2nd_Floor_100__DRAWING_4-4-2019_S300R.pdf
PDF 10 MB Posted
- Attached to
- Treasury OFAC Renovation Federal contract opportunity
- Solicitation number
- 2032H319R00008
About this file
2nd Fl Drawing
View the file
Other files for this federal contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
1 2 3 4 5
A
B
C
D department of TREASURY, TREASURY ANNEX BUILDING
1500 PENNSYLVANIA AVENUE NW | WASHINGTON DC 20220
DRAWING INDEX
GENERAL
ARCHITECTURAL
KEY PLANVICINTY MAP
TREASURY ANNEX 2ND FLOOR INTERIOR RENOVATION
TREASURY ANNEX
BUILDING
N
G-001 COVER SHEET 01 OF 55
AD101 EXISTING / DEMOLITION FLOOR PLAN 02 OF 55
A-101 PROPOSED FLOOR PLAN 03 OF 55
A-102 ENLARGED PROPOSED FLOOR PLAN NW-QUADRANT 04 OF 55
A-103 ENLARGED PROPOSED FLOOR PLAN NE-QUADRANT 05 OF 55
A-104 ENLARGED PROPOSED FLOOR PLAN SW-QUADRANT 06 OF 55
A-105 ENLARGED PROPOSED FLOOR PLAN SE-QUADRANT 07 OF 55
A-107 PROPOSED FLOOR PLAN WITH FURNITURE 08 OF 55
A-108 PROPOSED RCP (CONSTRUCTION NO MEP) 09 OF 55
A-201 SECTION A-A W/ ENLARGED PART 1 10 OF 55
A-202 SECTION A-A W/ ENLARGED PARTS 2 & 3 11 OF 55
A-203 SECTION B-A W/ ENLARGED PART 1 12 OF 55
A-301 WALL TYPE A1 & A2 13 OF 55
A-302 WALL TYPE B1 & B2 14 OF 55
A-303 WALL TYPE C & D1 15 OF 55
A-304 WALL TYPE D2 & D3 16 OF 55
A-305 WALL TYPE E1 & E2 17 OF 55
A-306 WALL TYPE E3 & F1 18 OF 55
A-307 WALL TYPE F2 19 OF 55
A-308 WALL TYPE F3 & G 20 OF 55
A-309 WALL TYPE H1 & H2 21 OF 55
GENERAL CONDITIONS
1. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OF THE DESCRIPTION OF DETAILS OF WORK WHICH ARE
MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS-DESCRIBED DETAILS OF WORK BUT SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FROM AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATION
2. MANUFACTURER SPECIFIED WITHIN THE CONSTRUCTION DOCUMENTS ARE PROVIDED AS A MINIMUM PERFORMANCE CRITERIA, SUBSTITUTIONS WILL BE CONSIDERED IF COMPLAINT TO THE PERFORMANCE ESTABLISHED BY THE MANUFACTURER NOTED. BUILDING MATERIALS SUBSTANDARD TO THESE REQUIREMENTS WILL BE SUMMARILY REJECTED.
ALL BUILDING COMPONENTS ARE TO BE HEAVY DUTY QUALITY AND BE FOR ABUSIVE RESISTANCE INSTALLATION. BUILDING COMPONENTS SPECIFIED HEREIN THAT DO NOT MEET THE HEAVY DUTY-ABUSIVE ENVIRONMENTAL CRITERIA MUST BE
BROUGHT TO THE ATTENTION OF THE BUILDING REPRESENTATIVE AND WILL BE RE-SPECIFIED
3. BY THE SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND HAS FAMILIARIZED
HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED
4. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS AND/OR SIZE. VERIFY ALL DIMENSIONS BEFORE PROCEEDING AND OBTAIN MEASUREMENTS AT THE JOB FOR ALL WORK REQUIRED TO BE ACCURATELY FITTED TO THE BUILDING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SUCH MEASUREMENTS AND FOR THE PRECISE FITTING
OF THE WORK
5. IF CONFLICTS ARE DISCOVERED AT ANY TIME BETWEEN THE ENGINEERING AND ARCHITECTURAL DRAWINGS, THE COR SHALL BE CONTACTED AT ONCE TO RESOLVE THE PROBLEM. IF THE COR IS NOT CONTACTED, THE CONTRACTOR SHALL ACCEPT THE RESPONSIBILITY TO CORRECT ANY AND ALL SUCH WORK NOT IN A COORDINATE WITH THE ARCHITECTURAL
DRAWINGS
6. CHANGES TO THE DRAWINGS (ADDITIONS, DELETIONS OR ALTERATIONS) THAT MIGHT CONSTITUTE A CHANGE ORDER MUST BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL, OTHERWISE CONTRACTOR WOULD UNDERTAKE SUCH
WORK AT HIS OWN RISK AND WORK MIGHT HAVE TO BE REVERSED AT CONTRACTOR'S OWN COST
7. ALL SALVAGEABLE MATERIALS SHALL BE RETURNED TO THE GOVERNMENT
8. THE G. C. AND ALL SUB-CONTRACTOR SHALL SUBMIT TO GOVERNMENT AND COR SUBMITTALS AND SHOP DRAWINGS FOR
REVIEW PRIOR TO START OF CONSTRUCTION.
9. UPON COMPLETION OF THE INSTALLATION, REMOVE ALL DEBRIS FROM THE BUILDING CREATED BY THE WORK PROVIDED UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. REMOVE ANY SOILED SPOTS FROM THE FACE OF THE CARPET OR OTHER FINISH SURFACES USING PROCESSES RECOMMENDED BY THE MANUFACTURER AND IN A MANNER ACCEPTABLE TO THE GOVERNMENT. REPLACE ANY AREAS OF CARPET OR FINISH SURFACES WHERE CLEANING HAS FAIL TO RESTORE THE
APPEARANCE AND QUALITY SATISFACTORILY, AS DETERMINED BY THE GOVERNMENT.
10. ALL CONTRACTORS SHALL PERFORM ALL WORK IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS.
11. THE G. C. SHALL VERIFY REQUIREMENTS FOR ALL EQUIPMENT INDICATED ON THE DRAWINGS WHETHER SUPPLIED BY THE
GOVERNMENT OR SUB-CONTRACTOR.
12. WHERE THE G. C. IS INSTRUCTED TO ALIGN A PARTITION WITH TWO OR MORE COLUMNS AND THE COLUMNS ARE DISCOVERED TO BE OF UNEQUAL SIZE, THE LARGER OF THE COLUMNS SHALL DETERMINE THE LOCATION OF THE
PARTITION. THIS WILL ALSO APPLY TO WET COLUMNS AND CORE WALLS.
