11-Addendum No120260908.pdf
PDF 1015 KB Posted
- Solicitation number
- US.251947
- Issued by
- Somerset County, Pennsylvania
About this file
This is Addendum No. 1 to the bidding documents for the Schuylkill County Emergency Training Facility project (Project No. 0325-900015.01), issued by Benesch on September 8, 2026, and addressed to all prospective bidders. The addendum adds Section 220010 - Basic Requirements for Plumbing Construction to the specifications and modifies the original bidding documents dated September 2026. Sealed bids for the plumbing construction contract (Contract No. 2) will be received online via the PennBid Program by the Schuylkill County Controller until Wednesday, October 21, 2026, at 9:00 AM prevailing time, with bid results and tentative award available following the Board of Commissioners meeting on October 28, 2026. The project encompasses the construction of an emergency training facility and will be bid as four separate prime contracts: General Construction, Plumbing Construction, HVAC Construction, and Electrical Construction. All bidding documents are available at no cost through the PennBid portal at http://PennBid.bonfirehub.com.
The addendum includes comprehensive plumbing specifications covering basic requirements, common work requirements, excavation, meters and gauges, valves, identification systems, and insulation. Bid security in the amount of 10 percent of the total bid must accompany each submission in the form of a certified check, bank draft, or bid bond made payable to the County of Schuylkill. The successful bidder will be required to furnish Performance and Payment Bonds each in the amount of 100 percent of the contract price with an approved corporate surety. Davis-Bacon wage rates apply to this contract. The contract documents establish requirements for shop drawings, coordination drawings, equipment installation, piping systems, valve installation, and system identification per industry standards including ASME, AWS, ASTM, and NFPA specifications. All equipment, materials, and labor provided shall be warranted for a minimum of one year after substantial completion.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
400 One Norwegian Plaza Pottsville, PA 17901 www.benesch.com
P 570-622-4055
Y:\Pennsylvania\03XX-90S\0325-900015.01\Office_Docs\Specifications\Addenda\Addendum 1\Addendum No120260908.docx
ADDENDUM NO. 1
To: All Perspective Bidders
Date: September 8, 2026
From: Kevin Marmas, P.E. Benesch
Subject: Schuylkill County – Emergency Training Facility Addendum No. 1 – Project No. 0325-900015.01
Bid Receipt: Bid will be received online via the PennBid Program by the Schuylkill County Controller until Wednesday, October 21, 2026, at 9:00 AM, (prevailing time).
This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated September 2026.
1. Section 220010 – Basic Requirements – Plumbing Construction has been added to the specifications and is attached to this Addenda.
This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
The Bidder shall acknowledge receipt of this Addendum in the appropriate space on PennBID.
End of Addendum No. 1
BASIC REQUIREMENTS – PLUMBING CONSTRUCTION 220010 - 1
SECTION 220010 - BASIC REQUIREMENTS – PLUMBING CONSTRUCTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes general administrative and procedural requirements for plumbing system installations.
Administrative and procedural requirements are included in this Section and in various Division 1 Sections.
1.3 PERMITS AND FEES
A. Refer to Non-Technical Specifications, General Conditions for information relating to permits and fees.
1.4 PROJECT SCHEDULE
A. Refer to applicable Non-Technical Specification Sections for contract completion time and project construction schedule.
1.5 SHOP DRAWINGS AND SUBMITTALS
A. Follow the procedures specified in the Division 01 sections. Also refer to individual sections of the Division 22 specifications for additional shop drawing and Submittal requirements.
B. It is the responsibility of the contractor to thoroughly review any and all shop drawings prior to submission to the Architect/Engineer. The contractor’s review shall include verifying conformance to the project documents.
The contractor will also be responsible for verifying the quantities of materials are adequate.
C. All shop drawings shall be submitted with a cover sheet indicating the name of the project, the Architects and Engineers name, the name of the vendor and the contractor. There must be sufficient space on the title sheet to allow the appropriate stamping by both the Architect and the Engineer. Shop drawings and submittals not conforming to the above may be returned without review.
D. All shop drawing submittals will include a listing of any and all exceptions to the requirements indicated in the specifications and on the drawings. Where there are no exceptions, the submittals shall indicate such.
Submittals that do not have this listing will not be reviewed.
1.6 COORDINATION DRAWINGS
A. Coordination drawings are required. Refer to applicable Division 01 sections for the work required by this Contractor in preparing Coordination Drawings.
