3rd_Floor_Restroom_100__3-28-2019_R.pdf

PDF 5 MB Posted

Attached to
Treasury OFAC Renovation Federal contract opportunity
Solicitation number
2032H319R00008
Issued by
Department of the Treasury Internal Revenue Service

About this file

3rd fl Restroom Drawing

View the file

Other files for this federal contract opportunity

Other files attached to Treasury OFAC Renovation, newest first.
File Type Posted
Plumbing_2nd_Floor.pdf PDF
Wage_Determination_DC2_-_072619.pdf PDF
2032H319R00008_005.pdf PDF
Plumbing_3rd_Floor.pdf PDF
2032H319R00008_004.pdf PDF
Attachment_C_-2nd_Floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
2032H319R00008_0003.pdf PDF
2032H319R00008_0002.pdf PDF
Site_Visit_List.pdf PDF
2032H319R00008_-_0001.pdf PDF
Attachment_B_-_2nd_floor_LAN_room_cable_tray_layout.pdf PDF
1_-_2032H319R00008-OFAC_RENOVATION_7-9-19.pdf PDF
Attachment_C_-2nd_Floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
Sketch_of_X010_Lock.pdf PDF
drawing_A106_-_Security_&_Secured_Window_Package_2nd_Fl.pdf PDF
Sign_Type_A2.pdf PDF
SIGN_P-Mount-Teknion.pdf PDF
SD2500_2510TechSpec.pdf PDF
Security_&_Secured_Window_Package_2nd_Fl.pdf PDF
Secure_Insert_Window_Detail.pdf PDF
Attachment_C_-_Annex_3rd_floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
Treasury_Annex_Restrooms_Renovation_Spec.pdf PDF
Sign_Type_A1.pdf PDF
Security_&_Secured_Window_Package_3rd_Fl.pdf PDF
3rd_Floor_RFP_v1.pdf PDF
2nd_Floor_RFP.pdf PDF
2nd_Floor_100__DRAWING_4-4-2019_S300R.pdf PDF
3rd_floor_April_28_2019_100__Full_Set.pdf PDF
Attachment_B_-3rd_floor_LAN_room_Cable_Tray_Layout.pdf PDF
3rd_Floor_Annex_100__SPEC.pdf PDF
2nd_and_3rd_Floor_Furniture_Power_&_Data_Changes.pdf PDF
Attachment_A_-_2nd_floor_LAN_room_layout.pdf PDF
Treasury_Annex_2nd_Floor_ET101_Revised.pdf PDF
2nd_Floor_Annex_100__SPEC.pdf PDF
Attachment_D_-2nd_floor_Information_Outlet_Layout.pdf PDF
Historic_Restoration_Package_dated_4.4.19.pdf PDF
Attachment_D_-_3rd_floor_Information_Outlet_layout.pdf PDF
3rd_floor_-_ET-101_Revised.pdf PDF
Attachment_A_-3rd_floor_LAN_room_layout.pdf PDF
Schedule_FFB_2nd_and_3rd_Floors.xlsx XLSX spreadsheet
TRES_2nd_Floor_Restroom_100___DRAWING_3-28-2019.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RM-301

MEN

JANITOR CLOSET

NEW WATER HEATER

PLUMBING ACCESS

9'-71 8"

RW-301

WOMEN

P-8 / P-9

1 2 3 4 5

1 2 3 4 5

A

B

C

D department of TREASURY, TREASURY ANNEX BUILDING

1500 PENNSYLVANIA AVENUE NW | WASHINGTON DC 20220

DRAWING INDEX

VICINTY MAP

TREASURY ANNEX 3RD FLOOR RESTROOMS RENOVATION

TREASURY ANNEX

BUILDING

N

GENERAL CONDITIONS

1. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OF THE DESCRIPTION OF DETAILS OF WORK WHICH ARE

MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS-DESCRIBED DETAILS OF WORK BUT SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FROM AND DESCRIBED IN THE DRAWINGS AND

SPECIFICATION

2. MANUFACTURER SPECIFIED WITHIN THE CONSTRUCTION DOCUMENTS ARE PROVIDED AS A MINIMUM PERFORMANCE CRITERIA, SUBSTITUTIONS WILL BE CONSIDERED IF COMPLAINT TO THE PERFORMANCE ESTABLISHED BY THE MANUFACTURER NOTED. BUILDING MATERIALS SUBSTANDARD TO THESE REQUIREMENTS WILL BE SUMMARILY REJECTED.

ALL BUILDING COMPONENTS ARE TO BE HEAVY DUTY QUALITY AND BE FOR ABUSIVE RESISTANCE INSTALLATION. BUILDING COMPONENTS SPECIFIED HEREIN THAT DO NOT MEET THE HEAVY DUTY-ABUSIVE ENVIRONMENTAL CRITERIA MUST BE

BROUGHT TO THE ATTENTION OF THE BUILDING REPRESENTATIVE AND WILL BE RE-SPECIFIED

3. BY THE SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND HAS FAMILIARIZED

HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED

4. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS AND/OR SIZE. VERIFY ALL DIMENSIONS BEFORE PROCEEDING AND OBTAIN MEASUREMENTS AT THE JOB FOR ALL WORK REQUIRED TO BE ACCURATELY FITTED TO THE BUILDING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SUCH MEASUREMENTS AND FOR THE PRECISE FITTING

OF THE WORK

5. IF CONFLICTS ARE DISCOVERED AT ANY TIME BETWEEN THE ENGINEERING AND ARCHITECTURAL DRAWINGS, THE COR SHALL BE CONTACTED AT ONCE TO RESOLVE THE PROBLEM. IF THE COR IS NOT CONTACTED, THE CONTRACTOR SHALL

ACCEPT THE RESPONSIBILITY TO CORRECT ANY AND ALL SUCH WORK

6. CHANGES TO THE DRAWINGS (ADDITIONS, DELETIONS OR ALTERATIONS) THAT MIGHT CONSTITUTE A CHANGE ORDER MUST BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL, OTHERWISE CONTRACTOR WOULD UNDERTAKE SUCH

WORK AT HIS OWN RISK AND WORK MIGHT HAVE TO BE REVERSED AT CONTRACTOR'S OWN COST

7. ALL SALVAGEABLE MATERIALS SHALL BE RETURNED TO THE GOVERNMENT

8. THE G. C. AND ALL SUB-CONTRACTOR SHALL SUBMIT TO GOVERNMENT AND COR SUBMITTALS AND SHOP DRAWINGS FOR

REVIEW PRIOR TO START OF CONSTRUCTION.

9. UPON COMPLETION OF THE INSTALLATION, REMOVE ALL DEBRIS FROM THE BUILDING CREATED BY THE WORK PROVIDED UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. REMOVE ANY SOILED SPOTS FROM THE FACE OF THE CARPET OR OTHER FINISH SURFACES USING PROCESSES RECOMMENDED BY THE MANUFACTURER AND IN A MANNER ACCEPTABLE TO THE GOVERNMENT. REPLACE ANY AREAS OF CARPET OR FINISH SURFACES WHERE CLEANING HAS FAIL TO RESTORE THE

APPEARANCE AND QUALITY SATISFACTORILY, AS DETERMINED BY THE GOVERNMENT.

10. ALL CONTRACTORS SHALL PERFORM ALL WORK IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL CODES AND

REGULATIONS.

