23 05 48.00 40.pdf

PDF 49 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is a Technical Specifications document for vibration and seismic controls for HVAC piping and equipment at Tinker Air Force Base, Oklahoma, issued in April 2019.

The specification establishes requirements for vibration isolation mounting systems designed to protect HVAC equipment from vibration transmission. Key design parameters include specific mounting types (A, B, C, F) with defined elastomer loading limits and deflection ranges, and base types (U, R, S, CIB) constructed from structural steel or concrete with specified stiffness requirements. The document provides detailed equipment-specific isolation requirements across multiple scenarios, including centrifugal and reciprocating water chillers, compressors, refrigeration units, centrifugal pumps, air-cooled condensing units, air-handling units of varying pressure classes, cooling towers, and piping systems. Isolation provisions are tabulated by equipment type and installation location (basement, on/above grade), with floor spans of 20, 30, or 40 feet, specifying the mounting type, base type, and minimum static deflection in inches required for each configuration. Isolator types for piping and ductwork (G, H, J, K, L, M) are specified with minimum elastomer or spring deflections of 3/8-inch to 1-inch depending on application. Materials must include natural rubber or chloroprene elastomer with Shore A durometer measurements between 40 and 60, with corrosion protection for exposed metal parts. Contractors must submit equipment performance data, installation drawings, and outline drawings within ten working days of contract award, with installation drawings due five working days prior to commencing installation. Field quality control requires deflection testing of all isolation devices with test reports submitted to verify compliance with specified minimum deflections, conducted in the presence of the Contracting Officer.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 23 05 48. 00 40

VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND EQUI PMENT

PART 1 GENERAL

Sect i on 23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS appl i es t o wor k speci f i ed i n t hi s sect i on t o t he ext ent appl i cabl e.

Sect i on 23 05 15 COMMON PI PI NG FOR HVAC appl i es t o wor k speci f i ed i n t hi s sect i on t o t he ext ent appl i cabl e.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ACOUSTI CAL SOCI ETY OF AMERI CA ( ASA)

ASA S2. 71 ( 1983; R 2006) Gui de t o t he Eval uat i on of Human Exposur e t o Vi br at i on i n Bui l di ngs

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE HVAC APP I P HDBK ( 2011) HVAC Appl i cat i ons Handbook, I - P Edition

ASHRAE HVAC APP SI HDBK ( 2015) HVAC Appl i cat i ons Handbook, SI Edition

NATI ONAL ENVI RONMENTAL BALANCI NG BUREAU ( NEBB)

NEBB PROCEDURAL STANDARDS ( 2005) Pr ocedur al St andar ds f or TAB ( Test i ng, Adj ust i ng and Bal anci ng) Envi r onment al Syst ems

1. 2 ADMI NI STRATI VE REQUI REMENTS

Wi t hi n t en wor ki ng days of Cont r act Awar d, submi t equi pment and per f or mance dat a f or v i br at i on i sol at or syst ems i ncl udi ng equi pment base desi gn; i ner t i a- bl ock mass r el at i ve t o suppor t equi pment wei ght ; spr i ng l oads and f r ee, oper at i ng, and sol i d hei ght s of spr i ng; spr i ng di amet er s;

nonmet al l i c i sol at or l oadi ng and def l ect i on; di st ur bi ng f r equency; nat ur al f r equency of mount s; def l ect i on of wor ki ng member ; and ant i c i pat ed amount of physi cal movement at t he r ef er ence poi nt s.

Ensur e t he dat a i ncl udes i nf or mat i on on t he f ol l owi ng:

a. Mount i ngs

b. Bases

c. I sol at or s

d. Fl oor - Mount ed Pi pi ng

Apr i l 2019 Page 1 SECTI ON 23 05 48. 00 40

e. Ver t i cal Pi pi ng

Fi ve wor ki ng days pr i or t o commencement of i nst al l at i on, submi t i nst al l at i on dr awi ngs f or v i br at i on i sol at or syst ems i ncl udi ng equi pment and per f or mance r equi r ement s.

I ndi cat e wi t hi n out l i ne dr awi ngs f or v i br at i on i sol at or syst ems, over al l physi cal f eat ur es, di mensi ons, r at i ngs, ser vi ce r equi r ement s, and wei ght s of equi pment .

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

I nst al l at i on Dr awi ngs; G

Out l i ne Dr awi ngs; G

SD- 03 Pr oduct Dat a

Equi pment and Per f or mance Dat a; G

I sol at or s; G

SD- 06 Test Repor t s

Type of I sol at or ; G

Type of Base; G

Al l owabl e Def l ect i on; G

Measur ed Def l ect i on; G

1. 4 QUALI TY CONTROL

Ensur e al l v i br at i on- cont r ol appar at us i s t he pr oduct of a s i ngl e manuf act ur i ng sour ce, wher e possi bl e. Human exposur e l evel s shoul d be consi der ed usi ng ASA S2. 71 and NEBB PROCEDURAL STANDARDS.

PART 2 PRODUCTS

2. 1 SYSTEM DESCRI PTI ON

Schedul ed i sol at i on mount i ng i s i n i nches and i s a mi ni mum st at i c deflection.

Spans r ef er r ed t o i n par agr aph EQUI PMENT, means l ongest bay di mensi on.

Det er mi ne exact mount i ng s i zes and number of i sol at or s by t he i sol at or manuf act ur er based on equi pment t hat wi l l be i nst al l ed. Check equi pment

Apr i l 2019 Page 2 SECTI ON 23 05 48. 00 40 r evol ut i ons per mi nut e ( r pm) and spr i ng def l ect i ons t o ver i f y t hat r esonance cannot occur .

2. 1. 1 Desi gn Requi r ement s

Desi gn f or v i br at i on i sol at i on usi ng ASHRAE HVAC APP I P HDBK, Chapt er 48, as appl i cabl e t o t he f ol l owi ng sect i ons.

2. 1. 1. 1 Mountings

Pr ovi de t he f ol l owi ng mount i ngs:

Type A: Composi t e pad, wi t h 0. 25- i nch t hi ck el ast omer t op and bot t om l ayer s, mol ded t o cont ai n a pat t er n wi t h nonsl i p char act er i st i cs i n al l hor i zont al di r ect i ons. El ast omer l oadi ng i s not t o exceed 40 pounds per squar e i nch ( psi ) . Ensur e mi ni mum over al l t hi ckness i s 1 i nch. Maxi mum def l ect i ons up t o 0. 25- i nch ar e al l owed. Type B: Doubl e r ubber - i n- shear or el ast omer - i n- shear wi t h mol ded- i n st eel r ei nf or cement i n t op and bot t om.

Maxi mum def l ect i ons up t o 0. 50- i nch ar e al l owed. Type C: Fr ee- st andi ng l at er al l y st abl e open- spr i ng t ype f or def l ect i ons over 0. 50- i nch, wi t h bui l t - i n bear i ng and l evel i ng pr ovi s i ons, 0. 25- i nch t hi ck Type A base el ast omer pads, and accessor i es. Ensur e out si de di amet er of each spr i ng i s equal t o or gr eat er t han 0. 9 t i mes t he oper at i ng hei ght of t he spr i ng under r at ed l oad. Type F: Combi nat i on spr i ng and r ubber - i n- shear or el ast omer - i n- shear st eel f r amed f or hanger - r od mount i ng, wi t h mi ni mum t ot al st at i c def l ect i on of 1- i nch. 2. 1. 1. 2 Bases

Pr ovi de t he f ol l owi ng bases:

Type U: Uni t i sol at or s wi t hout r ai l s, st r uct ur al - st eel bases, or i ner t i a bl ocks. Type R: Rai l s, connect ed or di sconnect ed mi l l - r ol l ed st r uct ur al st eel , of suf f i c i ent di mensi on t o pr ecl ude def l ect i on at mi dpoi nt of unsuppor t ed span i n excess of 1/ 1, 440t h of t he span bet ween i sol at or s, power t r ansmi ssi on, component mi sal i gnment , and any over hung wei ght . Wher e Type R bases ar e speci f i ed and t he equi pment pr oposed r equi r es addi t i onal base suppor t , use a Type S base. Type S: St r uct ur al - st eel bases common t o a suppor t ed assembl y, made f r om wel ded- j oi nt mi l l - r ol l ed st r uct ur al st eel wi t h c l osed- per i met er conf i gur at i on, i sol at or s at t ached t o out r i gger suppor t s.

Ensur e hei ght of st eel member s i s suf f i c i ent t o pr ovi de st i f f ness r equi r ed t o mai nt ai n equi pment manuf act ur er ' s r ecommended al i gnment and dut y ef f i c i ency of power - t r ansmi ssi on component s. Ensur e hei ght of st eel member does not r esul t i n member def l ect i on at mi dpoi nt of unsuppor t ed span of mor e t han 1/ 1, 440t h of t he span bet ween i sol at or s. Mi ni mum hei ght i s 5- i nches.

Type CI B: Pr ovi de concr et e i ner t i a bl ocks common t o t he ent i r e assembl y, wi t h wel ded- j oi nt const r uct i on, mi l l - r ol l ed st r uct ur al - st eel per i met er s, wel ded- i n No. 4 r ei nf or ci ng bar s 8- i nches on cent er each way near t he bot t om of t he bl ock, out r i gger - i sol at or mount i ng pr ovi s i ons, anchor bol t s. Fi l l wi t h 3, 000 psi cur ed- st r engt h concr et e.

Conf i gur e r ect angul ar i ner t i a bases t o accommodat e equi pment suppor t ed.

Ensur e mi ni mum t hi ckness of i ner t i a base, i n addi t i on t o pr ovi di ng sui t abl e mass, i s suf f i c i ent t o pr ovi de st i f f ness t o mai nt ai n equi pment manuf act ur er ' s r ecommended al i gnment and dut y ef f i c i ency of power - t r ansmi ssi on component s, and i s suf f i c i ent t o r esul t i n base def l ect i on at mi dpoi nt of unsuppor t ed span of not mor e t han 1/ 1, 440t h of t he span bet ween i sol at or s. Ver i f y mi ni mum t hi ckness, t he

Apr i l 2019 Page 3 SECTI ON 23 05 48. 00 40 pr ecedi ng r equi r ement s not wi t hst andi ng, i s 8 per cent of t he l ongest base di mensi on.

Ensur e pumps wi t h f l exi bl e coupl i ngs do not have i ner t i a base l ess t han 8- i nches t hi ck, and t he mi ni mum mass of concr et e i ner t i a bl ock i s equal i n wei ght t o suppor t ed equi pment .

2. 2 EQUIPMENT

Vi br at i on i sol at i on desi gn per ASHRAE HVAC APP I P HDBK, Chapt er 37, .

2. 2. 1 Cent r i f ugal Wat er Chi l l er Package Locat i ons

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

Hermetic A-U-0.25 B-U-0.50 D-S-1.75 D-S-2.5

Open Type B-U-0.38 D-U-1.0 D-CIB-1.75 D-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 2 Reci pr ocat i ng Wat er Chi l l er Package Locat i ons

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

500 t o 750 r pm D-U-1.0 D-U-1.5 D-S-2.5 D-CIB-2.75

750 r pm and Over D-U-1.0 D-U-1.0 D-R-2.0 D-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 3 Absor pt i on Wat er Chi l l er Package Locat i ons

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

Standard A-U-0.25 D-U-1.0 D-U-1.5 D-U-2.75

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

Apr i l 2019 Page 4 SECTI ON 23 05 48. 00 40

2. 2. 4 Reci pr ocat i ng Compr essor / Condenser Locat i ons

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

500 t o 750 r pm D-U-1.0 D-U-1.5 D-U-2.5 D-CIB-2.75

750 r pm and Over D-U-1.0 D-U-1.0 D-U-2.0 D-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 5 Reci pr ocat i ng Ref r i ger at i on Compr essor Locat i ons

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

500 t o 750 r pm C-U-1.0 C-U-1.5 C-S-2.5 C-CIB-2.75

750 r pm and Over C-U-1.0 C-U-1.0 C-R-2.0 C-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 6 Cent r i f ugal Pump Locat i ons

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

Close-couple t hr ough 5 hp

None -R-0.35 C-S-1.0 C-S-1.0

Bedplate-mounted t hr ough 5 hp

None C-CIB-1.0 C-CIB-1.5 C-CIB-1.75

7- 1/ 2 hp None C-CIB-1.0 C-CIB-1.75 C-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 7 Ai r - Cool ed Condensi ng Uni t Locat i ons

TYPE

EQUIPMENT

20- FOOT ROOF- SPAN

PROVISIONS*

30- FOOT ROOF- SPAN

PROVISIONS*

40- FOOT ROOF- SPAN

PROVISIONS*

Thr ough 5 hp over 900 rpm

B-U-0.5 D-U-1.0 D-U-1.75

Over 5 hp t o 500 r pm B-U-0.5 D-U-1.75 D-U-2.5

500 r pm and over B-U-0.5 D-U-1.0 D-U-1.75

Apr i l 2019 Page 5 SECTI ON 23 05 48. 00 40

TYPE

EQUIPMENT

20- FOOT ROOF- SPAN

PROVISIONS*

30- FOOT ROOF- SPAN

PROVISIONS*

40- FOOT ROOF- SPAN

PROVISIONS*

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 8 Low- Pr essur e Suspended Ai r - Handl i ng Uni t ( AHU) Locat i ons

Vi br at i on- i sol at i on pr ovi s i ons appl y t o cei l i ng- suspended Ai r Movi ng and Condi t i oni ng Associ at i on Cl ass A packaged cent r al - st at i on uni t s.

TYPE

EQUIPMENT

20- FOOT ROOF- SPAN

PROVISIONS*

30-FOOT

ROOF-SPAN

PROVISIONS*

40-FOOT

ROOF-SPAN

PROVISIONS*

Thr ough 5 hp F-U-1.0 F-U-1.0 F-U-1.0

7- 1/ 2 hp and over 250 t o 500 r pm

F-U-1.75 F-U-1.75 F-U-1.75

500 r pm and over F-U-1.0 F-U-1.25 F-U-1.55

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 9 Low- Pr essur e AHU Locat i ons

Vi br at i on- i sol at i on pr ovi s i ons appl y t o f l oor - mount ed Ai r Movi ng and Condi t i oni ng Associ at i on Cl ass A packaged cent r al - st at i on uni t s.

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

Thr ough 5 hp B-U-0.35 C-U-1.0 C-U-1.0 C-U-1.0

7- 1/ 2 hp and over 250 t o 500 r pm

B-U-0.35 C-U-1.75 C-U-1.75 C-U-1.75

500 r pm B-U-0.35 C-U-1.0 C-U-1.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 10 Medi um- and Hi gh- Pr essur e AHU Locat i ons

Vi br at i on- i sol at i on pr ovi s i ons appl y t o f l oor - mount ed Ai r Movi ng and Condi t i oni ng Associ at i on Cl asses B and C packaged cent r al - st at i on uni t s.

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

Thr ough 20 hp 250 t o 300 r pm

B-U-0.35 C-U-2.5 C-U-2.5 C-U-3.5

Apr i l 2019 Page 6 SECTI ON 23 05 48. 00 40

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

300 t o 500 r pm B-U-0.35 C-U-1.75 C-U-1.75 C-U-2.5

500 r pm and over B-U-0.35 C-U-1.0 C-U-1.0 C-U-1.75

Over 20 hp 250 t o 300 r pm

B-U-0.35 C-U-2.5 C-CIB-3.5 C-CIB-3.5

300 t o 500 r pm B-U-0.35 C-U-2.5 C-CIB-2.5 C-CIB-3.5

500 r pm and over B-U-0.35 C-U-1.0 C-CIB-1.75 C-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 11 Ai r - Movi ng Devi ce Locat i ons

Vi br at i on- i sol at i on pr ovi s i ons appl y t o housed or unhoused f r ee- st andi ng f ans of any pr essur e r at i ng, l ocat ed i n f i el d- er ect ed, f i el d- or f act or y- f abr i cat ed cent r al - st at i on uni t s, and unhoused r et ur n- ai r suppl y- ai r ser vi ce.

TYPE

EQUIPMENT

BASEMENT

BELOW-GRADE

PROVISIONS*

ON/ABOVE

GRADE

20-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

30-FOOT

FLOOR-SPAN

PROVISIONS*

ON/ABOVE

GRADE

40-FOOT

FLOOR-SPAN

PROVISIONS*

Thr ough 20 hp 250 t o 300 r pm

B-U-0.35 C-S-2.5 C-S-2.5 C-S-3.5

300 t o 500 r pm B-U-0.35 C-S-1.75 C-S-1.75 C-S-2.5

500 r pm and over B-U-0.35 C-S-1.0 C-S-1.5 C-S-1.75

Over 20 hp 250 t o 300 r pm

B-U-0.35 C-S-2.75 C-CIB-3.5 C-CIB-5.0

300 t o 500 r pm B-U-0.35 C-S-1.75 C-CIB-2.5 C-CIB-3.5

500 r pm and over B-U-0.35 C-S-1.0 C-CIB-1.75 C-CIB-2.5

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 12 Cr oss- Fl ow Cool i ng Tower Locat i ons

TYPE

EQUIPMENT

20- FOOT ROOF- SPAN

PROVISIONS*

30-FOOT

ROOF-SPAN

PROVISIONS*

40-FOOT

ROOF-SPAN

PROVISIONS*

Package under t ower base t o 500 r pm

B-U-0.35 D-U-2.0 D-U-2.5

Apr i l 2019 Page 7 SECTI ON 23 05 48. 00 40

EQUIPMENT

20- FOOT ROOF- SPAN

PROVISIONS*

30-FOOT

ROOF-SPAN

PROVISIONS*

40-FOOT

ROOF-SPAN

PROVISIONS*

500 r pm and over B-U-0.35 D-U-1.0 D-U-1.75

Fi el d er ect ed under t ower base; al l r pm

Under mechani cal equi pment suppor t i ng f r ame t o 500 r pm

500 r pm and over

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 13 Bl ow- Thr ough Cool i ng Tower Locat i ons

TYPE

EQUIPMENT

20- FOOT ROOF- SPAN

PROVISIONS*

30-FOOT

ROOF-SPAN

PROVISIONS*

40-FOOT

ROOF-SPAN

PROVISIONS*

Under t ower base t o 500 r pm

B-U-0.35 C-S-2.5 C-S-3.5

500 r pm and over B-U-0.35 C-S-1.0 C-S-1.75

* TYPE OF MOUNTI NG, BASE, AND MI NI MUM DEFLECTI ON I N I NCHES

2. 2. 14 Pi pe And Duct Vi br at i on I sol at i on

Type G: Pr ovi de i sol at or s wi t h i n- ser i es cont ai ned st eel spr i ngs and pr ef or med f i br ous- gl ass or chl or opr ene- el ast omer el ement s f or connect i ng t o bui l di ng- st r uct ur e at t achment s. Load devi ces by suppor t ed syst em dur i ng oper at i ng condi t i ons t o pr oduce a mi ni mum spr i ng and el ast omer st at i c def l ect i on of 1- i nch and 3/ 8- i nch, respectively.

Type H: Pr ovi de i sol at or s wi t h cont ai ned chl or opr ene- el ast omer el ement s f or connect i ng t o bui l di ng- st r uct ur e at t achment s. Load devi ces by suppor t ed syst em dur i ng oper at i ng condi t i ons t o pr oduce a mi ni mum el ast omer st at i c def l ect i on of 3/ 8- i nch.

Type J: Pr ovi de i sol at or s wi t h el ast omer s mount ed on f l oor - suppor t ed col umns or di r ect l y on t he f l oor . Load devi ces by suppor t ed syst em dur i ng oper at i ng condi t i ons t o pr oduce a mi ni mum el ast omer st at i c def l ect i on of 3/ 8- i nch.

2. 2. 14. 1 Fl oor - Mount ed Pi pi ng

Type K: Pr ovi de i sol at or s wi t h spr i ngs mount ed on f l oor - suppor t ed col umns or di r ect l y on t he f l oor . Load devi ces by suppor t ed syst em dur i ng oper at i ng condi t i ons t o pr oduce a mi ni mum spr i ng st at i c def l ect i on of 1- i nch.

Apr i l 2019 Page 8 SECTI ON 23 05 48. 00 40

2. 2. 14. 2 Ver t i cal Pi pi ng

Type L: Pr ovi de i sol at or s whi ch ar e pi pe base- suppor t devi ces wi t h one or mor e cont ai ned st eel spr i ngs. Load devi ces by suppor t ed syst em dur i ng oper at i ng condi t i ons t o pr oduce a mi ni mum st at i c def l ect i on of 1- i nch. Equi p devi ces wi t h pr ecompr essi on and ver t i cal - l i mi t f eat ur es, as wel l as a mi ni mum 1/ 4- i nch t hi ck el ast omer sound pad and i sol at i on washer s, f or mount i ng t o f l oor .

Type M: Pr ovi de i sol at or s whi ch ar e el ast omer mount ed basepl at e and r i ser pi pe- gui de devi ces, wi t h cont ai ned doubl e act i ng el ast omer el ement s whi ch under r at ed l oad have a mi ni mum st at i c def l ect i on of 3/ 8- i nch. Si ze i sol at or t o accommodat e t her mal i nsul at i on wi t hi n t he st at i onar y gui de r i ng.

2. 3 MATERIALS

Ensur e r ubber i s nat ur al r ubber and el ast omer i s chl or opr ene. Shor e A dur omet er measur ement of bot h mat er i al s and r ange bet ween 40 and 60.

I nor gani c mat er i al s such as pr ecompr essed, hi gh- densi t y, f i br ous gl ass encased i n a r esi l i ent moi st ur e- i mper vi ous membr ane may be used i n l i eu of speci f i ed nat ur al r ubber and el ast omer s. Wher e t hi s subst i t ut i on i s made, ensur e speci f i ed def l ect i ons ar e modi f i ed by t he manuf act ur i ng sour ce t o accommodat e physi cal char act er i st i cs of i nor gani c mat er i al s and t o pr ovi de equal or bet t er v i br at i on i sol at i on.

Ensur e weat her - exposed met al v i br at i on- i sol at or par t s ar e cor r osi on pr ot ect ed. Chl or opr ene coat spr i ngs.

2. 4 TESTS, I NSPECTI ONS, AND VERI FI CATI ONS

Submi t t est r epor t s f or t est i ng v i br at i on i sol at i on f or each t ype of i sol at or and each t ype of base. Meet r ef er enced st andar ds cont ai ned wi t hi n t hi s sect i on. I ncl ude i n t est r epor t s al l owabl e def l ect i on and measur ed def l ect i on al so meet i ng r ef er enced st andar ds wi t hi n t hi s sect i on.

PART 3 EXECUTI ON

3. 1 INSTALLATION

I nst al l equi pment i n accor dance wi t h manuf act ur er ' s r ecommendat i ons.

Ensur e r ai l s, st r uct ur al st eel bases, and concr et e i ner t i a bl ocks ar e r ai sed not l ess t han 1- i nch above t he f l oor and ar e l evel when equi pment suppor t ed i s under oper at i ng l oad.

Ensur e v i br at i on- i sol at i on i nst al l at i on and def l ect i on t est i ng af t er equi pment st ar t - up i s di r ect ed by a compet ent r epr esent at i ve of t he manufacturer.

3. 2 FI ELD QUALI TY CONTROL

3. 2. 1 Test s and Repor t s

Ensur e v i br at i on- i sol at i on devi ces ar e def l ect i on t est ed. Submi t t est r epor t s subst ant i at i ng t hat al l equi pment has been i sol at ed as speci f i ed

Apr i l 2019 Page 9 SECTI ON 23 05 48. 00 40 and t hat mi ni mum speci f i ed def l ect i ons have been met . Make al l measur ement s i n t he pr esence of t he Cont r act i ng Of f i cer .

- - End of Sect i on - -

Apr i l 2019 Page 10 SECTI ON 23 05 48. 00 40

File details come from the government source that posted it. Updated .