13. THE G. C. SHALL REPAIR ALL DAMAGE CAUSED BY HIM OR HIS SUB-CONTRACTORS DURING CONSTRUCTION.
PRE-EXISTING DAMAGE MUST BE REVIEWED AND ACKNOWLEDGED, IN WRITING BY THE GOVERNMENT AND ARCHITECT PRIOR TO COMMENCEMENT OF WORK. DAMAGE NOT DOCUMENTED PRIOR TO CONSTRUCTION START SHALL BE REPAIRED
TO LIKE NEW CONDITION WITHOUT ADDITIONAL CHARGE TO THE GOVERNMENT.
14. THE G. C. SHALL ENSURE THAT ALL PAINT HAS BEEN REMOVED FROM ALL NON-SCHEDULE PAINTED SURFACES PRIOR TO
DELIVERY OF THE SPACE.
15. THE G. C. SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED
16. IF THERE IS A QUESTION AS TO THE ACCEPTABLE LEVEL OF QUALITY FOR THE INSTALLATION OF ANY MATERIALS, THE
GOVERNMENT'S REPRESENTATIVE DECISION WILL BE FINAL
17. NEW DOOR HARDWARE, INCLUDING HINGES AND LOCK SETS, ARE TO BE MOUNTED AT ABA HEIGHTS UNLESS NOTED
OTHERWISE
18. ALL CEILING REGISTERS, GRILLES, VENTS AND DIFFUSERS SHALL BE FACTORY FINISHED. IF PAINTING IS REQUIRED, PROVIDE ENAMEL FINISH
19. ALL J-BENDS AND OTHER GYPSUM METAL TRIM SHALL BE SPACKLE-BLENDED INTO THE ADJACENT SURFACE.
20. WHERE TWO OR MORE WALL SWITCHES OR DIMMERS OCCUR IN THE SAME LOCATION, THEY ARE TO RECEIVE A COMMON
GANG PLATE WHOSE FINISH IS TO MATCH THE BUILDING STANDARD SWITCH PLATE.
21. ALL PAINTED WALLS SHALL BE HAVE A LEVEL 4 FINISH: WITH ONE ROLLER-APPLIED (1) PRIMER COAT AND (2)
ROLLER-APPLIED FINISH COATS.
22. PROVIDE THRESHOLDS AT ALL DOORS AND TRANSITION STRIPS WHERE CARPET MEETS A DIFFERENT TYPE OF FLOORING
23. REVIEW THE SPECIFICATIONS AND CUT SHEETS FOR ACCESSORIES, FIXTURES, ETC. THAT ACCOMPANY THE DRAWING SET PRIOR TO PLACING ORDERS. IF CONFLICTS ARE FOUND, INFORM THE ARCHITECT OF SUCH FINDINGS AND TAKE NO ACTION UNTIL RESOLVED. IN THOSE CASES, IF AN ORDER FOR AN UNRESOLVED ITEM IS PLACED WITHOUT APPROVAL OF ARCHITECT, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY IF THE ITEM IS NOT ACCEPTED BY THE CLIENT
N
AC
ACT
ADJ
AFF
ALUM
ATT
B & B
BD
BET
BF
BIT
BLDG
BTM
CER
CJ
CL
CLG
CMU
COMP
CONC
CONT
D
AT
ACOUSTIC
ACOUSTIC CEILING TILE
ADJUSTABLE
ABOVE FINISHED FLOOR
ALUMINUM
ATTENUATION
BALLED AND BAGGED
BOARD
BETWEEN
BARRIER FREE
BITUMINOUS
BUILDING
BOTTOM
CERAMIC
CONTROL JOINT
CENTER LINE
CEILING
CONCRETE MASONRY UNIT
COMPRESSIBLE
CONCRETE
CONTINUOUS
DEEP
DEMO
D.F.
DIA
DS
EXTG
F&I
FF
FLR
FV
GA
GALV
GC
GL
GPDW
O.C.
O.D.
O.H.
OZ.
PLAM
PLYWD
PR
DEMOLITION
DRINKING FOUNTAIN
DIAMETER
DOWN SPOUT
EXISTING
FURNISH AND INSTALL
FINISHED FLOOR
FLOOR
FIELD VERIFY
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLASS
GYPSUM WALLBOARD
ON CENTER
OUTSIDE DIAMETER
OVERHEAD OR OPP. HAND
OUNCE
PLASTIC LAMINATE
PLYWOOD
PAIR
ABBREVIATIONS
PT
PTD
QTY
REINF
REQ'D
RM.
SHT
SIM
SS
THK
TYP.
VCT
VERT
VIF
VP
UON
W.
