1_-_2032H319R00008-OFAC_RENOVATION_7-9-19.pdf

PDF 674 KB Posted

Attached to
Treasury OFAC Renovation
Solicitation number
2032H319R00008
Issued by

About this file

Solicitation 2032H319R00008

View the file

Other files

File Type Posted
2032H319R00008_005.pdf PDF
Plumbing_2nd_Floor.pdf PDF
Wage_Determination_DC2_-_072619.pdf PDF
Plumbing_3rd_Floor.pdf PDF
2032H319R00008_004.pdf PDF
Attachment_C_-2nd_Floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
2032H319R00008_0003.pdf PDF
2032H319R00008_0002.pdf PDF
Site_Visit_List.pdf PDF
2032H319R00008_-_0001.pdf PDF
Attachment_A_-3rd_floor_LAN_room_layout.pdf PDF
TRES_2nd_Floor_Restroom_100___DRAWING_3-28-2019.pdf PDF
Schedule_FFB_2nd_and_3rd_Floors.xlsx XLSX spreadsheet
Attachment_A_-_2nd_floor_LAN_room_layout.pdf PDF
Treasury_Annex_2nd_Floor_ET101_Revised.pdf PDF
2nd_Floor_100__DRAWING_4-4-2019_S300R.pdf PDF
SIGN_P-Mount-Teknion.pdf PDF
Security_&_Secured_Window_Package_3rd_Fl.pdf PDF
Secure_Insert_Window_Detail.pdf PDF
3rd_floor_April_28_2019_100__Full_Set.pdf PDF
2nd_Floor_RFP.pdf PDF
Attachment_B_-3rd_floor_LAN_room_Cable_Tray_Layout.pdf PDF
SD2500_2510TechSpec.pdf PDF
Sign_Type_A2.pdf PDF
drawing_A106_-_Security_&_Secured_Window_Package_2nd_Fl.pdf PDF
Security_&_Secured_Window_Package_2nd_Fl.pdf PDF
Attachment_C_-2nd_Floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
3rd_Floor_RFP_v1.pdf PDF
Sign_Type_A1.pdf PDF
Attachment_C_-_Annex_3rd_floor_Pricing_Worksheet_RR.xlsx XLSX spreadsheet
Treasury_Annex_Restrooms_Renovation_Spec.pdf PDF
Sketch_of_X010_Lock.pdf PDF
Attachment_B_-_2nd_floor_LAN_room_cable_tray_layout.pdf PDF
3rd_Floor_Annex_100__SPEC.pdf PDF
2nd_and_3rd_Floor_Furniture_Power_&_Data_Changes.pdf PDF
3rd_floor_-_ET-101_Revised.pdf PDF
Attachment_D_-_3rd_floor_Information_Outlet_layout.pdf PDF
Historic_Restoration_Package_dated_4.4.19.pdf PDF
3rd_Floor_Restroom_100__3-28-2019_R.pdf PDF
Attachment_D_-2nd_floor_Information_Outlet_Layout.pdf PDF
2nd_Floor_Annex_100__SPEC.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

2032H319R00008

2. TYPE OF SOLICITATION

SEALED BID (IFB)

x NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

1 86

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

19PR-TDP--0422

6. PROJECT NO.

7. ISSUED BY CODE 1-IRS NON-IT (OTPS) 8. ADDRESS OFFER TO

IRS non-IT (OTPS) Internal Revenue Service DCOS/Procurement OS:PR:T, Stop C7-430 5000 Ellin Road Lanham MD 20706

9. FOR

INFORMATION

CALL:

a. NAME

NANCY KEBE

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

240-613-9362

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

1. PROJECT - SMALL BUSINESS SET-ASIDE DESIGN-BID-BUILD (DBB) FIRM FIXED PRICE CONSTRUCTION CONTRACT, IN SUPPORT OF US TREASURY REQUIREMENT TO DEMOLISH AND RENOVATE 2ND AND 3RD FLOOR AT THE TREASURY ANNEX BUILDING LOCATED IN WASHINGTON, D.C. IN ACCORDANCE WITH ENCLOSED SCOPE OF

WORK, AND SPECS AND DRAWINGS.

2. NAICS: 236220, Commercial and Institutional Building Construction; Size Standard: $36,500,000. Period of Performance 730 calendar days. Magnitude of Construction is between $5,000,000.00 and $10,000,000.00

3. Proposal Due Date: August 8, 2019, 2:00 PM EST. All questions are to be submitted via email to nancy.p.kebe@irs.gov by July 25, 2019 2:00pm EST. Email subject shall state "RFI 2032H319R00008 – OFAC Renovation”

4. Site Visit/ Pre-Proposal Conference is scheduled for July 17, 2019 at the Treasury Annex Building located at 701 Madison Place, NW, Washington D.C, 20220. All attendees must submit the following information via nancy.p.kebe@irs.gov by 2pm July 12, 2019 in order to attend the site visit:

A. Full Name (including middle name) B. Date of Birth C. Social Security Number D. City and State of current Residence

11. The Contractor shall begin performance 10 calendar days and complete it within 730 calendar days after receiving award, x notice to proceed. The performance period is X mandatory negotiable. (See .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 14_00 (hour) local time 0_8 /0 8 /2 0 1 9 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due .

b. An offer guarantee x is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

NSN 7540-01-155-3212 STANDARD FORM 1442 (Rev. 4-85) Prescribed by GSA FAR(48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

x YES NO 12b. CALENDAR DAYS mailto:nancy.p.kebe@irs.gov

AMOUNTS

OFFER (Must be fully completed by offeror)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

Continued...

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c)

26. ADMINISTERED BY CODE 1-IRS NON-IT (OTPS) 27. PAYMENT WILL BE MADE BY

IRS non-IT (OTPS) Internal Revenue Service DCOS/Procurement OS:PR:T, Stop C7-430 5000 Ellin Road Lanham MD 20706

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT

(Contractor is required to sign this document and return 1 copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,

29. AWARD

(Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

NANCY P. KEBE

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 4-85) BACK

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

NAME OF OFFEROR OR CONTRACTOR

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

NSN 7540-01-152-8067

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

2032H319R00008

PAGE OF

3 86

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

Invoice Approver/COR: CHOATE, BARBARA Delivery Location Code: TDP ANNEX

TDP ANNEX

DEPARTMENT OF THE TREASURY- TREASUR

1500 PENNSYLVANIA AVENUE, NW

PENNSYLVANIA AT MADISON PLACE

WASHINGTON DC 20220 US

Period of Performance: 09/30/2019 to 09/30/2021

0001 Project A: Treasury Annex 2nd Floor Renovation Period of Performance 9/30/19 to 7/31/20 for the General Contractor portion of the work Period of Performance 7/31/20 to 9/30/20 for the Treasury portion of the work(Government responsibility)

Treasury Annex 2nd Floor, Interior Renovation - Division 1 thru 26 (General Conditions, Existing Conditions (including furniture removal).

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 07/31/2020

0002 Treasury Annex 2nd Floor Interior Renovation Division 27 - Telecommunications

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 09/30/2020

0003 Treasury Annex 2nd Floor Restroom Renovations

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 09/30/2020

0004 Treasury Annex 2nd Floor Signage

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 09/30/2020

0005 Treasury Annex 2nd Floor Security & Secured Window Package

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 09/30/2020

0006 Treasury Annex 2nd Floor Historic Restoration Continued ...

Sponsored by GSA

2032H319R00008

4 86

Package

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 09/30/2020

0007 Treasury Annex 2nd Floor Contingency

Delivery: 09/30/2020 Period of Performance: 09/30/2019 to 09/30/2020

OPTION Project B: Treasury Annex 2nd Floor Renovation 0008 Period of Performance 9/23/20 to 7/24/21 for the General Contractor portion of the work Period of Performance 7/27/21 to 9/26/21 for the Treasury portion of the work(Government responsibility)

Treasury Annex 2nd Floor, Interior Renovation - Division 1 thru 26 (General Conditions, Existing Conditions (including furniture removal).

(Option Line Item) 09/30/2021

Delivery: 09/30/2021 Period of Performance: 09/30/2020 to 09/30/2021

OPTION Treasury Annex RS Means Division 27, 3rd Floor 0009 Telecommunications (Option Line Item) 09/30/2021

Delivery: 09/30/2021 Period of Performance: 09/30/2020 to 09/30/2021

OPTION Treasury Annex 3rd Floor Restroom Renovations

Delivery: 09/30/2021 Period of Performance: 09/30/2020 to 09/30/2021

OPTION Treasury Annex 3rd Floor Signage 0011 (Option Line Item) 09/30/2021

Delivery: 09/30/2021 Period of Performance: 09/30/2020 to 09/30/2021

OPTION Treasury Annex 3rd Floor Security and Secured 0012 Continued ...

Sponsored by GSA

2032H319R00008

5 86

OPTION

Window Package (Option Line Item) 09/30/2021

Delivery: 09/30/2021 Period of Performance: 09/30/2020 to 09/30/2021

Treasury Annex 3rd Floor Contingency (Option Line Item) 09/30/2021

Delivery: 09/30/2021 Period of Performance: 09/30/2020 to 09/30/2021

Contents

SECTION I…………………………………………………………………………………………………..1

PRICE SCHEDULE

SECTION II

INSTRUCTIONS TO OFFERORS

SECTION III

SOLICITATION PROVISIONS

A. BASIS FOR AWARD

B. EVALUATION PROCEDURE

C. PROPOSAL SUBMISSION

SECTION IV

CLAUSES INCORPORATED BY REFERENCE AND FULL TEXT

SECTION V

SCOPE OF WORK

SECTION VI

WAGE DETERMINATION DC2

PRICE SCHEDULE

Offerors should quote a price on each item listed. Exercising Option CLINS will be based on availability of funds.

PROJECT A CLIN 0001 - 0007

OFAC RENOVATION 2ND and 3rd FLOOR

CLIN DESCRIPTION TOTAL AMOUNT

CLIN 0001

Treasury Annex 2nd Floor, Interior Renovation - Division 1 thru 26 (General Conditions, Existing Conditions (including furniture removal).

CLIN 0002

Treasury Annex 2nd Floor Interior Renovation Division 27 - Telecommunications

CLIN 0003

Treasury Annex 2nd Floor Restroom Renovations

CLIN 0004

Treasury Annex 2nd Floor Signage $

CLIN 0005

Treasury Annex 2nd Floor Security & Secured Window Package

CLIN 0006

Treasury Annex 2nd Floor Historic Restoration Package

CLIN 0007

Treasury Annex 2nd Floor Contingency

PROJECT A TOTAL $

PROJECT B CLIN 0008 – 0013 Optional CLINS

OPTION

CLIN 0008

Treasury Annex 3rd Floor, Interior Renovation - Division 1 thru 26 (General Conditions, Existing Conditions (including furniture removal). $

OPTION

CLIN 0009

Treasury Annex RS Means Division 27, 3rd Floor Telecommunications $

OPTION

CLIN 0010

Treasury Annex 3rd Floor Restroom Renovations $

OPTION

CLIN 0011

Treasury Annex 3rd Floor Signage

OPTION

CLIN 0012

Treasury Annex 3rd Floor Security and Secured Window Package $

OPTION

CLIN 0013

Treasury Annex 3rd Floor Contingency $

PROJECT B TOTAL $

TOTAL PRICE PROPOSAL $

PROJECT A CLIN 0001 – 0007

For informational purposes only

Division Description Totals

01 General Requirements

02 Existing Conditions

03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment

12 Furnishings

13 Temporary Trailers

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

Total – Project A

PROJECT B OPTION CLIN 0008 – CLIN 0013

For informational purposes only

Division Description Totals

01 General Requirements

02 Existing Conditions

03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment

12 Furnishings

13 Temporary Trailers

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

Total – Project B

SECTION II

INSTRUCTIONS TO OFFERORS

IMPORTANT NOTES REGARDING THIS ACQUISITION

1. COMPETITION: Total Small Business Set-Aside.

2. SUBMISSION OF PROPOSALS

1) All proposals must be submitted in accordance with the procedures set forth in Block 13 of Page 1 of this Solicitation document. Proposals must be submitted electronically via nancy.p.kebe@irs.gov.

2) It is the responsibility of each offeror to ensure that its proposal is received by the Contracting Office prior to the date and time set for the receipt of the proposals – See Block 13A of Page 1 of the Solicitation.

3) SF 1442 BACK (Page 2 of the Solicitation): Offerors are required to acknowledge the receipt of all amendments to the Solicitation on the Standard Form 1442 in Block 19. Offerors shall fully complete all the required areas located under the section designated as “OFFER” (refer to Items 14 through 20C).

4) BID GUARANTEE: The offerors are required to submit a Bid Guarantee for this procurement.

Any offeror failing to submit an authentic Bid Guarantee will be considered non-responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% of the bidder’s price or $3,000,000.00, whichever is less.

5) BONDS AND INSURANCE: The Contractor shall be required to furnish proof of insurance, including copies of the required endorsements, and performance and payment bonds within 10 calendar days following the Contractor’s receipt of the contract award.

3. REQUESTS FOR INFORMATION

Technical inquiries and questions relating to this solicitation are to be submitted via email, to nancy.p.kebe@irs.gov. Email subject shall state "RFI 2032H319R00008 – OFAC Renovation” by July 25, 2019. Prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. All questions will be addresses via an amendment to the solicitation on

FBO.

This is a competitive negotiation acquisition; as such, there is no public proposal opening and no information will be given out as to the number of Offerors or the results of the competition until award is made.

PLEASE NOTE: THE LAST DAY FOR INTERESTED OFFERORS TO SUBMIT THEIR CONTRACTING

AND TECHNICAL REQUESTS FOR INFORMATION IS JULY 25, 2019 AT 2:00 PM (EST). NO OTHER

REQUEST FOR INFORMATION WILL BE ACCEPTED AFTER THIS DATE.

SECTION III

SOLICITATION PROVISIONS

A. BASIS FOR AWARD

Proposals must meet the criteria stated in the request for proposal (RFP) to be eligible for award, to include responsiveness, technical acceptability and responsibility.

This acquisition will utilize the Lowest Priced Technically Acceptable (LPTA) procedure to make an award. The award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. For the offeror determined to be technically acceptable, award will be made to that vendor with the lowest overall price.

While the Government will strive for maximum objectivity, the technical go/no go process, by its nature, is subjective; therefore, professional judgment is implicit throughout the evaluation process. The Government intends to make an award based on the initial proposals. If further information is required, the contracting officer may contact the offeror or offerors. Award will be made to the responsible offeror whose proposal conforms to all solicitation requirements, such as terms and conditions, representations and certifications, technical requirements, and provides the lowest price to the Government based on the results of the evaluation.

Basis of award for the contract:

Factor 1 Technical Approach and Experience

Factor 2 Past Performance on Relevant Projects

Factor 3 Price

The lowest evaluated price exceeds all non-price factors. All non-price factors are approximately equal. After all the evaluations have been completed by the Source Selection Evaluation Board (SSEB), a component of the Source Selection Team (SST), the SSEB Chair will brief the SSA.

The Government reserves the right to reject all offers.

The Source Selection Decision shall represent the Source Selection Authority's (SSA) independent judgment.

The decision shall be documented, and the documentation shall include the rationale for any business judgments relied on by the SSA. In accordance with FAR 15.305 past performance will be evaluated.

NOTE: The government intends to award without discussion IAW FAR 52.215-1(f)(4) and promote an efficient and streamlined process as possible due to needs of the government. Therefore we will limit our initial evaluation of offerors to the three (3) lowest priced proposals initially and we will follow this process until we have a technically acceptable and responsible offeror, competing independently, whose priced offer satisfies the Government’s expressed requirement. Award will then be made on an LPTA basis.

B. EVALUATION PROCEDURE

1. FACTORS TO BE EVALUATED:

The LPTA evaluation process will be accomplished as follows:

Factor 1: Technical Approach: Evaluation of the offeror's proposal shall address each element as it applies to the evaluation criteria. During evaluations of each proposal, the Government will assign an overall adjectival rating to the factor and write a narrative evaluation reflecting the identified findings.

Factor 2: Past Performance on Relevant Projects: Each offeror's past performance will be reviewed to determine relevancy and confidence assessment.

Factor 3: Price: The resulting award will be a firm-fixed-price contract. Price reasonableness will be utilized in the evaluation of the firm-fixed-price effort.

2. EVALUATION RATINGS

a. Proposal Ratings: Factors 1 and 2 will be adjectivally rated. Offerors submitting proposals for this project should limit submissions to data essential for the evaluation of proposals.

See Section 4. "Evaluation Criteria," below for a discussion of the evaluation criteria applicable to these factors.

b. Technical Rating Definitions.

The following combined technical/risk rating definitions will be utilized in the evaluation of

Factor 1. RATING DESCRIPTION

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. There is a very low risk of unsuccessful performance.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies.

Proposal is not awardable.

c. Past Performance Assessment Definitions. Factor 2 will be evaluated using the following Performance Assessments:

RATING DESCRIPTION

Acceptable Based on the offeror's recent/relevant performance record, the

Government has a reasonable expectation that the offeror will successfully perform the required effort.

Unacceptable Based on the offeror's recent/relevant performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

No Past Performance No recent/relevant performance record is available or the offeror's (Neutral) performance record is so sparse that no confidence assessment rating can be reasonably assigned.

See Section 4. "Evaluation Criteria," for guidance on the Unknown Confidence (Neutral) rating.

Past Performance shall also be rated in accordance with the relevancy of the past performance. The following will be used for Factor 2:

RATING DESCRIPTION

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

3. EVALUATION APPROACH

3.1 FACTOR 1: TECHNICAL APPROACH AND EXPERIENCE:

The Government will evaluate the extent of recent and relevant project experience as it relates to the size, scope, and magnitude of this requirement. The Offeror must demonstrate relevant experience with at least three (3) project experience summaries that provide recent and relevant experience as it relates to the size, scope and magnitude of this requirement. The projects must be related to renovation and/or restoration on Government Historical Building. For the purpose of this solicitation, recent will be defined as either a project completed within the last (7) seven years or a project which is underway with construction at least 50% complete. The Government may place higher value on recent and relevant projects in which the Offeror performed as a prime contractor than as a subcontractor.

Project Management Plan:

The Offeror shall describe the approach for managing the project schedule, cost, deliverable, and personnel.

The proposal shall address how the Offeror will staff the project and manage all resources as assigned in support of the Scope of Work.

Schedule:

The offeror shall provide a detailed schedule showing how the work will be performed in order to meet the completion date. The offeror must discuss its scheduling capabilities and procedures to be used for this contract, which must include schedule updates and incorporating modifications into the schedule. The schedule shall demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period.

Project Team:

The offeror shall demonstrate their qualifications to construct the solicited facility by describing the organizational structure and project team to be used for this project. All disciplines shall be led by an experienced professional registered in the discipline (if professional registration is recognized). The offeror shall submit documentation as to the availability of Key Personnel that indicates each individual's current assignment and the offeror's plan to ensure that the named personnel will be used on this contract. If the named person isn't available upon award, a person with the same or better qualifications shall be proposed for approval by the Contracting Officer.

Key Personnel shall include at minimum: Construction Project Manager, Construction Superintendent, and Contract Safety Manager. A five year minimum experience is required by each key personnel submitted in Historic Restoration in government buildings. All OSHA training requirements must be up to date. Resumes shall be provided and should include the following:

1. Employee's title for this project

2. Number of years with current firm and with other firms

3. Number of years in the proposed role or position

4. Specialization

5. Professional Registration (Type and State Registration) and/or certification

6. Personnel's specific experience and qualifications relevant to this project to include their role on this project. Relevant experience should include Historic Restoration in Government Buildings.

The offeror shall submit an organizational chart identifying the proposed team that will execute this project.

The organizational chart shall include the offeror's key personnel and key subcontractors. Specific subcontractors are not required to be named in the organizational chart but should be identified by type.

Please note: Construction and design of SCIFs shall be performed by U.S. companies using U.S. persons (an individual who has been lawfully admitted for permanent residence as defined in 8 U.S.C. 1101(a)(2) or who is a protected individual as defined by U.S.C.1324b(a) (3)).

Factor 1 will be evaluated to determine the following:

a. Does the offeror’s proposal demonstrate having the required minimum five years’ experience in historic government office renovation and remodeling.

b. Does the project team have a minimum of five years’ experience with historic government office renovation and remodeling.

c. Does the technical approach demonstrate that the project teams have executed similar complexity or work and have previously worked together on successful projects.

d. Does the technical approach demonstrate flexibility to address differing site conditions with minimal impact to cost and schedule.

e. Does the technical approach, scheduled sequence of work and management approach ensure a safe on time completion of the project?

3.2 FACTOR 2: PAST PERFORMANCE ON RELEVANT PROJECTS

The offeror shall provide information that demonstrates the offeror's past performance on relevant projects similar in nature and scope of the solicitation. The offeror shall submit information on a minimum of three projects that have had a performance period within the past seven years from the date of the original issuance of this solicitation. In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least one of the projects submitted for Factor 2 for consideration in response to the past performance requirements of this RFP.

In addition to the construction elements discussed above, the submitted projects must clearly identify the following criteria: (A sample form is included at Attachment A, "Contractors Past Performance.")

a. Contractor's Name

b. Project Name & Location

c. Project Owner with Point of Contact Information ( If Government contract, provide contract number and contracting office)

d. Detailed Description

e. Explanation of Relevancy

f. Problems Encountered and Solutions

g. Lost Time Accidents

h. Schedule (original start, actual start, original finish, actual finish)

i. Costs (original project cost, final project cost)

j. Offeror' s Role and Work Self-Performed

k. Subcontracted Work (extent and type of work subcontracted by percentage)

l. Number of Request for Equitable Adjustments (REA's) submitted

m. Safety and DART rating

The offeror shall provide the performance evaluations for the submitted projects that demonstrate the offeror's performance on recent and relevant projects. The offeror shall provide formal performance evaluation if available. The Government's preference is the formal evaluation. If the formal evaluation is included, a Past Performance Questionnaire (PPQ) is NOT required or desired.

If a formal evaluation is unavailable, the offeror shall obtain the information using the form entitled, "Past Performance Questionnaire" included (Attachment B). The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2, Past Performance of Relevant Projects. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal.

If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Nancy Kebe via email at Nancy.p.Kebe@irs.gov prior to proposal closing date. Offerors may include performance recognition documents received within the last six years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror' s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

3.3 FACTOR 3: PRICE:

The offeror shall submit a firm fixed price.

