Summary: SECTION 23 31 13.00 40 METAL DUCTS – TAFB Technical Specifications
This document is a technical specification for metal ductwork systems at Tinker Air Force Base, Oklahoma, effective April 2019. The specification establishes requirements for low-pressure and high-velocity/high-pressure ductwork systems, including components such as fittings, dampers, louvers, and duct smoke detectors. Low-pressure systems are defined as those with maximum air velocity of 2,000 feet per minute (fpm) and static pressure of 2 inches water gage (wg). High-velocity systems encompass those exceeding 2,000 fpm or 2-inches wg pressure, with medium pressure ranging from over 2-inches wg through 6-inches wg positive, and high pressure from over 6-inches wg through 10-inches wg positive. The specification prohibits rigid fiberglass ductwork in high-velocity applications.
Materials must include hot-dip galvanized carbon steel conforming to ASTM A653/A653M Designation G90, with minimum sheet metal thicknesses specified based on duct width. All components—round sheet metal duct fittings, high-pressure double-wall ducts, turning vanes, manual volume dampers, gravity backdraft and relief dampers, and fire dampers—must meet referenced ASHRAE, SMACNA, UL, and NFPA standards. Louver basis of design is the Ruskin model ELF6375DXH extruded aluminum with minimum 57% free area. Installation requirements mandate airtight construction with reinforcements, bracing, proper jointing using elastomer compounds, and flanged connections with chloroprene gaskets. Duct supports must be installed with 20-to-1 safety factors, maximum 10-foot spans, and vibration isolation for discharge ducting extending 50 feet beyond the air handling unit. Submittals requiring government approval ("G" designation) include connection diagrams, product data, design calculations, leakage tests, and operation and maintenance manuals for medium and high-pressure systems.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB, OK TAFB Technical Specifications 2019
April 2019 Page 1 SECTION 23 31 13.00 40
SECTION 23 31 13.00 40
METAL DUCTS
PART 1 GENERAL
Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS apply to work specified in this section.
Section 23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT applies to work in this section.
Section 40 17 30.00 40 WELDING GENERAL PIPING applies to work specified in this section.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2011) Steel Construction Manual
AISC 360 (2010) Specification for Structural Steel Buildings
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE EQUIP IP HDBK (2012) Handbook, HVAC Systems and Equipment (IP Edition)
ASHRAE EQUIP SI HDBK (2012) Handbook, HVAC Systems and Equipment (SI Edition)
ASHRAE FUN IP (2013; Addenda and Corrigendum 2013) Fundamentals Handbook, I-P Edition
ASHRAE FUN SI (2013; Addenda and Corrigendum 2013) Fundamentals Handbook, SI Edition
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2011; Amendment 2012) Specification for Filler Metals for Brazing and Braze Welding
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
April 2019 Page 2 SECTION 23 31 13.00 40
ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A924/A924M (2016a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM C1071 (2016) Standard Specification for Fibrous Glass Duct Lining Insulation (Thermal and Sound Absorbing Material)
ASTM D257 (2014) Standard Test Methods for D-C Resistance or Conductance of Insulating Materials
ASTM E90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 90A (2015) Standard for the Installation of Air Conditioning and Ventilating Systems
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1966 (2005) HVAC Duct Construction Standards Metal and Flexible, 3rd Edition
SMACNA 1987 (2006) HVAC Duct Systems Inspection Guide, 3rd Edition
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Painting Manual (2002) Good Painting Practice, Steel Structures Painting Manual, Volume 1
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE AMS 2480 (2009; Rev H) Phosphate Treatment, Paint, Base
UNDERWRITERS LABORATORIES (UL)
UL 181 (2013) Factory-Made Air Ducts and Air Connectors
UL 555 (2006; Reprint Aug 2016) UL Standard for Safety Fire Dampers
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are For Contractor Quality Control and for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the
April 2019 Page 3 SECTION 23 31 13.00 40
Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Material, Equipment, and Fixture Lists; G
Records of Existing Conditions; G
SD-02 Shop Drawings
Connection Diagrams; G
Offset Fitting Configurations; G
SD-03 Product Data
Equipment and Performance Data
Galvanized Steel Ductwork Materials; G
Brazing Materials
Mill-Rolled Reinforcing and Supporting Materials
Round Sheet Metal Duct Fittings; G
Round, High-Pressure, Double-Wall Sheet Metal Ducts; G
Turning Vanes; G
Sound Traps; G
Flexible Connectors; G
Flexible Duct Materials
Power Operated Dampers; G
Fire Dampers and Wall Collars; G
Gravity Backdraft and Relief Dampers; G
Manual Volume Dampers; G
SD-05 Design Data
Design Analysis and Calculations; G
SD-06 Test Reports
Ductwork Leakage Tests; G
Operational Tests; G
SD-07 Certificates
April 2019 Page 4 SECTION 23 31 13.00 40
Listing of Product Installations
Galvanized Steel Ductwork Materials
Brazing Materials
Mill-Rolled Reinforcing and Supporting Materials
Round Sheet Metal Duct Fittings
Round, High-Pressure, Double-Wall Sheet Metal Ducts
Turning Vanes
Dampers
Sound Traps
Flexible Connectors
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
Power Operated Dampers; G
Fire Dampers and Wall Collars; G
SD-11 Closeout Submittals
Record Drawings; G
1.3 QUALITY CONTROL
When furnishing the listing of product installations for medium and high pressure ductwork systems include identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years. Include purchaser, address of installation, service organization, and date of installation.
PART 2 PRODUCTS
Include the manufacturer's style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site information within material, equipment, and fixture lists.
2.1 SYSTEM DESCRIPTION
Provide low-pressure systems ductwork and plenums where maximum air velocity is 2,000-feet per minute(fpm) and maximum static pressure is 2-inches water gage (wg), positive or negative.
Submit connection diagrams for low pressure ductwork systems indicating the relation and connection of devices and apparatus by showing the general physical layout of all controls, the interconnection of one system (or portion of system) with another, and internal tubing, wiring, and other devices.
High velocity systems ductwork encompass systems where:
April 2019 Page 5 SECTION 23 31 13.00 40
a. Minimum air velocity exceeds 2,000-feet per minute (fpm) or static pressure exceeds 2-inches water gage (wg).
b. Medium static pressure ranges from over 2-inches wg through 3-inches wg, positive or negative, or over 3-inches wg through 6-inches wg positive.
c. High static pressure ranges from over 6-inches wg through 10-inches wg, positive.
d. Do not use rigid fibrous-glass ductwork.
2.1.1 Design Requirements
Submit records of existing conditions including the results of a survey consisting of work area conditions, and features of existing structures and facilities within and adjacent to the jobsite.
Submit equipment and performance data for medium and high pressure ductwork systems consisting of use life, system functional flows, safety features, and mechanical automated details. Submit test response and performance characteristics curves for certified equipment.
Submit design analysis and calculations for ductwork systems indicating the manufacturer's recommended air velocities, maximum static pressure, and temperature calculations.
2.2 COMPONENTS
2.2.1 Round Sheet Metal Duct Fittings
Submit offset fitting configurations for approval. Shop fabricate fittings.
2.2.1.1 Fittings Construction
Manufacture as separate fittings, not as tap collars welded or brazed into duct sections.
Provide two-piece type miter elbows for angles less than 31 degrees, three-piece type for angles 31 through 60 degrees, and five-piece type for angles 61 through 90 degrees. Ensure centerline radius of elbows is 1-1/2 times fitting cross section diameter.
Provide conical type crosses, increasers, reducers, reducing tees, and 90-degree tees.
Ensure cutouts in fitting body are equal to branch tap dimension or, where smaller, excess material is flared and rolled into smooth radius nozzle configuration.
2.2.2 Round, High-Pressure, Double-Wall Sheet Metal Ducts
Shop fabricate ducts and fittings.
Construction comprises of an airtight, vapor barrier, outer pressure shell, a 1 inch insulation layer, and a metal inner liner that completely covers the insulation throughout the system.
April 2019 Page 6 SECTION 23 31 13.00 40
Provide insulation conforming to NFPA 90A and ASTM C1071 for thermal conductivity in accordance with ASTM D257.
2.2.3 Reinforcement
Support inner liners of both duct and fittings by metal spacers welded in position to maintain spacing and concentricity.
2.2.4 Fittings
Make divided flow fittings as separate fittings, not tap collars into duct sections, with the following construction requirements:
a. Sound, airtight, continuous welds at intersection of fitting body and tap
b. Tap liner securely welded to inner liner, with weld spacing not to exceed 3-inches.
c. Pack insulation around the branch tap area for complete cavity filling.
d. Carefully fit branch connection to cutout openings in inner liner without spaces for air erosion of insulation and without sharp projections that cause noise and airflow disturbance.
Continuously braze seams in the pressure shell of fittings. Protect galvanized areas that have been damaged by welding with manufacturer's standard corrosion-resistant coating.
Construct two-piece type elbows for angles through 35 degrees, three-piece type for angles 36 through 71 degrees, and five-piece type for angles 72 through 90 degrees.
Provide conical type crosses, increasers, reducers, reducing tees, and 90-degree tees.
2.2.5 Turning Vanes
Provide double-wall type turning vanes, commercially manufactured for high-velocity system service.
2.2.6 Dampers
Construct low pressure drop, high-velocity manual volume dampers, and high-velocity fire dampers in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966.
2.2.7 Sound Traps
Provide sound traps.
Ensure the pressure drop at the rated flow does not exceed ratings in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966 or design criteria.
Ensure the sound trap is airtight when operating under an internal pressure of 0.37 pounds per square inch. Provide an air-side surface capable of withstanding air velocities of 10,000-feet per minute without any particulate matter leaving the trap and being carried downstream.
April 2019 Page 7 SECTION 23 31 13.00 40
2.2.7.1 Attenuation
Factory fabricate sound traps. Confirm cataloged acoustic attenuation made by an independent laboratory in accordance with ASTM E90. Confirm pressure drop measurements in accordance with ASHRAE EQUIP IP HDBK, Chapter 18. For noise-reduction data, include effects of flanking paths and vibration transmission. Conduct tests with standard metal inlet and outlet connections under indicated capacity flow.
Ensure attenuation is in accordance with ASHRAE FUN IP. Include a graphic system noise spectrum certification indicating proposed fan sound power level. Attenuation of ducting system proposed for installation is based on ASHRAE FUN IP for bends, branches, and other duct system construction noise criteria curve.
Reduce fan-rated sound-power level to not less than 65 decibels in the 250-hertz third octave band when measured at the sound trap discharge end.
2.2.7.2 Construction of Sound Traps
Provide double-metal walled, sound traps. Provide mill-galvanized sheet metal steel with commercial weight of zinc, conforming to ASTM A653/A653M.
Exterior metal acts as a vapor barrier. Metal thickness is not less than that required for the pressure service, in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966, but not less than 22-gage. Cover absorbing material, on the sound-impinging side, with formed perforated mill-galvanized steel of not less than 24-gage. Ensure all exterior sheet joints are continuously welded, or construct with locksets filled with chloroprene mastic prior to forming.
Spot weld interior surfaces not more than 3-inches on center. Ensure all connections to duct transitions are flanged with through-bolted 1/8-inch by 1-inch continuous rubber gasketing. Provide vibration isolated trapeze type supports.
Provide fibrous glass absorption material. Ensure surfaces exposed to airstream are chloroprene coated or protected with woven fibrous-glass cloth conforming to ASTM C1071. Ensure the total compressed thickness gives the required attenuation, and thermal insulation to preclude condensation on exterior surface under normal operating conditions.
Compressed material density is approximately 4.5 pounds per cubic foot.
Select materials conforming to fire hazard requirements of NFPA 90A.
2.2.8 Flexible Connectors for Sheet Metal
Use UL listed connectors, 30-ounce per square yard, waterproof, fire-retardant, airtight, woven fibrous-glass cloth, double coated with chloroprene. Clear width, not including clamping section, is 6 to 8-inches.
2.2.9 Duct Hangers
For duct hangers in contact with galvanized duct surfaces, provide galvanized steel painted with inorganic zinc.
2.2.10 Mill-Rolled Reinforcing and Supporting Materials
Provide mill-rolled structural steel conforming to ASTM A36/A36M.
April 2019 Page 8 SECTION 23 31 13.00 40
Whenever in contact with sheet metal ducting, provide galvanized steel in accordance with ASTM A123/A123M.
In lieu of mill-rolled structural steel, submit equivalent strength, proprietary-design, rolled-steel structural support systems for approval.
2.2.11 Flexible Duct Materials
Ensure flexible duct connectors comply with NFPA 90A, and conform with UL 181, Class 1 material.
2.2.12 Manual Volume Dampers
Conform to SMACNA 1966 for volume damper construction.
Equip dampers with an indicating quadrant regulator with a locking feature externally located and easily accessible for adjustment and standoff brackets to allow mounting outside external insulation. Where damper rod lengths exceed 30-inches, provide a regulator at each end of damper shaft.
2.2.12.1 Damper Construction
Provide all damper shafts with two-end bearings.
Ensure splitter damper is 22 -gage sheet metal. Hinges are 1/8-inch thick door type.
Provide a full length damper shaft and extend it beyond the damper blade.
use a 3/8 -inch square shaft for damper lengths up to 20 -inches and a 1/2 -inch square shaft for damper lengths 20 -inches and larger. Where necessary to prevent damper vibration or slippage, provide adjustable support rods with locking provisions external to duct at damper blade end.
Provide dampers in ducts having a width perpendicular to the axis of the damper that is greater than 12 -inches of multiblade type having a substantial frame with blades fabricated of 16 -gage metal. Provide blades not exceeding 10 -inches in width and 48 -inches in length, welded to 1/2 -inch diameter shafts. Ensure dampers greater than 48 -inches in width are made in two or more sections with intermediate mullions, each section being mechanically interlocked with the adjoining section or sections. Provide blades with graphite-impregnated nylon bearings and connect so that adjoining blades rotate in opposite directions.
2.2.13 Gravity Backdraft and Relief Dampers
Construct frames of not less than 1-1/2- by 4-inch reinforced 16-gage galvanized carbon steel. Solidly secure frames and mullions in place and seal with elastomer caulking against air bypass.
Provide shaft bearings with graphite-impregnated nylon .
Equip counterbalanced dampers with fixed or adjustable counterbalancing weights.
Gravity backdraft dampers may be equipment manufacturer's standard construction in sizes 18 by 18 -inch or smaller, when furnished integral with air moving equipment.
April 2019 Page 9 SECTION 23 31 13.00 40
2.2.13.1 Blade Construction
Maximum blade width is 9 inches, and maximum blade length is 36 -inches.
Blade material is 16-gage galvanized steel . Provide blades with mechanically retained seals and 90-degree limit stops.
Blades linked together for relief service dampers are to open not less than 30 degrees on 0.05-inch wg differential pressure.
2.2.14 Power-Operated Dampers
Ensure dampers conform to applicable requirements specified under Section
23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC.
2.2.15 Fire Dampers and Wall Collars
Ensure fire damper locations are in accordance with NFPA 90A.
Provide fire dampers in ductwork at firewall barriers.
Construct and label fire dampers in accordance with UL 555 to provide damper and mounting fire-resistance that equals or exceeds fire-resistance of the construction in which installed. For link loads in excess of 20 pounds , provide UL-approved quartzoid links.
Construct wall collars in accordance with UL 555.
2.3 MATERIALS
2.3.1 Galvanized Steel Ductwork Materials
Provide hot-dip galvanized carbon steel ductwork sheet metal of lock-forming quality, with regular spangle-type zinc coating, conforming to ASTM A924/A924M and ASTM A653/A653M, Designation G90. Treat duct surfaces to be painted by annealing.
Conform to ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966 for sheet metal gages and reinforcement thickness.
Low pressure ductwork minimum thicknesses are:
MINIMUM SHEET METAL THICKNESS
DUCT WIDTH
INCHES
GAGE
0-12 26
13-30 24
31-60 22
2.3.2 Brazing Materials
Provide silicon bronze brazing materials conforming to AWS A5.8/A5.8M.
2.3.3 Mill-Rolled Reinforcing and Supporting Materials
Conform to ASTM A36/A36M for mill-rolled structural steel. Wherever in contact with sheet metal ducting, galvanize to conforming with
ASTM A123/A123M .
April 2019 Page 10 SECTION 23 31 13.00 40
In lieu of mill-rolled structural steel, submit for approval, equivalent strength, proprietary design, rolled-steel structural support systems.
2.4 LOUVERS
2.4.1 Furnish and install louvers as hereinafter specified where shown on plans or as described in schedules. Louvers shall be stationary drainable type with drain gutters in each blade and downspouts in jambs and mullions. Louvers shall have a minimum of 57% free area based on a 48” wide x 48” high (1219 x 1219) size. Stationary drainable blades shall be contained within a 6” (152) frame. Louver components (heads, jambs, sills, blades, & mullions) shall be factory assembled by the louver manufacturer. Louver sizes too large for shipping shall be built up by the contractor from factory assembled louver sections to provide overall sizes required. Louver design shall limit span between visible mullions to 10 feet (3) and shall incorporate structural supports required to withstand a windload of 30 lbs. per sq. ft. (1.44KPa) (equivalent of a 110 mph wind [177 KPH] wind–specifier may substitute any loading required).
Louvers basis of design shall be Ruskin model ELF6375DXH extruded 6063T6 aluminum construction as follows:
Frame: 6” deep ELF6375DXH – 0.125” wall thickness Blades: ELF6375DXH - .125” (3.2) nominal wall thickness. Drainable blades are positioned at 37 1/2° angle and spaced approximately 5 29/32”
(150) center to center.
Screen: 3/4” x .051” (19 x 1.3) expanded, flattened aluminum in removable frame.
Finish: Government architect to select finish specification from Ruskin Finishes Brochure.
Published louver performance data bearing the AMCA Certified Ratings Seal for Air Performance & Water Penetration must be submitted for approval prior to fabrication and must demonstrate pressure drop and water penetration equal to or less than the Ruskin model specified.
2.5 DUCT SMOKE DETECTORS
2.5.1 Provide ionization type duct smoke detector in the supply air duct of all units with greater than 2,000 CFM airflow. Units with greater than 15,000 CFM shall have detectors in the supply and return air ducts. Detectors shall be installed IAW NFPA 90A. Smoke detectors shall be wired to de-energize the respective unit dans upon sensing products of combustion.
PART 3 EXECUTION
3.1 PREPARATION
For sheet metal surfaces to be painted, and surfaces to which adhesives are to be applied, clean surface of oil, grease, and deleterious substances.
Ensure strength is adequate to prevent failure under service pressure or vacuum created by fast closure of duct devices. Provide leaktight, automatic relief devices.
3.1.1 Construction Standards
April 2019 Page 11 SECTION 23 31 13.00 40
Provide sheet metal construction in accordance with the recommendations for best practices in ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32, SMACNA 1966, and NFPA 90A.
Design and fabricate supplementary steel in accordance with AISC 360 and
AISC 325.
Where construction methods for certain items are not described in the referenced standards or herein, perform the work in accordance with recommendations for best practice defined in ASHRAE EQUIP IP HDBK.
3.2 INSTALLATION
Fabricate an airtight system. Include reinforcements, bracing, supports, framing, gasketing, sealing, and fastening to provide rigid construction and freedom from vibration, airflow-induced motion and noise, and excessive deflection at specified maximum system air pressure and velocity.
Provide offsets and transformations as required to avoid interference with the building construction, piping, or equipment.
Make plenum anchorage provisions, sheet metal joints, and other areas airtight and watertight by caulking, mating galvanized steel and concrete surfaces with a two-component elastomer.
3.2.1 Jointing
Enclose dampers located behind architectural intake or exhaust louvers by a rigid sheet metal collar and sealed to building construction with elastomers for complete air tightness.
Provide outside air-intake ducts and plenums made from sheet metal with soldered watertight joints.
3.2.2 Ducts
Wherever ducts pass through firewalls or through walls or floors dividing conditioned spaces from unconditioned spaces, provide a flanged segment in that surface during surface construction.
Where interiors of ducting may be viewed through air diffusion devices, April 2019 Page 12 SECTION 23 31 13.00 40 construct the viewed interior with sheet metal and paint flat black.
3.2.2.1 Ductwork Cleaning Provisions
Protect open ducting from construction dust and debris in a manner approved by the Contracting Officer. Clean dirty assembled ducting by subjecting all main and branch interior surfaces to airstreams moving at velocities two times specified working velocities, at static pressures within maximum ratings. This may be accomplished by: filter-equipped portable blowers which remain the Contractor's property; wheel-mounted, compressed-air operated perimeter lances which direct the compressed air and which are pulled in the direction of normal airflow; or other means approved by the Contracting Officer. Use water- and oil- free compressed air for cleaning ducting. After construction is complete, and prior to acceptance of the work, remove construction dust and debris from exterior surfaces. Clean in conformance with SMACNA 1987.
3.3 APPLICATION
3.3.1 Low Pressure Sheet Metal Ducts
Weld angle iron frames at corners and ends, whenever possible. Rivet or weld angle iron reinforcements to ducts not more than 6-inches on center, with not less than two points of attachment. Spot welding, where used, is 3-inches on center.
Seal standard seam joints with an elastomer compound to comply with SMACNA 1966 Seal Class A, B or C as applicable.
Limit crossbreaking to 4-feet and provide on all ducts 8-inches wide and wider. Provide bead reinforcement in lieu of crossbreaking where panel popping may occur. Where rigid insulation is applied, crossbreaking is not required.
3.3.1.1 Longitudinal Duct Seams
Provide Pittsburgh lock corner seams.
3.3.1.2 Joints and Gaskets
Bolt companion angle flanges together with 1/4 -inch diameter bolts and nuts spaced 6 -inches on center. Gasket flanged joints with chloroprene full-face gaskets 1/8 -inch thick, with Shore A 40 durometer hardness.
Use one piece gaskets, vulcanized at joints.
3.3.1.3 Flexible Duct Joints
Between flexible duct without sheet metal collars and round metal ductwork connections make joints by trimming the ends, coating the inside of the flexible duct for a distance equal to depth of insertion with elastomer caulk, and by securing with sheet metal screws or binding with a strap clamp.
3.3.1.4 Square Elbows
Provide single-vane duct turns in accordance with SMACNA 1966, use on ducts 12 inches in width and narrower.
April 2019 Page 13 SECTION 23 31 13.00 40
3.3.1.5 Radius Elbows
Conform to SMACNA 1966 for radius elbows. Provide an inside radius equal to the width of the duct. Where installation conditions preclude use of standard elbows, the inside radius may be reduced to a minimum of 0.25 times duct width. Install turning vanes in accordance with the following schedule.
RADIUS OF TURNING VANES IN PERCENT OF DUCT WIDTH
WIDTH OF ELBOWS
INCHES
VANE NO. 1 VANE NO. 2 VANE NO. 3
Up to 16 56 -- --
17 to 48 43 73 --
49 and over 37 55 83
Where two elbows are placed together in the same plane for ducts 30-inches wide and larger, continue the guide vanes through both elbows rather than spaced in accordance with above schedule.
3.3.1.6 Outlets, Inlets, and Duct Branches
Install branches, inlets, and outlets so that air turbulence is reduced to a minimum and air volume properly apportioned. Install adjustable splitter dampers at all supply junctions to permit adjustment of the amount of air entering the branch. Wherever an air-diffusion device is shown as being installed on the side, top, or bottom of a duct, and whenever a branch take-off is not of the splitter type; provide a commercially manufactured 45 degree side-take-off (STO) fitting with manual volume damper to allow adjustment of the air quantity and to provide an even flow of air across the device or duct it services.
Where a duct branch is to handle more than 25 percent of the air handled by the duct main, use a complete 90-degree increasing elbow with an inside radius of 0.75 times branch duct width. Size of the leading end of the increasing elbow within the main duct with the same ratio to the main duct size as the ratio of the related air quantities handled.
Where a duct branch is to handle 25 percent or less of the air handled by the duct main, construct the branch connection with a 45 degree side take-off entry in accordance with SMACNA 1966.
3.3.1.7 Duct Transitions
Where the shape of a duct changes, ensure the angle of the side of the transition piece does not exceed 15 degrees from the straight run of duct connected thereto.
Where equipment is installed in ductwork, ensure the angle of the side of the transition piece from the straight run of duct connected thereto does not exceed 15 degrees on the upstream side of the equipment and 22-1/2 degrees on the downstream side of the equipment.
3.3.1.8 Branch Connections
Construct radius tap-ins in accordance with SMACNA 1966.
April 2019 Page 14 SECTION 23 31 13.00 40
3.3.1.9 Access Openings
Construct access door in accordance with SMACNA 1966, except that sliding doors may be used only for special conditions upon prior approval.
Provide double-panel type doors.
Install access doors and panels in ductwork upstream and downstream from coils adjacent to fire dampers at controls or at any item requiring periodic inspection, adjustment, maintenance, or cleaning , and every 20-feet for indoor air quality housekeeping purposes.
Minimum access opening size is 12 by 18 -inches, unless precluded by duct dimensions or otherwise indicated.
Make airtight access doors that leak by adding or replacing hinges and latches or by construction of new doors adequately reinforced, hinged, and latched.
3.3.1.10 Duct Access for Cleaning
Make duct access particularly suitable for commercial duct cleaning methods utilizing vacuum devices. Space access openings with a frequency and at points that permits ready access to duct internals with essentially no duct or insulation cutting. Where access through an air-diffusion device or through access doors specified herein is not available at a specific point, provide 8 -inch diameter, 16 -gage access plates not more than 10 -feet on center. Where duct is insulated and vapor-sealed, provide mastic seals around circumference of access. When access plate is in place and insulated, externally identify the location.
3.3.1.11 Plenum Construction
Provide intake and discharge plenum companion angle joints with the following minimum thickness of materials:
LONGEST ANGLES
SIDE
INCHES
SHEET METAL
USS GAGE
ALL SIDES
COMPANION ANGLES
INCHES
REINFORCEMENT
24 INCHES ON
CENTER MAXIMUM
To 48 20 1-1/2 by 1-1/2 by 1/8
1-1/2 by 1-1/2 by 1/8
49 to 84 18 2 by 2 by 1/8 2 by 2 by 3/16
85 to 120 16 2 by 2 by 1/8 2 by 2 by 1/8
121 and larger 14 2 by 2 by 3/16 2 by 2 by 3/16
At the floor line and other points where plenums join masonry construction, bolt panels 12 -inches on center to 2- by 2- by 3/16 -inch thick hot-dip galvanized steel angle that has been secured to the masonry with masonry anchors and bolts 24-inches on center and caulked tight to the masonry.
Anchor panels to curbing with hot-dip galvanized steel angle iron of a size not less than 2- by 2- by 3/16 -inch thick. Concrete curbing includes angle iron nosing with welded studs for the anchoring of panels.
Level nosing at curb height within plus or minus 1/16 -inch.
April 2019 Page 15 SECTION 23 31 13.00 40
Weld and grind miter corners for angle iron and channel iron.
3.3.1.12 Plenum Door Construction
Construct plenum access doors in accordance with SMACNA 1966 except that access doors smaller than man-access doors have door openings framed with angle iron that is one commercial size smaller than the specified panel reinforcement.
Ensure man-access door size conforms to SMACNA 1966 and paragraph ACCESS OPENINGS. Insulated and uninsulated construction is per SMACNA 1966.
Frame door openings with channel iron. Frame doors with angle iron.
Size channel iron and angle iron approximately the same size as specified panel reinforcement. Provide exterior door skin 16 gage. Fabricate latches from steel with hinges at least 4 -inches long, and bolts at least 3/8 -inch diameter.
3.3.1.13 Manual Volume Dampers
Provide balancing dampers of the splitter, butterfly, or multilouver type, to balance each respective main and branch duct.
For dampers regulated through ceilings provide a regulator concealed in a box mounted in the ceiling, with a cover finish aesthetically compatible with ceiling surface. Where ceiling is of removable construction, set regulators above the ceiling, and mark the location on ceiling in a manner acceptable to the Contracting Officer.
3.3.1.14 Flexible Connectors for Sheet Metal
Connect air handling equipment, ducts crossing building expansion joints, and fan inlets and outlets to upstream and downstream components by treated woven-cloth connectors.
Install connectors only after system fans are operative, and vibration isolation mountings have been adjusted. When system fans are operating, ensure connectors are free of wrinkles caused by misalignment or fan reaction. Width of surface is curvilinear.
3.3.2 Rectangular Sheet Metal Ducts
3.3.2.1 Medium-Pressure Gages, Joints, and Reinforcement
Ensure minimum sheet metal gages, joints, and reinforcements between joints are in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966.
Ensure sheet metal minimum thickness, transverse reinforcement between joints, and joints of ducts are in accordance with the following:
April 2019 Page 16 SECTION 23 31 13.00 40
LONGEST
(INCHES)
SHEET
METAL
GAGE
ALL SIDES
COMPANION ANGLE
(INCHES)
REINFORCEMENT ANGLES
24 INCHES ON
CENTER MAXIMUM
(BACK TO BACK)
97 to 108 16 2 by 2 by 1/8, two tie rods along angle
Two 2 by 2 by 1/8, two tie rods along angle
109 to 132 16 2 by 2 by 3/16, two tie rods along angle
Two 2 by 2 by 3/16, two tie rods along angle
133 and longer 14 2 by 2 by 3/16, with tie rods every 48 inches
Two 2 by 2 by 3/16, with tie rods every 48 inches
3.3.2.2 Medium- And High-Pressure Branches, Inlets, Outlets
Install branches, inlets, and outlets to minimize air turbulence and to ensure proper airflow.
Install dampers so that the amount of air entering duct mains is adjustable.
Provide commercially manufactured air extractors to allow adjustment of the air quantity and to provide an even flow of air across the device or duct served.
3.3.2.3 Duct Branch Transition
Where a duct branch handles over 25 percent of the air transported by the duct main, use a complete 90-degree increasing elbow, with an inside radius of 0.75 times duct branch width. Ensure the size of the trailing end of the increasing elbow within the main duct has the same ratio to the main duct size as the ratio of the relative air quantities handled.
Where a duct branch is to handle 25 percent or less of the air handled by the duct main, provide a branch connection with an inside radius of 0.75 times branch duct width, a minimum arc length of 45 degrees, and an outside radius of 1.75 times duct branch width. Place arc tangent to duct main.
3.3.2.4 High-Pressure Gages, Joints, and Reinforcement
Ensure sheet metal minimum thickness, joints, and reinforcement between joints are in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966.
Use the following types of ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966 joints and seams:
Transverse Joints:
a. Welded flange joint with angle
b. Companion angle flanged joint
Longitudinal Seams:
April 2019 Page 17 SECTION 23 31 13.00 40
a. Approved lock seams, back brazed, or continuously brazed seams for ducts with largest dimension up to 72-inches
b. Continuously welded or brazed seams for ducts with largest dimension greater than 72-inches
Sheet metal minimum thickness, transverse reinforcement between joints, and companion angle joints of ducts with longest side greater than 96 inches are in accordance with the following:
LONGEST
(inches)
SHEET METAL
GAGE
ALL SIDES
COMPANION ANGLE
(inches)
REINFORCEMENT ANGLES
24 INCHES ON
CENTER MAXIMUM
(BACK TO BACK)
97 to 108 16 2 by 2 by 1/8, two tie rods along angle
*Two 2 by 2 by 1/8, two tie rods along angle
109 to 132 16 2 by 2 by 3/16, two tie rods along angle
*Two 2 by 2 by 3/16, two tie rods along angle
133 and longer 14 2-1/2 by 2-1/2 by 3/16, with tie rods every 24 inches
*Two 2-1/2 by 2-1/2 by 3/16, with tie rods every 24 inches
3.3.3 Round Sheet Metal Ducts
3.3.3.1 Duct Gages and Reinforcement
Sheet metal minimum thickness, joints, and reinforcement between joints shall be in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966.
Provide ducts with supplemental girth angle supports, riveted with solid rivets 6 inches on center to duct. Locate girth angles as follows:
DIAMETER, INCHES REINFORCEMENT-MAXIMUM SPACING
INCHES
25 to 36 1-1/4 by 1-1/4, 1/8 thick, 72 inches on center
37 to 50 1-1/4 by 1-1/4, 1/8 thick, 60 inches on center
51 to 60 1-1/2 by 1-1/2, 1/8 thick, 48 inches on center
Use hex-shaped bolt heads and nuts, 5/16-inch diameter for ducts up to 50-inch diameter, and 3/8-inch diameter for 51-inch diameter ducts and larger.
Continuously weld flanges to duct on outside of duct and intermittently welded with 1-inch welds every 4-inches on inside joint face. Remove
April 2019 Page 18 SECTION 23 31 13.00 40 excess filler metal from inside face. Protect galvanized areas that have been damaged by welding with manufacturer's standard corrosion-resistant coating.
3.3.3.2 Duct Joints
Provide duct joints manufactured by machine, with spiral locksets up to and including 60-inch diameters, and to dimensional tolerances compatible with fittings provided. Draw-band girth joints are not acceptable.
Prepare slip joints by coating the male fitting with elastomer sealing materials, exercising care to prevent mastic from entering fitting bore.
Leave only a thin annular mastic line exposed internally. Use sheet metal screws to make assembly rigid, not less than four screws per joint, maximum spacing 6-inches. Do not use pop rivets. Tape and heat seal all joints.
3.3.3.3 Duct Transitions
Where the shape of a duct changes, ensure the angle of the side of the transition piece does not exceed 15 degrees from the straight run of duct connected thereto.
Where equipment is installed in ductwork, ensure the angle of the side of the transition piece from the straight run of duct connected thereto does not exceed 15 degrees on the upstream side of the equipment and 22-1/2 degrees on the downstream side of the equipment.
3.3.4 Round, High Pressure, Sheet Metal Duct Installation
3.3.4.1 Joints
Provide an inner coupling to align the inner lining to maintain good airflow conditions equivalent to standard round high-pressure duct joints. Butt joints are not suitable for the inner liner. Accomplish this alignment by . For ducts over 34-inches inside diameter, provide a separate coupling for inner alignment, with the pressure shells joined by angle-ring flanged connections.
3.3.4.2 Insulation Ends
At the end of an uninsulated section or run where internally insulated duct connects to uninsulated spiral duct, fitting, fire damper or flexible duct, install an insulated end-fitting to bring the outer pressure shell down to nominal size.
3.3.5 Transverse Reinforcement Joints
Provide transverse reinforcements that are . Weld transverse reinforcement at all corners to form continuous frames.
3.3.6 Joint Gaskets
For flanged joints, use chloroprene full-face gaskets 1/8-inch thick, with Shore A 40 durometer hardness. Use one-piece gaskets, vulcanized at joints.
April 2019 Page 19 SECTION 23 31 13.00 40
3.3.7 Radius Elbows
Fabricate elbow proportions and radius elbows in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966.
3.3.8 Plenum Connections
Ensure round duct connections are welded joint bellmouth type.
Ensure rectangular duct connections are bellmouth type, constructed in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966.
3.3.9 Access Openings
Install access panels in ductwork adjacent to fire dampers.
Minimum size of access opening is 12 by 18 inches, unless precluded by duct dimension.
Frame access openings with welded and ground miter joints, 1/8-inch thick angle iron, with 1/4 -inch studs welded to frame. Ensure cover plates are not less than 16-gage, reinforced as necessary for larger sizes constructed of 12-gage metal.
In lieu of access doors, use readily accessible flanged duct sections upon approval. Provide stable hanger supports for disconnected duct terminal.
3.3.10 Duct Supports
Install duct support in accordance with ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966. Meet the minimum size for duct hangers as specified in ASHRAE EQUIP IP HDBK, Chapter 16, ASHRAE FUN IP, Chapter 32 and SMACNA 1966. Provide two hangers where necessary to eliminate sway. Support attachment to duct surfaces by welding 4-inches on center.
Take the following into account in selection of a hanging system:
a. Location and precedence of work under other sections
b. Interferences of various piping and electrical conduit
c. Equipment,and building configuration
d. Structural and safety factor requirements
e. Vibration, and imposed loads under normal and abnormal service conditions
Support sizes, configurations, and spacing are given to show the minimal type of supporting components required. If installed loads are excessive for the specified hanger spacing, hangers, and accessories provide heavier-duty components . After system startup, replace any duct support device which due to length, configuration, or size, vibrates or causes possible failure of a member. Do not use a ductwork support system that allows a cascade-type failure to occur.
Do not hang ductwork and equipment from roof deck, piping, or other ducts
April 2019 Page 20 SECTION 23 31 13.00 40 or equipment. Maximum span between any two points is 10-feet, with lesser spans as required by duct assemblies, interferences, and permitted loads imposed.
Where support from metal deck systems is involved, coordinate support requirements with installation of metal deck.
3.3.10.1 Hangars
Attach hanger rods, angles, and straps to beam clamps. Receive approval from the Contracting Officer for concrete inserts, masonry anchors, and fasteners for the application.
Hardened high-carbon spring-steel fasteners fitted onto beams and miscellaneous structural steel are acceptable upon prior approval of each proposed application and upon field demonstration of conformance to specification requirements. Make fasteners from steel conforming to AISI Type 1055 1070, treated and finished in conformance with SAE AMS 2480, Type Z (zinc phosphate base), Class 2 (supplementary treatment). Verify a 72-hour load-carrying capacity by a certified independent laboratory.
Where ductwork system contains heavy equipment, excluding air-diffusion devices and single-leaf dampers, hang such equipment independently of the ductwork by means of rods or angles of sizes adequate to support the load.
Cross-brace hangers to preclude swaying both vertically and laterally.
3.3.10.2 Installation
Ensure hanger spacing gives a 20-to-1 safety factor for supported load.
Maximum load supported by any two fasteners is 100 pounds.
Install hangers on both sides of all duct turns, branch fittings, and transitions.
Friction rod assemblies are not acceptable.
3.3.10.3 Strap-type Hangars
Support rectangular ducts up to 36-inches by strap-type hangers attached at not less than three places to not less than two duct surfaces in different planes.
Perforated strap hangers are not acceptable.
3.3.10.4 Trapeze Hangars
Support rectangular ducting, 36-inches and larger, by trapeze hangers.
Support ducts situated in unconditioned areas and required to have insulation with a vapor-sealed facing on trapeze hangers. Space hangers far enough out from the side of the duct to permit the duct insulation to be placed on the duct inside the trapeze. Do not penetrate the vapor-sealed facing with duct hangers.
Where trapeze hangers are used, support the bottom of the duct on angles sized as follows:
April 2019 Page 21 SECTION 23 31 13.00 40
WIDTH OF DUCT,
INCHES
MINIMUM BOTTOM ANGLE SIZE,
INCHES
30 and smaller 1-1/4 by 1-1/4 by 1/8
31 to 48 1-1/2 by 1-1/2 by 1/8
49 to 72 1-1/2 by 1-1/2 by 3/16
73 to 96 2 by 2 by 1/4
97 and wider 3 by 3 by 1/4
3.3.10.5 Purlins
Do not support ducting from roof purlins at points greater than one-sixth of the purlin span from the roof truss. Do not exceed 400 pounds load per hanger.
If the hanger load must exceed the above limit, provide reinforcing of purlin(s) or additional support beam(s). When an additional beam is used, have the beam bear on the top chord of the roof trusses, and also bear over the gusset plates of top chord. Stabilize the beam by connection to roof purlin along bottom flange.
Purlins used for supporting fire-protection sprinkler mains, electrical lighting fixtures, electrical power ducts, or cable trays are considered fully loaded. Provide supplemental reinforcing or auxiliary support steel for these purlins when used to support ductwork.
3.3.10.6 Vibration Isolation
Isolate the structure from duct support vibration at points indicated.
Refer to Section 23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC
PIPING AND EQUIPMENT.
Provide vibration isolators in discharge ducting system for a distance not less than 50-feet beyond the air handling unit. Coordinate deflection of duct and equipment mountings.
3.3.11 Flexible Connectors for Steel Metal
Connect air-handling equipment, ducts crossing building expansion joints, and fan inlets and outlets to upstream and downstream components with treated woven-cloth connectors.
Install connectors only after system fans are operative and all vibration isolation mountings have been adjusted. When system fans are operating, ensure connectors are free of wrinkles caused by misalignment or fan reaction. Width of surface is curvilinear.
3.3.12 Insulation Protection Angles
Provide galvanized 20-gage sheet, formed into an angle with a 2-inch exposed long leg with a 3/8-inch stiffening break at outer edge, and with a variable concealed leg, depending upon insulation thickness.
Install angles over all insulation edges terminating by butting against a wall, floor foundation, frame, and similar construction. Fasten angles in place with blind rivets through the protection angle, insulation, and
April 2019 Page 22 SECTION 23 31 13.00 40 sheet metal duct or plenum. Install angles after final insulation covering has been applied.
3.3.13 Duct Probe Access
Provide holes with neat patches, threaded plugs, or threaded or twist-on caps for air-balancing pitot tube access. Provide extended-neck fittings where probe access area is insulated.
3.3.14 Openings In Roofs and Walls
Existing building openings are fixed in size and can not be resized with out authorization. Provide equipment to suit existing opening size.
3.4 FIELD QUALITY CONTROL
3.4.1 Fire Damper Tests
Perform operational tests on each fire damper in the presence of the Contracting Officer by enervating a fusible link with localized heat.
Provide and install new links after successful testing.
3.4.2 Ductwork Leakage Tests
Conduct complete leakage test of new ductwork in accordance with Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC. Perform tests prior to installing ductwork insulation.
3.4.3 Inspection
Inspect ductwork in accordance with SMACNA 1987.
3.5 CLOSEOUT ACTIVITIES
3.5.1 Operation and Maintenance
Submit 6 copies of the operation and maintenance manuals 30 calendar days prior to testing the medium and high pressure ductwork systems. Update data and resubmit for final approval no later than 30 calendar days prior to contract completion.
Ensure operation and maintenance manuals are consistent with manufacturer's standard brochures, schematics, printed instructions, general operating procedures and safety precautions.
3.5.2 Record Drawings
Provide record drawings with current factual information. Include deviations from, and amendments to, the drawings. Include concealed or visible changes in the work. Label drawings "As-Built".
-- End of Section --