Text version
RM-301
MEN
JANITOR CLOSET
NEW WATER HEATER
PLUMBING ACCESS
9'-71 8"
RW-301
WOMEN
P-8 / P-9
1 2 3 4 5
1 2 3 4 5
A
B
C
D department of TREASURY, TREASURY ANNEX BUILDING
1500 PENNSYLVANIA AVENUE NW | WASHINGTON DC 20220
DRAWING INDEX
VICINTY MAP
TREASURY ANNEX 3RD FLOOR RESTROOMS RENOVATION
TREASURY ANNEX
BUILDING
N
GENERAL CONDITIONS
1. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OF THE DESCRIPTION OF DETAILS OF WORK WHICH ARE
MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS-DESCRIBED DETAILS OF WORK BUT SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FROM AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATION
2. MANUFACTURER SPECIFIED WITHIN THE CONSTRUCTION DOCUMENTS ARE PROVIDED AS A MINIMUM PERFORMANCE CRITERIA, SUBSTITUTIONS WILL BE CONSIDERED IF COMPLAINT TO THE PERFORMANCE ESTABLISHED BY THE MANUFACTURER NOTED. BUILDING MATERIALS SUBSTANDARD TO THESE REQUIREMENTS WILL BE SUMMARILY REJECTED.
ALL BUILDING COMPONENTS ARE TO BE HEAVY DUTY QUALITY AND BE FOR ABUSIVE RESISTANCE INSTALLATION. BUILDING COMPONENTS SPECIFIED HEREIN THAT DO NOT MEET THE HEAVY DUTY-ABUSIVE ENVIRONMENTAL CRITERIA MUST BE
BROUGHT TO THE ATTENTION OF THE BUILDING REPRESENTATIVE AND WILL BE RE-SPECIFIED
3. BY THE SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND HAS FAMILIARIZED
HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED
4. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS AND/OR SIZE. VERIFY ALL DIMENSIONS BEFORE PROCEEDING AND OBTAIN MEASUREMENTS AT THE JOB FOR ALL WORK REQUIRED TO BE ACCURATELY FITTED TO THE BUILDING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SUCH MEASUREMENTS AND FOR THE PRECISE FITTING
OF THE WORK
5. IF CONFLICTS ARE DISCOVERED AT ANY TIME BETWEEN THE ENGINEERING AND ARCHITECTURAL DRAWINGS, THE COR SHALL BE CONTACTED AT ONCE TO RESOLVE THE PROBLEM. IF THE COR IS NOT CONTACTED, THE CONTRACTOR SHALL
ACCEPT THE RESPONSIBILITY TO CORRECT ANY AND ALL SUCH WORK
6. CHANGES TO THE DRAWINGS (ADDITIONS, DELETIONS OR ALTERATIONS) THAT MIGHT CONSTITUTE A CHANGE ORDER MUST BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL, OTHERWISE CONTRACTOR WOULD UNDERTAKE SUCH
WORK AT HIS OWN RISK AND WORK MIGHT HAVE TO BE REVERSED AT CONTRACTOR'S OWN COST
7. ALL SALVAGEABLE MATERIALS SHALL BE RETURNED TO THE GOVERNMENT
8. THE G. C. AND ALL SUB-CONTRACTOR SHALL SUBMIT TO GOVERNMENT AND COR SUBMITTALS AND SHOP DRAWINGS FOR
REVIEW PRIOR TO START OF CONSTRUCTION.
9. UPON COMPLETION OF THE INSTALLATION, REMOVE ALL DEBRIS FROM THE BUILDING CREATED BY THE WORK PROVIDED UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. REMOVE ANY SOILED SPOTS FROM THE FACE OF THE CARPET OR OTHER FINISH SURFACES USING PROCESSES RECOMMENDED BY THE MANUFACTURER AND IN A MANNER ACCEPTABLE TO THE GOVERNMENT. REPLACE ANY AREAS OF CARPET OR FINISH SURFACES WHERE CLEANING HAS FAIL TO RESTORE THE
APPEARANCE AND QUALITY SATISFACTORILY, AS DETERMINED BY THE GOVERNMENT.
10. ALL CONTRACTORS SHALL PERFORM ALL WORK IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS.
11. THE G. C. SHALL VERIFY REQUIREMENTS FOR ALL EQUIPMENT INDICATED ON THE DRAWINGS WHETHER SUPPLIED BY THE
GOVERNMENT OR SUB-CONTRACTOR.
12. WHERE THE G. C. IS INSTRUCTED TO ALIGN A PARTITION WITH TWO OR MORE COLUMNS AND THE COLUMNS ARE DISCOVERED TO BE OF UNEQUAL SIZE, THE LARGER OF THE COLUMNS SHALL DETERMINE THE LOCATION OF THE
PARTITION. THIS WILL ALSO APPLY TO WET COLUMNS AND CORE WALLS.
13. THE G. C. SHALL REPAIR ALL DAMAGE CAUSED BY HIM OR HIS SUB-CONTRACTORS DURING CONSTRUCTION.
PRE-EXISTING DAMAGE MUST BE REVIEWED AND ACKNOWLEDGED, IN WRITING BY THE GOVERNMENT AND ARCHITECT PRIOR TO COMMENCEMENT OF WORK. DAMAGE NOT DOCUMENTED PRIOR TO CONSTRUCTION START SHALL BE REPAIRED
TO LIKE NEW CONDITION WITHOUT ADDITIONAL CHARGE TO THE GOVERNMENT.
14. THE G. C. SHALL ENSURE THAT ALL PAINT HAS BEEN REMOVED FROM ALL NON-SCHEDULE PAINTED SURFACES PRIOR TO
DELIVERY OF THE SPACE.
15. THE G. C. SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED
16. IF THERE IS A QUESTION AS TO THE ACCEPTABLE LEVEL OF QUALITY FOR THE INSTALLATION OF ANY MATERIALS, THE
GOVERNMENT'S REPRESENTATIVE DECISION WILL BE FINAL
17. NEW DOOR HARDWARE, INCLUDING HINGES AND LOCK SETS, ARE TO BE MOUNTED AT ABA HEIGHTS UNLESS NOTED
OTHERWISE
18. ALL CEILING REGISTERS, GRILLES, VENTS AND DIFFUSERS SHALL BE FACTORY FINISHED. IF PAINTING IS REQUIRED, PROVIDE ENAMEL FINISH
19. ALL J-BENDS AND OTHER GYPSUM METAL TRIM SHALL BE SPACKLE-BLENDED INTO THE ADJACENT SURFACE.
20. WHERE TWO OR MORE WALL SWITCHES OR DIMMERS OCCUR IN THE SAME LOCATION, THEY ARE TO RECEIVE A COMMON
GANG PLATE WHOSE FINISH IS TO MATCH THE BUILDING STANDARD SWITCH PLATE.
21. ALL PAINTED WALLS SHALL BE HAVE A LEVEL 4 FINISH: WITH ONE ROLLER-APPLIED (1) PRIMER COAT AND (2)
ROLLER-APPLIED FINISH COATS.
22. PROVIDE THRESHOLDS AT ALL DOORS AND TRANSITION STRIPS WHERE CARPET MEETS A DIFFERENT TYPE OF FLOORING
23. REVIEW THE SPECIFICATIONS AND CUT SHEETS FOR ACCESSORIES, FIXTURES, ETC. THAT ACCOMPANY THE DRAWING SET PRIOR TO PLACING ORDERS. IF CONFLICTS ARE FOUND, INFORM THE ARCHITECT OF SUCH FINDINGS AND TAKE NO ACTION UNTIL RESOLVED. IN THOSE CASES, IF AN ORDER FOR AN UNRESOLVED ITEM IS PLACED WITHOUT APPROVAL OF ARCHITECT, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY IF THE ITEM IS NOT ACCEPTED BY THE CLIENT
24. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, SPECIFICATIONS AND DETAILS, THE MOST STRINGENT
REQUIREMENT APPLIES. INFORM COR OF SUCH FINDINGS
N
AC
ACT
ADJ
AFF
ALUM
ATT
B & B
BD
BET
BF
BIT
BLDG
BTM
CER
CJ
CL
CLG
CMU
COMP
CONC
CONT
D
AT
ACOUSTIC
ACOUSTIC CEILING TILE
ADJUSTABLE
ABOVE FINISHED FLOOR
ALUMINUM
ATTENUATION
BALLED AND BAGGED
BOARD
BETWEEN
BARRIER FREE
BITUMINOUS
BUILDING
BOTTOM
CERAMIC
CONTROL JOINT
CENTER LINE
CEILING
CONCRETE MASONRY UNIT
COMPRESSIBLE
CONCRETE
CONTINUOUS
DEEP
DEMO
D.F.
DIA
DS
EXTG
F&I
FF
FLR
FV
GA
GALV
GC
GL
GPDW
O.C.
O.D.
O.H.
OZ.
PLAM
PLYWD
PR
DEMOLITION
DRINKING FOUNTAIN
DIAMETER
DOWN SPOUT
EXISTING
FURNISH AND INSTALL
FINISHED FLOOR
FLOOR
FIELD VERIFY
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLASS
GYPSUM WALLBOARD
ON CENTER
OUTSIDE DIAMETER
OVERHEAD OR OPP. HAND
OUNCE
PLASTIC LAMINATE
PLYWOOD
PAIR
ABBREVIATIONS
PT
PTD
QTY
REINF
REQ'D
RM.
SHT
SIM
SS
THK
TYP.
VCT
VERT
VIF
VP
UON
W.
W/
PRESSURE TREATED
PAINTED
QUANTITY
REINFORCED
REQUIRED
ROOM
SHEET
SIMILAR
STAINLESS STEEL
THICKNESS
TYPICAL
VINYL COMPOSITION TILE
VERTICAL
VERIFY IN FIELD
VENEER PLASTER
UNLESS OTHERWISE NOTED
WIDE
WITH
SYMBOLS
ALIGN
ALIGN SURFACES
CENTER LINE
X
GENERAL / KEYED NOTE
DEMOLITION NOTE
ROOM NAME
ROOM NUMBER
EXTG WALL TO BE REMOVED
X PARTITION TYPE
EXTG WALL TO REMAIN
NEW DOOR ASSEMBLY
X-
XX
X
EXTG DOOR ASSEMBLY
TO BE REMOVED
EXTG DOOR ASSEMBLY
X-XXX
NEW PARTITION
X DRAWING REVISION NUMBER
1 22OF
G - 001
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
SHEET
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
COVER PAGE
NEW WALL
100%
3RD FLOOR
0018-11
28 MARCH 2019
TREASURY ANNEX BUILDING:
RESTROOM RENOVATION
RESTROOM RENOVATION
3RD
RESTROOMS & JANITOR CLOSET
N.T.S.
OVERALL PROPOSED CONDITION
KEY PLAN
LC
XXX
XXX
XX
GENERAL
ARCHITECTURAL
G-001 COVER SHEET 01 OF 33
AD101 EXISTING / DEMOLITION FLOOR PLAN MEN RESTROOM 02 OF 33
AD102 EXISTING / DEMOLITION FLOOR PLAN WOMEN RESTROOM 03 OF 33
A-101 PROPOSED MEN BATHROOM FLOOR PLAN 04 OF 33
A-102 PROPOSED MEN BATHROOM FLOOR PLAN ACCESSIBILITY 05 OF 33
A-103 PROPOSED WOMEN BATHROOM FLOOR PLAN 06 OF 33
A-104 PROPOSED WOMEN BATHROOM FLOOR PLAN ACCESSIBILITY 07 OF 33
A-401 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 08 OF 33
A-402 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 09 OF 33
A-403 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 10 OF 33
A-404 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 11 OF 33
A-405 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 12 OF 33
A-406 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 13 OF 33
A-407 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 14 OF 33
A-408 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 15 OF 33
A-409 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 16 OF 33
A-601 FINISHES SCHEDULE 17 OF 33
A-602 BATHROOM FIXTURES SCHEDULE 18 OF 33
A-603 BATHROOM ACCESSORIES SCHEDULE 19 OF 33
A-604 PLUMBING ACCESSORIES SPECS 20 OF 33
A-605 PLUMBING ACCESSORIES SPECS 21 OF 33
A-606 PLUMBING ACCESSORIES SPECS 22 OF 33
P-001 SYMBOLS, ABBREVIATIONS & PLUMBING SCHEDULE 23 OF 33
P-002 DETAILS 24 OF 33
P-101 DEMOLITION & PROPOSED PLUMBING 25 OF 33
P-601 RISER DIAGRAMS 26 OF 33
M-101 DEMOLITION & PROPOSED MECHANICAL 27 OF 33
E-001 SYMBOLS & ABBREVIATIONS 28 OF 33
E-101 DEMOLITION AND PROPOSED LIGHTING AND POWER 29 OF 33
E-601 DETAILS AND PANEL SCHEDULES 30 OF 33
E-602 DETAILS AND PANEL SCHEDULES 31 OF 33
E-603 DETAILS AND PANEL SCHEDULES 32 OF 33
E-604 DETAILS AND PANEL SCHEDULES 33 OF 33
MECHANICAL
ELECTRICAL
PLUMBING
6' -0
2'-21 4"
2' -3
1 8"
1'-41 4"
3' -4
1 4" 1'
-5 1 2"
1' -4
1 4" 1'
-4 3 8"
2' -6
7 8"
7'-101 4"
2' -1
3 4"
'-1
0"
4" 21
2"
10"
1'-9"
2' -0
1 4" 5'-0"
1'-0"
2' -7
1 8"
5' -3
3'-0"2'-8"2'-53 4"
1' -2
1 2"
8"
'-0
1 8"
4'-5"
1' -1
0"
RM 30
1-A
LC
LC
RM-301
MEN
LC
LC
LC
LC
LC
LC
10'-5"
EXISTING AND DEMOLITION PLANS
AD 101
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
GENERAL NOTES
DEMOLITION NOTES
100%
10/20/2018
3RD FLOOR
0018-11
28 MARCH 2019
KEYED NOTES
DEMOLISH PORTION OF EXISTING WALL ASSEMBLY AS
DEPICTED DOWN TO ORIGINAL SUBSTRATE.
DEMOLISH EXISTING CERAMIC TILE FLOORING, MORTAR AND
GROUT. MAKE FLOOR SMOOTH AND LEVEL TO RECEIVE NEW
CERAMIC TILE FLOORING.
DEMOLISH CMU WALL TO ACCESS PLUMBING LINES, DEMOLISH
PEDAL FLUSHERS, AND INSTALL NEW EQUIPMENT
DEMOLISH EXISTING WALL CERAMIC TILE, WALL BASE,
MORTAR & GROUT DOWN TO ORIGINAL SUBSTRATE WITHOUT
DAMAGING EXTANT TERRA COTTA WALL, WHICH IS TO
REMAIN
DEMOLISH ALL EXISTING BATHROOM FIXTURES AND ALL
ACCESSORIES. THAT INCLUDES (BUT NOT LIMITED TO): FLOOR
MOUNTED WATER CLOSETS, PEDAL FLUSHERS, VANITY, SINKS,
FAUCETS, URINALS, MIRRORS, SHELVES, PAPER TOWEL
DISPENSER, SOAP DISPENSERS, TOILET PAPER HOLDERS,
AND RECESSED AND SURFACE MOUNTED WASTE BINS
DEMOLISH EXISTING TOILET ROOM PARTITIONS AND DOORS
EXISTING TOILET WASTE LINE (FLOOR) TO BE CAPPED
DEMOLISH EXISTING WALL MOUNTED FIXTURES' CARRIERS
EXPOSE ENTIRE MARBLE ENFRAMENT. ALLOW 1" CLEAR FROM
EDGE OF MARBLE TO WALL
DEMOLISH ELECTRICAL OUTLETS AND SWITCHES. SEE
ELECTRICAL DRAWINGS
DEMOLISH ACT CEILING AND GRID. INSTALL NEW CEILING
SYSTEM AS PER RCP
REMOVE ALL EXISTING LIGHT FIXTURES. SEE ELECTRICAL
DRAWINGS
DEMOLISH EXISTING S/R DIFFUSERS. SEE HVAC DRAWINGS
DEMOLISH EXISTING FIRE ALARM SYSTEM DEVICES. SEE FIRE
PROTECTION DRAWINGS
DISCONNECT AND REMOVE EXISTING ELECTRIC HAND DRYER.
RETURN TO TREASURY
DEMOLISH CMU WALL TO ACCESS PLUMBING LINES, DEMOLISH
PEDAL FLUSHERS, AND INSTALL NEW EQUIPMENT
EXISTING MARBLE ENFRAMENT TO REMAIN. CLEAN & POLISH
EXISTING DOOR, HARDWARE & OPENER TO REMAIN.
DOOR SWING TO BE MIRRORED, DOOR TO BE REFINISHED
WALL MOUNTED FIXTURE CARRIAGE TO BE REPLACED
EXISTING TOILET WASTE LINE (FLOOR) AND WATER LINES TO
REMAIN AND TO BE REUSED
EXISTING SINK WASTE LINE AND WATER LINES TO REMAIN
EXISTING URINAL WASTE LINE AND WATER LINES TO REMAIN
INSTALL NEW FIXTURE CARRIER
FIRE SPRINKLERS TO REMAIN. PROTECT SPRINKLER HEADS
DURING CONSTRUCTION AND ADJUST HEIGHT TO WORK WITH
NEW CEILING SYSTEM
EXISTING TERRA COTTA BLOCK, MORTAR AND TILE TO REMAIN
EXISTING AND DEMOLITION MEN BATHROOM RM-201A-1
3/4" = 1'-0"
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND
DIMENSIONS BEFORE STARTING WORK. NO FORENSIC
DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY.
DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL
CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR
PRIOR TO PROCEEDING w/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /
NEC/ IMC / IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR
PARTITION TO FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW
UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS AND MATERIALS, MUST BE
FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED
OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY
FOR THE COMPLETION OF THE PROJECT, SHALL BE
CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,
SECTIONS, SPECIFICATIONS AND DETAILS, THE MOST
STRINGENT REQUIREMENT APPLIES
7. THE CONTRACTOR SHALL THOROUGHLY CLEAN UP ALL AREAS
WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE
CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND
PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED
DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE
SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF
THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION
ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE
SATISFACTION AND APPROVAL OF TREASURY / CO
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING
MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING
DECK AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB
AND SQUARE
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
EXISTING RM 301
6 10
11 12 13 14
1 1
11 2
9 9
3/4"= 1'-0" 0 1' 2' 3'
TREASURY ANNEX BUILDING:
RESTROOM RENOVATION
RESTROOM RENOVATION
4'-9"
2' -7
2'
-6
5' -2
3 8"
RW-301
WOMEN
1' -9
1' -6
1 4" 2'
-0 1 2"
'-6
'-1
0" 20 '-1
0"
LC
LC
1' -1
5 8"
LC
LC
LC
LC
LC
1'
-3 5 8"
1' -4
1 4" 1'
-1 0"
6' -5
1 4"
'-0
1 8"
1' -3
1 4"
10'-6"
9'-4"
4"
2' -1
1 2" 2'-1"
1' -1
2'-91 2"
RW 301-A
2'-97 8"
9"1 34" 3"
5'-23 8"
10'-6"
5'-3"
71 4"
5'-7"
AD 102
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
10/20/2018
3RD FLOOR
N
GENERAL NOTES
DEMOLITION NOTES
KEYED NOTES
DEMOLISH PORTION OF EXISTING WALL ASSEMBLY AS
DEPICTED, DOWN TO ORIGINAL SUBSTRATE.
DEMOLISH EXISTING CERAMIC TILE FLOORING, MORTAR AND
GROUT. MAKE FLOOR SMOOTH AND LEVEL TO RECEIVE NEW
CERAMIC TILE FLOORING.
DEMOLISH EXISTING WALL CERAMIC TILE, WALL BASE,
MORTAR & GROUT DOWN TO ORIGINAL SUBSTRATE.
EXISTING SINK WASTE LINE AND WATER LINES TO BE CAPPED
DEMOLISH ALL EXISTING BATHROOM FIXTURES AND ALL
ACCESSORIES. THAT INCLUDES (BUT NOT LIMITED TO): FLOOR
MOUNTED WATER CLOSETS, PEDAL FLUSHERS, VANITY, SINKS,
FAUCETS, URINALS, MIRRORS, SHELVES, PAPER TOWEL
DISPENSER, SOAP DISPENSERS, TOILET PAPER HOLDERS,
AND RECESSED AND SURFACE MOUNTED WASTE BINS
DEMOLISH EXISTING TOILET ROOM PARTITIONS AND DOORS
EXISTING TOILET WASTE LINE (FLOOR) TO BE CAPPED
DEMOLISH EXISTING WALL MOUNTED FIXTURES' CARRIERS
EXPOSE ENTIRE MARBLE ENFRAMENT. ALLOW 1" CLEAR FROM
EDGE OF MARBLE TO WALL IF POSSIBLE
DEMOLISH ELECTRICAL OUTLETS AND SWITCHES. SEE
ELECTRICAL DRAWINGS
DEMOLISH ACT CEILING AND GRID. INSTALL NEW CEILING
SYSTEM AS PER RCP
REMOVE ALL EXISTING LIGHT FIXTURES. SEE ELECTRICAL
DRAWINGS
DEMOLISH EXISTING S/R DIFFUSERS. SEE MEP DRAWINGS
DEMOLISH EXISTING FIRE ALARM SYSTEM. SEE FIRE
PROTECTION DRAWINGS
DISCONNECT AND REMOVE EXISTING ELECTRIC HAND DRYER.
RETURN TO TREASURY
EXISTING MARBLE ENFRAMENT TO REMAIN. CLEAN & POLISH
EXISTING DOOR, HARDWARE & OPENER TO REMAIN.
DOOR SWING TO BE MIRRORED, DOOR TO BE REFINISHED
EXISTING TOILET WASTE LINE (FLOOR) AND WATER LINES TO
REMAIN AND TO BE REUSED
EXISTING SINK WASTE LINE AND WATER LINES TO REMAIN
FIRE SPRINKLERS TO REMAIN. PROTECT SPRINKLER HEADS
DURING CONSTRUCTION AND ADJUST HEIGHT TO WORK WITH
NEW CEILING SYSTEM
LOCATION OF EXISTING ACCESS PANEL TO REMAIN. REPLACE
COVER
EXISTING TERRA COTTA BLOCK, MORTAR AND TILE TO REMAIN.
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
EXISTING AND DEMOLITION WOMEN BATHROOM RW-201A-1
3/4" = 1'-0"
2 5 6 10
11 12
1 1
1 1
9 9
3/4"= 1'-0" 0 1' 2' 3'
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND
DIMENSIONS BEFORE STARTING WORK. NO FORENSIC
DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY.
DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL
CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR
PRIOR TO PROCEEDING W/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /
NEC/ IMC / IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR
PARTITION TO FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW
UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS AND MATERIALS, MUST BE
FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED
OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY
FOR THE COMPLETION OF THE PROJECT, SHALL BE
CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,
SECTIONS, SPECIFICATIONS AND DETAILS, THE MOST
STRINGENT REQUIREMENT APPLIES
7. THE CONTRACTOR SHALL THOROUGHLY CLEAN UP ALL AREAS
WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE
CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND
PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED
DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE
SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF
THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION
ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE
SATISFACTION AND APPROVAL OF TREASURY / CO
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING
MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING
DECK AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB
AND SQUARE
EXISTING RW 301
EXISTING AND DEMOLITION PLANS
TREASURY ANNEX BUILDING:
RESTROOM RENOVATION
RESTROOM RENOVATION
100%
0018-11
28 MARCH 2019
6' -4
7 8"
7'-31 4"
'-1
0"
4'-73 8"
3'-31 2"
1' -8
R M
-A
LC
LC
RM-301
MEN
LC
LC
LC
LC
LC
LC
P-4
P-5
P-4
P-5
RM301-B
P-1/P-2
P-3
P-1/P-2
P-3
LC
LC
RM301-C
RM301-D
43 4" 61 4"
1'-25 8"
2' -6
7 8" 3'
-0
2' -1
1"
5'-11 4"
2'-6"
3' -0
2' -0
2'
-0
9" 9"
2' -0
ALIGN
LC
P-3P-1/P-2
LC
8"
3' -0
1' -3
1 4"
LC
1' -0
1'
-4
LC
6"
LCLC
4"
5'-0"
3'-3" 4'-6"
55 8"
1' -3
5 8" 1'
-3
P-6
P-6 P-7
NEW TILE
P-7
6' -3
3 8"
2'-0"
3'-21 8"
2' -0
5 8" LC
EXISTING TILE
FCU 5"5"
1/2" GREEN BOARD ON
2 1/2" 16GA STUDS
NEW WALL
FRAMED
EXISTING WALL
TERRA COTTA
EXISTING WALL
TERRA COTTA
EXISTING WALLS
TERRA COTTA
EXISTING
STRUCTURAL
1' -8
LC
67 8"
NEW WALL
FRAMED
COLUMN
2'-3"
5' -0
5'-51 2"
2"
31 2"
2"
2"
1' -4
1 8"LC31 4"
PROPOSED MEN ROOM FLOOR PLAN
A - 101
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
1/4"= 1'-0" 0 2' 4' 8'6'
10/20/2018
GENERAL NOTES
KEYED NOTES
INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT
INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALL BASE, MORTAR AND GROUT AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT,) AFTER EXTANT TILE AND MORTAR HAVE
BEEN REMOVED. GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING
NEW PARTITION ASSEMBLY: 3 5/8" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE ONE OR BOTH
SIDES AS DEPICTED. ( STUDS 16 GA,TRACK 12 GA)
INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALLS BASE MORTAR AND GROUT AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT). INSTALL GREEN BOARD ON 16GA, 2 1/2" DEEP STUDS @ 16" o.c. FULL HEIGHT. EXTEND GREEN BOARD A MIN OF 3" ABOVE ACT CEILING
STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) & 6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @ 34" AFF.
INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE
ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE & MEP DRAWINGS.
ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL
FIXTURES AND ACCESSORIES IN ADA STALL.
INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE
INSTALL NEW TOILET PARTITION SYSTEM/ URINAL SCREEN AS PER FIXTURE SCHEDULE. PROVIDE ALL
NECESSARY FASTENERS, HARDWARE AND SHOE
EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND
TRANSOM TO BE CLEANED AND REFINISHED
CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL
NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES &
FITTINGS AS NEEDED
NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS
DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY
EXISTING WASTE LINE (FLOOR OR WALL) & WATER LINES TO BE CAPPED. SEE MEP DRAWINGS.SEE MEP
DRAWINGS
PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR ALL
SINKS. SEE MEP DRAWINGS
CENTER MIRROR ON SPACE BETWEEN WALLS. SIZE AS DEPICTED
CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO WORK WITH THE NEW CEILING
SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE PROTECTION DRAWINGS
INSTALL NEW CARRIER, DRAIN AND WATER LINES FOR URINALS
NEW LOW WALL ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE WHERE
DEPICTED ( STUDS 16 GA,TRACK 12 GA) AS PER FINISHES SCHEDULE
CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602
DO NOT INSTALL NEW FIXTURE AT THE LOCATION OF THE REMOVED ONE. EXTANT PLUMBING LINES TO
REMAIN IF NEEDED TO SERVICE NEW FIXTURE. CAP UNUSED LINES
PROVIDE ALL NECESSARY ELECTRICAL WORK TO SUPPLY POWER TO ALL HARD WIRED DEVICES. SEE
ELECTRICAL DRAWINGS
NEW WATER HEATER TO BE LOCATED IN ADJACENT JANITOR'S CLOSET. SEE G-001 & MEP DRAWINGS
C-4 STEEL CHANNELS ACROSS FRONT AND BACK SUPPORTED ON LOW WALLS TO CARRY MARBLE SLAB.
INSTALL 3/4" PLYWOOD UNDER SLAB TO FASTER SINK. SEE DETAILS ON A-403. COORDINATE
PLACEMENT OF STEEL IN RELATIONSHIP TO SINK. CONTRACTOR TO SUBMIT SHOP DRAWINGS
PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
PROPOSED RM 301
PROPOSED RM 301 FLOOR PLANA-1
3/4" = 1'-0"
4 5
3/4"= 1'-0" 0 1' 2' 3'
3RD FLOOR
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR PRIOR TO
PROCEEDING W/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, SPECIFICATIONS AND DETAILS, THE
MOST STRINGENT REQUIREMENT APPLIES
7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED
TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL DAMAGES CAUSED BY THE
CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND
APPROVAL OF TREASURY
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK AND BRACED AS NEEDED. ALL
WALLS MUST BE PLUMB AND SQUARE
A C C E S S O R I E S L E G E N D
TOILET PARTITIONS
URINAL PRIVACY SCREEN
1 1/2" DIAM. x 36" LONG S.S. GRAB BAR w/ SNAP FLANGE 1 1/2" DIAM. x 48" LONG S.S. GRAB BAR w/ SNAP FLANGE
6 DECK-MOUNTED SOAP DISPENSER
SURFACE MOUNTED TOILET TISSUE
DISPENSER & UTILITY SHELF
COAT HOOK
CONTURA SERIES SURFACE-MOUNTED
SEAT COVER DISPENSER
TM
1 1/2" DIAMETER x 18" LONG S.S. GRAB BAR w/ SNAP FLANGE
TRIM LINE SERIES SURFACE-MOUNTED
WASTE RECEPTACLE
TM
ELECTRIC HAND DRYER
COVERED WASTE RECEPTACLE
N/A
FRAMED MIRROR 37" (h) x 60" (w)
TREASURY ANNEX BUILDING:
RESTROOM RENOVATION
RESTROOM RENOVATIONJANITOR'S CLOSET SIDE:
COORDINATE LOCATION OF NEW WATER
HEATER WITH MEP DRAWINGS
2 2
2 2 4
100%
RM-301
MEN
RM-301
MEN
4"
4' -0
" M
AX
5' -8
3'
-4 " A
C C
2'
-4
4'-6"
M
IN
. 3 3"
M
AX
. 3 6"
M
IN
. 3 9"
M
AX
. 4 1"
" M
IN
MIN. 39"
MAX. 41"
TOILET PAPER HOLDER
3'-0" 1'-0" MAX. SOAP DISPENSER
IN COUNTERTOP
DISPENSER
CONTROL
M
IN
. 3 3"
M
AX
. 3 6"
ADA URINAL
M
AX
STANDARD URINAL
2' -0
2' -1
0" M
AX
3' -4
" M
AX
" M
IN
WHEELCHAIR CLEAR
KNEE SPACE
2' -3
9"
11" 6"
8"
HAND WASH
SIGN
HEIGHT TO BASELINE
OF BRAILLE
SIGNAGE FRONT VIEW TOILET & GRAB BARS
PROVIDE BLOCKING AS REQUIRED
2' -1
0"
" M
AX
9"
7"-9"
5"
M
AX
" M
IN
4' -4
1 4"
3' -6
3' -4
ELECTRICAL
SWITCHES
6"
RIM
RIM
LC
16" - 18"
TOP
LC
LC
RIM 4
8"
- 6 0"
LC
1'-0"
Ø 1 14" - 1 12" LC
TOP
TOILET SEAT COVER
LC
2' -1
1"
ADA SINK & MIRROR
HOOKS &
SHELVES
0"
M
IN
- 4 8"
M
AX
SOAP DISPENSER
WALL MOUNTED
LC
PAPER TOWEL DISPENSER
/ WASTE RECEPTACLE
WASTE RECEPTACLE
" M
IN
" M
AX
LC
TOWEL
SLOT
ELECTRIC
HAND DRYER
HIGHEST OPERABLE
8"
M
AX
R M
-A
RM-301
MEN
P-4
P-5
P-4
P-5
RM301-B
P-1/P-2
P-3
P-1/P-2
P-3
RM301-C
RM301-D
P-3P-1/P-2
P-6
P-6 P-7
P-7
FCU
Ø5'-0"
2' -6
4'-0"
4'-0"
2' -6
5'-3"
PROPOSED MEN ROOM ADA CLEARANCES
A - 102
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
1/2"= 1'-0" 0 1' 2' 4'3'
10/20/2018
GENERAL NOTES
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
PROPOSED REFLECTED CEILING PLAND-3
1/4" = 1'-0"
ADA COMPLIANT INSTALLATION FOR FIXTURES AND ACCESSORIESA-1
1/2" = 1'-0"
PROPOSED FLOOR TILE PATTERNB-3
1/4" = 1'-0"
PROPOSED RM 301
A-4023 C-1
ADA CLEAR FLOOR SPACE & INTERIOR ELEVATION NOMENCLATUREB-1
N/S
A-4011 C-1ELEVATION A-401 2A-1
A-402 4A-1
A-403 C-3
A-403 A-1
ELEVATION
A-403 A-3
A-404 C-3
A-404 C-1
24x24 ACT + GRID
RAISED AREA TO CLEAR
WINDOW ENFRAMENT
A-404 A-3
A-404 A-1
LINE OF SOFFIT
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS
BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED
AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED
BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM
COR PRIOR TO PROCEEDING W/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /
IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO
FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS
SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL
TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE
CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE
PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF
WORK
6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,
SPECIFICATIONS AND DETAILS, THE MOST STRINGENT REQUIREMENT
APPLIES
7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS
OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS
RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK
RELATED TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED
COVERS MUST BE REINSTALLED AT END OF THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR
REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND
APPROVAL OF TREASURY
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING
MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK
AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB AND SQUARE
TREASURY ANNEX BUILDING:
RESTROOM RENOVATION
RESTROOM RENOVATION
100%
28 MARCH 2019
3RD FLOOR
RW-301
WOMEN
LC
LC
LC
LC
LC
LC
LC
2'-97 8"
ALIGN
FCU
R W
1-
A
RW301-B
3' -0
2' -0
1 4"
P-3 P-1/P-2
1' -0
1' -4
LC
6"
LC LC
4"
3'-3"
LC
8"
NEW TILE
EXISTING TILE
4'-6"
P-3
P-1/P-2
P-3
P-1/P-2
RW301-C
RW301-D
2' -0
2'
-0
9"
2' -6
3 4"
3'-61 8"
5'-2"
2' -1
0"
P-6 P-7
2'-0"
LC
5'-0"
LC
LC
3' -0
LC
1'
-6
1' -6
8"
2'-0"
P-6 P-7
P-6 P-7
LC
EXISTING WALL
TERRA COTTA
EXISTING CMU
WALL
EXISTING WALL
TERRA COTTA
EXISTING WALL
TERRA COTTA
EXISTING STRUCTURAL
COLUMN
EXISTING CMU
WALL
5'-4"
EXISTING STRUCTURAL
COLUMN
3' -4
61 2"
41 2"
1/2" GREEN BOARD ON
2 1/2" 16GA STUDS
2"
'-0
PROPOSED WOMEN ROOM FLOOR PLAN
A - 103
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
10/20/2018
BATHROOM RENOVATION
BATHROOM RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
PROPOSED RW 301
PROPOSED RW 301 FLOOR PLANA-1
3/4" = 1'-0"
3RD FLOOR
3/4"= 1'-0" 0 1' 2' 3'
1 17
13 15
A C C E S S O R I E S L E G E N D
TOILET PARTITIONS
URINAL PRIVACY SCREEN
1 1/2" DIAM. x 36" LONG S.S. GRAB BAR w/ SNAP FLANGE 1 1/2" DIAM. x 48" LONG S.S. GRAB BAR w/ SNAP FLANGE
6 DECK-MOUNTED SOAP DISPENSER
SURFACE MOUNTED TOILET TISSUE
DISPENSER & UTILITY SHELF
COAT HOOK
CONTURA SERIES SURFACE-MOUNTED
SEAT COVER DISPENSER
TM
1 1/2" DIAMETER x 18" LONG S.S. GRAB BAR w/ SNAP FLANGE
TRIM LINE SERIES SURFACE-MOUNTED
WASTE RECEPTACLE
TM
ELECTRIC HAND DRYER
COVERED WASTE RECEPTACLE
FRAMED MIRROR 37" (h) x 60" (w)
FRAMED MIRROR 37" (h) x 30" (w)
JANITOR'S CLOSET SIDE:
WHERE EXTANT TILE IS DEMOLISHED
REPLACE IT IN KIND. USE GREEN BOARD
AS A SUBSTRATE
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS
BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS
CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE
ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWING. IN
THOSE CASES INFORM COR PRIOR TO PROCEEDING W/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /
IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO
FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS
SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT
ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE
CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF
THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S
SCOPE OF WORK
6. 6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,
SPECIFICATIONS AND DETAILS, THE MOST STRINGENT REQUIREMENT
APPLIES
7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS
OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS
RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK
RELATED TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED
COVERS MUST BE REINSTALLED AT END OF THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR
REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND
APPROVAL OF TREASURY
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING
MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK
AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB AND SQUARE
KEYED NOTES
INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT
INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALL BASE, MORTAR AND GROUT AS PER
FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT,) AFTER EXTANT TILE AND
MORTAR HAVE BEEN REMOVED. GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING
NEW PARTITION ASSEMBLY: 2 1/2" STEEL STUDS (SEE WALL TYPE), 1/2" GREEN BOARD AND CERAMIC
TILE ONE OR BOTH SIDES AS DEPICTED. ( STUDS 16 GA,TRACK 12 GA)
INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALLS BASE MORTAR AND GROUT AS PER
FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT). INSTALL GREEN BOARD ON 16GA, 7/8" DEEP HAT CHANNELS @ 12" O.C. FASTENED W/ 3" TOGGLE BOLTS TO EXISTING TILED
WALL . EXTEND GREEN BOARD A MIN OF 3" ABOVE ACT CEILING
STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) & 6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @
34" AFF. INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE
ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE AND MEP DRAWINGS
ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL
FIXTURES AND ACCESSORIES IN ADA STALL.
INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE
INSTALL NEW TOILET PARTITION SYSTEM AS PER FIXTURE SCHEDULE PROVIDE ALL NECESSARY
FASTENERS, HARDWARE AND SHOE
EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND
TRANSOM TO BE CLEANED AND REFINISHED
CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL
NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES
& FITTINGS AS NEEDED
NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY
EXISTING WASTE LINE (FLOOR OR WALL) & WATER LINES TO BE CAPPED. SEE MEP DRAWINGS.SEE
MEP DRAWINGS
PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR
ALL SINKS. SEE MEP DRAWINGS
CENTER MIRROR ON SPACE BETWEEN WALLS (TWO SINKS) / ON SINK (ONE SINK)
CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING, 2HR FOR STRUCTURE. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO
WORK W/ THE NEW CEILING SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE
PROTECTION DRAWINGS
NEW FIXTURE LOCATION. PROVIDE NEW PLUMBING LINES AS NEEDED. SEE MEP DRAWINGS
NEW LOW WALL ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE WHERE
DEPICTED ( STUDS 16 GA,TRACK 12 GA) AS PER FINISHES SCHEDULE
CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602
DO NOT INSTALL NEW FIXTURE AT THE LOCATION OF THE REMOVED ONE. EXTANT PLUMBING LINES
TO REMAIN IF NEEDED TO SERVICE NEW FIXTURE. CAP UNUSED LINES
PROVIDE ALL NECESSARY ELECTRICAL WORK TO SUPPLY POWER TO ALL HARD WIRED DEVICES.
SEE ELECTRICAL DRAWINGS
NEW WATER HEATER TO BE LOCATED IN ADJACENT JANITOR'S CLOSET. SEE G-001 & MEP
DRAWINGS
C-4 STEEL CHANNELS ACROSS FRONT AND BACK SUPPORTED ON LOW WALLS TO CARRY MARBLE
SLAB. INSTALL 3/4" PLYWOOD UNDER SLAB TO FASTER SINK. SEE DETAILS ON A-403. COORDINATE
PLACEMENT OF STEEL IN RELATIONSHIP TO SINK. CONTRACTOR TO SUBMIT SHOP DRAWINGS
PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT
100%
4"
4' -0
" M
AX
5' -8
3'
-4 " A
C C
2'
-4
4'-6"
M
IN
. 3 3"
M
AX
. 3 6"
M
IN
. 3 9"
M
AX
. 4 1"
" M
IN
MIN. 39"
MAX. 41"
TOILET PAPER HOLDER
3'-0" 1'-0" MAX. SOAP DISPENSER
IN COUNTERTOP
DISPENSER
CONTROL
M
IN
. 3 3"
M
AX
. 3 6"
SANITARY NAPKIN
RECEPTACLE
2' -1
0" M
AX
3' -4
" M
AX
" M
IN
WHEELCHAIR CLEAR
KNEE SPACE
2' -3
9"
11" 6"
8"
HAND WASH
SIGN
HEIGHT TO BASELINE
OF BRAILLE
SIGNAGE FRONT VIEW TOILET & GRAB BARS
PROVIDE BLOCKING AS REQUIRED
2' -1
0"
" M
AX
9"
" M
IN
" M
AX
7"-9"
5"
M
AX
" M
IN
4' -4
1 4"
3' -6
3' -4
ELECTRICAL
SWITCHES
6"
LC
16" - 18"
TOP
LC
LC
RIM 4
8"
- 6 0"
LC
1'-0"
Ø 1 14" - 1 12" LC
TOP
TOILET SEAT COVER
LC
2' -1
1"
ADA SINK & MIRROR
HOOKS &
SHELVES
0"
M
IN
- 4 8"
M
AX
SOAP DISPENSER
WALL MOUNTED
LC
PAPER TOWEL DISPENSER
/ WASTE RECEPTACLE
WASTE RECEPTACLE
3' -4
1' -1
1"
SANITARY NAPKIN
DISPENSER
LC
TOWEL
SLOT
HIGHEST OPERABLE
8"
M
AX
ELECTRIC
HAND DRYER
PART
RW-301
WOMEN
RW-301
WOMEN
RW-301
WOMEN
FCU
R W
1-
A
RW301-B
P-3 P-1/P-2
P-3
P-1/P-2
P-3
P-1/P-2
RW301-C
RW301-D
P-6 P-7
P-6 P-7
P-6 P-7
Ø5'-0"
2' -6
4'-0"
5'-1"
PROPOSED WOMEN ROOM ADA CLEARANCES
A - 102
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
10/20/2018
BATHROOM RENOVATION
BATHROOM RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
ADA COMPLIANT INSTALLATION FOR FIXTURES AND ACCESSORIESA-1
1/2" = 1'-0"
PROPOSED REFLECTED CEILING PLAND-3
1/4" = 1'-0"
PROPOSED FLOOR TILE PATTERNB-3
1/4" = 1'-0"
PROPOSED RW 301
A-40614 C-1
ADA CLEAR FLOOR SPACE & INTERIOR ELEVATION NOMENCLATUREB-1
N/S
A-40512 C-1ELEVATION A-405 13A-1
A-406 15A-1
A-407 C-3
A-407 A-1
ELEVATION
A-409 C-3
24x24 ACT + GRID
RAISED AREA TO CLEAR
WINDOW ENFRAMENT
1/4"= 1'-0" 0 2' 4' 8'6'
A-408 A-3
A-409 A-3
A-409 A-1
A-408 A-1
A-408 C-3
LINE OF SOFFIT
A-407 A-3
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS
BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED
AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED
BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM
COR PRIOR TO PROCEEDING W/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /
IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO
FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS
SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL
TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE
CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE
PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF
WORK
6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,
SPECIFICATIONS AND DETAILS, THE MOST STRINGENT REQUIREMENT
APPLIES
7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS
OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS
RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK
RELATED TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED
COVERS MUST BE REINSTALLED AT END OF THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR
REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND
APPROVAL OF TREASURY
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING
MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK
AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB AND SQUARE
100%
28 MARCH 2019
9'
-0
'-0
T of FF
B of ACT
B of ACT
T of FF
T of CTOP
2' -1
0"
'-0
T of FF
B of ACT
/4
T of FF
9'
-0
B of ACT
T of TILE
T of PART.
'-1 0"
MATERIALPRODUCTTRADENAMEMODELNUMBER
1'-23 4"
5'-0"
3' -1
T of TILE
'-1
1 4"
P-4
P-4
P-5
P-5
P-7 P-7
P-6P-6
PROP. MEN RESTROOM INTERIOR ELEVATIONS
A - 401
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
10/20/2018
GENERAL NOTES
KEYED NOTES
INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT
INSTALL NEW CERAMIC WALL TILE AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE
RESISTANT) GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING
BULKHEAD RECESSED 16" FROM NORTH WALL (EXPOSE FULL WINDOW & MARBLE SURROUND.) FRAME BULKHEAD W/ 2 1/2" STEEL STUDS AND 1/2" GREEN BOARD (STUDS 20 GA,TRACK 16 GA). SEE A-3 / 602
INSTALL NEW CERAMIC WALL BASE, MORTAR AND GROUT
STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) &
6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @
34" AFF. INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE
NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES & FITTINGS AS NEEDED. ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE
& MEP DRAWINGS
ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL
FIXTURES AND ACCESSORIES IN ADA STALL.
INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE
INSTALL NEW TOILET PARTITION SYSTEM AND URINAL PRIVACY SCREEN AS PER FIXTURE SCHEDULE
PROVIDE ALL NECESSARY FASTENERS, HARDWARE AND SHOE
EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND
TRANSOM TO BE CLEANED AND REFINISHED
CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL
ADD MISSING 5" MARBLE TRIM HEADER TO MATCH EXTANT SIDES
CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602
PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR ALL
SINKS. SEE MEP DRAWINGS
CENTER MIRROR ON SPACE BETWEEN WALLS. SIZE AS DEPICTED
CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO WORK WITH THE NEW CEILING SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE PROTECTION DRAWINGS
PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT
NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY. ALL
NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE & MEP DRAWINGS
INSTALL NEW CARRIER, DRAIN AND WATER LINES FOR URINALS
INSTALL DYSON 964691-01 BACK PANEL (STAINLESS STEEL SATIN FINISH) TO THE WALL W/ CONTACT
ADHESIVES. H: 31-1/2" X W: 15-3/4" X D: 1/32"
PROVIDE A NEW PLUMBING ACCESS. INSTALL AN 8" x 8" STAINLESS STEEL COVER W/ LOCK
NEW PARTITION ASSEMBLY: 3 5/8" STEEL STUDS, 1/2" GREEN BOARD & CERAMIC TILE AS DEPICTED.
( STUDS 16 GA,TRACK 12 GA)
NEW PARTITION ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD & CERAMIC TILE AS DEPICTED.
( STUDS 16 GA,TRACK 12 GA)
NEW LOW WALL ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE WHERE
DEPICTED ( STUDS 16 GA,TRACK 12 GA) AS PER FINISHES SCHEDULE
C-4 STEEL CHANNELS ON 4 SIDES SUPPORTING MARBLE SLAB. INSTALL 3/4" PLYWOOD UNDER SLAB TO FASTER SINK. SEE DETAILS ON A-403. COORDINATE PLACEMENT OF STEEL IN RELATIONSHIP TO
SINK. CONTRACTOR TO SUBMIT SHOP DRAWINGS
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
PROPOSED RM 301 INTERIOR ELEVATIONS
PROPOSED ELEVATION 1C-1
3/4" = 1'-0"
PROPOSED ELEVATION 2A-1
3/4" = 1'-0"
6 6
18 19
3/4"= 1'-0" 0 1' 2' 3'
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR PRIOR TO
PROCEEDING W/ WORK
2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDITION
3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE
CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, SPECIFICATIONS AND DETAILS, THE
MOST STRINGENT REQUIREMENT APPLIES
7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED
TRASH AND DEBRIS
8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)
9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION ALL DAMAGES CAUSED BY THE
CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND
APPROVAL OF TREASURY
10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING MANUFACTURER'S SPECIFICATIONS
11. ALL FINISHES AS PER FINISHES SCHEDULE
12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK AND BRACED AS NEEDED. ALL
WALLS MUST BE PLUMB AND SQUARE
TREASURY ANNEX BUILDING:
RESTROOM RENOVATION
RESTROOM RENOVATION
A-602 A-3
TYP
8 8
146 1814
100%
28 MARCH 2019
-1
0"3' -9
3' -0
" 3' -6
'-1
'-0
T of FF
B of ACT
9' -0
B of ACT
MATERIALPRODUCTTRADENAMEMODELNUMBER
5'-0"
3' -1
T of TILE
6'
-1
1 4"
"24
" 17
36"
'-0
T of FF
B of ACT
9'
-0
B of ACT
/4
T of TILE
P-4
P-4
P-6
P-5
P-5
P-3 P-3
P-1 / P-2 P-1 / P-2
P-3
P-1 / P-2
P-7P-7
P-6
A - 402
N
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
GENERAL NOTES
KEYED NOTES
INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT
INSTALL NEW CERAMIC WALL TILE AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE
RESISTANT) GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING
BULKHEAD RECESSED 16" FROM NORTH WALL (EXPOSE FULL WINDOW & MARBLE SURROUND.) FRAME BULKHEAD W/ 2 1/2" STEEL STUDS AND 1/2" GREEN BOARD (STUDS 20 GA,TRACK 16 GA). SEE A-3 / 602
INSTALL NEW CERAMIC WALL BASE, MORTAR AND GROUT
STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) &
6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @
34" AFF. INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE
NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES & FITTINGS AS NEEDED. ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE
& MEP DRAWINGS
ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL
FIXTURES AND ACCESSORIES IN ADA STALL. SEE SCHEDULES
INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE
INSTALL NEW TOILET PARTITION SYSTEM AND URINAL PRIVACY SCREEN AS PER FIXTURE SCHEDULE
PROVIDE ALL NECESSARY FASTENERS, HARDWARE AND SHOE
EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND
TRANSOM TO BE CLEANED AND REFINISHED
CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL
ADD MISSING 5" MARBLE TRIM HEADER TO MATCH EXTANT SIDES
CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602
PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR ALL
SINKS. SEE MEP DRAWINGS
CENTER MIRROR ON SPACE BETWEEN WALLS. SIZE AS DEPICTED
CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO WORK WITH THE NEW CEILING SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE PROTECTION DRAWINGS
PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT
NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY. ALL
NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE & MEP DRAWINGS
INSTALL NEW CARRIER, DRAIN AND WATER LINES FOR URINALS
INSTALL DYSON 964691-01 BACK PANEL (STAINLESS STEEL SATIN FINISH) TO THE WALL W/ CONTACT
ADHESIVES. H: 31-1/2" X W: 15-3/4" X D: 1/32"
PROVIDE A NEW PLUMBING ACCESS. INSTALL AN 8" x 8" STAINLESS STEEL COVER W/ LOCK
NEW PARTITION ASSEMBLY: 3 5/8" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE AS DEPICTED.
( STUDS 16 GA,TRACK 12 GA)
NEW PARTITION ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE AS DEPICTED.
( STUDS 16 GA,TRACK 12 GA)
C-4 STEEL CHANNELS ON 4 SIDES SUPPORTING MARBLE SLAB.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.