22-Final Draft Schedule B-4 River Skimmer PM.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Operation and Maintenance of Water Reclamation Infrastructure
Solicitation number
P-3216
Issued by
Milwaukee County, Mattoon Village, Wisconsin

About this file

This document is an asset maintenance schedule and inventory spreadsheet for the Milwaukee Metropolitan Sewerage District (MMSD), focusing on water reclamation infrastructure equipment. The file details preventive maintenance (PM) protocols for four primary assets: two conveyor belt systems, one towable/trailer, and one river skimmer boat. The assets are categorized as active fleet and mechanical equipment, with specific maintenance tasks outlined for pre-season, mid-season, and post-season periods. The river skimmer boat (Asset ID 121,503) was originally acquired on 4/12/12 at a cost of $375,000, with an estimated useful life of 15 years, and is currently classified as a low-risk asset.

The document provides comprehensive maintenance checklists for each asset, including detailed inspection points for tires, electrical systems, hydraulic components, engines, and structural elements. The assets are valued at approximately $654,101 collectively, with replacement costs and in-service dates carefully documented. The maintenance schedule appears designed to ensure optimal operational readiness and extend the functional lifespan of critical water infrastructure equipment. The river skimmer boat and associated equipment are manufactured by Aquarius Systems from North Prairie, Wisconsin, and are integral to the district's water management operations.

View the file

Other files

File Type Posted
18-Final Draft Exhibit P - Governance.pdf PDF
23-Final Draft Schedule B-3 Conveyance PM.xlsx XLSX spreadsheet
13-Final Draft Exhibit B - Scope of Services.pdf PDF
25-Final Draft Exhibit A - Description of the Facilities.pdf PDF
4-Final Draft Contract.pdf PDF
20-Final Draft Schedule B-10 JIWRF and SSWRF Basin Cleaning List.xlsx XLSX spreadsheet
2-Final Draft Exhibit C - Standards of Performance.pdf PDF
11-Final Draft Exhibit E - Minimum Staffing Plan.pdf PDF
26-Final Draft Exhibit R - Permits.pdf PDF
3-Final Draft Exhibit I - CMMS approach.pdf PDF
21-Final Draft Exhibit Q - Information Technology Requirements.pdf PDF
10-Final Draft Exhibit F - CM Authorization Form.pdf PDF
16-Final Draft Price Proposal Worksheet for RFP.xlsx XLSX spreadsheet
5-Final Draft Exhibit M - Security and Emergency Events.pdf PDF
9-Final Draft Exhibit K - Letter of Credit.pdf PDF
7-Final Draft Exhibit S - Submissions.pdf PDF
24-Final Draft SCHEDULE B-1 JIWRF PM.xlsx XLSX spreadsheet
12-Final Draft Exhibit D - Fees.pdf PDF
1-Final Draft Exhibit J - Insurance.pdf PDF
27-Final Draft Schedule B-10 JIWRF Basin Cleaning Map.tif TIF image
14-Final Draft Exhibit L - Inventory.pdf PDF
17-Final Draft SCHEDULE B-2 SSWRF PM.xlsx XLSX spreadsheet
15-Final Draft RFP for Post 2027.pdf PDF
28-Final Draft Schedule B-10 SSWRF Basin Cleaning Map.tif TIF image
19-Final Draft Schedule B-8 - Automatic Operation Sequence.pdf PDF
8-Final Draft Exhibit H - Water Reclamation Facilities Design Capacities.pdf PDF
6-Final Draft Exhibit G - Procurement and Corrective Maintenance Management Standards.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vessel Asset Summary with PMs

ASSET CLASSASSET TYPEASSET QTYACTIVITYPM FREQUENCY
CONVEYORCONVEYOR, BELT2
CONVEYORCONVEYOR, BELTPERFORM MSA.A
CONVEYORCONVEYOR, BELTPOST-SEASON (AUTUMN)A
CONVEYORCONVEYOR, BELTCHANGE ENGINE OIL & FILTERA
CONVEYORCONVEYOR, BELTRECORD DATE & HOURSA
CONVEYORCONVEYOR, BELTREMOVE BATTERY (STORE IN BATTERY ROOM)A
CONVEYORCONVEYOR, BELTDRAIN FUEL FROM CARBURETORA
CONVEYORCONVEYOR, BELTADD FUEL STABILIZER TO FUEL TANKA
CONVEYORCONVEYOR, BELTCHANGE SPARK PLUGS (2)A
CONVEYORCONVEYOR, BELTCHECK TIRES & AIR PRESSURE IN TIRESA
CONVEYORCONVEYOR, BELTLUBE ALL BEARINGSA
CONVEYORCONVEYOR, BELTADJUST CHAINS FOR CONVEYORA
CONVEYORCONVEYOR, BELTINSPECT & REPLACE HYDRAULIC HOSES AS NEEDEDA
CONVEYORCONVEYOR, BELTCHANGE HYDRAULIC FILTER & OIL YEARLY OR AS NEEDEDA
CONVEYORCONVEYOR, BELTREPACK BEARINGS EVERY 3-4 YEARSA
TOWABLE/TRAILERTOWABLE/TRAILER1
TOWABLE/TRAILERTOWABLE/TRAILERTRAILER, SKIMMERLine 10 5RECORD DATE_________
10INSPECT TIRES FOR PROPER INFLATION, WEAR, & DAMAGE_______
15CHECK WHEEL LUGS FOR PROPER TORQUE________
20INSPECT SUSPENSION COMPONENTS: SPRINGS, SHACKLES,BUSHINGS, MOUNTS,EQUALIZER BEAMS,AND AXLES.LUBRICATE AS REQUIRED______
30CK BRAKE FLUID RESERVOIR & INSPECT SURGE COUPLER ( if applicable)________
35INSPECT BRAKES FOR PROPER ADJUSTMENT & OPERATION___________
40CHECK ALL LIGHTS, INSPECT ELEC CABLE & CONNECTION PLUG_________
45INSPECT TRAILER COUPLING FOR WEAR OR DAMAGE________
50INSPECT SAFETY CHAINS, MOUNTING & HOOKS FOR WEAR OR DAMAGE____
55INSPECT BREAKAWAY CABLE/CONNECTOR (IF APPLICABLE)________
60INSPECT TRAILER DECKING, SIDE BOARDS,AND FENDERS_________
61INSPECT RAMPS,RAMP HINGES,AND LOCKS FOR WORN,DAMAGED, OR MISSING PARTS.__________
65NOTE: FOR TRAILERS EQUIPPED WITH ELECTRIC BRAKES AND BATTERY
66OPERATED SAFETY BREAK AWAY SYSTEM.
67CLEAN AND CHARGE BATTERY______
70PERFORM OPERATIONAL TEST OF EMERGENCY BRAKING SYSTEM______ Line 20 Appearance
A
WATERCRAFTWATERCRAFT1
WATERCRAFTWATERCRAFTBOAT, RIVER SKIMMERLine 10 PRE-SEASON (SPRING)

DATE:_______ HR. ______

VALVE ADJUSTMENT ______

LUBE STEERING LINKAGE & OUTDRIVE PIVOTS______

CHARGE, TEST & INSTALL BATTERIES, ____

TEST ENGINE CONTROLS______

INSPECT AND CLEAN ENG. SEA WATER INTAKE______

INSPECT LOWER UNIT, (2)______ ______

CK ENGINE STARTING/CHARGING SYSTEMS______

CHECK/ADJUST 3 CONVEYOR CHAINS

TEST RUNNING LIGHTS & CABIN LIGHTS______

TEST RUN ENGINES (CK WATER PUMP & THERMOSTAT OPERATION)______

TEST TRIM & TILT CONTROLS______

LUBE ALL PIVOTS & PILL BLOCK BEARINGS______

POST-SEASON (AUTUMN)

DRAIN FIRE HOSE PUMP

CHANGE ENGINE OIL AND FILTER______ ______

RECORD DATE _______ HR _______

REMOVE BATTERY (STORE IN BATTERY ROOM)______

CHECK/ADJUST 3 CONVEYOR CHAINS

INSPECT PROPELLERS FOR DAMAGE______ ______

ADD FUEL STABILIZER TO BOTH FUEL TANKS______ ______

LUBE ALL PIVOTS & PILL BLOCK BEARINGS_______

INSPECT ALL ANODES & REPLACE AS NECESSARY_________

INSPECT/REPLACE SIDE THRUSTER PROPS (4) & ANODES________

REPLACE FUEL FILTERS_____

TEST ENGINE COOLANT-RECORD PROTECTION________

ADD NALCOOL AS NEEDED

INSPECT/REPLACE HYDRAULIC HOSES AS NEEDED

REPLACE HYDRAULIC FILTERS (2) & OIL

WRAP BOTH CABINS FOR POST-SEASON STORAGE4M
WATERCRAFTWATERCRAFTBOAT, RIVER SKIMMERLINE 10 MID-SEASON PM

10 COMPLETE VISUAL INSPECTION

15 CHECK INSIDE HULL FOR LEAKS OR DAMAGE

20 DRAIN WATER FROM HYDRAULIC TANK (OPEN PEPCOCK)

25 CHECK HYDRAULIC SYSTEM FOR LEAKS OR DAMAGE

30 CHECK HYDRAULIC CYLINDERS FOR HOSES, CRACKS OR DEFORMATIONS

40 CHECK HYDRAULIC FLUID LEVEL 50 CHECK RADIATOR FLUID LEVEL

55 REPLACE ALL HYDRAULIC SPIN-ON FILTERS

60 REPLACE HYDRAULIC OIL

65 CLEAN HYDRAULIC TANK MAGNET

70 MACHINE LUBRICATION (SEE MASTER LUBE CHART)

80 CHECK CONVEYOR BELTING FOR PROPER TENSION & DAMAGE

90 CHANGE ENGINE OIL AS NEEDED

100 CHECK NUTS & BOLTS FOR PROPER TENSIONING

110 CHECK MUFFLER & EXHAUST SYSTEM

120 CHECK STRUCTURAL MEMBERS & WELDS

130 CHECK BATTERIES AND STARTING SYSTEM

140 REPLACE EXTERNAL FUEL PRE-FILTER

150 REPLACE AIR FILTER

160 SERVICE PRIMARY AND SECONDARY FUEL FILTERS

170 DRAIN ENGINE BREATHER CANISTER LINE 20 APPEARANCE

A
ASSET COUNT4

Assets With PMs

AssetsClassAsset ValueAsset LifeAsset RiskRenewal StrategyOther
MMSD Asset IDAsset DescriptionAsset StatusAsset CategoryAsset ClassAsset TypeFixed Asset ClassOriginal Invoice CostOriginal Acquisition CostCurrent Year Replacement CostIn Service DateInitial Est Useful LifeLast Rehab DateRehab Useful LifeGoverning Rehab Replace YearGoverning Next Inspection Due YrsRetire DateIn Open RiskAsset Risk LevelAsset Risk ScoreGoverning LOF ScoreLOF Score DriverLOF Score MortalityLOF Score CapacityGoverning COF ScoreCOF Score DriverCOF Score CMMS CriticalityCOF Score Pipe DiameterAsset COFNext Renewal TypeNext Rehab TypeNext Renewal Cost (Current Yr $)Next Investment YearRecommended ActionBuildingField LocationPositionMunicipalityCMMS Asset IDProjectsOpen Action Status in ProjectTransmittal No.P&ID or Equipment Tag No.Unit ProcessControl LoopSerial No.ManufacturerManufacturer Model No.OWAM CommentsPrevious Asset ID
121,503BOAT, RIVER SKIMMERACTIVEFLEETWATERCRAFTWATERCRAFT187 - TRANSPORTATION$375,000.00$546,747.424/12/12152/28/22102,025NLow105MortalityFAILURE RATE2CMMS Criticality2#BLDG10210200000E-00053973MCRR1505,P.O.6403,MCRR1505a,MCRR1505b,MCRR1679Y2523UU172, ENGINE SN 68325852AQUARIUS SYSTEMS NORTH PRAIRIE, WITH-28SPL TRASH HUNTER

DW 4/28/17

143,866 TRAILER, SKIMMER ACTIVE FLEET TOWABLE/TRAILER TOWABLE/TRAILER 187 - TRANSPORTATION 15 N 2 CMMS Criticality 2 # BLDG285 28500000 E-00057888 N 1D9T3L033WN202176 A FL WC 143866 TMINZLAFF 4/15/25 7:43 11/28/16 9:27 SYNERGEN UPDATED CATEGORY, CLASS, AND/OR TYPE

DW 5/22/17

121,504 CONVEYOR, OFF-LOADING, RIVER SKIMMER ACTIVE MECHANICAL CONVEYOR CONVEYOR, BELT 185 - MACHINERY & EQUPMENT $95,000.00 $138,509.35 4/12/12 20 2,032 N 2 CMMS Criticality 2 # BLDG102 10200000 E-00053974 P.O.6403 N UU174 AQUARIUS SYSTEMS NORTH PRAIRIE, WI PIER CONVEYOR A FL WC 121504 TMINZLAFF 8/23/23 13:40 UPDATED CLASS CATEGORY AND/OR TYPE

DW 4/28/17

152,875 CONVEYOR, OFF-LOADING, RIVER SKIMMER ACTIVE MECHANICAL CONVEYOR CONVEYOR, BELT 185 - MACHINERY & EQUPMENT $143,500.00 $169,844.63 7/8/20 20 2,040 N 2 CMMS Criticality 2 # BLDG102 10200000 E-00061603 M01038/PO 11150 N PO# 11150 AQUARIUS SYSTEMS NORTH PRAIRIE, WI MSC-34 Pier Conveyor A FL WC 152875 TMINZLAFF 8/23/23 13:47 4/26/21 17:27 TMINZLAFF

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .