12-Addendum No2 20260915.pdf

PDF 8 MB Posted

Attached to
Schuylkill County - Emergency Training Facility (0325-900015.01)
Solicitation number
US.251947
Issued by
Somerset County, Pennsylvania

About this file

This addendum document, issued by Alfred Benesch & Company on behalf of Schuylkill County, Pennsylvania, provides supplementary information for the Emergency Training Facility construction project (Project No. 0325-900015.01). The addendum modifies the original bidding documents dated September 2026 and applies to all registered plan holders. Sealed bids for this project will be received online through the PennBid Program by the Schuylkill County Controller until Wednesday, October 21, 2026, at 9:00 AM, prevailing time. The project involves construction of a new single-story fire training facility with approximately 14,100 square feet of combined office/training space and garage space, along with associated parking, stormwater management features, and site improvements. The bid will be divided into four separate prime contracts: General Construction, Plumbing, HVAC, and Electrical Construction. Bid results will be available following the Board of Commissioners meeting, with a tentative award date of Wednesday, October 28, 2026.

Addendum No. 2 requires bidders to acknowledge receipt through the PennBid system and mandates submission of a geotechnical report and a Public Works Employment Verification Form with bid packages. The geotechnical investigation, conducted by Barry Isett & Associates, Inc., reveals that the 3-acre site is underlain by variable existing fill material (extending to depths up to 29 feet) resulting from uncontrolled backfilling of former surface coal mining operations. The site also contains deep coal mine tunnels approximately 200 feet below ground surface and potential mine shafts within the proposed building and stormwater basin footprints. Due to the thickness and variability of the fill material, conventional soil removal is not feasible; the geotechnical engineer recommends ground improvement measures such as deep dynamic compaction or rammed aggregate piers, or alternative foundation solutions such as a mat foundation or load transfer platform to mitigate differential settlement risks. Bidders are advised to consult with ground improvement contractors to understand cost and schedule impacts. Davis-Bacon wage rates will apply to this contract, and successful bidders must provide performance and payment bonds equal to 100 percent of the contract price.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

400 One Norwegian Plaza Pottsville, PA 17901 www.benesch.com

P 570-622-4055

Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum 2\Addendum No2_20260915.docx

ADDENDUM NO. 2

To: All Perspective Bidders

Date: September 15, 2026

From: Kevin Marmas, P.E. Benesch

Subject: Schuylkill County – Emergency Training Facility Addendum No. 2 – Project No. 0325-900015.01

Bid Receipt: Bid will be received online via the PennBid Program by the Schuylkill County Controller until Wednesday, October 21, 2026, at 9:00 AM, (prevailing time).

This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated September 2026.

1. Geotechnical Report is attached for your reference and made part of the specifications.

2. Public Works Employment Verification Form, please complete and upload with your bid submission.

This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.

The Bidder shall acknowledge receipt of this Addendum in the appropriate space on PennBID.

End of Addendum No. 2

November 25, 2024 Project #1020223.000

Mr. Michael Rohl, PE, CBSI Alfred Benesch & Company 250 Centronia Road, Suite 150 Allentown, PA 18104

RE: PROPOSED EMA FIRE SCHOOL BUILDING

Firemens Road, Schuylkill County, Pennsylvania Geotechnical Report Summary

Dear Mr. Rohl:

Barry Isett & Associates, Inc. (Isett) performed this geotechnical investigation for the proposed Fire School Building. The current development scheme consists of the construction of a new single-story Fire School Building with a footprint of 14,100 SF and FFE of 1496.30 feet. Site grades will be lowered throughout much of the site during the proposed development. This report presents the investigation findings and provides recommendations for the design and construction.

The site is located within the footprint of a former coal mine. Historical mine records indicted that the former mine consisted of a surface mine underlain by deep mine tunnels. The former strip mine was backfilled between 1969 and 1992.

The subsurface investigation for this study included a total of six (6) borings which were performed on October 22 and October 23, 2024. The site was found to be underlain by successive strata of existing fill, native soil, and bedrock. The existing fill was found to be highly variable in both consistency and thickness. The fill was found to extend to depths up to 29 feet.

The variable composition and density of the existing fill indicate that the mine was backfilled in an uncontrolled (uncompacted) manner. The variable thickness and uncontrolled nature of the fill presents a significant risk for differential building settlement.

The existing fill must be improved in order to minimize the risk of differential settlement. Due to the thickness of the existing fill, conventional soils exchange (removal and replacement) is not considered a viable remediation option. A ground improvement program can be implemented to strengthen the existing fill soils in place for support of shallow foundations. Alternatively the structure can be built utilizing a mat foundation.

Executive Summary November 15, 2024 Geotechnical Report Proposed EMA Fire School Building Sheet 2 of 2

Deep Dynamic Compaction is believed to be the move viable ground improvement option. A ground improvement program is anticipated to add a significant cost to construction. Isett recommends that ground improvement contractors be consulted to better understand how ground improvement will impact the project budget and construction schedule.

We appreciate the opportunity to serve you and look forward to the successful completion of this work.

Please let us know if there is anything Isett can do to help move this project forward.

Sincerely, Sean D. Burns, P.G.

Project Geologist

James Kugel, P.E.

Geotechnical Engineer, Department Head

Geotechnical Engineering Report for the

Proposed EMA Fire School Building Firemens Road Ryan Township and West Mahanoy Township Schuylkill County, Pennsylvania

Prepared for:

Alfred Benesch & Company 250 Cetronia Road, Suite 150 Allentown, PA 18104

Prepared by:

Barry Isett and Associates, Inc.

5420 Crackersport Road Allentown, Pennsylvania 18104

Sean D. Burns, P.G.

PA Registration: PG-005536 Project Geologist

James D. Kugel, P.E.

PA Registration: PE-091073-E Geotechnical Engineer / Department Head

Dated: November 25, 2024 Project No.: 1020223.000

Table of Contents

1.0 SCOPE OF GEOTECHNICAL SERVICES

2.0 EXISTING CONDITIONS

3.0 PROPOSED CONSTRUCTION

4.0 DOCUMENT REVIEW

4.1 Regional Bedrock and Surficial Geology Maps

4.2 Historical Aerial Photographs and Topographic Maps

4.3 Historical Mine Maps

4.4 Infiltration Report by ECS Mid-Atlantic, LLC

5.0 SUBSURFACE INVESTIGATION

5.1 Summary of Field Investigation Methods

6.0 GEOTECHNICAL RECOMMENDATIONS

6.1 Demolition and Clearing

6.2 Foundations Options

6.2.1 Shallow Foundations after Ground Improvement

6.2.2 Shallow Foundations atop Load Transfer Platform

6.2.3 Mat Foundation

6.3 Ground Improvement Options

6.3.1 Deep Dynamic Compaction (DDC)

6.3.2 Rammed Aggregate Piers

6.4 Concrete Slabs

6.5 Flexible Pavements

6.6 Seismic Design Information

6.7 Excavation

6.8 Groundwater Control

6.9 Structural Fill

6.9.1 Reuse of Onsite soils

6.9.2 Imported Structural Fill

6.10 Fill Placement and Compaction

6.11 Environmental Considerations

6.12 Construction Quality Control

List of Appendices

Appendix A – Figures

Figure 1 – Site Aerial Photograph

Figure 2 – Regional Topographic Map

Figure 3 – Regional Geologic Map

Appendix B – Site Grading & Utility Plan Plan by Benesch

Appendix C – Historical Mine Map Review and Review of Reclamation Documents by Isett

Appendix D – Test Pit Logs by ECS Mid-Atlantic, LLC

Appendix E – Location Plan

Appendix F – Subsurface Data

Geotechnical Engineering Report November 25, 2024 Proposed EMA Fire School Schuylkill County, Pennsylvania Sheet 1 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

1.0 SCOPE OF GEOTECHNICAL SERVICES

Barry Isett & Associates, Inc. (Isett) performed a subsurface investigation for the proposed EMA Fire School Building located along Firemens Road adjacent to the existing Schuylkill County Training Academy (the site). This geotechnical report presents the investigation findings and provides recommendations for the design and construction of the proposed building. This study included review of applicable site information from published sources; review of previous subsurface information obtained at the site by others; a subsurface investigation consisting of borings; an analysis of the geotechnical data acquired at the site; and presentation of recommendations for the proposed new construction.

This report satisfies the scope of geotechnical services outlined in the Proposal for Geotechnical Services prepared by Isett dated May 15, 2023 (Revised September 17, 2024).

Elevations presented in this report reference survey data presented in the Existing Conditions & Demolition Plan and Subdivision Plan prepared by Alfred Benesch & Company (Benesch) dated October 19, 2023. Orientations are in reference to cardinal directions unless otherwise noted.

This investigation does not include an evaluation of environmental conditions or stormwater management considerations.

2.0 EXISTING CONDITIONS

The approximately 3.0-acre site consists of an undeveloped grass field and brush. The site is bordered as follows:

• North: Densley wooded undeveloped land,

• East: Firemens Road and Commercial buildings,

• South: Schukill County Training Academy, a resevior, and Interstate 81,

• West: Densley wooded undeveloped land.

Elevations within the site vary from approximately El. 1508 feet in the northwest to El.1486 feet in the southeast. Grade generally slopes downward from the west to the east.

The site is interested by the township lines of West Mahanoy Township and Ryan Township.

An aerial photograph showing the location of the site is included in Figure 1 in Appendix A.

Existing site conditions are shown in the Existing Conditions and Demolition Plan by Benesch included as Appendix B.

3.0 PROPOSED CONSTRUCTION

Based on the Preliminary/Final Major Subdivision and Land Development Plan prepared by Benesch dated October 19, 2023, it is understood that the proposed development includes the following:

• Construction of a new single-story office/training facility with an attached garage in the center of the site. The proposed building will have an approximate combined footprint of 14,100 square feet (SF), with approximately 10,900 square feet of office/training space and 3,200 square feet of garage space. The proposed building will have a finished floor elevation (FFE) of approximately El. 1496.30 feet.

• Construction of five (5) surface stormwater best management practices (BMPs).

• Construction of new parking area/drive lanes to accommodate 116 new parking spaces.

Schuylkill County, Pennsylvania Sheet 2 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

Site grades will be lowered throughout much of the site during the proposed development. Cuts up to 7 feet and fills up to 2 feet will be required to adjust grades within the proposed building footprint.

Cuts up to 10 feet and fills up to 2 feet will be required to achieve proposed grades within the proposed parking lots. Deeper cuts (up to 14 feet) will be required to lower grades for the proposed stormwater swales and basins.

The latest development concept does not include site retaining walls.

Preliminary structural loads were provided by Benesch. The typical and maximum interior column loads are anticipated to be 35 kips and 50 kips, respectively. The typical and maximum exterior column loads are anticipated to be 15 kips and 30 kips, respectively. Isett should be provided the opportunity to review the final structural loads and revise the recommendations provided herein, if necessary.

Existing site conditions are shown in the Site Grading & Utility Plan by Benesch included as Appendix B.

Erosion & Sediment Control Plan by Benesch

Schuylkill County, Pennsylvania Sheet 3 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

4.0 DOCUMENT REVIEW

Published geologic information and reports pertaining to the site were reviewed for this study.

Pertinent information with respect to the geotechnical evaluation of the site is summarized in the following sections.

4.1 Regional Bedrock and Surficial Geology Maps

Published geologic and topographic information presented by the Department of Conservation and

Natural Resources (DCNR) pertaining to the site was reviewed prior to the subsurface investigation.

Information pertinent to the development of the site obtained from this research is as follows:

The site is included in the United States Geologic Survey (USGS) Shenandoah 7.5’ Topographic

Quadrangle Map. The project site is situated in the Anthracite Upland Section of the Ridge and

Valley Physiographic Province. The dominant topographic landform consists of an upland surface having low, linear rounded hills, strip mines, and waste piles; upland surrounded by an escarpment, a valley, and a mountain rim. Sediments originate from fluvial erosion, some glacial erosion, and periglacial mass wasting. Relief is low (100 to 300 feet) to high (601 to 1,000 feet). The geologic structure consists of many narrow folds having steep limbs; many faults.

Published geologic mapping indicates that the majority of the site is underlain by the

Pennsylvania-aged Pottsville Formation. The northern portion of the site is underlain by the

Pennsylvania-aged Llewellyn Formation. These two formations are separated by a dormant geologic fault.

The Pottsville Formation consists of mainly of well to very well cemented, predominantly gray medium grained to conglomeratic sandstone beds (ranging in thickness from about 10 to 70 feet), with minor amounts of siltstone, claystone, shale, thin discontinuous coals, and, in Mercer and adjacent counties, two marine limestones. Total thickness ranges from about 200 to 275 feet.

The Llewellyn Formation consists of sandstone, conglomerate, shale, fire clay, slate, and numerous coal beds. The sandstone and conglomerate are well cemented but highly fractured. The beds are exposed in the Wyoming Valley and in the coal fields around Hazleton. The Llewellyn

Formation has been folded into a series of shallower troughs near Hazleton. These troughs have been intensely folded, faulted, and, in places, overturned. The maximum reported thickness of this formation is 830 feet.

A dormant fault between the Pottsville Formation and the Llewellyn Formation runs through the northern portion of the site. The New Boston Syncline is directly south of the site and trends east to west.

Published soils mapping obtained from the United States Department of Agriculture (USDA) Natural

Resources Conservation was reviewed prior to the subsurface investigation. Surface soils within the site are characterized as Udorthents, strip mine. The parent material is man made and altered materials from mixed rock types resulting from strip mining.

Maps depicting the regional topography and bedrock geology are depicted in Figure 2 and Figure 3 of Appendix A.

4.2 Historical Aerial Photographs and Topographic Maps

Historic site documentation was obtained from the USGS, the Nationwide Environmental Title

Research, LLC, the Pennsylvania Imagery Navigator and Google Earth Pro. The earliest historical

Schuylkill County, Pennsylvania Sheet 4 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

imagery of the site is from 1942 and shows strip mining activity near the site. Between 1942 and

1958 the mining activity had ceased, and the site was left undeveloped. Between 1958 and 2004, the site was used as an access road. Between 1999 and 2004, the site was regraded and enclosed with a fence. The site has remained relatively unchanged between 2004 and present day.

4.3 Historical Mine Maps

Isett performed a mine map review as part of this study to evaluate the occurrence of historic strip and subsurface mining within the project area. Historical mine maps indicate that the site is underlain by areas of both surface strip mining and subsurface coal mines. The strip-mined areas appear to have been backfilled and grades raised by as much as 25 feet to 30 feet. The deep coal mines are located approximately 200 feet below ground surface. A potential mine shaft is located below the proposed stormwater basin. Another potential mine shaft is shown below the proposed fire school footprint.

The Historical Mine Map Review and Review of Reclamation Documents by Isett is provided in Appendix C.

4.4 Infiltration Report by ECS Mid-Atlantic, LLC

An infiltration report for the site was prepared by ECS Mid-Atlantic, LLC dated June 28, 2023. The subsurface investigation consisted of five (5) test pits and infiltration testing for the proposed infiltration basins at the site. Based on the findings of the subsurface investigation, the site is underlain by existing fill and native material. Bucket refusal was encountered in each test pit at depths ranging from 5.0 feet to 9.0 feet below existing grades. Test Pits TP-01 to TP-04 encountered bucket refusal within the existing fill stratum and TP-05 encountered bucket refusal in native material. The infiltration rate achieved during the testing ranged between 0.00 in/hour and

0.88 in/hour with a factor of safety of 2 applied.

The Test Pit Logs from the Infiltration Study are provided as Appendix D for reference.

5.0 SUBSURFACE INVESTIGATION

The subsurface investigation for this geotechnical study consisted of six (6) geotechnical borings within the proposed development area.

5.1 Summary of Field Investigation Methods

Six (6) borings, identified as B-1 through B-6, were completed by Eichelbergers, Inc. using a track mounted Geoprobe 7822 DT drill rig on October 22 and October 23, 2024.

The borings were located in the field by Isett personnel using existing features as reference. The borings were completed under the full-time observation of Isett geotechnical staff under the direct supervision of an Isett Professional Geotechnical Engineer. Logs documenting sample information and field observations were maintained throughout the investigation.

The borings were advanced to depths ranging from 10.0 feet to 36 feet below existing grades using a 6-inch outer-diameter, hollow stem continuous-flight auger and NQ-sized rock core barrel. Refusal of the split-barrel spoon (SPT value greater than 50 blows over 6 inches) was encountered at boring locations B-1, B-3, B-4, and B-6 within the existing fill and residual strata. Refusal of the hollow-stem augers was encountered at a depth of 20.0 feet below existing grade at the location of B-3.

Schuylkill County, Pennsylvania Sheet 5 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

Standard Penetration Test (SPT) samples of the subsurface soils were obtained using a 2-inch outer-diameter split-barrel (split-spoon) sampler in accordance with American Society for Testing and Materials (ASTM) D1586. The sampler was driven using an automatic hammer. The number of hammer blows required to drive the soil sampler 6 inches into the ground (the blow count) was recorded for each soil sample on the field logs. Blow counts are used to calculate the SPT value for a sample, and this SPT value is used to estimate engineering parameters necessary for geotechnical analyses. SPT values included in this report and relied on for analysis have been corrected for hammer efficiency.

The presence of bedrock was indicated by the refusal of the hollow-stem augers and by rock coring.

Rock core samples were collected using a diamond-embedded NQ-sized bit via rotary methods in accordance with ASTM D2113. Water was added to the hole to cool the bit and evacuate the cuttings during coring.

Groundwater levels were inferred from the moisture content of the samples obtained during the drilling procedures and detected using a water level meter after the completion of each boring and prior to rock coring. Boreholes were backfilled using the extracted soil cuttings.

The boring locations are shown on the Location Plan included in Appendix E.

5.2 Summary of Subsurface Data

The following strata were identified during the geotechnical investigation and categorized based on their engineering properties and environment of deposition/formation. Descriptions of each distinct stratum are as follows:

• Topsoil was encountered directly at the ground surface at the location of B-1, B-3, B-4, and B-5. The presence of organic material was inferred visually and by odor. Average topsoil thickness was approximately 3 inches.

• Existing Fill was encountered at all boring locations either directly beneath the topsoil or directly at the ground surface. The fill was found to extend to depths ranging from 3.8 feet to

29.0 feet below existing grades. Soils in this stratum were heterogenous with compositions ranging from Sandy SILT (ML), SILT (ML), Silty SAND (SM), and Poorly-Graded fine SAND (SP) in accordance with the USCS, were dry to moist, and exhibited low plasticity. The existing fill contained deleterious material including coal fragments, coal ash, and wood.

SPT values obtained within the stratum ranged from 2 to 62 blows per foot with an average of 19 blows per foot, indicative of a very loose to very dense relative density.

The thickness of the fill was found to increase from north to south.

• Residuum was encountered directly below the existing fill at all boring locations except for B-2. Soils of the stratum consisted of Well-Graded GRAVEL (GW), Poorly-Graded GRAVEL (GP), SILT (ML), Sandy SILT (ML), and Silty SAND (SM) in accordance with the USCS, were dry to moist and exhibited low plasticity or were non-plastic.

SPT values obtained while sampling within the stratum ranged from 6 to 125 blows per foot with an average of 43 blows per foot, indicative of a loose to very dense relative density.

• Anthracite Coal Seam was encountered beneath the existing fill and above the residuum at the location of B-4 at a depth of 29.0 feet below existing grade and extending to a depth of

35.5 feet (from El. 1473 to El.1466).

Schuylkill County, Pennsylvania Sheet 6 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

SPT values (corrected for hammer efficiency) obtained while sampling within the stratum ranged from 0 to 3 blows per foot with an average of 2 blows per foot, indicative of a very loose relative density.

• Bedrock was encountered directly beneath the residuum at the location of B-3 at a depth of

20.0 feet below existing grades (corresponding to El.1475). The bedrock consisted of sandstone interbedded with shale, was dark gray to black, soft to medium hard, and laminated to thinly bedded.

• Groundwater was not encountered during the investigation. Groundwater readings were taken over the limited duration of the geotechnical investigation, and are indicative of groundwater conditions at this time, only. Groundwater levels may fluctuate with varying seasonal and climatological conditions.

Subsurface Profiles and Boring Logs are provided in Appendix F.

6.0 GEOTECHNICAL RECOMMENDATIONS

The site is underlain by a thick deposit of existing fill overlying residual soils and sandstone bedrock.

Both the mine maps and borings suggest that the highwall of the former mine runs through the proposed building footprint. The existing fill extends to depths ranging from 3 feet to 29 feet. The variable composition and density of the existing fill indicate that the mine was backfilled in an uncontrolled (uncompacted) manner. The variable thickness and uncontrolled nature of the fill presents a significant risk for differential building settlement.

The existing fill must be improved in order to minimize the risk of differential settlement. Due to the thickness of the existing fill, conventional soils exchange (removal and replacement) is not considered a viable remediation option. A ground improvement program can be implemented to strengthen the existing fill soils in place for support of shallow foundations. Alternatively the structure can be built utilizing a mat foundation.

Isett presents the following recommendations for design and construction of the proposed site development:

6.1 Demolition and Clearing

Site clearing should begin with grubbing, including, at a minimum, removing all root mass, vegetation, and topsoil within the construction area and extending a minimum of 10 feet beyond.

Average topsoil thickness encountered during this study was approximately 3 inches. The grubbed materials, including topsoil, should be stockpiled away from the construction areas for reuse or proper disposal off-site.

Earthwork to establish grades within the building pad will require cuts and fills on the order of 14 feet and 2 feet respectively. Based on the latest grading plan, it is anticipated that a soil export will be necessary to balance the earthwork volume.

Any existing utilities present on the site and to remain in service should be rerouted from the work area or protected during construction. Coordination to abandon or reroute any existing utilities should be coordinated directly with the utility owner. Utilities designated to be abandoned should be removed or filled using flowable fill. Prior to placing flowable fill, the flow path of all pipes should be verified to ensure that filling the pipes will not adversely affect nearby properties and/or utilities.

Excavations made to remove existing utilities should be backfilled with compacted structural fill

Schuylkill County, Pennsylvania Sheet 7 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

under the supervision of the Geotechnical Engineer’s on-site representative in accordance with this report.

Any exposed soil within the proposed development areas should be proofrolled prior to placing structural fill to raise grades or constructing finished surfaces. Proofrolling requires a minimum

10-ton smooth drum roller, or equipment with similar contact pressure, to pass slowly over the surface at a speed not to exceed approximately 3 miles per hour. Where equipment access is restricted, the equipment with greatest contact pressure that can access the work area should be used for the proofroll. A representative of the Geotechnical Engineer of Record shall observe the ground surface as the roller passes and note any signs of instabilities such as rutting or surface deflection. Additional proofrolling should be performed in any area deemed necessary by the

Geotechnical Engineer based on observations.

Proofrolling of subgrade may be necessary more than once, depending on the construction schedule and precipitation. The subgrade should be sealed at the end of each workday by slow passes of compaction equipment. Once subbase material is placed on a subgrade, construction travel should be restricted from the area. Any surface instabilities revealed by the proofroll should be remediated at that time prior to structural fill placement.

Subsurface instabilities are anticipated to occur throughout the site including the proposed building and parking areas. Ground improvement and/or a load transfer platform can be implemented to stabilize the site and reduce future settlements.

6.2 Foundations Options

Preliminary column loads are anticipated to range from 15 kips to 50 kips. Under the anticipated structural loads, conventional shallow foundations bearing in the existing fill stratum would experience excessive settlement.

The following foundation options are considered viable to support the proposed building and limit differential settlements:

• Shallow foundations and slab-on-grade after ground improvement

• Shallow foundations and slab-on-grade atop load transfer platform

• Mat foundation

The typical depth of frost penetration in West Mahanoy Township is approximately 48 inches. Bottom of foundations along building perimeters within interior, unheated areas, and frost walls for mat foundations must be placed at least a depth equal to the frost depth below the final exterior grade for protection against uplift from frost heave.

Foundation bearing materials must be unfrozen, relatively dry, firm, and stable prior to the placement of foundation concrete. Loose material shall be completely removed from the foundation excavation, and the bottom of the excavations shall be compacted with hand-operated equipment such as a

“jumping-jack” tamper, or walk-behind trench roller.

Continuous foundations can be stepped if the bottom of the foundation maintains a minimum of 4 feet of soil cover below final exterior grade for protection against frost heave. Steps are to be vertical

(formed) and should not exceed 2 feet in vertical change over a 5-foot horizontal distance. Steps greater than 2 feet in height should be designed to resist stress from lateral soil pressure and adjacent foundation surcharge.

Schuylkill County, Pennsylvania Sheet 8 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

6.2.1 Shallow Foundations after Ground Improvement

Ground improvement can be implemented to densify site soils in place and reduce total and differential settlements under the structural loads. Deep dynamic compaction and Rammed

Aggregate Piers are anticipated to be the most viable ground improvement options.

If a ground improvement program is implemented, Isett anticipates the proposed building can be designed using shallow foundations with a bearing capacity of 3.0 ksf with differential settlements less than 0.75-inch.

6.2.2 Shallow Foundations atop Load Transfer Platform

A load transfer platform (LTP) is a compacted soil element used to increase the foundation load distribution area over weak strata. LTPs are strengthened using geosynthetic reinforcement.

Installation of an LTP would require over-excavation at least four (4) feet below the proposed foundation bearing elevation (corresponding to approximately El. 1488 feet), and extending no less than five (5) feet beyond the proposed foundation dimension in all directions.

Isett recommends the LTP consist of dense-graded aggregate meeting the gradation of PennDOT

2A placed in controlled compacted lifts in accordance with this report. The LTP should be placed atop a layer of interaxial (InterAx) geogrid, and mechanically stabilized using a second layer of

InterAX geogrid placed at approximately mid-height of the LTP.

Isett anticipates that the proposed mechanically stabilized LTP would be capable of limiting post-improvement total settlement to 1.0 inch and differential settlement to 0.75-inch with a bearing capacity of 3.0 ksf.

6.2.3 Mat Foundation

A mat foundation could be designed to reduce the differential settlement of the proposed building bearing atop unimproved ground. A mat foundation is a reinforced concrete foundation of uniform or variable thickness that covers the entire building area. Mat foundations act to spread the load evenly throughout the footprint of the building and provide a relatively stiffer overall foundation compared to spread footings, resulting in smaller differential settlements.

Design of a mat foundation is an iterative process between the geotechnical and structural engineer during the design phase in order to optimize the reinforcement design and converge the settlements between the geotechnical and structural models. Based on the preliminary loads from the structural engineer, total settlements of a mat foundation bearing on native soils may exceed the project tolerances. The allowable bearing capacity for the design of the mat slab is 1.0 ksf with total and differential settlements less than 1.0 inch and 0.75-inch, respectively.

6.3 Ground Improvement Options

The existing fill is heterogeneous and variable throughout the site and contains deleterious material, such as coal ash, coal, and organics. Improvement of the existing fill is required to support shallow foundations.

Typically, improved ground is capable of supporting 3 ksf to 7 ksf applied loads. The capacity of the improved ground is a function of the ground improvement technique, imparted compaction energy, diameter, length and spacing of ground improvement elements, thickness and strength of the

Schuylkill County, Pennsylvania Sheet 9 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

unsuitable soil layer, and competency of the underlying bearing stratum.

Ground improvement is typically delegated design and installed by the design-build contractor. Prior to ground improvement work, the contractor shall submit a work plan and drawings for approval by the Geotechnical Engineer of Record. The specific ground improvement program may vary from the preliminary work plan submittal based on the Contractor’s experience and observed ground response. The Geotechnical Engineer of Record may direct additional energy applications during the ground improvement should there be evidence of soft areas or locations with a lesser degree of improvement.

A representative of The Geotechnical Engineer should provide continuous oversight during all ground improvement procedures to ensure the ground improvement work satisfies the specified performance criteria.

Isett offers the following ground improvement options for shallow foundation support:

6.3.1 Deep Dynamic Compaction (DDC)

Deep dynamic Compaction (DDC) involves densification of loose natural and fill deposits by repeatedly dropping a heavy tamper (generally 12 to 70 kips) from heights ranging from approximately 40 feet to 100 feet to reduce the anticipated settlement under the proposed structural loading.

Deep dynamic compaction (DDC) is an effective ground improvement method in soils with low plasticity, low saturation, and a water content below the plastic limit. Generally, the soils within the existing fill stratum meet these criteria, and are susceptible to improvement provided the energy is applied in multiple phases to allow complete pore pressure dissipation between phases.

DDC should be performed subsequent to site preparation and grading. The building area should be sufficiently firm and level to support the DDC crane.

After each phase, craters left by the compaction process should be leveled with a bulldozer by grading soil into the craters. Craters should be leveled on a daily basis to prevent accumulation of water, ice, or other debris, and to facilitate subsequent dynamic compaction passes. Craters are expected to be deep. Structural fill may have to be imported during the DDC program to fill the craters.

To confirm the degree of desired improvement is achieved, Isett recommends a verification testing program. The program should consist of confirmation borings at locations determined by the

Geotechnical Engineer of Record.

Ground vibrations produced during DDC could damage nearby structures and utilities. Prior to beginning the DDC program, adjacent structures should be surveyed and documented thoroughly for existing defects. Vibration monitoring using seismographs should be performed during dynamic compaction to ensure vibrations along adjacent properties, active utilities, and near existing structures are within acceptable levels.

DDC can also be utilized to improve subgrades outside of the proposed building footprint for support of pavement.

6.3.2 Rammed Aggregate Piers

Aggregate piers are a ground improvement method consisting of compacted vertical stone columns installed through weak strata. The incorporation of the compacted aggregate piers into the soil mass

Schuylkill County, Pennsylvania Sheet 10 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

increases the load bearing capacity of the soil and reduces total and differential settlement under applied loads.

The aggregate pier diameter, length, and spacing is dependent upon the design loads and performance criteria specified by the Geotechnical Engineer. The spacing of the aggregate piers is typically increased at column locations, and dispersed below slabs and other lightly loaded structural elements. Generally, aggregate piers are not an economically and logistically viable ground improvement technique for improvement of asphalt subgrades.

To confirm the degree of desired improvement is achieved, Isett recommends a third-party quality control program. The program should involve dynamic cone penetrometer (DCP) field testing of aggregate pier elements after installation to verify proper compaction.

Aggregate piers should consist of dense-graded aggregate to reduce permeability. A cement admixture may also be desired to further reduce aggregate permeability and increase strength.

Ground accelerations generated during aggregate pier installation may impact nearby structures and utilities. Prior to beginning aggregate pier installation, adjacent structures should be surveyed and documented thoroughly for existing defects.

6.4 Concrete Slabs

The proposed floor can be designed as a slab-on-grade provided ground improvement is performed or a load transfer platform is utilized. It is anticipated that the subgrade will consist of improved existing fill or controlled structural fill.

The slab-on-grade should be supported on a minimum 8-inch-thick layer of crushed aggregate to allow for a uniform distribution onto subgrade materials. The crushed aggregate shall meet the requirements for AASHTO #57 stone or an equivalent. Concrete slab-on-grades can be designed for a modulus of subgrade reaction of 100 pounds per square inch per inch (pci) when placed on compacted improved existing fill, or load transfer platform. Bearing materials must be dry, firm, and stable prior to the placement of concrete slabs.

A moisture barrier is recommended for damp-proofing slab floors. The placement of the vapor barrier should be performed in accordance with the manufacturer’s recommendations and the guidelines presented by the Portland Cement Association.

6.5 Flexible Pavements

Areas of unsuitable subgrade soil are expected to be encountered within the proposed pavement area. Due to the thickness of the unsuitable existing fill stratum within the proposed pavement area, conventional soils exchange (removal and replacement) is not expected to be feasible to stabilize subgrades.

To stabilize pavement subgrades, Isett recommends expanding the footprint of the ground improvement or load transfer platform to include the proposed pavement area. The load transfer platform below the proposed pavement should extend at least 2 feet below bottom of subbase elevation, and include a double layer of geosynthetic reinforcement.

The pavement section should include a free-draining, crushed aggregate subbase. Construction traffic should be limited after the subbase is placed.

Schuylkill County, Pennsylvania Sheet 11 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

6.6 Seismic Design Information

The determination of earthquake loads based on structural design recommended in the International

Building Code (IBC) requires that a site be classified based on the average properties of the top 100 feet of soil and rock materials. Based on the preliminary boring data, this site meets the criteria for a

Seismic Site Classification D based on Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineering (ASCE 7-10), Chapter 20.

The above classification is based on theoretical values assumed from the uncorrected SPT values measured during the field investigation.

6.7 Excavation

A bulk cut is required to achieve the proposed final site grades. Excavations are expected to occur primarily within the existing fill and residual soil strata. A soil export will be necessary to balance earthwork since there will be limited fill placement.

Bedrock was encountered at a depth of 20 feet below existing grades corresponding to El. 1475 feet.

Based on the anticipated minimum foundation bearing elevation of El. 1491.3 feet, rock excavation will not be required for construction of proposed building foundations.

Localized bedrock excavation may be required for the deeper cuts on the north side of the site. Late model equipment fitted with rock ripping teeth and/or a hydraulic hammer attachment to an excavator are anticipated to be suitable for performing rock excavations, if needed.

If construction personnel or equipment are to enter an open excavation, the excavation must be sloped, benched, or shored to prevent collapse in accordance with Occupational safety and Health

Administration (OSHA) guidelines presented in Safety and Health Regulations for Construction, 29

CFR 1926, Subpart P. For example, temporary excavations in type C soils shall have a maximum allowable slop of 1.5H:1V. A competent person as defined by the aforementioned OSHA regulation is required to confirm stability of all excavations during construction. If deemed necessary by said competent person, the design of excavation support needs to consider lateral earth pressures and surcharges such as loads from construction equipment, traffic, adjacent structures, etc. The majority of site excavation will occur within the existing fill. The existing fill is expected to classify as OSHA

Type C soil.

Excavations adjacent to existing structures, such as foundations, walls, slabs, roadways, pavements, or utilities, shall be reviewed by a representative of the Geotechnical Engineer of Record to evaluate undermining risks. Generally, excavations extending below the 1H:1V influence zone of these structures present the potential to undermine these structures.

6.8 Groundwater Control

Groundwater was not encountered during this geotechnical investigation. Groundwater levels may fluctuate from levels reported herein with seasonal and climatological patterns.

Based on conditions encountered during the subsurface investigation, excavations for foundations and supporting utilities are anticipated to be above the regional groundwater table.

Surface runoff or groundwater seepage during construction should be controlled using conventional submersible pumps and gravel sumps. The pumping and discharge of all dewatering effluent should be performed in accordance with all applicable regulations and any environmental requirements for the site.

Schuylkill County, Pennsylvania Sheet 12 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

The pumping and discharge of all dewatering effluent should be performed in accordance with all applicable regulations and any environmental requirements for the site.

6.9 Structural Fill

Structural fill is material used to support foundations, pavements, slabs and sidewalks, and backfill walls. Ideally, structural fill shall meet the following criteria:

• Relatively free of debris, waste, frozen materials, vegetation, organics, ash cinders.

• Homogeneous.

• Having a plasticity index of less than 10.

• Free of rock or gravel larger than three inches in any dimension.

• Containing less than 30 percent by weight smaller than the No. 200 sieve (fine particles).

• Meeting the definition of clean fill according to PA DEP Management of Fill Policy, 258-2182-

773.

• Containing less than 0.5 percent sulfur.

6.9.1 Reuse of Onsite soils

Materials to be made available for reuse as structural fill are expected to consist mainly existing fill with minor amounts of residual soils. The onsite existing fill soils are variable and contain various amounts of deleterious materials and are not considered suitable for reuse as structural fill.

Residual soils made available during construction are considered suitable for reuse as structural fill.

Traditional moisture conditioning may be required and is time consuming, but is expected to be feasible during periods of warm weather (May through September). Traditional moisture conditioning outside of this period may result in excessive construction delays.

6.9.2 Imported Structural Fill

Imported structural fill soils should meet the requirements for ideal structural fill outlined previously in this Section. In addition to these criteria, imported structural fill shall be classified as a well-graded, poorly-graded, or silty gravel (GW, GP, or GM); a well-graded, poorly graded, or silty sand (SW, SP, SM); or a combination of any of these classifications by the USCS.

The Management of Fill Policy adopted by the PA DEP provides procedures for determining whether fill is “clean fill” prior to the import or export of materials. The ESA Phase I results may necessitate the need for environmental sampling and analysis. In addition to extra costs, these environmental services can add weeks to months to the approval of moving soil on or off-site. Because the site grading requires net soil export, time to sample and test the site soils should be accounted for in the project schedule and budget.

All structural fill should be reviewed by the Geotechnical Engineer prior to import.

6.10 Fill Placement and Compaction

Structural fill should be placed in horizontal or near-horizontal “lifts” and compacted to the satisfaction of the Geotechnical Engineer of Record.

Fill materials shall not be placed in areas with standing water, atop frozen subgrade, or on surfaces that have not been approved by the Geotechnical Engineer of Record.

Schuylkill County, Pennsylvania Sheet 13 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

Generally, the loose lift thickness of structural fill should not exceed 12 inches and should be compacted with a smooth-drum, vibratory roller with a minimum static drum weight of 10 tons or equivalent compaction equipment. In trenches and other areas with limited maneuverability, fill should be placed in loose lifts not exceeding 4 inches thick, and should be compacted with smaller compaction equipment (smaller drum rollers, walk behind rollers, jumping jack style tampers, etc.).

Structural fill shall be placed with a moisture content within 2 percent of the optimum moisture content for compaction as determined by ASTM D698 or ASTM D1557.

The recommended compaction criteria for structural fill areas are provided in Table I below. The level of compaction is the density that equates to a percentage of the maximum dry density (MDD) as determined by either a Standard Proctor test (ASTM D698) or a Modified Proctor test (ASTM D1557).

TABLE I – COMPACTION CRITERIA

Structural Area Percent MDD

(ASTM D698)

Percent MDD

(ASTM D1557)

Foundation Support

Wall Backfill

Pavement Subgrade

Slab Support

Sidewalk Support

98 95

Utility Trenches Not Beneath a Structure 95 92

Landscaped Areas 92 90

A successful compaction routine should be determined on-site with the support of a representative of the Geotechnical Engineer of Record. This routine should include lift thickness and the number of passes of the compaction equipment needed to achieve required compaction.

6.11 Environmental Considerations

Industrial fills or soils contaminated with industrial fill can be highly corrosive to steel and concrete.

Particularly, industrial fill such as coal ash, can be acidic or alkaline and may have high sulfate and chloride content. Significant quantities of coal silt were identified during the subsurface investigation completed for this study.

The site should be evaluated by an environmental professional to identify any potential environmental conditions that would impact future development. If environmental impacts to the soil and/or groundwater are identified and result in significant offsite disposal costs, it may be more economically feasible to utilize a ground improvement program or foundation system that minimizes the amount of soil export.

Environmental conditions that have yet to be identified and/or characterized may override geotechnical recommendations presented herein. Environmental conditions should be considered with respect to impacts on the geotechnical aspects of the work described in this report and together with recommendations regarding on-site reuse of site materials, foundation design, and off-site disposal of materials. If future action is required to address the environmental conditions, the

Geotechnical Engineer of Record should be provided the opportunity to review the action plan and revise engineering recommendations provided herein, if necessary.

Schuylkill County, Pennsylvania Sheet 14 of 14

Project No.: 1020223.000 Barry Isett & Associates, Inc.

6.12 Construction Quality Control

This project will require bulk earthwork and ground improvement. Special inspections should be performed continuously throughout these construction activities.

Any unexpected conditions encountered during excavation should be further evaluated by a licensed geotechnical professional and/or foundation design engineer.

As the project approaches construction phase, the Geotechnical Engineer of Record should participate in descope and pre-construction meetings with the project team and prospective site and foundation contractors to discuss anticipated construction challenges. The Geotechnical Engineer should review the final structural design documents, assist with generation of applicable project specifications, and review design submittals provided by design-build and specialty contractors.

The Geotechnical Engineer of Record should remain active in the project throughout construction phase by reviewing shop drawings relating to geotechnical aspects of the construction, reviewing field reports prepared by the Owner’s third-party construction materials testing agency, responding to Request for Information notices related to geotechnical aspects of construction, preparing supplemental geotechnical documents for construction, and performing Site visits as requested by the Contractor, Architect, or Owner to evaluate field conditions.

Although this geotechnical investigation was completed within industry standards of the profession, earthen materials can vary between testing locations. As a result, the subsurface conditions described or interpreted herein should be confirmed by an on-site representative of the Geotechnical

Engineer of Record during construction in order to identify conditions that deviate in important ways from the design assumptions, and confirm the applicability of the recommendations presented herein.

Providing continuity of geotechnical services from initial investigation through construction allows for a quick reaction to such situations, and a means to provide a resolution to issues effectively and economically. As the project moves from design into the construction phase, the budget should allow for all aspects of the earthwork construction to be inspected by a representative of the Geotechnical

Engineer of Record including site preparation, fill remediation, deep foundation oversight, subgrade verification, structural fill placement, underpinning, support of excavation, and compaction.

This report was prepared by Barry Isett & Associates, Inc. (Isett) in accordance with industry standards for the geotechnical profession.

The conclusions presented in this report are based on the subsurface data collected and their interpretation as stated in this report.

Actual field conditions can vary over time and between testing locations. Isett reserves the right to review and revise the recommendations contained within this report when design information varies from the listed assumptions. The conclusions and recommendations presented herein assume that construction practices will be completed following the industry standard of care and that Construction Quality Control will be overseen by a Professional Engineer qualified in Geotechnical Engineering and familiar with the content and intent of this report.

Appendix A drolando Image sburns Snapshot sburns Rectangle sburns Rectangle sburns Rectangle sburns Rectangle sburns Text Box

FIGURE 1

sburns Text Box

COPYRIGHT 2024

sburns Text Box 10/02/2024 sburns Text Box

EMA FIRE SCHOOL BUILDING

100 FIREMANS ROAD

FRACKVILLE

SCHUYLKILL COUNTY, PENNSYLVANIA

sburns Text Box DRAWING SOURCE: Google Earth - Accessed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .