Summary with PMs
| ASSET CLASS | ASSET TYPE | ASSET QTY | ACTIVITY | PM FREQUENCY | |
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | 124 | |||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | DRAIN CONDENSATE; TOP OFF GREASE IF NEEDED | A | ||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | INSPECT LUBRICATION ON MAIN GEAR CASE; ALSO LUBRICATE ZERK FITTING ON THE HOUSING COVER | S | ||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | INSPECT LUBRICATION ON GEARED LIMIT SWITCH | A | ||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | CHANGE THE GEAR OIL | 2-YR | ||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | CHANGE THE BEARINGS AND SEALS | 6-YR | ||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | OPERATE GATE | M | ||
| ACTUATOR, GATES/VALVES | ACTUATOR, ELECTRIC & ACTUATOR, HYDRAULIC | OBSERVE GATE CYLINDER GO SWITCH INDICATOR LIGHTS FOR PROPER OPERATION | M | ||
| BATTERY | ELECTRICAL, BATTERY | 1 | |||
| BATTERY | ELECTRICAL, BATTERY | TIGHTEN CONNECTIONS, PANEL AND BATTERIES | Q | ||
| BATTERY | ELECTRICAL, BATTERY | CLEAN CABINET, WIPE, VACUUM | Q | ||
| BATTERY | ELECTRICAL, BATTERY | INSPECT FOR DAMAGE, HEAT, BULGES OR UNUSUAL COLOR, WEAR AND TEAR | Q | ||
| BATTERY | ELECTRICAL, BATTERY | INSPECT FOR AND CLEAN UP ANY SPILL OR SULFATE BUILDUP (WHITISH LOOKING RESIDUE) | Q | ||
| BATTERY | ELECTRICAL, BATTERY | CHECK ELECTROLITES LEVEL AND FILL WIRH DISTILLED WATER AS NEEDED. | Q | ||
| BATTERY | ELECTRICAL, BATTERY | VERIFY FLOAT VOLTAGE APPROX: 2.15-2.30 VOLTS/CELLS VERIFY CURRENT: PANEL METER WILL INDICATE LOAD | Q | ||
| BATTERY | ELECTRICAL, BATTERY | HYDROMETER MEASURE SPECIFIC GRAVITY READING AT FILL CHARGE FILLED WITH ELECTROLYTE HIGH LINE @ 75F~+/- .005 OF THE NORMAL SPECIFIC GRAVITY LISTED ON CELL COVER | Q | ||
| BATTERY | ELECTRICAL, BATTERY | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| BOILER | BOILER, WATER HEATER | 2 | |||
| BOILER | BOILER, WATER HEATER | PERFORM ANNUAL WATER HEATER BLOWDOWN | A | ||
| BUILDING ROOF AND COMPONENTS | ROOFING SYSTEM | 3 | |||
| BUILDING ROOF AND COMPONENTS | ROOFING SYSTEM | CLEAN DEBRIS FROM ROOF | A | ||
| BUILDING ROOF AND COMPONENTS | ROOFING SYSTEM | CLEAR ALL DRAINS | A | ||
| BUILDING ROOF AND COMPONENTS | ROOFING SYSTEM | CHECK GUTTERS, DOWN SPOUTS AND FLASHING FOR ANY MISSING OR DAMAGE | A | ||
| BUILDING ROOF AND COMPONENTS | ROOFING SYSTEM | CONTRACTED ROOF INSPECTION | 2-YR | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | 68 | |||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | COLLECT AND DISPOSE OF LITTER AND LARGER DEBRIS SUCH AS BOXES, PIPE, WOOD, ETC. | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | SWEEP OFF WINDOW SILLS | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | KNOCK DOWN COBWEBS ON PIPES, RAILINGS & EQUIPMENT | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | KNOCK DOWN COBWEBS AT DOORWAYS AND WINDOWS | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | SWEEP ALL FLOORS AND STAIRWAYS | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | WASH DOWN TROUGHS, CHANNELS AND EQUIPMENT AS NECESSARY | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | PERFORM A FULL VISUAL INSPECTION OF THE BUILDING STRUCTURE AND ENTER CM WORK ORDER FOR ANY AREA IN NEED OF REPAIR OR PAINT | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | CHECK AND REPORT ANY EQUIPMENT IN NEED OF REPAIR OR PAINTING | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | INSPECT THE BUILDING SHELL INCLUDING INSIDE AND OUTSIDE WALLS, WINDOWS, AND DOORS FOR OVERALL CONDITION AND DAMAGE, INCLUDING WATER INTRUSION. | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | RECAULK OR RESEAL ALL EXTERIOR WINDOWS AND DOORS AS NEEDED | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | CHECK INTERIOR & EXTERIOR ELECTRICAL RECEPTACLES FOR PROPER OPERATION | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | REPLACE BULBS IN ANY INTERIOR OR EXTERIOR LIGHTS (INCLUDING EXIT LIGHTS) AS REQUIRED | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | INSPECT AND REPAIR ALL ACCESS LADDERS, FENCES, GATES, SIGNAGE AND HOSE BIBBS | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | INSPECT ALL LANDSCAPING SUCH AS TREES, SHRUBS AND GRASS; TRIM OR REPLACE ITEMS AS NEEDED | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | INSPECT ALL FLOOR DRAINS; CLEAN AS NEEDED | A | ||
| BUILDING SUPPORT STRUCTURE, FRAMEWORK, FOUNDATION | BUILDING, CONCRETE/MASONRY & BUILDING, WOOD FRAME CONSTRUCTION | CONTRACTED STRUCTURAL INSPECTION | ONCE DURING TERM FOR EACH BUILDING BY 12/31/32 | ||
| CHAMBERS \ VAULTS, INGROUND | STRUCTURE, CHAMBER & VAULT, GATE, METER, VALVES | 429 | |||
| CHAMBERS \ VAULTS, INGROUND | STRUCTURE, CHAMBER & VAULT, GATE, METER, VALVES | VISUAL INSPECTION OF STRUCTURE | ALL SITES INSPECTED IN FIRST YEAR OF CONTRACT. SUBSEQUENT INSPECTIONS TO OCCUR AS DIRECTED BY MMSD AND PAID AS TASK ORDER SERVICE. | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | 524 | |||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | PM RTU/PLC CHECK ALL CONNECTIONS (POWER, COMMUNITCATION INPUT, OUTPUT ETC. | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK POWER SUPPLY CONDITION AND OUTPUT POWER LEVELS | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK OPERATIONAL LIGHTS | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | INSPECT MODEMS AND RADIO OPERATION CHECK ALL CONNECTIONS CHECK CABLE RUNS TO ANTENNA FOR CRACKS, LOOSE CONNECTIONS, CRUSHED CABLES AND HOLES | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | MAKE SURE ALL CONNECTIONS ARE WATERPROOF | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK GROUND CONNECTIONS | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK SURGE SUPPRESSORS | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK ANTENNA CONDITION AND DIRECTION | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK PROGRAM SETTING AS WELL AS REFLECTED POWER (VSWR) | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | VERIFY POWER SUPPLIES AND BATTERIES ARE WITHIN TOLERANCES | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | CHECK FOR DUST, INSECTS AND RODENTS AND CLEAN | Q | ||
| COMMUNICATIONS EQUIPMENT | CELLULAR MODEMS, RADIOS, RTU, SIGNAL REPEATERS | MAKE SURE COOLING FANS ARE WORKING | Q | ||
| COMPRESSOR | COMPRESSORS, RECIPROCATING & ROTARY | 37 | |||
| COMPRESSOR | COMPRESSORS, RECIPROCATING & ROTARY | CHECK RECIPROCATING COMPRESSOR OPERATION; INSPECT FOR LEAKS, DRAIN CONDENSATE, INSPECT AND CLEAN FILTERS, CHECK AND CHANGE OIL | S | ||
| COMPRESSOR | COMPRESSORS, RECIPROCATING & ROTARY | CHECK ROTARY COMPRESSOR OPERATION; INSPECT FOR LEAKS, DRAIN CONDENSATE, INSPECT AND CLEAN FILTERS, CHECK AND CHANGE OIL | Q | ||
| COMPRESSOR | DRYER, AIR | 1 | |||
| COMPRESSOR | DRYER, AIR | CHECK PILOT AIR FILTER ELEMENT DIFFERENTIAL PRESSURE. REPLACE FILTER ELEMENT IF GREATER THAN 10 PSI. | Q | ||
| COMPRESSOR | DRYER, AIR | CHECK FOR EXCESSIVE CLOGGING IN PREFILTER AND AFTER FILTER ELEMENTS | S | ||
| COMPRESSOR | DRYER, AIR | CHECK OUTLET DEW POINT. SHOULD BE -40 | S | ||
| COMPRESSOR | DRYER, AIR | INSPECT PILOT AIR CYCLINDERS FOR LEAKS OR WORN-OUT SEAL AND REPLACE IF NECESSARY. | A | ||
| COMPRESSOR | DRYER, AIR | DRAIN AND CHECK FOR MOISTURE | M | ||
| COMPRESSOR | DRYER, AIR | PURGE WATER FROM AIR COMPRESSOR | Q | ||
| DISCONNECT / BREAKER, FUSES (SAFETY FOR ELECTRICAL WIRING) | ELECTRICAL, BREAKERS & FUSES | 1 | |||
| DISCONNECT / BREAKER, FUSES (SAFETY FOR ELECTRICAL WIRING) | ELECTRICAL, BREAKERS & FUSES | VISUAL INSPECTION FOR CORROSION | A | ||
| DISCONNECT / BREAKER, FUSES (SAFETY FOR ELECTRICAL WIRING) | ELECTRICAL, BREAKERS & FUSES | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| ELEVATORS | ELEVATORS, ALL TYPES | 1 | |||
| ELEVATORS | ELEVATORS, ALL TYPES | ACCOMPANY CITY OF MILWAUKEE ELEVATOR INSPECTOR ON ROUNDS | A | ||
| ELEVATORS | ELEVATORS, ALL TYPES | PERFORM INDUSTRY STANDARD INSPECTION AND MAINTENANCE BY CERTIFIED ELEVATOR CONTRACTOR | A | ||
| EQUIPMENT CONTROL | CONTROL PANEL, GENERAL | 23 | |||
| EQUIPMENT CONTROL | CONTROL PANEL, GENERAL | INSPECT FOR CORROSION; BURNING OR ARCHING; LOOSE WIRING; DAMAGED EQUIPMENT COMPONANTS, ENCLOSURES, WIRES, RACEWAYS; CLEAN DUST, ANIMAL, INSECT AND OTHER TYPES OF DEBRIS. INSPECT FOR SIGNS OF WATER. | A | ||
| EQUIPMENT CONTROL | PLC, GENERAL | 125 | |||
| EQUIPMENT CONTROL | PLC, GENERAL | RTU/PLC CHECK ALL CONNECTIONS (POWER, COMMUNITCATION INPUT, OUTPUT ETC. | Q | ||
| EQUIPMENT CONTROL | PLC, GENERAL | CHECK POWER SUPPLY CONDITION AND OUTPUT POWER LEVELS | Q | ||
| EQUIPMENT CONTROL | PLC, GENERAL | CHECK OPERATIONAL LIGHTS | Q | ||
| EQUIPMENT CONTROL | PLC, GENERAL | CHECK THAT THE OPERATION SWITCH IS IN THE RIGHT POSITION | Q | ||
| EQUIPMENT CONTROL | PLC, GENERAL | VISUAL CHECK OF EQUIPMENT CONDITION | S | ||
| EQUIPMENT CONTROL | PLC, GENERAL | CHECK PLC BATTERY AND CHANGE PER MANUFACTURES RECOMMENDATION | S | ||
| EQUIPMENT CONTROL | PLC, GENERAL | CHECK PLC PROGRAM PARAMETERS | S | ||
| EQUIPMENT CONTROL | PLC, GENERAL | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | 4 | |||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | CHECK BELT ALIGNMENT. CHECK FOR WEAR, TEARS, AND PROPER TENSION. RE-ALIGN OR REPLACE AS NEEDED | Q | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | CHECK/TIGHTEN ALL FASTENERS & SET SCREWS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | CHECK/LUBRICATE BEARINGS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | CHECK/CLEAN WHEEL & HOUSING | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | CHECK MOTOR FOR EXCESSIVE VIBRATION, NOISE OR LUBRICATION | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | BLOWER, CENTRIFUGAL | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | 23 | |||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | CHECK BELT ALIGNMENT. CHECK FOR WEAR, TEARS, AND PROPER TENSION. RE-ALIGN OR REPLACE AS NEEDED | Q | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | CHECK/TIGHTEN ALL FASTENERS & SET SCREWS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | CHECK/LUBRICATE BEARINGS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | CHECK/CLEAN WHEEL & HOUSING | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | CHECK MOTOR FOR EXCESSIVE VIBRATION, NOISE OR LUBRICATION | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, CENTRIFUGAL | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | 1 | |||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | CHECK BELT ALIGNMENT. CHECK FOR WEAR, TEARS, AND PROPER TENSION. RE-ALIGN OR REPLACE AS NEEDED | Q | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | CHECK/TIGHTEN ALL FASTENERS & SET SCREWS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | CHECK/LUBRICATE BEARINGS | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | CHECK/CLEAN WHEEL & HOUSING | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | CHECK MOTOR FOR EXCESSIVE VIBRATION, NOISE OR LUBRICATION | A | ||
| FAN, BLOWER, FORCED AIR MOVEMENT | FAN, EXHAUST PROPELLER TYPE | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | 1 | |||
| FILTRATION | FILTER, AIR INTAKE CLEANER | PS0501: SAMPLE MEDIA: ONE MODULE IN EACH LAYER SHOULD BE SAMPLED. | S | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | PS0501: REMOVE THE ACCESS PLACE BY PRYING IT OPEN WITH A FLATHEAD SCREWDRIVER. | S | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | PS0501: REMOVE APROXIMATELY 1/4 CUP OF MEDIA & PLACE IN SEALED PLASTIC BAG OR OTHER NON-POROUS CONTAINER. REPLACE THIS MEDIA WITH NEW MEDIA & MARK THE MODULE WITH SAMPLE DATE TO AVOID FUTURE SAMPLING OF REPLACEMENT MEDIA. | S | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | PS0501: LABEL EACH BAG WITH THE CUSTOMER NAME, SYSTEM DESIGNATION, DATE OF SAMPLING, PRODUCT NAME, AND ORIGINAL INSTALL DATE. AN E-MAIL ADDRESS SHOULD BE INCLUDED FOR THE PERSON WHO IS TO RECEIVE THE REPORT. (SAMPLE LABEL IN O&M 2302, TAB 2, LAST PAGE.) | S | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | PS0501: SHIP THE MEDIA SAMPLES TO PUREAIR FILTRATION FOR REMAINING LIFE ANALYSIS | S | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | MARNE DRIVE FM MH 13702 AND 13716: INSPECT FOR PROPER OPERATION AND ODORS PRESENT | CHANGE MEDIA WHEN ORDER IS PRESENT OF MINIMUM OF ANNUALLY | ||
| FILTRATION | FILTER, AIR INTAKE CLEANER | PS0402: INSPECT FOR PROPER OPERATION AND ODORS PRESENT | CHANGE MEDIA WHEN ORDER IS PRESENT OF MINIMUM OF ANNUALLY | ||
| MH43109 VENT: INSPECT FOR PROPER OPERATION AND ODORS PRESENT | |||||
| FILTRATION | FILTER, AIR INTAKE CLEANER | ERIE ST VALVE VAULT: INSPECT FOR PROPER OPERATION AND ODORS PRESENT | CHANGE MEDIA WHEN ORDER IS PRESENT OF MINIMUM OF ANNUALLY | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | 303 | |||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | CLEAN AND REGREASE OPERATING STEM. CHECK BACKLASH, FULLY OPEN AND CLOSE GATE | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | GREASE FLOOR STAND WHERE APPROPRIATE | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | GREASE OPERATOR WHERE APPROPRIATE | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | HOSE DOWN FLAP GATE WITH CLEAN WATER TO REMOVE DEPOSITS | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | IF SCRUBBING IS NECESSARY US STAINLESS STEEL BRUSH | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | ENSURE THAT THE FLAP GATE IS WORKING PROPERLY | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | OPEN AND INSPECT THE NEOPRENE SEAL | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | REMOVE ANY DEBRIS OR OBSTACLES PREVENTING PROPER OPERATION | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | INSPECT HINGES TO DETECT PREMATURE WEAR OF HMW POLYETHYLENE BEARING | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | ENSURE THAT FASTENERS ARE PROPERLY TIGHTENED | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | CHECK THE SEAT FOR DEFECTS THAT COULD IMPAIR PROPER SEATING OR WATER TIGHTNESS | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | CHECK THE STEM FOR WEAR AND ANY DAMAGED THREADS. IF THREADS ARE DAMAGED, USE A SMALL FINE FILE TO REMOVE SMALL BURRS ON THE THREAD. | Q | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | CHECK THE STEM BRUSHING FOR SMALL PIECES OF BRONZE WHICH MAY HAVE WORN AWAY. IF EXCESS MATERIAL IS NOTICED THE STEM BUSHING SHOULD BE REPLACED. | Q | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | CHECK THE EXPOSED PORTION OF THE GATE WHEN IT IS IN THE FULL OPEN POSITION FOR EXCESSIVE WEAR. IF THE GATE IS EXCESSIVELY WORN, THE GATE SHOULD BE REPLACED. | Q | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | KEEP THE VALVE WELL LUBRICATED AND THE GATE FREE OF EXCESS BUILD-UP | Q | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | MOVE SLUICE GATE THROUGH FULL OPEN CLOSE CYCLE. REPEAT UNTIL GATE MOVES FREELY | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, MAINTENANCE ONLY | 105 | |||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | CLEAN AND REGREASE OPERATING STEM. CHECK BACKLASH, FULLY OPEN AND CLOSE GATE | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | GREASE FLOOR STAND WHERE APPROPRIATE | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | GREASE OPERATOR WHERE APPROPRIATE | A | ||
| GATE, CHANNEL FLOW CONTROL | GATES, ALL TYPES | MOVE SLUICE GATE THROUGH FULL OPEN CLOSE CYCLE. REPEAT UNTIL GATE MOVES FREELY | A | ||
| GATE, CHANNEL FLOW CONTROL | STOP LOGS | 27 | |||
| GATE, CHANNEL FLOW CONTROL | STOP LOGS | VISUALLY INSPECT THE CONDITION OF THE STOP LOGS FOR DAMAGE OR LEAKS | A | ||
| GEARBOXES | GEARBOX, | 2 | (SMALLER GEARBOXES NOT LISTED AS INDIVIDUAL ASSETS) | ||
| GEARBOXES | GEARBOX, | CHECK GEARBOX OIL LEVELS, ADD IF NECESSARY | M | ||
| GEARBOXES | GEARBOX, | GREASE LINESHAFT BEARINGS | M | ||
| GEARBOXES | GEARBOX, | CHANGE OIL IN CENTER GEARBOX AND TWO END UNITS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | 1 | |||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | CHECK UPS VOLTAGE | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | START GENERATOR PANEL | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | RUN GENERATOR FOR ONE HALF HOUR | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | VERIFY THAT VOLTAGE IS BALANCED | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | RECORD DATE AND HOURS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | BEFORE STARTING, NOTIFY CCS OF PM IN PROGRESS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | REMOVE UNIT FROM STANDBY STATUS, (PANEL SWITCH TO OFF POSITION) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | CHANGE ENGINE OIL AND FILTER (150 hr.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | TAKE OIL SAMPLE IF NOT CHANGING OIL | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | RECORD DATE & HRS. OF MOST RECENT ENGINE OIL CHANGE | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT AIR INTAKE DUCTING & SERVICE AIR FILTER | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT BLOCK HEATER | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT COOLING SYSTEM AND RECORD DEGREE OF PROTECTION | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | TEST NITRATES (ADD NALCOOL OR CHANGE COOLANT FILTER) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT RADIATOR, PRESSURE TEST SYSTEM, AND TEST CAP. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | RECORD DATE & HRS. OF LAST COOLANT CHANGE | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | REPLACE FUEL FILTER (ea. 150 hr.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | RECORD DATE & HRS. OF MOST RECENT FUEL FILTER REPLACEMENT | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | DRAIN FUEL/WATER SEPERATOR (if equipped) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT& ADJUST or REPLACE, ALL DRIVE BELTS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | CHECK GOVERNOR OPERATION AND OIL LEVEL | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | CLEAN BATTERY AND TOP OFF CELLS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | CLEAN BATTERY POSTS AND CABLE CONNECTIONS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT EXHAUST SYSTEM | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | INSPECT ALL MOUNTS, GUARDS, AND SAFETY DECALS. REPAIR/REPLACE AS NEEDED. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | (DIESEL ENG.),ADJUST VALVES AND INJECTORS (EA. 800HR.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | VISUALLY INSPECT UNIT FOR FLUID LEAKS,AND ANY WORN OR DAMAGED PARTS. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | TEST RUN UNIT: REPORT ANY PROBLEMS,NOTIFY SUPERVISOR AND RECORD ON WORK ORDER. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | RETURN UNIT CONTROLS TO THE PROPER OPERATIONAL MODE AND NOTIFY OPERATIONS (CCS), WHEN COMPLETED. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, DIESEL | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | 14 | |||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | RECORD DATE AND HOURS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | BEFORE STARTING, NOTIFY CCS OF PM IN PROGRESS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | REMOVE UNIT FROM STANDBY STATUS, (PANEL SWITCH TO OFF POSITION) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHANGE ENGINE OIL AND FILTER (150 hr.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | TAKE OIL SAMPLE IF NOT CHANGING OIL | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | RECORD DATE & HRS. OF MOST RECENT ENGINE OIL CHANGE | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT AIR INTAKE DUCTING & SERVICE AIR FILTER | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT BLOCK HEATER | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT COOLING SYSTEM AND RECORD DEGREE OF PROTECTION | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | TEST NITRATES (ADD NALCOOL OR CHANGE COOLANT FILTER) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT RADIATOR, PRESSURE TEST SYSTEM, AND TEST CAP. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | RECORD DATE & HOURS OF LAST COOLANT CHANGE | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | REPLACE FUEL FILTER (ea. 150 hr.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | RECORD DATE AND HOURS OF MOST RECENT FUEL FILTER REPLACEMENT | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | DRAIN FUEL/WATER SEPERATOR (if equipped) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT& ADJUST or REPLACE, ALL DRIVE BELTS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHECK GOVERNOR OPERATION AND OIL LEVEL | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CLEAN BATTERY AND TOP OFF CELLS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CLEAN BATTERY POSTS AND CABLE CONNECTIONS | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | (GAS ENG.) REPLACE SPARK PLUGS, AND INSPECT IGNITION WIRES (EA.400 hr.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | (GAS ENG.) INSPECT DIST. CAP AND ROTOR (REPLACE AS NECC.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | (GAS ENG.) REPLACE DISTRIBUTOR POINTS (EA.400 HR.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT EXHAUST SYSTEM | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | INSPECT ALL MOUNTS, GUARDS, AND SAFETY DECALS. REPAIR/REPLACE AS NEEDED. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | (DIESEL ENG.),ADJUST VALVES AND INJECTORS (EA. 800HR.) | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | VISUALLY INSPECT UNIT FOR FLUID LEAKS,AND ANY WORN OR DAMAGED PARTS. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | TEST RUN UNIT: REPORT ANY PROBLEMS,NOTIFY SUPERVISOR AND RECORD ON WORK ORDER | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | RETURN UNIT CONTROLS TO THE PROPER OPERATIONAL MODE AND NOTIFY OPERATIONS (CCS), WHEN COMPLETED. | S | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHECK FOR LEAKS | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHECK ALL FLUID LEVELS | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHECK BELTS; ADJUST OR REPLACE AS NEEDED | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHECK HEATERS | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CHECK BATTERY CHARGERS | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | EXERCISE & RUN | M | ||
| GENERATOR, ELECTRICAL | GENERATOR, NATURAL GAS | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| GRASS,TREES, LANDSCAPING | GROUNDS, IMPROVED, LANDSCAPING | 9 | |||
| GRASS,TREES, LANDSCAPING | GROUNDS, IMPROVED, LANDSCAPING | MAY OF EACH YEAR: TRIM BUSHES & REPLACE ALL DEAD, DISEASED OR DAMAGED BUSHES OR TREES | S | ||
| GRASS,TREES, LANDSCAPING | GROUNDS, IMPROVED, LANDSCAPING | OCTOBER OF EACH YEAR: REPLACE ALL DEAD, DISEASED OR DAMAGED BUSHES OR TREES | S | ||
| GRASS,TREES, LANDSCAPING | GROUNDS, IMPROVED, LANDSCAPING | REMOVE LITTER | M | ||
| GROUNDS, UNIMPROVED | GROUNDS, UNIMPROVED, EARTHWORK | 218 | |||
| GROUNDS, UNIMPROVED | GROUNDS, UNIMPROVED, EARTHWORK | SNOW ROUTE - ALL SITES: DRIVEWAYS, CLEAR TO DOORWAYS, CONTROL CABINETS, GATE ACCESS MANHOLES | AS NEEDED, PAID AS TASK ORDER | ||
| GROUNDS, UNIMPROVED | GROUNDS, UNIMPROVED, EARTHWORK | REMOVE LITTER | M | ||
| GROUNDS, UNIMPROVED | GROUNDS, UNIMPROVED, EARTHWORK | TURF ROUTE | GRASS CUT TO REMAIN BELOW 5" OR AS DIRECTED BY DISTRICT, PAID PER TASK ORDER | ||
| GROUNDS, UNIMPROVED | GROUNDS, UNIMPROVED, EARTHWORK | INSPECT ALL ACCESS SHAFT COVERS TO STRUCTURES AT KK, CT, LM, NS, AND NWSRS FOR DAMAGE | A | ||
| HOISTS & CRANES | HOIST, GANTRY | 5 | |||
| HOISTS & CRANES | HOIST, GANTRY | CHECK LIMIT SWITCH OPERATION | C | ||
| HOISTS & CRANES | HOIST, GANTRY | CHECK WIRE ROPE FOR KINKS | C | ||
| HOISTS & CRANES | HOIST, GANTRY | CHECK CONTROLS OPERATION | C | ||
| HOISTS & CRANES | HOIST, GANTRY | VISUALLY INSPECT HOOK | C | ||
| HOISTS & CRANES | HOIST, GANTRY | INSPECT/LUBRICATE WIRE ROPE/CHAIN | S | ||
| HOISTS & CRANES | HOIST, GANTRY | LUBRICATE EXPOSED GEARING | S | ||
| HOISTS & CRANES | HOIST, GANTRY | LUBRICATE BEARINGS | S | ||
| HOISTS & CRANES | HOIST, GANTRY | LUBRICATE AXLE SHAFTS | S | ||
| HOISTS & CRANES | HOIST, GANTRY | CHECK GEARCASE OIL LEVEL | M | ||
| HOISTS & CRANES | HOIST, GANTRY | DRAIN/REFILL GEARCASE | A | ||
| HOISTS & CRANES | HOIST, GANTRY | INSPECT/ADJUST MOTOR BRAKES | S | ||
| HOISTS & CRANES | HOIST, GANTRY | INSPECT CONTACTORS | A | ||
| HOISTS & CRANES | HOIST, GANTRY | PERFORM OSHA INSPECTION | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | 13 | |||
| HOISTS & CRANES | HOIST, OVERHEAD | CHECK LIMIT SWITCH OPERATION | C | ||
| HOISTS & CRANES | HOIST, OVERHEAD | CHECK WIRE ROPE FOR KINKS | C | ||
| HOISTS & CRANES | HOIST, OVERHEAD | CHECK CONTROLS OPERATION | C | ||
| HOISTS & CRANES | HOIST, OVERHEAD | VISUALLY INSPECT HOOK | C | ||
| HOISTS & CRANES | HOIST, OVERHEAD | INSPECT/LUBRICATE WIRE ROPE/CHAIN | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | LUBRICATE EXPOSED GEARING | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | LUBRICATE BEARINGS | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | LUBRICATE AXLE SHAFTS | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | CHECK GEARCASE OIL LEVEL | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | DRAIN/REFILL GEARCASE | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | INSPECT/ADJUST MOTOR BRAKES | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | INSPECT CONTACTORS | A | ||
| HOISTS & CRANES | HOIST, OVERHEAD | PERFORM OSHA INSPECTION | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | 59 | |||
| HVAC | HVAC, AIR HANDLING UNITS | CHECK DRIVE BELT TENSION & CONDITION | Q | ||
| HVAC | HVAC, AIR HANDLING UNITS | GREASE FAN BEARINGS | Q | ||
| HVAC | HVAC, AIR HANDLING UNITS | LUBRICATE MOTOR BEARINGS | Q | ||
| HVAC | HVAC, AIR HANDLING UNITS | CHECK AIR FILTERS; CHANGE IF NEEDED | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | CHECK ALIGNMENT OF FAN & MOTOR SHEAVES; ADJUST IF NECESSARY | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | INSPECT & CLEAN DRAIN PANS & DISCHARGE PIPING | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | ACTUATE AIR INTAKE DAMPERS; ADJUST AS NEEDED FOR A TIGHT SEAL | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | LUBRICATE DAMPER LINKAGE PIVOT POINTS & BUSHING | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | START UP UNIT AND CHECK CONTROLS; ENSURE PROPER AUTO OPERATION | A | ||
| HVAC | HVAC, AIR HANDLING UNITS | ON GAS-FIRED UNITS, CLEAN BURNER, ADJUST FIRE AND ADJUST AIR FLOW RATE | A | ||
| HVAC | HVAC, COOLING UNIT, CONDENSER\CHILLER, FREON\WATER-GLYCOL | 1 | |||
| HVAC | HVAC, COOLING UNIT, CONDENSER\CHILLER, FREON\WATER-GLYCOL | CLEAN DEBRIS FROM CONDENSER COIL | A | ||
| HVAC | HVAC, HEAT, ELECTRIC OR GAS FIRED | 8 | |||
| HVAC | HVAC, HEAT, ELECTRIC OR GAS FIRED | CLEAN FAN BLADES AND CABINET | A | ||
| HVAC | HVAC, HEAT, ELECTRIC OR GAS FIRED | START UP UNIT AND CHECK CONTROLS; ENSURE PROPER AUTO OPERATION | A - Early November | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | 2 | |||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | CLEAN FILTER | S | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | MANUALLY CLEAN FAN AND UNIT CABINET-WIPE DOWN | S | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | MANUALLY CLEAN HEATING ELEMENT AND COIL-WIPE DOWN | S | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | REMOVE LOCK-OUT/TAG-OUT FROM UNIT | S | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | CYCLE UNIT ON BY SETTING THERMOSTAT ABOVE AMBIENT AIR TEMPERATURE -VERIFY THAT UNIT STARTS TO CIRCULATE WARM AIR | S | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | SET THERMOSTAT BELOW AMBIENT AIR TEMERATURE-VERIFY THAT UNIT CYCLES OFF | S | ||
| HVAC | HVAC, SMALL SPACE AIR COOLING OR HEATING, WINDOW A/C, BASEBOARD\WALL HEATERS | SET THERMOSTAT AT 55 DEGREES | S | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | 34 | |||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | CHECK ACCUMULATORS | M | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | CHECK RUN TIMERS | M | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | CHECK FOR LEAKS | M | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | CHECK LINES AND FITTINGS | M | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | CHECK PRESSURE | M | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | CHECK PRE-CHARGE | M | ||
| HYDRAULIC POWER | HYDRAULIC BACKUP NITROGEN SUPPORT SYSTEM | RE-CHARGE ACCUMULATOR (AS NEEDED) | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | 37 | |||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK OIL LEVEL/DRAIN BACK | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK FOR OIL LEAKS, CHECK HOSES AND FITTINGS | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK OIL FOR CHANGE IN COLOR | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK BY-PASS VALVE | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK SOLENOID OPERATION | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK FILTERS | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | CHECK MOTOR COUPLINGS | M | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | INSPECT HPU PRESSURE TRANSMITTER | Q | ||
| HYDRAULIC POWER | POWER PACK, HYDRAULIC | INSPECT OVERALL CONDITION OF CURRENT TRIPS OVERFLOW AND HPU | S | ||
| CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||||
| LABORATORY | LABORATORY EQUIPMENT, BENCHTOP | 1 | |||
| LABORATORY | LABORATORY EQUIPMENT, BENCHTOP | OPEN CABINET, CHECK TEMPERATURE, CONFIRM FAN AND REFRIGERATOR ARE WORKING | M | ||
| CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||||
| LABORATORY | LABORATORY EQUIPMENT, FIXED | 23 | |||
| LABORATORY | LABORATORY EQUIPMENT, FIXED | OPEN CABINET, CHECK TEMPERATURE, CONFIRM FAN AND REFRIGERATOR ARE WORKING | M | ||
| CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||||
| LIGHTING AND GENERAL ELECTRICAL SERVICES | LIGHTING, GROUP | 82 | |||
| LIGHTING AND GENERAL ELECTRICAL SERVICES | LIGHTING, GROUP | INSPECT ALL EXPOSED CONDUIT FOR CORROSION OR DAMAGE | A | ||
| LIGHTING AND GENERAL ELECTRICAL SERVICES | LIGHTING, GROUP | VERIFY OPERATION AND CONDITION OF HEAT TRACE SYSTEM | A | ||
| INSPECT ALL EXPOSED CONDUIT FOR CORROSION OR DAMAGE | A | ||||
| CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||||
| MANHOLE | ALL MANHOLES (SANITARY, SIPHON, STRUCTURE) | 3,769 | |||
| MANHOLE | ALL MANHOLES (SANITARY, SIPHON, STRUCTURE) | 3,769 | MACP LEVEL 2 CCTV INSPECTION | 1-20 YR BASED ON PAST INSPECTION. PAID AS TASK ORDER | |
| MANHOLE | ALL MANHOLES (SANITARY, SIPHON, STRUCTURE) | 206 | HATCH INSPECTION | A | |
| MANHOLE | ALL MANHOLES (SANITARY, SIPHON, STRUCTURE) | 952 | DROP INSPECTION | A | |
| MANHOLE | ALL MANHOLES (SANITARY, SIPHON, STRUCTURE) | 338 | TARRING | A | |
| MANHOLE | ALL MANHOLES (SANITARY, SIPHON, STRUCTURE) | 47 | SIPHON RISER/DROP INSPECTION | M | |
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, AREA VELOCITY | 131 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, AREA VELOCITY | VERIFY LEVEL, CHECK VELOCITY AND FLOW AGAINST HISTORICAL DATA. SIMULATE VALUES TO CCS IF ON IFIX | S | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, MAGNETIC | 16 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, MAGNETIC | METER & MONITORING, CONTROL INSTRUMENTATION | A | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, MAGNETIC | METER & MONITORING, CONTROL INSTRUMENTATION | D | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, ULTRASONIC | 11 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, ULTRASONIC | METER & MONITORING, CONTROL INSTRUMENTATION | A | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | FLOW METER, ULTRASONIC | METER & MONITORING, CONTROL INSTRUMENTATION | D | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, ENERGY (GAS/ELEC) | 1 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, ENERGY (GAS/ELEC) | METER & MONITORING, CONTROL INSTRUMENTATION | A | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, ENERGY (GAS/ELEC) | METER & MONITORING, CONTROL INSTRUMENTATION | D | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, GAS, PROCESS | 8 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, GAS, PROCESS | CLEAN PROBE AND CALIBRATE | Q | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, LEVEL | 187 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, LEVEL | CALIBRATE METER AND VERIFY LOOP DEVICES | A | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, LEVEL | CHECK READINGS TO ENSURE THEY ARE TRENDING PROPERLY, WRITE WO FOR FLOW HEAD CLEANING AS NECESSARY | D | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, LEVEL | CHECK IF LEVEL METERS ARE FUCTIONING PROPERLY AT EACH SITE | M | ||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, PRESSURE | 8 | |||
| METER & MONITORING, CONTROL INSTRUMENTATION | MONITOR, PRESSURE | VERIFICATION OF ACCURATE READINGS | A | ||
| MIXERS | MIXER, FIXED | 1 | |||
| MIXERS | MIXER, FIXED | RELUBRICATE BEARINGS (OMALA 150 - SHELL) | M | ||
| MIXERS | MIXER, FIXED | PERFORM GENERAL MOTOR INSPECTION | M | ||
| MIXERS | MIXER, FIXED | VIBRATION MONITORING | Q | ||
| MIXERS | MIXER, FIXED | CHANGE GEAR DRIVE OIL (OMALA 68 - SHELL) | S | ||
| MIXERS | MIXER, FIXED | CHANGE GEAR REDUCER OIL (OMALA 220 - SHELL) | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS < 1000 HP | 21 | |||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS < 1000 HP | CLEAN THE FILTER AND UNIT | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS < 1000 HP | INSPECT THE INTERIOR & EXTERIOR FANS | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS < 1000 HP | INSPECT THE ENCLOSURE GASKETS | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS < 1000 HP | CLEAN AND RETIGHTEN ELECTRICAL CONNECTIONS | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS > 1000 HP | 3 | |||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS > 1000 HP | REPLACE FILTER (AS NEEDED) | M | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS > 1000 HP | INSPECT THE INTERIOR & EXTERIOR FANS | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS > 1000 HP | INSPECT THE ENCLOSURE GASKETS | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS > 1000 HP | CLEAN AND RETIGHTEN ELECTRICAL CONNECTIONS | A | ||
| MOTOR CONTROL, STARTERS, DRIVES | VARIABLE FREQUENCY DRIVERS > 1000 HP | CLEAN THE UNIT | A | ||
| MOTORS, ELECTRICAL | MOTOR (ALL), ELECTRICALLY DRIVEN | 32 | |||
| MOTORS, ELECTRICAL | MOTOR (ALL), ELECTRICALLY DRIVEN | GREASE MOTOR BEARINGS | A | ||
| MOTORS, ELECTRICAL | MOTOR (ALL), ELECTRICALLY DRIVEN | MEGGER MOTOR | A | ||
| MOTORS, ELECTRICAL | MOTOR (ALL), ELECTRICALLY DRIVEN | CHECK ELECTRICAL CABLE FOR WEAR | A | ||
| MOTORS, ELECTRICAL | MOTOR (ALL), ELECTRICALLY DRIVEN | MOTOR INSULATION ANALYSIS | A | ||
| MOTORS, ELECTRICAL | MOTOR (ALL), ELECTRICALLY DRIVEN | CHECK ANCHORING ON MOTOR, DRIVE HOUSING AND THRUST BEARING TOP SCREW | A | ||
| NETWORK BACKBONE, SWITCHES, ROUTERS | NETWORK CABLING, BACKBONE, ETHERNET, FIBREOPTICS AND CONNECTIONS, COMPUTERS, SERVERS, MONITORS, PRINTERS, SWITCHES, ROUTERS, WIRELESS ACCESS POINTS | 10 | |||
| NETWORK BACKBONE, SWITCHES, ROUTERS | NETWORK CABLING, BACKBONE, ETHERNET, FIBREOPTICS AND CONNECTIONS, COMPUTERS, SERVERS, MONITORS, PRINTERS, SWITCHES, ROUTERS, WIRELESS ACCESS POINTS | LOAD TEST BATTERIES, FILTER CHANGE, VISUAL INSPECTION, ASSURE TEMPERATURE IS ACCEPTABLE | S | ||
| NETWORK BACKBONE, SWITCHES, ROUTERS | NETWORK CABLING, BACKBONE, ETHERNET, FIBREOPTICS AND CONNECTIONS, COMPUTERS, SERVERS, MONITORS, PRINTERS, SWITCHES, ROUTERS, WIRELESS ACCESS POINTS | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| PIPE APPURTENANCES, E.G. BACKFLOW PREVENTERS, CATHODIC PROTECTION, FIXTURES | BACKFLOW PREVENTERS, ALL | 11 | |||
| PIPE APPURTENANCES, E.G. BACKFLOW PREVENTERS, CATHODIC PROTECTION, FIXTURES | BACKFLOW PREVENTERS, ALL | WORK WITH MUNICIPALITY FOR ANNUAL INSPECTION | A | ||
| PIPE APPURTENANCES, E.G. BACKFLOW PREVENTERS, CATHODIC PROTECTION, FIXTURES | CATHODIC PROTECTION | 1 | |||
| PIPE APPURTENANCES, E.G. BACKFLOW PREVENTERS, CATHODIC PROTECTION, FIXTURES | CATHODIC PROTECTION | INSPECT CP DATA TO DETERMINE IF ANODES REQUIRE REPLACEMENT | Q | ||
| POTABLE WATER PIPING | PLUMBING, PIPING, POTABLE WATER DISTRIBUTION AND DRAINAGE | 1 | |||
| POTABLE WATER PIPING | PLUMBING, PIPING, POTABLE WATER DISTRIBUTION AND DRAINAGE | INSPECT FOR DAMAGE OR CORROSION | A | ||
| POWER DISTRIBUTION PANEL (BUS) | AUTOMATIC TRANSFER SWITCH | 9 | |||
| POWER DISTRIBUTION PANEL (BUS) | AUTOMATIC TRANSFER SWITCH | INSPECT NORMAL/ALT, INDICATORS, NOISE | M | ||
| POWER DISTRIBUTION PANEL (BUS) | AUTOMATIC TRANSFER SWITCH | INSPECT AND VERIFY DEVICE OPERATES PROPERLY | A | ||
| POWER DISTRIBUTION PANEL (BUS) | AUTOMATIC TRANSFER SWITCH | CLEAN THE UNIT OF DUST, INSECTS, AND OTHER DEBRIS | A | ||
| POWER DISTRIBUTION PANEL (BUS) | MOTOR CONTROL CENTER (ALL), A.C. ELECTRICAL, | 14 | |||
| POWER DISTRIBUTION PANEL (BUS) | MOTOR CONTROL CENTER (ALL), A.C. ELECTRICAL, | INSPECT ELECTRICAL SWITCHING EQUIPMENT, PANEL INDICATORS, FLAGS, FAULTS, NOISE ARCING, TEMPERATURE, CLEANLINESS | M | ||
| POWER DISTRIBUTION PANEL (BUS) | MOTOR CONTROL CENTER (ALL), A.C. ELECTRICAL, | CONDUCT THERMAL IMAGING ON EACH CUBICLE/BREAKER | A | ||
| POWER DISTRIBUTION PANEL (BUS) | MOTOR CONTROL CENTER (ALL), A.C. ELECTRICAL, | CLEAN THE UNIT OF DUST, INSECTS, AND OTHER DEBRIS | A | ||
| POWER DISTRIBUTION PANEL (BUS) | POWER DISTRIBUTION PANEL | 1 | |||
| POWER DISTRIBUTION PANEL (BUS) | POWER DISTRIBUTION PANEL | VISUAL CONDITION ASSESSMENT | A | ||
| POWER DISTRIBUTION PANEL (BUS) | POWER DISTRIBUTION PANEL | CLEAN THE UNIT OF DUST, INSECTS, AND OTHER DEBRIS | A | ||
| POWER DISTRIBUTION PANEL (BUS) | SWITCHGEAR | 8 | |||
| POWER DISTRIBUTION PANEL (BUS) | SWITCHGEAR | INSPECT CABLE AND WIRE CONNECTIONS. | A | ||
| POWER DISTRIBUTION PANEL (BUS) | SWITCHGEAR | INSPECT JOINTS AND INSULATION. | A | ||
| POWER DISTRIBUTION PANEL (BUS) | SWITCHGEAR | INSPECT CONTACT SURFACES | A | ||
| POWER DISTRIBUTION PANEL (BUS) | SWITCHGEAR | RUN BUILT-IN SELF TEST WHERE APPLICABLE | A | ||
| POWER DISTRIBUTION PANEL (BUS) | SWITCHGEAR | CLEAN SWITCHGEAR OF DUST, INSECTS, AND OTHER DEBRIS | A | ||
| PROCESS PIPING, GRAY\BROWN WATER, SLUDGE | PROCESS PIPING, GRAVITY | 5 | |||
| PROCESS PIPING, GRAY\BROWN WATER, SLUDGE | PROCESS PIPING, GRAVITY | INSPECT FOR DAMAGE OR CORROSION | A | ||
| PROCESS PIPING, GRAY\BROWN WATER, SLUDGE | PROCESS PIPING, PRESSURE | 2 | |||
| PROCESS PIPING, GRAY\BROWN WATER, SLUDGE | PROCESS PIPING, PRESSURE | INSPECT FOR DAMAGE OR CORROSION | A | ||
| PUMP STATION/BYPASS GATE WET WELL | 10 | ||||
| PUMP STATION/BYPASS GATE WET WELL | DRAIN, CLEAN AND INSPECT WET WELL AT PS0401, PS0501, PS0402, PS0301, PS0502, PS0101, PS0302, BS0502, BS0506, BS0601, BS0405 | 5-YR | |||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP DRY, GEAR | 26 | |||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP DRY, GEAR | REGREASE MOTOR BEARINGS | 2000 – 4000 hrs | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP DRY, GEAR | CHECK COUPLING FOR DAMAGE | A | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | 29 | |||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | GREASE MOTOR | M | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | VIBRATION MONITORING | Q | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | CLEAN ELECTRODE | A | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | CLEAN FLOAT CHECK VALVE | A | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | CHECK PUMP SEAL | A | ||
| PUMPS, CONVENTIONAL, NON-SUBMERSIBLE | PUMP, CENTRIFUGAL | CHECK IMPELLER FOR EXCESSIVE WEAR | A | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | 25 | |||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | REPLACE BEARINGS IF NECESSARY | A | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK WEAR RINGS | A | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | INSPECT COUPLINGS | A | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK BRUSHES, RINGS, & MOTOR | A | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | PERFORM GENERAL OVERHALL OF PUMP AND MOTOR | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | REPLACE BEARINGS IF NECESSARY | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK WEAR RINGS | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK LEAKAGE CHAMBER | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK SUPPORT CHAIN/WIRE ROPE | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHANGE OIL | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK ELECTRICAL TERMINALS | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | MEASURE INSULATION RESISTANCE | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CHECK UPS OPERATION | 5Y | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CABLE - IF THE OUTER JACKET IS DAMAGED, REPLACE THE CABLE. CHECK THAT THE CABLES DO NOT HAVE ANY SHARP BENDS AND ARE NOT PINCHED. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | CONNECTION TO POWER - CHECK THAT THE CONNECTIONS ARE PROPERLY TIGHTENED. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | ELECTRICAL CABINETS - CHECK THAT THEY ARE CLEAN AND DRY. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | LEVEL REGULATORS - CHECK THE CONDITION AND FUNCTIONALITY. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | LIFTING DEVICE - CHECK THAT LOCAL SAFETY REGULATIONS ARE FOLLOWED. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | LIFTING HANDLE - CHECK THE SCREWS, CONDITION OF THE LIFTING HANDLS. REPLACE IF NECESSARY. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | OVERLOAD PROTECTION AND OTHER PROTECTIONS - CHECK THE CORRECT SETTINGS. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | PERSONNEL SAFETY DEVICES - CHECK THE GUARD RAILS, COVERS AND OTHER PROTECTIONS. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | ROTATION DIRECTION - CHECK THE IMPELLER ROTATION. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | ERMINAL BOARD - CHECK THAT THE CONNECTIONS ARE PROPERLY TIGHTENED. | M | ||
| PUMPS, SUBMERSIBLE | PUMP SUBMERSIBLE, CENTRIFUGAL | VOLTAGE AND AMPERAGE - CHECK THE RUNNING VALUES | M | ||
| PUMPS, SUBMERSIBLE | PUMP, SUMP | 4 | |||
| PUMPS, SUBMERSIBLE | PUMP, SUMP | CHECK THE ELECTRIC CABLES | A | ||
| PUMPS, SUBMERSIBLE | PUMP, SUMP | VISUALLY INSPECT THE LIFTING CHAIN/ROPE | A | ||
| PUMPS, SUBMERSIBLE | PUMP, SUMP | CHECK MONITORING EQUIPMENT | 3Y | ||
| PUMPS, SUBMERSIBLE | PUMP, SUMP | CHANGE OIL | 3Y | ||
| SAFETY | SAFETY EQUIPMENT, FALL PROTECTION, HARNESS | 4 | |||
| SAFETY | SAFETY EQUIPMENT, FALL PROTECTION, HARNESS | INSPECT AND TEST | S | ||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, FORCE MAIN - ALL MATERIALS | 40 | |||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, FORCE MAIN - ALL MATERIALS | PACP CCTV INSPECTION | 1-20 YR BASED ON PAST INSPECTION. PAID AS TASK ORDER | ||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, FORCE MAIN - ALL MATERIALS | CLEANING AS REQUIRED | 1-20 YR. PAID AS TASK ORDER | ||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, GRAVITY | 4,790 | |||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, GRAVITY | PACP CCTV INSPECTION | 1-20 YR BASED ON PAST INSPECTION. PAID AS TASK ORDER | ||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, GRAVITY | CLEANING AS REQUIRED | 1-20 YR. PAID AS TASK ORDER | ||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, SIPHON - ALL MATERIALS | 65 | |||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, SIPHON - ALL MATERIALS | PACP CCTV INSPECTION | 1-20 YR BASED ON PAST INSPECTION. PAID AS TASK ORDER | ||
| SANITARY, SEWER PIPING | CONVEYANCE, SANITARY, SIPHON - ALL MATERIALS | CLEANING AS REQUIRED | 1-20 YR. PAID AS TASK ORDER | ||
| SOLAR POWER SYSTEM | PHOTOVOLTAIC SYSTEM | 6 | |||
| SOLAR POWER SYSTEM | PHOTOVOLTAIC SYSTEM | VERIFY FUNCTIONALITY BY ENSURING BATTERIES ARE CHARGED AND HOLDLING A CHARGE | S | ||
| SOLAR POWER SYSTEM | PHOTOVOLTAIC SYSTEM | VISUAL INSPECTION OF UNIT | S | ||
| SOLAR POWER SYSTEM | PHOTOVOLTAIC SYSTEM | CLEAN DUST, INSECT, AND OTHER DEBRIS | A | ||
| SOLIDS SCREENING | BAR SCREEN, RACK | 32 | |||
| SOLIDS SCREENING | BAR SCREEN, RACK | INSPECT AND CLEAN TRASH RACK AT CT, KK, LM, NS, AND NSWRS ISS SITES | 2-YR | ||
| SOLIDS SCREENING | BAR SCREEN, RACK | INSPECT AND CLEAN BAR SCREEN AT PS0401 AND PS0402 | W | ||
| SOLIDS SCREENING | BAR SCREEN, RACK | INSPECT AND CLEAN BAR SCREEN AND PS0501 | 3 TIMES PER WEEK | ||
| SOLIDS SCREENING | BAR SCREEN, RACK | INSPECT AND CLEAN BAR SCREENS AT PS0301, PS0502, PS0101, PS0302, PS0704, BS0502, BS0506, BS0601, AND BS0405 | INSPECT AFTER EVERY PUMPING EVENT AND CLEAN AS NECESSARY | ||
| STORM | STORM PIPE, GRAVITY | 1 | |||
| STORM | STORM PIPE, GRAVITY | PACP CCTV INSPECTION | 1-20 YR. PAID AS TASK ORDER | ||
| STORM | STORM PIPE, GRAVITY | CLEANING AS REQUIRED | 1-20 YR. PAID AS TASK ORDER | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | 6 | |||
| TANK STORAGE | TANK, PRESSURE & STEEL | PERFORM LOCK-OUT TAG-OUT OF PUMPS ISS PUMPS FEEDING JIHT | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | SLOWLY AND CAREFULLY LOOSEN BOLTS ON MANWAY HATCH, | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | WATCHING FOR UNCONTROLLED SEWERAGE LEAKING FROM | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | MANWAY. IF SPILLING SEWERAGE CANNOT BE CONTROLED, TIGHTEN BOLTS | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | TO SEAL MANWAY HATCH | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | NOTIFY FPMW SO THAT THEY CAN RE-DRAIN THE HEAD TANK | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | CHECK FOR RUST OR CHIPPED PAINT AND LEAKS AT THE MAN WAYS. | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | CHECK THAT LADDER IS SECURE. | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | PERFORM LOCK-OUT TAG-OUT OF PUMPS ISS PUMPS FEEDING SSHT | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | OPEN CROSS CONNECT VALVE TO JIHT TO DRAIN ANY REMAINING SEWERAGE FROM SSHT | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | ONCE REMAINING SEWERAGE HAS BEEN DRAINED FROM SSHT, CLOSE AND LOCK-OUT TAG-OUT CROSS CONNECT VALVE | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | NOTIFY THE PIPF THAT THE MANWAY HATCH CAN BE OPENED | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | ONCE MANWAY CAN BE SAFELY OPENED WITHOUT FEAR OF UNCONTROLLED RELEASE, VACTOR ANY AND ALL DEBRIS FROM SSHT. | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | ONCE CLEANED, INSPECT INTERIOR WALLS AND RISER FOR ANY VISABLE SIGNS OF FAILURE | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | ANY SIGNS OF FAILURE SHOULD BE REPORTED TO YOUR SUPERVISOR | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | IF INTERIOR INSPECTION SHOWS NO SIGNS OF FAILURE, NOTIFY PIPF TO SEAL MANWAY | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | REMOVE LOCK-OUTS AND TAG-OUTS | A | ||
| TANK STORAGE | TANK, PRESSURE & STEEL | RETURN SSHT BACK TO OPERATIONS | A | ||
| TOOLS | CHAINFALLS, COMEALONGS, PORTABLE HOISTS | 2 | |||
| TOOLS | CHAINFALLS, COMEALONGS, PORTABLE HOISTS | CRANE CONTRACTOR TO PERFORM SAFETY & PREVENTIVE INSPECTION PER | |||
| OSHA 1910.179 | A | ||||
| TOOLS | HAND TOOLS, GROUP | 2 | |||
| TOOLS | HAND TOOLS, GROUP | PERFORM SAFETY AND PREVENTATIVE INSPECTION PER OSHA'S 1910.179. | A | ||
| TOOLS | HAND TOOLS, GROUP | PERFORM INSPECTION PER CHECK LIST AND REPORT FINDINGS | A | ||
| TOOLS | PORTABLE POWER TOOLS, AC ELECTRIC | 11 | |||
| TOOLS | PORTABLE POWER TOOLS, AC ELECTRIC | CHECK FOR DAMAGE AND ENSURE PROPER FUNCTION | A | ||
| TOWER | TOWER, CELL | 3 | |||
| TOWER | TOWER, CELL | DOES TOWER STRUCTURE APPEAR IN GOOD CONDITION | A | ||
| TOWER | TOWER, CELL | ANY APPARENT STRUCTURAL DAMAGE | A | ||
| TOWER | TOWER, CELL | BENT OR FRACTURED MEMBERS | A | ||
| TOWER | TOWER, CELL | LOOSE OR MISSING MECHANICAL FASTENERS | A | ||
| TOWER | TOWER, CELL | TOWER TWISTED OR DISTORTED | A | ||
| TOWER | TOWER, CELL | VERTICLAL ALIGNMENT CORRECT | A | ||
| TOWER | TOWER, CELL | IS GALVANIZING IN GOOD CONDITION | A | ||
| TOWER | TOWER, CELL | ANY FLAKING, WEARING, RUST | A | ||
| TOWER | TOWER, CELL | CORRECT MINOR GALVANIZING ISSUES | A | ||
| TOWER | TOWER, CELL | CONCRETE DAMAGED OR CRACKING | |||
| BASE PLATE FASTENERS SECURED PROPERLY | A | ||||
| TOWER | TOWER, CELL | CLIMB SAFETY DEVICES IN GOOD CONDITION & WORKING PROPERLY |
CLIMBING LADDER IN GOOD CONDITION
CLIMBING PEGS IN GOOD CONDITION
| ALL CLIMBING DEVICES PROPERLY SECURED | A | ||
| TOWER | TOWER, CELL | LIGHTNING ROD IN GOOD CONDITION | |
| CONNECTIONS IN GOOD CONDITION | A | ||
| TOWER | TOWER, CELL | TRANSMISSION LINES IN GOOD CONDITION |
CABLE HANGERS & HOISTS IN GOOD CONDITION
GROUNDING WIRING CONNECTED PROPERLY
SEALS AT CONNECTORS IN GOOD CONDITION
ANTENNAS IN GOOD CONDITION
| ANTENNA MOUNTS IN GOOD CONDITION | A | ||||
| TOWER | TOWER, CELL | MAJOR CLIMBING INSPECTION ACCORDING TO TIA/EIA 222-H | 5 years | ||
| TRANSFORMER | TRANSFORMER, AC ELECTRIC | 6 | |||
| TRANSFORMER | TRANSFORMER, AC ELECTRIC | CHECK FOR OIL LEAKS, COOLING FINS CLEAR GOOD AIR FLOW; CHECK AND RECORD OIL LEVEL, WINDING TEMPERATURE, TOP OIL TEMPERTURE, PRESSURE | A | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | 7 | |||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | CHECK FAN: SPINS, FINS INTACT, FUNCTIONAL | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | INSPECT WIRES, BOARDS AND CONNECTIONS FOR DAMAGE, HEAT, OR UNUSUAL COLOR, WEAR AND TEAR. | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | TIGHTEN CONNECTIONS, PANEL AND BATTERIES | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | CLEAN CABINET OF DUST, INSPECT, AND OTHER DEBRIS. WIPE AND VACUUM. CLEAN OR REPLACE FILTERS. | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | BATTERIES: CHECK ELECTROLYTES LEVEL AND FILL WITH DISTILLED WATER AS NEEDED. | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | CLEAN SULFATE BUILDUP (WHITISH LOOKING RESIDUE) WITH SOLUTION CREATED BY DAMPENING A CLOTH WITH A SOLUTION OF BICARBONATE OF SODA AND COLD WATER 1.0 LB TO 1.0 GALLON | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | USING A HYDROMETER, MEASURE SPECIFIC GRAVITY READING AT FULL CHARGE & FILLED WITH ELECTROLYTE TO HIGH LINE; SHOULD BE @ 75~+/- .005 OF THE NORMAL SPECIFIC GRAVITY LISTED ON THE CELL COVER | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | MEASURE OUTPUT VOLTAGE, CURRENT AND OUTPUT FREQUENCY AND CHECK AGAINST RATED VALUES | S | ||
| UNINTERRUPTIBLE POWER SUPPLY | POWER SUPPLY, BACKUP | ||||
| VALVE, PIPE FLOW CONTROL | VALVES, BALL | 47 | |||
| VALVE, PIPE FLOW CONTROL | VALVES, BALL | VISUALLY INSPECT VALVE AND REMOVE DEBRIS AND/OR LOOSE DIRT FROM STEM PRIOR TO EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, BALL | LUBRICATE STEM IF APPLICABLE WHILE EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, BALL | EXERCISE THE GATE OR VALVE THROUGH A COMPLETE CYCLE UNLESS OTHERWISE NOTED. REPEATE OPERATION UNTIL DEVICE MOVES FREELY | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, BUTTERFLY | 9 | |||
| VALVE, PIPE FLOW CONTROL | VALVES, BUTTERFLY | VISUALLY INSPECT VALVE AND REMOVE DEBRIS AND/OR LOOSE DIRT FROM STEM PRIOR TO EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, BUTTERFLY | LUBRICATE STEM IF APPLICABLE WHILE EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, BUTTERFLY | EXERCISE THE GATE OR VALVE THROUGH A COMPLETE CYCLE UNLESS OTHERWISE NOTED. REPEATE OPERATION UNTIL DEVICE MOVES FREELY | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, DUCKBILL | 27 | |||
| VALVE, PIPE FLOW CONTROL | VALVES, DUCKBILL | VISUALLY INSPECT VALVE FOR SIGNS OF WEAR, TEAR, OR DAMAGE | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, DUCKBILL | CLEAN VALVE OF DEBRIS, SEDIMENT, OR BIOFILM BUILDUP | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, GATE TYPE | 9 | |||
| VALVE, PIPE FLOW CONTROL | VALVES, GATE TYPE | VISUALLY INSPECT VALVE AND REMOVE DEBRIS AND/OR LOOSE DIRT FROM STEM PRIOR TO EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, GATE TYPE | LUBRICATE STEM IF APPLICABLE WHILE EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, GATE TYPE | EXERCISE THE GATE OR VALVE THROUGH A COMPLETE CYCLE UNLESS OTHERWISE NOTED. REPEAT OPERATION UNTIL DEVICE MOVES FREELY | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, KNIFE | 16 | |||
| VALVE, PIPE FLOW CONTROL | VALVES, KNIFE | VISUALLY INSPECT VALVE AND REMOVE DEBRIS AND/OR LOOSE DIRT FROM STEM PRIOR TO EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, KNIFE | LUBRICATE STEM IF APPLICABLE WHILE EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, KNIFE | EXERCISE THE GATE OR VALVE THROUGH A COMPLETE CYCLE UNLESS OTHERWISE NOTED. REPEAT OPERATION UNTIL DEVICE MOVES FREELY | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, PLUG | 2 | |||
| VALVE, PIPE FLOW CONTROL | VALVES, PLUG | VISUALLY INSPECT VALVE AND REMOVE DEBRIS AND/OR LOOSE DIRT FROM STEM PRIOR TO EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, PLUG | LUBRICATE STEM IF APPLICABLE WHILE EXERCISING | A | ||
| VALVE, PIPE FLOW CONTROL | VALVES, PLUG | EXERCISE THE GATE OR VALVE THROUGH A COMPLETE CYCLE UNLESS OTHERWISE NOTED. REPEATE OPERATION UNTIL DEVICE MOVES FREELY | A |
This is the start of the file's text. The full file is on GovTribe.