4. EVALUATION CRITERIA

a. FACTOR 1: TECHNICAL APPROACH AND EXPERIENCE: The offeror will be rated on an adjectival basis of acceptable or unacceptable. To achieve an "acceptable" the offeror will submit the information listed in section 5.1.

b. FACTOR 2: PAST PERFORMANCE ON RELEVANT PROJECTS: Past performance will be rated in terms of how likely there is a performance risk to the Government; that is, acceptable risk or unacceptable risk that the offeror will succeed performing the work. The more relevant a proposed project is, the more weight it will be given in the overall confidence assessment rating. If an offeror has no record of relevant past performance, or if information on the offeror's past performance is not available, the offeror must state that fact. That offeror may be rated as Unknown Confidence/ Neutral. As stated in FAR 15.305(a)(2)(iv), an offeror without a record of relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered 'acceptable.'

c. FACTOR 3: PRICE: Price Analysis: The process of examining and evaluating an Offeror's proposed price to determine if it is fair and reasonable, without evaluating its separate cost elements and proposed profit/fee will be conducted in accordance with FAR Part 15. Price analysis may involve comparison with other prices; e.g., comparing an Offeror's proposed prices of competing Offerors or with previously proposed prices for the same or similar items, and/or any of the price analysis techniques specified in FAR 15.404-l(b)(2).

5. EVALUATION PROVISION

a. Technical Evaluation Board and Price Evaluation Board will review the lowest price proposals against the approved evaluation criteria to ensure an equitable, impartial, and comprehensive evaluation against the solicitation requirements. Evaluation Board Chairs (Technical and Price) will prepared and present the report with all supporting documentation to the Source Selection Authority.

b. The Source Selection Authority, independently exercising prudent business judgment, will determine the offeror that proposed the lowest evaluated priced technically acceptable proposal.

c. Discussions: Offerors are advised that it is the intent of the Government to make an award without discussions. However, the Government reserves the right to hold discussions if it determines that discussions are necessary. Therefore, proposals should be submitted on the most favorable terms that the Offeror can submit to the Government.

d. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard terms and conditions) may result in a determination to reject a proposal.

e. The Government reserves the right to reject any or all proposals at any time prior to award.

f. The Government reserves the right to limit a competitive range for efficiency purposes.

g. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.

6. EVALUATION FORMS

Evaluation forms required to be used in responding to this RFP are provided on the following pages. They include:

Attachment A: Contractor's Past Performance Attachment B: Past Performance Questionnaire

C. PROPOSAL SUBMISSION

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. OVERVIEW

1.1 This Request for Proposal (RFP) solicits for the renovation of the OFAC 2nd and 3rd floor located in the Treasury Annex Building, Washington, DC. Offerors responding to this RFP are required to submit their proposals in accordance with the instructions contained in this Section.

1.2 The purpose of these instructions is to establish a uniform evaluation procedure for the proposals by the Source Selection Evaluation Team (SST) and the determination by the Source Selection Authority (SSA) using a lowest price technically acceptable evaluation (See Federal Acquisition Regulation 15.305). In as much as the proposal shall describe the capability of the offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

1.3 For the purposes of this solicitation, the Government will utilize a single-phase process. The resultant contract will be a single firm-fixed price contract. This solicitation is a small business set aside competition.

2. GENERAL INSTRUCTIONS

2.1 Any legally organized offeror may submit a proposal.

2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more small business firms form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements;

provided, the arrangements are identified, and company relationships are fully disclosed in the offer. The offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. The teaming agreements shall be provided and submitted in Tab A of Document 1.

2.3 If applicable, the offeror shall submit evidence from the offeror's SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.

2.4 Information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, will not be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight of the information to this procurement. Information about subcontractors may not be given much weight unless the proposal contains evidence that the subcontractor is committed to perform the work. If information about a subcontractor is properly submitted and given weight during the evaluation, the expectation is that this subcontractor will perform this work. Before utilizing another subcontractor for this work, the Government must consent.

2.5 Offerors shall submit their proposal electronically to Nancy Kebe at nancy.p.kebe@irs.gov

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT:

3.1 Title Page. Include the title of the solicitation, solicitation number, offeror name, DUNS number, and date of the submittal.

3.2 Table of Contents. The proposal shall consist of two documents.Document1 (Technical Proposal) and Document2 (Price Proposal). Each Document of the proposal shall contain a detailed table of contents as described in 3.8, below. The complete table of contents shall be included in each document.

3.3 The page count is at the discretion of the offeror. However, it is anticipated this should be approximately 30 - 40 pages in total or 10MB.

3.4 Offerors shall submit the following:

Document1: marked Technical Proposal | firms name | 2032H319R00008 Document2: marked Price Proposal | firms name | 2032H319R00008

3.5 Subject Line shall be marked: Solicitation RFP: 2032H319R00008 OFAC Renovation

3.6 The proposal shall be organized and tabbed as follows:

Folder 1(Technical Proposal):

TAB A: Teaming Agreement(s), if applicable. See paragraph 2.2. Note -The Small Business Administration (SBA) must approve a joint venture agreement prior to the award of the contract on behalf of the joint venture. See paragraph 2.3.

TAB B: Factor 1 Technical Approach and Experience Compliance

TAB C: Factor 2 Past Performance on Relevant Projects

Folder 2 (Price Schedule/Solicitation Information):

Factor 3 - Price Proposal

TAB D: Standard Form 1442 completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB E: Bid Bond.

TAB F: Certificate of Corporate Principal/Authority.

Sample: CERTIFICATE OF CORPORATE AUTHORITY

(This Certificate shall be submitted as part of the proposal or signed contract if the offeror is a corporation.) CERTIFICATE

I, , certify that I am the of the corporation named as bidder/offeror therein, that , who signed this bid/proposal on behalf of the bidder/offeror, was then of said corporation;

that said bid/proposal was duly signed for and in behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.

Seal of (Signature/Title)

(Typed Name of Corporation)

(Corporate Seal)

TAB G: Compliance Statement. The offeror is required to sign and certify that all items submitted in the proposal comply with the RFP requirements and any differences, deviations or exceptions must be stated and explained in this section.

Offerors are required to complete the statement and submit it with their proposal in TAB G of folder 2.

Even if there are no differences, deviations or exceptions, the offeror must submit the signed Compliance Statement stating that no differences, deviations or exceptions exist.

Sample: Statement of Compliance: This offeror hereby certifies this proposal is in compliance with the solicitation and its requirements. There are no exceptions, deviations or differences.

TAB H: FACTOR 3 PRICE

Price Proposal (signed)

Attachment A: CONTRACTOR'S PAST PERFORMANCE

<<Picture>

Contractor's Name (Who performed the work?):

Project Name: Project Location:

City, State

Project Owner: Point of contact information (owner name, POC name, address, and phone minimum) If Government Contract, additionally provide the contract number and contracting office)

Detailed Description: General scope and relevance. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.

Also, include a detailed explanation of Relevancy.

Problems encountered during performance and solutions to stated problems:

Lessons learned:

REA's: # Submitted/$ Submitted

# Approved/$ Approved

Claims: # Submitted/$ Submitted

# Granted/$ Granted Safety: DART Rate, Man hours

BGSF: XXX,:XXX I Lost Time Accidents:

Schedule:

Start Date: I Original Completion: I Final Contract Completion: I Beneficial Occupancy Date:

MM-DD-YYYY MM-DD-YYYY MM-DD-YYYY MM-DD-YYYY

Cost:

Original Project Cost: Final Project Cost: Cost Difference

Original Subcontractor Cost: Final Subcontractor Cost: Cost Difference

Attachment B PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: THE GOVERNMENT REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO

THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE

CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO

VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to E VG S M U N effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

SECTION IV

CLAUSES INCORPORATED BY REFERENCE AND FULL TEXT

52.204-7 System for Award Management OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or OCT 2010

Information Other Than Certified Cost or Pricing Data 52.215-21 Requirements for Certified Cost or Pricing Data and Data OCT 2010

Other Than Certified Cost or Pricing Data -- Modifications 52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress Payments Exclusively For APR 1984

Small Business Concerns

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price (FFP) contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.