11. THE G. C. SHALL VERIFY REQUIREMENTS FOR ALL EQUIPMENT INDICATED ON THE DRAWINGS WHETHER SUPPLIED BY THE

GOVERNMENT OR SUB-CONTRACTOR.

12. WHERE THE G. C. IS INSTRUCTED TO ALIGN A PARTITION WITH TWO OR MORE COLUMNS AND THE COLUMNS ARE DISCOVERED TO BE OF UNEQUAL SIZE, THE LARGER OF THE COLUMNS SHALL DETERMINE THE LOCATION OF THE

PARTITION. THIS WILL ALSO APPLY TO WET COLUMNS AND CORE WALLS.

13. THE G. C. SHALL REPAIR ALL DAMAGE CAUSED BY HIM OR HIS SUB-CONTRACTORS DURING CONSTRUCTION.

PRE-EXISTING DAMAGE MUST BE REVIEWED AND ACKNOWLEDGED, IN WRITING BY THE GOVERNMENT AND ARCHITECT PRIOR TO COMMENCEMENT OF WORK. DAMAGE NOT DOCUMENTED PRIOR TO CONSTRUCTION START SHALL BE REPAIRED

TO LIKE NEW CONDITION WITHOUT ADDITIONAL CHARGE TO THE GOVERNMENT.

14. THE G. C. SHALL ENSURE THAT ALL PAINT HAS BEEN REMOVED FROM ALL NON-SCHEDULE PAINTED SURFACES PRIOR TO

DELIVERY OF THE SPACE.

15. THE G. C. SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED

16. IF THERE IS A QUESTION AS TO THE ACCEPTABLE LEVEL OF QUALITY FOR THE INSTALLATION OF ANY MATERIALS, THE

GOVERNMENT'S REPRESENTATIVE DECISION WILL BE FINAL

17. NEW DOOR HARDWARE, INCLUDING HINGES AND LOCK SETS, ARE TO BE MOUNTED AT ABA HEIGHTS UNLESS NOTED

OTHERWISE

18. ALL CEILING REGISTERS, GRILLES, VENTS AND DIFFUSERS SHALL BE FACTORY FINISHED. IF PAINTING IS REQUIRED, PROVIDE ENAMEL FINISH

19. ALL J-BENDS AND OTHER GYPSUM METAL TRIM SHALL BE SPACKLE-BLENDED INTO THE ADJACENT SURFACE.

20. WHERE TWO OR MORE WALL SWITCHES OR DIMMERS OCCUR IN THE SAME LOCATION, THEY ARE TO RECEIVE A COMMON

GANG PLATE WHOSE FINISH IS TO MATCH THE BUILDING STANDARD SWITCH PLATE.

21. ALL PAINTED WALLS SHALL BE HAVE A LEVEL 4 FINISH: WITH ONE ROLLER-APPLIED (1) PRIMER COAT AND (2)

ROLLER-APPLIED FINISH COATS.

22. PROVIDE THRESHOLDS AT ALL DOORS AND TRANSITION STRIPS WHERE CARPET MEETS A DIFFERENT TYPE OF FLOORING

23. REVIEW THE SPECIFICATIONS AND CUT SHEETS FOR ACCESSORIES, FIXTURES, ETC. THAT ACCOMPANY THE DRAWING SET PRIOR TO PLACING ORDERS. IF CONFLICTS ARE FOUND, INFORM THE ARCHITECT OF SUCH FINDINGS AND TAKE NO ACTION UNTIL RESOLVED. IN THOSE CASES, IF AN ORDER FOR AN UNRESOLVED ITEM IS PLACED WITHOUT APPROVAL OF ARCHITECT, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY IF THE ITEM IS NOT ACCEPTED BY THE CLIENT

24. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, SPECIFICATIONS AND DETAILS, THE MOST STRINGENT

REQUIREMENT APPLIES. INFORM COR OF SUCH FINDINGS

N

AC

ACT

ADJ

AFF

ALUM

ATT

B & B

BD

BET

BF

BIT

BLDG

BTM

CER

CJ

CL

CLG

CMU

COMP

CONC

CONT

D

AT

ACOUSTIC

ACOUSTIC CEILING TILE

ADJUSTABLE

ABOVE FINISHED FLOOR

ALUMINUM

ATTENUATION

BALLED AND BAGGED

BOARD

BETWEEN

BARRIER FREE

BITUMINOUS

BUILDING

BOTTOM

CERAMIC

CONTROL JOINT

CENTER LINE

CEILING

CONCRETE MASONRY UNIT

COMPRESSIBLE

CONCRETE

CONTINUOUS

DEEP

DEMO

D.F.

DIA

DS

EXTG

F&I

FF

FLR

FV

GA

GALV

GC

GL

GPDW

O.C.

O.D.

O.H.

OZ.

PLAM

PLYWD

PR

DEMOLITION

DRINKING FOUNTAIN

DIAMETER

DOWN SPOUT

EXISTING

FURNISH AND INSTALL

FINISHED FLOOR

FLOOR

FIELD VERIFY

GAUGE

GALVANIZED

GENERAL CONTRACTOR

GLASS

GYPSUM WALLBOARD

ON CENTER

OUTSIDE DIAMETER

OVERHEAD OR OPP. HAND

OUNCE

PLASTIC LAMINATE

PLYWOOD

PAIR

ABBREVIATIONS

PT

PTD

QTY

REINF

REQ'D

RM.

SHT

SIM

SS

THK

TYP.

VCT

VERT

VIF

VP

UON

W.

W/

PRESSURE TREATED

PAINTED

QUANTITY

REINFORCED

REQUIRED

ROOM

SHEET

SIMILAR

STAINLESS STEEL

THICKNESS

TYPICAL

VINYL COMPOSITION TILE

VERTICAL

VERIFY IN FIELD

VENEER PLASTER

UNLESS OTHERWISE NOTED

WIDE

WITH

SYMBOLS

ALIGN

ALIGN SURFACES

CENTER LINE

X

GENERAL / KEYED NOTE

DEMOLITION NOTE

ROOM NAME

ROOM NUMBER

EXTG WALL TO BE REMOVED

X PARTITION TYPE

EXTG WALL TO REMAIN

NEW DOOR ASSEMBLY

X-

XX

X

EXTG DOOR ASSEMBLY

TO BE REMOVED

EXTG DOOR ASSEMBLY

X-XXX

NEW PARTITION

X DRAWING REVISION NUMBER

1 22OF

G - 001

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

SHEET

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

COVER PAGE

NEW WALL

100%

3RD FLOOR

0018-11

28 MARCH 2019

TREASURY ANNEX BUILDING:

RESTROOM RENOVATION

RESTROOM RENOVATION

3RD

RESTROOMS & JANITOR CLOSET

N.T.S.

