This solicitation is for replacing boilers in Building 10 at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is seeking proposals to replace boilers under solicitation number 36C24122R0084. Offerors should provide mechanical drawings and specifications for a new high-efficiency boiler system. The attached request for proposals includes additional requirements for the boiler replacement project, which must be completed by December 31, 2019. Proposals are due by April 15, 2019 and the contract is expected to be awarded by May 15, 2019.
View the file
Other files for this federal contract opportunity
Show all 50
Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL ABBREVIATIONS
& SYMBOLS
M-001
JJPAP
2 3
1 BULLETIN NO. 1 07/06/2022
'- 0
'-9
/2
'- 0
43'-1"
FUEL OIL TANK
4,000 GAL
FUEL OIL
TANK
30,000 GAL
FUEL OIL
TANK
30,000 GAL
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
PHASING AND TEMPORARY WORK
SITE PLAN
MC101
GDSAP
PLAN
NORTH
ACTUAL
NORTH
1 BULLETIN NO. 1 07/06/20221 BULLETIN NO. 1 07/06/2022
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
TEMPORARY AND FINAL CONDENSATE
PIPING INSTALLATION SEQUENCE
MJ604
GDSAP
4321 5
A
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
E
BOILER CONTROL
PANEL CLEARANCE
(R E F
TU
B E
P U
LL
(R E F
TU
B E
P U
LL
(R E F
TU
B E
P U
LL
C L
C L
C L
BOILER CONTROL
PANEL
CLERANCE
BOILER CONTROL
PANEL
CLERANCE
D/A-10-03-001
MP303
MP303
BOILER REAR
DOOR CLERANCE
BOILER REAR
DOOR CLERANCE
BOILER REAR
DOOR CLERANCE
B-10-02-001 B-10-02-002 B-10-01-003
DEAREATOR
(N)BOILER
(N)BOILER
(N)BOILER
ECONOMIZER
ECONOMIZER
ECONOMIZER
FHX-10-02-001
FHX-10-02-002 FHX-10-02-003
ACHP-10-02-04A
MP302
GENERATOR
ROOM
BOILER LEVEL
CONTROL ROOM
ERV-10-02-001
UH-10-03-004
UH-10-03-005
UH-10-03-006
UH-10-02-003
UH-10-03-001 UH-10-03-002
UH-10-03-003
DT-10-02-001
TRANSFORMER
UH-10-02-004
ACHP-10-02-05A
ACHP-10-02-06A
ACHP-10-02-07A
BOILER FRONT
DOOR SWING
(TYP.)
UH-10-02-007
UH-10-02-001
DWH-10-03-001
UH-10-02-002
ACHP-10-02-06B
ACHP-10-02-07B
MP302
EXHAUST MUFFLER
REFER TO MH102
FOR DETAILS3
MP303
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
PLAN
NORTH ACTUAL
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/6
/2
:5
:4
A
M
MQ102
MECHANICAL
EQUIPMENT ARRANGEMENT PLAN
BOILER LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
EQUIPMENT ARRANGEMENT PLAN - BOILER LEVEL
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
TRADES.
NO. DESCRIPTION DATE
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
E
(E)4"HPS
(E)2 1/2"MPR
(E)1 1/2"MPR
(E)2"MPR
(N)8" HPS DROP
MP301
MP302
MP303
MP303
(N)3/4" HPS
UP TO AMINE-
CHEMICAL FEED
(N)6" HPS
SPARE (N)4" HPS TO
BUILDING 9
(N)8" HPS TO
BUILDING 9
(N)8" HPS TO
BUILDING 1
(N)6" HPS RISE
TO BOILER 1
(N)6" HPS RISE
TO BOILER 2
(N)6" HPS
RISE TO
BOILER 3
(N)8" HPS UP
TO STEAM TEST
SILENCER
(N)4" HPS UP
TO DEAREATOR
BDS-10-01-001
BLOW
DOWN
SEPERATOR
CONDENSATE
RECEIVER
CONDENSATE
STORAGE
TANK
CS-10-01-001
(N)3"PC
(N)4"HPS
(N)2"BD
(N)2"FWPS
(E)2"MPR
(N)8"HPS
(N)3"NG
ACHP-10-001
2"FWPS UP
REFER TO DRAWING
MP102 FOR CONTINUATION
(N)2 1/2"FWPD
(N)2 1/2"FWPD
FUEL
PUMP
SKID
(N)8"HPS
(E)2 1/2"MPS
(E)1"MPR
(E)2"MPR
RUN FUEL OIL
PIPING IN NEW
TRENCH.
(N)1"BO
(E)8"HPS
(N)4"HPS
(N)2"BD UP
(N)2"BD UP
(N)2"BD UP
(N)2"BD UP
(N)2"FWPD UP
(N)1"BD UP
(N)1"BO UP
(N)2"FWPD UP
(N)1"BD UP
(N)1"BO UP
(N)2"BD UP
(N)2"FWPD UP
(N)1"BD UP
(N)1"BO UP
(N)2"BD UP
(N)2"FWPD UP
(N)STEAM TRAP
(N)1 1/2"HPR
UP
(N )1
M P R
FEEDWATER
PUMPS
FWP-10-01-003
FWP-10-01-002
FWP-10-01-001
(E)8" HPS TO
BUILDING 1
(N)2"FOR
(N)2"FOS
(N)2"FOS
(N)2"FOR
(N)2"FOS AND (N)2" FOR DN IN
TRENCH PIT. REFER TO DRAWING
MC101 FOR CONTIINUATION.
(TYP. OF 4)
(N)1"FOS &
(N)1"FOR UP
TO BOILER 3.
(N)1"FOS &
(N)1"FOR UP
TO BOILER 2.
FUEL
OIL
FILTERATION
GENERATOR
FUEL
PUMP
SKID
FLASH
TANK
FT-10-01-001
ACHP-10-01-01A
(N)1"FOS &
(N)1"FOR UP
TO BOILER 1.
(N)5"HPR
(N )4 H P S
(N)4"PC(N)4"PC
(N )2
S C W
TYPICAL
INSULATION
ON PIPING
1' - 1 1/2"
(N)4"HPS
FOP-10-01-002
FOM-10-01-001
FOP-10-01-001
(N)4"SV
(N)1"MPR
(N)1"MPR
(N)2"MPR
(N)1 1/2"MPR
(N)3"HPS
(N)4"SV
(N)3"HPS
(N)10"HPS
10-PRV-01-001
10-01-PRV-002
(N)4" HPS TO
PRV FOR UNIT
HEATERS
(N)2-1/2"MPS
DROP
(N)1/2"CF
(N )1 C F
(N)1/2"CF
(N)2"FOR
RUN 2"FOR AND
2"FOS IN TRENCH.
(N)2"BD
(N)4"SV UP
(N)2"MPR
(N)2"MPR
(N)1 1/4"HPR
(N)1"MPR
(N)4"PC
DROP
(N)1" HPS UP TO
MASTER STEAM
PRESSURE
TRANSMITTER
(N)4" SV UP
RE:DRAWING MP102
(N)2"FWPD UP
TO BOILER #1
(N)2"FWPD UP
TO BOILER #2
(N)2"FWPD UP
TO BOILER #3
(N)2"FWPD(N)2"FWPD
(N)2"FWPD
(N)2"FWPD
(N)2"FWPD
UH-10-01-001
UH-10-01-002
(N)2 1/2"FWPD
(N)2 1/2"FWPD
(N)3"NG UP
RE: DRAWING MP102
OFFICE
(N)4"MPS UP
SEE DWG
MP103 FOR
CONT.
(N)2"MPR
(N)4"OFL
(N)2"FWPD
(N)2"FOS
(N)2"FOR
(N)2"FWPD
(N)3/4"MPS
1-1/4"MPC
DOWN FROM
ABOVE
(N)2"FOS
(N)2 1/2"MPS
(N)3/4"MPR UP
(N)4"SV UP
THRU ROOF
(N)3/4"MPR
CTP-10-01-001
CTP-10-01-002
UH-10-01-003
(N)2"D
(N)4"FWPS
FUEL OIL
PIPING DROP
(N)CORROSIVE
COMPOUNT
TANK
(N)CORROSIVE
COMPOUNT
TANK
CHEMICAL
INJECTION
PUMPS
(N)CORROSIVE
COMPOUNT
TANK
(N)1"FOS
(N)1"FOR
(N)1"FOS
(N)1"FOR
ANNEX
(N)4"PC
(N)3/4"MPS(N)3/4"MPS
(N)3/4"MPR
TRANSFORMER
BREAK ROOM
ACHP-10-01-03A
ACHP-10-01-02A
(N)4"MPS
(N)RS
& RL
(TYP.)
(N)3/4"PC
RS, RL, AND PC
PIPING UP IN
PLUMBING CHASE
(TYP.)
CO
CO
T
T
T
CO
(N)3/4"MPS
(N)1-1/2"MPR
UP
LOUVER
L-10-01-001
EXISTING
GAS TRAIN
TO REMAIN AS IS
(N)3/4"RS & RL
UP
(N)3/4"MPS &
MPR UP
3' - 4"
1' - 2"
1' - 4"
1' - 6"
(N)1 1/4"MPR
(N)1 1/2"HPR9
(N)1"FOS
(N)1"FOR
(N)3/4"MPS
(N)8"HPS
(N)1 1/2"MPR
(N)1 1/4"MPR
(N)2"MPR
UP
(N)3"PC
(N)8"HPS
CRU-10-01-002
(E)8"HPS
(E)10"HPS
(N)4"MPR
(N)3"HPR
(N)3"CTPD (N)3"CTPD
(N)5"HPR
(E)4"HPS
(N)3"HPS RISE
TO DOMESTIC
WATER
HEATER
(N)4"SV
MP101
FOM-10-01-002
WATER TREATMENT
SKID
(N)1"FOR
(N)1"FOS
MP302
(N)2"FOS
(N)2"FOR
(N)1 1/4"MPR 12
(N)PIPE HANGER TYP
(N)PIPE HANGER TYP
(N)PIPE HANGER
TYP
(N)PIPE HANGER
TYP
(N)PIPE HANGER
TYP
(N)4"PC
MP303
(N)2 1/2"MPS
(N)2 1/2"MPS
E
MP302
MP302
MAIN
STEAM HEADER
(N)2"FOS
(N)2"FOR
(N)2"FOR
(N)2"FOS
(N)1 1/4"MPR
(N)3"HPS
(N)8"HPS(N)2"MPR
(N)2"FWPS
PIPE
HANGER (TYP.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/6
/2
:5
:3
A
M
MP101
MECHANICAL
PIPING PLAN
MAIN LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
NEW WORK PLAN - MAIN LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 FEEDWATER ISOLATION VALVES FOR EACH BOILER SHALL BE LOCATED IN AN ACCESSIBLE
LOCATION.
2 RUN NEW FUEL OIL PIPING IN NEW TRENCH IN THE EXISTING LOWER LEVEL SLAB. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS.
3 1"FOS & 1"FOR UP TO GENERATOR ON BOILER LEVEL.
4 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE
CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.
5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM
1/8 INCH PER FOOT. TERMINATE TO FUNNEL DRAIN IN WALL.
6 REFER TO DRAWING MH601 FOR REFRIGERANT PIPING DIAGRAM.
7 NEW TRENCH FOR FUEL OIL PIPING. REFER TO DETAIL 6 ON DRAWING MP501 AND
STRUCTURAL DRAWINGS FOR DETAILS.
8 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM
1/8 INCH PER FOOT. ROUTE TO NEAREST FLOOR DRAIN.
9 PROVIDE SCH 40 STEEL PIPE SLEEVE IN EXTERIOR/FOUNDATION WALL. PROVIDE LINK-SEAL IN
ANNUL SPACE BETWEEN PIPE AND SLEEVE. REFER TO DETAIL 5 ON DRAWING MP502.
10 INSTALL NEW NATURAL GAS PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF VALVE AT THE
GAS TRAIN. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.
11 COORDINATE ROUTING OF NEW PIPING IN AREA OF NEW STAIRS. DO NOT LOCATE ANY
EQUIPMENT REQUIRING MAINTENEANCE ACCESS UNDER THE STAIRS. REFER TO STRUCTURAL
DRAWINGS FOR ADDITIONAL DETAILS.
12 SAFETY RELIEF VALVE - REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR
ADDITIONAL DETAILS.
13 ALL PIPING IN THE BOILER PLANT MUST BE FORGED STEEL.
14 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.
15 ALL MAIN STEAM VALVES SHALL HAVE A FACTORY INSTALLED 1" BYPASS LINE WITH GLOBE
VALVE FOR WARM-UP. NOT SHOWN FOR CLARITY.
16 4" CTPD UP TO DA FROM CONDENSATE TRANSFER PUMP DISCHARGE HEADER. REFER TO
DRAWINGS MP601, MP602 AND MP603 FOR ADDITIONAL DETAILS. REFER TO DRAWING MP102
FOR CONTINUATION.
17 NEW 1" FOS AND 1" FOR FROM NEW 4,000 UNDERGROUND TANK. REFER TO DRAWING MC101
AND CIVIL DRAWINGS FOR ADDITIONAL DETAILS. COORDINATE ROUTING OF PIPES WITH ALL
TRADES.
18 BOILER WATER TREATMENT SYSTEM TO BE PROVIDED UNDER A SEPARATE CONTRACT.
CONTRACTOR SHALL COORDINATE SPACE REQUIREMENTS WITH WATER TREATMENT VENDOR AND
ALL TRADES. WATER TREATMENT SKID BASIS OF DESIGN BARCLAY WATER MANAGEMENT INC.
CONTACT: ERIC NADEAU 774-400-4259 OR ALEX JARVIS 617-945-3046.
19 PROVIDE 8" HPS WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP601
FOR ADDITIONAL INFORMATION.
20 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO
DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.
21 PROVIDE 4" PC WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP603
FOR ADDITIONAL INFORMATION.
22 1" HPS UP TO WATER FILL CONNECTION (HYDRO STATIC TESTING). REFER TO DRAWING MP602
FOR ADDITIONAL DETAILS.
23 4"PC FROM CONDENSATE RETURN UNITS (CRU-10-01-001/002) UP TO TOP INLET ON
CONDENSATE STORAGE TANK. COORDINATE ROUTING WITH ALL TRADES.
24 COORDINATE LOCATIONS OF NEW FUEL OIL EQUIPMENT WITH ALL TRADES.
25 NEW MAXON AUTOMATIC GAS SHUTOFF VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL
DETAILS. LOCATE VALVE IN ACCESSIBLE LOCATION, COORDINATE LOCATION WITH ALL TRADES.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
TRADES.
SCALE: 1/2" = 1'-0"2
PART PLAN - PIPE PENETRATIONS
NO. DESCRIPTION DATE
D
6.7 8 9
B
C
B.3
CC
BB
DD
E
D/A-10-03-001
MP301
MP302
MP303
DEAREATOR
B-10-02-001 B-10-02-002 B-10-01-003
(N)BOILER
(N)BOILER
(N)BOILER
(N)6"SV
(N)2"FWPS
(N)4"OFL
(N)2"FWPD
(N)2"BD
(N)1"BD
(N)2"BD
(N)1"BD
(N)2"BD
(N)2"BD
(N)2"BD
(N)3"NG
(N)3"NG
(N)3"NG
(N)1"CF
(N)1"CF
(N)1"CF
(N)1/2"FWS
(N)1"CF
(N)3"NG
ACHP-10-02-04A
(N)3"NG
(N)6" HPS
RISE TO
BOILER 1
(N)6" HPS RISE
TO BOILER 2
(N)6" HPS
RISE TO
BOILER 3
(N)8" HPS UP
TO STEAM TEST
SILENCER
(N)3" HPS UP
TO DEAREATOR
ERV-10-02-001
UP FROM BELOW
RE:DRAWING MP101
UP THRU ROOF
(N)3"NG 1
(N)3"NG(N)3"NG
BOILER TUBE PULL
(TYPICAL)
(N)2"FWPD
GENERATOR
ROOM
ANNEX
CONTROL ROOM
BOILER LEVEL
(N)2"BD
DOWN
(N)2"BD
DOWN
(N)2"BD
DOWN
(N)1"FOS
(N)1"FOR
(UP FROM LOWER LEVEL
RE: DRAWING MP101)
(N)4"SV UP UH-10-02-003
2"FWPD UP
FROM LOWER LEVEL
UP FROM LOWER LEVEL
2"FWPD UP
FROM LOWER LEVEL
DT-10-02-001
(N)2-1/2"MPS UP
(N)3/4"MPR DN
(N)3/4"MPS
(N)3/4"MPR
(N)4"CTPD
DN. TO SURGE
TANK BELOW
(N)4"FWPS
UH-10-02-004
(N)3/4"MPS
(N)3/4"MPR
ACHP-10-02-06A
ACHP-10-02-07A
ACHP-10-02-05A
(N)4"SV FROM
BELOW UP
THRU ROOF
(N)3/4"MPS & MPR DN
(N)RS & RL (N)3/4"PC
RS, RL, AND PC
PIPING DN 3
(N)RS & RL
(N)RS & RL
(TYP.)
SECURITY
IT
(N)3/4"RS & RL
(N)3/4"RS & RLTYP.
(N)3/4"RS & RL
L-10-02-003
(UP TO
CATWALK LEVEL)
RE: DRAWING
MP103
LOUVER
L-10-02-004
(ABOVE DOOR)
TRANSFORMER
6"SV UP
1-1/4"LPR
1-1/2"MPR UP
4"FWPS DN TO
FEEDWATER PUMPS
FROM DA
RE:DWG MP101
3"NG UP
(N)3"NG UP
RE: DRAWING MP102
3"NG
DOWN FROM ABOVE
RE:DRAWING MP103
(N)1 1/4"LPR
UP TO 10-PRV-1
STATION 6
(N)3/4"MPR
FROM UNIT
HEATERS
(T)4"PC
(T)2 1/2"
(TYP.)
MAINTENACE
ADDITION
UH-10-02-002
(N)2" HPS
UP/DN
UH-10-02-001
(N)4"SV
EXHAUST MUFFLER
REFER TO MH102
FOR DETAILS
(N)1"LPG
(N)1"LPG
(N)3/4"LPG
(N)3/4"LPG (N)3/4"LPG
(TYP.)
(N)1"LPG
ACHP-10-02-06B
ACHP-10-02-07B
4"PC
UP FROM BELOW
RE: DWG MP101
MP303
L-10-02-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/6
/2
:5
:3
A
M
MP102
MECHANICAL
PIPING PLAN
BOILER LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
NEW WORK PLAN - BOILER LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 NATURAL GAS PIPING IS LOCATED IN CEILING SPACE OF ANNEX.
2 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE
CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.
3 PROVIDE INSULATED METAL WALL ENCLOSURE FOR PIPING DOWN THRU FLOOR. FINISH TO
MATCH ADJACENT SURFACES.
4 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM
1/8 INCH PER FOOT.
6 FUEL OIL PIPING UP FROM BELOW.
7 REFER TO THE MJ SERIES DRAWINGS FOR PHASING (TEMPORARY) PIPING.
8 BLOWDOWN PIPING BELOW BOILERS.
9 GAS TRAIN VENTS UP THROUGH ROOF. SIZE VENTS PER DETAIL #2 ON DRAWING MP506.
10 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.
11 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO
DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.
12 3/4" LPG TO BOILER BURNER/IGNITER - REFER TO DETAIL 2 ON DRAWING MP506.
13 BOILER SAFETY RELIEF VALVE. CONTRACTOR SHALL VERIFY CONNECTION SIZES WITH APPROVED
EQUIPMENT SHOP DRAWINGS. REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR
ADDITIONAL DETAILS.
14 REFER TO DRAWING MP604 FOR ADDITIONAL LPG PIPING DETAILS.
15 4" CTPD DA TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
TRADES.
NO. DESCRIPTION DATE
D
6.7
B
C
B.3
CC
BB
DD
E
(N)6"HPS
(N)6 HPS
DROP TO
BOILER 1
(N)6" HPS
DROP TO
BOILER 2
(N)6" HPS
DROP TO
BOILER 3
(N)6" HPS DN
TO HEADER
(N)6" HPS
DROP
(N)6" HPS DN
TO HEADER
(N)8" HPS DN
TO HEADER
CATWALK
(INV. EL. 35.72')
CATWALK
(INV. EL. 35.72')
CATWALK
(INV. EL. 35.72')
MP302
MP303
MP303
D/A-10-03-001
(N)4" SV UP
(N)6"HPS
(N)6"HPS
(N)8"LPS
(N)8"LPS(N)4"CTPD
(N)6"SV
DEAREATOR
FHX-10-02-001 FHX-10-02-002 FHX-10-02-003
ECONOMIZER
ECONOMIZER
ECONOMIZER
MP303
MP302
(N)3"NG
(N)2 1/2"
SV DN TO
BOILER.
(N)3"SV
DN TO
BOILER.
(N)6"SV UP
FROM DRIP
PAN ELBOW
(N)2-1/2"SV
DN TO BOILER
(N)8" LPS DROP
(N)4" HPS DN
TO HEADER
(N )8 H P S
(N)18"HPS
(N)22"HPS
UP THRU
ROOF
(N)6"HPS
(N)4"SV
PRV-10-03-001
10-CV-03-001
UH-10-03-005
UH-10-03-006
UP THRU ROOF
UP FROM BELOW
RE:DRAWING MP101
ANNEX
UH-10-03-004
(N)3/4"MPR
(N)4"MPS
UH-10-03-003
UH-10-03-002UH-10-03-001
(N)1 1/4"MPS
(N)3/4"MPR
(N)3/4"MPR
(N)4"MPS
(N)1 1/4"MPS
(N)1 1/4"MPS
(N)3/4"MPR
(N)1-1/4"MPR DN
(N)4"HPS
2"BYPASS DN
RE:DRAWING MP102
CATWALK LEVEL
(N)6"HPS
(N)2"MPR
(N)1 1/4"MPR
(N)2"MPR
(N)3"NG DOWN
(N)3"NG DN
(N)4"SV UP
THRU ROOF
FROM BELOW
4"SV
UP THRU ROOF
2"MPR DN.
DOMESTIC
HOT
WATER
GENERATOR
4” MPS DN SEE
MP-101 FOR
CONTINUATION
MP302
(N)2-1/2"SV
DN. TO BOILER
(N)3"SV
DN. TO BOILER
(N)3/4"MPR
1-1/4"
LPR DOWN
2" BYPASS
(N)2" HPS DN
2"HPS
DWH-10-03-001
4"SV
UP THRU ROOF
3" LPS DOWN
TO DOMESTIC WATER HEATER
3"LPS
2"HPS
SV-10-03-012
UH-10-02-007
PIPE OFFSET
AROUND DUCT
(N)4"SV
PRV-10-03-002
(N)1 1/4"
(N)1 1/4"
(BELOW HPS)
(N)4"SV UP
FROM BELOW
(N)PIPE HANGER
TYP
(N)PIPE HANGER TYP
(N)PIPE
HANGER TYP
(N)PIPE
HANGER TYP
B-10-01-003
B-10-02-002
B-10-02-001
(N)1"MPS
(N)3/4"MPR
MP303
STS-10-03-001
(N)1 1/4"MPS
3 3
SV-10-03-010
8"SV UP FROM
SV-10-03-011
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/6
/2
:5
:4
A
M
MP103
MECHANICAL
PIPING PLAN
CATWALK LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
NEW WORK PLAN - CATWALK LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 GAS TRAIN VENTS UP THROUGH ROOF. SIZE VENTS PER DETAIL #2 ON DRAWING MP506.
2 6" SV UP FROM DRIP PAN ELBOWS.
3 6" SV UP THROUGH ROOF. REFER TO DETAIL #8 ON DRAWING MP503.
4 PROVIDE DRIP PAN ELBOWS PER DETAIL #8 ON DRAWING MP503.
5 PROVIDE STEAM CONTROL VALVE WITH BYPASS FOR CONTROL OF THE UNIT HEATERS SERVING
THE BOILER LEVEL. CONTROL VALVE SHALL BE WIRED TO THERMOSTAT LOCATED ON A COLUMN
AS INDICATED. REFER TO DETAIL #2 ON DRAWING M-801.
6 4" CTPD UP TO DA FROM CONDENSATE TRANSFER PUMP DISCHARGE HEADER. REFER TO
DRAWINGS MP601, MP602 AND MP603 FOR ADDITIONAL DETAILS. REFER TO DRAWING MP102
FOR CONTINUATION.
7 ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
TRADES.
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL STEAM GENERATION
FLOW DIAGRAM - DEAERATOR &
CONDENSATE STORAGE TANK
MP603
AHTMAP
MECHANICAL STEAM GENERATION
NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM
MP604
AHTMJV
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
1 BULLETION NO. 1 07/06/2022
MECHANICAL
BOILER WATER TREATMENT
FLOW DIAGRAM
MP605
GDSAP
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
HVAC AIRFLOW &
REFRIGERANT DIAGRAM
MH601
RHDAP
MECHANICAL SCHEDULES
M-701
AHTMAP
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
| M-001 |
| M-001 |
| MC101 |
| MC101 |
| MJ604 |
| MJ604 |
| MQ102 - MECHANICAL EQUIPMENT ARRANGEMENT PLAN BOILER LEVEL |
| MP101 - MECHANICAL PIPING PLAN MAIN LEVEL |
| MP102 - MECHANICAL PIPING PLAN BOILER LEVEL |
| MP103 - MECHANICAL PIPING PLAN CATWALK LEVEL |
| MP603 |
| MP603 |
| MP604 |
| MP604 |
| MP605 |
| MP605 |
| MH601 |
| MH601 |
| M-701 |
| M-701 |