13-Addendum No3 20261002.pdf
PDF 2 MB Posted
- Solicitation number
- US.251947
- Issued by
- Somerset County, Pennsylvania
About this file
Addendum No. 3 Summary – Schuylkill County Emergency Training Facility
This Addendum No. 3, issued October 2, 2026, by Benesch on behalf of Schuylkill County, modifies the bidding documents for the Schuylkill County Emergency Training Facility project (No. 0325-900015.01). The project is being bid as four separate prime contracts: General Construction, Plumbing Construction, HVAC Construction, and Electrical Construction. Sealed bids are due online via PennBid by Wednesday, October 21, 2026, at 9:00 AM prevailing time. The addendum extends the deadline for submitting bid questions from September 30, 2026, to October 16, 2026, at 11:00 AM. Key modifications include revisions to HVAC control system specifications requiring a Tridium Niagara 4 control system installed by one of three approved vendors (Advanced Enviromation in Fleetwood PA, Nexgen Automation in Harrisburg PA, or OAE Systems in Harrisburg PA), and multiple drawing changes affecting foundation waterproofing, floor treatments in specific rooms, lighting fixture types and connections, and related specifications. The addendum also incorporates the Pennsylvania American Water Service Connection Forms and Process Packet as official contract documents and includes all questions and answers posted on PennBid as part of the bid documents.
The addendum does not specify pricing or payment terms within its content, as these are addressed in the base contract documents. Bidders must acknowledge receipt of Addendum No. 3 on PennBid. A tentative award date is set for Wednesday, October 28, 2026, contingent on determination of low bidders and submission of required insurance and performance/payment bonds. The project is located at 125 Firemen's Road, Frackville, PA 17931, spanning Ryan Township and West Mahanoy Township, with Ryan Township holding jurisdictional authority for zoning and building permits. Davis-Bacon wage rates apply to the contract. The documents establish that each prime contractor is responsible for obtaining applicable permits and paying all permit fees associated with their respective trades.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
400 One Norwegian Plaza
Pottsville, PA 17901 www.benesch.com
P 570-622-4055
Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum
3\Addendum No3_20260930.docx
ADDENDUM NO. 3
To: All Perspective Bidders
Date: October 2, 2026
From: Kevin Marmas, P.E. Benesch
Subject: Schuylkill County – Emergency Training Facility
Addendum No. 3 – Project No. 0325-900015.01
Bid Receipt: Bid will be received online via the PennBid Program by the Schuylkill County Controller until
Wednesday, October 21, 2026, at 9:00 AM, (prevailing time).
This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated September
2026 as follows:
1. Bid Question Deadline: The deadline to submit questions online at http://PennBid.bonfirehub.com has been extended from Wednesday, September 30, 2026 (until 11:00 AM) to October 16, 2026, until 11:00
AM.
2. Section 230900 – HVAC System Controls: Refer to section 1.2, “Summary”. Delete subsection F, In its entirety.
3. Section 230900 – HVAC Control Systems: Refer to section 2.1, “BAS Installer/supplier Qualifications”.
Add the following Subsection:
E. Subject to compliance requirements, provide a Tridium Niagara 4 control system, with products finished, engineered, and installed by one of the following:
1. Advanced Enviromation, Fleetwood PA.
2. Nexgen Automation, Harrisburg, PA.
3. OAE Systems, Harrisburg, PA.
4. Drawing Changes:
a. Drawing A.5.2 – Exterior faces of CMU or Concrete Footers: Add the following General Note to drawing A.5.2: "The perimeter of exterior faces of CMU or Concrete footers shall receive one of the two coatings: Cold-applied, Emulsified Asphalt Dampproofing where the earth comes in contact with Vertical Foundation; the rest of the area will receive Masonry Paint where the area does not come in touch with the earth. Furnish and install all miscellaneous materials to complete the coating."
b. Drawing A.6.2 – Room Numbers 117, 118, 119, 206, and 208: The floors in these rooms shall receive waterproofing (Schluter Kerdi) and the ceramic tiles shall extend up to the ceiling line.
c. Drawing E.2.1, Floor Plan – Lighting: Refer to entrance canopy south of Vestibule 100, change the (4) exterior light fixtures to type ‘K1’ in lieu of type ‘K’.
d. Drawing E.2.1, Floor Plan – Lighting: Connect all exit sign type ‘E’, ‘E1’ and ‘EV’ light fixtures shown on drawing to line side of nearest 120V corridor lighting circuit.
400 One Norwegian Plaza
Pottsville, PA 17901 www.benesch.com
P 570-622-4055
Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum
3\Addendum No3_20260930.docx
ADDENDUM NO. 3
e. Drawing E.5.2, Fixture Schedule and Notes: Refer to lighting fixture schedule, add type ‘K1’ fixture as manufacturer Gotham cat. #EV04SH 40/15 DFR SOL MVOLT EZ10 ELR, 14 watt, 120V, recessed mounting with emergency battery pack.
5. PA American Water Service Connection Forms and Process Packet: Attached as part of this addendum.
6. Questions asked on PennBid: Please note, the attached (PENNBID Public Q&A) questions and the official responses are officially included as part of the bid documents.
This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
The Bidder shall acknowledge receipt of this Addendum in the appropriate space on PennBID.
End of Addendum No. 3
Congratulations on your new building project. We look forward to providing you with water service. Below is a helpful packet of information that will guide you through the process of obtaining water service to your new property. By following these instructions, it will also help to expedite the process and installation of your new water service. Please begin this process well in advance of when you’d like your water service to start to allow ample time to meet all requirements.
NOTE: This document is meant to be a guide. There may be local requirements that this document would not address. Please work closely with our team throughout the process to ensure the project meets all requirements and runs smoothly.
STEP 1: NEW SERVICE APPLICATION
Proper application must be submitted and made in writing. Please mail or email the completed forms to our local office:
Email ___________________________________________________________________
PLEASE NOTE: If water service can be provided, a $30.00 activation fee will be added to the individuals account when the first bill is issued.
QUESTIONS?
For more information or if you have questions, please contact the local supervisor or operations specialist for your area.
Name___________________________________________________________________
Phone___________________________________________________________________
Email ___________________________________________________________________
NEW WATER SERVICE
INSTALLATION GUIDE
WE KEEP LIFE FLOWING™
SERVICE. ONE MORE WAY WE KEEP LIFE FLOWING.
If you’re building a new home or business, or expanding your current facilities, and would like to have water service supplied to your new property, this document will help guide you through the process.
NEW WATER
SERVICE
PROCESS AT A
GLANCE
Submit New Service Application
If approved, discuss requirements with Pennsylvania American Water representative
Install service line and meter pit or vault to meet specifications
Install proper backflow protection
Activate your water service
02-2019
SHARED
SERVICE
LINES NOT
ALLOWED
Our Tariff Rule 18.1, as approved by the Public Utility Commission, states:
“Each meter serving a premise or multiple premises shall be supplied through an independent service pipe from a separate control valve or valve box unless specifically approved and authorized by the Company.” This means that a separate water service line is required for each meter setting. Customers cannot split a service line after the control valve to supply water service to more than one meter.
STEP 2: INSTALL SERVICE PIPE AND METER PIT OR VAULT
SERVICE PIPE REQUIREMENTS
Once your application has been received and approved, the local New Service Contact will contact you to discuss the new service connection process. The first step will be for the applicant to have a service pipe and meter pit or vault installed according to all water company specifications. The service pipe is the pipeline you own and are responsible for maintaining, which connects your in-home plumbing to the company’s control valve (curb stop). Please refer to Pennsylvania American Water’s service pipe specifications drawing for more information.
• The applicant’s service pipe must be installed to the company-approved curb stop location, and the end of the service pipe must be clearly marked by the applicant.
Please work with your local New Service Contact to determine the best location and to obtain the minimum coverage requirements (depth of service pipe to make sure it is below the frost line.)
• The portion of the service line from Pennsylvania American Water’s main to the control valve will be installed, owned and maintained by and at the expense of the Pennsylvania American Water.
• The portion of service pipe on the applicant’s property, from the control valve, to the meter and into the premise being served, will be installed, owned and maintained at the expense of the applicant or owner.
• The applicant’s service pipe must be a minimum of 3/4-inch in size and must be material that meets local building codes. Please note: if you are installing a sprinkler system or lawn irrigation system, you may be required to install a larger service connection or a separate service connection. Please contact the New Service Contact for the approved materials or with any questions you may have.
• Once the service pipe is installed, along with the meter service pit or vault, please notify Pennsylvania American Water New Service Contact to begin the process of connecting your service pipe to our water main. All connections to our water main must be completed by Pennsylvania American Water authorized crews. This procedure may take up to eight weeks. Please provide ample notification so that we can meet your needs.
METER PIT/VAULT REQUIREMENTS
All new water service requests require the installation of a water meter pit or meter vault.
This houses the meter equipment. It is the applicant’s responsibility to purchase, install, maintain and own the water meter pit or vault. Please refer to our meter drawings for more information on our specifications.
• All water used through the service pipe will be metered. The water company will provide and install a meter for each customer without charge. It is the responsibility of the customer to protect the meter from misuse or damage (including freezing) any expense for repair or replacement is the customer’s responsibility.
• The specific location of the meter pit or vault will be determined by the water company and shall be readily accessible and protected by the customer or owner. The meter pit is generally installed at the applicant’s property line along the public right of way;
however, site limitations will factor into the location of the pit or vault. Please contact your New Service Contact if the location has not been provided.
• A stop and waste valve is required at the point of entry where the service pipe enters the home or business.
When the static water pressure exceeds 100 psi, the applicant must install and maintain a pressure reducing valve at his/her own expense. The required location for the pressure reducing valve is prior to the meter. Please refer to the specifications on page 7.
STEP 3: INSTALL PROPER BACKFLOW PROTECTION
Backflow Protection Device Requirements
All customers are required to install proper backflow prevention at the meter pit/vault or at the point of entry where your service pipe enters your home or facility. If we find that proper backflow is not installed upon inspection, you will be required to install the correct device before receiving water service. For more information on approved backflow devices and installation requirements, please contact Pennsylvania American Water’s Backflow Department at 1-877-290-1769, so we will have your local backflow specialist get in contact with you.
STEP 4: ACTIVATE YOUR WATER SERVICE
The final step is to activate the service. After the service connection has been made by the company and you have installed the service pipe and meter pit or vault according to the specifications and have a backflow device properly installed, the next step is to schedule an appointment with Pennsylvania American Water to have the meter installed.
This can be done by contacting our Customer Service Center at 1-800-565-7292, Monday- Friday, 7 a.m. to 7 p.m. Please be sure to inform the customer service representative that a water service application has been filed, an account has been created and inform the representative of the correct address of service. Please note: if your meter is 4 inches or larger, please contact your New Service Contact to make an appointment.
THE VALUE
OF WATER
SERVICE IS
UNBEATABLE!
You can have just about anything delivered to your home these days, but what, other than tap water service, costs a penny? Pennsylvania American Water provides water service that meets or surpasses all state and federal drinking water regulations and delivers it directly to your tap around the clock -- a great value to have a service so essential available at your fingertips any time, day or night.
UNAUTHORIZED USE
Use of jumpers or spacers and/or operating the control valve (curb stop) to obtain water service is considered theft of service and is Illegal.
BANZACR
Highlight 1-800-565-7292
Are you calling to get a new service in an existing building or a new lot?
New service or upgrade refers to a applicant who needs service for new construction on a vacant lot or where an existing service is in need of an upgrade for increased demand.
How much time does it take for Pennsylvania American Water to install its service line?
Once the applicant has completed the application process and the applicant portion of the service pipe is completed;
it usually takes up to eight weeks.
