BOILERS,
DEAERATOR, SURGE TANK, CONDENSATE, FUEL OIL PUMPS).
6. INSTALL NEW PIPING
7. DEMOLISH EXISTING FUEL OIL TANKS.
8. INSTALL NEW 4,000 GALLON FUEL OIL TANK AND ASSOCIATED
PIPING FOR NEW EMERGENCY GENERATOR.
9. INSTALL NEW SECURITY VIDEO SURVEILLANCE OPTICAL
FIBER.
10. INSTALL SECURITY ELECTRONICS EQUIPMENT ASSOCIATED
WITH NEW GATE CONTROLLERS.
* SHADED AREAS ARE PART OF THIS PHASE OF CONSTRUCTION
PHASE 3 CONSISTS OF THE FOLLOWING WORK:
PHASE 3 – TEMPORARY BOILERS & MAIN STAIR
1. DEMOLISH AND REMOVE TEMPORARY BOILERS AND PIPING.
2. INSTALL NEW STAIRS IN NORTHWEST CORNER (TEMPORARY
PIPING PREVENTS THE STAIRS FROM BEING INSTALLED
EARLIER).
* SHADED AREAS ARE PART OF THIS PHASE OF CONSTRUCTION
3/32" = 1'-0"B1 PHASE 1 - SURROUNDING SITEWORK & INSTALLATION OF MECHANICAL TEMPORARY EQUIPMENT AND PIPING
3/32" = 1'-0"B6 PHASE 2 - BOILER PLANT RENOVATION & ADDITION
3/32" = 1'-0"F6 PHASE 3 - TEMPORARY BOILERS & MAIN STAIRS
PHASE 1 CONSISTS OF THE FOLLOWING WORK:
PHASE 1 – SURROUNDING SITEWORK & INSTALLATION OF
MECHANICAL TEMPORARY EQUIPMENT AND PIPING
1. SCOPE FOR THE NEW RETAINING WALL.
2. INSTALL NEW GAS MAIN FOR THE TEMPORARY BOILERS.
3. INSTALL NEW (2) 30,000 GALLON FUEL OIL TANKS AND PIPING.
4. INSTALL NEW DUCT BANK TO FEED TRAILER TRANSFORMER.
5. INSTALL TEMPORARY BOILER TRAILERS AND CONTROL ROOM
TRAILER.
6. INSTALL TEMPORARY PIPING OUTSIDE.
7. INSTALL TEMPORARY PIPING INSIDE BUILDING 10 TO SUPPLY
THE EXISTING STEAM UTILITIES LEAVING BUILDING 10.
PROVIDE WEATHERPROOF INFILL PANEL. REF. DETAIL
D9/AE502
8. INSTALL TEMPORARY MV TRANSFORMER AND TEMPORARY
EQUIPMENT. CONNECT TEMPORARY BOILERS.
9. DEMOLISH EXISTING 300 KVA OUTDOOR MV TRANSFORMER
AFTER THE TEMPORARY BOILERS ARE OPERATIONAL.
10. DEMOLITION OF EQUIPMENT/DEVICES WITHIN BOILER PLANT
CAN BEGIN.
11. INSTALL THE NEW MV TRANSFORMER AND FEEDER.
* * SHADED AREAS ARE PART OF THIS PHASE OF CONSTRUCTION
GENERAL PHASING NOTE
REFERE TO EACH DISCIPLINE FOR ADDITIONAL PHASING NOTES.
REFER TO THE GENERAL REQUIREMENTS SPECIFICATION 01 00 00,
SECTION 1.6.G PHASING FOR ADDITIONAL INFORMATION.
4321 5
A.2
B.2
A
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
LOCKERS
OFFICE
RESTROOM
SHOWER
9 9 9
9 9 9
AD105
C1
AD105
F1
C.7
B.4
B.1
A.1
4.9
1.2
AD106 F5
AD106C5
A.4
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
2. EXISTING ROOF CONDITIONS CONTAINED WITHIN THE CONSTRUCTION DOCUMENTS ARE BASED ON THE INFORMATION OBTAINED
FROM CONSTRUCTION DOCUMENTS AND FIELD SURVEY, AND SHALL NOT BE CONSTRUED AS "AS BUILT". THE CONTRACTOR TO FIELD
SURVEY EXISTING CONDITIONS PRIOR TO THE ONSET OF CONSTRUCTION.
