2-HVAC Specs-Fire School.pdf

PDF 906 KB Posted

Attached to
Schuylkill County - Emergency Training Facility (0325-900015.01)
Solicitation number
US.251947
Issued by
Somerset County, Pennsylvania

About this file

This is an HVAC specifications document for the Schuylkill County Emergency Training Facility construction project in Pennsylvania. The project is being bid as one of four separate prime contracts, with this document providing technical specifications for Contract No. 3-HVAC Construction. Sealed bids are being received online through the PennBid Program by the Schuylkill County Controller with a deadline of Wednesday, October 21, 2026, at 9:00 AM. Bid results will be available online following the Board of Commissioners Board Meeting, with a tentative award date of Wednesday, October 28, 2026. All bidding documents are available at no cost through http://PennBid.bonfirehub.com.

Each bid submission must include a certified check, bank draft, or satisfactory Bid Bond payable to Schuylkill County in the amount of 10 percent of the total bid. The successful bidder will be required to furnish Performance and Payment Bonds, each in the amount of 100 percent of the contract price with a corporate surety approved by the owner. Davis-Bacon Wage Rates apply to this contract. The owner reserves the right to waive any informality, reject any or all items, or waive technicalities in bids. Non-discrimination requirements apply to all employees and applicants for employment based on race, age, color, religion, sex, national origin, or handicap.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIC REQUIREMENTS – HVAC CONSTRUCTION 230010 - 1

SECTION 230010 - BASIC REQUIREMENTS – HVAC CONSTRUCTION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Non-technical/Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes general administrative and procedural requirements for HVAC installations.

Administrative and procedural requirements are included in this Section and in other Non-technical/Division 01 Specification Sections.

1.3 PERMITS AND FEES

A. Refer to Non-technical/Division 01 Specification Sections, General Conditions of The Contract, for information relating to permits and fees.

1.4 PROJECT SCHEDULE

A. Refer to Non-technical/Division 01 Specification sections for contract completion time and project construction schedule.

1.5 SHOP DRAWINGS AND SUBMITTALS

A. Follow the procedures specified in the Non-technical/Division 01 Specification Sections. Also refer to individual sections of the Division 23 specifications for additional shop drawing and submittal requirements.

B. It is the responsibility of the contractor to thoroughly review any and all shop drawings prior to submission to the Architect/Engineer. The contractor’s review shall include verifying conformance to the project documents.

The contractor will also be responsible for verifying the quantities of materials are adequate.

C. All shop drawings shall be submitted with a cover sheet indicating the name of the project, the Architects and Engineers name, the name of the vendor and the contractor. There must be sufficient space on the title sheet to allow the appropriate stamping by both the Architect and the Engineer. Shop drawings and submittals not conforming to the above may be returned without review.

D. All shop drawing submittals will include a listing of any and all exceptions to the requirements indicated in the specifications and on the drawings. Where there are no exceptions, the submittals shall indicate such.

Submittals that do not have this listing will not be reviewed.

1.6 COORDINATION DRAWINGS

A. Coordination drawings are required. Refer to Non-technical/Division 01 Specification Sections for the work required by this Contractor in preparing Coordination Drawings.

1.7 INSTALLATION ACCESSIBILITY

A. The installation of all equipment and appurtenances shall be completed so that access and clearances meet the requirements of the equipment manufacturer as well as the requirements of all applicable codes.

BASIC REQUIREMENTS – HVAC CONSTRUCTION 230010 - 2

1.8 ACCEPTABLE MANUFACTURERS

A. The design of the mechanical systems is based on the equipment manufacturer indicated on the drawings.

Although individual sections of the specifications may list other manufacturers, these manufacturers will be accepted only if the following occurs:

1. Performance, as judged by the engineer, must be equal to the design-based equipment.

2. Operating characteristics, as judged by the engineer, must be identical to those of the design-based equipment.

3. Physical size of the equipment must be such that it can be installed in the available space, maintaining all required clearances for access/maintenance and meet the architectural requirements of the project such as installed height, length, width and operating weight. The contractor shall be responsible for verifying the equipment meets this requirement.

4. The contractor will be responsible for any costs associated for adding additional supports, changes in electrical wiring, piping changes, ductwork changes and / or controls that may be required if equipment other than the design based is used.

1.9 RECORD DOCUMENTS

A. Prepare record documents, including Operating and Maintenance Manuals, in accordance with Non-technical/Division 01 Specification Sections. In addition to the requirements specified, indicate the following installed conditions:

1. Mains and branches of piping systems, with valves and control devices and numbered, concealed unions located, and with items requiring maintenance located (i.e., traps, strainers, expansion compensators, tanks, etc.). Valve location diagrams, complete with valve tag chart. Indicate actual inverts and horizontal locations of underground piping.

2. Equipment locations (exposed and concealed), dimensioned from prominent building lines.

3. Approved substitutions, Contract Modifications, and actual equipment and materials installed.

4. Contract Modifications, actual equipment and materials installed.

5. Record Documents are to be prepared and/or revised to indicate the room names and numbers to be used by the owner after the projects is complete.

1.10 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.

B. When materials and products are stored on site, provide protection from weather and temperatures that may cause damage to the items.

1.11 EXTRA MATERIALS

A. Various Division 23 Specification Sections may indicate extra materials (filters, fan belts, etc.) that are to be provided with the respective equipment. Where indicated, the contractor shall provide the required extra materials.

B. When directed by the owner’s representative, the contractor shall install extra filters in the respective equipment. If no additional installation is required, the contractor shall forward, to the owner, all extra materials. When forwarding materials obtain a receipt for any materials forwarded.

C. The contractor shall also provide a list of all filter sizes for each type and size of unit provided on the project.

BASIC REQUIREMENTS – HVAC CONSTRUCTION 230010 - 3

1.12 WARRANTY

A. All equipment, material and labor provided by the contractor shall be warranted for a minimum period of one year after the date of substantial completion. Refer to Division 23 Technical Specification sections for additional Warranties that may be required.

PART 2 - PRODUCTS

2.1 Not Applicable.

PART 3 - EXECUTION

3.1 ROUGH-IN

A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected.

B. Obtain equipment shop drawings for the various items that require rough-in.

3.2 HVAC INSTALLATIONS

A. Sequence, coordinate, and integrate the various elements of mechanical systems, materials, and equipment.

Comply with the following requirements:

1. Coordinate mechanical systems, equipment, and materials installation with other building components.

2. Verify all dimensions by field measurements.

3. Coordinate requirements for chases slots, and openings in other building components during the progress of construction, to allow for mechanical installations.

4. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Give particular attention to large equipment requiring positioning prior to closing in the building.

5. Where mounting heights are not detailed or dimensioned, install systems, materials, and equipment to provide the maximum headroom possible.

6. Coordinate connection of mechanical systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection for each service.

7. Install systems, materials, and equipment to conform with approved submittal data, including coordination drawings, to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to the Engineer.

8. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces.

9. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. Extend grease fittings to an accessible location.

10. Install systems, materials, and equipment giving right-of-way priority to the systems required to be installed at a specified slope.

11. Seal all places where piping or ducts pass through walls and floors.

3.3 CUTTING AND PATCHING

A. Perform cutting, fitting, and patching of mechanical equipment and materials required to:

1. Uncover Work to provide for installation of ill-timed Work.

BASIC REQUIREMENTS – HVAC CONSTRUCTION 230010 - 4

2. Removal and replacement of defective Work.

3. Remove and replace Work not conforming to requirements of the Contract Documents.

4. Remove samples of installed Work as specified for testing.

5. Install equipment and materials in existing structures.

B. Upon written instructions from the Architect, uncover and restore Work to provide for Architect/Engineer observation of concealed Work.

C. In areas of the building where new finishes are being provided, the patching required on a surface which is to receive a new finish will be to bring the underlying surface up to the finish required to receive the final finish.

This contractor shall coordinate subsurface finish requirements with the finish trade contractor(s).

D. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas.

E. Patch existing finished surfaces and building components using new materials matching existing materials and experienced Installers. Installers' qualifications refer to the materials and methods required for the surface and building components being patched.

3.4 CLEANING

A. This contractor shall be required to thoroughly clean all installed equipment, ductwork and piping. Cleaning shall be required before substantial completion on any phase of the project. Do not use cleaning materials and agents that are hazardous to health or property or that may damage the finished surfaces.

END OF SECTION 230010

ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 230030 - 1

SECTION 230030 – ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Electrical connections to equipment specified under other Divisions or furnished by Owner.

1.2 REFERENCES

A. NEMA WD 1 - General Purpose Wiring Devices

B. NEMA WD 6 - Wiring Device Configurations.

C. ANSI/NFPA 70 - National Electric Code.

1.3 COORDINATION

A. Obtain and review shop drawings, product data, and manufacturer's instructions for equipment furnished under other Divisions.

1. Should there be a difference between the design and the installed equipment; change orders shall only be paid for the difference in the rough-ins. If the Division 26 Contractor installs any rough-ins prior to requesting and receiving shop drawings for the equipment to be installed, and the equipment is different than designed, the required rework shall be performed at no additional cost to the owner aside from the difference is cost between the design documents and installed equipment.

2. Should there be a need to install rough-ins ahead of equipment review and final shop drawing, the Division 26 Contractor shall submit a Request for Information, outlining the equipment to be fed, and how the schedule is impacted for review by the Engineer, Architect, Owner and Owner’s Representative.

B. Determined connection locations and requirements.

C. Sequence rough-in of electrical connections to coordinate with installation schedule for equipment.

D. Sequence electrical connections to coordinate with start-up schedule for equipment.

PART 2 - PRODUCTS

2.1 CORDS AND CAPS

A. Attachment Plug Configuration: Match receptacle configuration at outlet provided for equipment.

B. Cord Construction: Oil-resistant thermoset insulated Type SO multiconductor flexible cord with identified equipment grounding conductor, suitable for hard usage in damp locations.

C. Cord Size: Same as rating of branch circuit overcurrent protection.

ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 230030 - 2

PART 3 - EXECUTION

3.1 PREPARATION

A. Review equipment submittals prior to installation and electrical rough-in. Verify location, size, and type of connections. Coordinate details of equipment connections with supplier and installer.

B. The Contractor shall be responsible to coordinate all electrical which are installed for roof top equipment.

Refer to “Coordination” in Section 260010 for additional requirements.

3.2 EXAMINATION

A. Verify that equipment is ready for electrical connection, wiring, and energization.

3.3 ELECTRICAL CONNECTIONS

A. Electrical connections shall meet equipment manufacturer's instructions.

B. Conduit connections to equipment shall use flexible conduit. Liquidtight flexible conduit with watertight connectors shall be used in damp or wet locations.

