2nd_Floor_100__DRAWING_4-4-2019_S300R.pdf

PDF 10 MB Posted

Attached to
Treasury OFAC Renovation Federal contract opportunity
Solicitation number
2032H319R00008
Issued by
Department of the Treasury Internal Revenue Service

About this file

2nd Fl Drawing

View the file

Other files for this federal contract opportunity

Other files attached to Treasury OFAC Renovation, newest first.
File Type Posted
Wage_Determination_DC2_-_072619.pdf PDF
Plumbing_3rd_Floor.pdf PDF
2032H319R00008_005.pdf PDF
Plumbing_2nd_Floor.pdf PDF
2032H319R00008_004.pdf PDF
Attachment_C_-2nd_Floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
2032H319R00008_0003.pdf PDF
2032H319R00008_0002.pdf PDF
Site_Visit_List.pdf PDF
2032H319R00008_-_0001.pdf PDF
Treasury_Annex_Restrooms_Renovation_Spec.pdf PDF
Secure_Insert_Window_Detail.pdf PDF
Attachment_C_-_Annex_3rd_floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
2nd_Floor_Annex_100__SPEC.pdf PDF
Attachment_D_-2nd_floor_Information_Outlet_Layout.pdf PDF
Historic_Restoration_Package_dated_4.4.19.pdf PDF
Attachment_D_-_3rd_floor_Information_Outlet_layout.pdf PDF
3rd_Floor_Restroom_100__3-28-2019_R.pdf PDF
3rd_floor_-_ET-101_Revised.pdf PDF
Attachment_A_-3rd_floor_LAN_room_layout.pdf PDF
Schedule_FFB_2nd_and_3rd_Floors.xlsx XLSX spreadsheet
TRES_2nd_Floor_Restroom_100___DRAWING_3-28-2019.pdf PDF
3rd_floor_April_28_2019_100__Full_Set.pdf PDF
2nd_Floor_RFP.pdf PDF
Sign_Type_A1.pdf PDF
Security_&_Secured_Window_Package_3rd_Fl.pdf PDF
3rd_Floor_RFP_v1.pdf PDF
Attachment_B_-3rd_floor_LAN_room_Cable_Tray_Layout.pdf PDF
3rd_Floor_Annex_100__SPEC.pdf PDF
2nd_and_3rd_Floor_Furniture_Power_&_Data_Changes.pdf PDF
Attachment_A_-_2nd_floor_LAN_room_layout.pdf PDF
Treasury_Annex_2nd_Floor_ET101_Revised.pdf PDF
Attachment_B_-_2nd_floor_LAN_room_cable_tray_layout.pdf PDF
1_-_2032H319R00008-OFAC_RENOVATION_7-9-19.pdf PDF
Attachment_C_-2nd_Floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
Sketch_of_X010_Lock.pdf PDF
drawing_A106_-_Security_&_Secured_Window_Package_2nd_Fl.pdf PDF
Sign_Type_A2.pdf PDF
SIGN_P-Mount-Teknion.pdf PDF
SD2500_2510TechSpec.pdf PDF
Security_&_Secured_Window_Package_2nd_Fl.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

1 2 3 4 5

A

B

C

D department of TREASURY, TREASURY ANNEX BUILDING

1500 PENNSYLVANIA AVENUE NW | WASHINGTON DC 20220

DRAWING INDEX

GENERAL

ARCHITECTURAL

KEY PLANVICINTY MAP

TREASURY ANNEX 2ND FLOOR INTERIOR RENOVATION

TREASURY ANNEX

BUILDING

N

G-001 COVER SHEET 01 OF 55

AD101 EXISTING / DEMOLITION FLOOR PLAN 02 OF 55

A-101 PROPOSED FLOOR PLAN 03 OF 55

A-102 ENLARGED PROPOSED FLOOR PLAN NW-QUADRANT 04 OF 55

A-103 ENLARGED PROPOSED FLOOR PLAN NE-QUADRANT 05 OF 55

A-104 ENLARGED PROPOSED FLOOR PLAN SW-QUADRANT 06 OF 55

A-105 ENLARGED PROPOSED FLOOR PLAN SE-QUADRANT 07 OF 55

A-107 PROPOSED FLOOR PLAN WITH FURNITURE 08 OF 55

A-108 PROPOSED RCP (CONSTRUCTION NO MEP) 09 OF 55

A-201 SECTION A-A W/ ENLARGED PART 1 10 OF 55

A-202 SECTION A-A W/ ENLARGED PARTS 2 & 3 11 OF 55

A-203 SECTION B-A W/ ENLARGED PART 1 12 OF 55

A-301 WALL TYPE A1 & A2 13 OF 55

A-302 WALL TYPE B1 & B2 14 OF 55

A-303 WALL TYPE C & D1 15 OF 55

A-304 WALL TYPE D2 & D3 16 OF 55

A-305 WALL TYPE E1 & E2 17 OF 55

A-306 WALL TYPE E3 & F1 18 OF 55

A-307 WALL TYPE F2 19 OF 55

A-308 WALL TYPE F3 & G 20 OF 55

A-309 WALL TYPE H1 & H2 21 OF 55

GENERAL CONDITIONS

1. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OF THE DESCRIPTION OF DETAILS OF WORK WHICH ARE

MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS-DESCRIBED DETAILS OF WORK BUT SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FROM AND DESCRIBED IN THE DRAWINGS AND

SPECIFICATION

2. MANUFACTURER SPECIFIED WITHIN THE CONSTRUCTION DOCUMENTS ARE PROVIDED AS A MINIMUM PERFORMANCE CRITERIA, SUBSTITUTIONS WILL BE CONSIDERED IF COMPLAINT TO THE PERFORMANCE ESTABLISHED BY THE MANUFACTURER NOTED. BUILDING MATERIALS SUBSTANDARD TO THESE REQUIREMENTS WILL BE SUMMARILY REJECTED.

ALL BUILDING COMPONENTS ARE TO BE HEAVY DUTY QUALITY AND BE FOR ABUSIVE RESISTANCE INSTALLATION. BUILDING COMPONENTS SPECIFIED HEREIN THAT DO NOT MEET THE HEAVY DUTY-ABUSIVE ENVIRONMENTAL CRITERIA MUST BE

BROUGHT TO THE ATTENTION OF THE BUILDING REPRESENTATIVE AND WILL BE RE-SPECIFIED

3. BY THE SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND HAS FAMILIARIZED

HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED

4. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS AND/OR SIZE. VERIFY ALL DIMENSIONS BEFORE PROCEEDING AND OBTAIN MEASUREMENTS AT THE JOB FOR ALL WORK REQUIRED TO BE ACCURATELY FITTED TO THE BUILDING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SUCH MEASUREMENTS AND FOR THE PRECISE FITTING

OF THE WORK

5. IF CONFLICTS ARE DISCOVERED AT ANY TIME BETWEEN THE ENGINEERING AND ARCHITECTURAL DRAWINGS, THE COR SHALL BE CONTACTED AT ONCE TO RESOLVE THE PROBLEM. IF THE COR IS NOT CONTACTED, THE CONTRACTOR SHALL ACCEPT THE RESPONSIBILITY TO CORRECT ANY AND ALL SUCH WORK NOT IN A COORDINATE WITH THE ARCHITECTURAL

DRAWINGS

6. CHANGES TO THE DRAWINGS (ADDITIONS, DELETIONS OR ALTERATIONS) THAT MIGHT CONSTITUTE A CHANGE ORDER MUST BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL, OTHERWISE CONTRACTOR WOULD UNDERTAKE SUCH

WORK AT HIS OWN RISK AND WORK MIGHT HAVE TO BE REVERSED AT CONTRACTOR'S OWN COST

7. ALL SALVAGEABLE MATERIALS SHALL BE RETURNED TO THE GOVERNMENT

8. THE G. C. AND ALL SUB-CONTRACTOR SHALL SUBMIT TO GOVERNMENT AND COR SUBMITTALS AND SHOP DRAWINGS FOR

REVIEW PRIOR TO START OF CONSTRUCTION.

9. UPON COMPLETION OF THE INSTALLATION, REMOVE ALL DEBRIS FROM THE BUILDING CREATED BY THE WORK PROVIDED UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. REMOVE ANY SOILED SPOTS FROM THE FACE OF THE CARPET OR OTHER FINISH SURFACES USING PROCESSES RECOMMENDED BY THE MANUFACTURER AND IN A MANNER ACCEPTABLE TO THE GOVERNMENT. REPLACE ANY AREAS OF CARPET OR FINISH SURFACES WHERE CLEANING HAS FAIL TO RESTORE THE

APPEARANCE AND QUALITY SATISFACTORILY, AS DETERMINED BY THE GOVERNMENT.

10. ALL CONTRACTORS SHALL PERFORM ALL WORK IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL CODES AND

REGULATIONS.

11. THE G. C. SHALL VERIFY REQUIREMENTS FOR ALL EQUIPMENT INDICATED ON THE DRAWINGS WHETHER SUPPLIED BY THE

GOVERNMENT OR SUB-CONTRACTOR.

12. WHERE THE G. C. IS INSTRUCTED TO ALIGN A PARTITION WITH TWO OR MORE COLUMNS AND THE COLUMNS ARE DISCOVERED TO BE OF UNEQUAL SIZE, THE LARGER OF THE COLUMNS SHALL DETERMINE THE LOCATION OF THE

PARTITION. THIS WILL ALSO APPLY TO WET COLUMNS AND CORE WALLS.

13. THE G. C. SHALL REPAIR ALL DAMAGE CAUSED BY HIM OR HIS SUB-CONTRACTORS DURING CONSTRUCTION.

PRE-EXISTING DAMAGE MUST BE REVIEWED AND ACKNOWLEDGED, IN WRITING BY THE GOVERNMENT AND ARCHITECT PRIOR TO COMMENCEMENT OF WORK. DAMAGE NOT DOCUMENTED PRIOR TO CONSTRUCTION START SHALL BE REPAIRED

TO LIKE NEW CONDITION WITHOUT ADDITIONAL CHARGE TO THE GOVERNMENT.

14. THE G. C. SHALL ENSURE THAT ALL PAINT HAS BEEN REMOVED FROM ALL NON-SCHEDULE PAINTED SURFACES PRIOR TO

DELIVERY OF THE SPACE.

15. THE G. C. SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED

16. IF THERE IS A QUESTION AS TO THE ACCEPTABLE LEVEL OF QUALITY FOR THE INSTALLATION OF ANY MATERIALS, THE

GOVERNMENT'S REPRESENTATIVE DECISION WILL BE FINAL

17. NEW DOOR HARDWARE, INCLUDING HINGES AND LOCK SETS, ARE TO BE MOUNTED AT ABA HEIGHTS UNLESS NOTED

OTHERWISE

18. ALL CEILING REGISTERS, GRILLES, VENTS AND DIFFUSERS SHALL BE FACTORY FINISHED. IF PAINTING IS REQUIRED, PROVIDE ENAMEL FINISH

19. ALL J-BENDS AND OTHER GYPSUM METAL TRIM SHALL BE SPACKLE-BLENDED INTO THE ADJACENT SURFACE.

20. WHERE TWO OR MORE WALL SWITCHES OR DIMMERS OCCUR IN THE SAME LOCATION, THEY ARE TO RECEIVE A COMMON

GANG PLATE WHOSE FINISH IS TO MATCH THE BUILDING STANDARD SWITCH PLATE.

21. ALL PAINTED WALLS SHALL BE HAVE A LEVEL 4 FINISH: WITH ONE ROLLER-APPLIED (1) PRIMER COAT AND (2)

ROLLER-APPLIED FINISH COATS.

22. PROVIDE THRESHOLDS AT ALL DOORS AND TRANSITION STRIPS WHERE CARPET MEETS A DIFFERENT TYPE OF FLOORING

23. REVIEW THE SPECIFICATIONS AND CUT SHEETS FOR ACCESSORIES, FIXTURES, ETC. THAT ACCOMPANY THE DRAWING SET PRIOR TO PLACING ORDERS. IF CONFLICTS ARE FOUND, INFORM THE ARCHITECT OF SUCH FINDINGS AND TAKE NO ACTION UNTIL RESOLVED. IN THOSE CASES, IF AN ORDER FOR AN UNRESOLVED ITEM IS PLACED WITHOUT APPROVAL OF ARCHITECT, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY IF THE ITEM IS NOT ACCEPTED BY THE CLIENT

N

AC

ACT

ADJ

AFF

ALUM

ATT

B & B

BD

BET

BF

BIT

BLDG

BTM

CER

CJ

CL

CLG

CMU

COMP

CONC

CONT

D

AT

ACOUSTIC

ACOUSTIC CEILING TILE

ADJUSTABLE

ABOVE FINISHED FLOOR

ALUMINUM

ATTENUATION

BALLED AND BAGGED

BOARD

BETWEEN

BARRIER FREE

BITUMINOUS

BUILDING

BOTTOM

CERAMIC

CONTROL JOINT

CENTER LINE

CEILING

CONCRETE MASONRY UNIT

COMPRESSIBLE

CONCRETE

CONTINUOUS

DEEP

DEMO

D.F.

DIA

DS

EXTG

F&I

FF

FLR

FV

GA

GALV

GC

GL

GPDW

O.C.

O.D.

O.H.

OZ.

PLAM

PLYWD

PR

DEMOLITION

DRINKING FOUNTAIN

DIAMETER

DOWN SPOUT

EXISTING

FURNISH AND INSTALL

FINISHED FLOOR

FLOOR

FIELD VERIFY

GAUGE

GALVANIZED

GENERAL CONTRACTOR

GLASS

GYPSUM WALLBOARD

ON CENTER

OUTSIDE DIAMETER

OVERHEAD OR OPP. HAND

OUNCE

PLASTIC LAMINATE

PLYWOOD

PAIR

ABBREVIATIONS

PT

PTD

QTY

REINF

REQ'D

RM.

SHT

SIM

SS

THK

TYP.

VCT

VERT

VIF

VP

UON

W.

W/

PRESSURE TREATED

PAINTED

QUANTITY

REINFORCED

REQUIRED

ROOM

SHEET

SIMILAR

STAINLESS STEEL

THICKNESS

TYPICAL

VINYL COMPOSITION TILE

VERTICAL

VERIFY IN FIELD

VENEER PLASTER

UNLESS OTHERWISE NOTED

WIDE

WITH

SYMBOLS

ALIGN

ALIGN SURFACES

CENTER LINE

X

GENERAL / KEYED NOTE

DEMOLITION NOTE

ROOM NAME

ROOM NUMBER

EXTG WALL TO BE REMOVED

X PARTITION TYPE

EXTG WALL TO REMAIN

NEW DOOR ASSEMBLY

X-

XX

X

EXTG DOOR ASSEMBLY

TO BE REMOVED

EXTG DOOR ASSEMBLY

X-XXX

NEW PARTITION

X DRAWING REVISION NUMBER

MECHANICAL

ELECTRICAL

G - 001

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

SHEET

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0018-05

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

COVER PAGE

NEW SCIF WALL

NEW WALL FULL HEIGHT

LC

XXX

XXX

XX

2ND FLOOR

28 MARCH 2019

100%

A-310 WALL TYPE H3 & H4 22 OF 55

A-311 WALL TYPE H5 & H6 23 OF 55

A-312 WALL TYPE J1 & J2 24 OF 55

A-401 PROPOSED BREAK ROOM MILLWORK 25 OF 55

A-402 PROPOSED UNISEX BATHROOM FLOOR PLAN 26 OF 55

A-403 PROPOSED UNISEX BATHROOM INTERIOR ELEVATIONS 27 OF 55

A-601 FINISHES NOTES + ROOM FINISHES SCHEDULE 28 OF 55

A-602 ROOM FINISHES SCHEDULE 29 OF 55

A-603 FINISHES SCHEDULE 30 OF 55

A-604 RESTROOM FINISHES SCHEDULE 31 OF 55

A-605 DOOR SCHEDULE 32 OF 55

A-606 DOOR SCHEDULE 33 OF 55

A-607 HARDWARE SCHEDULE 34 OF 55

A-608 PLUMBING SCHEDULE 35 OF 55

A-609 RESTROOM ACCESSORIES SCHEDULE 36 OF 55

F-001 SYMBOLS AND ABBREVIATIONS 37 OF 55

FD101 DEMOLITION FIRE PROTECTION 38 OF 55

F-101 PROPOSED FIRE ALARM 39 OF 55

F-102 PROPOSED FIRE PROTECTION 40 OF 55

M-001 SYMBOLS, ABBREVIATIONS & SECTION 41 OF 55

MD101 DEMOLITION MECHANICAL 42 OF 55

M-101 PROPOSED MECHANICAL 43 OF 55

M-501 MECHANICAL DETAILS 44 OF 55

M-601 MECHANICAL SCHEDULES 45 OF 55

E-001 SYMBOLS & ABBREVIATIONS 46 OF 55

ED101 DEMOLITION LIGHTING S 47 OF 55

ED102 DEMOLITION POWER 48 OF 55

E-101 PROPOSED LIGHTING 49 OF 55

E-102 PROPOSED POWER 50 OF 55

ET101 PROPOSED TELECOM 51 OF 55

E-501 DETAILS 52 OF 55

E-601 PANEL SCHEDULES 53 OF 55

E-602 PANEL SCHEDULES 54 OF 55

E-603 PANEL SCHEDULES 55 OF 55

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

FIRE PROTECTION

ST-2 A

EV-203 EV-204

EV-202

EV-201

20 21

N.I.C.

ELECTRICAL

CLOSET

E202-A

R M

A

R W

A

JANITOR

CLOSET

J

A

E201-A

E-202

ELECTRICAL

CLOSET

E-201

ST-2 B

S 240-A

32 33

45 46

J-202

E

JANITOR

CLOSET

J-201

J201-A

TELECOM

CLOSET

C

C-203A

HISTORIC

CORRIDOR

C-200

T

A

T-201

E203-A

C

A

C240-A

MEN

RESTROOM

RM-201

WOMEN

RESTROOM

RW-201

200-B

C200-A

19 22 23 24

2231B 2221 2220 2205 2196 2195 2186 2185 2176 2175 2161

21012092

C205

C240

2002 C200

C251

T

B

C210

2211 2202

2061 2062 2063 2064 2065

2051 2053 2054

2052A

2052D 2052C 2052B

2025-A

2021 2022 2023 2024

67 69

47 48

585756

C

J

200-C

200-E

C

D

200-G

C

F

200-H

2231A

LEGEND

WALLS TO BE DEMOLISHED

EXISTING WALLS WITHIN THE AREA OF WORK

TO REMAIN00

EXISTING COLUMN & SURROUND WITHIN THE AREA

OF WORK TO REMAIN

EXISTING COLUMN & SURROUND WITHIN THE

AREA OF WORK. COLUMN TO REMAIN AND

SURROUND TO BE REMOVED

±160'-0"

±68'-7"

B A

EXISTING WALLS OUTSIDE THE AREA OF WORK

TO REMAIN

CLOSET

C-201

REFERENCE RESTROOM

RENOVATION PACKAGE

R

EF

ER

EN

CE

H

IS

T

O R

IC

R

ES

T

O R

A T

IO

N

P A

CK

A

G E

REFERENCE SECURITY /

SECURED WINDOWS PACKAGE

N

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/8"= 1'-0"

0 4'

8'

16'

2'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

GENERAL NOTES

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING.

NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE

SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL

CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/

WORK

2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,

DETAILS AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT

APPLIES

3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /

IECC / IFC LATEST EDITION

4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO

FINISH WALL OR PARTITION

5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS

SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT

ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE

CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE

PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF

WORK

7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER

EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE

REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED TRASH AND

DEBRIS

7. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A

SOURCE DESIGNATED BY THE COR

8.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB

SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR

SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE

SATISFACTION AND APPROVAL OF TREASURY / COR

8. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE

REMOVED/ PROVIDED BY TREASURY.

9. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND

VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED

COVERS MUST BE REINSTALLED AT END OF THE JOB)

11. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING

CONSTRUCTION

DEMOLITION NOTES

1 DEMOLISH EXISTING PARTITION / WALL AS DEPICTED

DEMOLISH EXISTING DOORS & FRAME. RETURN TO TREASURY

FACILITIES MANAGEMENT

EXISTING FURNITURE & OFFICE EQUIPMENT TO BE REMOVED

BY TREASURY

DEMOLISH EXISTING SUSPENDED CEILING GRID, ACT & LIGHT

FIXTURES

DEMOLISH EXISTING CARPET

DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB

ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY

DESIGNATED COLUMNS)

DEMOLISH EXISTING DUCT WORK AS PER MEP DRAWINGS

DEMOLISH ELECTRICAL OUTLETS & SWITCHES, AND CABLINNG

AS PER ELECTRICAL DRAWINGS

KEYED NOTES

NO WORK SHALL TAKE PLACE WITHIN AREAS DESIGNATED N.I.C.

EXISTING WALL / COLUMN ENCLOSURE TO REMAIN

EXISTING DOOR TO REMAIN. NO ALTERATIONS

EXISTING DOOR TO REMAIN. ALTERATIONS NOTED ON A-102

EXTG THROUGH WALL / THROUGH FLOOR PIPE(S) TO REMAIN

RADIATORS / FCU TO REMAIN

6 6

EXISTING AND DEMOLITION FLOOR PLAN

A-1

1/8" = 1'-0"

TYP

EXISTING & DEMO FLOOR PLAN

AD 101

4 4

N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

KE

Y

P

LA

N

100%

28 MARCH 2019

10'-4" 19'-0"

19'-2

5'-5

7'-1

2109-A

2110-A

2111-A

2112-A

2113-A

A

A

A

OFFICE

A

1 4

13'-9

3 4

A

10'-4"

A

A

5'-0"

5'-0"

3 4

16'-11

3'-2"

R.O.