W/
PRESSURE TREATED
PAINTED
QUANTITY
REINFORCED
REQUIRED
ROOM
SHEET
SIMILAR
STAINLESS STEEL
THICKNESS
TYPICAL
VINYL COMPOSITION TILE
VERTICAL
VERIFY IN FIELD
VENEER PLASTER
UNLESS OTHERWISE NOTED
WIDE
WITH
SYMBOLS
ALIGN
ALIGN SURFACES
CENTER LINE
X
GENERAL / KEYED NOTE
DEMOLITION NOTE
ROOM NAME
ROOM NUMBER
EXTG WALL TO BE REMOVED
X PARTITION TYPE
EXTG WALL TO REMAIN
NEW DOOR ASSEMBLY
X-
XX
X
EXTG DOOR ASSEMBLY
TO BE REMOVED
EXTG DOOR ASSEMBLY
X-XXX
NEW PARTITION
X DRAWING REVISION NUMBER
MECHANICAL
ELECTRICAL
G - 001
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
SHEET
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0018-05
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
COVER PAGE
NEW SCIF WALL
NEW WALL FULL HEIGHT
LC
XXX
XXX
XX
2ND FLOOR
28 MARCH 2019
100%
A-310 WALL TYPE H3 & H4 22 OF 55
A-311 WALL TYPE H5 & H6 23 OF 55
A-312 WALL TYPE J1 & J2 24 OF 55
A-401 PROPOSED BREAK ROOM MILLWORK 25 OF 55
A-402 PROPOSED UNISEX BATHROOM FLOOR PLAN 26 OF 55
A-403 PROPOSED UNISEX BATHROOM INTERIOR ELEVATIONS 27 OF 55
A-601 FINISHES NOTES + ROOM FINISHES SCHEDULE 28 OF 55
A-602 ROOM FINISHES SCHEDULE 29 OF 55
A-603 FINISHES SCHEDULE 30 OF 55
A-604 RESTROOM FINISHES SCHEDULE 31 OF 55
A-605 DOOR SCHEDULE 32 OF 55
A-606 DOOR SCHEDULE 33 OF 55
A-607 HARDWARE SCHEDULE 34 OF 55
A-608 PLUMBING SCHEDULE 35 OF 55
A-609 RESTROOM ACCESSORIES SCHEDULE 36 OF 55
F-001 SYMBOLS AND ABBREVIATIONS 37 OF 55
FD101 DEMOLITION FIRE PROTECTION 38 OF 55
F-101 PROPOSED FIRE ALARM 39 OF 55
F-102 PROPOSED FIRE PROTECTION 40 OF 55
M-001 SYMBOLS, ABBREVIATIONS & SECTION 41 OF 55
MD101 DEMOLITION MECHANICAL 42 OF 55
M-101 PROPOSED MECHANICAL 43 OF 55
M-501 MECHANICAL DETAILS 44 OF 55
M-601 MECHANICAL SCHEDULES 45 OF 55
E-001 SYMBOLS & ABBREVIATIONS 46 OF 55
ED101 DEMOLITION LIGHTING S 47 OF 55
ED102 DEMOLITION POWER 48 OF 55
E-101 PROPOSED LIGHTING 49 OF 55
E-102 PROPOSED POWER 50 OF 55
ET101 PROPOSED TELECOM 51 OF 55
E-501 DETAILS 52 OF 55
E-601 PANEL SCHEDULES 53 OF 55
E-602 PANEL SCHEDULES 54 OF 55
E-603 PANEL SCHEDULES 55 OF 55
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
FIRE PROTECTION
ST-2 A
EV-203 EV-204
EV-202
EV-201
20 21
N.I.C.
ELECTRICAL
CLOSET
E202-A
R M
A
R W
A
JANITOR
CLOSET
J
A
E201-A
E-202
ELECTRICAL
CLOSET
E-201
ST-2 B
S 240-A
32 33
45 46
J-202
E
JANITOR
CLOSET
J-201
J201-A
TELECOM
CLOSET
C
C-203A
HISTORIC
CORRIDOR
C-200
T
A
T-201
E203-A
C
A
C240-A
MEN
RESTROOM
RM-201
WOMEN
RESTROOM
RW-201
200-B
C200-A
19 22 23 24
2231B 2221 2220 2205 2196 2195 2186 2185 2176 2175 2161
21012092
C205
C240
2002 C200
C251
T
B
C210
2211 2202
2061 2062 2063 2064 2065
2051 2053 2054
2052A
2052D 2052C 2052B
2025-A
2021 2022 2023 2024
67 69
47 48
585756
C
J
200-C
200-E
C
D
200-G
C
F
200-H
2231A
LEGEND
WALLS TO BE DEMOLISHED
EXISTING WALLS WITHIN THE AREA OF WORK
TO REMAIN00
EXISTING COLUMN & SURROUND WITHIN THE AREA
OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE
AREA OF WORK. COLUMN TO REMAIN AND
SURROUND TO BE REMOVED
±160'-0"
±68'-7"
B A
EXISTING WALLS OUTSIDE THE AREA OF WORK
TO REMAIN
CLOSET
C-201
REFERENCE RESTROOM
RENOVATION PACKAGE
R
EF
ER
EN
CE
H
IS
T
O R
IC
R
ES
T
O R
A T
IO
N
P A
CK
A
G E
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
N
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING.
NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE
SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL
CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/
WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,
DETAILS AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT
APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /
IECC / IFC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO
FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS
SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT
ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE
CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE
PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF
WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER
EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE
REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED TRASH AND
DEBRIS
7. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A
SOURCE DESIGNATED BY THE COR
8.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB
SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR
SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE
SATISFACTION AND APPROVAL OF TREASURY / COR
8. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE
REMOVED/ PROVIDED BY TREASURY.
9. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED
COVERS MUST BE REINSTALLED AT END OF THE JOB)
11. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING
CONSTRUCTION
DEMOLITION NOTES
1 DEMOLISH EXISTING PARTITION / WALL AS DEPICTED
DEMOLISH EXISTING DOORS & FRAME. RETURN TO TREASURY
FACILITIES MANAGEMENT
EXISTING FURNITURE & OFFICE EQUIPMENT TO BE REMOVED
BY TREASURY
DEMOLISH EXISTING SUSPENDED CEILING GRID, ACT & LIGHT
FIXTURES
DEMOLISH EXISTING CARPET
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB
ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY
DESIGNATED COLUMNS)
DEMOLISH EXISTING DUCT WORK AS PER MEP DRAWINGS
DEMOLISH ELECTRICAL OUTLETS & SWITCHES, AND CABLINNG
AS PER ELECTRICAL DRAWINGS
KEYED NOTES
NO WORK SHALL TAKE PLACE WITHIN AREAS DESIGNATED N.I.C.
EXISTING WALL / COLUMN ENCLOSURE TO REMAIN
EXISTING DOOR TO REMAIN. NO ALTERATIONS
EXISTING DOOR TO REMAIN. ALTERATIONS NOTED ON A-102
EXTG THROUGH WALL / THROUGH FLOOR PIPE(S) TO REMAIN
RADIATORS / FCU TO REMAIN
6 6
EXISTING AND DEMOLITION FLOOR PLAN
A-1
1/8" = 1'-0"
TYP
EXISTING & DEMO FLOOR PLAN
AD 101
4 4
N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
KE
Y
P
LA
N
100%
28 MARCH 2019
10'-4" 19'-0"
19'-2
5'-5
7'-1
2109-A
2110-A
2111-A
2112-A
2113-A
A
A
A
OFFICE
A
1 4
13'-9
3 4
A
10'-4"
A
A
5'-0"
5'-0"
3 4
16'-11
3'-2"
R.O.
A
A
A
13'-3
1 2
10'-5"
10'-6"
A
1 4
3 4
13'-0"
9'-6"
5'-0"
11'-6"
A
A
A
A
A
A
A
A
5'-0"
5'-0"
14'-6
" 12'-6"
11'-3
6'-9
11'-0"
A
20'-3"
A
A
A
11'-9" 11'-9"5'-6
3 4
2005-A
A
1 2
22'-11
BREAK ROOM
14'-0
1 2
3 4
R O
11'-0" 11'-0"
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2" 3'-2"
COMPUTER ROOM
C204-A
C-204
2108-A
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
11'-6"11'-6"
3'-2"
R.O.
3'-2"
TEAM MEETING ROOM
3'-2"
3'-3"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
R O
R O
R O
R O
R O
R O
5'-5
E
A
J
A
E
A
S
A
NORTH CORRIDOR
37'-0
OPEN OFFICE AREA
NORTH
45'-7
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN OFFICE AREA
SOUTH
C-210
21'-3
EAST
CORRIDOR
C-211
WEST
CORRIDOR
C-212
J
A
C
A
T
A
T
B
OFFICE
OFFICE
OFFICE
OFFICE
RECEPTIONIST
AREA
OPEN OFFICE AREA
WEST
CENTRAL E-W CORRIDOR
C-213
SOUTH CORRIDOR
C-2145
OFFICE
OFFICE
OFFICE
OFFICE
LAN ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
A
A
11'-6"
OFFICE
OFFICE
OFFICE
C
A
C
A
A
E
Q U
A L
S
I Z
E
O
F F
I C
E
T
50'-3"
± 47'-6
4 EQUAL SIZE OFFICES (2124 T0 2127)
21'-10"
3 EQUAL SIZE OFFICES (2102 T0 2104) 2 EQUAL SIZE OFFICES (2105 & 2106)
24'-7
2 EQUAL SIZE OFFICES (2128 & 2129)
3'-2"
R.O.
34'-6
13'-6"
14'-2
13'-9
UNISEX
RESTROOM
RU-201
1 4
C E
N T
R A
L
N
C
O R
R I D
O R
C
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
11'-0"
17'-8
7'-2
31'-4
3 4
5 8
55'-3
5'-0"
14'-2
1 4
3 8
50'-4
14'-1
ST-2 A
EV-203 EV-204
EV-202
EV-201
20 21
N.I.C.
ELECTRICAL
CLOSET
R M
A
R W
A
E-202
ELECTRICAL
CLOSET
E-201
ST-2 B
32 33
J-202
E
JANITOR
CLOSET
J-201
TELECOM
CLOSET
C
HISTORIC
CORRIDOR
C-200
T-201
C A
MEN
RESTROOM
RM-201
WOMEN
RESTROOM
RW-201
200-B
C200-A
200-C
E
G
C F
H
±68'-7"
B
A
A
R U
A
3'-2"
R.O.
200-D
C200-J
1 2
1 4
1 2
REFERENCE RESTROOM
RENOVATION PACKAGE
R
EF
ER
EN
CE
H
IS
T
O R
IC
R
ES
T
O R
A T
IO
N
P A
CK
A
G E
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
PROPOSED 2ND FLOOR PLAN
A - 101
N
PROPOSED FLOOR PLAN
A-1
1/8" = 1'-0"
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
KEYED NOTES
9. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE
REMOVED/ PROVIDED BY TREASURY.
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS
AND VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.
(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)
11. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING
CONSTRUCTION
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED
BUT IN A PERMANENTLY CLOSED POSITION.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR
TO OPEN INTO HISTORIC CORRIDOR AND CHANGE HARDWARE.
SEE HARDWARE SCHEDULE.
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND
CASING; WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING
VISUAL SURVEILLANCE AND OPERABLE BLINDS
NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO
UNDERSIDE OF FLOOR PLATE (TRUE CEILING) IN COMPLIANCE w/
SCIF REQUIREMENT (ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01
/ STC 45 SOUND GROUP 3 OR BETTER). PROVIDE A CONTINUOUS
BEAD OF ACOUSTICAL CAULK AT ALL INTERSECTIONS W/ OTHER
SURFACES (HORIZONTAL OR VERTICAL, BOTH SIDES). WALL
MUST BE UNIFORMLY FINISHED ON BOTH SIDES, FROM FLOOR
SLAB (TRUE FLOOR) TO UNDER- SIDE OF FLOOR PLATE (TRUE
CEILING). WHERE SCIF WALL ABUTS EXISTING WALL, CUT BACK
EXTANT BASEBOARD AS NEEDED
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING
CEILING, MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR
GENERAL AND 2-HR STRUCTURAL MEMBERS) FILL ALL HOLES IN
CEILING (PLASTER AND TERRACOTTA) W/ CLOSED CELL, NON
EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH
AFTER APPLICATION
FURNISH AND INSTALL ELECTROSTATIC DISSIPATIVE TILE AS PER
FINISHES SCHEDULE
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN
GWB ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY
DESIGNATED COLUMNS) PROCEED AS INDICATED IN WALL TYPE
DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL AND MILL
WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL
TYPESW/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING
FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP WOOD BASE. FINISH
WALLS AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN,
FREE OF OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW
CARPET INSTALL.
FURNISH AND INSTALL RESILIENT FLOORING AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE CLEAN, FREE OF OLD GLUE
AND FLOORING REMNANTS PRIOR TO NEW FLOOR INSTALL.
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS
SEE RCP AND MEP DRAWINGS
SCIF ENTRY/EXIT: PROVIDE NEW 1 3/4" SCIF LEVEL 3 ACOUSTIC
STEEL DOOR AND FRAME W/ X10 LOCK (
PREP FOR DOOR BY
GENERAL CONTRACTOR. F&I OF BMS, IDS, ACD AND X10 BY
TREASURY OSP SEE A-602) . HARDWARE MUST MEET FEDERAL
SPECIFICATION FF-L-2740 / UL 2050
FOR BREAK ROOM 2005 CABINETS AND COUNTER TOP SEE A-401
UNISEX BATHROOM AS PER A-402 + MEP DRAWINGS
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR
DOOR TO HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES
(LEFT-RIGHT / RIGHT-LEFT)
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS
DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE
COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD
BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE
EXISTING TERRA COTTA + PLASTER WALL TO REMAIN & TO BE
FURRED OUT AS PER WALL TYPE TO ACHIEVE AN STC-45 (SOUND
GROUP 3) OR BETTER, AND TO INSTALL ELECTRICAL BOXES
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
FURRING & 1/2" GWB TO ALIGN W/ NEW WALL (SEE WALL TYPES)
NON LABELED WALLS ARE "D" TYPE. VERIFY ON ENLARGED
FLOOR PLANS
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.
REFINISH AS PER FINISHES/ ROOM SCHEDULES
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. SINCE DOOR
WILL BE USED FOR EXIT ONLY CHANGE HARDWARE.
EXTANT ORIGINAL TILE (FLOOR AND WALLS) TO REMAIN. CLEAN
AND ADD MISSING TILES IF SIMILAR ARE AVAILABLE ON SITE.
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC
DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT
BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR
TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND
SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /
IECC / IFC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR
PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY
MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES.
ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT
NECESSARY FOR THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF
THE CONTRACT'S SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S
WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER
DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS
7. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE
DESIGNATED BY THE COR
8.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST
DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR
REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND APPROVAL OF COR
NW
SW
NW NE
100%
28 MARCH 2019
NE
SE
SW SE
TYP
TYP
TYP
TYP
TYP
17 17
TYP
A2
A1
E2
G
G
F2
F3
H3 H1
E1
E3
B2
E3
20202020
C
E2
E1
E1
F2
E2
F1
H3
H1
H3
H6
H2H2
H3
23 23
J1
J2
B1
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
KE
Y
P
LA
N
M-402
3 4
16'-11
A
A
10'-5"
A
A
5'-0"
2005-A
A
22'-11
BREAK ROOM
13'-8"
1 2
3 4
R.O.
TEAM MEETING ROOM
ELECTRICAL
CLOSET
E
A
R M
A
JANITOR
CLOSET
J
A
E
A
MECHANICAL
CLOSET
E-202
ELECTRICAL
CLOSET
E-201
OPEN OFFICE AREA
NORTH
45'-7
J-202
WEST
CORRIDOR
C-212
JANITOR CLOSET
J-201
J
A
C
A
HISTORIC
CORRIDOR
C-200
3'-2"
R.O.
CENTRAL E-W CORRIDOR
C-213
MEN
RESTROOM
RM-201
UNISEX
RESTROOM
RU-201
R U
A
R.O.
3'-2"
R O
18'-3"
3 8
54'-11"
R.O.
3'-2"
3'-2"
OFFICE
WEST
1 4
1 2
1 4
7'-2
50'-9"
6'-8
10'-6
6'-10"
1 4
10'-0
1'-2
17'-8
4'-2
200-B
C
E
G
C
F
200-D
EV-203 EV-204
ST-2A
EV-201
EV-202
3'-2"
R.O.
3'-2"
R.O.
LAN ROOM
C
REFERENCE RESTROOM
RENOVATION PACKAGE
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
ENLARGED FLOOR PLAN NORTH WEST QUAD
A - 102
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
NW
ENLARGED NORTH-WEST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
QUADRANT
KEYED NOTES
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED
BUT IN A PERMANENTLY CLOSED POSITION.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR
TO OPEN INTO HISTORIC CORRIDOR AND CHANGE HARDWARE.
SEE HARDWARE SCHEDULE.
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND
CASING; WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING
VISUAL SURVEILLANCE AND OPERABLE BLINDS
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING
CEILING, MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR
GENERAL AND 2-HR STRUCTURAL MEMBERS) FILL ALL HOLES IN
CEILING (PLASTER AND TERRACOTTA) W/ CLOSED CELL, NON
EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH
AFTER APPLICATION
FURNISH AND INSTALL ELECTROSTATIC DISSIPATIVE TILE AS PER
FINISHES SCHEDULE
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN
GWB ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY
DESIGNATED COLUMNS) PROCEED AS INDICATED IN WALL TYPE
DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL AND MILL
WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL
TYPES W/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING
FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP WOOD BASE. FINISH
WALL AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN,
FREE OF OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW
CARPET INSTALL.
FURNISH AND INSTALL RESILIENT FLOORING AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE CLEAN, FREE OF OLD GLUE
AND FLOORING REMNANTS PRIOR TO NEW FLOOR INSTALL.
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS
SEE RCP AND MEP DRAWINGS
FOR BREAKROOM 2005 CABINETS AND COUNTER TOP SEE A-401
UNISEX BATHROOM AS PER A-402 + MEP DRAWINGS
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR
DOOR TO HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES
(LEFT-RIGHT / RIGHT-LEFT)
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS
DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE
COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD
BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.
REFINISH AS PER FINISHES/ ROOM SCHEDULES
G
H1
E3
E3
E2
E1
D1
E1
E1
J1
E3
9 10
D1
D1
4 6
9 10
4 6
4 6
9 10
4 6
9 10
4 6
9 12
4 6
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION
WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED
BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND
SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDIT.
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM
NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR
THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CSW
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK. THE
CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK
RELATED TRASH AND DEBRIS
8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE DESIGNATED BY THE
COR
9. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE.
ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AND TO THE SATISFACTION AND APPROVAL OF TREASURY / COR
10. EXISTING / NEW SYSTEMS FURNITURE/EQUIPMENT TO BE
REMOVED/ PROVIDED BY TREASURY.
11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS
AND VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.
(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)
12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING
CONSTRUCTION
KEYED NOTES
N-W QUADRANT
J2
28 MARCH 2019
100%
N
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
KE
Y
P
LA
N
19'-2
5'-5
7'-1
2113-A
A
A
1 4
13'-9
A
A
5'-0"
5'-0"
A
A
A
10'-5"
A
13'-0"
5'-0"
11'-6"
A
A
A
12'-6"
11'-3
6'-9
COMPUTER ROOM
C204-A
C-204
11'-6"11'-6"
R.O.
R.O.
5'-5
R M
A
R W
A
JANITOR
CLOSET
J
A
NORTH CORRIDOR
C-210
J-202
21'-1
EAST
CORRIDOR
C-211
E
RECEPTIONIST
AREA
CENTRAL E-W CORRIDOR
C-213
E
A
C A
14'-2
13'-9
MEN
RESTROOM
RM-201
WOMEN
RESTROOM
RW-201
3'-2"
3'-2"
R.O.
3'-2"
2'-0
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
3'-2"
R.O.
3'-2"
R.O.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
7'-5"
10'-0
OFFICE
OFFICE
R.O.
3'-3"
R.O.
3'-2"
R.O.
3'-2"
1'-2
1'-10
13'-1
3'-2"
R.O.
10'-4
OFFICE
2112-A
R O
R O
5 8
R O
R O
R O
OFFICE
OFFICE
OFFICE
CENTRAL N-S
CORRIDOR
C-214
3 4
1 4
6'-10"
1 4
7 8
1'-2
N.I.C.
32 33
3'-2"
R.O.
3 4
14'-1
11'-0"
2109-A
C
A
A
ST-2B
2110-A
2111-A
1'-6"
11'-3
" 7'-0"
10'-6"
8'-11"
9'-3
1 4
1 2
37'-0
14'-11
" 11'-3
P-8
P-9
REFERENCE RESTROOM
RENOVATION PACKAGE
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
ENLARGED FLOOR PLAN NORTH EAST QUAD
A - 103
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
NE
ENLARGED NORTH-EAST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
KEYED NOTES
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR TO
HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES (LEFT-RIGHT /
RIGHT-LEFT)
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING;
WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE PREPARED AND
PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL
SURVEILLANCE AND OPERABLE BLINDS
NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO
UNDERSIDE OF FLOOR PLATE (TRUE CEILING) IN COMPLIANCE w/ SCIF
REQUIREMENT (ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01 / STC 45
SOUND GROUP 3 OR BETTER). PROVIDE A CONTINUOUS BEAD OF
ACOUSTICAL CAULK AT ALL INTERSECTIONS W/ OTHER SURFACES
(HORIZONTAL OR VERTICAL, BOTH SIDES). WALL MUST BE UNIFORMLY
FINISHED ON BOTH SIDES, FROM FLOOR SLAB (TRUE FLOOR) TO UNDER-
SIDE OF FLOOR PLATE (TRUE CEILING). WHERE SCIF WALL ABUTS
EXISTING WALL, CUT BACK EXTANT BASEBOARD AS NEEDED
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING,
MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR
STRUCTURAL MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND
TERRACOTTA) W/ CLOSED CELL, NON EXPANDING FIREPROOFING FOAM.
TROWEL FOAM SMOOTH AFTER APPLICATION
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB
ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED
COLUMNS) PROCEED AS INDICATED IN WALL TYPE DETAILS. ADD 4"+
CAP WOOD BASE. WALL & MILL WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPES
W/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/
1/2" GWB + 4" W/ CAP WOOD BASE. FINISH WALLS AND MILL WORK AS
PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF
OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL.
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP
AND MEP DRAWINGS
SCIF ENTRY/EXIT: PROVIDE NEW 1 3/4" SCIF LEVEL 3 ACOUSTIC STEEL
DOOR AND FRAME W/ X10 LOCK (
PREP FOR DOOR BY G.C. F&I OF BMS,
IDS, ACD AND X10 BY TREASURY OSP SEE A-602) . HARDWARE MUST
MEET FEDERAL SPECIFICATION FF-L-2740 / UL 2050
IF AFTER DEMOLITION EXTANT COLUMN GWB (MODERN) IS DAMAGED,
REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2"
GWB. REINSTALL PREVIOUSLY REMOVED WOOD BASE FINISH WALL AND
MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
EXISTING TERRA COTTA + PLASTER WALL TO REMAIN & TO BE FURRED
OUT AS PER WALL TYPE TO ACHIEVE AN STC-45 (SOUND GROUP 3) OR
BETTER, AND TO INSTALL ELECTRICAL BOXES
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED. REFINISH
AS PER FINISHES/ ROOM SCHEDULES
EXTANT ORIGINAL TILE (FLOOR AND WALLS) TO REMAIN. CLEAN AND ADD
MISSING TILES IF SIMILAR ARE AVAILABLE ON SITE.
4 4 4
C
B2
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
N-E QUADRANT
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED
AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND
DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST
STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDIT.
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY
LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE PROJECT, SHALL
BE CONSIDERED PART OF THE CSW
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK. THE CONTRACTOR IS
RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS
8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE
DESIGNATED BY THE COR
9. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE
AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION
AND APPROVAL OF TREASURY / COR
10. EXISTING / NEW SYSTEMS FURNITURE/EQUIPMENT TO BE REMOVED/
PROVIDED BY TREASURY.
11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.
(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)
12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING
CONSTRUCTION
KEYED NOTES
A2
A1
A2
H3
H4
H3 or
D2
D3D1D1
D3
D2
D2
D1
D1
D1
D1
D1
D1
D1
D1 D1 D1
D1 D1
D1
D1
D1
D1
D1
D1
D1 D1
D3
D2
D3
D2
D2
H2
H2
H1
H2
28 MARCH 2019
100%
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
KE
Y
P
LA
N
QUADRANT
N
B1
3 4
16'-11
A
A
A
A
A
A
5'-0"
12'-6"
11'-3
11'-0"
A
20'-3"
A
A
A
11'-9" 11'-9"5'-6
3 4
1 2
11'-0" 11'-0"
11'-6"11'-6"
R.O.
E
A
ELECTRICAL
CLOSET
E-201
OPEN OFFICE AREA
SOUTH
JANITOR CLOSET
J-201
J
A
TELECOM CLOSET
HISTORIC
CORRIDOR
C-200
T
A
T
B
T-201
OFFICE
OPEN OFFICE AREA
WEST
CENTRAL E-W CORRIDOR
C-213
SOUTH CORRIDOR
C-214
A
A
11'-6
50'-3"
3 EQUAL SIZE OFFICES (2102 T0 2104)
24'-7
2 EQUAL SIZE OFFICES (2128 & 2129)
34'-6
3'-2"
R.O.
3'-2"
3'-2"
R.O.
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
3'-2"
R.O.
OFFICE
OFFICE
OFFICE
3'-2"
R.O.
OFFICE
OFFICE
OFFICE
R.O.
3'-2"
R.O.
3'-2"
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
3'-2"
R.O.
OFFICE
OFFICE
2'-6"
3'-7
7 8
1 4
7'-5
" 3'-9
1 2
1'-10
WEST
CORRIDOR
C-212
1 4
1 2
1 4
7'-2
6'-8
6'-10"
1 4
10'-0
1'-2
17'-8
32 33
C200-A
G
H
C200-J
EV-201
EV-202
3'-2"
R.O.
3'-2"
R.O.
LAN ROOM
B
A
12'-9
1 2
1 4
1 2
8'-2"
8'-2"
7'-11" 7'-11"
7'-11"
1'-6
1'-6
1'-6
10'-11
21"
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR
PLATE UP TO CEILING PLATE. GWB FROM FLOOR
PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA
OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND
WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP
TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA
( NOT IN CONTRACT)
ENLARGED FLOOR PLAN SOUTH WEST QUAD
A - 104
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
ENLARGED SOUTH-WEST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
KEYED NOTES
S-W QUADRANT
3 3 3 3 3 3 3
H6
H3
H3
H3
H2
H2
D2 D2 D2 D2
D3
D3
D3 D3
D1
D1
D1
D1
D1 D1
D1 D1
D1 D1
D1 D1
D1
D1 D1
D1
D1
D1 D1 D1
E1
G
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING; WINDOW
SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL
SURVEILLANCE AND OPERABLE BLINDS
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING, MUST
MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR STRUCTURAL
MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND TERRACOTTA) W/ CLOSED
CELL, NON EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH AFTER
APPLICATION
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB ENCLOSURE
SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED COLUMNS) PROCEED
AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL
AND MILL WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/ 3 5/8" 16
GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP
WOOD BASE. FINISH WALLS AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.
SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND FLOORING
REMNANTS PRIOR TO NEW CARPET INSTALL
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND MEP
DRAWINGS
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS
DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE
COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD
BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.
REFINISH AS PER FINISHES/ ROOM SCHEDULES
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. SINCE DOOR WILL
BE USED FOR EXIT ONLY CHANGE HARDWARE
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED
BUT IN A PERMANENTLY CLOSED POSITION.
28 MARCH 2019
100%
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
KE
Y
P
LA
N
SW
QUADRANT
10'-4" 19'-0"
'-5
7'-11 4"
-A
-A
'-5
13'-93 4"
-A
10'-4"
'-5
'-6
3 4"
16'-113 8"
-A
-A
-A
4' -4
'-0
13'-0"
11'-6"
-A
-A
-A
-A
-A
-A
5'-0"
12'-6"
11'-31 4"
6'-93 4"
4' -4
4'
-8
-A
11'-9"
'-7
3 4"
11'-0"
2108-A
11'-6"11'-6"
R.O. R.O.
5'-47 8"
E201-A
S 240-A
EAST
CORRIDOR
C-211
E-
SET J201-A
RECEPTIONIST
AREA
CENTRAL E-W CORRIDOR
C-213
-A
-A
11'-61 8"
E20 3-A
C -2
A
'-5
1 4"
'-6
'-6
'-6
'-6
50'-3"
21'-93 4"04)
2 EQUAL SIZE OFFICES (2105 & 2106)
128 & 2129)
13'-6"
3'-2" 3'-2" R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
OFFICE
3'-2" R.O.
OFFICE
OFFICE
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
OFFICE
OFFICE
OFFICE
OPEN OFFICE AREA
SOUTH
3'-2" R.O.
3'-2" 3'-2" R.O.
OFFICE
OFFICE
OFFICE
OFFICE
3'-2" R.O.
3'-2" R.O.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
R .O
3'
-2
R .O
3'
-2
R .O
3'
-2
R .O
3'
-2
8'-2"
'-8
1 2"
3'-63 4" 4'-21
4" 4'-101 4"R.O.
26'-105 8"
6' -1
1" 6'
-1 1"
6' -1
1"
1'-53 4"
4"
OFFICE
OFFICE
OFFICE
'-0
1 4"
3'-91 4"
1'-107 8"
WEST
CORRIDOR
C-212 6'
-1 1 4"
CENTRAL N-S
CORRIDOR
C-21411 '-9
1 2"
'-4
1' -9
1 4" 7'-21
4"
6'-81 4" 4'
-4
6'-10"
1' -9
1 4" 4'
-4
10'-07 8"
1'-25 8"
17'-85 8"
20 21
N.I.C.
32 33
3'-2" R.O.
3'-2" R.O.
LAN ROOM
2109-A
C24 0A
-A
ST-2B
2110-A
2111-A
14'-61 2"13'-31
2"
'-0
'-4
5 8"
12'-91 2"
'-8
'-9
1 4"
'-2
3 4"
10'-111 2"
4"
9' -0
1 2"
47'-61 2"
26'-73 4"
37'-01 4"
31'-01 4"
'-0
3 8"
5'-0"
1' -2
5 8"
7'-11" 7'-11" 7'-11" 7'-11"
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR
PLATE UP TO CEILING PLATE. GWB FROM FLOOR
PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA
OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND
WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP
TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA
( NOT IN CONTRACT)
ENLARGED FLOOR PLAN SOUTH EAST QUAD
A - 105
R
EV
IS
IO
N N
O
TE
S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IF
IC
AT
IO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/4"= 1'-0"
0 2' 4'
8' 1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
ENLARGED SOUTH-EAST QUADRANT OF THE PROPOSED FLOOR PLANA-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
S-E QUADRANT
KEYED NOTES
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING;
WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL
SURVEILLANCE AND OPERABLE BLINDS
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING,
MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR
STRUCTURAL MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND
TERRACOTTA) W/ CLOSED CELL, NON EXPANDING FIREPROOFING FOAM.
TROWEL FOAM SMOOTH AFTER APPLICATION
3 3 3 3 3 3 3
5 5
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB ENCLOSURE
SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED COLUMNS) PROCEED
AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL
AND MILL WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/ 3 5/8"
16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2" GWB + 4" W/
CAP WOOD BASE. FINISH WALLS AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.
SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND
FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL.
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND
MEP DRAWINGS
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS DAMAGED,
REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2" GWB.
REINSTALL PREVIOUSLY REMOVED WOOD BASE. FINISH WALL AND MILL WORK
AS PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
FURRING & 1/2" GWB TO ALIGN W/ NEW WALL (SEE WALL TYPE DETAIL)
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED. REFINISH AS PER
FINISHES/ ROOM SCHEDULES
H3
H3
H3
H3
H2
H2
D1
D1
D1
H2
H2
F2 F2
F3 F1
28 MARCH 2019
100%
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
KE
Y
P
LA
N
SE
QUADRANT
N
D1D1D1
D1 D1
D1
D1
D1
D1
D1
D1 D1
D1
D1D1
D1 D1
D1
E2
E2D2 D2
D2
D3
D2
D3
D2
D2
D3
D3
COMPUTER ROOM
C
OPEN OFFICE AREA
WEST SOUTH CORRIDOR
C-214
3'-0"
3'-0"
S
2003-A 2003-B 2003-C
2003-D 2003-E 2003-F
2003-G 2003-H 2003-I
J
2002-C
2002-B
2002-A
2002-D 2002-E 2002-F
2002-G
2002-H
2001-D 2001-E
2001-F 2001-G
2001-J 2001-K 2001-L 2001-M
2001-B
2001-C2001-A
2109-A
2110-A
2111-A
2112-A
2113-A
A
A
A
OFFICE
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
2005-A
A
BREAK ROOM
C204-A
2108-A
TEAM MEETING ROOM
E
A
J
A
E
A
NORTH CORRIDOR
OPEN OFFICE AREA
NORTH
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN OFFICE AREA
SOUTH
C-210
EAST
CORRIDOR
C-211
WEST
CORRIDOR
C-212
J
A
T
A
T
B
OFFICE
OFFICE
OFFICE
OFFICE
RECEPTIONIST
AREA
CENTRAL E-W CORRIDOR
C-213
SOUTH CORRIDOR
C-214
OFFICE
OFFICE
OFFICE
OFFICE
LAN ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
A
A
OFFICE
OFFICE
OFFICE
C
A
C
A
A
UNISEX
RESTROOM
RU-201
C E
N T
R A
L
N
C
O R
R I D
O R
C
ST-2 A
EV-203 EV-204
EV-202
EV-201
20 21
N.I.C.
ELECTRICAL
CLOSET
R M
A
R W
A
JANITOR
CLOSET
E-202
ELECTRICAL
CLOSET
E-201
ST-2 B
32 33
J-202
E
JANITOR
CLOSET
J-201
TELECOM
CLOSET
C
HISTORIC
CORRIDOR
C-200
T-201
C A
MEN
RESTROOM
RM-201
WOMEN
RESTROOM
RW-201
REFERENCE RESTROOM
200-B
C200-A
200-C
200-E
200-G
C F
200-H
B
A
A
R U
A
200-D
C
A
C200-J
2007-A
4'-8"
2001-H 2001-I
S
2008-A
RENOVATION PACKAGE
R
EF
ER
EN
CE
H
IS
T
O R
IC
R
ES
T
O R
A T
IO
N
P A
CK
A
G E
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
PROPOSED 2ND FLOOR PLAN WITH FURNITURE
A - 106
PROPOSED FLOOR PLAN WITH FURNITURE
A-1
1/8" = 1'-0"
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
GENERAL NOTES
KEYED NOTES
NEW SYSTEMS FURNITURE AND ALL ASSOCIATED CABLING TO
BE INSTALLED WHERE DEPICTED. SYSTEMS FURNITURE
INSTALLATION BY TREASURY
WHERE TWO DESKS ARE DEPICTED IN THE SAME OFFICE,
ELECTRICAL & IT SET UP MUST BE DESIGNED AND IMPLE-
MENTED FOR DUAL USAGE
24 WORK STATIONS 6' x 9'
11 KIOSK STATIONS
28 PRIVATE OFFICES
12 DOUBLE OCCUPANCY
16 SINGLE OCCUPANCY
63 PEOPLE WHEN ALL OFFICES ARE USED FOR SINGLE OCCUPANCY
75 PEOPLE WHEN 14 OFFICES ARE USED FOR DOUBLE OCCUPANCY
28 MARCH 2019
MARK DATE DESCRIPTION
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE
STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED AT
THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE
ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS.
INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,
SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST
STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /
NEC/ IMC / IECC / IFC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION
TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW
UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE
FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED
OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY
FOR THE COMPLETION OF THE PROJECT, SHALL BE
CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS
AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE
FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK
RELATED TRASH AND DEBRIS
7. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM
A SOURCE DESIGNATED BY THE COR
8.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT
THE JOB SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE
CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AND TO THE SATISFACTION AND APPROVAL OF
TREASURY / COR
8. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE
REMOVED/ PROVIDED BY TREASURY.
9. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED
DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE
SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF
THE JOB)
11. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC
DURING CONSTRUCTION
N
N.I.C.N.I.C. N.I.C.
N.I.C.
N.I.C. N.I.C.
100%
KE
Y
P
N.I.C.
LEGEND
CEILING HEIGHT @ 10'-8" AFF (PERIMETER TO
CLEAR WINDOWS)
CEILING HEIGHT @ 8'-6" AFF ALL CENTRAL SECTION
AND NORTHERN AREA
1/2" GWB BULKHEAD
EXISTING STRUCTURAL CONCRETE BEAM
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR
PLATE UP TO CEILING PLATE. GWB FROM FLOOR PLATE
TO 6" ABOVE ACT
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
NEW WALLS GWB (NON-SCIF) FROM FLOOR
PLATE UP TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA
( NOT IN CONTRACT)
BULKHEAD
N.I.C.
N.I.C.
N.I.C.
N.I.C.
REFERENCE RESTROOM
RENOVATION PACKAGE
R
EF
ER
EN
CE
H
IS
T
O R
IC
R
ES
T
O R
A T
IO
N
P A
CK
A
G E
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
PROPOSED REFLECTED CEILING PLAN
A - 107
PROPOSED REFLECTED CEILING PLAN ( ONLY CEILING CONSTRUCTION )
A-1
1/8" = 1'-0"
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
2 ND FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
0019-07
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
2ND FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
GENERAL NOTES
KEYED NOTES
CEILING HEIGHT @ ±10'-8" AFF ACT
(PERIMETER TO CLEAR WINDOWS)
CEILING HEIGHT @ 8'-6" AFF ALL CENTRAL SECTION AND
NORTHERN AREA ACT
BULKHEAD CONSTRUCTION: 2 1/2" 20 GA STEEL STUDS W/ GWB
ALL EXPOSED SIDES. BULKHEAD TO EXTEND 1" DOWN FROM
ACT CEILING. WIDTH AS DEPICTED IN RELATIONSHIP TO
PILASTERS. ATTACH BULKHEAD TOP PLATE TO UNDERSIDE
OF EXTANT TERRA COTTA AS PER PROJECT'S STRUCTURAL
ENGINEERS REPORT *
BULKHEADS WITHIN THE PERIMETER OFFICES / SPACE ARE
ONLY NEEDED WHERE FCU PIPES ARE LOWER THAN CEILING.
SURVEY CEILING AFTER DEMOLITION TO ASCERTAIN THEIR
EXACT LOCATION. tHUS, BULKHEADS SHOULD ONLY BE
CONSTRUCTED TO HIDE FCU'S PIPES
OPEN AREAS WITHOUT CEILING
* THE TOP TRACK SHALL BE ANCHORED WITH
DEWALT/POWERS ZAMAC NAILIN ANCHORS 1/4" x TO THE
UNDERSIDE OF THE TERRA COTTA. ANCHOR SPACING SHOULD
BE SUCH THAT THE LOADS DO NOT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.