C. Wiring connections shall use wire and cable with insulation suitable for temperatures encountered in heat producing equipment.

D. Receptacle outlets shall be used where connection with attachment plug is indicated. Where attachment plug is required, equipment shall have a cord and cap.

E. Suitable strain-relief clamps and fittings shall be used for cord connections at outlet boxes and equipment connection boxes.

F. Disconnect switches, controllers, control stations, and control devices shall be located as indicated and per NEC requirements.

G. Verify proper rotation of three phase equipment.

H. Where applicable, power wiring shall be extended through external disconnect switches, local control switches, remote mounted control panels, etc. and connected to terminals in the equipment.

I. Where applicable, wire and conduit shall be extended between control device (start/stop pushbuttons or lighted handle switch) and combination starter/disconnect switches.

J. Coolers and Freezers: freezer and cooler walls, floors and ceilings shall be cut and sealed around conduit openings.

3.4 MISCELLANEOUS CONNECTIONS

A. Fire alarm, security, data, telephone and other low voltage connections shall be installed as required at equipment.

3.5 CONTRACTOR RESPONSIBILITIES (DIVISION 23 CONTRACT)

A. HVAC Control System Panels & Equipment Controls

1. 120 volt – 1 phase.

ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 230030 - 3

2. Division 23 Contractor shall provide power connection to control panel from nearest 120/208 volt electrical panel. Power for control panels for equipment being fed from the emergency generator, including, but not limited to boilers, heating pumps, selected air handling and terminal equipment, etc., shall be derived from the nearest 120/208 volt normal/emergency panel.

3. In addition to HVAC control system panels, where terminal equipment, including, but not limited to shut-off VAV boxes are provided with 120V connection, Division 23 Contractor shall provide power connection to the unit as described above.

4. Division 26 Contractor shall assist the Division 23 Contractor in locating the appropriate panel, ensure there is a spare 20A/1P breaker to feed the control panels and label breaker accordingly.

5. All wiring associated with the unit shall be by the Division 23 Contractor per manufacturer requirements.

B. Duct-mounted Smoke Detector

1. Division 26 Contractor shall furnish duct mounted smoke detector, including detector base and appropriately sized sampling tube for duct being installed.

2. Division 23 Contractor shall install sampling tube and detector base in duct. Coordinate exact location with Division 26 Contractor.

3. Division 26 Contractor shall install detector in base, wire and program into fire alarm system.

4. Division 26 Contractor shall provide relay, and wiring to associated HVAC unit from fire alarm system so that unit shuts down and supervisory signal is provided upon detection of smoke. Refer to Division 28 “Fire Alarm and Detection System” and drawings for additional requirements.

5. Any other connections and/or equipment required shall be furnished and installed by the Division 23 Contractor.

6. Any other connections and/or equipment required shall be furnished and installed by the Division 23 Contractor.

C. Ductless Air Conditioner (DAC-1)

1. 208 volt – 1 phase.

2. 2-pole toggle switch shall be furnished and installed by the Division 26 Contractor adjacent to unit.

3. Division 26 Contractor shall wire through switch and make one power connection to the line side terminals in the unit.

4. Power wire for DAC unit shall come from the exterior unit. In systems where indoor unit receives separate power feed, provide junction box adjacent to the disconnect at the outdoor unit and run to the indoor unit for connection so that a single breaker controls both units.

5. All other wiring within the unit and between the unit and associated condensing unit shall be by the Division 23 Contractor per manufacturer requirements.

D. Outdoor Rooftop Packaged Air Handling Units (RTU-1,2,3,4)

1. 208 volt – 3 phase.

2. All wiring from the input terminals to the respective devices in the unit shall be factory installed by the equipment manufacturer.

3. Starters with overload protection or variable frequency drive(s) for the fans shall be furnished and installed by equipment manufacturer.

4. Division 26 Contractor shall provide a NEMA 3R fused disconnect switch, installed, where coordinated with the Division 23 Contractor to ensure all access doors remain functional. This fused disconnect switch shall be provided regardless of whether the unit is provided with a unit mounted disconnect.

5. Division 26 Contractor shall make one power connections to the unit terminals.

6. Equipment manufacturer shall provide control power transformer as required to power controls, unit lighting and convenience outlet and other 120V accessories as required.

7. All other wiring in the unit shall be factory installed by the equipment manufacturer.

8. Any other connections and/or equipment required shall be furnished and installed by the Division 23

Contractor.

ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 230030 - 4

E. Outdoor Rooftop Gas Fired Make-Up Air Units (MAU-1A,1B)

1. 208 volt – 1 phase.

2. All wiring from the input terminals to the respective devices in the unit shall be factory installed by the equipment manufacturer.

3. Starters with overload protection or variable frequency drive(s) for the fans shall be furnished and installed by equipment manufacturer.

4. Division 26 Contractor shall provide a NEMA 3R fused disconnect switch, installed, where coordinated with the Division 23 Contractor to ensure all access doors remain functional. This fused disconnect switch shall be provided regardless of whether the unit is provided with a unit mounted disconnect.

5. Division 26 Contractor shall make one power connections to the unit terminals.

6. Any other connections and/or equipment required shall be furnished and installed by the Division 23

Contractor.

F. Condensing Boiler (Gas) (B-1)

1. 120 volt – 1 phase.

