Addendum No. 5 Summary
Addendum No. 5, dated October 15, 2026, modifies the bidding documents for the Schuylkill County Emergency Training Facility construction project (Project No. 0325-900015.01) administered by Benesch on behalf of Schuylkill County, Pennsylvania. The addendum addresses four separate prime contracts: General Construction, Plumbing Construction, HVAC Construction, and Electrical Construction. Key modifications include updates to project specifications across multiple divisions, including a 24" x 36" cast aluminum dedication plaque with a $4,000 cash allowance, a 30-foot aluminum flagpole with American flag, revisions to door hardware schedules, and expansions of utility specifications. Sealed bids are due online via PennBid by Wednesday, October 21, 2026, at 9:00 AM prevailing time, with bid results available following the Board of Commissioners meeting and a tentative award date of October 28, 2026. The addendum supersedes and clarifies information contained in the September 2026 bidding documents and previous addenda, and bidders must acknowledge receipt through the PennBid system.
The addendum includes significant technical specification revisions across multiple divisions, including updates to site water service utility laterals, storm utility drainage piping, HVAC system insulation, HVAC system controls, and packaged outdoor energy recovery units. Notable additions include Ductile Iron Pipe and High-Density Polyethylene (HDPE) tubing as approved piping materials for water service laterals, and expansion of manufacturer options for packaged outdoor energy recovery units. The HVAC system controls section specifies Nexgen Automation as the only acceptable subcontractor for the campus-wide Building Management System, with designated regional contacts provided. Architectural plan revisions include door schedule modifications and detail adjustments. All bidders must submit certified checks or bid bonds equal to 10 percent of the total bid, and the successful contractor will be required to furnish Performance and Payment Bonds in an amount equal to 100 percent of the contract price. Davis-Bacon wage rates apply to this contract.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
400 One Norwegian Plaza
Pottsville, PA 17901 www.benesch.com
P 570-622-4055
Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum 5 - Not yet issued\Addendum No5_20261015.docx
ADDENDUM NO. 5
To: All Perspective Bidders
Date: October 15, 2026
From: Kevin Marmas, P.E. Benesch
Subject: Schuylkill County – Emergency Training Facility
Addendum No. 5 – Project No. 0325-900015.01
Bid Receipt: Bid will be received online via the PennBid Program by the Schuylkill County Controller until
Wednesday, October 21, 2026, at 9:00 AM, (prevailing time).
This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated September
2026 as follows:
1. Project Manual Table of Contents: Has been updated and is attached to this addendum.
2. Section 01010 - Summary of Work: - Revise Subsection 1.3.D.4.a.4 to read: A dedication plaque for the project which will include the name of the building, names of the officials involved, names of the contractors and professionals. The plaque shall be 24” x 36” bevel- edged cast aluminum plaque with pebble background. The Base Bid for the Contract No. 1 (General Construction Contract) will include
Cash Allowance of $4,000.00 for furnishing and installing this dedication plaque.
3. Section 01010 - Summary of Work: - Revise Subsection 1.3.D.4.a.5 to read: A Thirty (30) feet high x Six
(6) inch diameter Aluminum Flag Pole (.156) with clear satin aluminum finish, with a flag and halyard.
Pole to be Flagpoles, ETC Kennedy Series - Internal Halyard Cam Cleat Aluminum Flagpole with
Reinforced Welded Door or approved equal. Foundation sizing in accordance with manufacturer recommendations and code requirements. Foundation in accordance with manufacturer recommendations and Section 03300 - "Cast-in-Place Concrete - Site Work". Item includes purchase and installation of a 5'x8' American Flag.
4. Section 08710 – Door Hardware Schedule: Has been updated and is attached to this addendum.
5. Section 33141 – Site Water Service Utility Laterals: Has been updated to included Ductile Iron Pipe and
HDPE Tubing as piping and fitting materials. This updated Section 33141 is attached to this addendum.
6. Section 33410 – Storm Utility Drainage Piping: Has been updated to included Underground Roof Drain
PVC piping. This updated Section 33410 is attached to this addendum.
7. Section 33650 – Ductile Iron Pipe and Fittings: Is now added to the Division 31 (Civil Specifications) and is attached to this addendum.
8. Section 33655 – High Density Polyethylene (HDPE) Pipe and Fittings: Is now added to the Division 31
(Civil Specifications) and is attached to this addendum.
9. 230700 – HVAC System Insulation (Replace Item #2 in Addendum 4 with the following): Refer to
Section 2.5; “Exterior Duct and Plenum Insulation”. Add the following sub-section:
B. In lieu of the Techna-Duc system specified in A. contractor can use 2” of rigid exterior
Fiberglass duct insulation, (R-12), with a weather tight cover. Weather tight cover shall be Venture Clad 1579GCW-WME, or equal. The exterior insulation is in addition to the
1” duct liner specified.
10. Section 230900 – HVAC System Controls: Revise Subsection 1.2.F to read:
400 One Norwegian Plaza
Pottsville, PA 17901 www.benesch.com
P 570-622-4055
Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum 5 - Not yet issued\Addendum No5_20261015.docx
ADDENDUM NO. 5
The facility has standardized on a campus wide BMS system by Nexgen Automation. Nexgen
Automation is the ONLY acceptable sub-contractor. Contact: 1.) Shane Winters (Central
PA): shane.winters@nexgenpa.com (717) 645-7739; 2.) Corey Ferguson (East of Berks
County): corey.ferguson@nexgenpa.com (484) 375-7037.
11. Section 237525 – Packaged Outdoor Energy Recovery Units: Items #3 and #4 in Addendum 4 should be revised to refer to Section 237525 instead of Section 238725
12. Section 237525 – Packaged Outdoor Energy Recovery Units (Replace Item #3 in Addendum 4 with the following): Refer to section 2.1 “Manufactures” add the following additional manufacturer:
5. Valient HVAC, LLC
13. Drawing Changes:
a. Land Development Plan for Construction – Sheet 5 of 15; Water meter vault location now indicated and proposed waterline layout adjusted to enter meter vault.
b. Land Development Plan for Construction – Sheet 12 of 15 Grinder Pump and Lateral
Installation Detail; Proposed force main line from grinder pump to the valve box is now indicated to be one and one-quarter inch (1-1/4”) diameter.
c. Architectural Plans – Sheet A.6.1 – Door Schedule: Revise Door #200 in the Door Schedule to be a pair of doors, (2) 3’-0” X 6’-8” doors with Hardware Set No. 6.
d. Architectural Plans – Sheet A.6.1 – Door Schedule: Delete Door #207 from the Door Schedule.
There is no Door #207.
e. Architectural Plans – Sheet A.6.1 – Door Schedule: Revise Door #209 in the Door Schedule to be specified as a single, 3’-0” X 6’-8” door.
f. Architectural Plans – Sheet A.6.1 – Details 6/A.6.1; 7/A.6.1; and 8/A.6.1: Revise as indicated in attached detail revisions and add.
14. Questions asked on PennBid: Please note, the attached additional (PENNBID Public Q&A) questions and the official responses are officially included as part of the bid documents.
This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
The Bidder shall acknowledge receipt of this Addendum in the appropriate space on PennBID.
End of Addendum No. 5
TABLE OF CONTENTS
BIDDING REOUIREMENTS (The items with * shall be submitted as part of bid package.)
Invitation to Bid
Instruction to Bidders [AIA Document A701-2018 will be a part of this Contract. A sample copy is available upon request.]
General Conditions [AIA Document A201-2017 will be a part of this Contract. A sample copy is available upon request.]
Agreement between Owner and Contractor [AIA Document A101-2017 will be a part of this
Contract. A sample copy is available upon request.]
Supplementary Conditions
Davis Bacon Wage Rates
Form of Bid*
Bid Bond*
Performance Bond
Labor and Materials Payment Bond
Maintenance Bond
Bidders Qualification Statement*
TECHNICAL SPECIFICATIONS
[UNDER CONTRACTS NO. 1, 2, 3 and 4)
Division 1 01010
01035
01290
01330
01500
01731
01770
01782
Summary of Work
Contract Modification Procedure
Payment procedures
Submittal Procedures
Temporary Facilities and Controls
Cutting and Patching
Closeout Procedures
Operation and Maintenance Data
[UNDER CONTRACT NO. 1: GENERAL CONSTRUCTION)
Division 3 03300
Division 4 04810
Cast-in-Place Concrete
Unit Masonry Assemblies
Division 5
Division 6
05120
05210
05310
05400
05500
06100
06202
06402
Structural Steel
Steel Joist Framing
Steel Deck
Cold-Formed Metal Framing
Metal Fabrications
Rough Carpentry
Interior Finish Carpentry
Interior Architectural Woodwork
Division 7 07210
07421
Building Insulation
Metal Wall Panel
TOC-I
07531
07620
07920
EPDM Roofing
Sheet Metal Flashing & Trim
Joint Sealant
Division 8 08111
08141
08360
08460
08520
08710
Hollow Metal Doors and Frames
Flush Wood Doors
Insulated Sectional Steel Doors
Automatic Entrance Doors
Aluminum Windows
Door Hardware Schedule
Division 9 09255
09512
09651 09900
093013
Division 10 10155
10431 10522 10523
10650
Division 30 30100
Division 31 01060
01120
01712
03300
13000
22131
31000
31100
31250
32121
32171
32172
32311
32920
33141
33410
33650
33655
Gypsum Wallboard Assemblies
Acoustical Tile Ceiling
Resilient Floor Tile
Painting
Ceramic Tiling
Toilet Compartments
Signage
Fire Extinguisher Cabinet
Fire Extinguisher
Operable Partitions
Aggregate Piers
Mobilization-Demobilization
Summary
Construction Survey
Cast-in-Place Concrete-Site Work
Special Construction
Facility Sanitary Sewers-Site Work
Earthwork
Site Clearing
Soil Erosion & Sediment Control
Asphalt Paving
Parking Bumpers
Pavement Markings
Chain Link Fences and Gates
Turf & Grasses
Site Water Service Utility Laterals
Storm Utility Drainage Piping
Ductile Iron Pipe and Fittings
High-Density Polyethylene (HDPE) Pipe and Fittings
[UNDER CONTRACT NO. 2: PLUMBING CONSTRUCTION)
Division 22 PLUMBING Specifications
[UNDER CONTRACT NO. 3 HVAC CONSTRUCTION)
Division 23 HVAC Specifications
[UNDER CONTRACT NO. 4: ELECTRICAL CONSTRUCTION]
Division 26 Electrical Specifications
End of Table of Contents
SECTION 08710 - DOOR HARDWARE SCHEDULE
END OF SECTION 08710
EMA Fire School Building Project No. 0325-900015.01
SITE WATER SERVICE UTILITY LATERALS (REVISED ADDENDUM NO. 5) Section 33141
SITE WATER SERVICE UTILITY LATERALS 33141 - 1
SECTION 33141 - SITE WATER SERVICE UTILITY LATERALS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Water piping and fittings.
2. Corporation stop assemblies.
3. Curb stop assemblies.
4. Backflow preventers.
B. Related Requirements:
1. Section 22110 "Facility Water Distribution" for connections to building water service.
2. Section 31051 "Soils for Earthwork" for backfill-soil type.
3. Section 31051 "Aggregates for Earthwork" for bedding- and cover-material type.
4. Section 31231 "Trenching" for excavation of pipe trench.
5. Section 31232 "Fill" for backfilling of trench.
6. Section 33011 "Disinfection of Water Utility Piping Systems" for flushing and disinfecting of water system.
7. Section 33050 "Thrust Restraint for Utility Piping" for thrust restraints as required by this
Section.
8. Section 33650 “Ductile Iron Pipe and Fittings” for materials, installation, and testing requirements for ductile iron piping used in underground utility systems.
9. Section 33655 “High-Density Polyethylene (HDPE) Pipe and Fittings” for high-density polyethylene (PE 3406/3608/4710) dual rated pipe with ductile iron pipe size (DIPS)
O.D. buried pressure pipe intended for the transportation of potable water.
1.2 SUBMITTALS
A. Product Data:
1. Water piping and fittings.
2. Corporation stop assemblies.
3. Curb stop assemblies.
4. Backflow preventers.
B. Field Quality-Control Reports: For utility laterals as specified in this Section.
C. Qualifications Statement: For manufacturer.
SITE WATER SERVICE UTILITY LATERALS 33141 - 2
1.3 CLOSEOUT SUBMITTALS
A. Project Record Documents: Record actual locations of piping mains, curb stops, connections, thrust restraints, pressure-pipe centerline elevations, and gravity-pipe invert elevations.
B. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.4 QUALITY ASSURANCE
A. Manufacturers Qualifications: Company specializing in manufacturing products specified in this
Section with a minimum of three years' documented experience.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
B. Store materials according to manufacturer instructions.
C. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
PART 2 - PRODUCTS
2.1 PIPE MATERIALS
A. Perform Work in accordance with the requirements in the Piping Schedule or as indicated on the plans.
2.2 WATER PIPING AND FITTINGS
A. Copper Tubing:
1. Comply with ASTM B88.
2. Type: K annealed.
3. Fittings: Cast copper ASME B16.18.
4. Joints: Compression connection or BCuP silver braze; AWS A5.8/A5.8M.
B. Ductile Iron Pipe
1. Refer to Section 33650 – Ductile Iron Pipe and Fittings
C. HDPE Tubing
1. Refer to Section 33655 – High-Density Polyethylene (HDPE) Pipe and Fittings
SITE WATER SERVICE UTILITY LATERALS 33141 - 3
2.3 CORPORATION STOP ASSEMBLIES
A. Manufacturers:
1. A.Y. McDonald Mfg. Co.
2. Hydro Instruments.
3. Mueller Co.
B. Corporation Stops:
1. Comply with ASTM B62.
2. Body: Brass or red brass alloy.
3. Inlet End: Threaded for tapping according to AWWA C800.
4. Outlet End: Suitable for service pipe specified.
C. Service Saddles:
1. Type: Double strap.
2. Designed to hold pressures in excess of pipe working pressure.
2.4 CURB STOP ASSEMBLIES
A. Manufacturers:
1. A.Y. McDonald Mfg. Co.
2. Mueller Co.
B. Curb Stops:
1. Body: Brass or red brass alloy.
2. Comply with ASTM B62.
3. Valve Type: Plug.
4. Sealing: Positive pressure.
C. Curb Boxes and Covers:
1. Body: Cast iron.
2. Type: Extension or Buffalo.
3. Base: Minneapolis or arch pattern.
4. Lid:
a. Inscription: WATER.
b. Plug: Pentagonal.
2.5 MATERIALS
A. Bedding: Fill Type as specified on the construction drawings.
B. Cover: Fill Type as specified on the construction drawings.
SITE WATER SERVICE UTILITY LATERALS 33141 - 4
C. Soil Backfill from Above Pipe to Finish Grade:
1. Soil Type as specified on the construction drawings.
2. Subsoil: No rocks greater than 6 inches in diameter, frozen earth, or foreign matter.
2.6 ACCESSORIES
A. Pipe Markers: As specified in Section 330597 "Identification and Signage for Utilities."
B. Thrust Restraints: As specified in Section 33050 "Thrust Restraint for Utility Piping."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Cut pipe ends square, ream pipe and tube ends to full pipe diameter, and remove burrs.
B. Remove scale and dirt from inside and outside of piping before assembly.
C. Prepare pipe connections to equipment with flanges or unions.
3.3 INSTALLATION OF SITE WATER SERVICE UTILITY LATERALS
A. Corporation Stop Assemblies:
1. Make connection for each different kind of water main, using suitable materials, equipment, and methods as approved by Architect/Engineer.
2. Provide service clamps for mains constructed of materials other than cast iron or ductile iron.
3. Location:
a. Screw corporation stops directly into tapped and threaded iron main at 10- and 2-o'clock positions along main's circumference.
b. Locate and stagger corporation stops at least 12 inches apart longitudinally.
4. Use seals or other devices such that no leaks are present in mains at points of tapping.
5. Do not backfill and cover service connections until installation has been approved by
Architect/Engineer.
B. Bedding:
SITE WATER SERVICE UTILITY LATERALS 33141 - 5
1. Excavate pipe trench as specified.
2. Placement:
a. Place bedding material as indicated on Drawings.
b. Level fill materials in one continuous layer not exceeding 8 inches of compacted depth.
c. Compact to 95 percent maximum density.
3. Backfill around sides and to top of pipe with cover fill, tamp in place, and compact to 95 percent maximum density.
4. Backfill around sides and to top of pipe as specified on the construction details.
5. Maintain optimum moisture content of fill material to attain required compaction density.
6. Place fill materials as specified on the construction details.
C. Pipe and Fittings:
1. Maintain separation of water main from sewer piping according to the Department of
Environmental Protection (DEP) code.
2. Group piping with other Site piping Work whenever practical.
3. Install pipe to allow for expansion and contraction without stressing pipe or joints.
4. Install access fittings to permit disinfection of water system.
5. Thrust Restraints: Form and place concrete for thrust restraints at each elbow or change of direction of pipe.
6. Establish elevations of buried piping with not less than 4 feet of cover.
7. Pipe Markers: As specified in Section 330597 "Identification and Signage for Utilities."
8. Backfill trench as specified on the construction details.
D. Curb Stop Assemblies:
1. Set curb stops on solid bearing compacted soil.
2. Boxes:
a. Center and plumb curb boxes over curb stops.
b. Set box cover flush with finished grade.
E. Service Connections:
1. Install water service as indicated on Drawings.
2. Install water service to within 5 feet of building and connect to building water service as specified in the project manual and construction drawings.
F. Disinfection of Water Piping System: Flush and disinfect system as specified.
3.4 TOLERANCES
A. Install pipe to indicated elevation to within tolerance of 5/8 inch.
END OF SECTION 33141
STORM UTILITY DRAINAGE PIPING (REVISED ADDENDUM NO. 5) Section 33410
STORM UTILITY DRAINAGE PIPING Section 33410 - Page 1
SECTION 33410 - STORM UTILITY DRAINAGE PIPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
B. PENNDOT Publication 408 specifications, Sections 601, 605, 610 and 850, latest revision. Use
PennDOT Publication 408 for any discrepancies between specifications provided in this document and the PennDOT Highway Construction Specifications.
1.2 SUMMARY
A. Section Includes:
1. Stormwater Pipe and fittings.
2. Drainage Structures
3. Underdrain
4. Anti-seep Collar
5. Concrete Cradle
6. Nonpressure transition couplings.
7. Encasement for piping.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings:
1. Include plans, elevations, sections, reinforcement and details.
1.4 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Show pipe sizes, locations, and elevations. Show other piping in same trench and clearances from storm drainage system piping. Indicate interface and spatial relationship between manholes, piping, and proximate structures.
B. Product Certificates: For each type of cast-iron soil pipe and fitting, from manufacturer.
C. Field quality-control reports.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Protect pipe, pipe fittings, and seals from dirt and damage.
B. Handle structures and pipe in accordance with manufacturer's written rigging instructions.
Section 33410 – Page 2 STORM UTILITY DRAINAGE PIPING
1.6 PROJECT CONDITIONS
A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated:
1. Notify Engineer no fewer than two days in advance of proposed interruption of service.
2. Do not proceed with interruption of service without Engineer's written permission.
PART 2 - PRODUCTS
2.1 PE PIPE AND FITTINGS
A. Corrugated PE Drainage Pipe and Fittings NPS 3 to NPS 10: AASHTO M 252M, Type S, with smooth waterway for coupling joints. Storm pipe item is 15” Thermoplastic Pipe, Group III, 8’-
2’ Fill, PennDOT 408 Section 601.
1. Silttight Couplings: PE sleeve with ASTM D 1056, Type 2, Class A, Grade 2 gasket material that mates with tube and fittings.
2. Soiltight Couplings: AASHTO M 252M, corrugated, matching tube and fittings.
B. Corrugated PE Pipe and Fittings NPS 12 to NPS 60: AASHTO M 294M, Type S, with smooth waterway for coupling joints.
1. Silttight Couplings: PE sleeve with ASTM D 1056, Type 2, Class A, Grade 2 gasket material that mates with pipe and fittings.
2. Soiltight Couplings: AASHTO M 294M, corrugated, matching pipe and fittings.
2.2 PERFORATED-WALL PIPES AND FITTINGS
A. Perforated PE Pipe and Fittings. Underdrain item is 4” Pipe Underdrain with Geotextile, Class
1 and coarse aggregate, PennDOT Pub 408, Section 610.
1. NPS 6 and Smaller: ASTM F405 or AASHTO M 252, Type CP; corrugated, for coupled joints.
2. NPS 8 and Larger: ASTM F667; AASHTO M 252, Type CP; or AASHTO M 294, Type CP; corrugated; for coupled joints.
3. Couplings: Manufacturer's standard, band type.
B. Perforated PVC Sewer Pipe and Fittings: ASTM D2729, bell-and-spigot ends, for loose joints.
2.3 NONPRESSURE TRANSITION COUPLINGS
A. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism on each end.
B. Sleeve Materials:
STORM UTILITY DRAINAGE PIPING Section 33410 - Page 3
1. For Concrete Pipes: ASTM C 443, rubber.
2. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC.
3. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined.
C. Unshielded, Flexible Couplings:
1. Manufacturers: Subject to compliance with requirements:
2. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following:
a. Dallas Specialty & Mfg. Co.
b. Fernco Inc.
c. Logan Clay Pipe.
d. Mission Rubber Company; a division of MCP Industries, Inc.
e. NDS Inc.
f. Plastic Oddities; a division of Diverse Corporate Technologies, Inc.
g. Approved Equal.
3. Description: Elastomeric sleeve with corrosion-resistant-metal tension band and tightening mechanism on each end.
D. Shielded, Flexible Couplings:
1. Manufacturers: Subject to compliance with requirements:
2. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following:
a. Cascade Waterworks Mfg.
b. Dallas Specialty & Mfg. Co.
c. Mission Rubber Company; a division of MCP Industries, Inc.
d. Approved equal.
3. Description: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.
E. Ring-Type, Flexible Couplings:
1. Manufacturers: Subject to compliance with requirements:
2. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following:
a. Fernco Inc.
b. Logan Clay Pipe.
c. Mission Rubber Company; a division of MCP Industries, Inc.
d. Approved Equal.
3. Description: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring.
Section 33410 – Page 4 STORM UTILITY DRAINAGE PIPING
2.4 ENCASEMENT FOR PIPING
A. Standard: ASTM A 674 or AWWA C105.
2.5 CATCH BASINS AND OUTLET STRUCTURES
A. Standard Precast Concrete Catch Basins. Catch basin item is for Type M Concrete Top Unit and Bicycle Safe Grate and a Standard Inlet Box, Height </= 10’, per PennDOT Pub 408, Section 605.
1. Description: PennDOT Type M Inlet, PennDOT Pub 408, Section 605.
2. Base Section: 6-inch minimum thickness for floor slab and 4-inch minimum thickness for walls and base riser section, and separate base slab or base section with integral floor.
3. Riser Sections: 4-inch minimum thickness, and lengths to provide depth indicated.
4. Top Section: Eccentric-cone type unless concentric-cone or flat-slab-top type is indicated. Top of cone of size that matches grade rings.
5. Joint Sealant: ASTM C 990, bitumen or butyl rubber.
6. Adjusting Rings: Interlocking rings with level or sloped edge in thickness and shape matching catch basin frame and grate. Include sealant recommended by ring manufacturer.
7. Grade Rings: Include two or three reinforced-concrete rings, of 6- to 9-inch total thickness, that match 24-inch- diameter frame and grate.
8. Pipe Connectors: ASTM C 923, resilient, of size required, for each pipe connecting to base section.
B. Frames and Grates: Bicycle Safe Grates or Standard Grate, as indicated, PennDOT Pub 408, Section 605.
C. 4’-0” X 2’-0” Catch Basins
1. Catch Basin with a grate surface of 4’-0” X 2’-0”.
2. Catch Basin Products:
a. Old Castle Precast
b. Monarch Products Company Inc.
c. Or approved Equal
3. Frames and Grates: Heavy duty, according to PennDOT standards.
4. Trash Rack: According to detail.
2.6 SCOUR CONTROL (ROCK LINING)
A. General: Construct rip-rap, as indicated.
1. Rip Rap: Class, size, and gradation in accordance with the National Crushed Stone
Association, per PennDOT Pub 408, Section 850
2.7 PIPE HEADWALL
A. General: Type D-W Endwall for 15” Pipe, per PennDOT Pub 408 Section 605
2. Construct according to PennDOT Pub 72M Road Construction Standards.
STORM UTILITY DRAINAGE PIPING Section 33410 - Page 5
2.8 UNDERGROUND ROOF DRAINS
A. Plastic Pipe with Bell and Spigot End Connections with Rubber-Ring-Sealed Gasket Joint:
1. Material: PVC SDR-35
2. Comply with ASTM D3034, SDR-35.
3. Inside Nominal Diameter:
a. For 6” Pipe: 5.915 inches,
b. For 8” Pipe: 7.920 inches.
4. Fittings: PVC.
5. Joints:
a. Elastomeric gaskets.
b. Comply with ASTM F477.
PART 3 - EXECUTION
3.1 PREPARATION OF FOUNDATION FOR BURIED STORM SEWERAGE SYSTEMS
A. Grade trench bottom to provide a smooth, firm, stable, and rock free foundation, throughout the length of the pipe.
B. Remove unstable, soft, and unsuitable materials at the surface upon which pipes are to be laid, and backfill with clean sand or pea gravel to indicated level.
C. Shape bottom of trench to fit bottom of pipe. Fill unevenness with AASHTO #8 backfill. Dig bell holes at each pipe joint to relieve the bells of all loads and to ensure continuous bearing of the pipe barrel on the foundation.
3.2 EARTHWORK
A. Excavation, trenching, and backfilling are specified in Division 31 Section "Earthwork."
3.3 PIPING INSTALLATION
A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground storm drainage piping. Location and arrangement of piping layout take into account design considerations. Install piping as indicated, to extent practical. Where specific installation is not indicated, follow piping manufacturer's written instructions.
B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements.
C. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.
D. When installing pipe under streets or other obstructions that cannot be disturbed, use pipe-jacking process of microtunneling.
Section 33410 – Page 6 STORM UTILITY DRAINAGE PIPING
E. Install gravity-flow, nonpressure drainage piping according to the following:
1. Install piping pitched down in direction of flow, at minimum slope of 1 percent, except where indicated otherwise.
2. Install piping 6-inch and larger with restrained joints at tee fittings and at changes in direction. Use corrosion-resistant rods, pipe or fitting manufacturer's proprietary restraint system, or cast-in-place concrete supports or anchors.
3. Install piping with 12-inch minimum cover.
4. Install corrugated steel piping according to ASTM A 798/A 798M.
5. Install PE corrugated sewer piping according to ASTM D 2321.
6. Install nonreinforced-concrete sewer piping according to ASTM C 1479 and ACPA's
"Concrete Pipe Installation Manual."
7. Install reinforced-concrete sewer piping according to ASTM C 1479 and ACPA's
"Concrete Pipe Installation Manual."
8. Install underground roof drain PVC pipe, fittings, and accessories according to ASTM
D2321, and seal joints watertight.
3.4 PIPE JOINT CONSTRUCTION
A. Join gravity-flow, nonpressure drainage piping according to the following:
1. Join corrugated steel sewer piping according to ASTM A 798/A 798M.
2. Join corrugated PE piping according to ASTM D 3212 for push-on joints.
3. Join non-reinforced concrete sewer piping according to ASTM C 14 and ACPA's
"Concrete Pipe Installation Manual" for rubber-gasketed joints.
4. Join reinforced-concrete sewer piping according to ACPA's "Concrete Pipe Installation
Manual" for rubber-gasketed joints.
5. Join dissimilar pipe materials with nonpressure-type flexible couplings.
6. Join PVC underground roof drain piping according to ASTM D 3212.
3.5 CATCH BASIN AND OUTLET STRUCTURE AND DRAINAGE STRUCTURES
INSTALLATION
A. Construct catch basins and outlet structures to sizes and shapes indicated.
B. Set frames and grates to elevations indicated.
C. Construct inlet head walls, aprons, and sides of reinforced concrete, as indicated.
D. Construct riprap of broken stone, as indicated.
E. Install outlets that spill onto grade, anchored with concrete, where indicated.
F. Install outlets that spill onto grade, with flared end sections that match pipe, where indicated.
G. Install/attach trash rack for outlet structure.
3.6 CONCRETE PLACEMENT FOR ANTI-SEEP COLLAR AND CONCRETE CRADLE
A. Place cast-in-place concrete according to ACI 318.
STORM UTILITY DRAINAGE PIPING Section 33410 - Page 7
B. Construct per details. Includes framing and all other items of work needed for a complete installation.
3.7 CONNECTIONS
A. Connect nonpressure, gravity-flow drainage piping in building's storm building drains.
B. Make connections to existing piping and underground manholes.
1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch overlap, with not less than 6 inches of concrete with 28-day compressive strength of 3000 psi.
2. Make branch connections from side into existing piping, 4 inch to 20 inch. Remove section of existing pipe, install wye fitting into existing piping, and encase entire wye with not less than 6 inches of concrete with 28-day compressive strength of 3000 psi.
3. Make branch connections from side into existing piping, 21 inch or larger, or to underground manholes and structures by cutting into existing unit and creating an opening large enough to allow 3 inches of concrete to be packed around entering connection. Cut end of connection pipe passing through pipe or structure wall to conform to shape of and be flush with inside wall unless otherwise indicated. On outside of pipe, manhole, or structure wall, encase entering connection in 6 inches of concrete for minimum length of 12 inches to provide additional support of collar from connection to undisturbed ground.
a. Use concrete that will attain a minimum 28-day compressive strength of 3000 psi unless otherwise indicated.
b. Use epoxy-bonding compound as interface between new and existing concrete and piping materials.
4. Protect existing piping, manholes, and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate.
3.8 CLOSING ABANDONED STORM DRAINAGE SYSTEMS
A. Abandoned Piping: Close open ends of abandoned underground piping indicated to remain in place. Include closures strong enough to withstand hydrostatic and earth pressures that may result after ends of abandoned piping have been closed. Use either procedure below:
1. Close open ends of piping with at least 8-inch thick, brick masonry bulkheads.
2. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Do not use wood plugs.
B. Abandoned Manholes and Structures: Excavate around manholes and structures as required and use one procedure below:
1. Remove manhole or structure and close open ends of remaining piping.
Section 33410 – Page 8 STORM UTILITY DRAINAGE PIPING
2. Remove top of manhole or structure down to at least 36 inches below final grade. Fill to within 12 inches of top with stone, rubble, gravel, or compacted dirt. Fill to top with concrete.
C. Backfill to grade according to Division 31 Section "Earthwork."
3.9 IDENTIFICATION
A. Materials and their installation are specified in Division 31 Section "Earthwork." Arrange for installation of green warning tape directly over piping and at outside edge of underground structures.
1. Use warning tape or detectable warning tape over ferrous piping.
2. Use detectable warning tape over nonferrous piping and over edges of underground structures.
3.10 FIELD QUALITY CONTROL
A. Inspect interior of piping to determine whether line displacement or other damage has occurred.
Inspect after approximately 24 inches of backfill is in place, and again at completion of Project.
1. Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter.
c. Damage: Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
e. Exfiltration: Water leakage from or around piping.
2. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified.
3. Reinspect and repeat procedure until results are satisfactory.
B. Replace leaking piping using new materials and repeat testing until leakage is within allowances specified.
3.11 CLEANING
A. Clean interior of piping of dirt and superfluous materials. Flush with water.
END OF SECTION 33410
DUCTILE IRON PIPE AND FITTINGS Section 33650
DUCTILE IRON PIPE AND FITTINGS Section 33650 – Page 1
SECTION 33650- DUCTILE IRON PIPE AND FITTINGS
PART 1 GENERAL
1.1 COORDINATION OF WORK
A. Connection to existing pipelines may require shutdown of Owner facilities. Construction Work and connections shall be closely coordinated with the Owner through the Owner and/or Engineer. The
Engineer and/or Owner, may select the time, including Saturdays, Sundays, and holidays, which in the opinion of the Owner and/or Engineer, will cause the least inconvenience to the Owner and/or its customers, for connection to existing pipelines, and the Contractor will perform such connections at such times as may be directed by the Owner and/or Engineer.
1.2 RELATED WORK
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.3 SUBMITTALS
A. Shop Drawings and manufacturer’s literature for all Contractor supplied materials shall be promptly submitted to the Owner and/or Engineer for approval.
B. Record drawings at Project closeout of installed water system piping and products according to
Division 1 Section "Project Closeout."
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end-caps. Maintain end-caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.
B. Protect stored pipes and tubes from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.
1.5 PROJECT CONDITIONS
A. Perform site survey, research public utility records, and verify existing utility locations. Contact utility-locating service for area where Project is located.
B. Verify that water system piping may be installed in compliance with original design and referenced standards.
PART 2 PRODUCTS
A. Research has documented that certain pipe materials (such as polyvinyl chloride, polyethylene and polybutylene) and certain elastomers (such as those used in gasket material) may be subject to permeation by lower-molecular weight organic solvents or petroleum products. Products supplied under this section have been selected based on the non-expectation of encountering petroleum products or any unknown chemical substance the Owner and/or Engineer is to be notified immediately. Installation of any further piping in the area of suspected contamination shall be stopped until direction is provided by the Owner and/or Engineer.
DUCTILE IRON PIPE AND FITTINGS Section 33650 – Page 2
B. All piping, materials, equipment, etc. should be National Sanitation Foundation (NSF) approved.
2.1 PIPE MATERIAL
A. General
1. Ductile iron pipe shall conform to the latest Specifications as adopted by the American National
Standards institute, Inc. (ANSI) and the American Water Works Association (AWWA).
Specifically, ductile iron pipe shall conform to ANSI/AWWA C151/A21.51.
2. The pipe shall be coated outside with a bituminous coating in accordance with ANSI/AWWA
C151/A21.51. The pipe interior shall be cement mortar lined and seal coated in compliance with the latest revision of ANSI/AWWA C104/A21.4.
3. Pipe Class
a. The class of pipe to be furnished shall be Class 52.
4. Pipe Coating
a. The exterior of the pipe shall receive a factory-applied asphaltic coating approximately 1 mil thick in accordance with the requirements of AWWA C151/A21.51
5. Testing
a. Each length of pipe shall be subjected to a hydrostatic proof test as required by
ANSI/AWWA C151/A21.51.
B. Joints
1. Mechanical and Push-On
a. Mechanical and push-on joints including accessories shall conform to ANSI/AWWA C111-
A21.11.
2. Flanged
a. Flanged joints shall conform to ANSI/AWWA C110/A21.10 or ANSI 16.1 for fittings and
ANSI/AWWA C115/A21.15 for pipe. Flanged joints shall not be used in underground installations except within structures.
b. All flanged joints shall be furnished with 1/8-inch think, red rubber or styrene butadiene rubber gaskets. The bolts shall have American Standard heavy unfinished hexagonal head and nut dimensions all as specified in American Standard for Wrench Head Bolts and Nuts and
Wrench Opening (ANSI B18.2). For bolts of 1¾ inches in diameter and larger, bolt studs with a nut on each end are recommended. Material for bolts and nuts shall conform to ASTM
A107.
3. Underground Utility Line Marker Tape:
a. Empire Level Manufacturing Corporation, blue tape with continuously printed caption
"Caution -- Waterline Buried Below" or approved equal.
4. Utility Line Marker Post:
DUCTILE IRON PIPE AND FITTINGS Section 33650 – Page 3
a. Rhino, Tri View or approved equal, Blue Post, with sticker imprinted with Utility Name, Type, and contact information. Posts in residential areas should be 48” in higher, and in industrial, off road, and adjacent to highways shall be 60”. Post should be visible from three sides.
b. Posts are considered to be incidental to pipelines, fittings, bends, hydrants and perpendicular roadway crossings.
2.2 FITTINGS
A. Ductile Iron Fittings
1. Standard fittings shall be ductile iron conforming to ANSI/AWWA C110/A21.10. Compact ductile iron fittings shall meet the requirements of ANSI/AWWA C153/A21.53.
a. Working Pressures: Fittings shall be suitable for the following working pressures unless otherwise noted:
Table 1- Standard Ductile Iron Pipe and Fittings
Size
Pressure Pounds per Square Inch
Compact
Ductile Iron
Standard
Ductile Iron
3”-24” 250 250
30”-48” 250 250
b. Coatings and Linings: The fittings shall be coated with an asphaltic coating in accordance with ANSI/AWWA C151/A21.51 and lined inside with cement mortar and seal coated in accordance with ANSI/AWWA C104/A21.4.
B. Joints
1. Mechanical and Push-On
a. Mechanical and push-on joints including accessories shall conform to ANSI/AWWA
C111/A21.11. As an option, “Megalug” joint restraints, as manufactured by EBAA Iron Sales
(or approved equal) may be used.
2. Flanged
a. Flanged joints shall meet the requirements of ANSI/AWWA C115/A21.15 or ANSI 16.1.
Flanged joints shall not be used in underground installations except within structures.
b. All flanged joints shall be furnished with a minimum 1/8-inch thick red rubber or styrene butadiene rubber gasket. The bolts shall have American Standard heavy unfinished hexagonal head and nut dimensions all as specified in ANSI B18.2. For bolts of 1¾ inches in diameter and larger, bolt studs with a nut on each end are recommended. Material for bolts and nuts shall conform to ASTM A107.
3. Restrained
a. When restrained joints are required for pipe and fittings, they shall be of the boltless push-on-type which provides joint restraint independent of the joint seal. Restrained system shall be suitable for the following working pressures:
Table 2 - Standard Restrained Joints Pipe and Fittings
DUCTILE IRON PIPE AND FITTINGS Section 33650 – Page 4
Size Pressure (lbs/in2)
4”-12” 250
14”-24” 350
30”-50” 250
PART 3 EXECUTION
3.1 INSTALLATION
A. General Locations and Arrangements
1. Drawings indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated except where deviations to layout are approved on coordination drawings.
B. Install piping at indicated slope.
C. Install components having pressure rating equal to or greater than system operating pressure.
D. Install three (3) bronze alloy wedges per joint.
E. Install piping free of sags and bends and as shown on the Drawings.
F. Locate groups of pipes parallel to each other, spaced to permit valve servicing.
G. Install fittings for changes in direction and branch connections.
H. The provisions specified in Section 336000 shall be strictly followed in addition to the following requirements:
1. Push-On Joint
a. The surfaces with which the rubber gasket comes in contact shall be thoroughly cleaned juts prior to assembly. The gasket shall then be inserted into the groove in the bell. Before starting joint assembly, a liberal coating of special lubricant shall be applied to the gasket and the spigot end. With the spigot centered in the bell, the spigot end is pushed home.
2. Mechanical Joints
a. All components shall be cleaned and lubricated with soapy water prior to assembly. Slip the follower gland and gasket over the pipe plain end making sure the small side of the gasket and lip of the gland face the bell socket. Insert the plain end into the socket. Push gasket into position with fingers, gasket should be evenly seated. Slide gland into position, insert bolts and tighten by hand. Bolts are then tightened alternately (across from one another) to the following normal torques:
Table 3 - Mechanical Joints
Bolt Size Range of Torque (FT-LBS)
5\8” 40-60
¾” 60-90
1” 70-100
1¼” 90-120
DUCTILE IRON PIPE AND FITTINGS Section 33650 – Page 5
3. Restrained Joints
a. Ball and Socket: Assemble and install the ball and socket joint according to he manufacturer’s recommendations. The joint shall be thoroughly cleaned and lubricated.
Check the retainer ring fastener.
b. Push-On: Assemble and install the push-on joint according to the manufacturer’s recommendations. The joint shall be thoroughly cleaned and lubricated. Check the retainer ring fastener.
c. During “pushing home” of any style piping, timber shall be placed between the jacking device (backhoe bucket, pipe jack, etc.) and the pipe being driven home.
4. Dissimilar Materials Piping Joints
a. Construct joints using adapters that are compatible with both piping materials, outside diameters, and system working pressure. Refer to "Piping Systems Common Requirements"
Article for joining piping of dissimilar metals.
5. Thrust Backing
a. Concrete Thrust Backing required on bends, hydrants, etc...
b. Wrap Thrust Backing Areas with Plastic prior to pouring concrete
6. Identification
a. Plastic Underground Warning Tapes: Polyethylene plastic tape, 6 inches (150 mm) wide by 4 mils (1 mm) thick, solid blue in color with continuously printed caption in black letters
"CAUTION - WATER LINE BURIED BELOW."
END OF SECTION 33650
HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS Section 33655
HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS Section 33655 - Page 1
SECTION 33655 - HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. This specification includes but is not limited to high-density polyethylene (PE
3406/3608/4710) dual rated pipe with ductile iron pipe size (DIPS) O.D. buried pressure pipe intended for the transportation of potable water.
1.2 REFERENCE STANDARDS
A. AWWA C906 - Polyethylene (PE) pressure Pipe & Tubing, 4 inch through 63 inch for water.
B. ASTM D3035 - Standard Spec for PE Pipe (DR-PR) Based on Controlled Outside Diameter.
C. ASTM D3261 - Butt Heat Fusion PE Fittings for PE Pipe & Tubing.
D. ASTM D3350 - Standard Specification for PE Pipe & Fittings Materials.
E. ASTM D1238 - Melt Flow Index.
F. ASTM D1505 - Density of Plastics.
G. ASTM D2837 - Hydrostatic Design Basis.
H. NSF STD #14 - Plastic Piping Components & Related Materials.
I. TR-33/2005 - Generic Butt Fusion Joining Procedure for Field Joining of PE Pipe.
J. NSF STD #61 - Drinking Water System Components.
1.3 SUBMITTALS
A. Section 013300 - Submittal Procedures specifies requirements for submittals.
B. Manufacturers' Literature: Submit manufacturers' catalog information for each type of pipe, fittings, couplings, adapters, gaskets, and assembly of joints for approval of the
Engineer. Include manufacturers' recommendations for deflection in pipe joints.
C. Certificates: Submit certifications for each type of pipe, fittings, gaskets, lubricants, or other joint materials form the manufacturers attesting that each of these meets or exceeds specifications requirements.
D. Samples or Shop Drawings: Submit shop drawings for joint assemblies and one sample of each type of jointing materials.
E. Shop Drawings: Submit shop drawings for all adapters joining HDPE to different pipe materials to be used in the Contract (i.e., HDPE to DIP MJ, HDPE to Gasketed Adapter, HDPE to DIP flanged, or HDPE to Threaded Transition as applicable).
HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS Section 33655 - Page 2
1.4 DELIVERY, STORAGE, AND HANDLING
A. Section 016000 - Product Requirements specifies requirements for transporting, handling, storing, and protecting products.
B. Deliver materials in manufacturer's packaging including application instructions.
1.5 EXISTING CONDITIONS
A. Field Measurements: Verify field measurements prior to fabrication. Indicate field measurements on Shop Drawings.
1.6 GENERAL
A. USE: Provide High Density Polyethylene (HDPE) pipe for use as potable water main pressure pipe. All material used in the production of water main piping shall be approved by the National Sanitation Foundation (NSF).
B. DOCUMENTATION
1. Documentation for the resin's manufacturer showing results of the following tests for resin identification:
a. Melt Flow Index ASTM D1238
2. Density ASTM D1505
C. FINISHED PRODUCT EVALUATION
1. Production staff shall check each length of pipe produced for the items listed below. The results of all measurements shall be recorded on production sheets, which become part of the manufacturer's permanent records.
2. Pipe in process shall be checked visually, inside, and out for cosmetic defects
(grooves, pits, hollows, etc.).
3. Pipe outside diameter shall be measured using suitable periphery tape to ensure conformance with ASTM F714 or ASTM D3035, whichever is applicable.
4. Pipe wall thickness shall be measured at 12 equally spaced locations around the circumference at both ends of the pipe to ensure conformance with ASTM F714 or ASTM D3035, whichever is applicable.
5. Pipe length shall be measured.
6. Pipe markings shall be examined and checked for accuracy.
7. Pipe ends shall be checked to ensure they are cut square and clean.
8. Subject inside surface to a "reverse bend test" to ensure the pipe is free of oxidation (brittleness).
D. STRESS REGRESSION TESTING
1. The polyethylene pipe manufacturer shall provide certification that stress regression testing has been performed on the specific polyethylene resin being utilized in the manufacture of this product. This stress regression testing shall have been done in accordance with ASTM D2837 and the manufacturer shall provide a product supplying a minimum Hydrostatic Design Basis (HDB) of
1,600 psi as determined in accordance with ASTM D2837.
E. COMPATIBILITY
HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS Section 33655 - Page 3
1. Contractor is responsible for compatibility between pipe materials, fittings and appurtenances.
1.7 WARRANTY
A. Section 017000 - Execution and Closeout Requirements specifies requirements for warranties.
B. The pipe Manufacturer shall provide a warranty against manufacturing defects of material and workmanship for a period of ten years after the final acceptance of the project by Owner. The Manufacturer shall replace at no expense to the Owner any defective pipe/fitting material including labor within the warranty period.
PART 2 - PRODUCTS
2.1 MANUFACTURER
A. All HDPE pipes shall be from a single manufacturer, who is fully experienced, reputable, and qualified in the manufacture of the HDPE pipe to be furnished. The pipe shall be designed, constructed, and installed in accordance with the best practices and methods and shall comply with these Specifications. Qualified manufacturers shall be: Charter
Plastics, Chevron Phillips Chemical, Dow Chemical Company, JM Eagle, KWH Pipe, or approved equal.
2.2 MATERIALS FOR PIPE SIZES 4-INCH DIAMETER AND LARGER
A. Materials used for the manufacture of polyethylene pipe and fittings shall be made from a
PE 3408/3608 or PE 4710 high density polyethylene resin compound meeting cell classification 445474C (black pipe) or 445474E (black pipe with blue striping) per
ASTM D3350; and meeting Type III, Class C, Category 5, Grade P34 per ASTM D1238.
B. High Density Polyethylene (HDPE) pipe shall comply with AWWA Specifications C906 and NSF61.
C. If rework compounds are required, only those generated in the Manufacturer's own plant from resin compounds of the same class and type from the same raw material supplier shall be used.
D. Dimensions and workmanship shall be as specified by ASTM F714, HDPE fittings and transitions shall meet ASTM D3261. HDPE pipe shall have a minimum density of 0.955 grams per cubic centimeter. All HDPE pipe and fittings shall have a Hydrostatic Design
Basis (HDB) of 1,600 psi.
E. HDPE pipe and accessories 4-inch diameter and larger, shall be 250 psi meeting the requirements of Standard Dimension Ration (SDR) 9 as MINIMUM STRENGTH.
F. The pipe Manufacturer must certify compliance with the above requirements.
HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS Section 33655 - Page 4
2.3 ADAPTERS
A. All molded adapters and fabricated fittings shall be fully pressure rated to match the pipe
SDR pressure rating to which they are made. All adapters shall be molded or fabricated by the manufacturer. No Contractor fabricated fittings shall be used. Acceptable adapter manufacturer is Central Plastics or approved equal.
B. The manufacturer of the HDPE pipe shall supply all HDPE fittings and accessories as well as any adapters and/or specials required to perform…