Do I need a water pressure regulator?
If your water pressure will exceed 100 pounds per square inch (psi), you will be required to install a pressure regulator.
If you need assistance determining the pressure at your location, please contact the local New Service Contact.
Do I need to have an inspection performed before I back fill?
Please check your local plumbing code.
Who supplies the meter?
Pennsylvania American Water supplies the meter.
Can I add additional meters to an existing service?
No. The company does not allow additional meters on one service pipe. There must be a separate service pipe for each meter.
Does the water company install my service pipe?
No. The applicant is responsible for installing the service pipe from the new home or business to the company-approved curb stop location.
Is there a tap in fee?
No, provided that a water company main abuts your property. If a main does not abut your property, a main extension agreement would be required. For more information, please contact Customer Service Center at 1-800-565-7292.
Do I need fire service?
Please check with your local municipality pertaining to fire protection requirements. A fire sprinkler system will require the installation of a backflow prevention assembly. If you are required to install a fire sprinkler system, our Backflow Prevention Specialist can assist you in determining what type of backflow assembly is required.
What if I want a fire alarm system?
This does not pertain to your water service unless you are installing a fire sprinkler system.
What if I want lawn irrigation?
Lawn irrigation may require a larger service connection or a separate service connection and will require the installation of a reduced pressure zone backflow prevention assembly.
Will I pay sewage charges for water used by my lawn irrigation system?
This depends on several factors including if you area billed for wastewater service based on how much water you use. Please contact your sewer service provider for more information. If Pennsylvania American Water provides the wastewater service in your area, please contact our Customer Service Center for more information at 1-800-565-7292.
FREQUENTLY ASKED QUESTIONS AND ANSWERS
Please complete Property, Applicant and Signature sections below to apply for water service.
Thank you for the opportunity to be your water service provider.
PROPERTY TO BE SERVED
Municipality_________________________________________________________________________________________________
House # __________ Street Prefix __________ Street Name and Suffix______________________________________________
Apt/Lot # __________ City ________________________________________ State __________ Zip _______________________
Sewage Authority_____________________________________________________________________________________________
Type of Service: Residential Commercial Industrial Other______________________________________
Type of Heat: Hot Water Forced Air Other__________________________________________________________
APPLICANTS’ INFORMATION
Name (first, middle, last) _ ____________________________________________________________________________________
Phone ____________________________ Cell ____________________________ Email____________________________________
Name (first, middle, last) _ ____________________________________________________________________________________
Phone ____________________________ Cell ____________________________ Email____________________________________
Mailing Address (if different than service address listed above)_______________________________________________________________
(I)(We), the applicant(s) for water service from Pennsylvania American Water have read and understood the above application. (I)(We) will be jointly and severally bound by this application to pay and one-time fee of $30 to cover the cost of setting up (my)(our) account which will be added to your first bill. DO NOT SEND CHECK WITH THIS
APPLICATION.
PLEASE READ ABOVE STATEMENTS BEFORE SIGNING.
SIGNATURES
Applicant for Service ____________________________________________________ Date________________________________
Applicant for Service ____________________________________________________ Date________________________________
FOR OFFICE USE ONLY
Premise No. __________________ NSI Account No. _______________________ PWSID___________________________________________________________
Usage Data_______________ BP Name and Number __________________ AW Area _____________District Code_____________________________________
Work Order______________________________________________________ Service Tap Date _________________Tap Size _________ Service Size _________
Type of Service: Residential Commercial Industrial Other______________________________________________________________
Meter Route _________________Meter Stop ______________ Meter No. _____________ Meter Size _ _____________________________________ # of Dials
Meter Set Date _________________ Meter Set Reading _________________ Meter Location_ ______________________________________________________
Meter Read Instructions_ ________________________________________________________________________________________________________________
Additional Notes________________________________________________________________________________________________________________________
Rate Code ___________________ Sewage Code _______________ Distribution Zone _____________________ Engineering Area_________________________
Copy to: Dispatch Call Center Work Order File ____________________________ _____________________________
WATER SERVICE APPLICATION
Customer Name:__________________________ Address:_ ____________________________________________________
Subject Property Address (if different than above):___________________________________________________________
Type of Occupancy:___________________________________________No. of Floors:_______________________________
Average daily demand:_________________gallons per day (gpd) Maximum daily demand:__________________ gpd
Please fill in the areas and columns shaded in tan ONLY.
Other fields will be filled in by our office.
Fixture or Appliance No. of Fixtures (customer to fill out this column)
Fixture Value @ 60 psi
Fixture Value (for office use only)
Faucet - Kitchen Sink x 2.2 =
Faucet - Lavatory Sink x 1.5 =
Faucet - Utility Sink x 4 =
Wash Sink (each set of faucets) x 4 =
Shower (single head, shower only) x 2.5 =
Bathtub x 8 =
Toilet – Flush Valve Type x 35 =
Toilet – Tank Type x 4 =
Urinal – Pedestal Flush Valve x 35 =
Urinal – Wall Flush Valve x 16 =
Bidet x 2 =
Dishwasher x 2 =
Clothes Washing Machine x 6 =
Hose Bibs (w/ 50 ft. of hose) – 1/2” x 5 =
Hose Bibs (w/ 50 ft. of hose) – 5/8” x 9 =
Hose Bibs (w/ 50 ft. of hose) – 3/4 x 12 =
Miscellaneous
Bedpan Washer x 10 =
Dental Unit x 2 =
Drinking Fountain x 2 =
COMBINED FIXTURE VALUE TOTAL =
For office use: Customer Peak Demand (from Fig. 4-2 or 4-3) _______ x Pressure Factor (from Table 4-1) ______
__________ gpm
Add Irrigation (please check one): Spray Systems Rotary Systems No. of sections = __________ sections (100 ft2 area = 1 section)
__________ gpm
Fire Flow Demand (sprinklers, etc.) _________ gpm _________ pressure + __________ gpm
Residential Customers: Is your dwelling equipped with a water supplied automatic fire protection system (sprinkler system)? Yes No
Is there a fire hydrant currently on the property? Yes No
Are you requesting that a fire hydrant be installed? Yes No
Added Fixed Load (process water, cooling water, etc.) _________ pressure + __________ gpm
For office use: _________ Pressure at curb
TOTAL PEAK DEMAND LOAD = __________ gpm
† For Spray Systems: Use 1.16; For Rotary Systems Use 0.40 6
WATER CUSTOMER DATA SHEET
3/4-INCH AND 1 INCH SERVICE LINE INSTALLATION
WITH AN OUTSIDE METER PIT
2-INCH METER PIT SPECIFICATIONS
2-INCH METER VAULT SPECIFICATIONS
4-INCH TO 10-INCH METER VAULT SPECIFICATIONS
BANZACR
Highlight
BANZACR
Highlight
11/2021
Large Services (>=4”) Process – New Services OR Replacements Note: Process does not need to be in the exact numbered order. Adjust as required.