2. Thermal overload switch shall be furnished and installed by the Division 26 Contractor adjacent to unit.

3. Division 26 Contractor shall wire through switch and make one power connection to the line side terminals in the unit.

4. Any other connections and/or equipment required shall be furnished and installed by the Division 23

Contractor.

G. Electric Cabinet Unit Heaters (ECH-1)

1. 120 volt – 1 phase.

2. Fused disconnect switch in unit by equipment manufacturer.

3. Division 26 Contractor shall make one power connection to the unit.

Any other connections and/ or equipment required shall be provided by Division 23 Contractor.

H. Electric Unit Heaters (EUH-1)

1. 208 volt – 3 phase.

2. Fused disconnect switch furnished and installed by Division 26 Contractor adjacent to the unit.

3. Division 26 Contractor shall make one power connection to the unit through the switch.

4. Any other connections and/ or equipment required shall be provided by Division 23 Contractor.

I. Air Cooled Condensing Unit (CU-1)

1. 208 volt – 1 phase

2. Division 26 contractor shall furnish and install a NEMA 3R fused disconnect switch at unit and shall extend power wiring thru switch to unit and shall make one connection to terminals in unit.

3. Where CU is associated with an indoor DAC, power wire for AC unit shall come from the exterior unit.

In systems where indoor unit receives separate power feed, provide junction box adjacent to the disconnect at the outdoor unit and run to the indoor unit for connection so that a single breaker controls both units.

4. All other wiring within the unit and between the unit and associated indoor unit shall be by the Division 23 Contractor per manufacturer requirements.

J. Roof Fans (EF-1,2,3,4)

1. 120 volt – 1 phase.

2. Integral disconnect switch provided by the equipment manufacturer.

3. Division 26 Contractor shall install Division 23 Contractor speed control in space being served by fan.

Coordinate location in field for balancing.

4. Division 26 Contractor shall make one power connection through speed control where applicable.

5. Any other connections and/ or equipment required shall be provided by Division 23 Contractor.

ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 230030 - 5

K. Energy Recovery Units (ERU-1)

1. 208 volt – 3 phase.

2. All wiring from the input terminals to the respective devices in the unit shall be factory installed by the equipment manufacturer.

3. Starters with overload protection or variable frequency drive(s) for the fans shall be furnished and installed by equipment manufacturer.

4. Division 26 Contractor shall provide a fused disconnect switch, extend power wiring through the disconnect switch to the control panel and make one power connection to terminals in unit.

5. All other wiring in the unit shall be factory installed by the equipment manufacturer.

6. Any other connections and/or equipment required shall be furnished and installed by the Division 23

Contractor.

L. Fan Powered Variable Air Volume Box with Electric Reheat (FPV-1,2,3)

1. 208 volt - 3 phase.

2. Division 26 Contractor shall provide a disconnect switch adjacent to unit and shall extend power wiring thru disconnect to unit and shall make one connection to terminals in unit.

3. Any other connections and/or equipment required shall be furnished and installed by the Division 23

Contractor.

M. Pumps (P-1)

1. 120 volt – 1 phase.

2. Thermal overload switch shall be furnished and installed by the Division 26 Contractor. Division 26

Contractor shall install switch adjacent to the unit.

3. Division 26 Contractor shall run power wiring thru overload switch and make one power connection.

4. Any other connections and/or equipment required shall be furnished and installed by the Division 23

Contractor.

3.6 CONTRACTOR RESPONSIBILITIES (DIVISION 22 CONTRACT)

A. Water Heater Package Type Oil/Gas (DWH-1)

1. 120 volt – 1 phase.

2. Integral factory wired control panel shall be provided by the manufacturer. Control panel shall include all starters, overload protection, and control transformer.

3. Division 26 Contractor shall furnish and install toggle switch adjacent to unit and extend power wiring through the switch to the control panel and make one power connection.

4. Any other connections and/or equipment required shall be furnished and installed by the Division 22

Contractor.

B. Recirculating Pumps (CP-1)

1. 120 volt – 1 phase.

2. Thermal overload switch or starter/disconnect switch shall be furnished and installed by the Division

26 Contractor adjacent to the unit. Wire thru switch to pump motor.

3. Any other connections and/or equipment required shall be furnished and installed by the Division 22

Contractor.

C. Electric Water Cooler

1. 120 volt – 1 phase.

2. Division 26 Contractor shall refer to Electric Water Cooler shop drawings and furnish and install a duplex receptacle contained within the enclosure where applicable, or provide direct connection where cord and plug is not provided.

3. Any other connections and/or equipment required shall be furnished and installed by the Division 22 Contractor.

ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 230030 - 6

3.7 CONTRACTOR RESPONSIBILITIES (GENERAL CONTRACT)

A. Sewage Grinder Pump

1. 240 volt – 1 phase.

2. Stanchion mounted exterior weatherproof control panel with disconnect switch shall be provided by the General Contractor.

3. Division 26 Contractor shall provide buck-boost transformer inside the building and wire to line side of exterior control panel and make single point power connection. All wiring from load side of control panel to grinder pump is the responsibility of the General Contractor.

4. Division 26 Contractor shall provide 1” spare conduit with pull string to grinder pump and Division 23 Contractor shall provide control wiring for connection to building automation system.

5. Any other wiring connections and/or equipment required shall be furnished and installed by the General Contractor.

END OF SECTION 230030

METERS AND GAUGES FOR HVAC PIPING 230530 - 1

SECTION 230530 - METERS AND GAUGES FOR HVAC PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: Thermometers, Gauges, Test plugs and accessories.

1.3 SUBMITTALS

A. Submit Product Data for type of product.

B. Provide operation installation and maintenance data.

PART 2 - PRODUCTS

2.1 METAL-CASE, LIQUID-IN-GLASS THERMOMETERS

A. Manufacturers: Subject to compliance with requirements, provide fully adjustable angle thermometers by one of the following:

1. Palmer - Wahl Instruments Inc.

2. Trerice, H. O. Co.

3. Weiss Instruments, Inc.

4. Weksler Instruments Operating Unit; Dresser Industries; Instrument Div.

5. Miljoco Corporation.

B. Case: Cast aluminum with dark blue epoxy coating, 9 inches long.

C. Window: Clear acrylic for temperatures up to 300 deg. F; glass for higher temperatures.

D. Tube: blue reading, organic filled.

E. Window: Clear acrlylic.

F. Stem: brass for thermowell installation and of length to suit installation.

G. Accuracy: Plus or minus 1 scale division.

2.2 THERMOWELLS

A. Manufacturers: Same as manufacturer of thermometer being used.

METERS AND GAUGES FOR HVAC PIPING 230530 - 2

B. Description: Pressure-tight, brass construction, socket-type metal fitting made for insertion into piping and of type, diameter, and length required to hold thermometer.

2.3 PRESSURE GAUGES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Palmer - Wahl Instruments Inc.

2. Trerice, H. O. Co.

3. Weiss Instruments, Inc.

4. Weksler Instruments Operating Unit; Dresser Industries; Instrument Div.

5. Miljoco Corporation.

B. Dial-Type Pressure Gauges: Indicating-dial type complying with ASME B40.100.

1. Case: Liquid-filled type, fiberglass reinforced polypropylene, 4-1/2-inch diameter, solid front, blow-out back.

2. Pressure-Element Assembly: Bronze tube.

3. Pressure Connection: Brass, NPS ¼ or ½”.

4. Movement: Stainless steel rotary type with stainless steel bushings.

5. Dial: Satin-faced, nonreflective aluminum with permanently etched scale markings.

6. Pointer: Red or other dark-color metal.

7. Window: Acrylic plastic.

8. Accuracy: plus or minus .5 percent range.

9. Vacuum-Pressure Range: 30-in. Hg of vacuum to 150 psig of pressure.

10. Range for Fluids under Pressure: Two times operating pressure.

11. Temperature range: 250 deg. F for heating systems; 150 Deg. F for all other hydronic systems.

C. Pressure-Gauge Fittings:

1. Valves: NPS 1/4 brass or stainless-steel needle type valve.

2.4 TEST PLUGS

A. Manufacturers: Subject to compliance with requirements provide test plug (PT Plug) products by one of the following:

1. Flow Design, Inc.

2. Peterson Equipment Co., Inc.

3. Sisco Manufacturing Co.

4. Trerice, H. O. Co.

5. Watts Industries, Inc.; Water Products Div.

B. Description: Ports are to be suitable to accept thermometer stem or pressure gauge adapter and shall have dual EPDM internal seals, threaded brass cap with metal retainer strap. Ports are to be adequate length and suitable for installation in insulated or non insulated piping.

C. Construction: Brass body with dual EPDM seals.

D. Minimum Pressure and Temperature Rating: 1000 psig at 270 deg F.

METERS AND GAUGES FOR HVAC PIPING 230530 - 3

3.1 THERMOMETER APPLICATIONS

A. Install thermometers where indicated on the drawings, see plans and detail drawings.

B. Provide the following temperature ranges for thermometers

1. Heating Hot Water System: 30 to 240 deg. F, with 2-degree scale divisions.

3.2 GAUGE APPLICATIONS

A. Install pressure gauges where indicated in other Division 23 Sections and where indicated on the drawings plans and detail drawings.

3.3 INSTALLATIONS

A. Install direct-mounting thermometers and adjust vertical and tilted positions.

B. Install thermowells with socket extending to center of pipe and in vertical position in piping tees where thermometers are indicated.

C. Install pressure gauges in piping tees with pressure gauge located on pipe at most readable position.

D. Install shut-off needle-valve and snubber fitting in piping for each pressure gauge and thermometer.

E. Install test plugs in tees in piping.

3.4 CONNECTIONS

A. Install meters and gauges adjacent to machines and equipment to allow service and maintenance for meters, gauges, machines, and equipment.

3.5 ADJUSTING

A. Calibrate meters according to manufacturer’s written instructions, after installation.

B. Adjust faces of meters and gauges to proper angle for best visibility.

END OF SECTION 230530

GENERAL DUTY VALVES FOR HVAC PIPING 230540 - 1

SECTION 230540 – GENERAL DUTY VALVES FOR HVAC PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This section includes various types of general duty valves used in HVAC systems.

1.3 SUBMITTALS

A. Product Data: For each type of valve indicated.

1.4 QUALITY ASSURANCE

A. Source Limitations: Obtain each type of valve from the same manufacturer.

B. ASME Compliance:

1. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

2. ASME B31.9 for building services piping valves.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping per the manufacturer’s recommendations and to prevent damage during shipping.

B. Store valves per the manufacturer’s recommendations.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS FOR VALVES

A. Refer to Part 3 for HVAC valve schedule and applications of valves.

B. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

C. Valve Sizes: Same as upstream piping unless otherwise indicated.

GENERAL DUTY VALVES FOR HVAC PIPING 230540 - 2

2.2 BRONZE BALL VALVES

A. Two-Piece, Full-Port, Bronze Ball Valves:

1. Manufacturers: Subject to compliance with requirements provide products by one of the following:

a. Conbraco Industries, Inc.

b. Crane Co.; Crane Valve Group.

c. Hammond Valve.

d. Milwaukee Valve Company.

e. NIBCO INC.

2. Description:

a. Manufactured to comply with standard MSS SP-110.

b. Rated for 150 psig SWP and 600 psig CWP.

c. Two-piece cast bronze body.

d. Seats: TFE.

e. Anti-blowout stem and chrome plated bronze ball.

3. Where valves are to be installed in insulated piping, provide extended handles with memory stop, and made of a non-thermal conductive material. Provide a protective sleeve to allow operation of the valve without damaging the insulation.

2.3 BRONZE SWING CHECK VALVES

A. Class 150, Bronze Swing Check Valves with Bronze Disc:

1. Manufacturers: Subject to compliance with requirements provide products by one of the following:

a. Crane Co.

b. Milwaukee Valve Company.

c. NIBCO INC.

2. Description:

a. Manufactured to comply with MSS SP-67.

b. CWP Rating: 300 psig.

c. Body Design: Horizontal flow.

d. Body Material: bronze.

e. Disc: bronze.

2.4 IRON SWING CHECK VALVES

A. Class 125, Iron Swing Check Valves with Metal Seats:

1. Manufacturers: Subject to compliance with requirements provide products by one of the following:

a. Crane Co.; Crane Valve Group; Crane Valves.

b. Milwaukee Valve Company.

c. NIBCO INC.

GENERAL DUTY VALVES FOR HVAC PIPING 230540 - 3

2. Description:

a. Standard: MSS SP-71, Type I.

b. NPS 2-1/2 to NPS 12, CWP Rating: 200 psig.

c. Body Design: Clear or full waterway.

d. Body Material: ASTM A 126, gray iron with bolted bonnet.

e. Ends: Flanged.

f. Trim: Bronze.

2.5 IRON, GROOVED-END SWING CHECK VALVES

A. 300 CWP, Iron, Grooved-End Swing Check Valves:

1. Manufacturers: Subject to compliance with requirements provide products by one of the following:

a. Anvil International, Inc.

b. Victaulic Company.

2. Description:

a. CWP Rating: 300 psig.

b. Body Material: ASTM A 536, ductile iron.

c. Seal: EPDM.

d. Disc: Spring operated, ductile iron or stainless steel.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Do not attempt to repair defective valves; replace with new valves.

3.2 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

GENERAL DUTY VALVES FOR HVAC PIPING 230540 - 4

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valve applications are not indicated, use the following:

1. Shutoff Service: Ball or butterfly valves.

2. Throttling Service except Steam: Ball, or butterfly valves.

3. Pump-Discharge Check Valves:

a. NPS 2 and Smaller: Bronze swing check valves with bronze disc.

b. NPS 2-1/2 and Larger: Iron swing check valves with lever and weight or with spring or iron, center-guided, resilient-seat check valves.

B. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP classes or CWP ratings may be substituted.

END OF SECTION 230540

IDENTIFICATION FOR HVAC SYSTEMS 230570 - 1

SECTION 230570 - IDENTIFICATION FOR HVAC SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following identification materials:

1. Equipment markers.

2. Duct markers.

3. Warning tags.

B. Refer to other Division 23 Specification Sections for requirements to label and identify materials, equipment and accessories relating to other components of the HVAC System(s).

1.3 SUBMITTALS

A. Submit Product Data for type of marker and tag along with a schedule where each type will be installed.

1.4 COORDINATION

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with location of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Provide identification materials available through Craftmark Pipe Markers or equal.

2.2 EQUIPMENT MARKERS

A. Equipment Markers: 1/8” thick black plastic tag with engraved data in white letters, pre-drilled holes for permanent attachment on equipment.

1. Minimum marker size: 4” wide by 2” high. Length and width to be larger if required for marker content.

2. Minimum letter size: ½”.

3. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate material.

4. Marker content: equipment name tag as shown on the drawings (i.e., AHU-1).

IDENTIFICATION FOR HVAC SYSTEMS 230570 - 2

2.3 DUCTWORK IDENTIFICATION

A. Manufactured self-adhesive vinyl peel off markers, 4” x 24” with bold 2” letters. Include airflow direction, duct service (such as supply, return, and exhaust and air handling system identification (i.e. AHU-2 SUPPLY

AIR).

PART 3 - EXECUTION

3.1 EQUIPMENT IDENTIFICATION

A. Install and permanently fasten equipment markers on each major item of HVAC equipment. Locate nameplates where accessible and visible. Nameplates are not required for HVAC equipment that is exposed to view in finished areas such as corridors, stairs, offices and classrooms. Include nameplates for the following general categories of equipment:

1. Air Terminal Units.

2. Rooftop Units

3. Make Up Air Units

4. Boilers

5. Pumps

6. Exhaust Fans

3.2 PIPING IDENTIFICATION

A. Provide labels for all piping systems including:

1. Heating Hot Water Supply and Return Piping.

B. Locate pipe markers where piping is above accessible ceilings, exposed in machine and/or equipment rooms and in maintenance spaces such as shafts, tunnels, and plenums as follows:

1. Near each valve and control device.

2. Near each branch connection, excluding short takeoffs for fixtures and terminal units. Where flow pattern is not obvious, mark each pipe at branch.

3. Near penetrations through walls, floors, ceilings, and non-accessible enclosures.

4. At access doors, manholes, and similar access points that permit view of concealed piping.

5. Near major equipment items and other points of origination and termination.

6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in areas of congested piping and equipment.

3.3 DUCT IDENTIFICATION

A. Install duct markers with permanent adhesive on air ducts according to the following:

1. Supply ducts.

2. Return ducts.

3. Exhaust ducts.

B. Locate duct markers where ducts are above accessible ceilings, exposed in machine and\or equipment rooms and in maintenance spaces such as shafts, tunnels, and plenums as follows:

1. Near each branch connection.

2. Near penetrations through walls, floors, ceilings, and non-accessible enclosures.

3. At access doors and similar access points.

IDENTIFICATION FOR HVAC SYSTEMS 230570 - 3

4. Near major equipment items and other points of origination and termination.

5. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in areas of congested piping and equipment.

END OF SECTION 230570

HVAC SYSTEM TESTING, ADJUSTING, AND BALANCING 230600 - 1

SECTION 230600 - HVAC SYSTEM TESTING, ADJUSTING, AND BALANCING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Testing, Adjusting and Balancing (TAB) work is to be provided a qualified TAB firm and shall be part of the HVAC Contractor’s work.

B. Work under this section includes, but is not limited to, Testing, Adjusting and Balancing (TAB) of the following air systems, water systems and HVAC equipment:

1. All constant-volume and variable air volume systems.

2. All constant-flow hydronic systems.

3. Primary-secondary hydronic systems.

4. Boilers.

5. Air handling units.

6. Variable air volume units.

7. Ductwork leak testing verification.

C. All TAB work shall comply with the requirements of TAB procedures required by the Associated Air Balancing Council, National Environmental Balancing Bureau, Testing Adjusting and Balancing Bureau and ASHRAE.

D. Coordinate and witness the installation work of the HVAC Contractor including all sub-contractors working for the HVAC Contractor and Electrical Contractor. Provide progress inspections of the work to ensure the installation of all systems is progressing as required and will operate as specified when completed. Report results of the progress inspection to the Owner's Representative.

E. Provide duct system leak testing verification. The work required for leak testing of various duct systems is indicated in Section 233110. The TAB contractor is required to verify the leakage rate of the various duct systems conforms to the requirements indicated in SMACNA's "HVAC Air Duct Leakage Test Manual." Based upon satisfactory initial duct leakage test results, the testing may be reduced. At a minimum leak test the following systems:

1. All of the supply air system on the high pressure side of the VAV Boxes. w

F. Submit balancing reports for all air and water systems.

G. Validate the start-up and operation of all HVAC equipment and systems by the HVAC Contractor.

H. Validate the start-up and operation of the HVAC Controls system. Submit reports indicating the operation of all equipment, throughout the range of operation, meets the requirement of the Sequence of Operations.

1.3 DEFINITIONS

A. AABC: Associated Air Balance Council.

HVAC SYSTEM TESTING, ADJUSTING, AND BALANCING 230600 - 2

B. NEBB: National Environmental Balancing Bureau.

C. TABB: Testing Adjusting and Balancing Bureau.

D. TAB: Testing, adjusting, and balancing.

1.4 SUBMITTALS

A. Qualification Data: Within 45 days of Contractor's Notice to Proceed, submit documentation that the TAB contractor and this Project's TAB team members meet the qualifications specified herein.

1.5 QUALITY ASSURANCE

A. TAB Contractor Qualifications: Engage a TAB entity certified by NEBB, AABC and/or TABB in the testing, adjusting and balancing of both air and water systems. The firm shall guarantee that all work will be performed in accordance with the applicable NEBB, AABC and/or TABB procedures. Evidence of the firm's certification shall be provided to the engineer or designated owner's representative.

B. Instrumentation Type, Quantity, Accuracy, and Calibration: As described in ASHRAE 111, Section 5, "Instrumentation."

C. The TAB firm shall have a minimum of 5 years’ experience with projects of a similar size and scope.

1.6 PROJECT CONDITIONS

A. Partial Owner Occupancy: Owner may occupy completed areas of building before Substantial Completion.

Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations. Review the project’s construction phasing plan and provide the necessary number of TAB visits to comply with the phasing plan.

B. Review the project’s construction phasing plan and provide the necessary number of site visits to comply with the phasing plan and complete all tab work before each phase is scheduled to be complete.

PART 2 - PRODUCTS

2.1 DUCT ACCESSORY HARDWARE

A. Instrument Test Ports: Cast iron or cast aluminum to suit duct material, including screw cap and gasket. Size to allow insertion of pitot tube and other testing instruments and of length to suit the specified eternal duct insulation thickness. Provide special gaskets where test holes are to be installed in round or oval ducts. Test Ports to be Duro-Dyne model TH1, IP2 and/or IP4.

HVAC SYSTEM TESTING, ADJUSTING, AND BALANCING 230600 - 3

3.1 EXAMINATION

A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems' designs that may preclude proper TAB of systems and equipment. Examine systems for installed balancing devices, such as test ports, gage cocks, thermometer wells, flow-control devices, balancing valves and fittings, and manual volume dampers. Verify that locations of these balancing devices are accessible.

B. Refer to the Contract Drawings for notes that relate to balancing of the air and water systems.

C. Examine the approved shop drawing submittals for all HVAC systems and equipment prior to starting the TAB work.

D. Examine design data including HVAC system descriptions, statements of design assumptions for environmental conditions and systems' output, and statements of philosophies and assumptions about HVAC system and equipment controls.

E. Examine ceiling plenums and underfloor air plenums used for supply, return, or relief air to verify that they meet the leakage class of connected ducts as specified in Division 23 Section Metal Ducts, and are properly separated from adjacent areas. Verify that penetrations in plenum walls are sealed and fire-stopped if required.

F. Examine equipment performance data including fan and pump curves.

1. Relate performance data to Project conditions and requirements, including system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.

2. Calculate system-effect factors to reduce performance ratings of HVAC equipment when installed under conditions different from the conditions used to rate equipment performance. To calculate system effects for air systems, use tables and charts found in AMCA 201, "Fans and Systems," or in SMACNA's "HVAC Systems - Duct Design." Compare results with the design data and installed conditions.

G. Examine system and equipment installations and verify that field quality-control testing, cleaning, and adjusting specified in individual Sections have been performed.

H. Examine test reports specified in individual system and equipment Sections.

I. Examine HVAC equipment and filters and verify that bearings are greased, belts are aligned and tight, and equipment with functioning controls is ready for operation.

J. Examine terminal units, such as variable-air-volume boxes, and verify that they are accessible and their controls are connected and functioning.

K. Examine strainers. Verify that startup screens are replaced by permanent screens with indicated perforations.

L. Examine three-way valves for proper installation for their intended function of diverting or mixing fluid flows.

M. Examine heat-transfer coils for correct piping connections and for clean and straight fins.

N. Examine system pumps to ensure absence of entrained air in the suction piping.

O. Examine operating safety interlocks and controls on HVAC equipment.

P. Report deficiencies discovered before and during performance of TAB procedures. Observe and record system reactions to changes in conditions. Record default set points if different from indicated values.

HVAC SYSTEM TESTING, ADJUSTING, AND BALANCING 230600 - 4

3.2 PREPARATION

A. Verify all systems are complete, including controls, before starting the TAB work.

3.3 GENERAL PROCEDURES FOR TESTING AND BALANCING

A. Cut insulation, ducts, pipes, and equipment cabinets for installation of test probes to the minimum extent necessary for TAB procedures.

1. After testing and balancing, patch probe holes in ducts with same material and thickness as used to construct ducts.

2. After testing and balancing, install test ports and duct access doors where required.

3. Install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish to meet the requirements of the installation.

B. Mark equipment and balancing devices, including damper-control positions, valve position indicators, fan-speed-control levers, and similar controls and devices, with paint or other suitable, permanent identification material to show final settings.

C. Take and report testing and balancing measurements in inch-pound (IP) units.

3.4 GENERAL PROCEDURES FOR BALANCING AIR SYSTEMS

A. Prepare test reports for both fans and outlets. Obtain manufacturer's outlet factors and recommended testing procedures. Crosscheck the summation of required outlet volumes with required fan volumes.

B. For variable-air-volume systems, develop a plan to simulate diversity.

C. Determine the best locations in main and branch ducts for accurate duct-airflow measurements.

D. Check airflow patterns from the outdoor-air louvers and dampers and the return- and exhaust-air dampers through the supply-fan discharge and mixing dampers.

E. Locate start-stop and disconnect switches, electrical interlocks, and motor starters.

F. Verify that motor starters are equipped with properly sized thermal protection.

G. Check dampers for proper position to achieve desired airflow path.

H. Check for airflow blockages.

I. Check condensate drains for proper connections and functioning.

J. Check for proper sealing of air-handling-unit components.

K. Where required, verify that air duct system is sealed as specified in Division 23 Section "Metal Ducts."

L. Install instrument test holes in ducts at all required locations for testing and balancing purposes.

M. Air Handling Unit(s) filters: Provide verification of controls and provide set points for monitoring the filter pressure drop in all air handling units where indicated in Specification Section 230905 HVAC Sequence of Operation. Provide adjustment when necessary.

HVAC SYSTEM TESTING, ADJUSTING, AND BALANCING 230600 - 5

N. Building Pressurization: Provide verification of controls and provide set points for building pressurization control in various systems as indicated in Specification Section 230905 HVAC Sequence of Operation. Provide adjustment when necessary.

O. Verify performance of air flow monitors. Measure outdoor air flow at all air flow monitors and verify the measured air flows are within 5% of the air flow indicated on the BMS. Provide verification in the final balancing report.

3.5 PROCEDURES FOR CONSTANT-VOLUME AIR SYSTEMS

A. Adjust fans to deliver total indicated airflows within the maximum allowable fan speed listed by fan manufacturer.

1. Measure total airflow. Measure air flows in main ducts and at terminal outlets and inlets.

2. Measure fan static pressures as follows to determine actual static pressure:

a. Measure outlet static pressure as far downstream from the fan as practical and upstream from restrictions in ducts such as elbows and transitions.

b. Measure static pressure directly at the fan outlet or through the flexible connection.

c. Measure inlet static pressure of single-inlet fans in the inlet duct as near the fan as possible, upstream from the flexible connection, and downstream from duct restrictions.

d. Measure inlet static pressure of double-inlet fans through the wall of the plenum that houses the fan.

3. Measure static pressure across…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .