10-Final Draft Exhibit F - CM Authorization Form.pdf

PDF 292 KB Posted

Attached to
Operation and Maintenance of Water Reclamation Infrastructure
Solicitation number
P-3216
Issued by
Milwaukee County, Mattoon Village, Wisconsin

About this file

Exhibit F is a Company Level B Corrective Maintenance Request Authorization Form from the Final Draft RFP 2025, designed for use by a company (likely a municipal or utility organization) and its associated district (MMSD). The form provides a structured template for documenting maintenance needs, investigations, and approvals for facility repairs or improvements. It includes sections for detailed information about the facility, the specific maintenance issue, priority level, expected scope of repairs, maintenance history, and proposed repair process.

The form requires comprehensive documentation including the facility's age, expected useful life, description of the issue, investigation details, and priority justification. It allows for multiple levels of review and authorization, with checkboxes for approving the scope, implementation, and final implementation by the maintenance officer. The form also captures critical project management details such as expected repair duration, cost estimates, potential in-house or contracted work, and advertisement dates for work. The multi-page document is designed to ensure thorough documentation, clear communication, and structured decision-making for corrective maintenance requests.

View the file

Other files

File Type Posted
18-Final Draft Exhibit P - Governance.pdf PDF
23-Final Draft Schedule B-3 Conveyance PM.xlsx XLSX spreadsheet
13-Final Draft Exhibit B - Scope of Services.pdf PDF
25-Final Draft Exhibit A - Description of the Facilities.pdf PDF
4-Final Draft Contract.pdf PDF
20-Final Draft Schedule B-10 JIWRF and SSWRF Basin Cleaning List.xlsx XLSX spreadsheet
2-Final Draft Exhibit C - Standards of Performance.pdf PDF
11-Final Draft Exhibit E - Minimum Staffing Plan.pdf PDF
26-Final Draft Exhibit R - Permits.pdf PDF
3-Final Draft Exhibit I - CMMS approach.pdf PDF
21-Final Draft Exhibit Q - Information Technology Requirements.pdf PDF
16-Final Draft Price Proposal Worksheet for RFP.xlsx XLSX spreadsheet
5-Final Draft Exhibit M - Security and Emergency Events.pdf PDF
9-Final Draft Exhibit K - Letter of Credit.pdf PDF
7-Final Draft Exhibit S - Submissions.pdf PDF
24-Final Draft SCHEDULE B-1 JIWRF PM.xlsx XLSX spreadsheet
12-Final Draft Exhibit D - Fees.pdf PDF
1-Final Draft Exhibit J - Insurance.pdf PDF
27-Final Draft Schedule B-10 JIWRF Basin Cleaning Map.tif TIF image
14-Final Draft Exhibit L - Inventory.pdf PDF
17-Final Draft SCHEDULE B-2 SSWRF PM.xlsx XLSX spreadsheet
15-Final Draft RFP for Post 2027.pdf PDF
28-Final Draft Schedule B-10 SSWRF Basin Cleaning Map.tif TIF image
22-Final Draft Schedule B-4 River Skimmer PM.xlsx XLSX spreadsheet
19-Final Draft Schedule B-8 - Automatic Operation Sequence.pdf PDF
8-Final Draft Exhibit H - Water Reclamation Facilities Design Capacities.pdf PDF
6-Final Draft Exhibit G - Procurement and Corrective Maintenance Management Standards.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 3 Exhibit F - Final Draft RFP 2025

EXHIBIT F

CM AUTHORIZATION FORM

COMPANY LEVEL B CORRECTIVE MAINTENANCE REQUEST

Location (i.e. WRF/Building/Conv Site) Facility (i.e. building, equipment, vehicle or asset type and number)

Age of Facility Expected useful life of the Facility Description of the Issue Investigated by

Priority of project and reason for priority (e.g. reduced capacity, no redundancy, safety issue)

Expected scope of repairs

Summary of PM and CM history (i.e. previous issues identified and recurring issues)

Other existing issues to be addressed as part of the project (e.g. add hard facing to a screw conveyor, increase capacity of pump)

P.E. stamp needed: Yes ☐ No ☐ Unknown ☐

Expected total cost of repairs

Proposed process for completing repairs (i.e. Company staff, Contracted, Combination, Spare parts used, managed by Company, managed by District), initial cost breakdown and initial schedule.

Overtime requested by Company: Yes ☐ No ☐

Page 2 of 3 Exhibit F - Final Draft RFP 2025

MMSD AUTHORIZATION

Scope

Approved as proposed: ☐

Approved with conditions noted below: ☐ Conditions/Comments: Click or tap here to enter text.

Not Approved ☐

Proposed Implementation

Approved as proposed: ☐

Approved with conditions noted below: ☐ Conditions/Comments: Click or tap here to enter text.

Not Approved ☐

Does responsibility for payment need to be reviewed?

Yes ☐ No ☐ Reason for review

Reviewed by _________________________________ Date _____________

Approved by ________________________________ Date _____________

IF APPROVED BY THE DISTRICT AND ASSIGNED TO COMPANY

STAFF TO EXECUTE

Detailed Scope of work

For any work performed in-house, what is the expected start date

For any work advertised by the Company, what is the expected advertisement date

Page 3 of 3 Exhibit F - Final Draft RFP 2025

Expected duration of repairs, including work performed in-house, contracted work, and parts/equipment lead time

Detailed cost estimate

Final Implementation

Approved as proposed: ☐

Approved with conditions noted below: ☐

Conditions/Comments: Click or tap here to enter text.

Not Approved ☐

Maintenance Officer Signature: ________________________________________

Date:

Reviewed by:
Date:
Approved by:
Date_2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text11:
Text12:
Text13:
Check Box14: Off
Check Box15: Off
Check Box16: Off
Text10:
Text17:
Text18:
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Text23:
Check Box24: Off
Check Box25: Off
Check Box26: Off
Text27:
Check Box28: Off
Check Box29: Off
Check Box30: Off
Text31:
Text32:
Text33:
Text34:
Text35:
Check Box36: Off
Check Box37: Off
Text38:
Check Box39: Off
Text40:

File details come from the government source that posted it. Updated .