Action by: Customer / Developer / Owner / Owners Representative / Engineer – will be indicated in the below steps as “Customer” Action by: Water Company – Pennsylvania American Water Company (PAWC)
1) Customer calls the Customer Service Center (CSC) (800)565-7292.
CSC will create an account. Including a New Service Inquiry (NSI) #, Business Partner (BP) #.
CSC will provide Customer with a Water Service Application (WSA) containing the NSI# and BP#.
CSC will provide Customer with the PAWC Supervisor / Contact depending on the project type For small services (2” or smaller) and individual residential customers, contact:
Michael Rager - (717)554-0045 – Michael.Rager@amwater.com For large services (4” or larger), residential developments (multiple homes), commercial, or TBD, contact:
Robert Banzaca - (717)602-4051 – Robert.Banzaca@amwater.com
2) Customer contacts the water company with the project intent.
Customer must provide the following:
Preliminary map and written description of the property location and extents. Including:
Full Address(s), Tax Parcel #(s), Description of existing and proposed structures and their uses, Expected construction start date and estimated project completion date.
3) PAWC will determine if the project is located within PAWC certificated territory and if water main exists fronting the property or if a main extension will be necessary to serve the property.
PAWC will let the customer know if a main extension will be required.
All costs required for main extensions are the responsibility of the developer and the developer must enter into an agreement with PAWC and provide a check including all applicable taxes to PAWC before work can commence. As of 2021 additional services or increases to an existing served lot is at the expense of the developer/customer and an associated agreement must be prepared accordingly.
4) Customer requests “Letter of Service” / “Letter of Intent to Serve” / “Will Serve Letter” Municipalities often require this letter from the water company when filing plans.
PAWC will provide appropriate letter with project specific wording
5) Customer requests available flow and pressure for the project area.
This is only necessary when the building will have a sprinkler / fire suppression system or the building use has specific pressure constraints. Otherwise, static pressures should be sufficient.
Specify “preliminary inquiry” for a project, which will not begin for more than 1 year.
If preliminary, PAWC will provide known flow and pressures from previous tests, if available.
If a previous test for the area is not available, PAWC will conduct a 2 hydrant flow test.
If the project will begin within the year, PAWC will provide the results of a hydrant flow test.
If existing tests are more than 1 year old, a new Hydrant flow test will be conducted.
6) Customer requests a Map of PAWC water mains for their project area, that request should utilize PAonecall website. This is useful for preliminary design to determine the tie-in and service line location.
PAWC will send a map, this will be provided in pdf format to the contact indicated on the design ticket.
mailto:Michael.Rager@amwater.com mailto:Robert.Banzaca@amwater.com
7) Customer fills out the Water Service Application (WSA) and sends to PAWC Contact PAWC creates a Premise# for the property.
8) Customer submits information to PAWC for Sizing of Meter, Meter Vault and Service Line All documents should be sent to PAWC Contact in pdf format via email.
To size the new service the customer must supply PAWC with the following:
A) The latest and recent Site Plan Include land development plan pages that show existing & proposed water facilities (highlighted/bold).
Plan must show the following in correct scale:
- The entire Property/Development
- Proposed and/or Existing building(s)
- Existing PAWC main (Label “Existing PAWC”. Include Diameter)
- Proposed PAWC Main Extensions related to the project (Label “Proposed”. Include Diameter)
- Proposed tie-in location (Label)
- Proposed Service Line from existing PAWC main to meter pit. (Mark with W. Label Diameter).
- Proposed meter pit/vault location. Labeled
Note: Vaults should be located as close to the tie-in to the main in the street as possible, preferably within 5’ of the property line.
Vault should be in-line with the service line direction with no bends/elbows, if possible.
Meter Vaults have a large footprint. Plans should include sufficient space to accommodate the vault where it can be easily installed and maintained. Typically, large vaults are 6 feet in width. Vaults designed for 4” meters are approximately 12 feet long.
Similarly, 6”, 8” and 10” vaults are typically 16, 18 and 20 feet long, respectively.
- Proposed Service line from the meter pit to the building(s). (Mark with a W. Label Diameter)
- All proposed water facilities outside the building(s).
- Proposed hydrants related to the project, Private and/or Public. Label required flow.
B) Plumbing Plans Including the Riser Detail C) Sprinkler Plans D) Sprinkler Hydraulic Calculations (Most Important) Calculations must be based on the assumed Service Line diameter and lengths.
Include a graph comparing the available flow from the Hydrant Flow Test to the requested fire flow Include a pump design and performance curve, if applicable.
E) Back Flow Prevention Device(s) specifications An anti-backflow device is required in the meter pit to protect the PAWC system from contamination.
Typically, there is a single service line for both fire and domestic service to the pit and from the pit, which splits after it has entered the building.
The owner may opt to also install an anti-backflow device internal to the building to separate the fire suppression service from the potable water line.
F) Current W-9 (https://www.irs.gov/uac/about-form-w9) PAWC Reviews the submission for completion.
9) Once all of the documents are received in step 8 the documents are given to the Engineering Planning Department to complete the Meter Sizing. PAWC informs the customer of the appropriate meter, meter vault and service line size via email.
If the sizing indicated by PAWC differs from the requested sizing one of the three options must be taken:
1. Accept size and continue to step 10 submittal documents
2. Update design documents and resubmit justifying size difference
3. Execute PAWC approved indemnification letter accepting liability of the size difference https://www.irs.gov/uac/about-form-w9
10) The customer contacts a meter vault manufacturer. Typical: Monarch or AC Miller.
The manufacturer will provide a Meter Pit Detail Drawing (Plan & Profile).
11) The customer submits the Meter Pit Detail Drawing to PAWC for final approval.
PAWC informs the customer that the submitted Meter Vault has been approved for purchasing.
12) PAWC provides a “Stone Drain for Meter Pit” detail drawing to the Customer. The alternate to the stone drain are either a fixed sump pump or daylight to approved location. Stone drain are not to be installed in areas with rock or high water tables.
Customer signs Stone Drain detail and emails to PAWC, indicating the customer’s understanding that a stone drain must be included in the meter vault installation or confirm which alternate will be used.
13) PAWC designs the service line tap, purchases materials obtains permits, hires a contractor and oversees installation of the service line and service valve at the customers property boundary. As indicated in step 3 as of 2021 additional services or increases to an existing served lot is at the expense of the developer/customer and an associated agreement is required and must be executed with associated check prior to beginning installation of the service.
14) Customer installs or hires a sub-contractor to install the Meter Vault and Service Line from the Service valve to the Meter Vault and from the Meter Vault to the building. Ductile Iron pipe is required from the service valve to the vault, after the vault is at the Engineer/contractors/ developers/customers discretion.
Note: Where the Meter and Meter Pit Vault are smaller than the Service Line diameter, installation will require reducers outside the meter pit on both the inlet and outlet. For instance, if a 6-inch service line and a 4-inch meter and meter pit are approved, a 6”x4” reducer must be installed before and after the meter pit.
Modifications should NOT be made to the interior of the meter pit to fit a meter that the vault was not designed for. This ensures the proper length of straight pipe before and after the meter.
15) Customer informs PAWC 10-14 days in advance of when the Meter Vault will be ready for meter set. This allows time to order and receive the large meter, schedule vault inspection, and resolve any inspection issues. Be aware all water usage is to be metered so the service may not be turned on for testing until the meter is set. Reference the attach vault inspection checklist of requirements. For replacement services where there is an existing meter, that will be removed at the same time as the large meter set. Preparation in the field must be made by the plumbing contractor to reduce length of water service interruption.
PAWC arranges to have the Meter vault inspection. Depending on necessary corrections and timing of corrections delay on scheduled meter set may occur as it may require rescheduling of planned meter set.
17) Customer arranges for all required corrective action per the inspection to be completed and confirms vault is ready for reinspection. (As required) Meter set will not be scheduled with 3rd party contractor until vault is approved.
PAWC arranges to have the Meter vault inspection (As required).
18) Once vault is approved, Customer will be advised the meter set has been scheduled or be required to call Customer Service Center (CSC) (800)565-7292 for a meter set. Contact Local Supervisor/Project PM prior to making the call to CSC as direct scheduling may be available.
CSC drops a WO for the meter set and PAAW/Contractor sets meter and removes existing meter(s) (as required)
WATER SERVICE CONNECTION FORMS
To review your request for a water service connection in Pennsylvania, the following information must be submitted. Please complete all pages of this form. ALL questions must be answered. Return completed form along with one copy of the site plan showing proposed water service diagram to your local Pennsylvania American Water office for approval.
1. Developer Name _________________________________ Phone No._______________
Street__________________________________________________________
City _____________________________ State_____________ Zip__________
County_________________________
Email:__________________________________________________________
Development Name ________________________________
Municipality______________________
2. Builder (party asking for meter set(s))
Name ______________________________ Phone No._______________
Address Street__________________________________________________________
City _____________________________ State_____________ Zip__________
Email:__________________________________________________________
3. Designer’s Name _____________________________________ Phone No._______________
Address Street__________________________________________________________
4. Contractor’s Name _________________________________ ____ Phone No._______________
5. Information Furnished On This Form by____________________________ Phone____________
Comments:____________________________________________________________________________
6. Type of Development/Service Request:
New Residential Subdivision_____ Commercial/Industrial/Business Park_____
Single Structure _____ Other (describe)___________________________________________
Type of Structure(s): Office _____ School _____ Hospital _____ Apartment Complex_____
Townhouse_____ Multi-Family _____ Duplex_____ Single Family Home_____
Yes No Size Comments
Domestic
Irrigation
Fire Protection
Combined Service *
Number of Floors _______ First Floor Elevation: ________(enter range if multiple structures)
7. Service Required and Size
* Includes Domestic, Irrigation, and/ or Fire Service
8. Domestic Service Requirements: (At Point of Connection) GPD-gallons per day
Maximum Daily Flow requested:_________
GPD
Pressure Requested: ________________ p.s.i
Average Daily Flow requested: __________
GPD
Pressure Requested: ________________ p.s.i.
9. Irrigation System (underground) (At Point of Connection) gpm – gallons per minute
10. Fire Protection Service Requirements: (At point of Connection)
Fire Flow Request g.p.m. at p.s.i.
Number of Fire Pumps
Total
Total & Capacity each pump g.p.m.
Number of Fire Hydrants Total & Capacity each hydrant g.p.m.
Number of Hose Cabinets Total & Capacity per hose g.p.m.
Number of Sprinklers in
Operation at Once
Total & Capacity per head g.p.m.
Type of Residential Sprinkler Multipurpose_____ Standalone_____ Separate_____
Type of Backflow Preventer Stnd double check____ Testable double check____ Reduced Pressure_____
Is antifreeze solution planned for fire service? Yes______ No_______
11. Public Fire Hydrants: _____ number, capacity each hydrant ____________ g.p.m.
12. Other (At Point of Connection)
Describe Use (Process, Cooling, etc.)_______________________________________________
Expected hours occupied or processing: __________ to _________
12. Schedule for Service:_________ Water Service requested by:____________________ Date_____
13. Access @ meter pit to: 115 VAC power: Yes ____ No ____
Telephone Line: Yes ____ No ____
Notes:
Maximum flow requested: _____gpm Duration:_________ Hrs Residual:_____________p.s.i.
Average flow requested:_______gpm Duration: ________ Hrs Residual:_____________p.s.i.
Maximum flow requested: _____gpm Duration:_________ Hrs Residual:_____________p.s.i.
Average flow requested:_______gpm Duration: ________ Hrs Residual:_____________p.s.i.
a. Fire and irrigation systems may require pumps. This is the owner's responsibility to determine what if anything is needed based from flow test provided by the Company upon request. Flow test will be accomplished at the earliest time possible with regard to the integrity of the water system.
b. All fire systems require reduced pressure zone backflow protection
c. All services will require an outside meter pit. Specifications for such should be requested along with an office meeting to review your proposed installation.
d. Grounding of Electric or other utility or appliance to the water line is prohibited
e. Proposed water system design must be PaDEP Public Water Supply design standards and
Pennsylvania American Water design requirements & technical specifications.
Generated on Oct 02, 2026 9:49 AM EDT - Response
Public Q&A
#1 - Pre Bid Meeting
Vendor, Sep 03, 2026 9:36 AM EDT, Not Public - Pending
Is the Pre Bid meeting mandatory?
Response, Sep 14, 2026 2:29 PM EDT, Public - In Review
Response, Sep 14, 2026 2:29 PM EDT, Public - Answered
The Pre Bid meeting is not mandatory.
#41 - Disregard question regarding Estimated Start & Completion dates
Vendor, Sep 03, 2026 10:30 AM EDT, Not Public - Pending
Please disregard. I found the information in the Summary.
Response, Oct 02, 2026 9:39 AM EDT, Public - In Review
Response, Oct 02, 2026 9:40 AM EDT, Public - Answered
Noted.
#4 - Plumbing Spec
Vendor, Sep 03, 2026 12:51 PM EDT, Not Public - Pending
Is there a Plumbing Spec for this project? It was not found in the bidding documents for download.
Please provide.
Response, Sep 14, 2026 5:10 PM EDT, Public - In Review
Response, Sep 14, 2026 5:10 PM EDT, Public - Answered
Plumbing specifications now added to Public Files as Addendum 1.
#3 - Plumbing Specs
Vendor, Sep 03, 2026 2:24 PM EDT, Not Public - Pending
Table of Contents List - Division 22 Plumbing Specifications but I do not see a file for the Plumbing
Specs. Please advise.
Response, Sep 14, 2026 5:09 PM EDT, Public - In Review
Response, Sep 14, 2026 5:10 PM EDT, Public - Answered
Plumbing specifications now added to Public Files as Addendum 1.
#42 - Dampproofing / Waterproofing
Vendor, Sep 03, 2026 2:45 PM EDT, Not Public - Pending
Please confirm the foundation walls do not require dampproofing or waterproofing? I did not see any indicated.
Response, Oct 02, 2026 9:41 AM EDT, Public - In Review
Response, Oct 02, 2026 9:41 AM EDT, Public - Answered
Drawing A.5.2 – Exterior faces of CMU or Concrete Footers: Add the following General Note to drawing A.5.2: "The perimeter of exterior faces of CMU or Concrete footers shall receive one of the two coatings: Cold-applied, Emulsified Asphalt Dampproofing where the earth comes in contact with Vertical Foundation; the rest of the area will receive Masonry Paint where the area does not come in touch with the earth. Furnish and install all miscellaneous materials to complete the coating."
#11 - bid time
Vendor, Sep 04, 2026 9:12 AM EDT, Not Public - Pending
Can the bid due time be made later in the day? Its never a good idea to have a bid due at 9:00am due to the fact that subs and vendors don't get in earlier because of it and then its a scramble to assemble our bids. Please consider noon or later.
Response, Sep 15, 2026 4:54 PM EDT, Public - In Review
Response, Sep 15, 2026 4:55 PM EDT, Public - Answered
Bid time is set by the advertisement. No changes can be made.
#8 - Public Works Verification Form
Vendor, Sep 04, 2026 9:25 AM EDT, Not Public - Pending
The Advertisement for Bid indicates a Public Works Verification Form must be submitted with our bid the the Public Works Verification Form was not provided with the Bid Documents. Please advise.
Response, Sep 15, 2026 4:47 PM EDT, Public - In Review
Response, Sep 15, 2026 4:47 PM EDT, Public - Answered
The Public Works Employment Verification Form has been included in Addendum 2 which has been uploaded to the Public Files.
#12 - Zoning & Building Permits
Vendor, Sep 04, 2026 9:34 AM EDT, Not Public - Pending
Per the Summary of Work, 1.3, D.1., the contractor is responsible to obtain and pay for all building permits and zoning permits.
1. Since the project is located in two Townships (Ryan & West Mahanoy) which Township will have jurisdiction for the project?
2. Please confirm each Prime Contractor is responsible for there Own Building Permits?
Response, Sep 16, 2026 12:51 PM EDT, Public - In Review
Response, Sep 16, 2026 12:57 PM EDT, Public - Answered
Ryan Township will have jurisdiction for the project regarding zoning permit and building permit as well as UCC inspections. Each Prime Contractor will be responsible for obtaining their applicable permits, all permit fees, and any other expenses associated with the permitting.
#22 - Notice to Proceed
Vendor, Sep 04, 2026 9:35 AM EDT, Not Public - Pending
What is the anticipated Notice to Proceed / Start Construction?
Response, Sep 29, 2026 5:24 PM EDT, Public - In Review
Response, Sep 29, 2026 5:25 PM EDT, Public - Answered
Upon determination of the low bidder, the contractor will be required to submit the necessary insurance and bonds. Upon review and acceptance, the Notice to Proceed will be issued.
#30 - Temporary Water
Vendor, Sep 04, 2026 9:45 AM EDT, Not Public - Pending
Please confirm the Plumbing Prime Contractor is responsible to provide temporary water and is responsible for the use charge fees?
Response, Oct 01, 2026 4:18 PM EDT, Public - In Review
Response, Oct 01, 2026 4:19 PM EDT, Public - Answered
Temporary Water should be included under the Prime Plumbing Contract and should include any usage fees.
#31 - Temporary Heating & Cooling
Vendor, Sep 04, 2026 9:47 AM EDT, Not Public - Pending
Please confirm the Prime HVAC Contractor is responsible to provide temporary heating & cooling for the project and is responsible for any use charge fees?
Response, Oct 01, 2026 4:19 PM EDT, Public - In Review
Response, Oct 01, 2026 4:20 PM EDT, Public - Answered
Temporary Heating and Cooling should be included under the Prime HVAC Contract and should include any use charge fees.
#32 - Temporary Electric & Lighting
Vendor, Sep 04, 2026 9:49 AM EDT, Not Public - Pending
Please confirm the Prime Electrical Contractor is responsible to provide the temporary electric and lighting for the project and shall include any usage fees?
Response, Oct 01, 2026 4:20 PM EDT, Public - In Review
Response, Oct 01, 2026 4:21 PM EDT, Public - Answered
Temporary Electric and Lighting should be included under the Prime Electrical Contract and should include any usage fees.
#33 - Temporary Utility Installation - Water
Vendor, Sep 04, 2026 1:29 PM EDT, Not Public - Pending
Who is responsible for this? Assuming the Plumber?
Response, Oct 01, 2026 4:22 PM EDT, Public - In Review
Response, Oct 01, 2026 4:22 PM EDT, Public - Answered
Temporary Water should be included under the Prime Plumbing Contract and should include any usage fees.
#34 - Temporary Utility Installation - Heating/Cooling
Vendor, Sep 04, 2026 1:30 PM EDT, Not Public - Pending
Who is responsible for this, Assuming the Mech. HVAC Contractor
Response, Oct 01, 2026 4:22 PM EDT, Public - In Review
Response, Oct 01, 2026 4:23 PM EDT, Public - Answered
Temporary Heating and Cooling should be included under the Prime HVAC Contract and should include any use charge fees.
#35 - Temporary Utility Installation - Power and Lighting
Vendor, Sep 04, 2026 1:31 PM EDT, Not Public - Pending
Who is responsible for this, assuming the electrician?
Response, Oct 01, 2026 4:23 PM EDT, Public - In Review
Response, Oct 01, 2026 4:23 PM EDT, Public - Answered
Temporary Electric and Lighting should be included under the Prime Electrical Contract and should include any usage fees.
#21 - Off - Site Parking for Workers
Vendor, Sep 04, 2026 1:32 PM EDT, Not Public - Pending
Is there not enough room on site and if not, does the County have a location close by or is this the responsibility of each Contractor/
Response, Sep 29, 2026 5:21 PM EDT, Public - In Review
Response, Sep 29, 2026 5:23 PM EDT, Public - Answered
There should be adequate parking on site or on the adjacent fire school property for workers.
#29 - Pest Control
Vendor, Sep 04, 2026 1:34 PM EDT, Not Public - Pending
Specs state engaging a service, but provides little to no detail. Then states an extended warranty.
What length is the owner looking for?
Response, Oct 01, 2026 4:14 PM EDT, Public - In Review
Response, Oct 01, 2026 4:16 PM EDT, Public - Answered
Contractor responsibility for all pest control requirements would terminate upon issuance of the
Certificate of Occupancy.
#28 - Water Service
Vendor, Sep 04, 2026 1:43 PM EDT, Not Public - Pending
Benesch Sheet 2 of 15, Grading & Utility Plan Note #28, indicates the service sizes is to be designed separately and provided on the plumbing plans but the plumbing plans do not show the size of the water service or type of material that is required. Please advise.
Response, Oct 01, 2026 4:12 PM EDT, Public - In Review
Response, Oct 01, 2026 4:12 PM EDT, Public - Answered
Water service lateral size to be three-inch (3") copper or HDPE.
#17 - Electrical Power & Control Wiring to Grinder Pump
Vendor, Sep 04, 2026 1:53 PM EDT, Not Public - Pending
Drawing E.1.1, Drawing Note #8, indicates the electrical power wiring for the grinder pump is by the Electrical Prime Contractor and the Control Wiring is by Others. Benesch Sheet 2 of 15, Grading & Utility Plan Note #31, indicates the electrical power to the grinder pump is the responsibility of the Contractor. Please confirm the Electrical Prime Contractor will be responsible to provide the electrical power wiring and the General Prime Contractor will be responsible for the control wiring to the grinder pump?
Response, Sep 21, 2026 8:50 AM EDT, Public - In Review
Response, Sep 21, 2026 8:52 AM EDT, Public - Answered
Correct. The Electrical Prime Contractor will be responsible to provide the electrical power wiring to the grinder pump. The General Prime Contractor will be responsible for the control wiring to the grinder pump.
#18 - Existing Water Main along Firemen's Road
Vendor, Sep 08, 2026 2:52 PM EDT, Not Public - Pending
Please clarify what size pipe the existing water main along Firemen's Road is, so we can price the tapping sleeve accordingly?
Response, Sep 24, 2026 8:45 AM EDT, Public - In Review
Response, Sep 24, 2026 8:46 AM EDT, Public - Answered
The existing water main along Firemen's Road is a 12-inch ductile iron pipe.
#10 - Geotechnical Report
Vendor, Sep 08, 2026 4:18 PM EDT, Not Public - Pending
Please provide a copy of the Geotechnical Report so the Aggregate Piers can be designed accordingly.
Response, Sep 15, 2026 4:49 PM EDT, Public - In Review
Response, Sep 15, 2026 4:49 PM EDT, Public - Answered
The Geotechnical Report has been included in Addendum 2 which has been uploaded to the
Public Files.
#6 - Landscaped Area Adjacent to Garage End Wall
Vendor, Sep 08, 2026 4:36 PM EDT, Not Public - Pending
Benesch Sheet 4 of 15, please clarify what shall be installed in the landscaped area on the East
Side of the building between the garage and sidewalk? Nothing is labeled on the plan.
Response, Sep 15, 2026 8:39 AM EDT, Public - In Review
Response, Sep 15, 2026 8:39 AM EDT, Public - Answered
Proposed river rock shall be placed at this location.
#2 - Address
Vendor, Sep 09, 2026 9:46 AM EDT, Not Public - Pending
What is the physical address of the new facility, please.
Response, Sep 14, 2026 2:54 PM EDT, Public - In Review
Response, Sep 14, 2026 2:54 PM EDT, Public - Answered
Existing site address: 125 Firemen's Rd, Frackville, PA 17931
#7 - Public Works Employment Verification Form
Vendor, Sep 09, 2026 9:48 AM EDT, Not Public - Pending he Advertisement for Bids states that all submitted bids shall be accompanied by the Public Works
Employment Verification Form; however, we were unable to locate the form within the Project
Manual.
Could you please confirm where this form can be obtained and whether it is required to be completed and uploaded with the bid submission on PennBid?
Response, Sep 15, 2026 4:45 PM EDT, Public - In Review
Response, Sep 15, 2026 4:47 PM EDT, Public - Answered
The Public Works Employment Verification Form has been included in Addendum 2 which has been uploaded to the Public Files.
#16 - Sitework Section 01120 - Summary
Vendor, Sep 09, 2026 2:35 PM EDT, Not Public - Pending
The Sitework Specification Section 01120 - Summary, 1.4 B.1., indicates the project will be constructed under a single prime contract. Please confirm this is incorrect and project is being bid as (4) Separate Prime Contracts?
Response, Sep 21, 2026 8:33 AM EDT, Public - In Review
Response, Sep 21, 2026 8:44 AM EDT, Public - Answered
The project is being bid as four (4) separate Prime Contracts as indicated in the Project Description and Advertisement for Bids. Civil Spec Section 01120 - Summary, 1.4.B.1 is incorrect.
#13 - Inspection Fees
Vendor, Sep 09, 2026 2:42 PM EDT, Not Public - Pending
Sitework Spec Section 01120 - Summary, 1.24 A., indicates we shall include an allowance of
$12,000.00 for inspection fees by the municipalities or utilities. Is the inspection fee in addition to the Cash Allowance of $10,000.00 indicated in Section 01010 - Summary of Work, 1.3 D. 4. a.1?
Response, Sep 16, 2026 1:00 PM EDT, Public - In Review
Response, Sep 16, 2026 1:27 PM EDT, Public - Answered
Yes, these are two separate allowances, i.e. the $10,000 allowance is in addition to the $12,000 allowance. The $10,000 allowance is for any owner required or requested testing and inspections;
the $12,000 allowance is for municipal inspection fees.
#43 - Covered Parking Area
Vendor, Sep 10, 2026 10:15 AM EDT, Not Public - Pending
Drawing S.2 does not show rammed aggregate piers below the spread footers at the Covered
Parking Area but the cross-section on 1/S.11 does. Please confirm aggregate piers will be required under the spread footers at the Covered Parking Area?
Response, Oct 02, 2026 9:47 AM EDT, Public - In Review
Response, Oct 02, 2026 9:47 AM EDT, Public - Answered
Rammed Aggregate piers are required under the spread footers at the covered parking area. The foundation plan will be updated thru Addendum to include RAPs at those locations.
#44 - Main Entrance Canopy Piers
Vendor, Sep 10, 2026 11:13 AM EDT, Not Public - Pending
Drawing S.2 shows two (2) P18 piers at the main entrance canopy but the P18 piers are not indicated on the Column Pier Schedule on S.6. Please advise.
Response, Oct 02, 2026 9:48 AM EDT, Public - In Review
Response, Oct 02, 2026 9:48 AM EDT, Public - Answered
The entrance canopy piers shall be P18 as depicted on Drawing S.2. The Column Pier Schedule on Drawing S.6 will be updated through Addendum.
#5 - Classified/Unclassified
Vendor, Sep 10, 2026 2:19 PM EDT, Not Public - Pending
Is the sitework classified or unclassified?
Response, Sep 15, 2026 8:33 AM EDT, Public - In Review
Response, Sep 15, 2026 8:33 AM EDT, Public - Answered
Sitework is Unclassified. See Civil Specifications Section 31000-Earthwork, Part 3.1A.
#9 - Geotechnical Report
Vendor, Sep 10, 2026 2:19 PM EDT, Not Public - Pending
Is there a Geotechnical Report and will it be made available?
Response, Sep 15, 2026 4:48 PM EDT, Public - In Review
Response, Sep 15, 2026 4:48 PM EDT, Public - Answered
The Geotechnical Report has been included in Addendum 2 which has been uploaded to the
Public Files.
#14 - Permit Fees
Vendor, Sep 10, 2026 2:21 PM EDT, Not Public - Pending
Who will pay for permit fees?
Response, Sep 16, 2026 1:30 PM EDT, Public - In Review
Response, Sep 16, 2026 1:30 PM EDT, Public - Answered
Each Prime Contractor will be responsible for obtaining their applicable permits, all permit fees, and any other expenses associated with the permitting.
#19 - Liquidated Damages
Vendor, Sep 10, 2026 2:25 PM EDT, Not Public - Pending
Is there liquidated damages?
Response, Sep 24, 2026 3:35…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .