3rd_floor_April_28_2019_100__Full_Set.pdf
PDF 17 MB Posted
- Attached to
- Treasury OFAC Renovation Federal contract opportunity
- Solicitation number
- 2032H319R00008
About this file
3rd fl drawing
View the file
Other files for this federal contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 3 4 5
2 3 4 5
A
B
C
D department of TREASURY, TREASURY ANNEX BUILDING
1500 PENNSYLVANIA AVENUE NW | WASHINGTON DC 20220
DRAWING INDEX
KEY PLAN
VICINTY MAP
TREASURY ANNEX 3RD FLOOR INTERIOR RENOVATION
TREASURY ANNEX
BUILDING
N
GENERAL CONDITIONS
1. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OF THE DESCRIPTION OF DETAILS OF WORK WHICH ARE
MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR ARE CUSTOMARILY
PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS-DESCRIBED DETAILS OF
WORK BUT SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FROM AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATION
2. MANUFACTURER SPECIFIED WITHIN THE CONSTRUCTION DOCUMENTS ARE PROVIDED AS A MINIMUM PERFORMANCE
CRITERIA, SUBSTITUTIONS WILL BE CONSIDERED IF COMPLAINT TO THE PERFORMANCE ESTABLISHED BY THE
MANUFACTURER NOTED. BUILDING MATERIALS SUBSTANDARD TO THESE REQUIREMENTS WILL BE SUMMARILY REJECTED.
ALL BUILDING COMPONENTS ARE TO BE HEAVY DUTY QUALITY AND BE FOR ABUSIVE RESISTANCE INSTALLATION. BUILDING
COMPONENTS SPECIFIED HEREIN THAT DO NOT MEET THE HEAVY DUTY-ABUSIVE ENVIRONMENTAL CRITERIA MUST BE
BROUGHT TO THE ATTENTION OF THE BUILDING REPRESENTATIVE AND WILL BE RE-SPECIFIED
3. BY THE SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND HAS FAMILIARIZED
HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED
4. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS AND/OR SIZE. VERIFY ALL DIMENSIONS BEFORE PROCEEDING AND
OBTAIN MEASUREMENTS AT THE JOB FOR ALL WORK REQUIRED TO BE ACCURATELY FITTED TO THE BUILDING. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SUCH MEASUREMENTS AND FOR THE PRECISE FITTING
OF THE WORK
5. IF CONFLICTS ARE DISCOVERED AT ANY TIME BETWEEN THE ENGINEERING AND ARCHITECTURAL DRAWINGS, THE COR
SHALL BE CONTACTED AT ONCE TO RESOLVE THE PROBLEM. IF THE COR IS NOT CONTACTED, THE CONTRACTOR SHALL
ACCEPT THE RESPONSIBILITY TO CORRECT ANY AND ALL SUCH WORK NOT IN A COORDINATE WITH THE ARCHITECTURAL
DRAWINGS
6. CHANGES TO THE DRAWINGS (ADDITIONS, DELETIONS OR ALTERATIONS) THAT MIGHT CONSTITUTE A CHANGE ORDER
MUST BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL, OTHERWISE CONTRACTOR WOULD UNDERTAKE SUCH
WORK AT HIS OWN RISK AND WORK MIGHT HAVE TO BE REVERSED AT CONTRACTOR'S OWN COST
7. ALL SALVAGEABLE MATERIALS SHALL BE RETURNED TO THE GOVERNMENT
8. THE G. C. AND ALL SUB-CONTRACTOR SHALL SUBMIT TO GOVERNMENT AND COR SUBMITTALS AND SHOP DRAWINGS FOR
REVIEW PRIOR TO START OF CONSTRUCTION.
9. UPON COMPLETION OF THE INSTALLATION, REMOVE ALL DEBRIS FROM THE BUILDING CREATED BY THE WORK PROVIDED
UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. REMOVE ANY SOILED SPOTS FROM THE FACE OF THE CARPET OR
OTHER FINISH SURFACES USING PROCESSES RECOMMENDED BY THE MANUFACTURER AND IN A MANNER ACCEPTABLE TO
THE GOVERNMENT. REPLACE ANY AREAS OF CARPET OR FINISH SURFACES WHERE CLEANING HAS FAIL TO RESTORE THE
APPEARANCE AND QUALITY SATISFACTORILY, AS DETERMINED BY THE GOVERNMENT.
10. ALL CONTRACTORS SHALL PERFORM ALL WORK IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS.
11. THE G. C. SHALL VERIFY REQUIREMENTS FOR ALL EQUIPMENT INDICATED ON THE DRAWINGS WHETHER SUPPLIED BY THE
GOVERNMENT OR SUB-CONTRACTOR.
12. WHERE THE G. C. IS INSTRUCTED TO ALIGN A PARTITION WITH TWO OR MORE COLUMNS AND THE COLUMNS ARE
DISCOVERED TO BE OF UNEQUAL SIZE, THE LARGER OF THE COLUMNS SHALL DETERMINE THE LOCATION OF THE
PARTITION. THIS WILL ALSO APPLY TO WET COLUMNS AND CORE WALLS.
13. THE G. C. SHALL REPAIR ALL DAMAGE CAUSED BY HIM OR HIS SUB-CONTRACTORS DURING CONSTRUCTION.
PRE-EXISTING DAMAGE MUST BE REVIEWED AND ACKNOWLEDGED, IN WRITING BY THE GOVERNMENT AND ARCHITECT
PRIOR TO COMMENCEMENT OF WORK. DAMAGE NOT DOCUMENTED PRIOR TO CONSTRUCTION START SHALL BE REPAIRED
TO LIKE NEW CONDITION WITHOUT ADDITIONAL CHARGE TO THE GOVERNMENT.
14. THE G. C. SHALL ENSURE THAT ALL PAINT HAS BEEN REMOVED FROM ALL NON-SCHEDULE PAINTED SURFACES PRIOR TO
DELIVERY OF THE SPACE.
15. THE G. C. SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED
16. IF THERE IS A QUESTION AS TO THE ACCEPTABLE LEVEL OF QUALITY FOR THE INSTALLATION OF ANY MATERIALS, THE
GOVERNMENT'S REPRESENTATIVE DECISION WILL BE FINAL
17. NEW DOOR HARDWARE, INCLUDING HINGES AND LOCK SETS, ARE TO BE MOUNTED AT ABA HEIGHTS UNLESS NOTED
OTHERWISE
18. ALL CEILING REGISTERS, GRILLES, VENTS AND DIFFUSERS SHALL BE FACTORY FINISHED. IF PAINTING IS REQUIRED, PROVIDE ENAMEL FINISH
19. ALL J-BENDS AND OTHER GYPSUM METAL TRIM SHALL BE SPACKLE-BLENDED INTO THE ADJACENT SURFACE.
20. WHERE TWO OR MORE WALL SWITCHES OR DIMMERS OCCUR IN THE SAME LOCATION, THEY ARE TO RECEIVE A COMMON
GANG PLATE WHOSE FINISH IS TO MATCH THE BUILDING STANDARD SWITCH PLATE.
21. ALL PAINTED WALLS SHALL BE HAVE A LEVEL 4 FINISH: WITH ONE ROLLER-APPLIED (1) PRIMER COAT AND (2)
ROLLER-APPLIED FINISH COATS.
22. PROVIDE THRESHOLDS AT ALL DOORS AND TRANSITION STRIPS WHERE CARPET MEETS A DIFFERENT TYPE OF FLOORING
23. REVIEW THE SPECIFICATIONS AND CUT SHEETS FOR ACCESSORIES, FIXTURES, ETC. THAT ACCOMPANY THE DRAWING SET
PRIOR TO PLACING ORDERS. IF CONFLICTS ARE FOUND, INFORM THE ARCHITECT OF SUCH FINDINGS AND TAKE NO
ACTION UNTIL RESOLVED. IN THOSE CASES, IF AN ORDER FOR AN UNRESOLVED ITEM IS PLACED WITHOUT APPROVAL OF
ARCHITECT, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY IF THE ITEM IS NOT ACCEPTED BY THE CLIENT
N
AC
ACT
ADJ
AFF
ALUM
ATT
B & B
BD
BET
BF
BIT
BLDG
BTM
CER
CJ
CL
CLG
CMU
COMP
CONC
CONT
D
AT
ACOUSTIC
ACOUSTIC CEILING TILE
ADJUSTABLE
ABOVE FINISHED FLOOR
ALUMINUM
ATTENUATION
BALLED AND BAGGED
BOARD
BETWEEN
BARRIER FREE
BITUMINOUS
BUILDING
BOTTOM
CERAMIC
CONTROL JOINT
CENTER LINE
CEILING
CONCRETE MASONRY UNIT
COMPRESSIBLE
CONCRETE
CONTINUOUS
DEEP
DEMO
D.F.
DIA
DS
EXTG
F&I
FF
FLR
FV
GA
GALV
GC
GL
GPDW
O.C.
O.D.
O.H.
OZ.
PLAM
PLYWD
PR
DEMOLITION
DRINKING FOUNTAIN
DIAMETER
DOWN SPOUT
EXISTING
FURNISH AND INSTALL
FINISHED FLOOR
FLOOR
FIELD VERIFY
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLASS
GYPSUM WALLBOARD
ON CENTER
OUTSIDE DIAMETER
OVERHEAD OR OPP. HAND
OUNCE
PLASTIC LAMINATE
PLYWOOD
PAIR
ABBREVIATIONS
PT
PTD
QTY
REINF
REQ'D
RM.
SHT
SIM
SS
THK
TYP.
VCT
VERT
VIF
VP
UON
W.
W/
PRESSURE TREATED
PAINTED
QUANTITY
REINFORCED
REQUIRED
ROOM
SHEET
SIMILAR
STAINLESS STEEL
THICKNESS
TYPICAL
VINYL COMPOSITION TILE
VERTICAL
VERIFY IN FIELD
VENEER PLASTER
UNLESS OTHERWISE NOTED
WIDE
WITH
SYMBOLS
ALIGN
ALIGN SURFACES
CENTER LINE
X
GENERAL / KEYED NOTE
DEMOLITION NOTE
ROOM NAME
ROOM NUMBER
EXTG WALL TO BE REMOVED
X
PARTITION TYPE
EXTG WALL TO REMAIN
NEW DOOR ASSEMBLY
X X
X X
EXTG DOOR ASSEMBLY
TO BE REMOVED
EXTG DOOR ASSEMBLY
X
X
X
X
NEW PARTITION
X
DRAWING REVISION NUMBER
G - 001
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
COVER PAGE
NEW SCIF WALL
NEW WALL FULL HEIGHT
L
C
XXX
XXX
XX
3RD FLOOR
NW
NE
SW
QUADRANT
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
QUADRANT
QUADRANT
QUADRANT
0019-08
28 APRIL 2019
100%
GENERAL
ARCHITECTURAL
G-001 COVER SHEET 01 OF 56
AD101 EXISTING / DEMOLITION FLOOR PLAN 02 OF 56
A-101 PROPOSED FLOOR PLAN 03 OF 56
A-102 ENLARGED PROPOSED FLOOR PLAN NW-QUADRANT 04 OF 56
A-103 ENLARGED PROPOSED FLOOR PLAN NE-QUADRANT 05 OF 56
A-104 ENLARGED PROPOSED FLOOR PLAN SW-QUADRANT 06 OF 56
A-105 ENLARGED PROPOSED FLOOR PLAN SE-QUADRANT 07 OF 56
A-107 PROPOSED FLOOR PLAN WITH FURNITURE 08 OF 56
A-108 PROPOSED RCP (CONSTRUCTION NO MEP) 09 OF 56
A-301 WALL TYPE A1 & A2 10 OF 56
A-302 WALL TYPE B1 & B2 11 OF 56
A-303 WALL TYPE C & D1 12 OF 56
A-304 WALL TYPE D2 & D3 13 OF 56
A-305 WALL TYPE E1 & E2 14 OF 56
A-306 WALL TYPE E3 & F1 15 OF 56
A-307 WALL TYPE F2 16 OF 56
A-308 WALL TYPE F3 17 OF 56
A-309 WALL TYPE G & H1 18 OF 56
A-310 WALL TYPE H2 & H3 19 OF 56
A-311 WALL TYPE H4 & H5 20 OF 56
A-312 WALL TYPE H6 & H7 21 OF 56
A-313 WALL TYPE J1 & J2 22 OF 56
A-401 PROPOSED BREAK ROOM MILLWORK 23 OF 56
A-402 PROPOSED UNISEX BATHROOM FLOOR PLAN 24 OF 56
A-402 PROPOSED UNISEX BATHROOM INTERIOR ELEVATIONS 25 OF 56
A-601 FINISHES NOTES + ROOM FINISHES SCHEDULE 26 OF 56
A-602 ROOM FINISHES SCHEDULE 27 OF 56
A-603 FINISHES SCHEDULE 28 OF 56
A-604 RESTROOM FINISHES SCHEDULE 29 OF 56
A-605 DOOR SCHEDULE 30 OF 56
A-607 HARDWARE SCHEDULE 32 OF 56
A-608 PLUMBING SCHEDULE 33 OF 56
A-609 RESTROOM ACCESSORIES SCHEDULE 34 OF 56
A-610 RESTROOM ACCESSORIES CUT SHEETS 35 OF 56
A-611 RESTROOM ACCESSORIES & PLUMBING CUT SHEETS 36 OF 56
A-612 PLUMBING CUT SHEETS 37 OF 56
F-001 SYMBOLS AND ABBREVIATIONS 38 OF 56
FD101 DEMOLITION FIRE PROTECTION 39 OF 56
F-101 PROPOSED FIRE ALARM 40 OF 56
F-102 PROPOSED FIRE PROTECTION 41 OF 56
M-001 SYMBOLS, ABBREVIATIONS & SECTION 42 OF 56
MD101 DEMOLITION MECHANICAL 43 OF 56
M-101 PROPOSED MECHANICAL 44 OF 56
M-501 MECHANICAL DETAILS 45 OF 56
M-601 MECHANICAL SCHEDULES 46 OF 56
E-001 SYMBOLS & ABBREVIATIONS 47 OF 56
ED101 DEMOLITION LIGHTING S 48 OF 56
ED102 DEMOLITION POWER 49 OF 56
E-101 PROPOSED LIGHTING 50 OF 56
E-102 PROPOSED POWER 51 OF 56
ET101 PROPOSED TELECOM 52 OF 56
E-501 DETAILS 53 OF 56
E-601 PANEL SCHEDULES 54 OF 56
E-602 PANEL SCHEDULES 55 OF 56
E-603 PANEL SCHEDULES 56 OF 56
FIRE PROTECTION
MECHANICAL
ELECTRICAL
E301-A
J301-A
C-321A
HISTORIC
CORRIDOR
C-300
ST-3 A
EV-303 EV-304
EV-302
EV-301
JANITOR
CLOSET
MEN
M
A
W
A
ELECTRICAL
CLOSET
E-302
WOMEN
32 33TELECOM
CLOSET
T-301
ELECTRICAL
CLOSET
E-301
JANITOR
CLOSET
J-301
T
A
T
B
3171 3165 3154 3138 3135 3134 3129 3130 3121 3122
C331
C340A
C340
ST-3 B
C321
C351
3028 3026 3025
C350
3103 3102
3137 3136 31323133 3131
3173 3160
3161 3152
3163A 3163B
C310
C
A
3030 3029 3027
3023 3022
3091-I3091-H
3091-G
3091-F
3091-E
3091-D
C
B
E
E303-A
C
A
C340-A
N.I.C.
N.I.C.N.I.C.
N.I.C.
C320
3051 3052 3053 3054
3061 3062 3063 3064
20 2119 22 23 24
313029
J
A
J-302
S 340-A
C
D
C300-A
A
300-B
300-C
C
E
C
F
C300-G
C300-H
6867 69
47 48
34 35
54 58
LEGEND
WALLS TO BE DEMOLISHED
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK. COLUMN TO REMAIN
AND AS MUCH OF MODERN SURROUND TO BE REMOVED WHEN POSSIBLE
EXISTING WALLS OUTSIDE THE AREA OF WORK TO REMAIN
5 8
82'-9
159'-10
E202-A
3091-A
N.I.C.
EXISTING DOORS WITHIN THE AREA OF WORK TO REMOVED
X X
X A
EXISTING DOORS WITHIN THE AREA OF WORK TO REMAIN
N
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING.
NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE
SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL
CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/
WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS,
DETAILS AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT
APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC /
IECC / IFC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO
FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS
SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT
ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE
CONTRACT DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE
PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF
WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER
EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE
REMOVAL AND PROPER DISPOSAL OF ALL WORK RELATED TRASH AND
DEBRIS
8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A
SOURCE DESIGNATED BY THE COR
9. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB
SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR
SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE
SATISFACTION AND APPROVAL OF TREASURY / COR
10. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE
REMOVED/ PROVIDED BY TREASURY.
11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED
COVERS MUST BE REINSTALLED AT END OF THE JOB)
12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING
CONSTRUCTION
DEMOLITION NOTES
1 DEMOLISH EXISTING PARTITION / WALL AS DEPICTED
DEMOLISH EXISTING DOORS & FRAME. RETURN TO TREASURY
FACILITIES MANAGEMENT
EXISTING FURNITURE & OFFICE EQUIPMENT TO BE REMOVED
BY TREASURY
DEMOLISH EXISTING SUSPENDED CEILING GRID, ACT & LIGHT
FIXTURES
DEMOLISH EXISTING CARPET
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB
ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY
DESIGNATED COLUMNS)
DEMOLISH EXISTING DUCT WORK AS PER MEP DRAWINGS
DEMOLISH ELECTRICAL OUTLETS & SWITCHES, AND CABLINNG
AS PER ELECTRICAL DRAWINGS
PORTION OF WALL TO BE DEMOLISHED
JANITOR SINK AND FAUCET TO BE REMOVED. PIPES AND DRAIN TO
REMAIN
KEYED NOTES
NO WORK SHALL TAKE PLACE WITHIN AREAS DESIGNATED N.I.C.
EXISTING WALL / COLUMN ENCLOSURE TO REMAIN
EXISTING DOOR TO REMAIN AS IS. NO ALTERATIONS
EXISTING DOOR TO REMAIN. ALTERATIONS NOTED ON A-102
EXISTING THROUGH WALL / THROUGH FLOOR PIPE(S) TO REMAIN
RADIATORS / FCU TO REMAIN
EXISTING DOOR TO BE RELOCATED
INFILL SECTION WHERE DOOR WILL BE REMOVED
NEW JANITOR SINK AND FAUCET TO BE INSTALLED AT THE SAME
LOCATION
6 6
EXISTING AND DEMOLITION FLOOR PLAN
A-1
1/8" = 1'-0"
TYP
EXISTING & DEMO FLOOR PLAN
AD 101
4 4
1 2 3 4 5 6 7 8 9 10 11 12
N.I.C.
N.I.C.
N.I.C.
N.I.C.
0019-08
28 APRIL 2019
100%
HISTORIC
CORRIDOR
C-300
ST-3 A
EV-303 EV-304
EV-302
EV-301
13'-0" 11'-0"
3 4
11'-0"
A
A
OFFICE
OFFICE OFFICE OFFICE
310131023103
11'-0"
A
A
OFFICE
15'-5"
A
10'-3
15'-5"
OFFICE
23'-7
15'-5"
A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
A
12'-11
OFFICE
3105-A
OFFICE
MEETING
ROOM
M-302
BREAK ROOM
MECHANICAL
CLOSET
M302-A
5 8
R O
10'-10
1 2
COMPUTER
ROOM
21'-0"
12'-0
OFFICE
A
3'-2"
OFFICE
CONFERENCE ROOM
JANITOR
CLOSET
MEN
M A
W A
M-301
UNISEX
ELECTRICAL
CLOSET
E-302
E
A
WOMEN
W-301
32 33
T
A
T
B
TELECOM
CLOSET
T-301
E
A
J
A
ELECTRICAL
CLOSET
E-301
JANITOR
CLOSET
J-301
3 4
16'-11
3'-2"
R.O.
A
A
A
13'-3
1 2
10'-5"
10'-6"
3 4
9'-6"
A
A
A
5'-1"
14'-6
" 12'-6"
11'-3
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
37'-0
OFFICE
OFFICE
LAN ROOM
OFFICE
OFFICE
OFFICE
1 4
C E
N T
R A
L
C
O R
R I D
O R
E
A S
T
C
17'-8
7'-2
R.O.
5 8
3'-0"
J
A
J-302
E
A
C
A
A
E
C A
OFFICE
3'-2"
R.O.
3'-2"
R.O.
41'-10
MEETING
ROOM
MEETING
ROOM
OPEN OFFICE AREA SOUTH
OPEN OFFICE AREA
EAST
A
3'-2"
R.O.
OFFICE
CENTRAL CORRIDOR NORTH
C-314
CENTRAL
CORRIDOR WEST
C-312
CENTRAL CORRIDOR
C-315
CORRIDOR NORTH
C-311
CORRIDOR
SOUTH
C-313
A
3'-2"
R.O.
OFFICE
OFFICE
A
3'-2"
R.O.
A
A
3'-2"
R.O.
C-304
WEST
CORRIDOR
C-310
C
A
C
C302-A
C-302
C-301
C301-A
3001-B
3002-A
C-305
C305-A
C
A
B
67'-0
3 8
5 8
3 EQUAL SIZE OFFICES (3101 T0 3103)
34'-6
5'-0"
1 2
2 EQUAL SIZE OFFICES (3116 & 3117)
19'-8"
5'-0"
4'-7"5
3'-2"
R.O.
3 4
E
Q U
A L
S
I Z
E
O
F F
I C
S
T
7 8
5 8
14'-4
7 8
1 4
31'-1
21'-3
R O
R O
R O
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
11'-10
4'-4
13'-8"
4'-0"
10'-11
13'-1"
1 2
2 EQUAL SIZE MEETING ROOMS (3002 & 3002)
28'-10"
10'-9"
4'-0"
3'-2"
R.O.
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
3124-A
CENTRAL CORRIDOR SOUTH
C-316
E A
T
C
R
R I D
O R
C
3113-A
R O
R
O
R O
R O
3108-A
3107-A
3'-2"
R.O.