OVERALL PROPOSED CONDITION

KEY PLAN

LC

XXX

XXX

XX

GENERAL

ARCHITECTURAL

G-001 COVER SHEET 01 OF 33

AD101 EXISTING / DEMOLITION FLOOR PLAN MEN RESTROOM 02 OF 33

AD102 EXISTING / DEMOLITION FLOOR PLAN WOMEN RESTROOM 03 OF 33

A-101 PROPOSED MEN BATHROOM FLOOR PLAN 04 OF 33

A-102 PROPOSED MEN BATHROOM FLOOR PLAN ACCESSIBILITY 05 OF 33

A-103 PROPOSED WOMEN BATHROOM FLOOR PLAN 06 OF 33

A-104 PROPOSED WOMEN BATHROOM FLOOR PLAN ACCESSIBILITY 07 OF 33

A-401 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 08 OF 33

A-402 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 09 OF 33

A-403 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 10 OF 33

A-404 PROPOSED MEN BATHROOM INTERIOR ELEVATIONS 11 OF 33

A-405 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 12 OF 33

A-406 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 13 OF 33

A-407 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 14 OF 33

A-408 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 15 OF 33

A-409 PROPOSED WOMEN BATHROOM INTERIOR ELEVATIONS 16 OF 33

A-601 FINISHES SCHEDULE 17 OF 33

A-602 BATHROOM FIXTURES SCHEDULE 18 OF 33

A-603 BATHROOM ACCESSORIES SCHEDULE 19 OF 33

A-604 PLUMBING ACCESSORIES SPECS 20 OF 33

A-605 PLUMBING ACCESSORIES SPECS 21 OF 33

A-606 PLUMBING ACCESSORIES SPECS 22 OF 33

P-001 SYMBOLS, ABBREVIATIONS & PLUMBING SCHEDULE 23 OF 33

P-002 DETAILS 24 OF 33

P-101 DEMOLITION & PROPOSED PLUMBING 25 OF 33

P-601 RISER DIAGRAMS 26 OF 33

M-101 DEMOLITION & PROPOSED MECHANICAL 27 OF 33

E-001 SYMBOLS & ABBREVIATIONS 28 OF 33

E-101 DEMOLITION AND PROPOSED LIGHTING AND POWER 29 OF 33

E-601 DETAILS AND PANEL SCHEDULES 30 OF 33

E-602 DETAILS AND PANEL SCHEDULES 31 OF 33

E-603 DETAILS AND PANEL SCHEDULES 32 OF 33

E-604 DETAILS AND PANEL SCHEDULES 33 OF 33

MECHANICAL

ELECTRICAL

PLUMBING

6' -0

2'-21 4"

2' -3

1 8"

1'-41 4"

3' -4

1 4" 1'

-5 1 2"

1' -4

1 4" 1'

-4 3 8"

2' -6

7 8"

7'-101 4"

2' -1

3 4"

'-1

0"

4" 21

2"

10"

1'-9"

2' -0

1 4" 5'-0"

1'-0"

2' -7

1 8"

5' -3

3'-0"2'-8"2'-53 4"

1' -2

1 2"

8"

'-0

1 8"

4'-5"

1' -1

0"

RM 30

1-A

LC

LC

RM-301

MEN

LC

LC

LC

LC

LC

LC

10'-5"

EXISTING AND DEMOLITION PLANS

AD 101

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

GENERAL NOTES

DEMOLITION NOTES

100%

10/20/2018

3RD FLOOR

0018-11

28 MARCH 2019

KEYED NOTES

DEMOLISH PORTION OF EXISTING WALL ASSEMBLY AS

DEPICTED DOWN TO ORIGINAL SUBSTRATE.

DEMOLISH EXISTING CERAMIC TILE FLOORING, MORTAR AND

GROUT. MAKE FLOOR SMOOTH AND LEVEL TO RECEIVE NEW

CERAMIC TILE FLOORING.

DEMOLISH CMU WALL TO ACCESS PLUMBING LINES, DEMOLISH

PEDAL FLUSHERS, AND INSTALL NEW EQUIPMENT

DEMOLISH EXISTING WALL CERAMIC TILE, WALL BASE,

MORTAR & GROUT DOWN TO ORIGINAL SUBSTRATE WITHOUT

DAMAGING EXTANT TERRA COTTA WALL, WHICH IS TO

REMAIN

DEMOLISH ALL EXISTING BATHROOM FIXTURES AND ALL

ACCESSORIES. THAT INCLUDES (BUT NOT LIMITED TO): FLOOR

MOUNTED WATER CLOSETS, PEDAL FLUSHERS, VANITY, SINKS,

FAUCETS, URINALS, MIRRORS, SHELVES, PAPER TOWEL

DISPENSER, SOAP DISPENSERS, TOILET PAPER HOLDERS,

AND RECESSED AND SURFACE MOUNTED WASTE BINS

DEMOLISH EXISTING TOILET ROOM PARTITIONS AND DOORS

EXISTING TOILET WASTE LINE (FLOOR) TO BE CAPPED

DEMOLISH EXISTING WALL MOUNTED FIXTURES' CARRIERS

EXPOSE ENTIRE MARBLE ENFRAMENT. ALLOW 1" CLEAR FROM

EDGE OF MARBLE TO WALL

DEMOLISH ELECTRICAL OUTLETS AND SWITCHES. SEE

ELECTRICAL DRAWINGS

DEMOLISH ACT CEILING AND GRID. INSTALL NEW CEILING

SYSTEM AS PER RCP

REMOVE ALL EXISTING LIGHT FIXTURES. SEE ELECTRICAL

DRAWINGS

DEMOLISH EXISTING S/R DIFFUSERS. SEE HVAC DRAWINGS

DEMOLISH EXISTING FIRE ALARM SYSTEM DEVICES. SEE FIRE

PROTECTION DRAWINGS

DISCONNECT AND REMOVE EXISTING ELECTRIC HAND DRYER.

RETURN TO TREASURY

DEMOLISH CMU WALL TO ACCESS PLUMBING LINES, DEMOLISH

PEDAL FLUSHERS, AND INSTALL NEW EQUIPMENT

EXISTING MARBLE ENFRAMENT TO REMAIN. CLEAN & POLISH

EXISTING DOOR, HARDWARE & OPENER TO REMAIN.

DOOR SWING TO BE MIRRORED, DOOR TO BE REFINISHED

WALL MOUNTED FIXTURE CARRIAGE TO BE REPLACED

EXISTING TOILET WASTE LINE (FLOOR) AND WATER LINES TO

REMAIN AND TO BE REUSED

EXISTING SINK WASTE LINE AND WATER LINES TO REMAIN

EXISTING URINAL WASTE LINE AND WATER LINES TO REMAIN

INSTALL NEW FIXTURE CARRIER

FIRE SPRINKLERS TO REMAIN. PROTECT SPRINKLER HEADS

DURING CONSTRUCTION AND ADJUST HEIGHT TO WORK WITH

NEW CEILING SYSTEM

EXISTING TERRA COTTA BLOCK, MORTAR AND TILE TO REMAIN

EXISTING AND DEMOLITION MEN BATHROOM RM-201A-1

3/4" = 1'-0"

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND

DIMENSIONS BEFORE STARTING WORK. NO FORENSIC

DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY.

DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL

CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR

PRIOR TO PROCEEDING w/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /

NEC/ IMC / IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR

PARTITION TO FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW

UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS AND MATERIALS, MUST BE

FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED

OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY

FOR THE COMPLETION OF THE PROJECT, SHALL BE

CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK

6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,

SECTIONS, SPECIFICATIONS AND DETAILS, THE MOST

STRINGENT REQUIREMENT APPLIES

7. THE CONTRACTOR SHALL THOROUGHLY CLEAN UP ALL AREAS

WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE

CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND

PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED

DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE

SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF

THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION

ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE

SATISFACTION AND APPROVAL OF TREASURY / CO

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING

MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING

DECK AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB

AND SQUARE

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

EXISTING RM 301

6 10

11 12 13 14

1 1

11 2

9 9

3/4"= 1'-0" 0 1' 2' 3'

TREASURY ANNEX BUILDING:

RESTROOM RENOVATION

RESTROOM RENOVATION

4'-9"

2' -7

2'

-6

5' -2

3 8"

RW-301

WOMEN

1' -9

1' -6

1 4" 2'

-0 1 2"

'-6

'-1

0" 20 '-1

0"

LC

LC

1' -1

5 8"

LC

LC

LC

LC

LC

1'

-3 5 8"

1' -4

1 4" 1'

-1 0"

6' -5

1 4"

'-0

1 8"

1' -3

1 4"

10'-6"

9'-4"

4"

2' -1

1 2" 2'-1"

1' -1

2'-91 2"

RW 301-A

2'-97 8"

9"1 34" 3"

5'-23 8"

10'-6"

5'-3"

71 4"

5'-7"

AD 102

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

10/20/2018

3RD FLOOR

N

GENERAL NOTES

DEMOLITION NOTES

KEYED NOTES

DEMOLISH PORTION OF EXISTING WALL ASSEMBLY AS

DEPICTED, DOWN TO ORIGINAL SUBSTRATE.

DEMOLISH EXISTING CERAMIC TILE FLOORING, MORTAR AND

GROUT. MAKE FLOOR SMOOTH AND LEVEL TO RECEIVE NEW

CERAMIC TILE FLOORING.

DEMOLISH EXISTING WALL CERAMIC TILE, WALL BASE,

MORTAR & GROUT DOWN TO ORIGINAL SUBSTRATE.

EXISTING SINK WASTE LINE AND WATER LINES TO BE CAPPED

DEMOLISH ALL EXISTING BATHROOM FIXTURES AND ALL

ACCESSORIES. THAT INCLUDES (BUT NOT LIMITED TO): FLOOR

MOUNTED WATER CLOSETS, PEDAL FLUSHERS, VANITY, SINKS,

FAUCETS, URINALS, MIRRORS, SHELVES, PAPER TOWEL

DISPENSER, SOAP DISPENSERS, TOILET PAPER HOLDERS,

AND RECESSED AND SURFACE MOUNTED WASTE BINS

DEMOLISH EXISTING TOILET ROOM PARTITIONS AND DOORS

EXISTING TOILET WASTE LINE (FLOOR) TO BE CAPPED

DEMOLISH EXISTING WALL MOUNTED FIXTURES' CARRIERS

EXPOSE ENTIRE MARBLE ENFRAMENT. ALLOW 1" CLEAR FROM

EDGE OF MARBLE TO WALL IF POSSIBLE

DEMOLISH ELECTRICAL OUTLETS AND SWITCHES. SEE

ELECTRICAL DRAWINGS

DEMOLISH ACT CEILING AND GRID. INSTALL NEW CEILING

SYSTEM AS PER RCP

REMOVE ALL EXISTING LIGHT FIXTURES. SEE ELECTRICAL

DRAWINGS

DEMOLISH EXISTING S/R DIFFUSERS. SEE MEP DRAWINGS

DEMOLISH EXISTING FIRE ALARM SYSTEM. SEE FIRE

PROTECTION DRAWINGS

DISCONNECT AND REMOVE EXISTING ELECTRIC HAND DRYER.

RETURN TO TREASURY

EXISTING MARBLE ENFRAMENT TO REMAIN. CLEAN & POLISH

EXISTING DOOR, HARDWARE & OPENER TO REMAIN.

DOOR SWING TO BE MIRRORED, DOOR TO BE REFINISHED

EXISTING TOILET WASTE LINE (FLOOR) AND WATER LINES TO

REMAIN AND TO BE REUSED

EXISTING SINK WASTE LINE AND WATER LINES TO REMAIN

FIRE SPRINKLERS TO REMAIN. PROTECT SPRINKLER HEADS

DURING CONSTRUCTION AND ADJUST HEIGHT TO WORK WITH

NEW CEILING SYSTEM

LOCATION OF EXISTING ACCESS PANEL TO REMAIN. REPLACE

COVER

EXISTING TERRA COTTA BLOCK, MORTAR AND TILE TO REMAIN.

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

EXISTING AND DEMOLITION WOMEN BATHROOM RW-201A-1

3/4" = 1'-0"

2 5 6 10

11 12

1 1

1 1

9 9

3/4"= 1'-0" 0 1' 2' 3'

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND

DIMENSIONS BEFORE STARTING WORK. NO FORENSIC

DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY.

DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL

CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR

PRIOR TO PROCEEDING W/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /

NEC/ IMC / IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR

PARTITION TO FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW

UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS AND MATERIALS, MUST BE

FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED

OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY

FOR THE COMPLETION OF THE PROJECT, SHALL BE

CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK

6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,

SECTIONS, SPECIFICATIONS AND DETAILS, THE MOST

STRINGENT REQUIREMENT APPLIES

7. THE CONTRACTOR SHALL THOROUGHLY CLEAN UP ALL AREAS

WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE

CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND

PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED

DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE

SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF

THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION

ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE

SATISFACTION AND APPROVAL OF TREASURY / CO

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING

MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING

DECK AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB

AND SQUARE

EXISTING RW 301

EXISTING AND DEMOLITION PLANS

TREASURY ANNEX BUILDING:

RESTROOM RENOVATION

RESTROOM RENOVATION

100%

0018-11

28 MARCH 2019

6' -4

7 8"

7'-31 4"

'-1

0"

4'-73 8"

3'-31 2"

1' -8

R M

-A

LC

LC

RM-301

MEN

LC

LC

LC

LC

LC

LC

P-4

P-5

P-4

P-5

RM301-B

P-1/P-2

P-3

P-1/P-2

P-3

LC

LC

RM301-C

RM301-D

43 4" 61 4"

1'-25 8"

2' -6

7 8" 3'

-0

2' -1

1"

5'-11 4"

2'-6"

3' -0

2' -0

2'

-0

9" 9"

2' -0

ALIGN

LC

P-3P-1/P-2

LC

8"

3' -0

1' -3

1 4"

LC

1' -0

1'

-4

LC

6"

LCLC

4"

5'-0"

3'-3" 4'-6"

55 8"

1' -3

5 8" 1'

-3

P-6

P-6 P-7

NEW TILE

P-7

6' -3

3 8"

2'-0"

3'-21 8"

2' -0

5 8" LC

EXISTING TILE

FCU 5"5"

1/2" GREEN BOARD ON

2 1/2" 16GA STUDS

NEW WALL

FRAMED

EXISTING WALL

TERRA COTTA

EXISTING WALL

TERRA COTTA

EXISTING WALLS

TERRA COTTA

EXISTING

STRUCTURAL

1' -8

LC

67 8"

NEW WALL

FRAMED

COLUMN

2'-3"

5' -0

5'-51 2"

2"

31 2"

2"

2"

1' -4

1 8"LC31 4"

PROPOSED MEN ROOM FLOOR PLAN

A - 101

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

1/4"= 1'-0" 0 2' 4' 8'6'

10/20/2018

GENERAL NOTES

KEYED NOTES

INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT

INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALL BASE, MORTAR AND GROUT AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT,) AFTER EXTANT TILE AND MORTAR HAVE

BEEN REMOVED. GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING

NEW PARTITION ASSEMBLY: 3 5/8" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE ONE OR BOTH

SIDES AS DEPICTED. ( STUDS 16 GA,TRACK 12 GA)

INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALLS BASE MORTAR AND GROUT AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT). INSTALL GREEN BOARD ON 16GA, 2 1/2" DEEP STUDS @ 16" o.c. FULL HEIGHT. EXTEND GREEN BOARD A MIN OF 3" ABOVE ACT CEILING

STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) & 6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @ 34" AFF.

INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE

ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE & MEP DRAWINGS.

ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL

FIXTURES AND ACCESSORIES IN ADA STALL.

INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE

INSTALL NEW TOILET PARTITION SYSTEM/ URINAL SCREEN AS PER FIXTURE SCHEDULE. PROVIDE ALL

NECESSARY FASTENERS, HARDWARE AND SHOE

EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND

TRANSOM TO BE CLEANED AND REFINISHED

CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL

NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES &

FITTINGS AS NEEDED

NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS

DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY

EXISTING WASTE LINE (FLOOR OR WALL) & WATER LINES TO BE CAPPED. SEE MEP DRAWINGS.SEE MEP

DRAWINGS

PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR ALL

SINKS. SEE MEP DRAWINGS

CENTER MIRROR ON SPACE BETWEEN WALLS. SIZE AS DEPICTED

CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO WORK WITH THE NEW CEILING

SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE PROTECTION DRAWINGS

INSTALL NEW CARRIER, DRAIN AND WATER LINES FOR URINALS

NEW LOW WALL ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE WHERE

DEPICTED ( STUDS 16 GA,TRACK 12 GA) AS PER FINISHES SCHEDULE

CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602

DO NOT INSTALL NEW FIXTURE AT THE LOCATION OF THE REMOVED ONE. EXTANT PLUMBING LINES TO

REMAIN IF NEEDED TO SERVICE NEW FIXTURE. CAP UNUSED LINES

PROVIDE ALL NECESSARY ELECTRICAL WORK TO SUPPLY POWER TO ALL HARD WIRED DEVICES. SEE

ELECTRICAL DRAWINGS

NEW WATER HEATER TO BE LOCATED IN ADJACENT JANITOR'S CLOSET. SEE G-001 & MEP DRAWINGS

C-4 STEEL CHANNELS ACROSS FRONT AND BACK SUPPORTED ON LOW WALLS TO CARRY MARBLE SLAB.

INSTALL 3/4" PLYWOOD UNDER SLAB TO FASTER SINK. SEE DETAILS ON A-403. COORDINATE

PLACEMENT OF STEEL IN RELATIONSHIP TO SINK. CONTRACTOR TO SUBMIT SHOP DRAWINGS

PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

PROPOSED RM 301

PROPOSED RM 301 FLOOR PLANA-1

3/4" = 1'-0"

4 5

3/4"= 1'-0" 0 1' 2' 3'

3RD FLOOR

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR PRIOR TO

PROCEEDING W/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED

"EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT

SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE

COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK

6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, SPECIFICATIONS AND DETAILS, THE

MOST STRINGENT REQUIREMENT APPLIES

7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED

TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND VENTS TO PREVENT INTRODUCING

DUST INTO THE SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL DAMAGES CAUSED BY THE

CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND

APPROVAL OF TREASURY

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK AND BRACED AS NEEDED. ALL

WALLS MUST BE PLUMB AND SQUARE

A C C E S S O R I E S L E G E N D

TOILET PARTITIONS

URINAL PRIVACY SCREEN

1 1/2" DIAM. x 36" LONG S.S. GRAB BAR w/ SNAP FLANGE 1 1/2" DIAM. x 48" LONG S.S. GRAB BAR w/ SNAP FLANGE

6 DECK-MOUNTED SOAP DISPENSER

SURFACE MOUNTED TOILET TISSUE

DISPENSER & UTILITY SHELF

COAT HOOK

CONTURA SERIES SURFACE-MOUNTED

SEAT COVER DISPENSER

TM

1 1/2" DIAMETER x 18" LONG S.S. GRAB BAR w/ SNAP FLANGE

TRIM LINE SERIES SURFACE-MOUNTED

WASTE RECEPTACLE

TM

ELECTRIC HAND DRYER

COVERED WASTE RECEPTACLE

N/A

FRAMED MIRROR 37" (h) x 60" (w)

TREASURY ANNEX BUILDING:

RESTROOM RENOVATION

RESTROOM RENOVATIONJANITOR'S CLOSET SIDE:

COORDINATE LOCATION OF NEW WATER

HEATER WITH MEP DRAWINGS

2 2

2 2 4

100%

RM-301

MEN

RM-301

MEN

4"

4' -0

" M

AX

5' -8

3'

-4 " A

C C

2'

-4

4'-6"

M

IN

. 3 3"

M

AX

. 3 6"

M

IN

. 3 9"

M

AX

. 4 1"

" M

IN

MIN. 39"

MAX. 41"

TOILET PAPER HOLDER

3'-0" 1'-0" MAX. SOAP DISPENSER

IN COUNTERTOP

DISPENSER

CONTROL

M

IN

. 3 3"

M

AX

. 3 6"

ADA URINAL

M

AX

STANDARD URINAL

2' -0

2' -1

0" M

AX

3' -4

" M

AX

" M

IN

WHEELCHAIR CLEAR

KNEE SPACE

2' -3

9"

11" 6"

8"

HAND WASH

SIGN

HEIGHT TO BASELINE

OF BRAILLE

SIGNAGE FRONT VIEW TOILET & GRAB BARS

PROVIDE BLOCKING AS REQUIRED

2' -1

0"

" M

AX

9"

7"-9"

5"

M

AX

" M

IN

4' -4

1 4"

3' -6

3' -4

ELECTRICAL

SWITCHES

6"

RIM

RIM

LC

16" - 18"

TOP

LC

LC

RIM 4

8"

- 6 0"

LC

1'-0"

Ø 1 14" - 1 12" LC

TOP

TOILET SEAT COVER

LC

2' -1

1"

ADA SINK & MIRROR

HOOKS &

SHELVES

0"

M

IN

- 4 8"

M

AX

SOAP DISPENSER

WALL MOUNTED

LC

PAPER TOWEL DISPENSER

/ WASTE RECEPTACLE

WASTE RECEPTACLE

" M

IN

" M

AX

LC

TOWEL

SLOT

ELECTRIC

HAND DRYER

HIGHEST OPERABLE

8"

M

AX

R M

-A

RM-301

MEN

P-4

P-5

P-4

P-5

RM301-B

P-1/P-2

P-3

P-1/P-2

P-3

RM301-C

RM301-D

P-3P-1/P-2

P-6

P-6 P-7

P-7

FCU

Ø5'-0"

2' -6

4'-0"

4'-0"

2' -6

5'-3"

PROPOSED MEN ROOM ADA CLEARANCES

A - 102

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

1/2"= 1'-0" 0 1' 2' 4'3'

10/20/2018

GENERAL NOTES

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

PROPOSED REFLECTED CEILING PLAND-3

1/4" = 1'-0"

ADA COMPLIANT INSTALLATION FOR FIXTURES AND ACCESSORIESA-1

1/2" = 1'-0"

PROPOSED FLOOR TILE PATTERNB-3

1/4" = 1'-0"

PROPOSED RM 301

A-4023 C-1

ADA CLEAR FLOOR SPACE & INTERIOR ELEVATION NOMENCLATUREB-1

N/S

A-4011 C-1ELEVATION A-401 2A-1

A-402 4A-1

A-403 C-3

A-403 A-1

ELEVATION

A-403 A-3

A-404 C-3

A-404 C-1

24x24 ACT + GRID

RAISED AREA TO CLEAR

WINDOW ENFRAMENT

A-404 A-3

A-404 A-1

LINE OF SOFFIT

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS

BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED

AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED

BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM

COR PRIOR TO PROCEEDING W/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /

IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO

FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS

SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL

TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE

CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE

PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF

WORK

6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,

SPECIFICATIONS AND DETAILS, THE MOST STRINGENT REQUIREMENT

APPLIES

7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS

OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS

RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK

RELATED TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND

VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED

COVERS MUST BE REINSTALLED AT END OF THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL

DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR

REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND

APPROVAL OF TREASURY

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING

MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK

AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB AND SQUARE

TREASURY ANNEX BUILDING:

RESTROOM RENOVATION

RESTROOM RENOVATION

100%

28 MARCH 2019

3RD FLOOR

RW-301

WOMEN

LC

LC

LC

LC

LC

LC

LC

2'-97 8"

ALIGN

FCU

R W

1-

A

RW301-B

3' -0

2' -0

1 4"

P-3 P-1/P-2

1' -0

1' -4

LC

6"

LC LC

4"

3'-3"

LC

8"

NEW TILE

EXISTING TILE

4'-6"

P-3

P-1/P-2

P-3

P-1/P-2

RW301-C

RW301-D

2' -0

2'

-0

9"

2' -6

3 4"

3'-61 8"

5'-2"

2' -1

0"

P-6 P-7

2'-0"

LC

5'-0"

LC

LC

3' -0

LC

1'

-6

1' -6

8"

2'-0"

P-6 P-7

P-6 P-7

LC

EXISTING WALL

TERRA COTTA

EXISTING CMU

WALL

EXISTING WALL

TERRA COTTA

EXISTING WALL

TERRA COTTA

EXISTING STRUCTURAL

COLUMN

EXISTING CMU

WALL

5'-4"

EXISTING STRUCTURAL

COLUMN

3' -4

61 2"

41 2"

1/2" GREEN BOARD ON

2 1/2" 16GA STUDS

2"

'-0

PROPOSED WOMEN ROOM FLOOR PLAN

A - 103

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

TREASURY ANNEX BUILDING:

10/20/2018

BATHROOM RENOVATION

BATHROOM RENOVATION

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

PROPOSED RW 301

PROPOSED RW 301 FLOOR PLANA-1

3/4" = 1'-0"

3RD FLOOR

3/4"= 1'-0" 0 1' 2' 3'

1 17

13 15

A C C E S S O R I E S L E G E N D

TOILET PARTITIONS

URINAL PRIVACY SCREEN

1 1/2" DIAM. x 36" LONG S.S. GRAB BAR w/ SNAP FLANGE 1 1/2" DIAM. x 48" LONG S.S. GRAB BAR w/ SNAP FLANGE

6 DECK-MOUNTED SOAP DISPENSER

SURFACE MOUNTED TOILET TISSUE

DISPENSER & UTILITY SHELF

COAT HOOK

CONTURA SERIES SURFACE-MOUNTED

SEAT COVER DISPENSER

TM

1 1/2" DIAMETER x 18" LONG S.S. GRAB BAR w/ SNAP FLANGE

TRIM LINE SERIES SURFACE-MOUNTED

WASTE RECEPTACLE

TM

ELECTRIC HAND DRYER

COVERED WASTE RECEPTACLE

FRAMED MIRROR 37" (h) x 60" (w)

FRAMED MIRROR 37" (h) x 30" (w)

JANITOR'S CLOSET SIDE:

WHERE EXTANT TILE IS DEMOLISHED

REPLACE IT IN KIND. USE GREEN BOARD

AS A SUBSTRATE

GENERAL NOTES

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS

BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS

CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE

ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWING. IN

THOSE CASES INFORM COR PRIOR TO PROCEEDING W/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /

IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO

FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS

SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT

ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE

CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF

THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S

SCOPE OF WORK

6. 6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,

SPECIFICATIONS AND DETAILS, THE MOST STRINGENT REQUIREMENT

APPLIES

7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS

OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS

RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK

RELATED TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND

VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED

COVERS MUST BE REINSTALLED AT END OF THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL

DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR

REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND

APPROVAL OF TREASURY

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING

MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK

AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB AND SQUARE

KEYED NOTES

INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT

INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALL BASE, MORTAR AND GROUT AS PER

FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT,) AFTER EXTANT TILE AND

MORTAR HAVE BEEN REMOVED. GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING

NEW PARTITION ASSEMBLY: 2 1/2" STEEL STUDS (SEE WALL TYPE), 1/2" GREEN BOARD AND CERAMIC

TILE ONE OR BOTH SIDES AS DEPICTED. ( STUDS 16 GA,TRACK 12 GA)

INSTALL NEW CERAMIC WALL TILE AND CERAMIC WALLS BASE MORTAR AND GROUT AS PER

FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE RESISTANT). INSTALL GREEN BOARD ON 16GA, 7/8" DEEP HAT CHANNELS @ 12" O.C. FASTENED W/ 3" TOGGLE BOLTS TO EXISTING TILED

WALL . EXTEND GREEN BOARD A MIN OF 3" ABOVE ACT CEILING

STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) & 6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @

34" AFF. INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE

ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE AND MEP DRAWINGS

ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL

FIXTURES AND ACCESSORIES IN ADA STALL.

INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE

INSTALL NEW TOILET PARTITION SYSTEM AS PER FIXTURE SCHEDULE PROVIDE ALL NECESSARY

FASTENERS, HARDWARE AND SHOE

EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND

TRANSOM TO BE CLEANED AND REFINISHED

CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL

NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES

& FITTINGS AS NEEDED

NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY

EXISTING WASTE LINE (FLOOR OR WALL) & WATER LINES TO BE CAPPED. SEE MEP DRAWINGS.SEE

MEP DRAWINGS

PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR

ALL SINKS. SEE MEP DRAWINGS

CENTER MIRROR ON SPACE BETWEEN WALLS (TWO SINKS) / ON SINK (ONE SINK)

CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING, 2HR FOR STRUCTURE. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO

WORK W/ THE NEW CEILING SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE

PROTECTION DRAWINGS

NEW FIXTURE LOCATION. PROVIDE NEW PLUMBING LINES AS NEEDED. SEE MEP DRAWINGS

NEW LOW WALL ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE WHERE

DEPICTED ( STUDS 16 GA,TRACK 12 GA) AS PER FINISHES SCHEDULE

CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602

DO NOT INSTALL NEW FIXTURE AT THE LOCATION OF THE REMOVED ONE. EXTANT PLUMBING LINES

TO REMAIN IF NEEDED TO SERVICE NEW FIXTURE. CAP UNUSED LINES

PROVIDE ALL NECESSARY ELECTRICAL WORK TO SUPPLY POWER TO ALL HARD WIRED DEVICES.