3. ALL DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE DUE TO NUMBER AND VARYING CONDITIONS. CONTRACTOR TO VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
4. PROTECT EXISTING CONSTRUCTION, SURFACES AND MATERIALS INDICATED TO REMAIN FROM DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING MATERIALS AND SURFACES DAMAGED BY PERFORMANCE OF THE WORK.
5. ONLY AS MUCH ROOFING SHALL BE REMOVED THAT CAN BE REPLACED IN ONE WORK DAY. ROOF SHALL BE MADE WATER TIGHT AT
THE END OF EACH WORK DAY.
6. ALL EXISTING METAL FASTENERS AND COUNTER FLASHING SHALL BE REMOVED AND REPLACED. FLASHING AND COUNTER FLASHING THAT CANNOT BE REMOVED OR REINSTALLED SHALL BE REMOVED AS REQUIRED TO INSTALL NEW ROOFING AND REPLACE IN A
CONDITION COMPLIANT WITH THE ROOF WARRANTY REQUIREMENTS.
7. MAXIMUM WEIGHT OF TEMPORARY STORED ROOF CONSTRUCTION MATERIALS SHALL BE SUPPORTED OVER LARGE AREAS TO NOT
DAMAGE ROOFING.
8. IF MATERIALS ARE ENCOUNTERED THAT MAYBE HAZARDOUS OR MAY CONTAIN HAZARDOUS COMPONENTS, CEASE WORK
IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY THE COR.
9. DO NOT CUT STRUCTURAL COMPONENTS UNLESS INDICATED OTHERWISE.
10. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING OPEN FLAME.
11. COORDINATE REMOVAL OF DEMOLISHED MATERIALS WITH COR. PREVENT DUST AND DEBRIS FROM INFILTRATING OCCUPIED AREAS.
PROVIDE ENCLOSED CHUTES AND NEGATIVE AIR PRESSURE AS REQUIRED. DISPOSE OF DEMOLISHED MATERIALS IN LAWFUL
MANNER, OFF SITE.
12. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS AFFECTING THE OWNER'S
OPERATIONS.
13. TEMPORARY BOILERS TO BE FULLY FUNCTIONAL AND ONLINE PRIOR TO ANY DEMOLITION WORK ON THE BOILER PLANT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AD101
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DEMOLITION PLAN
MAIN LEVEL
1/4" = 1'-0"E1 MAIN LEVEL DEMOLITION PLAN
DEMOLITION GENERAL NOTES KEYED NOTES
2 EXISTING FLOORING TO REMAIN
6 DEMOLISH PORTION OF EXISTING WALL; REF. DEMO ELEVATIONS FOR HEIGHT. PROVIDE TEMP.
STRUCTURAL HEADER FOR MASONRY WALL ABOVE. REF. STRUC. DWGS
7 DEMOLISH EXISTING DOOR AND FRAME IN ITS ENTIRETY; PREP AREA FOR NEW
CONSTRUCTION
9 DEMOLISH EXISTING EQUIPMENT SLAB; PREP TO RECEIVE NEW SLAB TO MATCH EXISTING
MAIN SLAB. REF. STRUCTURAL
10 DEMOLISH EXISTING ACCESS PANEL FLOOR; PREP TO RECEIVE NEW SLAB TO MATCH
EXISTING MAIN SLAB
11 DEMOLISH EXISTING CURB. PATCH AND REPAIR FLOOR AS NEEDED. PREP AREA FOR NEW
FINISHES.
12 DEMOLISH EXISTING STAIR AND RAILING IN ITS ENTIRETY; PREP AREA FOR NEW
CONSTRUCTION
25 SAWCUT EXISTING WALL FOR NEW MTL LOUVER, REFERENCE FLOOR PLANS FOR LOCATION;
PROVIDE TEMP. STRUCTURAL HEADER FOR MASONRY WALL ABOVE. REF. MECHANICAL
B.2
A
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
AD105
C1
AD105
F1
C.7
B.4
B.1
A.1
4.9
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
1.2
AD106 F5
AD106C5
A.4
3'
2'
121234
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
2. EXISTING ROOF CONDITIONS CONTAINED WITHIN THE CONSTRUCTION DOCUMENTS ARE BASED ON THE INFORMATION OBTAINED
FROM CONSTRUCTION DOCUMENTS AND FIELD SURVEY, AND SHALL NOT BE CONSTRUED AS "AS BUILT". THE CONTRACTOR TO FIELD
SURVEY EXISTING CONDITIONS PRIOR TO THE ONSET OF CONSTRUCTION.
3. ALL DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE DUE TO NUMBER AND VARYING CONDITIONS. CONTRACTOR TO VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
4. PROTECT EXISTING CONSTRUCTION, SURFACES AND MATERIALS INDICATED TO REMAIN FROM DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING MATERIALS AND SURFACES DAMAGED BY PERFORMANCE OF THE WORK.
5. ONLY AS MUCH ROOFING SHALL BE REMOVED THAT CAN BE REPLACED IN ONE WORK DAY. ROOF SHALL BE MADE WATER TIGHT AT
THE END OF EACH WORK DAY.
6. ALL EXISTING METAL FASTENERS AND COUNTER FLASHING SHALL BE REMOVED AND REPLACED. FLASHING AND COUNTER FLASHING THAT CANNOT BE REMOVED OR REINSTALLED SHALL BE REMOVED AS REQUIRED TO INSTALL NEW ROOFING AND REPLACE IN A
CONDITION COMPLIANT WITH THE ROOF WARRANTY REQUIREMENTS.
7. MAXIMUM WEIGHT OF TEMPORARY STORED ROOF CONSTRUCTION MATERIALS SHALL BE SUPPORTED OVER LARGE AREAS TO NOT
DAMAGE ROOFING.
8. IF MATERIALS ARE ENCOUNTERED THAT MAYBE HAZARDOUS OR MAY CONTAIN HAZARDOUS COMPONENTS, CEASE WORK
IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY THE COR.
9. DO NOT CUT STRUCTURAL COMPONENTS UNLESS INDICATED OTHERWISE.
10. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING OPEN FLAME.
11. COORDINATE REMOVAL OF DEMOLISHED MATERIALS WITH COR. PREVENT DUST AND DEBRIS FROM INFILTRATING OCCUPIED AREAS.
PROVIDE ENCLOSED CHUTES AND NEGATIVE AIR PRESSURE AS REQUIRED. DISPOSE OF DEMOLISHED MATERIALS IN LAWFUL
MANNER, OFF SITE.
12. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS AFFECTING THE OWNER'S
OPERATIONS.
13. TEMPORARY BOILERS TO BE FULLY FUNCTIONAL AND ONLINE PRIOR TO ANY DEMOLITION WORK ON THE BOILER PLANT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AD102
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DEMOLITION PLAN
BOILER LEVEL
1/4" = 1'-0"E1 BOILER LEVEL DEMOLITION PLAN
DEMOLITION GENERAL NOTES KEYED NOTES
3 DEMOLISH EXISTING WALL LOUVER IN ITS ENTIRETY; PREP AREA FOR NEW CONSTRUCTION
6 DEMOLISH PORTION OF EXISTING WALL; REF. DEMO ELEVATIONS FOR HEIGHT. PROVIDE TEMP.
STRUCTURAL HEADER FOR MASONRY WALL ABOVE. REF. STRUC. DWGS
7 DEMOLISH EXISTING DOOR AND FRAME IN ITS ENTIRETY; PREP AREA FOR NEW
CONSTRUCTION
8 DEMOLISH EXISTING WINDOW AND FRAME IN ITS ENTIRETY
9 DEMOLISH EXISTING EQUIPMENT SLAB; PREP TO RECEIVE NEW SLAB TO MATCH EXISTING
MAIN SLAB. REF. STRUCTURAL
12 DEMOLISH EXISTING STAIR AND RAILING IN ITS ENTIRETY; PREP AREA FOR NEW
CONSTRUCTION
14 DEMOLISH EXISTING STRUCTURAL PLATFORM IN ITS ENTIRETY; REF. STRUCTURAL DWGS
28 SAWCUT EXISTING WALL FOR NEW DOOR OPENING, REF. DOOR SCHEDULE FOR OPENING
SIZE, REFERENCE FLOOR PLANS FOR LOCATION; PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
32 DEMOLISH EXISTING DAYTANK AND CONCRETE CONTAINMENT DIKE IN ITS ENTIRETY AND
REPAIR FLOOR AS NEEDED. PREP AREA FOR NEW FINISHES.
34 DEMOLISH EXISTING HOSE CABINET; REF. PLUMBING
DN
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
2. EXISTING ROOF CONDITIONS CONTAINED WITHIN THE CONSTRUCTION DOCUMENTS ARE BASED ON THE INFORMATION OBTAINED
FROM CONSTRUCTION DOCUMENTS AND FIELD SURVEY, AND SHALL NOT BE CONSTRUED AS "AS BUILT". THE CONTRACTOR TO FIELD
SURVEY EXISTING CONDITIONS PRIOR TO THE ONSET OF CONSTRUCTION.
3. ALL DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE DUE TO NUMBER AND VARYING CONDITIONS. CONTRACTOR TO VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
4. PROTECT EXISTING CONSTRUCTION, SURFACES AND MATERIALS INDICATED TO REMAIN FROM DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING MATERIALS AND SURFACES DAMAGED BY PERFORMANCE OF THE WORK.
5. ONLY AS MUCH ROOFING SHALL BE REMOVED THAT CAN BE REPLACED IN ONE WORK DAY. ROOF SHALL BE MADE WATER TIGHT AT
THE END OF EACH WORK DAY.
6. ALL EXISTING METAL FASTENERS AND COUNTER FLASHING SHALL BE REMOVED AND REPLACED. FLASHING AND COUNTER FLASHING THAT CANNOT BE REMOVED OR REINSTALLED SHALL BE REMOVED AS REQUIRED TO INSTALL NEW ROOFING AND REPLACE IN A
CONDITION COMPLIANT WITH THE ROOF WARRANTY REQUIREMENTS.
7. MAXIMUM WEIGHT OF TEMPORARY STORED ROOF CONSTRUCTION MATERIALS SHALL BE SUPPORTED OVER LARGE AREAS TO NOT
DAMAGE ROOFING.
8. IF MATERIALS ARE ENCOUNTERED THAT MAYBE HAZARDOUS OR MAY CONTAIN HAZARDOUS COMPONENTS, CEASE WORK
IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY THE COR.
9. DO NOT CUT STRUCTURAL COMPONENTS UNLESS INDICATED OTHERWISE.
10. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING OPEN FLAME.
11. COORDINATE REMOVAL OF DEMOLISHED MATERIALS WITH COR. PREVENT DUST AND DEBRIS FROM INFILTRATING OCCUPIED AREAS.
PROVIDE ENCLOSED CHUTES AND NEGATIVE AIR PRESSURE AS REQUIRED. DISPOSE OF DEMOLISHED MATERIALS IN LAWFUL
MANNER, OFF SITE.
12. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS AFFECTING THE OWNER'S
OPERATIONS.
13. TEMPORARY BOILERS TO BE FULLY FUNCTIONAL AND ONLINE PRIOR TO ANY DEMOLITION WORK ON THE BOILER PLANT.
4321 5
A.2
B.2
A
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
6 6 6
OFFICE
8 8 6 8 8 6 8 8 6
8 8 8 8 8 8 8 8
AD105
C1
AD105
F1
C.7
B.4
B.1
A.1
4.9
OPEN TO BELOW
OPEN TO BELOW OPEN TO BELOW
1.2
AD106 F5
AE202C6
A.4
/2
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AD103
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DEMOLITION PLAN
CATWALK LEVEL
Revisions: Date:
DEMOLITION GENERAL NOTES KEYED NOTES
5 DEMOLISH EXISTING WALL; PREP AREA FOR NEW FINISH.
6 DEMOLISH PORTION OF EXISTING WALL; REF. DEMO ELEVATIONS FOR HEIGHT. PROVIDE TEMP.
STRUCTURAL HEADER FOR MASONRY WALL ABOVE. REF. STRUC. DWGS
7 DEMOLISH EXISTING DOOR AND FRAME IN ITS ENTIRETY; PREP AREA FOR NEW
CONSTRUCTION
8 DEMOLISH EXISTING WINDOW AND FRAME IN ITS ENTIRETY
12 DEMOLISH EXISTING STAIR AND RAILING IN ITS ENTIRETY; PREP AREA FOR NEW
CONSTRUCTION
15 DEMOLISH EXISTING CATWALK PLATFORM AND RAILING IN ITS ENTIRETY
24 DEMOLISH EXISTING CONCRETE SLAB IN ITS ENTIRETY
28 SAWCUT EXISTING WALL FOR NEW DOOR OPENING, REF. DOOR SCHEDULE FOR OPENING
SIZE, REFERENCE FLOOR PLANS FOR LOCATION; PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
1/4" = 1'-0"E1 MAIN CATWALK DEMOLITION PLAN
B.2
A
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
20 20
C.7
B.4
B.1
A.1
4.9
21 21 21
30 30
1.2
A.4
33 33
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
2. EXISTING ROOF CONDITIONS CONTAINED WITHIN THE CONSTRUCTION DOCUMENTS ARE BASED ON THE INFORMATION OBTAINED
FROM CONSTRUCTION DOCUMENTS AND FIELD SURVEY, AND SHALL NOT BE CONSTRUED AS "AS BUILT". THE CONTRACTOR TO FIELD
SURVEY EXISTING CONDITIONS PRIOR TO THE ONSET OF CONSTRUCTION.
3. ALL DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE DUE TO NUMBER AND VARYING CONDITIONS. CONTRACTOR TO VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
4. PROTECT EXISTING CONSTRUCTION, SURFACES AND MATERIALS INDICATED TO REMAIN FROM DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING MATERIALS AND SURFACES DAMAGED BY PERFORMANCE OF THE WORK.
5. ONLY AS MUCH ROOFING SHALL BE REMOVED THAT CAN BE REPLACED IN ONE WORK DAY. ROOF SHALL BE MADE WATER TIGHT AT
THE END OF EACH WORK DAY.
6. ALL EXISTING METAL FASTENERS AND COUNTER FLASHING SHALL BE REMOVED AND REPLACED. FLASHING AND COUNTER FLASHING THAT CANNOT BE REMOVED OR REINSTALLED SHALL BE REMOVED AS REQUIRED TO INSTALL NEW ROOFING AND REPLACE IN A
CONDITION COMPLIANT WITH THE ROOF WARRANTY REQUIREMENTS.
7. MAXIMUM WEIGHT OF TEMPORARY STORED ROOF CONSTRUCTION MATERIALS SHALL BE SUPPORTED OVER LARGE AREAS TO NOT
DAMAGE ROOFING.
8. IF MATERIALS ARE ENCOUNTERED THAT MAYBE HAZARDOUS OR MAY CONTAIN HAZARDOUS COMPONENTS, CEASE WORK
IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY THE COR.
9. DO NOT CUT STRUCTURAL COMPONENTS UNLESS INDICATED OTHERWISE.
10. OBTAIN HOT WORK PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING OPEN FLAME.
11. COORDINATE REMOVAL OF DEMOLISHED MATERIALS WITH COR. PREVENT DUST AND DEBRIS FROM INFILTRATING OCCUPIED AREAS.
PROVIDE ENCLOSED CHUTES AND NEGATIVE AIR PRESSURE AS REQUIRED. DISPOSE OF DEMOLISHED MATERIALS IN LAWFUL
MANNER, OFF SITE.
12. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS AFFECTING THE OWNER'S
OPERATIONS.
13. TEMPORARY BOILERS TO BE FULLY FUNCTIONAL AND ONLINE PRIOR TO ANY DEMOLITION WORK ON THE BOILER PLANT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AD104
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DEMOLITION PLAN
ROOF
1/4" = 1'-0"E1 MAIN ROOF DEMOLITION PLAN
DEMOLITION GENERAL NOTES KEYED NOTES
18 DEMOLISH EXISTING PARAPET METAL COPING; REMOVE EXISTING BLOCK AND REPLACE WITH
PT WOOD BLOCKING TO MATCH HEIGHT AND WIDTH OF EXISTING
19 DEMOLISH EXISTING MEMBRANE ROOFING TO CONCRETE DECK; PREPARE SUBSTRATE TO
RECEIVE NEW FINISH
20 DEMOLISH EXISTING ROOF DRAIN, REF. PLUMBING DWGS
21 DEMOLISH EXISTING CRICKET MEMBRANE
30 EXISTING ROOF PENETRATIONS TO BE INFILLED PRIOR TO NEW ROOF INSTALL; REF.
STRUCTURAL DWGS
31 PROVIDE NEW FLASHING FOR EXISTING PIPING; REF. MECHANICAL DWGS
33 DEMOLISH AND REPLACE EXISTING OVERFLOW DRAIN
105 EXISTING ROOF HATCH TO REMAIN
ANNEX LEVEL 1
-4' - 0"
ANNEX LEVEL 2
5' - 5 9/16"
BOILER LEVEL
10' - 0"
MAIN ROOF
33' - 8"
ANNEX ROOF
14' - 4 9/16"
4 3 2 156.7
7 6
8 88 88 8
88 8 8 8 8
17171717
UPPER LEVEL
17' - 11 1/8"
T.O. PARAPET
36' - 5"
4.9
14' - 0" 14' - 0" 14' - 0"
ANNEX PARAPET
17' - 10 1/2"
1.2
2' - 3 1/4" +/- 4' - 2 1/8" +/- 4' - 0 1/2" +/-
8 8
D9
AE502
ANNEX LEVEL 1
-4' - 0"
ANNEX LEVEL 2
5' - 5 9/16"
MAIN LEVEL
0' - 0"
BOILER LEVEL
10' - 0"
MAIN ROOF
33' - 8"
ANNEX ROOF
14' - 4 9/16"
4321 5 6.7
8 9 10
8 8
8 8
8 8
8 8
8 8
UPPER LEVEL
17' - 11 1/8"
T.O. PARAPET
36' - 5"
4.9
18 18
ANNEX PARAPET
17' - 10 1/2"
6'
23' - 8" 8' - 0"
19' - 8" 2' - 8"
6'
1.2
6'
2' - 8" 14' - 0"
33 33
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AD105
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DEMOLITION
ELEVATIONS
1/4" = 1'-0"C1 NORTH DEMOLITION ELEVATION
1/4" = 1'-0"F1 SOUTH DEMOLITION ELEVATION
DEMOLITION GENERAL NOTES
KEYED NOTES
7 DEMOLISH EXISTING DOOR AND FRAME IN ITS
ENTIRETY; PREP AREA FOR NEW CONSTRUCTION
8 DEMOLISH EXISTING WINDOW AND FRAME IN ITS
ENTIRETY
17 SAWCUT EXISTING WALL FOR OVERHEAD DOOR
OPENING, REF. DOOR SCHEDULE FOR OPENING
SIZE, REFERENCE FLOOR PLANS FOR LOCATION;
PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
18 DEMOLISH EXISTING PARAPET METAL COPING;
REMOVE EXISTING BLOCK AND REPLACE WITH PT
WOOD BLOCKING TO MATCH HEIGHT AND WIDTH OF
EXISTING
28 SAWCUT EXISTING WALL FOR NEW DOOR OPENING,
REF. DOOR SCHEDULE FOR OPENING SIZE,
REFERENCE FLOOR PLANS FOR LOCATION;
PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
29 SAWCUT EXISTING WALL FOR NEW OPENING;
PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
33 DEMOLISH AND REPLACE EXISTING OVERFLOW
DRAIN
42 PROVIDE WEATHERPROOF INFILL PANEL AT
OPENING FOR TEMP. PIPE PENETRATIONS. REF.
PHASING PLANS
1. REFER TO OTHER CONTRACT DOCUMENTS FOR
DEMOLITION REQUIREMENTS
2. CONTRACTOR TO VERIFY EXISTING CONDITIONS IN THE
FIELD.
3. ALL DIMENSIONS AND INFORMATION IN THESE DRAWINGS
ARE BASED, IN PART, ON THAT FACT. ACTUAL
CONDITIONS MAY VARY FROM THAT SHOWN. NOTIFY THE
ARCHITECT IMMEDIATELY FOR REVIEW SHOULD ANY
DISCREPANCIES WHICH SIGNIFICANTLY AFFECT THE
DEMOLITION OR NEW CONSTRUCTION WORK OCCUR.
4. PROTECT EXISTING CONSTRUCTION, SURFACES AND
MATERIALS INDICATED TO REMAIN FROM DAMAGE OR
DETERIORATION DUE TO PERFORMANCE OF WORK.
PATCH AND REPAIR EXISTING MATERIALS AND SURFACES
DAMAGED BY PERFORMANCE OF THE WORK.
5. IF MATERIALS ARE ENCOUNTERED THAT MAYBE
HAZARDOUS OR MAY CONTAIN HAZARDOUS
COMPONENTS, CEASE WORK IMMEDIATELY, PREVENT
FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY
THE COR.
6. DO NOT CUT STRUCTURAL COMPONENTS UNLESS
INDICATED OTHERWISE.
7. COORDINATE REMOVAL OF DEMOLISHED MATERIALS
WITH COR. PREVENT DUST AND DEBRIS FROM
INFILTRATING OCCUPIED AREAS. PROVIDE ENCLOSED
CHUTES AND NEGATIVE AIR PRESSURE AS REQUIRED.
DISPOSE OF DEMOLISHED MATERIALS IN LAWFUL
MANNER, OFF SITE.
8. MATERIALS AND COMPONENTS TO BE SALVAGED ARE
INDICATED. REMOVE SALVAGE ITEMS AS COMPLETE
UNITS TO THE EXTENT POSSIBLE AND PROTECT FROM
FURTHER DAMAGE. CLEAN COMPONENTS OF DUST AND
DIRT. STORE ON SITE AS DIRECTED BY COR.
9. COORDINATE SCHEDULE WITH COR PRIOR TO
COMMENCING DEMOLITION WORK THAT MAY INTERRUPT
SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY
CONNECTIONS OR NEW SERVICES AS NECESSARY TO
ELIMINATE DISRUPTIONS AFFECTING THE OWNER'S
OPERATIONS.
10. REFER TO AE003 PHASING PLANS FOR TEMP. BOILER PIPE
CONNECTION THROUGH EXISTING WINDOW OPENING.
REF. MECHANICAL.
ANNEX LEVEL 2
5' - 5 9/16"
MAIN LEVEL
0' - 0"
BOILER LEVEL
10' - 0"
MAIN ROOF
33' - 8"
ANNEX ROOF
14' - 4 9/16"
AD BC B.3CC BBDD
T.O. PARAPET
36' - 5"
C.7 B.4 B.1 A.1
ANNEX PARAPET
17' - 10 1/2"
18 18
3 3
7'
4'
4'
2'
3' - 10" 2' - 6"
4' - 0" 3' - 4"
A.4
15' - 2 1/2" 3' - 4"
MAIN LEVEL
0' - 0"
BOILER LEVEL
10' - 0"
MAIN ROOF
33' - 8"
A DB CB.3BB
T.O. PARAPET
36' - 5"
C.7B.4B.1A.1
7'
3' - 10" 14' - 7 7/8"
A.4
1' - 6" 10' - 9 1/8" 1' - 6" 16' - 2 3/4"
1'
8'
/8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD., STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
ARCHITECTURAL
/1
/2
:0
:0
P
M
AD106
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 JBS/MKL EXB/CEM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DEMOLITION
ELEVATIONS
DEMOLITION GENERAL NOTES
KEYED NOTES
3 DEMOLISH EXISTING WALL LOUVER IN ITS
ENTIRETY; PREP AREA FOR NEW CONSTRUCTION
7 DEMOLISH EXISTING DOOR AND FRAME IN ITS
ENTIRETY; PREP AREA FOR NEW CONSTRUCTION
18 DEMOLISH EXISTING PARAPET METAL COPING;
REMOVE EXISTING BLOCK AND REPLACE WITH PT
WOOD BLOCKING TO MATCH HEIGHT AND WIDTH OF
EXISTING
28 SAWCUT EXISTING WALL FOR NEW DOOR OPENING,
REF. DOOR SCHEDULE FOR OPENING SIZE,
REFERENCE FLOOR PLANS FOR LOCATION;
PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
29 SAWCUT EXISTING WALL FOR NEW OPENING;
PROVIDE TEMP. STRUCTURAL HEADER FOR
MASONRY WALL ABOVE. REF. STRUC. DWGS
1. REFER TO OTHER CONTRACT DOCUMENTS FOR
DEMOLITION REQUIREMENTS
2. CONTRACTOR TO VERIFY EXISTING CONDITIONS IN THE
FIELD.
3. ALL DIMENSIONS AND INFORMATION IN THESE
DRAWINGS ARE BASED, IN PART, ON THAT FACT.
ACTUAL CONDITIONS MAY VARY FROM THAT SHOWN.
NOTIFY THE ARCHITECT IMMEDIATELY FOR REVIEW
SHOULD ANY DISCREPANCIES WHICH SIGNIFICANTLY
AFFECT THE DEMOLITION OR NEW CONSTRUCTION
WORK OCCUR.
4. PROTECT EXISTING CONSTRUCTION, SURFACES AND
MATERIALS INDICATED TO REMAIN FROM DAMAGE OR
DETERIORATION DUE TO PERFORMANCE OF WORK.
PATCH AND REPAIR EXISTING MATERIALS AND
SURFACES DAMAGED BY PERFORMANCE OF THE WORK.
5. IF MATERIALS ARE ENCOUNTERED THAT MAYBE
HAZARDOUS OR MAY CONTAIN HAZARDOUS
COMPONENTS, CEASE WORK IMMEDIATELY, PREVENT
FURTHER DISTURBANCE, SECURE THE AREA AND
NOTIFY THE COR.
6. DO NOT CUT STRUCTURAL COMPONENTS UNLESS
INDICATED OTHERWISE.
7. COORDINATE REMOVAL OF DEMOLISHED MATERIALS
WITH COR. PREVENT DUST AND DEBRIS FROM
INFILTRATING OCCUPIED AREAS. PROVIDE ENCLOSED
CHUTES AND NEGATIVE AIR PRESSURE AS REQUIRED.
DISPOSE OF DEMOLISHED MATERIALS IN LAWFUL
MANNER, OFF SITE.
8. MATERIALS AND COMPONENTS TO BE SALVAGED ARE
INDICATED. REMOVE SALVAGE ITEMS AS COMPLETE
UNITS TO THE EXTENT POSSIBLE AND PROTECT FROM
FURTHER DAMAGE. CLEAN COMPONENTS OF DUST AND
DIRT. STORE ON SITE AS DIRECTED BY COR.
9. COORDINATE SCHEDULE WITH COR PRIOR TO
COMMENCING DEMOLITION WORK THAT MAY INTERRUPT
SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY
CONNECTIONS OR NEW SERVICES AS NECESSARY TO
ELIMINATE DISRUPTIONS AFFECTING THE OWNER'S
OPERATIONS.
1/4" = 1'-0"C5 EAST DEMOLITION ELEVATION
1/4" = 1'-0"F5 WEST DEMOLITION ELEVATION
BUILDING 10
BOILER PLANT
APPROX. LOCATION
BUILDING 11
9 41
1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
2. ALL DETAILS SHOWN ARE DIAGRAMMATIC IN NATURE DUE TO NUMBER AND VARYING CONDITIONS. CONTRACTOR TO VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. PROTECT EXISTING CONSTRUCTION, SURFACES AND MATERIALS INDICATED TO REMAIN FROM DAMAGE OR DETERIORATION DUE TO
PERFORMANCE OF WORK. PATCH AND REPAIR EXISTING MATERIALS AND SURFACES DAMAGED BY PERFORMANCE OF THE WORK.
4. CONTRACTOR SHALL FOLLOW OSHA 1926 AND 19W STANDARDS FOR WORK ASSOCIATED WITH THIS PROJECT.
5. IF MATERIALS ARE ENCOUNTERED THAT MAYBE HAZARDOUS OR MAY CONTAIN HAZARDOUS COMPONENTS, CEASE WORK
IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE…