S06 MECHANICAL DRAWINGS BULLETIN 1.pdf

PDF 16 MB Posted

Attached to
Y1NB--650-19-100 Replace Boilers in Bldg 10 Federal contract opportunity
Solicitation number
36C24122R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This solicitation is for replacing boilers in Building 10 at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is seeking proposals to replace boilers under solicitation number 36C24122R0084. Offerors should provide mechanical drawings and specifications for a new high-efficiency boiler system. The attached request for proposals includes additional requirements for the boiler replacement project, which must be completed by December 31, 2019. Proposals are due by April 15, 2019 and the contract is expected to be awarded by May 15, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--650-19-100 Replace Boilers in Bldg 10, newest first.
File Type Posted
S06 RFI Responses 07262022.pdf PDF
36C24122R0084 0008.docx DOCX document
S06 RFI Response 07212022.pdf PDF
S06 AMENDED Drawing P-502.pdf PDF
S06 AMENDED Drawing P-601.pdf PDF
36C24122R0084 0006.docx DOCX document
S06 EXHIBIT C Past Performance Questionnaire Revised.pdf PDF
S06 IMG_3850.pdf PDF
36C24122R0084 0005.docx DOCX document
S06 RFI Responses 07192022.pdf PDF
S06 AMENDED Spec Section 33 16 15.pdf PDF
S06 IMG_4037.pdf PDF
S06 GE- Roofs.pdf PDF
S06 IMG_4044.pdf PDF
36C24122R0084 0004.docx DOCX document
S06 AMENDED Spec Section 03 52 00.pdf PDF
S06 IMG_0094.pdf PDF
S06 RFI Responses 07142022.pdf PDF
S06 Bldg 10 Boiler Plant REGULATED BLDG MATERIALS SURVEY REPORT.pdf PDF
S06 RFI Responses.pdf PDF
S06 EXHIBIT A Project Information Sheet for Contractors Amended.pdf PDF
36C24122R0084 0002.docx DOCX document
Site Visit Sign-In Sheet.pdf PDF
S02 BD03252022 Drawings - 0_General.pdf PDF
S02 BD03252022 Drawings - 7b_Mechanical - Part 2.pdf PDF
S02 BD03252022 Drawings - 8a_Electrical - Part 1.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol II.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol III.pdf PDF
S02 BD03252022 Drawings - 2a_Civil - Part 1.pdf PDF
S02 BD03252022 Drawings - 5_Fire Protection.pdf PDF
S02 BD03252022 Drawings - 6_Plumbing.pdf PDF
S02 BD03252022 Drawings - 7a_Mechanical - Part 1.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol I.pdf PDF
S02 BD03252022 Drawings - 1_Hazardous Materials.pdf PDF
S02 BD03252022 Drawings - 2b_Civil - Part 2.pdf PDF
S02 BD03252022 - Hazardous Materials Report Bldgs 9_10_.pdf PDF
S02 BD03252022 -Slope Stability Report.pdf PDF
S02 BD03252022 - Soil Erosion and Sediment Control Plan.pdf PDF
S02 JA DDC Security Systems Boilers 650-19-100.pdf PDF
S02 JA Lockset Boilers 650-19-100.pdf PDF
S02 36C24122R0084 Solicitation.pdf PDF
S02 JA Fire Alarm System Boilers 650-19-100.pdf PDF
S02 JA Utility Plant Boilers 650-19-100.pdf PDF
S02 RI20220001 Wage Determinations.pdf PDF
S02 VHA Supplemental Contract Requirements for Combatting COVID-19.pdf PDF
S02 EXHIBIT E VAAR Clause 852.219-77 Certificate of Compliance.pdf PDF
S02 EXHIBIT B Subcontractor Information and Consent Form.pdf PDF
S02 EXHIBIT D Calculation of Self Performed Work.pdf PDF
S02 EXHIBIT C Past Performance Questionnaire.pdf PDF
S02 EXHIBIT A Project Information Sheet for Contractors.pdf PDF
Show all 50

Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL ABBREVIATIONS

& SYMBOLS

M-001

JJPAP

2 3

1 BULLETIN NO. 1 07/06/2022

'- 0

'-9

/2

'- 0

43'-1"

FUEL OIL TANK

4,000 GAL

FUEL OIL

TANK

30,000 GAL

FUEL OIL

TANK

30,000 GAL

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

PHASING AND TEMPORARY WORK

SITE PLAN

MC101

GDSAP

PLAN

NORTH

ACTUAL

NORTH

1 BULLETIN NO. 1 07/06/20221 BULLETIN NO. 1 07/06/2022

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

TEMPORARY AND FINAL CONDENSATE

PIPING INSTALLATION SEQUENCE

MJ604

GDSAP

4321 5

A

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

E

BOILER CONTROL

PANEL CLEARANCE

(R E F

TU

B E

P U

LL

(R E F

TU

B E

P U

LL

(R E F

TU

B E

P U

LL

C L

C L

C L

BOILER CONTROL

PANEL

CLERANCE

BOILER CONTROL

PANEL

CLERANCE

D/A-10-03-001

MP303

MP303

BOILER REAR

DOOR CLERANCE

BOILER REAR

DOOR CLERANCE

BOILER REAR

DOOR CLERANCE

B-10-02-001 B-10-02-002 B-10-01-003

DEAREATOR

(N)BOILER

(N)BOILER

(N)BOILER

ECONOMIZER

ECONOMIZER

ECONOMIZER

FHX-10-02-001

FHX-10-02-002 FHX-10-02-003

ACHP-10-02-04A

MP302

GENERATOR

ROOM

BOILER LEVEL

CONTROL ROOM

ERV-10-02-001

UH-10-03-004

UH-10-03-005

UH-10-03-006

UH-10-02-003

UH-10-03-001 UH-10-03-002

UH-10-03-003

DT-10-02-001

TRANSFORMER

UH-10-02-004

ACHP-10-02-05A

ACHP-10-02-06A

ACHP-10-02-07A

BOILER FRONT

DOOR SWING

(TYP.)

UH-10-02-007

UH-10-02-001

DWH-10-03-001

UH-10-02-002

ACHP-10-02-06B

ACHP-10-02-07B

MP302

EXHAUST MUFFLER

REFER TO MH102

FOR DETAILS3

MP303

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

PLAN

NORTH ACTUAL

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/6

/2

:5

:4

A

M

MQ102

MECHANICAL

EQUIPMENT ARRANGEMENT PLAN

BOILER LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

EQUIPMENT ARRANGEMENT PLAN - BOILER LEVEL

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

TRADES.

NO. DESCRIPTION DATE

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

E

(E)4"HPS

(E)2 1/2"MPR

(E)1 1/2"MPR

(E)2"MPR

(N)8" HPS DROP

MP301

MP302

MP303

MP303

(N)3/4" HPS

UP TO AMINE-

CHEMICAL FEED

(N)6" HPS

SPARE (N)4" HPS TO

BUILDING 9

(N)8" HPS TO

BUILDING 9

(N)8" HPS TO

BUILDING 1

(N)6" HPS RISE

TO BOILER 1

(N)6" HPS RISE

TO BOILER 2

(N)6" HPS

RISE TO

BOILER 3

(N)8" HPS UP

TO STEAM TEST

SILENCER

(N)4" HPS UP

TO DEAREATOR

BDS-10-01-001

BLOW

DOWN

SEPERATOR

CONDENSATE

RECEIVER

CONDENSATE

STORAGE

TANK

CS-10-01-001

(N)3"PC

(N)4"HPS

(N)2"BD

(N)2"FWPS

(E)2"MPR

(N)8"HPS

(N)3"NG

ACHP-10-001

2"FWPS UP

REFER TO DRAWING

MP102 FOR CONTINUATION

(N)2 1/2"FWPD

(N)2 1/2"FWPD

FUEL

PUMP

SKID

(N)8"HPS

(E)2 1/2"MPS

(E)1"MPR

(E)2"MPR

RUN FUEL OIL

PIPING IN NEW

TRENCH.

(N)1"BO

(E)8"HPS

(N)4"HPS

(N)2"BD UP

(N)2"BD UP

(N)2"BD UP

(N)2"BD UP

(N)2"FWPD UP

(N)1"BD UP

(N)1"BO UP

(N)2"FWPD UP

(N)1"BD UP

(N)1"BO UP

(N)2"BD UP

(N)2"FWPD UP

(N)1"BD UP

(N)1"BO UP

(N)2"BD UP

(N)2"FWPD UP

(N)STEAM TRAP

(N)1 1/2"HPR

UP

(N )1

M P R

FEEDWATER

PUMPS

FWP-10-01-003

FWP-10-01-002

FWP-10-01-001

(E)8" HPS TO

BUILDING 1

(N)2"FOR

(N)2"FOS

(N)2"FOS

(N)2"FOR

(N)2"FOS AND (N)2" FOR DN IN

TRENCH PIT. REFER TO DRAWING

MC101 FOR CONTIINUATION.

(TYP. OF 4)

(N)1"FOS &

(N)1"FOR UP

TO BOILER 3.

(N)1"FOS &

(N)1"FOR UP

TO BOILER 2.

FUEL

OIL

FILTERATION

GENERATOR

FUEL

PUMP

SKID

FLASH

TANK

FT-10-01-001

ACHP-10-01-01A

(N)1"FOS &

(N)1"FOR UP

TO BOILER 1.

(N)5"HPR

(N )4 H P S

(N)4"PC(N)4"PC

(N )2

S C W

TYPICAL

INSULATION

ON PIPING

1' - 1 1/2"

(N)4"HPS

FOP-10-01-002

FOM-10-01-001

FOP-10-01-001

(N)4"SV

(N)1"MPR

(N)1"MPR

(N)2"MPR

(N)1 1/2"MPR

(N)3"HPS

(N)4"SV

(N)3"HPS

(N)10"HPS

10-PRV-01-001

10-01-PRV-002

(N)4" HPS TO

PRV FOR UNIT

HEATERS

(N)2-1/2"MPS

DROP

(N)1/2"CF

(N )1 C F

(N)1/2"CF

(N)2"FOR

RUN 2"FOR AND

2"FOS IN TRENCH.

(N)2"BD

(N)4"SV UP

(N)2"MPR

(N)2"MPR

(N)1 1/4"HPR

(N)1"MPR

(N)4"PC

DROP

(N)1" HPS UP TO

MASTER STEAM

PRESSURE

TRANSMITTER

(N)4" SV UP

RE:DRAWING MP102

(N)2"FWPD UP

TO BOILER #1

(N)2"FWPD UP

TO BOILER #2

(N)2"FWPD UP

TO BOILER #3

(N)2"FWPD(N)2"FWPD

(N)2"FWPD

(N)2"FWPD

(N)2"FWPD

UH-10-01-001

UH-10-01-002

(N)2 1/2"FWPD

(N)2 1/2"FWPD

(N)3"NG UP

RE: DRAWING MP102

OFFICE

(N)4"MPS UP

SEE DWG

MP103 FOR

CONT.

(N)2"MPR

(N)4"OFL

(N)2"FWPD

(N)2"FOS

(N)2"FOR

(N)2"FWPD

(N)3/4"MPS

1-1/4"MPC

DOWN FROM

ABOVE

(N)2"FOS

(N)2 1/2"MPS

(N)3/4"MPR UP

(N)4"SV UP

THRU ROOF

(N)3/4"MPR

CTP-10-01-001

CTP-10-01-002

UH-10-01-003

(N)2"D

(N)4"FWPS

FUEL OIL

PIPING DROP

(N)CORROSIVE

COMPOUNT

TANK

(N)CORROSIVE

COMPOUNT

TANK

CHEMICAL

INJECTION

PUMPS

(N)CORROSIVE

COMPOUNT

TANK

(N)1"FOS

(N)1"FOR

(N)1"FOS

(N)1"FOR

ANNEX

(N)4"PC

(N)3/4"MPS(N)3/4"MPS

(N)3/4"MPR

TRANSFORMER

BREAK ROOM

ACHP-10-01-03A

ACHP-10-01-02A

(N)4"MPS

(N)RS

& RL

(TYP.)

(N)3/4"PC

RS, RL, AND PC

PIPING UP IN

PLUMBING CHASE

(TYP.)

CO

CO

T

T

T

CO

(N)3/4"MPS

(N)1-1/2"MPR

UP

LOUVER

L-10-01-001

EXISTING

GAS TRAIN

TO REMAIN AS IS

(N)3/4"RS & RL

UP

(N)3/4"MPS &

MPR UP

3' - 4"

1' - 2"

1' - 4"

1' - 6"

(N)1 1/4"MPR

(N)1 1/2"HPR9

(N)1"FOS

(N)1"FOR

(N)3/4"MPS

(N)8"HPS

(N)1 1/2"MPR

(N)1 1/4"MPR

(N)2"MPR

UP

(N)3"PC

(N)8"HPS

CRU-10-01-002

(E)8"HPS

(E)10"HPS

(N)4"MPR

(N)3"HPR

(N)3"CTPD (N)3"CTPD

(N)5"HPR

(E)4"HPS

(N)3"HPS RISE

TO DOMESTIC

WATER

HEATER

(N)4"SV

MP101

FOM-10-01-002

WATER TREATMENT

SKID

(N)1"FOR

(N)1"FOS

MP302

(N)2"FOS

(N)2"FOR

(N)1 1/4"MPR 12

(N)PIPE HANGER TYP

(N)PIPE HANGER TYP

(N)PIPE HANGER

TYP

(N)PIPE HANGER

TYP

(N)PIPE HANGER

TYP

(N)4"PC

MP303

(N)2 1/2"MPS

(N)2 1/2"MPS

E

MP302

MP302

MAIN

STEAM HEADER

(N)2"FOS

(N)2"FOR

(N)2"FOR

(N)2"FOS

(N)1 1/4"MPR

(N)3"HPS

(N)8"HPS(N)2"MPR

(N)2"FWPS

PIPE

HANGER (TYP.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/6

/2

:5

:3

A

M

MP101

MECHANICAL

PIPING PLAN

MAIN LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

NEW WORK PLAN - MAIN LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 FEEDWATER ISOLATION VALVES FOR EACH BOILER SHALL BE LOCATED IN AN ACCESSIBLE

LOCATION.

2 RUN NEW FUEL OIL PIPING IN NEW TRENCH IN THE EXISTING LOWER LEVEL SLAB. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS.

3 1"FOS & 1"FOR UP TO GENERATOR ON BOILER LEVEL.

4 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE

CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.

5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM

1/8 INCH PER FOOT. TERMINATE TO FUNNEL DRAIN IN WALL.

6 REFER TO DRAWING MH601 FOR REFRIGERANT PIPING DIAGRAM.

7 NEW TRENCH FOR FUEL OIL PIPING. REFER TO DETAIL 6 ON DRAWING MP501 AND

STRUCTURAL DRAWINGS FOR DETAILS.

8 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM

1/8 INCH PER FOOT. ROUTE TO NEAREST FLOOR DRAIN.

9 PROVIDE SCH 40 STEEL PIPE SLEEVE IN EXTERIOR/FOUNDATION WALL. PROVIDE LINK-SEAL IN

ANNUL SPACE BETWEEN PIPE AND SLEEVE. REFER TO DETAIL 5 ON DRAWING MP502.

10 INSTALL NEW NATURAL GAS PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF VALVE AT THE

GAS TRAIN. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.

11 COORDINATE ROUTING OF NEW PIPING IN AREA OF NEW STAIRS. DO NOT LOCATE ANY

EQUIPMENT REQUIRING MAINTENEANCE ACCESS UNDER THE STAIRS. REFER TO STRUCTURAL

DRAWINGS FOR ADDITIONAL DETAILS.

12 SAFETY RELIEF VALVE - REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR

ADDITIONAL DETAILS.

13 ALL PIPING IN THE BOILER PLANT MUST BE FORGED STEEL.

14 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.

15 ALL MAIN STEAM VALVES SHALL HAVE A FACTORY INSTALLED 1" BYPASS LINE WITH GLOBE

VALVE FOR WARM-UP. NOT SHOWN FOR CLARITY.

16 4" CTPD UP TO DA FROM CONDENSATE TRANSFER PUMP DISCHARGE HEADER. REFER TO

DRAWINGS MP601, MP602 AND MP603 FOR ADDITIONAL DETAILS. REFER TO DRAWING MP102

FOR CONTINUATION.

17 NEW 1" FOS AND 1" FOR FROM NEW 4,000 UNDERGROUND TANK. REFER TO DRAWING MC101

AND CIVIL DRAWINGS FOR ADDITIONAL DETAILS. COORDINATE ROUTING OF PIPES WITH ALL

TRADES.

18 BOILER WATER TREATMENT SYSTEM TO BE PROVIDED UNDER A SEPARATE CONTRACT.

CONTRACTOR SHALL COORDINATE SPACE REQUIREMENTS WITH WATER TREATMENT VENDOR AND

ALL TRADES. WATER TREATMENT SKID BASIS OF DESIGN BARCLAY WATER MANAGEMENT INC.

CONTACT: ERIC NADEAU 774-400-4259 OR ALEX JARVIS 617-945-3046.

19 PROVIDE 8" HPS WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP601

FOR ADDITIONAL INFORMATION.

20 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO

DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.

21 PROVIDE 4" PC WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP603

FOR ADDITIONAL INFORMATION.

22 1" HPS UP TO WATER FILL CONNECTION (HYDRO STATIC TESTING). REFER TO DRAWING MP602

FOR ADDITIONAL DETAILS.

23 4"PC FROM CONDENSATE RETURN UNITS (CRU-10-01-001/002) UP TO TOP INLET ON

CONDENSATE STORAGE TANK. COORDINATE ROUTING WITH ALL TRADES.

24 COORDINATE LOCATIONS OF NEW FUEL OIL EQUIPMENT WITH ALL TRADES.

25 NEW MAXON AUTOMATIC GAS SHUTOFF VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL

DETAILS. LOCATE VALVE IN ACCESSIBLE LOCATION, COORDINATE LOCATION WITH ALL TRADES.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

TRADES.

SCALE: 1/2" = 1'-0"2

PART PLAN - PIPE PENETRATIONS

NO. DESCRIPTION DATE

D

6.7 8 9

B

C

B.3

CC

BB

DD

E

D/A-10-03-001

MP301

MP302

MP303

DEAREATOR

B-10-02-001 B-10-02-002 B-10-01-003

(N)BOILER

(N)BOILER

(N)BOILER

(N)6"SV

(N)2"FWPS

(N)4"OFL

(N)2"FWPD

(N)2"BD

(N)1"BD

(N)2"BD

(N)1"BD

(N)2"BD

(N)2"BD

(N)2"BD

(N)3"NG

(N)3"NG

(N)3"NG

(N)1"CF

(N)1"CF

(N)1"CF

(N)1/2"FWS

(N)1"CF

(N)3"NG

ACHP-10-02-04A

(N)3"NG

(N)6" HPS

RISE TO

BOILER 1

(N)6" HPS RISE

TO BOILER 2

(N)6" HPS

RISE TO

BOILER 3

(N)8" HPS UP

TO STEAM TEST

SILENCER

(N)3" HPS UP

TO DEAREATOR

ERV-10-02-001

UP FROM BELOW

RE:DRAWING MP101

UP THRU ROOF

(N)3"NG 1

(N)3"NG(N)3"NG

BOILER TUBE PULL

(TYPICAL)

(N)2"FWPD

GENERATOR

ROOM

ANNEX

CONTROL ROOM

BOILER LEVEL

(N)2"BD

DOWN

(N)2"BD

DOWN

(N)2"BD

DOWN

(N)1"FOS

(N)1"FOR

(UP FROM LOWER LEVEL

RE: DRAWING MP101)

(N)4"SV UP UH-10-02-003

2"FWPD UP

FROM LOWER LEVEL

UP FROM LOWER LEVEL

2"FWPD UP

FROM LOWER LEVEL

DT-10-02-001

(N)2-1/2"MPS UP

(N)3/4"MPR DN

(N)3/4"MPS

(N)3/4"MPR

(N)4"CTPD

DN. TO SURGE

TANK BELOW

(N)4"FWPS

UH-10-02-004

(N)3/4"MPS

(N)3/4"MPR

ACHP-10-02-06A

ACHP-10-02-07A

ACHP-10-02-05A

(N)4"SV FROM

BELOW UP

THRU ROOF

(N)3/4"MPS & MPR DN

(N)RS & RL (N)3/4"PC

RS, RL, AND PC

PIPING DN 3

(N)RS & RL

(N)RS & RL

(TYP.)

SECURITY

IT

(N)3/4"RS & RL

(N)3/4"RS & RLTYP.

(N)3/4"RS & RL

L-10-02-003

(UP TO

CATWALK LEVEL)

RE: DRAWING

MP103

LOUVER

L-10-02-004

(ABOVE DOOR)

TRANSFORMER

6"SV UP

1-1/4"LPR

1-1/2"MPR UP

4"FWPS DN TO

FEEDWATER PUMPS

FROM DA

RE:DWG MP101

3"NG UP

(N)3"NG UP

RE: DRAWING MP102

3"NG

DOWN FROM ABOVE

RE:DRAWING MP103

(N)1 1/4"LPR

UP TO 10-PRV-1

STATION 6

(N)3/4"MPR

FROM UNIT

HEATERS

(T)4"PC

(T)2 1/2"

(TYP.)

MAINTENACE

ADDITION

UH-10-02-002

(N)2" HPS

UP/DN

UH-10-02-001

(N)4"SV

EXHAUST MUFFLER

REFER TO MH102

FOR DETAILS

(N)1"LPG

(N)1"LPG

(N)3/4"LPG

(N)3/4"LPG (N)3/4"LPG

(TYP.)

(N)1"LPG

ACHP-10-02-06B

ACHP-10-02-07B

4"PC

UP FROM BELOW

RE: DWG MP101

MP303

L-10-02-005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/6

/2

:5

:3

A

M

MP102

MECHANICAL

PIPING PLAN

BOILER LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

NEW WORK PLAN - BOILER LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 NATURAL GAS PIPING IS LOCATED IN CEILING SPACE OF ANNEX.

2 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE

CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.

3 PROVIDE INSULATED METAL WALL ENCLOSURE FOR PIPING DOWN THRU FLOOR. FINISH TO

MATCH ADJACENT SURFACES.

4 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE

BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS

AS REQUIRED.

5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM

1/8 INCH PER FOOT.

6 FUEL OIL PIPING UP FROM BELOW.

7 REFER TO THE MJ SERIES DRAWINGS FOR PHASING (TEMPORARY) PIPING.

8 BLOWDOWN PIPING BELOW BOILERS.

9 GAS TRAIN VENTS UP THROUGH ROOF. SIZE VENTS PER DETAIL #2 ON DRAWING MP506.

10 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.

11 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO

DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.

12 3/4" LPG TO BOILER BURNER/IGNITER - REFER TO DETAIL 2 ON DRAWING MP506.

13 BOILER SAFETY RELIEF VALVE. CONTRACTOR SHALL VERIFY CONNECTION SIZES WITH APPROVED

EQUIPMENT SHOP DRAWINGS. REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR

ADDITIONAL DETAILS.

14 REFER TO DRAWING MP604 FOR ADDITIONAL LPG PIPING DETAILS.

15 4" CTPD DA TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

TRADES.

NO. DESCRIPTION DATE

D

6.7

B

C

B.3

CC

BB

DD

E

(N)6"HPS

(N)6 HPS

DROP TO

BOILER 1

(N)6" HPS

DROP TO

BOILER 2

(N)6" HPS

DROP TO

BOILER 3

(N)6" HPS DN

TO HEADER

(N)6" HPS

DROP

(N)6" HPS DN

TO HEADER

(N)8" HPS DN

TO HEADER

CATWALK

(INV. EL. 35.72')

CATWALK

(INV. EL. 35.72')

CATWALK

(INV. EL. 35.72')

MP302

MP303

MP303

D/A-10-03-001

(N)4" SV UP

(N)6"HPS

(N)6"HPS

(N)8"LPS

(N)8"LPS(N)4"CTPD

(N)6"SV

DEAREATOR

FHX-10-02-001 FHX-10-02-002 FHX-10-02-003

ECONOMIZER

ECONOMIZER

ECONOMIZER

MP303

MP302

(N)3"NG

(N)2 1/2"

SV DN TO

BOILER.

(N)3"SV

DN TO

BOILER.

(N)6"SV UP

FROM DRIP

PAN ELBOW

(N)2-1/2"SV

DN TO BOILER

(N)8" LPS DROP

(N)4" HPS DN

TO HEADER

(N )8 H P S

(N)18"HPS

(N)22"HPS

UP THRU

ROOF

(N)6"HPS

(N)4"SV

PRV-10-03-001

10-CV-03-001

UH-10-03-005

UH-10-03-006

UP THRU ROOF

UP FROM BELOW

RE:DRAWING MP101

ANNEX

UH-10-03-004

(N)3/4"MPR

(N)4"MPS

UH-10-03-003

UH-10-03-002UH-10-03-001

(N)1 1/4"MPS

(N)3/4"MPR

(N)3/4"MPR

(N)4"MPS

(N)1 1/4"MPS

(N)1 1/4"MPS

(N)3/4"MPR

(N)1-1/4"MPR DN

(N)4"HPS

2"BYPASS DN

RE:DRAWING MP102

CATWALK LEVEL

(N)6"HPS

(N)2"MPR

(N)1 1/4"MPR

(N)2"MPR

(N)3"NG DOWN

(N)3"NG DN

(N)4"SV UP

THRU ROOF

FROM BELOW

4"SV

UP THRU ROOF

2"MPR DN.

DOMESTIC

HOT

WATER

GENERATOR

4” MPS DN SEE

MP-101 FOR

CONTINUATION

MP302

(N)2-1/2"SV

DN. TO BOILER

(N)3"SV

DN. TO BOILER

(N)3/4"MPR

1-1/4"

LPR DOWN

2" BYPASS

(N)2" HPS DN

2"HPS

DWH-10-03-001

4"SV

UP THRU ROOF

3" LPS DOWN

TO DOMESTIC WATER HEATER

3"LPS

2"HPS

SV-10-03-012

UH-10-02-007

PIPE OFFSET

AROUND DUCT

(N)4"SV

PRV-10-03-002

(N)1 1/4"

(N)1 1/4"

(BELOW HPS)

(N)4"SV UP

FROM BELOW

(N)PIPE HANGER

TYP

(N)PIPE HANGER TYP

(N)PIPE

HANGER TYP

(N)PIPE

HANGER TYP

B-10-01-003

B-10-02-002

B-10-02-001

(N)1"MPS

(N)3/4"MPR

MP303

STS-10-03-001

(N)1 1/4"MPS

3 3

SV-10-03-010

8"SV UP FROM

SV-10-03-011

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/6

/2

:5

:4

A

M

MP103

MECHANICAL

PIPING PLAN

CATWALK LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

NEW WORK PLAN - CATWALK LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 GAS TRAIN VENTS UP THROUGH ROOF. SIZE VENTS PER DETAIL #2 ON DRAWING MP506.

2 6" SV UP FROM DRIP PAN ELBOWS.

3 6" SV UP THROUGH ROOF. REFER TO DETAIL #8 ON DRAWING MP503.

4 PROVIDE DRIP PAN ELBOWS PER DETAIL #8 ON DRAWING MP503.

5 PROVIDE STEAM CONTROL VALVE WITH BYPASS FOR CONTROL OF THE UNIT HEATERS SERVING

THE BOILER LEVEL. CONTROL VALVE SHALL BE WIRED TO THERMOSTAT LOCATED ON A COLUMN

AS INDICATED. REFER TO DETAIL #2 ON DRAWING M-801.

6 4" CTPD UP TO DA FROM CONDENSATE TRANSFER PUMP DISCHARGE HEADER. REFER TO

DRAWINGS MP601, MP602 AND MP603 FOR ADDITIONAL DETAILS. REFER TO DRAWING MP102

FOR CONTINUATION.

7 ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

TRADES.

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL STEAM GENERATION

FLOW DIAGRAM - DEAERATOR &

CONDENSATE STORAGE TANK

MP603

AHTMAP

MECHANICAL STEAM GENERATION

NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM

MP604

AHTMJV

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

1 BULLETION NO. 1 07/06/2022

MECHANICAL

BOILER WATER TREATMENT

FLOW DIAGRAM

MP605

GDSAP

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

HVAC AIRFLOW &

REFRIGERANT DIAGRAM

MH601

RHDAP

MECHANICAL SCHEDULES

M-701

AHTMAP

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

M-001
M-001
MC101
MC101
MJ604
MJ604
MQ102 - MECHANICAL EQUIPMENT ARRANGEMENT PLAN BOILER LEVEL
MP101 - MECHANICAL PIPING PLAN MAIN LEVEL
MP102 - MECHANICAL PIPING PLAN BOILER LEVEL
MP103 - MECHANICAL PIPING PLAN CATWALK LEVEL
MP603
MP603
MP604
MP604
MP605
MP605
MH601
MH601
M-701
M-701

File details come from the government source that posted it. Updated .