11-Final Draft Exhibit E - Minimum Staffing Plan.pdf

PDF 174 KB Posted

Attached to
Operation and Maintenance of Water Reclamation Infrastructure
Solicitation number
P-3216
Issued by
Milwaukee County, Mattoon Village, Wisconsin

About this file

This document is Exhibit E - Minimum Staffing Plan from a final draft Request for Proposal (RFP) for 2025, detailing comprehensive staffing requirements for water resource facilities (WRFs). The staffing plan encompasses 237 required positions across multiple departments including Management Staff, WRF Operations Staff, Maintenance Staff for JIWRF and SSWRF facilities, Asset Management Staff, Conveyance Operations and Maintenance Staff, Fleet Maintenance Staff, Seasonal Skimmer Staff, and Workforce Development Staff. Key positions are designated as critical and cannot be vacant, with specific certification requirements for roles such as WRF Operations Managers, who must possess advanced Wisconsin Department of Natural Resources (WDNR) wastewater certifications.

The document outlines strict staffing guidelines, including provisions that no individual can hold multiple roles simultaneously (except temporarily), and that key positions must always be filled or face fee reductions. The staffing plan includes leadership roles with lead positions in various departments, such as Powerhouse Maintenance Mechanics, Machinists, and Instrument Technicians. Notably, the plan requires cross-training for positions with only one allocated staff member and mandates that staffing shortages must never cause service disruptions, with any such disruption considered a Company Event of Default subject to fee reductions. The plan also includes provisions for workforce development, with positions for operators and technicians in training, and skilled trade apprenticeships to ensure ongoing professional development and succession planning.

View the file

Other files

File Type Posted
18-Final Draft Exhibit P - Governance.pdf PDF
23-Final Draft Schedule B-3 Conveyance PM.xlsx XLSX spreadsheet
13-Final Draft Exhibit B - Scope of Services.pdf PDF
25-Final Draft Exhibit A - Description of the Facilities.pdf PDF
4-Final Draft Contract.pdf PDF
20-Final Draft Schedule B-10 JIWRF and SSWRF Basin Cleaning List.xlsx XLSX spreadsheet
2-Final Draft Exhibit C - Standards of Performance.pdf PDF
26-Final Draft Exhibit R - Permits.pdf PDF
3-Final Draft Exhibit I - CMMS approach.pdf PDF
21-Final Draft Exhibit Q - Information Technology Requirements.pdf PDF
10-Final Draft Exhibit F - CM Authorization Form.pdf PDF
16-Final Draft Price Proposal Worksheet for RFP.xlsx XLSX spreadsheet
5-Final Draft Exhibit M - Security and Emergency Events.pdf PDF
9-Final Draft Exhibit K - Letter of Credit.pdf PDF
7-Final Draft Exhibit S - Submissions.pdf PDF
24-Final Draft SCHEDULE B-1 JIWRF PM.xlsx XLSX spreadsheet
12-Final Draft Exhibit D - Fees.pdf PDF
1-Final Draft Exhibit J - Insurance.pdf PDF
27-Final Draft Schedule B-10 JIWRF Basin Cleaning Map.tif TIF image
14-Final Draft Exhibit L - Inventory.pdf PDF
17-Final Draft SCHEDULE B-2 SSWRF PM.xlsx XLSX spreadsheet
15-Final Draft RFP for Post 2027.pdf PDF
28-Final Draft Schedule B-10 SSWRF Basin Cleaning Map.tif TIF image
22-Final Draft Schedule B-4 River Skimmer PM.xlsx XLSX spreadsheet
19-Final Draft Schedule B-8 - Automatic Operation Sequence.pdf PDF
8-Final Draft Exhibit H - Water Reclamation Facilities Design Capacities.pdf PDF
6-Final Draft Exhibit G - Procurement and Corrective Maintenance Management Standards.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 5 Exhibit E - Final Draft RFP 2025

EXHIBIT E

MINIMUM STAFFING PLAN

General Provisions

A. Per Section 3.02 of the Service Agreement, a fee reduction will be taken for Required Positions that are vacant past the 90-day grace period. However, the Required Positions do not represent all positions necessary to complete the Scope of Services. Certain functions may be staffed at the Company’s discretion, including: assistant general management, human resources, accounting, general administrative support and legal services. Housekeeping may be contracted out or performed by staff outside of the Minimum Staffing Plan. In addition, there are several items in the Scope of Services that are specifically called to be contracted out, including nitrogen system inspection and maintenance, baghouse inspections, roof inspections, the stack inspection and structural inspections.

B. No fee reduction will be taken for absences protected by the Family and Medical Leave Act, the Wisconsin Family and Medical Leave Act, or Military Leave for members of the National Guard or Reserves.

C. One individual cannot hold multiple roles under the Minimum Staffing Plan, except on a temporary basis to provide coverage for vacations or illness.

D. Key Positions must have someone in the role and are not allowed to be vacant for any length of time, or a Fee Reduction will be applied. Other staff may be temporarily assigned to fill a Key Position role; however, persons in other Key Positions are not eligible. Key Positions are italicized below.

E. For positions where only one position is included in the Minimum Staffing Plan, the Company must ensure other positions are cross-trained and able to provide coverage in instances of absences, unexpected or otherwise.

F. The Company shall determine how to structure staff, shifts and working hours to provide the coverage required by the Scope of Services. Lack of staffing must never be the cause of a service disruption. A service disruption due to lack of staffing is a Company Event of Default and will subject the Company, at a minimum, to Fee Reductions as set forth in Exhibit C.

Required Positions (237) – does not include Human Resources, Finance, General Administrative Support or Legal

A. Management Staff

a. Project Manager – 1 (Key Position)

b. Safety and Security – 2 (Key Positions)

Note: one at JIWRF, one at SSWRF

c. Conveyance Manager – 1 (Key Position)

d. WRF Operations Manager – 1 (Key Position)

Minimum Certifications: Must have all five Advanced WDNR wastewater certifications – (1) Biological solids/sludge handling, processing & reuse; (2)

Page 2 of 5 Exhibit E - Final Draft RFP 2025

Biological treatment: suspended growth processes; (3) Disinfection; (4) Nutrient removal: total phosphorus; (5) Solids separation

e. Maintenance and Asset Manager (WRF) – 1 (Key Position)

f. Maintenance and Asset Manager (Conveyance) – 1 (Key Position)

g. Capital Project Coordinator – 2 (Key Positions)

Note: these positions relate to District capital projects, not for Corrective Maintenance

h. Procurement & Warehouse Management - 2

i. Technology Manager - 1

j. Public Outreach Coordinator – 1

k. Water Education Specialist - 1

B. WRF Operations Staff

a. Operating Engineer 2 - JIWRF – 4

b. Operating Engineer 4 - JIWRF – 4

Minimum Certifications: PPO1 certification required

c. Operating Engineer – Special Utility - JIWRF – 2

Minimum Certifications: PPO1 certification required

d. Treatment Plant Operator 4 - Preliminary/Purification Treatment - JIWRF – 8

e. Treatment Plant Operator-Special Utility - JIWRF – 3

f. Solids Processing Operator 3-Filters – D&D – 4

g. Solids Processing Operator 4-Filters – D&D – 4

h. Solids Processing Operator 3-Dryers – D&D – 4

i. Solids Processing Operator 4-Dryers - D&D – 4

j. Solids Processing Operator 4-Special Utility - Silo and D&D – 4

k. Silo Operator – JIWRF - 1

l. Operating Engineer 4 - SSWRF – 4

Minimum Certifications: PPO1 certification required

m. Operating Engineer - Special Utility - SSWRF – 2

Minimum Certifications: PPO1 certification required

n. Treatment Plant Operator 4 – Primary/Secondary – SSWRF - 8

o. Treatment Plant Operator – Special Utility – SSWRF - 3

p. Process Engineer – 2

q. Technology Staff – 2

Note: at least 1 of the 2 must be a Controls Engineer

r. JIWRF Operations Supervisor - 1

s. D&D Operations Manager – 1

Minimum Certifications: Must have two Advanced WDNR certifications: (1) Biological solids/sludge handling, processing & reuse; (2) Solids separation

t. JIWRF Operations Manager – 1 Minimum Certifications: Must have three Advanced WDNR certifications: (1)

Page 3 of 5 Exhibit E - Final Draft RFP 2025

Biological treatment: suspended growth processes; (2) Disinfection; (3) Nutrient removal: total phosphorus

u. SSWRF Operations Manager – 2 Minimum Certifications: One must have two Advanced WDNR certifications: (1) Biological solids/sludge handling, processing & reuse; (2) Solids separation; the other must have three Advanced WDNR certifications: (1) Biological treatment:

suspended growth processes; (2) Disinfection; (3) Nutrient removal: total phosphorus

v. WRF Shift Supervisor - 6 C. JIWRF Maintenance Staff

a. Powerhouse Maintenance Mechanic – 6 Note: 1 of the 6 is a lead

b. Powerhouse Electrician – 1

c. Powerhouse Control Technician – 3

Note: 1 of the 3 is a lead

d. Machinist – 12

Note: 1 of the 12 is a lead

e. Field Plant Maintenance Worker – 7

Note: 1 of the 7 is a lead

f. Painter – 1

g. Steamfitter – 4

Note: 1 of the 4 is a lead

h. D&D Maintenance – 7

Note: 1 of the 7 is a lead

i. Lube Specialist - 2

j. Instrument Technician – 5

Note: 1 of the 5 is a lead

k. Electrician – 5

D. SSWRF Maintenance Staff

a. Machinist – 6

Note: 1 of the 6 is a lead

b. Steamfitter – 3

Note: 1 of the 3 is a lead

c. Instrument Technician – 3

Note: 1 of the 3 is a lead

d. Electrician – 3

Note: 1 of the 3 is a lead

e. Powerhouse Maintenance Mechanic – 4

Note: 1 of the 4 is a lead

Page 4 of 5 Exhibit E - Final Draft RFP 2025

f. Field Plant Maintenance Worker – 7 Note: 1 of the 7 is a lead

g. Painter - 1 E. Asset Management Staff

a. Planner – 4

b. System Analyst (CMMS/EAMS) – 2

c. Commissioning Engineer – 1

d. Reliability Engineer - 1

e. Commissioning, CMMS and Maintenance Planning Support Specialist – 1

f. JIWRF Powerhouse Supervisor – 1

g. JIWRF Mechanical Supervisor – 1

h. JIWRF B&G Supervisor – 1

i. JIWRF Electrical Supervisor – 1

j. SSWRF Mechanical Supervisor – 1

k. SSWRF Buildings and Grounds Supervisor – 1

l. SSWRF Electrical and Instrumentation & Controls Supervisor – 1

m. Warehouse Supervisor – 1

n. Warehouse Technician – 2

o. Project Engineer – 3

p. CAD professional – 1

q. Asset Management Administrative Assistant - 1

F. Conveyance Operations and Maintenance Staff

a. Instrument Technician – 5

Note: 1 of the 5 is a lead

b. Electrician – 3

c. Machinist – 3

d. Laborer – 11

e. Console Operator – 5

Note: 1 of the 5 is a lead

f. Collection Maintenance Supervisor – 1

g. Equipment Maintenance Supervisor – 1

h. Project Engineer – 1

i. Conveyance Administrative Assistant - 1

G. Fleet Maintenance Staff

a. Mechanic Supervisor – 1

b. Auto Mechanic – 4

H. Seasonal Skimmer Staff (April-November)

a. Skimmer Captain – 1

b. Skimmer staff – 2

Page 5 of 5 Exhibit E - Final Draft RFP 2025

I. Workforce Development Staff (Full-time employees, with benefits)

a. Wastewater Operator-in-Training – 1

b. Maintenance Laborer-in-Training – 1

c. Instrument Technician-in-Training – 1

d. Skilled Trade Apprentices – 2

File details come from the government source that posted it. Updated .