A

A

A

13'-3

1 2

10'-5"

10'-6"

A

1 4

3 4

13'-0"

9'-6"

5'-0"

11'-6"

A

A

A

A

A

A

A

A

5'-0"

5'-0"

14'-6

" 12'-6"

11'-3

6'-9

11'-0"

A

20'-3"

A

A

A

11'-9" 11'-9"5'-6

3 4

2005-A

A

1 2

22'-11

BREAK ROOM

14'-0

1 2

3 4

R O

11'-0" 11'-0"

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2" 3'-2"

COMPUTER ROOM

C204-A

C-204

2108-A

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

11'-6"11'-6"

3'-2"

R.O.

3'-2"

TEAM MEETING ROOM

3'-2"

3'-3"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

R.O.

R O

R O

R O

R O

R O

R O

5'-5

E

A

J

A

E

A

S

A

NORTH CORRIDOR

37'-0

OPEN OFFICE AREA

NORTH

45'-7

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE AREA

SOUTH

C-210

21'-3

EAST

CORRIDOR

C-211

WEST

CORRIDOR

C-212

J

A

C

A

T

A

T

B

OFFICE

OFFICE

OFFICE

OFFICE

RECEPTIONIST

AREA

OPEN OFFICE AREA

WEST

CENTRAL E-W CORRIDOR

C-213

SOUTH CORRIDOR

C-2145

OFFICE

OFFICE

OFFICE

OFFICE

LAN ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

A

A

11'-6"

OFFICE

OFFICE

OFFICE

C

A

C

A

A

E

Q U

A L

S

I Z

E

O

F F

I C

E

T

50'-3"

± 47'-6

4 EQUAL SIZE OFFICES (2124 T0 2127)

21'-10"

3 EQUAL SIZE OFFICES (2102 T0 2104) 2 EQUAL SIZE OFFICES (2105 & 2106)

24'-7

2 EQUAL SIZE OFFICES (2128 & 2129)

3'-2"

R.O.

34'-6

13'-6"

14'-2

13'-9

UNISEX

RESTROOM

RU-201

1 4

C E

N T

R A

L

N

C

O R

R I D

O R

C

NEW SCIF WALLS

NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP

TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT

LEGEND

EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN

EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN

EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK

NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE

N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)

11'-0"

17'-8

7'-2

31'-4

3 4

5 8

55'-3

5'-0"

14'-2

1 4

3 8

50'-4

14'-1

ST-2 A

EV-203 EV-204

EV-202

EV-201

20 21

N.I.C.

ELECTRICAL

CLOSET

R M

A

R W

A

E-202

ELECTRICAL

CLOSET

E-201

ST-2 B

32 33

J-202

E

JANITOR

CLOSET

J-201

TELECOM

CLOSET

C

HISTORIC

CORRIDOR

C-200

T-201

C A

MEN

RESTROOM

RM-201

WOMEN

RESTROOM

RW-201

200-B

C200-A

200-C

E

G

C F

H

±68'-7"

B

A

A

R U

A

3'-2"

R.O.

200-D

C200-J

1 2

1 4

1 2

REFERENCE RESTROOM

RENOVATION PACKAGE

R

EF

ER

EN

CE

H

IS

T

O R

IC

R

ES

T

O R

A T

IO

N

P A

CK

A

G E

REFERENCE SECURITY /

SECURED WINDOWS PACKAGE

PROPOSED 2ND FLOOR PLAN

A - 101

N

PROPOSED FLOOR PLAN

A-1

1/8" = 1'-0"

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

MARK DATE DESCRIPTION

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/8"= 1'-0"

0 4'

8'

16'

2'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

KEYED NOTES

9. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE

REMOVED/ PROVIDED BY TREASURY.

10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS

AND VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.

(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)

11. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING

CONSTRUCTION

NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED

BUT IN A PERMANENTLY CLOSED POSITION.

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR

TO OPEN INTO HISTORIC CORRIDOR AND CHANGE HARDWARE.

SEE HARDWARE SCHEDULE.

EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND

CASING; WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE

PREPARED AND PAINTED AS PER FINISHES SCHEDULE

EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING

VISUAL SURVEILLANCE AND OPERABLE BLINDS

NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO

UNDERSIDE OF FLOOR PLATE (TRUE CEILING) IN COMPLIANCE w/

SCIF REQUIREMENT (ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01

/ STC 45 SOUND GROUP 3 OR BETTER). PROVIDE A CONTINUOUS

BEAD OF ACOUSTICAL CAULK AT ALL INTERSECTIONS W/ OTHER

SURFACES (HORIZONTAL OR VERTICAL, BOTH SIDES). WALL

MUST BE UNIFORMLY FINISHED ON BOTH SIDES, FROM FLOOR

SLAB (TRUE FLOOR) TO UNDER- SIDE OF FLOOR PLATE (TRUE

CEILING). WHERE SCIF WALL ABUTS EXISTING WALL, CUT BACK

EXTANT BASEBOARD AS NEEDED

AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING

CEILING, MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR

GENERAL AND 2-HR STRUCTURAL MEMBERS) FILL ALL HOLES IN

CEILING (PLASTER AND TERRACOTTA) W/ CLOSED CELL, NON

EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH

AFTER APPLICATION

FURNISH AND INSTALL ELECTROSTATIC DISSIPATIVE TILE AS PER

FINISHES SCHEDULE

DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN

GWB ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY

DESIGNATED COLUMNS) PROCEED AS INDICATED IN WALL TYPE

DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL AND MILL

WORK AS PER FINISHES SCHEDULE

ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL

TYPESW/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING

FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP WOOD BASE. FINISH

WALLS AND MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES

SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN,

FREE OF OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW

CARPET INSTALL.

FURNISH AND INSTALL RESILIENT FLOORING AS PER FINISHES

SCHEDULE. SUBSTRATE MUST BE CLEAN, FREE OF OLD GLUE

AND FLOORING REMNANTS PRIOR TO NEW FLOOR INSTALL.

FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS

SEE RCP AND MEP DRAWINGS

SCIF ENTRY/EXIT: PROVIDE NEW 1 3/4" SCIF LEVEL 3 ACOUSTIC

STEEL DOOR AND FRAME W/ X10 LOCK (

PREP FOR DOOR BY

GENERAL CONTRACTOR. F&I OF BMS, IDS, ACD AND X10 BY

TREASURY OSP SEE A-602) . HARDWARE MUST MEET FEDERAL

SPECIFICATION FF-L-2740 / UL 2050

FOR BREAK ROOM 2005 CABINETS AND COUNTER TOP SEE A-401

UNISEX BATHROOM AS PER A-402 + MEP DRAWINGS

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR

DOOR TO HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES

(LEFT-RIGHT / RIGHT-LEFT)

IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS

DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE

COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD

BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE

EXISTING TERRA COTTA + PLASTER WALL TO REMAIN & TO BE

FURRED OUT AS PER WALL TYPE TO ACHIEVE AN STC-45 (SOUND

GROUP 3) OR BETTER, AND TO INSTALL ELECTRICAL BOXES

FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT

FURRING & 1/2" GWB TO ALIGN W/ NEW WALL (SEE WALL TYPES)

NON LABELED WALLS ARE "D" TYPE. VERIFY ON ENLARGED

FLOOR PLANS

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.

REFINISH AS PER FINISHES/ ROOM SCHEDULES

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. SINCE DOOR

WILL BE USED FOR EXIT ONLY CHANGE HARDWARE.

EXTANT ORIGINAL TILE (FLOOR AND WALLS) TO REMAIN. CLEAN

AND ADD MISSING TILES IF SIMILAR ARE AVAILABLE ON SITE.

GENERAL NOTES

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC

DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT

BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR

TO PROCEEDING w/ WORK

2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND

SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT APPLIES

3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /

IECC / IFC LATEST EDITION

4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR

PARTITION

5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY

MARKED "EXISTING", "EXTG", OR "(E)"

6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES.

ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT

NECESSARY FOR THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF

THE CONTRACT'S SCOPE OF WORK

7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S

WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER

DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS

7. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE

DESIGNATED BY THE COR

8.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST

DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR

REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND APPROVAL OF COR

NW

SW

NW NE

100%

28 MARCH 2019

NE

SE

SW SE

TYP

TYP

TYP

TYP

TYP

17 17

TYP

A2

A1

E2

G

G

F2

F3

H3 H1

E1

E3

B2

E3

20202020

C

E2

E1

E1

F2

E2

F1

H3

H1

H3

H6

H2H2

H3

23 23

J1

J2

B1

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

KE

Y

P

LA

N

M-402

3 4

16'-11

A

A

10'-5"

A

A

5'-0"

2005-A

A

22'-11

BREAK ROOM

13'-8"

1 2

3 4

R.O.

TEAM MEETING ROOM

ELECTRICAL

CLOSET

E

A

R M

A

JANITOR

CLOSET

J

A

E

A

MECHANICAL

CLOSET

E-202

ELECTRICAL

CLOSET

E-201

OPEN OFFICE AREA

NORTH

45'-7

J-202

WEST

CORRIDOR

C-212

JANITOR CLOSET

J-201

J

A

C

A

HISTORIC

CORRIDOR

C-200

3'-2"

R.O.

CENTRAL E-W CORRIDOR

C-213

MEN

RESTROOM

RM-201

UNISEX

RESTROOM

RU-201

R U

A

R.O.

3'-2"

R O

18'-3"

3 8

54'-11"

R.O.

3'-2"

3'-2"

OFFICE

WEST

1 4

1 2

1 4

7'-2

50'-9"

6'-8

10'-6

6'-10"

1 4

10'-0

1'-2

17'-8

4'-2

200-B

C

E

G

C

F

200-D

EV-203 EV-204

ST-2A

EV-201

EV-202

3'-2"

R.O.

3'-2"

R.O.

LAN ROOM

C

REFERENCE RESTROOM

RENOVATION PACKAGE

REFERENCE SECURITY /

SECURED WINDOWS PACKAGE

NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP

TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT

LEGEND

EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK

NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE

EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN

EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN

N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)

ENLARGED FLOOR PLAN NORTH WEST QUAD

A - 102

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/4"= 1'-0"

0 2'

4'

8'

1'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

NW

ENLARGED NORTH-WEST QUADRANT OF THE PROPOSED FLOOR PLAN

A-1

1/4" = 1'-0"

MARK DATE DESCRIPTION

QUADRANT

KEYED NOTES

NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED

BUT IN A PERMANENTLY CLOSED POSITION.

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR

TO OPEN INTO HISTORIC CORRIDOR AND CHANGE HARDWARE.

SEE HARDWARE SCHEDULE.

EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND

CASING; WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE

PREPARED AND PAINTED AS PER FINISHES SCHEDULE

EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING

VISUAL SURVEILLANCE AND OPERABLE BLINDS

AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING

CEILING, MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR

GENERAL AND 2-HR STRUCTURAL MEMBERS) FILL ALL HOLES IN

CEILING (PLASTER AND TERRACOTTA) W/ CLOSED CELL, NON

EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH

AFTER APPLICATION

FURNISH AND INSTALL ELECTROSTATIC DISSIPATIVE TILE AS PER

FINISHES SCHEDULE

DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN

GWB ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY

DESIGNATED COLUMNS) PROCEED AS INDICATED IN WALL TYPE

DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL AND MILL

WORK AS PER FINISHES SCHEDULE

ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL

TYPES W/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING

FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP WOOD BASE. FINISH

WALL AND MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES

SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN,

FREE OF OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW

CARPET INSTALL.

FURNISH AND INSTALL RESILIENT FLOORING AS PER FINISHES

SCHEDULE. SUBSTRATE MUST BE CLEAN, FREE OF OLD GLUE

AND FLOORING REMNANTS PRIOR TO NEW FLOOR INSTALL.

FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS

SEE RCP AND MEP DRAWINGS

FOR BREAKROOM 2005 CABINETS AND COUNTER TOP SEE A-401

UNISEX BATHROOM AS PER A-402 + MEP DRAWINGS

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR

DOOR TO HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES

(LEFT-RIGHT / RIGHT-LEFT)

IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS

DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE

COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD

BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.

REFINISH AS PER FINISHES/ ROOM SCHEDULES

G

H1

E3

E3

E2

E1

D1

E1

E1

J1

E3

9 10

D1

D1

4 6

9 10

4 6

4 6

9 10

4 6

9 10

4 6

9 12

4 6

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION

WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED

BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK

2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND

SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT APPLIES

3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDIT.

4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION

5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED

"EXISTING", "EXTG", OR "(E)"

6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM

NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR

THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CSW

7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK. THE

CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK

RELATED TRASH AND DEBRIS

8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE DESIGNATED BY THE

COR

9. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE.

ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH

EXISTING AND TO THE SATISFACTION AND APPROVAL OF TREASURY / COR

10. EXISTING / NEW SYSTEMS FURNITURE/EQUIPMENT TO BE

REMOVED/ PROVIDED BY TREASURY.

11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS

AND VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.

(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)

12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING

CONSTRUCTION

KEYED NOTES

N-W QUADRANT

J2

28 MARCH 2019

100%

N

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

KE

Y

P

LA

N

19'-2

5'-5

7'-1

2113-A

A

A

1 4

13'-9

A

A

5'-0"

5'-0"

A

A

A

10'-5"

A

13'-0"

5'-0"

11'-6"

A

A

A

12'-6"

11'-3

6'-9

COMPUTER ROOM

C204-A

C-204

11'-6"11'-6"

R.O.

R.O.

5'-5

R M

A

R W

A

JANITOR

CLOSET

J

A

NORTH CORRIDOR

C-210

J-202

21'-1

EAST

CORRIDOR

C-211

E

RECEPTIONIST

AREA

CENTRAL E-W CORRIDOR

C-213

E

A

C A

14'-2

13'-9

MEN

RESTROOM

RM-201

WOMEN

RESTROOM

RW-201

3'-2"

3'-2"

R.O.

3'-2"

2'-0

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

3'-2"

R.O.

3'-2"

R.O.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

7'-5"

10'-0

OFFICE

OFFICE

R.O.

3'-3"

R.O.

3'-2"

R.O.

3'-2"

1'-2

1'-10

13'-1

3'-2"

R.O.

10'-4

OFFICE

2112-A

R O

R O

5 8

R O

R O

R O

OFFICE

OFFICE

OFFICE

CENTRAL N-S

CORRIDOR

C-214

3 4

1 4

6'-10"

1 4

7 8

1'-2

N.I.C.

32 33

3'-2"

R.O.

3 4

14'-1

11'-0"

2109-A

C

A

A

ST-2B

2110-A

2111-A

1'-6"

11'-3

" 7'-0"

10'-6"

8'-11"

9'-3

1 4

1 2

37'-0

14'-11

" 11'-3

P-8

P-9

REFERENCE RESTROOM

RENOVATION PACKAGE

NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP

TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT

LEGEND

EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK

NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE

EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN

EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN

N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)

ENLARGED FLOOR PLAN NORTH EAST QUAD

A - 103

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/4"= 1'-0"

0 2'

4'

8'

1'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

NE

ENLARGED NORTH-EAST QUADRANT OF THE PROPOSED FLOOR PLAN

A-1

1/4" = 1'-0"

MARK DATE DESCRIPTION

KEYED NOTES

NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR TO

HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES (LEFT-RIGHT /

RIGHT-LEFT)

EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING;

WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE PREPARED AND

PAINTED AS PER FINISHES SCHEDULE

EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL

SURVEILLANCE AND OPERABLE BLINDS

NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO

UNDERSIDE OF FLOOR PLATE (TRUE CEILING) IN COMPLIANCE w/ SCIF

REQUIREMENT (ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01 / STC 45

SOUND GROUP 3 OR BETTER). PROVIDE A CONTINUOUS BEAD OF

ACOUSTICAL CAULK AT ALL INTERSECTIONS W/ OTHER SURFACES

(HORIZONTAL OR VERTICAL, BOTH SIDES). WALL MUST BE UNIFORMLY

FINISHED ON BOTH SIDES, FROM FLOOR SLAB (TRUE FLOOR) TO UNDER-

SIDE OF FLOOR PLATE (TRUE CEILING). WHERE SCIF WALL ABUTS

EXISTING WALL, CUT BACK EXTANT BASEBOARD AS NEEDED

AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING,

MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR

STRUCTURAL MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND

TERRACOTTA) W/ CLOSED CELL, NON EXPANDING FIREPROOFING FOAM.

TROWEL FOAM SMOOTH AFTER APPLICATION

DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB

ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED

COLUMNS) PROCEED AS INDICATED IN WALL TYPE DETAILS. ADD 4"+

CAP WOOD BASE. WALL & MILL WORK AS PER FINISHES SCHEDULE

ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPES

W/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/

1/2" GWB + 4" W/ CAP WOOD BASE. FINISH WALLS AND MILL WORK AS

PER FINISHES SCHEDULE

FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES

SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF

OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL.

FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP

AND MEP DRAWINGS

SCIF ENTRY/EXIT: PROVIDE NEW 1 3/4" SCIF LEVEL 3 ACOUSTIC STEEL

DOOR AND FRAME W/ X10 LOCK (

PREP FOR DOOR BY G.C. F&I OF BMS,

IDS, ACD AND X10 BY TREASURY OSP SEE A-602) . HARDWARE MUST

MEET FEDERAL SPECIFICATION FF-L-2740 / UL 2050

IF AFTER DEMOLITION EXTANT COLUMN GWB (MODERN) IS DAMAGED,

REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2"

GWB. REINSTALL PREVIOUSLY REMOVED WOOD BASE FINISH WALL AND

MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT

EXISTING TERRA COTTA + PLASTER WALL TO REMAIN & TO BE FURRED

OUT AS PER WALL TYPE TO ACHIEVE AN STC-45 (SOUND GROUP 3) OR

BETTER, AND TO INSTALL ELECTRICAL BOXES

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED. REFINISH

AS PER FINISHES/ ROOM SCHEDULES

EXTANT ORIGINAL TILE (FLOOR AND WALLS) TO REMAIN. CLEAN AND ADD

MISSING TILES IF SIMILAR ARE AVAILABLE ON SITE.

4 4 4

C

B2

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

3 6

8 9

N-E QUADRANT

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED

AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND

DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK

2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST

STRINGENT REQUIREMENT APPLIES

3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDIT.

4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION

5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY

LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE PROJECT, SHALL

BE CONSIDERED PART OF THE CSW

7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK. THE CONTRACTOR IS

RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS

8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE

DESIGNATED BY THE COR

9. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE

AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION

AND APPROVAL OF TREASURY / COR

10. EXISTING / NEW SYSTEMS FURNITURE/EQUIPMENT TO BE REMOVED/

PROVIDED BY TREASURY.

11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND

VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.

(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)

12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING

CONSTRUCTION

KEYED NOTES

A2

A1

A2

H3

H4

H3 or

D2

D3D1D1

D3

D2

D2

D1

D1

D1

D1

D1

D1

D1

D1 D1 D1

D1 D1

D1

D1

D1

D1

D1

D1

D1 D1

D3

D2

D3

D2

D2

H2

H2

H1

H2

28 MARCH 2019

100%

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

KE

Y

P

LA

N

QUADRANT

N

B1

3 4

16'-11

A

A

A

A

A

A

5'-0"

12'-6"

11'-3

11'-0"

A

20'-3"

A

A

A

11'-9" 11'-9"5'-6

3 4

1 2

11'-0" 11'-0"

11'-6"11'-6"

R.O.

E

A

ELECTRICAL

CLOSET

E-201

OPEN OFFICE AREA

SOUTH

JANITOR CLOSET

J-201

J

A

TELECOM CLOSET

HISTORIC

CORRIDOR

C-200

T

A

T

B

T-201

OFFICE

OPEN OFFICE AREA

WEST

CENTRAL E-W CORRIDOR

C-213

SOUTH CORRIDOR

C-214

A

A

11'-6

50'-3"

3 EQUAL SIZE OFFICES (2102 T0 2104)

24'-7

2 EQUAL SIZE OFFICES (2128 & 2129)

34'-6

3'-2"

R.O.

3'-2"

3'-2"

R.O.

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

3'-2"

R.O.

OFFICE

OFFICE

OFFICE

3'-2"

R.O.

OFFICE

OFFICE

OFFICE

R.O.

3'-2"

R.O.

3'-2"

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

3'-2"

R.O.

OFFICE

OFFICE

2'-6"

3'-7

7 8

1 4

7'-5

" 3'-9

1 2

1'-10

WEST

CORRIDOR

C-212

1 4

1 2

1 4

7'-2

6'-8

6'-10"

1 4

10'-0

1'-2

17'-8

32 33

C200-A

G

H

C200-J

EV-201

EV-202

3'-2"

R.O.

3'-2"

R.O.

LAN ROOM

B

A

12'-9

1 2

1 4

1 2

8'-2"

8'-2"

7'-11" 7'-11"

7'-11"

1'-6

1'-6

1'-6

10'-11

21"

NEW SCIF WALLS

NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR

PLATE UP TO CEILING PLATE. GWB FROM FLOOR

PLATE TO 6" ABOVE ACT

LEGEND

EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN

EXISTING COLUMN & SURROUND WITHIN THE AREA

OF WORK TO REMAIN

EXISTING COLUMN WITH NEW SURROUND

WITHIN THE AREA OF WORK

NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP

TO CEILING PLATE

N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA

( NOT IN CONTRACT)

ENLARGED FLOOR PLAN SOUTH WEST QUAD

A - 104

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/4"= 1'-0"

0 2'

4'

8'

1'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

ENLARGED SOUTH-WEST QUADRANT OF THE PROPOSED FLOOR PLAN

A-1

1/4" = 1'-0"

MARK DATE DESCRIPTION

KEYED NOTES

S-W QUADRANT

3 3 3 3 3 3 3

H6

H3

H3

H3

H2

H2

D2 D2 D2 D2

D3

D3

D3 D3

D1

D1

D1

D1

D1 D1

D1 D1

D1 D1

D1 D1

D1

D1 D1

D1

D1

D1 D1 D1

E1

G

NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.

EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING; WINDOW

SASHES, TRIM, MUNTINS AND SILLS, TO BE

PREPARED AND PAINTED AS PER FINISHES SCHEDULE

EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL

SURVEILLANCE AND OPERABLE BLINDS

AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING, MUST

MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR STRUCTURAL

MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND TERRACOTTA) W/ CLOSED

CELL, NON EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH AFTER

APPLICATION

DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB ENCLOSURE

SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED COLUMNS) PROCEED

AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL

AND MILL WORK AS PER FINISHES SCHEDULE

ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/ 3 5/8" 16

GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP

WOOD BASE. FINISH WALLS AND MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.

SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND FLOORING

REMNANTS PRIOR TO NEW CARPET INSTALL

FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND MEP

DRAWINGS

IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS

DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE

COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD

BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.

REFINISH AS PER FINISHES/ ROOM SCHEDULES

EXTANT DOOR ASSEMBLY & CASING TO REMAIN. SINCE DOOR WILL

BE USED FOR EXIT ONLY CHANGE HARDWARE

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED

BUT IN A PERMANENTLY CLOSED POSITION.

28 MARCH 2019

100%

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

KE

Y

P

LA

N

SW

QUADRANT

10'-4" 19'-0"

'-5

7'-11 4"

-A

-A

'-5

13'-93 4"

-A

10'-4"

'-5

'-6

3 4"

16'-113 8"

-A

-A

-A

4' -4

'-0

13'-0"

11'-6"

-A

-A

-A

-A

-A

-A

5'-0"

12'-6"

11'-31 4"

6'-93 4"

4' -4

4'

-8

-A

11'-9"

'-7

3 4"

11'-0"

2108-A

11'-6"11'-6"

R.O. R.O.

5'-47 8"

E201-A

S 240-A

EAST

CORRIDOR

C-211

E-

SET J201-A

RECEPTIONIST

AREA

CENTRAL E-W CORRIDOR

C-213

-A

-A

11'-61 8"

E20 3-A

C -2

A

'-5

1 4"

'-6

'-6

'-6

'-6

50'-3"

21'-93 4"04)

2 EQUAL SIZE OFFICES (2105 & 2106)

128 & 2129)

13'-6"

3'-2" 3'-2" R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

OFFICE

3'-2" R.O.

OFFICE

OFFICE

R.O.

3'-2"

R.O.

3'-2"

R.O.

3'-2"

OFFICE

OFFICE

OFFICE

OPEN OFFICE AREA

SOUTH

3'-2" R.O.

3'-2" 3'-2" R.O.

OFFICE

OFFICE

OFFICE

OFFICE

3'-2" R.O.

3'-2" R.O.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

R .O

3'

-2

R .O

3'

-2

R .O

3'

-2

R .O

3'

-2

8'-2"

'-8

1 2"

3'-63 4" 4'-21

4" 4'-101 4"R.O.

26'-105 8"

6' -1

1" 6'

-1 1"

6' -1

1"

1'-53 4"

4"

OFFICE

OFFICE

OFFICE

'-0

1 4"

3'-91 4"

1'-107 8"

WEST

CORRIDOR

C-212 6'

-1 1 4"

CENTRAL N-S

CORRIDOR

C-21411 '-9

1 2"

'-4

1' -9

1 4" 7'-21

4"

6'-81 4" 4'

-4

6'-10"

1' -9

1 4" 4'

-4

10'-07 8"

1'-25 8"

17'-85 8"

20 21

N.I.C.

32 33

3'-2" R.O.

3'-2" R.O.

LAN ROOM

2109-A

C24 0A

-A

ST-2B

2110-A

2111-A

14'-61 2"13'-31

2"

'-0

'-4

5 8"

12'-91 2"

'-8

'-9

1 4"

'-2

3 4"

10'-111 2"

4"

9' -0

1 2"

47'-61 2"

26'-73 4"

37'-01 4"

31'-01 4"

'-0

3 8"

5'-0"

1' -2

5 8"

7'-11" 7'-11" 7'-11" 7'-11"

NEW SCIF WALLS

NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR

PLATE UP TO CEILING PLATE. GWB FROM FLOOR

PLATE TO 6" ABOVE ACT

LEGEND

EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN

EXISTING COLUMN & SURROUND WITHIN THE AREA

OF WORK TO REMAIN

EXISTING COLUMN WITH NEW SURROUND

WITHIN THE AREA OF WORK

NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP

TO CEILING PLATE

N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA

( NOT IN CONTRACT)

ENLARGED FLOOR PLAN SOUTH EAST QUAD

A - 105

R

EV

IS

IO

N N

O

TE

S

GR

AP

HI

C

SC

AL

E

AGF

CE

RT

IF

IC

AT

IO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/4"= 1'-0"

0 2' 4'

8' 1'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

ENLARGED SOUTH-EAST QUADRANT OF THE PROPOSED FLOOR PLANA-1

1/4" = 1'-0"

MARK DATE DESCRIPTION

S-E QUADRANT

KEYED NOTES

NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.

EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING;

WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE

PREPARED AND PAINTED AS PER FINISHES SCHEDULE

EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL

SURVEILLANCE AND OPERABLE BLINDS

AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING,

MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR

STRUCTURAL MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND

TERRACOTTA) W/ CLOSED CELL, NON EXPANDING FIREPROOFING FOAM.

TROWEL FOAM SMOOTH AFTER APPLICATION

3 3 3 3 3 3 3

5 5

DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB ENCLOSURE

SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED COLUMNS) PROCEED

AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL

AND MILL WORK AS PER FINISHES SCHEDULE

ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/ 3 5/8"

16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2" GWB + 4" W/

CAP WOOD BASE. FINISH WALLS AND MILL WORK AS PER FINISHES SCHEDULE

FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.

SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND

FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL.

FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND

MEP DRAWINGS

IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS DAMAGED,

REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2" GWB.

REINSTALL PREVIOUSLY REMOVED WOOD BASE. FINISH WALL AND MILL WORK

AS PER FINISHES SCHEDULE

FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT

FURRING & 1/2" GWB TO ALIGN W/ NEW WALL (SEE WALL TYPE DETAIL)

EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED. REFINISH AS PER

FINISHES/ ROOM SCHEDULES

H3

H3

H3

H3

H2

H2

D1

D1

D1

H2

H2

F2 F2

F3 F1

28 MARCH 2019

100%

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

KE

Y

P

LA

N

SE

QUADRANT

N

D1D1D1

D1 D1

D1

D1

D1

D1

D1

D1 D1

D1

D1D1

D1 D1

D1

E2

E2D2 D2

D2

D3

D2

D3

D2

D2

D3

D3

COMPUTER ROOM

C

OPEN OFFICE AREA

WEST SOUTH CORRIDOR

C-214

3'-0"

3'-0"

S

2003-A 2003-B 2003-C

2003-D 2003-E 2003-F

2003-G 2003-H 2003-I

J

2002-C

2002-B

2002-A

2002-D 2002-E 2002-F

2002-G

2002-H

2001-D 2001-E

2001-F 2001-G

2001-J 2001-K 2001-L 2001-M

2001-B

2001-C2001-A

2109-A

2110-A

2111-A

2112-A

2113-A

A

A

A

OFFICE

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

2005-A

A

BREAK ROOM

C204-A

2108-A

TEAM MEETING ROOM

E

A

J

A

E

A

NORTH CORRIDOR

OPEN OFFICE AREA

NORTH

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE AREA

SOUTH

C-210

EAST

CORRIDOR

C-211

WEST

CORRIDOR

C-212

J

A

T

A

T

B

OFFICE

OFFICE

OFFICE

OFFICE

RECEPTIONIST

AREA

CENTRAL E-W CORRIDOR

C-213

SOUTH CORRIDOR

C-214

OFFICE

OFFICE

OFFICE

OFFICE

LAN ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

A

A

OFFICE

OFFICE

OFFICE

C

A

C

A

A

UNISEX

RESTROOM

RU-201

C E

N T

R A

L

N

C

O R

R I D

O R

C

ST-2 A

EV-203 EV-204

EV-202

EV-201

20 21

N.I.C.

ELECTRICAL

CLOSET

R M

A

R W

A

JANITOR

CLOSET

E-202

ELECTRICAL

CLOSET

E-201

ST-2 B

32 33

J-202

E

JANITOR

CLOSET

J-201

TELECOM

CLOSET

C

HISTORIC

CORRIDOR

C-200

T-201

C A

MEN

RESTROOM

RM-201

WOMEN

RESTROOM

RW-201

REFERENCE RESTROOM

200-B

C200-A

200-C

200-E

200-G

C F

200-H

B

A

A

R U

A

200-D

C

A

C200-J

2007-A

4'-8"

2001-H 2001-I

S

2008-A

RENOVATION PACKAGE

R

EF

ER

EN

CE

H

IS

T

O R

IC

R

ES

T

O R

A T

IO

N

P A

CK

A

G E

REFERENCE SECURITY /

SECURED WINDOWS PACKAGE

PROPOSED 2ND FLOOR PLAN WITH FURNITURE

A - 106

PROPOSED FLOOR PLAN WITH FURNITURE

A-1

1/8" = 1'-0"

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/8"= 1'-0"

0 4'

8'

16'

2'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

GENERAL NOTES

KEYED NOTES

NEW SYSTEMS FURNITURE AND ALL ASSOCIATED CABLING TO

BE INSTALLED WHERE DEPICTED. SYSTEMS FURNITURE

INSTALLATION BY TREASURY

WHERE TWO DESKS ARE DEPICTED IN THE SAME OFFICE,

ELECTRICAL & IT SET UP MUST BE DESIGNED AND IMPLE-

MENTED FOR DUAL USAGE

24 WORK STATIONS 6' x 9'

11 KIOSK STATIONS

28 PRIVATE OFFICES

12 DOUBLE OCCUPANCY

16 SINGLE OCCUPANCY

63 PEOPLE WHEN ALL OFFICES ARE USED FOR SINGLE OCCUPANCY

75 PEOPLE WHEN 14 OFFICES ARE USED FOR DOUBLE OCCUPANCY

28 MARCH 2019

MARK DATE DESCRIPTION

1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE

STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED AT

THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE

ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS.

INFORM COR PRIOR TO PROCEEDING w/ WORK

2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,

SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST

STRINGENT REQUIREMENT APPLIES

3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /

NEC/ IMC / IECC / IFC LATEST EDITION

4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION

TO FINISH WALL OR PARTITION

5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW

UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"

6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE

FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED

OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY

FOR THE COMPLETION OF THE PROJECT, SHALL BE

CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK

7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS

AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE

FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK

RELATED TRASH AND DEBRIS

7. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM

A SOURCE DESIGNATED BY THE COR

8.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT

THE JOB SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE

CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH

EXISTING AND TO THE SATISFACTION AND APPROVAL OF

TREASURY / COR

8. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE

REMOVED/ PROVIDED BY TREASURY.

9. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED

DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE

SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF

THE JOB)

11. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC

DURING CONSTRUCTION

N

N.I.C.N.I.C. N.I.C.

N.I.C.

N.I.C. N.I.C.

100%

KE

Y

P

N.I.C.

LEGEND

CEILING HEIGHT @ 10'-8" AFF (PERIMETER TO

CLEAR WINDOWS)

CEILING HEIGHT @ 8'-6" AFF ALL CENTRAL SECTION

AND NORTHERN AREA

1/2" GWB BULKHEAD

EXISTING STRUCTURAL CONCRETE BEAM

NEW SCIF WALLS

NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR

PLATE UP TO CEILING PLATE. GWB FROM FLOOR PLATE

TO 6" ABOVE ACT

EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN

NEW WALLS GWB (NON-SCIF) FROM FLOOR

PLATE UP TO CEILING PLATE

N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA

( NOT IN CONTRACT)

BULKHEAD

N.I.C.

N.I.C.

N.I.C.

N.I.C.

REFERENCE RESTROOM

RENOVATION PACKAGE

R

EF

ER

EN

CE

H

IS

T

O R

IC

R

ES

T

O R

A T

IO

N

P A

CK

A

G E

REFERENCE SECURITY /

SECURED WINDOWS PACKAGE

PROPOSED REFLECTED CEILING PLAN

A - 107

PROPOSED REFLECTED CEILING PLAN ( ONLY CEILING CONSTRUCTION )

A-1

1/8" = 1'-0"

R E

V I S

I O

N

N

O T

E S

GR

AP

HI

C

SC

AL

E

AGF

CE

RT

IFI

CA

TIO

NS

SHEET SIZE:

DISCIPLINE SHEET TYPE SEQUENCE

DRAWING NO.

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

DR

AW

IN

G

PR

OJ

EC

T

BU

ILD

IN

G

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

CO

NT

RA

CT

OR

S

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

24 x 36

DC-

2 3 4 5

2 3 4 5

A

B

C

D

DEPARTMENT OF TREASURY

1500 PENNSYLVANIA AV. NW

WASHINGTON DC 20220

BARBARA CHOATE

02/24/2018

2 ND FLOOR

MERIDIEN GROUP / CITADEL DCA

SUMMER CONSULTANTS

LSP

0019-07

TREASURY ANNEX BUILDING:

NEW OFFICE SPACE

2ND FLOOR RENOVATION

1/8"= 1'-0"

0 4'

8'

16'

2'

MERIDIEN GROUP, LLC

208 SOUTH KING ST. SUITE 303

LEESBURG, VA 20175

(703) 777-8285 www.meridiengroupllc.com

GENERAL NOTES

KEYED NOTES

CEILING HEIGHT @ ±10'-8" AFF ACT

(PERIMETER TO CLEAR WINDOWS)

CEILING HEIGHT @ 8'-6" AFF ALL CENTRAL SECTION AND

NORTHERN AREA ACT

BULKHEAD CONSTRUCTION: 2 1/2" 20 GA STEEL STUDS W/ GWB

ALL EXPOSED SIDES. BULKHEAD TO EXTEND 1" DOWN FROM

ACT CEILING. WIDTH AS DEPICTED IN RELATIONSHIP TO

PILASTERS. ATTACH BULKHEAD TOP PLATE TO UNDERSIDE

OF EXTANT TERRA COTTA AS PER PROJECT'S STRUCTURAL

ENGINEERS REPORT *

BULKHEADS WITHIN THE PERIMETER OFFICES / SPACE ARE

ONLY NEEDED WHERE FCU PIPES ARE LOWER THAN CEILING.

SURVEY CEILING AFTER DEMOLITION TO ASCERTAIN THEIR

EXACT LOCATION. tHUS, BULKHEADS SHOULD ONLY BE

CONSTRUCTED TO HIDE FCU'S PIPES

OPEN AREAS WITHOUT CEILING

* THE TOP TRACK SHALL BE ANCHORED WITH

DEWALT/POWERS ZAMAC NAILIN ANCHORS 1/4" x TO THE

UNDERSIDE OF THE TERRA COTTA. ANCHOR SPACING SHOULD

BE SUCH THAT THE LOADS DO NOT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.