SEE ELECTRICAL DRAWINGS

NEW WATER HEATER TO BE LOCATED IN ADJACENT JANITOR'S CLOSET. SEE G-001 & MEP

DRAWINGS

C-4 STEEL CHANNELS ACROSS FRONT AND BACK SUPPORTED ON LOW WALLS TO CARRY MARBLE

SLAB. INSTALL 3/4" PLYWOOD UNDER SLAB TO FASTER SINK. SEE DETAILS ON A-403. COORDINATE

PLACEMENT OF STEEL IN RELATIONSHIP TO SINK. CONTRACTOR TO SUBMIT SHOP DRAWINGS

PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT

100%

4"

4' -0

" M

AX

5' -8

3'

-4 " A

C C

2'

-4

4'-6"

M

IN

. 3 3"

M

AX

. 3 6"

M

IN

. 3 9"

M

AX

. 4 1"

" M

IN

MIN. 39"

MAX. 41"

TOILET PAPER HOLDER

3'-0" 1'-0" MAX. SOAP DISPENSER

IN COUNTERTOP

DISPENSER

CONTROL

M

IN

. 3 3"

M

AX

. 3 6"

SANITARY NAPKIN

RECEPTACLE

2' -1

0" M

AX

3' -4

" M

AX

" M

IN

WHEELCHAIR CLEAR

KNEE SPACE

2' -3

9"

11" 6"

8"

HAND WASH

SIGN

HEIGHT TO BASELINE

OF BRAILLE

SIGNAGE FRONT VIEW TOILET & GRAB BARS

PROVIDE BLOCKING AS REQUIRED

2' -1

0"

" M

AX

9"

" M

IN

" M

AX

7"-9"

5"

M

AX

" M

IN

4' -4

1 4"

3' -6

3' -4

ELECTRICAL

SWITCHES

6"

LC

16" - 18"

TOP

LC

LC

RIM 4

8"

- 6 0"

LC

1'-0"

Ø 1 14" - 1 12" LC

TOP

TOILET SEAT COVER

LC

2' -1

1"

ADA SINK & MIRROR

HOOKS &

SHELVES

0"

M

IN

- 4 8"

M

AX

SOAP DISPENSER

WALL MOUNTED

LC

PAPER TOWEL DISPENSER

/ WASTE RECEPTACLE

WASTE RECEPTACLE

3' -4

1' -1

1"

SANITARY NAPKIN

DISPENSER

LC

TOWEL

SLOT

HIGHEST OPERABLE

8"

M

AX

ELECTRIC

HAND DRYER

PART

RW-301

WOMEN

RW-301

WOMEN

RW-301

WOMEN

FCU

R W

1-

A

RW301-B

P-3 P-1/P-2

P-3

P-1/P-2

P-3

P-1/P-2

RW301-C

RW301-D

P-6 P-7

P-6 P-7

P-6 P-7

Ø5'-0"

2' -6

4'-0"

5'-1"

PROPOSED WOMEN ROOM ADA CLEARANCES

A - 102

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

TREASURY ANNEX BUILDING:

10/20/2018

BATHROOM RENOVATION

BATHROOM RENOVATION

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

ADA COMPLIANT INSTALLATION FOR FIXTURES AND ACCESSORIESA-1

1/2" = 1'-0"

PROPOSED REFLECTED CEILING PLAND-3

1/4" = 1'-0"

PROPOSED FLOOR TILE PATTERNB-3

1/4" = 1'-0"

PROPOSED RW 301

A-40614 C-1

ADA CLEAR FLOOR SPACE & INTERIOR ELEVATION NOMENCLATUREB-1

N/S

A-40512 C-1ELEVATION A-405 13A-1

A-406 15A-1

A-407 C-3

A-407 A-1

ELEVATION

A-409 C-3

24x24 ACT + GRID

RAISED AREA TO CLEAR

WINDOW ENFRAMENT

1/4"= 1'-0" 0 2' 4' 8'6'

A-408 A-3

A-409 A-3

A-409 A-1

A-408 A-1

A-408 C-3

LINE OF SOFFIT

A-407 A-3

GENERAL NOTES

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS

BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED

AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED

BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM

COR PRIOR TO PROCEEDING W/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /

IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO

FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS

SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL

TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE

CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE

PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF

WORK

6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,

SPECIFICATIONS AND DETAILS, THE MOST STRINGENT REQUIREMENT

APPLIES

7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS

OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS

RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK

RELATED TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND

VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED

COVERS MUST BE REINSTALLED AT END OF THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION. ALL

DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR

REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND

APPROVAL OF TREASURY

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING

MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK

AND BRACED AS NEEDED. ALL WALLS MUST BE PLUMB AND SQUARE

100%

28 MARCH 2019

9'

-0

'-0

T of FF

B of ACT

B of ACT

T of FF

T of CTOP

2' -1

0"

'-0

T of FF

B of ACT

/4

T of FF

9'

-0

B of ACT

T of TILE

T of PART.

'-1 0"

MATERIALPRODUCTTRADENAMEMODELNUMBER

1'-23 4"

5'-0"

3' -1

T of TILE

'-1

1 4"

P-4

P-4

P-5

P-5

P-7 P-7

P-6P-6

PROP. MEN RESTROOM INTERIOR ELEVATIONS

A - 401

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

10/20/2018

GENERAL NOTES

KEYED NOTES

INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT

INSTALL NEW CERAMIC WALL TILE AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE

RESISTANT) GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING

BULKHEAD RECESSED 16" FROM NORTH WALL (EXPOSE FULL WINDOW & MARBLE SURROUND.) FRAME BULKHEAD W/ 2 1/2" STEEL STUDS AND 1/2" GREEN BOARD (STUDS 20 GA,TRACK 16 GA). SEE A-3 / 602

INSTALL NEW CERAMIC WALL BASE, MORTAR AND GROUT

STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) &

6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @

34" AFF. INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE

NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES & FITTINGS AS NEEDED. ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE

& MEP DRAWINGS

ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL

FIXTURES AND ACCESSORIES IN ADA STALL.

INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE

INSTALL NEW TOILET PARTITION SYSTEM AND URINAL PRIVACY SCREEN AS PER FIXTURE SCHEDULE

PROVIDE ALL NECESSARY FASTENERS, HARDWARE AND SHOE

EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND

TRANSOM TO BE CLEANED AND REFINISHED

CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL

ADD MISSING 5" MARBLE TRIM HEADER TO MATCH EXTANT SIDES

CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602

PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR ALL

SINKS. SEE MEP DRAWINGS

CENTER MIRROR ON SPACE BETWEEN WALLS. SIZE AS DEPICTED

CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO WORK WITH THE NEW CEILING SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE PROTECTION DRAWINGS

PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT

NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY. ALL

NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE & MEP DRAWINGS

INSTALL NEW CARRIER, DRAIN AND WATER LINES FOR URINALS

INSTALL DYSON 964691-01 BACK PANEL (STAINLESS STEEL SATIN FINISH) TO THE WALL W/ CONTACT

ADHESIVES. H: 31-1/2" X W: 15-3/4" X D: 1/32"

PROVIDE A NEW PLUMBING ACCESS. INSTALL AN 8" x 8" STAINLESS STEEL COVER W/ LOCK

NEW PARTITION ASSEMBLY: 3 5/8" STEEL STUDS, 1/2" GREEN BOARD & CERAMIC TILE AS DEPICTED.

( STUDS 16 GA,TRACK 12 GA)

NEW PARTITION ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD & CERAMIC TILE AS DEPICTED.

( STUDS 16 GA,TRACK 12 GA)

NEW LOW WALL ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE WHERE

DEPICTED ( STUDS 16 GA,TRACK 12 GA) AS PER FINISHES SCHEDULE

C-4 STEEL CHANNELS ON 4 SIDES SUPPORTING MARBLE SLAB. INSTALL 3/4" PLYWOOD UNDER SLAB TO FASTER SINK. SEE DETAILS ON A-403. COORDINATE PLACEMENT OF STEEL IN RELATIONSHIP TO

SINK. CONTRACTOR TO SUBMIT SHOP DRAWINGS

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

PROPOSED RM 301 INTERIOR ELEVATIONS

PROPOSED ELEVATION 1C-1

3/4" = 1'-0"

PROPOSED ELEVATION 2A-1

3/4" = 1'-0"

6 6

18 19

3/4"= 1'-0" 0 1' 2' 3'

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING WORK. NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWING. IN THOSE CASES INFORM COR PRIOR TO

PROCEEDING W/ WORK

2. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDITION

3. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION

4. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED

"EXISTING", "EXTG", OR "(E)"

5. BEST PRACTICES, METHODS & MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT

SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE

COMPLETION OF THE PROJECT, SHALL BE

CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK

6. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, SPECIFICATIONS AND DETAILS, THE

MOST STRINGENT REQUIREMENT APPLIES

7. THE CONTRACTOR SHALL CLEAN UP ALL AREAS WHERE WORK HAS OCCURRED AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED

TRASH AND DEBRIS

8. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND VENTS TO PREVENT INTRODUCING

DUST INTO THE SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)

9. PROTECT EXTANT HISTORIC FABRIC DURING CONSTRUCTION ALL DAMAGES CAUSED BY THE

CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND

APPROVAL OF TREASURY

10. INSTALL ALL FIXTURES AND ACCESSORIES FOLLOWING MANUFACTURER'S SPECIFICATIONS

11. ALL FINISHES AS PER FINISHES SCHEDULE

12. NEW WALLS MUST BE ANCHORED TO UNDERSIDE OF CEILING DECK AND BRACED AS NEEDED. ALL

WALLS MUST BE PLUMB AND SQUARE

TREASURY ANNEX BUILDING:

RESTROOM RENOVATION

RESTROOM RENOVATION

A-602 A-3

TYP

8 8

146 1814

100%

28 MARCH 2019

-1

0"3' -9

3' -0

" 3' -6

'-1

'-0

T of FF

B of ACT

9' -0

B of ACT

MATERIALPRODUCTTRADENAMEMODELNUMBER

5'-0"

3' -1

T of TILE

6'

-1

1 4"

"24

" 17

36"

'-0

T of FF

B of ACT

9'

-0

B of ACT

/4

T of TILE

P-4

P-4

P-6

P-5

P-5

P-3 P-3

P-1 / P-2 P-1 / P-2

P-3

P-1 / P-2

P-7P-7

P-6

A - 402

N

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

GENERAL NOTES

KEYED NOTES

INSTALL NEW CERAMIC TILE FLOORING FT-1, MORTAR AND GROUT

INSTALL NEW CERAMIC WALL TILE AS PER FINISHES SCHEDULE, ON NEW GREEN BOARD (MOISTURE

RESISTANT) GREEN BOARD TO EXTEND A MIN OF 3" ABOVE ACT CEILING

BULKHEAD RECESSED 16" FROM NORTH WALL (EXPOSE FULL WINDOW & MARBLE SURROUND.) FRAME BULKHEAD W/ 2 1/2" STEEL STUDS AND 1/2" GREEN BOARD (STUDS 20 GA,TRACK 16 GA). SEE A-3 / 602

INSTALL NEW CERAMIC WALL BASE, MORTAR AND GROUT

STONE COUNTERTOP 24" DEEP ( 23" + 1" BULLNOSE OVERHANG) W/ 6" HIGH BACK SPLASH (3 SIDES) &

6" APRON. BACK SPLASH AND APRON MATERIAL TO MATCH COUNTERTOP. SET COUNTER TOP @

34" AFF. INSTALL UNDERMOUNTED SINK(S) AS PER PLUMBING SCHEDULE

NEW FIXTURE TO BE INSTALLED AT EXISTING LOCATION OF WASTE & WATER LINES. ADJUST LINES & FITTINGS AS NEEDED. ALL NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE

& MEP DRAWINGS

ABA/ADA MOUNTING HEIGHT FOR FIXTURE AND/OR ACCESSORY. ADA MOUNTING HEIGHT FOR ALL

FIXTURES AND ACCESSORIES IN ADA STALL. SEE SCHEDULES

INSTALL NEW BATHROOM ACCESSORIES PER ACCESSORIES SCHEDULE

INSTALL NEW TOILET PARTITION SYSTEM AND URINAL PRIVACY SCREEN AS PER FIXTURE SCHEDULE

PROVIDE ALL NECESSARY FASTENERS, HARDWARE AND SHOE

EXISTING DOOR, HARDWARE & OPENER TO REMAIN. DOOR SWING TO BE MIRRORED, DOOR AND

TRANSOM TO BE CLEANED AND REFINISHED

CLEAN AND POLISH EXISTING DOOR AND WINDOW MARBLE ENFRAMENT & SILL

ADD MISSING 5" MARBLE TRIM HEADER TO MATCH EXTANT SIDES

CLEAN AND POLISH EXISTING MARBLE THRESHOLD OR REPLACE AS PER A-602

PROVIDE NEW TRAPS (W/ ADA COMPLIANT UNDERSINK PROTECTION) AND NEW WATER LINES FOR ALL

SINKS. SEE MEP DRAWINGS

CENTER MIRROR ON SPACE BETWEEN WALLS. SIZE AS DEPICTED

CEILING WORK: FILL HOLES TO MAINTAIN 1HR FIRE-RATING. INSTALL NEW LIGHT FIXTURES, CEILING GRID AND TILE. EXISTING FIRE SPRINKLERS' HEIGHT TO BE ADJUSTED TO WORK WITH THE NEW CEILING SYSTEM. INSTALL NEW FIRE ALARM SYSTEM. SEE MEP & FIRE PROTECTION DRAWINGS

PAINT AS PER FINISHES SCHEDULE. EXTEND PAINTED AREA MIN. 3" ABOVE ACT

NEW FIXTURE TO BE INSTALLED ADJACENT TO THE LOCATION OF EXISTING WASTE & WATER LINES AS DEPICTED ON DRAWINGS. ADJUST LOCATION AND PLUMBING LINES & FITTINGS ACCORDINGLY. ALL

NEW PLUMBING FIXTURES TO BE INSTALLED AS PER PLUMBING SCHEDULE & MEP DRAWINGS

INSTALL NEW CARRIER, DRAIN AND WATER LINES FOR URINALS

INSTALL DYSON 964691-01 BACK PANEL (STAINLESS STEEL SATIN FINISH) TO THE WALL W/ CONTACT

ADHESIVES. H: 31-1/2" X W: 15-3/4" X D: 1/32"

PROVIDE A NEW PLUMBING ACCESS. INSTALL AN 8" x 8" STAINLESS STEEL COVER W/ LOCK

NEW PARTITION ASSEMBLY: 3 5/8" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE AS DEPICTED.

( STUDS 16 GA,TRACK 12 GA)

NEW PARTITION ASSEMBLY: 2 1/2" STEEL STUDS, 1/2" GREEN BOARD AND CERAMIC TILE AS DEPICTED.

( STUDS 16 GA,TRACK 12 GA)

C-4 STEEL CHANNELS ON 4 SIDES SUPPORTING MARBLE SLAB.