A
11'-10
3'-6
ST-3 B
C
S
A
N.I.C.
3110-A
R O
3111-A
R O
R O
R O
.3107-A
3109-A
R O
.3106-A
REFERENCE RESTROOM
RENOVATION PACKAGE
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE 3008-A
R O
R O
1 8
5'-4"
C A
1 8
3302-A
3302-B
R O
3'-0"
31'-6
21'-1
PROPOSED 3RD FLOOR PLAN
A - 101
N
PROPOSED FLOOR PLAN
A-1
1/8" = 1'-0"
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
KEYED NOTES
10. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO BE REMOVED/
PROVIDED BY TREASURY.
11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND VENTS TO
PREVENT INTRODUCING DUST INTO THE SYSTEM. (REMOVED COVERS MUST BE
REINSTALLED AT END OF THE JOB)
12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING CONSTRUCTION
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED
BUT IN A PERMANENTLY CLOSED POSITION.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR DOOR
TO OPEN INTO HISTORIC CORRIDOR AND CHANGE HARDWARE.
SEE HARDWARE SCHEDULE.
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND
CASING; WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING
VISUAL SURVEILLANCE AND OPERABLE BLINDS
NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO
UNDERSIDE OF FLOOR PLATE (TRUE CEILING) IN COMPLIANCE w/
SCIF REQUIREMENT (ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01
/ STC 45 SOUND GROUP 3 OR BETTER). PROVIDE A CONTINUOUS
BEAD OF ACOUSTICAL CAULK AT ALL INTERSECTIONS W/ OTHER
SURFACES (HORIZONTAL OR VERTICAL, BOTH SIDES). WALL
MUST BE UNIFORMLY FINISHED ON BOTH SIDES, FROM FLOOR
SLAB (TRUE FLOOR) TO UNDER- SIDE OF FLOOR PLATE (TRUE
CEILING). WHERE SCIF WALL ABUTS EXISTING WALL, CUT BACK
EXTANT BASEBOARD AS NEEDED
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING
CEILING, MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR
GENERAL AND 2-HR STRUCTURAL MEMBERS) FILL ALL HOLES IN
CEILING (PLASTER AND TERRACOTTA) W/ CLOSED CELL, NON
EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH
AFTER APPLICATION
FURNISH AND INSTALL ELECTROSTATIC DISSIPATIVE TILE AS PER
FINISHES SCHEDULE
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN
GWB ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY
DESIGNATED COLUMNS) PROCEED AS INDICATED IN WALL TYPE
DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL AND MILL
WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL
TYPES W/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING
FULL HEIGHT . FINISH WALLS AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN,
FREE OF OLD GLUE AND FLOORING REMNANTS PRIOR TO NEW
CARPET INSTALL.
FURNISH AND INSTALL RESILIENT FLOORING AS PER FINISHES
SCHEDULE. SUBSTRATE MUST BE CLEAN, FREE OF OLD GLUE
AND FLOORING REMNANTS PRIOR TO NEW FLOOR INSTALL.
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS
SEE RCP AND MEP DRAWINGS
SCIF ENTRY/EXIT: PROVIDE NEW 1 3/4" SCIF LEVEL 3 ACOUSTIC
STEEL DOOR AND FRAME W/ X10 LOCK (
PREP FOR DOOR BY
GENERAL CONTRACTOR. F&I OF BMS, IDS, ACD AND X10 BY
TREASURY OSP SEE A-602) . HARDWARE MUST MEET FEDERAL
SPECIFICATION FF-L-2740 / UL 2050
FOR BREAK ROOM 2005 CABINETS AND COUNTER TOP SEE A-401
UNISEX BATHROOM AS PER A-402 + MEP DRAWINGS
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR
DOOR TO HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES
(LEFT-RIGHT / RIGHT-LEFT)
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS
DAMAGED, REMOVE BASEBOARD AND REPLACE GWB / LAMINATE
COLUMN W/ 1/2" GWB. REINSTALL PREVIOUSLY REMOVED WOOD
BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE
EXISTING TERRA COTTA + PLASTER WALL TO REMAIN & TO BE
FURRED OUT AS PER WALL TYPE TO ACHIEVE AN STC-45 (SOUND
GROUP 3) OR BETTER, AND TO INSTALL ELECTRICAL BOXES
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
ALIGN WALL GWB WITH COLUMN
NON LABELED WALLS ARE "D" TYPE. VERIFY ON ENLARGED
FLOOR PLANS
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.
REFINISH AS PER FINISHES/ ROOM SCHEDULES
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. SINCE DOOR
WILL BE USED FOR EXIT ONLY CHANGE HARDWARE.
EXTANT ORIGINAL TILE (FLOOR AND WALLS) TO REMAIN. CLEAN
AND ADD MISSING TILES IF SIMILAR ARE AVAILABLE ON SITE
SCIF EXIT ONLY: SECONDARY EXIT PROVIDE NEW 1 3/4" SCIF
LEVEL 3, ACOUSTIC STEEL DOOR & FRAME W/ EXIT / PANIC
HARDWARE ONLY
WHERE FCU PIPES ARE ENCLOSED WITH SHEET METAL ALONG
THE WINDOW WALL AT FLOOR LEVEL, COVER THE FRONT OF
THE METAL ENCLOSURE WITH BASEBOARD AND THE TOP WITH A
WOOD CAP AS PER DETAIL A-4/A-603
GENERAL NOTES
8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE
DESIGNATED BY THE COR
9.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST
DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR
REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND APPROVAL OF
TREASURY / COR
NW NE
NE
SE
SW SE
TYP
TYP
TYP
TYP
TYP
E2
G
G
H1
E1
E1
B2
C
E3
E1
E1
H3
H3
H6
H2
23 23
J1
J2
1 2 3 4 5 6 7 8 9 10 11 12
SW
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
NW
NE
TYP
A2
G
G
G
TYP
H2
H6
NW
SW
E1
E3
E3
E1
E1
TYP
B1
H5
0019-08
28 APRIL 2019
100%
A1
A1
A2
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES
MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT
NECESSARY FOR THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER
DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS
E3
HISTORIC
CORRIDOR
EV-303
10'-3
23'-7
15'-5"
A
3113-A
3112-A
3111-A
3109-A
BREAK ROOM
5 8
A
OFFICE
CONFERENCE ROOM
MEN
M
A
UNISEX
E
A
E
A
J
A
ELECTRICAL
CLOSET
JANITOR
CLOSET
3 4
16'-11
A
A
10'-5"
A
A
5'-1"
LAN ROOM
7'-2
3'-0"
CENTRAL
CORRIDOR WEST
CORRIDOR NORTH
A
WEST
CORRIDOR
C
A
C301-A
3001-B
7 8
5 8
12'-7
4'-0"
13'-8"
4'-0"
10'-11
13'-1"
1 2
2 EQUAL SIZE MEETING ROOMS (3002 & 3002)
28'-10"
10'-9"
4'-0"
C302-A
3002-A
C305-A
C-305
R O
R O
R O
C-302
C-301
A
3'-2"
R.O.
1 2
2'-9
20'-10
23'-2
5 8
MEETING ROOM
3'-2"
R.O.
MEETING ROOM
MEETING ROOM
1 2
2'-7
8'-4
A
3'-2"
R.O.
R O
M302-A
M-302
MECHANICAL CLOSET
E-302
ELECTRICAL CLOSET
C
B
C-311
C-312
3'-2"
R.O.
R O
R O
3'-2"
R.O.
OFFICE
11'-6"
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
C-310
C-300
EV-304
EV-302
EV-301
5 8
5 8
5 8
5 8
1 4
3 8
7 8
9'-8"
14'-2
7'-0
10'-1
1'-2
10'-11
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
J-301
E-301
OFFICE
6'-10"
M-301
10'-10
17'-8
ST-3A
3'-6
R O
3110-A
R O
R O
3108-A
R O
12'-0
REFERENCE RESTROOM
RENOVATION PACKAGE
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
ENLARGED FLOOR PLAN NORTH WEST QUAD
A - 102
N
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
NW
ENLARGED NORTH-WEST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
QUADRANT
DEMOLISH AS MUCH AS POSSIBLE OF
THE EXISTING MODERN GWB ENCLO-
SURE SURROUNDING STRUCTURAL
COLUMNS (ONLY DESIGNATED
COLUMNS) PROCEED AS INDICATED IN
WALL TYPE DETAILS. ADD 4"+ CAP
WOOD BASE. FINISH WALL AND MILL
WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE
CONSTRUCTED AS PER WALL TYPES W/
3 5/8" 16 GA STEEL STUDS, EXTEND
WALL FRAMING FULL HEIGHT, W/ 1/2"
GWB + 4" W/ CAP WOOD BASE. FINISH
WALL AND MILL WORK AS PER FINISHES
SCHEDULE
FURNISH AND INSTALL NEW CARPET
TILES AS PER FINISHES SCHEDULE.
SUBSTRATE MUST BE EVEN AND LEVEL,
CLEAN, FREE OF OLD GLUE AND
FLOORING REMNANTS PRIOR TO NEW
CARPET INSTALL.
FURNISH AND INSTALL RESILIENT
FLOORING AS PER FINISHES SCHEDULE
SCHEDULE. SUBSTRATE MUST BE
CLEAN, FREE OF OLD GLUE AND
FLOORING REMNANTS PRIOR TO NEW
FLOOR INSTALL.
FURNISH AND INSTALL NEW CEILING
GRID, ACT AND DIFFUSERS SEE RCP
AND MEP DRAWINGS
FOR BREAKROOM 2005 CABINETS AND
COUNTER TOP SEE A-401
UNISEX BATHROOM AS PER A-402 + MEP
DRAWINGS
EXTANT DOOR ASSEMBLY & CASING TO
REMAIN. MIRROR DOOR TO HINGE
OPPOSITE TO WHERE IT CURRENTLY
HINGES (LEFT-RIGHT / RIGHT-LEFT)
IF AFTER DEMOLITION EXTANT GWB
SURROUNDING COLUMNS IS DAMAGED,
REMOVE BASEBOARD AND REPLACE
GWB / LAMINATE COLUMN W/ 1/2" GWB.
REINSTALL PREVIOUSLY REMOVED
WOOD BASE. FINISH WALL AND MILL
WORK AS PER FINISHES SCHEDULE
ALIGN NEW WALL GWB WITH COLUMN
EXTANT DOOR ASSEMBLY & CASING TO
REMAIN UNALTERED. REFINISH AS PER
FINISHES/ ROOM SCHEDULES
WHERE FCU PIPES ARE ENCLOSED W/
SHEET METAL ALONG THE WINDOW
WALL AT FLOOR LEVEL, COVER THE
FRONT OF THE METAL ENCLOSURE
WITH BASEBOARD AND THE TOP WITH A
WOOD CAP AS PER DETAIL A-4/A-603
G
H5
E1
E1
E1
D1
E1
E1
J1
E1
9 10
D3
4 6
9 10
4 6
4 6
9 10
4 6
9 10
4 6
9 12
4 6
KEYED NOTES
N-W QUADRANT
J2
SW
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
NW
NE
NO WORK SHALL TAKE PLACE WITHIN AREAS
MARKED AS N.I.C.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN
UNALTERED BUT IN A PERMANENTLY CLOSED
POSITION.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN.
MIRROR DOOR TO OPEN INTO HISTORIC
CORRIDOR AND CHANGE HARDWARE. SEE
HARDWARE SCHEDULE.
EXTANT WALLS, COLUMN SURROUNDS AND BASE;
DOORS AND CASING; WINDOW SASHES, TRIM,
MUNTINS AND SILLS, TO BE PREPARED AND
PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH
FILM PRECLUDING VISUAL SURVEILLANCE AND
OPERABLE BLINDS
AFTER DEMOLITION IS COMPLETED, ENTIRE
SPACE, INCLUDING CEILING, MUST MAINTAIN FIRE
RATING AS PER SPECS (1-HR GENERAL AND 2-HR
STRUCTURAL MEMBERS) FILL ALL HOLES IN
CEILING (PLASTER AND TERRACOTTA) W/ CLOSED
CELL, NON EXPANDING FIREPROOFING FOAM.
TROWEL FOAM SMOOTH AFTER APPLICATION
FURNISH AND INSTALL ELECTROSTATIC
DISSIPATIVE TILE AS PER FINISHES SCHEDULE
D2
D2
D2
D2
D2
D3
4 6
9 10
D3
4 6
9 10
4 6
9 10
4 6
9 10
4 6
9 10
E3
4 6
9 10
E1
E1
E1
E1
E1
E1
E1
E1
D3
D3
E3
E1
4 6
9 10
D2
H3
H4
0019-08
28 APRIL 2019
100%
E3
D3
P-6 & P-7
5 8
COMPUTER ROOM
21'-0"
JANITOR
CLOSET
MEN
M
A
W
A
WOMEN
32 33
A
A
A
1 2
10'-5"
10'-6"
9'-6"
A
A
A
14'-6
" 12'-6"
11'-3
54'-8
OFFICE
1 4
C E
N T
R A
L
C
O R
R I D
S
T
J
A
E
A
C
A
A
41'-10
5 8
1 4
31'-1
21'-3
E A
R
R I D
O R
MECHANICAL CLOSET
ELECTRICAL CLOSET
CENTRAL CORRIDOR WEST
C-314
C
3'-2"
R.O. R.O.
1'-2
10'-11
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3 4
E
C A
OFFICE
OFFICE
OFFICE
OFFICE
CENTRAL CORRIDOR
C-315
18'-0"
6'-10" 10'-9
8'-8
1'-4
6'-4"
4'-4"
A
R.O.
3'-2" 3'-2"
3 8
C
S
A N.I.C.
ST-3B
M-301 W-301
J-302
2'-4
12"
21'-1
21'-8
7 8
P-8
P-9
12'-0
3008-A
R O
R O
5'-4"
C
A
3302-A
C-304
5'-9"
3 8
31'-0"
REFERENCE RESTROOM
RENOVATION PACKAGE
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
ENLARGED FLOOR PLAN NORTH EAST QUAD
A - 103
N
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
NE
ENLARGED NORTH-EAST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
QUADRANT
KEYED NOTES
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. MIRROR
DOOR TO HINGE OPPOSITE TO WHERE IT CURRENTLY HINGES (LEFT-RIGHT
/ RIGHT-LEFT)
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING;
WINDOW SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL
SURVEILLANCE AND OPERABLE BLINDS
NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO UNDERSIDE
OF FLOOR PLATE (TRUE CEILING) IN COMPLIANCE w/ SCIF REQUIREMENT
(ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01 / STC 45 SOUND GROUP 3 OR
BETTER). PROVIDE A CONTINUOUS BEAD OF ACOUSTICAL CAULK AT ALL
INTERSECTIONS W/ OTHER SURFACES (HORIZONTAL OR VERTICAL, BOTH
SIDES). WALL MUST BE UNIFORMLY FINISHED ON BOTH SIDES, FROM
FLOOR SLAB (TRUE FLOOR) TO UNDER- SIDE OF FLOOR PLATE (TRUE
CEILING). WHERE SCIF WALL ABUTS EXISTING WALL, CUT BACK EXTANT
BASEBOARD AS NEEDED
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING,
MUST MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR
STRUCTURAL MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND
TERRACOTTA) W/ CLOSED CELL, NON EXPANDING FIREPROOFING FOAM.
TROWEL FOAM SMOOTH AFTER APPLICATION
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB
ENCLOSURE SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED
COLUMNS) PROCEED AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP
WOOD BASE. FINISH WALL AND MILL WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/
3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2"
GWB + 4" W/ CAP WOOD BASE. FINISH WALLS AND MILL WORK AS PER
FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.
SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND
FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL.
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP
AND MEP DRAWINGS
SCIF ENTRY/EXIT: PROVIDE NEW 1 3/4" SCIF LEVEL 3 ACOUSTIC STEEL
DOOR AND FRAME W/ X10 LOCK (
PREP FOR DOOR BY G.C. F&I OF BMS, IDS,
ACD AND X10 BY TREASURY OSP SEE A-602) . HARDWARE MUST MEET
FEDERAL SPECIFICATION FF-L-2740 / UL 2050
IF AFTER DEMOLITION EXTANT COLUMN GWB (MODERN) IS DAMAGED,
REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2"
GWB. REINSTALL PREVIOUSLY REMOVED WOOD BASE FINISH WALL AND
MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
EXISTING PLASTERED WALL TO REMAIN & TO BE FURRED OUT AS PER
WALL TYPE TO ACHIEVE AN STC-45 (SOUND GROUP 3) OR BETTER, AND TO
INSTALL ELECTRICAL BOXES
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED. REFINISH AS
PER FINISHES/ ROOM SCHEDULES
EXTANT ORIGINAL TILE (FLOOR AND WALLS) TO REMAIN. CLEAN AND ADD
MISSING TILES IF SIMILAR ARE AVAILABLE ON SITE
WHERE FCU PIPES ARE ENCLOSED W/ SHEET METAL ALONG THE WINDOW
WALL AT FLOOR LEVEL, COVER THE FRONT OF THE METAL ENCLOSURE
WITH BASEBOARD AND THE TOP W/ WOOD CAP AS PER DETAIL A-4/A-603
4 4 4
C
B2
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
3 6
8 9
N-E QUADRANT
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY.
DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC / NEC/ IMC / IECC / IFC LATEST EDIT.
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT
DOCUMENTS BUT NECESSARY FOR THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CSW
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND
PROPER DISPOSAL OF ALL WORK RELATED TRASH AND DEBRIS
8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM A SOURCE DESIGNATED BY THE COR
9. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING AND TO THE SATISFACTION AND APPROVAL OF TREASURY / COR
10. EXISTING / NEW SYSTEMS FURNITURE/EQUIPMENT TO BE REMOVED/
PROVIDED BY TREASURY.
11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS AND
VENTS TO PREVENT INTRODUCING DUST INTO THE SYSTEM.
(REMOVED COVERS MUST BE REINSTALLED AT END OF THE JOB)
12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC DURING
CONSTRUCTION
KEYED NOTES
A2
E2
A2
D1
D1
D1
D1
D1
D1 D1 D1
D1 D1
D1
D1
D1
D1
D1
H2
H2
H1
H2
SW
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
NW
NE
H2
H2
B1
0019-08
28 APRIL 2019
100%
17 17 17
E3
13'-0" 11'-0"
3 4
11'-0"
A
A
11'-0"
A
A
A
12'-11
3105-A
T
A
T
B
TELECOM
CLOSET
E
A
J
A
ELECTRICAL
CLOSET
JANITOR
CLOSET
3 4
16'-11
A
13'-3
3 4
A
A
14'-6
" 12'-6"
11'-3
LAN ROOM
OFFICE
OFFICE
1 4
7'-2
5 8
41'-10
OPEN OFFICE AREA SOUTH
A
A
A
C
A
3 8
3 EQUAL SIZE OFFICES (3101 T0 3103)
34'-6
5'-0"
1 2
2 EQUAL SIZE OFFICES (3116 & 3117)
19'-8"
5'-0"
4'-7"
19 20
14'-4
7 8
CENTRAL CORRIDOR SOUTH
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
C-316
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
EV-302
EV-301
CORRIDOR SOUTH
C-313
7'-10"
1'-7" 5'-9"
7'-8
1'-4
3'-2"
R.O.
1'-8
5'-2"
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
7'-9
3'-2"
R.O.
12"12"
5'-11
5'-11
6'-9
5'-0"
7'-0
10'-1
1'-2
10'-11
3'-2"
R.O.
3'-2"
R.O.
OFFICE
T-301
J-301
E-301
OFFICE
3123 3122
CENTRAL CORRIDOR
C-315
18'-0"
6'-10" 10'-9
8'-8
17'-8
15'-5"
15'-5"
3109-A
1 4
5 8
R O
3108-A
R O
3107-A
R O
5 8
15'-5"
3106-A
R O
5 8
20'-9
12'-0
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR
PLATE UP TO CEILING PLATE. GWB FROM FLOOR
PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA
OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND
WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP
TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA
( NOT IN CONTRACT)
ENLARGED FLOOR PLAN SOUTH WEST QUAD
A - 104
N
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
SW
ENLARGED SOUTH-WEST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
QUADRANT
KEYED NOTES
S-W QUADRANT
3 3 3 3 3 3 3
H6
H3
H3
H3
H2
H2
D2 D2 D2
D3 D3
D3
D1
D1
D1
D1 D1
D1 D1
D1 D1
D1
D1
D1
E1
G
NO WORK SHALL TAKE PLACE WITHIN AREAS MARKED AS N.I.C.
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING; WINDOW
SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL
SURVEILLANCE AND OPERABLE BLINDS
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING, MUST
MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR STRUCTURAL
MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND TERRACOTTA) W/ CLOSED
CELL, NON EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH AFTER
APPLICATION
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB ENCLOSURE
SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED COLUMNS) PROCEED
AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL
AND MILL WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/ 3 5/8" 16
GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2" GWB + 4" W/ CAP
WOOD BASE. FINISH WALLS AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.
SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND FLOORING
REMNANTS PRIOR TO NEW CARPET INSTALL
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND MEP
DRAWINGS
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS DAMAGED,
REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2" GWB.
REINSTALL PREVIOUSLY REMOVED WOOD BASE. FINISH WALL AND MILL WORK AS
PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED.
REFINISH AS PER FINISHES/ ROOM SCHEDULES
EXTANT DOOR ASSEMBLY & CASING TO REMAIN. SINCE DOOR WILL
BE USED FOR EXIT ONLY CHANGE HARDWARE
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED
BUT IN A PERMANENTLY CLOSED POSITION.
ALIGN NEW WALL GWB WITH COLUMN
WHERE FCU PIPES ARE ENCLOSED W/ SHEET METAL ALONG THE
WINDOW WALL AT FLOOR LEVEL, COVER THE FRONT OF THE METAL
ENCLOSURE WITH BASEBOARD AND THE TOP WITH A WOOD CAP AS
PER DETAIL A-4/A-603
SW
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
NW
NE
H6
D1
D1
3 2
D2
D1
D1
D1
D2
D2
D2
D2
D2
D3
D3
D3
0019-08
28 APRIL 2019
100%
15 15 15 15 15 15 15
11'-0"
3 4
10'-5
1 2
32 33
T
B
E
A
J
A
ELECTRICAL
CLOSET
JANITOR
CLOSET
3 4
16'-11
A
A
13'-3
1 2
10'-6"
3 4
A
A
A
5'-1"
14'-6
" 12'-6"
11'-3
LAN ROOM
OFFICE
OFFICE
1 4
C E
N T
R A
L
C
O R
R I D
S
T
7'-2
E
A
C
A
A
41'-10
OPEN OFFICE AREA SOUTH
OPEN OFFICE AREA
EAST
A
67'-7"
3 8
5 8
5'-0"
1 2
2 EQUAL SIZE OFFICES (3116 & 3117)
19'-8"
4'-7"
21 24
1 4
21'-3
3124-A
CENTRAL CORRIDOR SOUTH
E A
R
R I D
O R
C
3'-2"
R.O.
3'-2"
R.O. R.O.
C-316
OFFICE
OFFICE
3'-2"
R.O.
5'-11
10'-1
1'-2
10'-11
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3 4
E
C A
J-301
E-301
OFFICE
OFFICE
OFFICE
OFFICE
CENTRAL CORRIDOR
C-315
18'-0"
6'-10" 10'-9
8'-8
1'-4
6'-4"
4'-4"
A
R.O.
3'-2" 3'-2"
3 8
C
S
A N.I.C.
ST-3B
OFFICE
17'-8
2'-4
12"
N.I.C.
3302-B
R O
3'-0"
20'-7"
31'-6
R O
31'-0"
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR
PLATE UP TO CEILING PLATE. GWB FROM FLOOR
PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA
OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND
WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP
TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA
( NOT IN CONTRACT)
ENLARGED FLOOR PLAN SOUTH EAST QUAD
A - 105
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/4"= 1'-0"
0 2'
4'
8'
1'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
SE
ENLARGED SOUTH-EAST QUADRANT OF THE PROPOSED FLOOR PLAN
A-1
1/4" = 1'-0"
MARK DATE DESCRIPTION
QUADRANT
S-E QUADRANT
KEYED NOTES
NEW SCIF WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO UNDERSIDE OF
FLOOR PLATE (TRUE CEILING) IN COMPLIANCE W/ SCIF REQUIREMENT (ICD/ICS 705
IN COMPLIANCE W/ UFC 1-200-01 / STC 45 SOUND GROUP 3 OR BETTER). PROVIDE A
CONTINUOUS BEAD OF ACOUSTICAL CAULK AT ALL INTERSECTIONS W/ OTHER
SURFACES (HORIZONTAL OR VERTICAL, BOTH SIDES). WALL MUST BE UNIFORMLY
FINISHED ON BOTH SIDES, FROM FLOOR SLAB (TRUE FLOOR) TO UNDER- SIDE OF
FLOOR PLATE (TRUE CEILING). WHERE SCIF WALL ABUTS EXISTING WALL, CUT
BACK EXTANT BASEBOARD AS NEEDED
EXTANT WALLS, COLUMN SURROUNDS AND BASE; DOORS AND CASING; WINDOW
SASHES, TRIM, MUNTINS AND SILLS, TO BE
PREPARED AND PAINTED AS PER FINISHES SCHEDULE
EXTERIOR GLAZING SHALL BE TREATED WITH FILM PRECLUDING VISUAL
SURVEILLANCE AND OPERABLE BLINDS
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING, MUST
MAINTAIN FIRE RATING AS PER SPECS (1-HR GENERAL AND 2-HR STRUCTURAL
MEMBERS) FILL ALL HOLES IN CEILING (PLASTER AND TERRACOTTA) W/ CLOSED
3 3 3 3 3 3 3
CELL, NON EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH AFTER
APPLICATION
DEMOLISH AS MUCH AS POSSIBLE OF THE EXISTING MODERN GWB ENCLOSURE
SURROUNDING STRUCTURAL COLUMNS (ONLY DESIGNATED COLUMNS) PROCEED
AS INDICATED IN WALL TYPE DETAILS. ADD 4"+ CAP WOOD BASE. FINISH WALL
AND MILL WORK AS PER FINISHES SCHEDULE
ALL NEW WALLS (NON SCIF) TO BE CONSTRUCTED AS PER WALL TYPESW/ 3 5/8"
16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT, W/ 1/2" GWB + 4" W/
CAP WOOD BASE. FINISH WALLS AND MILL WORK AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CARPET TILES AS PER FINISHES SCHEDULE.
SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD GLUE AND
FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND
MEP DRAWINGS
IF AFTER DEMOLITION EXTANT GWB SURROUNDING COLUMNS IS DAMAGED,
REMOVE BASEBOARD AND REPLACE GWB / LAMINATE COLUMN W/ 1/2" GWB.
REINSTALL PREVIOUSLY REMOVED WOOD BASE. FINISH WALL AND MILL WORK
AS PER FINISHES SCHEDULE
FURNISH AND INSTALL SOUND BLANKET INSULATION ABOVE ACT
FURRING & 1/2" GWB TO ALIGN W/ NEW WALL (SEE WALL TYPE DETAIL)
EXTANT DOOR ASSEMBLY & CASING TO REMAIN UNALTERED. REFINISH AS PER
FINISHES/ ROOM SCHEDULES
WHERE FCU PIPES ARE ENCLOSED W/ SHEET METAL ALONG THE WINDOW WALL
AT FLOOR LEVEL, COVER THE FRONT OF THE METAL ENCLOSURE WITH
BASEBOARD AND THE TOP WITH A WOOD CAP AS PER DETAIL A-4/A-603
SCIF EXIT ONLY: SECONDARY EXIT PROVIDE NEW 1 3/4" SCIF LEVEL 3, ACOUSTIC
STEEL DOOR & FRAME W/ EXIT / PANIC HARDWARE ONLY
H3
H3
H3
H3
H2
H2
D1
D1
D1
H2
H2
H3
H3
SW
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
NW
NE
N
D1
D1
D1
D1
D1
E1
0019-08
28 APRIL 2019
100%
13 13 13 13 13 13 13
4 8 14
A1
A2
A2
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR PLATE UP
TO CEILING PLATE. GWB FROM FLOOR PLATE TO 6" ABOVE ACT
LEGEND
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN & SURROUND WITHIN THE AREA OF WORK TO REMAIN
EXISTING COLUMN WITH NEW SURROUND WITHIN THE AREA OF WORK
NEW WALLS GWB (NON-SCIF) FROM FLOOR PLATE UP TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA ( NOT IN CONTRACT)
HISTORIC
CORRIDOR
C-300
ST-3 A
EV-303 EV-304
EV-302
EV-301
A
A
OFFICE
OFFICE OFFICE OFFICE
310131023103
A
A
OFFICE
A
OFFICE
A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
A
OFFICE
3105-A
OFFICE
MEETING
ROOM
M-302
BREAK ROOM
MECHANICAL
CLOSET
M302-A
COMPUTER ROOM
3124-A
OFFICE
A
OFFICE
CONFERENCE ROOM
JANITOR
CLOSET
MEN
M A
W A
M-301
UNISEX
ELECTRICAL
CLOSET
E-302
E
A
WOMEN
W-301
32 33
T
A
T
B
TELECOM
CLOSET
T-301
E
A
J
A
ELECTRICAL
CLOSET
E-301
JANITOR
CLOSET
J-301
A
A
A
A
A
A
A
5'-0"
OFFICE
OFFICE
LAN ROOM
OFFICE
OFFICE
OFFICE
C E
N T
R A
L
C
O R
R I D
S
T
C
J
A
J-302
E
A
C
A
A
E
C A
OFFICE
MEETING
ROOM
MEETING
ROOM
4'-8
OPEN OFFICE AREA SOUTH
3302-A
3302-B
3301-A
3301-N3301-M3301-L3301-K3301-J
OPEN OFFICE AREA
EAST
3301-I
3301-H
A
OFFICE
3301-W 3301-V 3301-U 3301-T 3301-S 3301-R 3301-Q 3301-P
C340-B
CENTRAL CORRIDOR NORTH
C-314
CENTRAL CORRIDOR
C-315
NORTH CORRIDOR
C-311
WEST
CORRIDOR
C-310
CORRIDOR SOUTH
C-313
3302-E
A
OFFICE
OFFICE
A
3301-B3301-C
3301-O
3301-D3301-E3301-F
3301-G
A
A
C340-C
3008-A 3008-B 3008-C
3008-F 3008-E 3008-D
3008-I3008-H3008-G
C311-B
C311-A
3001-B
3002-A
C302-A
C-302
C-301
C301-A
C
A
C
C-305
C305-A
J
K
C
A
B
C
4'-8
3 4
8'-0"
3'-0"
3 8
7'-9"
5'-0"
C310-A
C310-B
C310-C
C310-D
C310-E
E A
R
R I D
O R
C
3302-F
3302-G
3302-H
3302-I
3302-J
3302-K
3302-L
3302-M
3302-N
3302-O
3302-P
3302-Q
3302-R
C E
N T
R A
L
C
O R
R I D
W
S
T
C
CENTRAL CORRIDOR SOUTH
C-316
3113-A
3112-A
3111-A
3110-A
3109-A
3107-A
ST-3 B
S
A
3108-A
3106-A
N.I.C.
REFERENCE RESTROOM
RENOVATION PACKAGE
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
C A
C-304 3008-A
3302-C
3302-D
3302-A
3302-B
3 4
3'-11
PROPOSED 3RD FLOOR PLAN WITH FURNITURE
A - 106
PROPOSED FLOOR PLAN WITH FURNITURE
A-1
1/8" = 1'-0"
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
GENERAL NOTES
KEYED NOTES
NEW SYSTEMS FURNITURE AND ALL ASSOCIATED CABLING
TO BE INSTALLED WHERE DEPICTED. SYSTEMS FURNITURE
INSTALLATION BY TREASURY
WHERE TWO DESKS ARE DEPICTED IN THE SAME OFFICE,
ELECTRICAL & IT SET UP MUST BE DESIGNED AND IMPLE-
MENTED FOR DUAL USAGE
FOLDING PARTITION TO FOLD INTO CLOSET WHEN NOT IN USE
WHERE FCU PIPES ARE ENCLOSED WITH SHEET METAL ALONG
THE WINDOW WALL AT FLOOR LEVEL, COVER THE FRONT OF
THE METAL ENCLOSURE WITH BASEBOARD AND THE TOP W/
WOOD CAD AS PER DETAIL A-4/A-603
48 WORK STATIONS 6' x 9'
11 KIOSK STATIONS
24 PRIVATE OFFICES
13 DOUBLE OCCUPANCY
11 SINGLE OCCUPANCY
83 PEOPLE WHEN ALL OFFICES ARE USED FOR SINGLE OCCUPANCY
96 PEOPLE WHEN 13 OFFICES ARE USED FOR DOUBLE OCCUPANCY
MARK DATE DESCRIPTION
N
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE
STARTING. NO FORENSIC DEMOLITION WAS CONDUCTED AT
THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE
ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS.
INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES,
SECTIONS, DETAILS AND SPECIFICATIONS, THE MOST
STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC / IPC /
NEC/ IMC / IECC / IFC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION
TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW
UNLESS SPECIFICALLY MARKED "EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE
FOLLOWED AT ALL TIMES. ANY ITEM NOT SPECIFICALLY LISTED
OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY
FOR THE COMPLETION OF THE PROJECT, SHALL BE
CONSIDERED PART OF THE CONTRACT'S SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS
AFTER EACH DAY’S WORK. THE CONTRACTOR IS RESPONSIBLE
FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WORK
RELATED TRASH AND DEBRIS
8. THE CONTRACTOR SHALL RECEIVE ELECTRICAL POWER FROM
A SOURCE DESIGNATED BY THE COR
9.PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT
THE JOB SITE AGAINST DAMAGE. ALL DAMAGES CAUSED BY THE
CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AND TO THE SATISFACTION AND APPROVAL OF
TREASURY / COR
10. EXISTING / NEW SYSTEMS FURNITURE AND EQUIPMENT TO
BE REMOVED/ PROVIDED BY TREASURY.
11. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED
DUCTS AND VENTS TO PREVENT INTRODUCING DUST INTO THE
SYSTEM. (REMOVED COVERS MUST BE REINSTALLED AT END OF
THE JOB)
12. PROTECT WINDOWS AND ALL EXTANT HISTORIC FABRIC
DURING CONSTRUCTION
SW
N.I.C.
N.I.C.
N.I.C. N.I.C.
SE
NW
NE
0019-08
28 APRIL 2019
N.I.C.
OPEN
OPEN
OPEN
BULKHEAD
BULKHEAD
BULKHEAD
B U
L K
H E
A D
BULKHEAD
LEGEND
CEILING HEIGHT @ 10'-8" AFF (PERIMETER TO
CLEAR WINDOWS)
CEILING HEIGHT @ 8'-6" AFF ALL CENTRAL SECTION
AND NORTHERN AREA
1/2" GWB BULKHEAD
NEW SCIF WALLS
NEW WALLS GWB (NON-SCIF) FRAMING FROM FLOOR
PLATE UP TO CEILING PLATE. GWB FROM FLOOR PLATE
TO 6" ABOVE ACT
EXISTING WALLS WITHIN THE AREA OF WORK TO REMAIN
NEW WALLS GWB (NON-SCIF) FROM FLOOR
PLATE UP TO CEILING PLATE
N.I.C. NO WORK TO BE PERFORMED WITHIN THIS AREA
( NOT IN CONTRACT)
REFERENCE RESTROOM
RENOVATION PACKAGE
REFERENCE SECURITY /
SECURED WINDOWS PACKAGE
BULKHEAD
PROPOSED REFLECTED CEILING PLAN
A - 107
PROPOSED REFLECTED CEILING PLAN ( ONLY CEILING CONSTRUCTION )
A-1
1/8" = 1'-0"
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
DC-
2 3 4 5
2 3 4 5
A
B
C
D
DEPARTMENT OF TREASURY
1500 PENNSYLVANIA AV. NW
WASHINGTON DC 20220
BARBARA CHOATE
02/24/2018
3RD FLOOR
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
TREASURY ANNEX BUILDING:
NEW OFFICE SPACE
3RD FLOOR RENOVATION
1/8"= 1'-0"
0 4'
8'
16'
2'
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
GENERAL NOTES
KEYED NOTES
CEILING HEIGHT @ ±10'-8" AFF ACT
(PERIMETER TO CLEAR WINDOWS)
CEILING HEIGHT @ 8'-6" AFF ALL CENTRAL SECTION AND
NORTHERN AREA ACT
PERIMETER CEILING OF CONFERENCE ROOM AND MIDDLE
BULKHEAD 30" WIDE @ 8'-6" AFF, USE 1/2" GWB
CENTRAL SECTION CONFERENCE ROOM @ ±10'-8" AFF ACT
BULKHEAD CONSTRUCTION: 2 1/2" 20…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.