10-Final Draft Exhibit F - CM Authorization Form.pdf
PDF 292 KB Posted
- Solicitation number
- P-3216
- Issued by
- Milwaukee County, Mattoon Village, Wisconsin
About this file
Exhibit F is a Company Level B Corrective Maintenance Request Authorization Form from the Final Draft RFP 2025, designed for use by a company (likely a municipal or utility organization) and its associated district (MMSD). The form provides a structured template for documenting maintenance needs, investigations, and approvals for facility repairs or improvements. It includes sections for detailed information about the facility, the specific maintenance issue, priority level, expected scope of repairs, maintenance history, and proposed repair process.
The form requires comprehensive documentation including the facility's age, expected useful life, description of the issue, investigation details, and priority justification. It allows for multiple levels of review and authorization, with checkboxes for approving the scope, implementation, and final implementation by the maintenance officer. The form also captures critical project management details such as expected repair duration, cost estimates, potential in-house or contracted work, and advertisement dates for work. The multi-page document is designed to ensure thorough documentation, clear communication, and structured decision-making for corrective maintenance requests.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 3 Exhibit F - Final Draft RFP 2025
EXHIBIT F
CM AUTHORIZATION FORM
COMPANY LEVEL B CORRECTIVE MAINTENANCE REQUEST
Location (i.e. WRF/Building/Conv Site) Facility (i.e. building, equipment, vehicle or asset type and number)
Age of Facility Expected useful life of the Facility Description of the Issue Investigated by
Priority of project and reason for priority (e.g. reduced capacity, no redundancy, safety issue)
Expected scope of repairs
Summary of PM and CM history (i.e. previous issues identified and recurring issues)
Other existing issues to be addressed as part of the project (e.g. add hard facing to a screw conveyor, increase capacity of pump)
P.E. stamp needed: Yes ☐ No ☐ Unknown ☐
Expected total cost of repairs
Proposed process for completing repairs (i.e. Company staff, Contracted, Combination, Spare parts used, managed by Company, managed by District), initial cost breakdown and initial schedule.
Overtime requested by Company: Yes ☐ No ☐
Page 2 of 3 Exhibit F - Final Draft RFP 2025
MMSD AUTHORIZATION
Scope
Approved as proposed: ☐
Approved with conditions noted below: ☐ Conditions/Comments: Click or tap here to enter text.
Not Approved ☐
Proposed Implementation
Approved as proposed: ☐
Approved with conditions noted below: ☐ Conditions/Comments: Click or tap here to enter text.
Not Approved ☐
Does responsibility for payment need to be reviewed?
Yes ☐ No ☐ Reason for review
Reviewed by _________________________________ Date _____________
Approved by ________________________________ Date _____________
IF APPROVED BY THE DISTRICT AND ASSIGNED TO COMPANY
STAFF TO EXECUTE
Detailed Scope of work
For any work performed in-house, what is the expected start date
For any work advertised by the Company, what is the expected advertisement date
Page 3 of 3 Exhibit F - Final Draft RFP 2025
Expected duration of repairs, including work performed in-house, contracted work, and parts/equipment lead time
Detailed cost estimate
Final Implementation
Approved as proposed: ☐
Approved with conditions noted below: ☐
Conditions/Comments: Click or tap here to enter text.
Not Approved ☐
Maintenance Officer Signature: ________________________________________
Date:
| Reviewed by: |
| Date: |
| Approved by: |
| Date_2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text11: |
| Text12: |
| Text13: |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Text10: |
| Text17: |
| Text18: |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Text23: |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Text27: |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Check Box36: Off |
| Check Box37: Off |
| Text38: |
| Check Box39: Off |
| Text40: |
File details come from the government source that posted it. Updated .