1.7 INSTALLATION ACCESSIBILITY
A. The installation of all equipment and appurtenances shall be done so that access and clearances meet the requirements of the equipment manufacturer and all applicable codes.
BASIC REQUIREMENTS – PLUMBING CONSTRUCTION 220010 - 2
1.8 ACCEPTABLE MANUFACTURERS
A. The design of the mechanical systems is based on the equipment manufacturer indicated on the drawings.
Although individual sections of the specifications may list other manufacturers, these manufacturers will be accepted only if the following occurs:
1. Performance, as judged by the engineer, must be equal to the design-based equipment.
2. Operating characteristics, as judged by the engineer, must be identical to those of the design-based equipment.
3. Physical size of the equipment must be such that it can be installed in the available space, maintaining all required clearances for access / maintenance and meet the architectural requirements of the project such as installed height, length, width and operating weight. The contractor shall be responsible for verifying the equipment meets this requirement.
4. The contractor will be responsible for any costs associated with additional supports, changes in electrical wiring, or piping changes that may be required if equipment other than the design based is used.
1.9 RECORD DOCUMENTS
A. Prepare record documents in accordance with applicable Division 01 sections. In addition to the requirements specified, indicate the following installed conditions:
1. Mains and branches of piping systems, with valves and control devices and numbered, concealed unions located, and with items requiring maintenance located (i.e., traps, strainers, expansion compensators, tanks, etc.). Valve location diagrams, complete with valve tag chart. Indicate actual inverts and horizontal locations of underground piping.
2. Equipment locations (exposed and concealed), dimensioned from prominent building lines.
3. Approved substitutions, Contract Modifications, and actual equipment and materials installed.
4. Contract Modifications, actual equipment and materials installed.
5. Record Documents are to be prepared and/or revised to indicate the room names and numbers to be used by the owner after the projects is complete.
1.10 OPERATING AND MAINTENANCE MANUALS
A. Prepare maintenance manuals in accordance with applicable Division 01 sections.
1.11 DELIVERY, STORAGE, AND HANDLING
A. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.
B. When materials and products are stored on site, provide protection from weather and temperatures that may cause damage to the items.
1.12 EXTRA MATERIALS
A. Various specification sections may indicate extra materials that are to be provided with the respective equipment. Where indicated the contractor shall provide the required extra materials. If no additional installation is required, the contractor shall forward, to the owner, all extra materials. When forwarding materials obtain a receipt for any materials forwarded.
1.13 WARRANTY
A. All equipment, material and labor provided by the contractor shall be warranted for a minimum period of one year after the date of substantial completion.
BASIC REQUIREMENTS – PLUMBING CONSTRUCTION 220010 - 3
PART 2 - PRODUCTS
2.1 Not Applicable.
PART 3 - EXECUTION
3.1 ROUGH-IN
A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected.
B. Obtain equipment shop drawings for the various items that require rough-in.
3.2 INSTALLATIONS
A. Sequence, coordinate, and integrate the various elements of mechanical systems, materials, and equipment.
Comply with the following requirements:
1. Coordinate mechanical systems, equipment, and materials installation with other building components.
2. Verify all dimensions by field measurements.
3. Coordinate requirements for chases slots, and openings in other building components during the progress of construction, to allow for mechanical installations.
4. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Give particular attention to large equipment requiring positioning prior to closing in the building.
5. Where mounting heights are not detailed or dimensioned, install systems, materials, and equipment to provide the maximum headroom possible.
6. Coordinate connection of mechanical systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection for each service.
7. Install systems, materials, and equipment to conform with approved submittal data, including coordination drawings, to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to the Engineer.
8. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces.
9. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. Extend grease fittings to an accessible location.
10. Install systems, materials, and equipment giving right-of-way priority to the systems required to be installed at a specified slope.
11. Seal all places where piping or ducts pass through walls and floors.
3.3 CUTTING AND PATCHING
A. Perform cutting, fitting, and patching of mechanical equipment and materials required to:
1. Uncover Work to provide for installation of ill-timed Work.
2. Removal and replacement of defective Work.
3. Remove and replace Work not conforming to requirements of the Contract Documents.
4. Remove samples of installed Work as specified for testing.
5. Install equipment and materials in existing structures.
B. Upon written instructions from the Architect, uncover and restore work to provide for Architect/Engineer observation of concealed Work.
BASIC REQUIREMENTS – PLUMBING CONSTRUCTION 220010 - 4
C. In areas of the building where new finishes are being provided, the patching required on a surface which is to receive a new finish will be to bring the underlying surface up to the finish required to receive the final finish.
This contractor shall coordinate subsurface finish requirements with the finish trade contractor(s).
D. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas.
E. Patch existing finished surfaces and building components using new materials matching existing materials and experienced Installers. Installers' qualifications refer to the materials and methods required for the surface and building components being patched.
3.4 CLEANING
A. This contractor shall be required to thoroughly clean all installed equipment, duct work and piping. Cleaning shall be required before substantial completion on any phase of the project. Do not use cleaning materials and agents that are hazardous to health or property or that may damage the finished surfaces.
END OF SECTION 220010
ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 220030 - 1
SECTION 220030 – ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Electrical connections to equipment specified under other Divisions or furnished by Owner.
1.2 REFERENCES
A. NEMA WD 1 - General Purpose Wiring Devices
B. NEMA WD 6 - Wiring Device Configurations.
C. ANSI/NFPA 70 - National Electric Code.
1.3 COORDINATION
A. Obtain and review shop drawings, product data, and manufacturer's instructions for equipment furnished under other Divisions.
1. Should there be a difference between the design and the installed equipment; change orders shall only be paid for the difference in the rough-ins. If the Division 26 Contractor installs any rough-ins prior to requesting and receiving shop drawings for the equipment to be installed, and the equipment is different than designed, the required rework shall be performed at no additional cost to the owner aside from the difference is cost between the design documents and installed equipment.
2. Should there be a need to install rough-ins ahead of equipment review and final shop drawing, the Division 26 Contractor shall submit a Request for Information, outlining the equipment to be fed, and how the schedule is impacted for review by the Engineer, Architect, Owner and Owner’s Representative.
B. Determined connection locations and requirements.
C. Sequence rough-in of electrical connections to coordinate with installation schedule for equipment.
D. Sequence electrical connections to coordinate with start-up schedule for equipment.
PART 2 - PRODUCTS
2.1 CORDS AND CAPS
A. Attachment Plug Configuration: Match receptacle configuration at outlet provided for equipment.
B. Cord Construction: Oil-resistant thermoset insulated Type SO multiconductor flexible cord with identified equipment grounding conductor, suitable for hard usage in damp locations.
C. Cord Size: Same as rating of branch circuit overcurrent protection.
ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 220030 - 2
PART 3 - EXECUTION
3.1 PREPARATION
A. Review equipment submittals prior to installation and electrical rough-in. Verify location, size, and type of connections. Coordinate details of equipment connections with supplier and installer.
B. The Contractor shall be responsible to coordinate all electrical which are installed for roof top equipment.
Refer to “Coordination” in Section 260010 for additional requirements.
3.2 EXAMINATION
A. Verify that equipment is ready for electrical connection, wiring, and energization.
3.3 ELECTRICAL CONNECTIONS
A. Electrical connections shall meet equipment manufacturer's instructions.
B. Conduit connections to equipment shall use flexible conduit. Liquidtight flexible conduit with watertight connectors shall be used in damp or wet locations.
C. Wiring connections shall use wire and cable with insulation suitable for temperatures encountered in heat producing equipment.
D. Receptacle outlets shall be used where connection with attachment plug is indicated. Where attachment plug is required, equipment shall have a cord and cap.
E. Suitable strain-relief clamps and fittings shall be used for cord connections at outlet boxes and equipment connection boxes.
F. Disconnect switches, controllers, control stations, and control devices shall be located as indicated and per NEC requirements.
G. Verify proper rotation of three phase equipment.
H. Where applicable, power wiring shall be extended through external disconnect switches, local control switches, remote mounted control panels, etc. and connected to terminals in the equipment.
I. Where applicable, wire and conduit shall be extended between control device (start/stop pushbuttons or lighted handle switch) and combination starter/disconnect switches.
J. Coolers and Freezers: freezer and cooler walls, floors and ceilings shall be cut and sealed around conduit openings.
3.4 MISCELLANEOUS CONNECTIONS
A. Fire alarm, security, data, telephone and other low voltage connections shall be installed as required at equipment.
3.5 CONTRACTOR RESPONSIBILITIES (DIVISION 23 CONTRACT)
A. HVAC Control System Panels & Equipment Controls
1. 120 volt – 1 phase.
ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 220030 - 3
2. Division 23 Contractor shall provide power connection to control panel from nearest 120/208 volt electrical panel. Power for control panels for equipment being fed from the emergency generator, including, but not limited to boilers, heating pumps, selected air handling and terminal equipment, etc., shall be derived from the nearest 120/208 volt normal/emergency panel.
3. In addition to HVAC control system panels, where terminal equipment, including, but not limited to shut-off VAV boxes are provided with 120V connection, Division 23 Contractor shall provide power connection to the unit as described above.
4. Division 26 Contractor shall assist the Division 23 Contractor in locating the appropriate panel, ensure there is a spare 20A/1P breaker to feed the control panels and label breaker accordingly.
5. All wiring associated with the unit shall be by the Division 23 Contractor per manufacturer requirements.
B. Duct-mounted Smoke Detector
1. Division 26 Contractor shall furnish duct mounted smoke detector, including detector base and appropriately sized sampling tube for duct being installed.
2. Division 23 Contractor shall install sampling tube and detector base in duct. Coordinate exact location with Division 26 Contractor.
3. Division 26 Contractor shall install detector in base, wire and program into fire alarm system.
4. Division 26 Contractor shall provide relay, and wiring to associated HVAC unit from fire alarm system so that unit shuts down and supervisory signal is provided upon detection of smoke. Refer to Division 28 “Fire Alarm and Detection System” and drawings for additional requirements.
5. Any other connections and/or equipment required shall be furnished and installed by the Division 23 Contractor.
6. Any other connections and/or equipment required shall be furnished and installed by the Division 23 Contractor.
C. Ductless Air Conditioner (DAC-1)
1. 208 volt – 1 phase.
2. 2-pole toggle switch shall be furnished and installed by the Division 26 Contractor adjacent to unit.
3. Division 26 Contractor shall wire through switch and make one power connection to the line side terminals in the unit.
4. Power wire for DAC unit shall come from the exterior unit. In systems where indoor unit receives separate power feed, provide junction box adjacent to the disconnect at the outdoor unit and run to the indoor unit for connection so that a single breaker controls both units.
5. All other wiring within the unit and between the unit and associated condensing unit shall be by the Division 23 Contractor per manufacturer requirements.
D. Outdoor Rooftop Packaged Air Handling Units (RTU-1,2,3,4)
1. 208 volt – 3 phase.
2. All wiring from the input terminals to the respective devices in the unit shall be factory installed by the equipment manufacturer.
3. Starters with overload protection or variable frequency drive(s) for the fans shall be furnished and installed by equipment manufacturer.
4. Division 26 Contractor shall provide a NEMA 3R fused disconnect switch, installed, where coordinated with the Division 23 Contractor to ensure all access doors remain functional. This fused disconnect switch shall be provided regardless of whether the unit is provided with a unit mounted disconnect.
5. Division 26 Contractor shall make one power connections to the unit terminals.
6. Equipment manufacturer shall provide control power transformer as required to power controls, unit lighting and convenience outlet and other 120V accessories as required.
7. All other wiring in the unit shall be factory installed by the equipment manufacturer.
8. Any other connections and/or equipment required shall be furnished and installed by the Division 23
Contractor.
ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 220030 - 4
E. Outdoor Rooftop Gas Fired Make-Up Air Units (MAU-1A,1B)
1. 208 volt – 1 phase.
2. All wiring from the input terminals to the respective devices in the unit shall be factory installed by the equipment manufacturer.
3. Starters with overload protection or variable frequency drive(s) for the fans shall be furnished and installed by equipment manufacturer.
4. Division 26 Contractor shall provide a NEMA 3R fused disconnect switch, installed, where coordinated with the Division 23 Contractor to ensure all access doors remain functional. This fused disconnect switch shall be provided regardless of whether the unit is provided with a unit mounted disconnect.
5. Division 26 Contractor shall make one power connections to the unit terminals.
6. Any other connections and/or equipment required shall be furnished and installed by the Division 23
Contractor.
F. Condensing Boiler (Gas) (B-1)
1. 120 volt – 1 phase.
2. Thermal overload switch shall be furnished and installed by the Division 26 Contractor adjacent to unit.
3. Division 26 Contractor shall wire through switch and make one power connection to the line side terminals in the unit.
4. Any other connections and/or equipment required shall be furnished and installed by the Division 23
Contractor.
G. Electric Cabinet Unit Heaters (ECH-1)
1. 120 volt – 1 phase.
2. Fused disconnect switch in unit by equipment manufacturer.
3. Division 26 Contractor shall make one power connection to the unit.
Any other connections and/ or equipment required shall be provided by Division 23 Contractor.
H. Electric Unit Heaters (EUH-1)
1. 208 volt – 3 phase.
2. Fused disconnect switch furnished and installed by Division 26 Contractor adjacent to the unit.
3. Division 26 Contractor shall make one power connection to the unit through the switch.
4. Any other connections and/ or equipment required shall be provided by Division 23 Contractor.
I. Air Cooled Condensing Unit (CU-1)
1. 208 volt – 1 phase
2. Division 26 contractor shall furnish and install a NEMA 3R fused disconnect switch at unit and shall extend power wiring thru switch to unit and shall make one connection to terminals in unit.
3. Where CU is associated with an indoor DAC, power wire for AC unit shall come from the exterior unit.
In systems where indoor unit receives separate power feed, provide junction box adjacent to the disconnect at the outdoor unit and run to the indoor unit for connection so that a single breaker controls both units.
4. All other wiring within the unit and between the unit and associated indoor unit shall be by the Division 23 Contractor per manufacturer requirements.
J. Roof Fans (EF-1,2,3,4)
1. 120 volt – 1 phase.
2. Integral disconnect switch provided by the equipment manufacturer.
3. Division 26 Contractor shall install Division 23 Contractor speed control in space being served by fan.
Coordinate location in field for balancing.
4. Division 26 Contractor shall make one power connection through speed control where applicable.
5. Any other connections and/ or equipment required shall be provided by Division 23 Contractor.
ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 220030 - 5
K. Energy Recovery Units (ERU-1)
1. 208 volt – 3 phase.
2. All wiring from the input terminals to the respective devices in the unit shall be factory installed by the equipment manufacturer.
3. Starters with overload protection or variable frequency drive(s) for the fans shall be furnished and installed by equipment manufacturer.
4. Division 26 Contractor shall provide a fused disconnect switch, extend power wiring through the disconnect switch to the control panel and make one power connection to terminals in unit.
5. All other wiring in the unit shall be factory installed by the equipment manufacturer.
6. Any other connections and/or equipment required shall be furnished and installed by the Division 23
Contractor.
L. Fan Powered Variable Air Volume Box with Electric Reheat (FPV-1,2,3)
1. 208 volt - 3 phase.
2. Division 26 Contractor shall provide a disconnect switch adjacent to unit and shall extend power wiring thru disconnect to unit and shall make one connection to terminals in unit.
3. Any other connections and/or equipment required shall be furnished and installed by the Division 23
Contractor.
M. Pumps (P-1)
1. 120 volt – 1 phase.
2. Thermal overload switch shall be furnished and installed by the Division 26 Contractor. Division 26
Contractor shall install switch adjacent to the unit.
3. Division 26 Contractor shall run power wiring thru overload switch and make one power connection.
4. Any other connections and/or equipment required shall be furnished and installed by the Division 23
Contractor.
3.6 CONTRACTOR RESPONSIBILITIES (DIVISION 22 CONTRACT)
A. Water Heater Package Type Oil/Gas (DWH-1)
1. 120 volt – 1 phase.
2. Integral factory wired control panel shall be provided by the manufacturer. Control panel shall include all starters, overload protection, and control transformer.
3. Division 26 Contractor shall furnish and install toggle switch adjacent to unit and extend power wiring through the switch to the control panel and make one power connection.
4. Any other connections and/or equipment required shall be furnished and installed by the Division 22
Contractor.
B. Recirculating Pumps (CP-1)
1. 120 volt – 1 phase.
2. Thermal overload switch or starter/disconnect switch shall be furnished and installed by the Division
26 Contractor adjacent to the unit. Wire thru switch to pump motor.
3. Any other connections and/or equipment required shall be furnished and installed by the Division 22
Contractor.
C. Electric Water Cooler
1. 120 volt – 1 phase.
2. Division 26 Contractor shall refer to Electric Water Cooler shop drawings and furnish and install a duplex receptacle contained within the enclosure where applicable, or provide direct connection where cord and plug is not provided.
3. Any other connections and/or equipment required shall be furnished and installed by the Division 22 Contractor.
ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT 220030 - 6
3.7 CONTRACTOR RESPONSIBILITIES (GENERAL CONTRACT)
A. Sewage Grinder Pump
1. 240 volt – 1 phase.
2. Stanchion mounted exterior weatherproof control panel with disconnect switch shall be provided by the General Contractor.
3. Division 26 Contractor shall provide buck-boost transformer inside the building and wire to line side of exterior control panel and make single point power connection. All wiring from load side of control panel to grinder pump is the responsibility of the General Contractor.
4. Division 26 Contractor shall provide 1” spare conduit with pull string to grinder pump and Division 23 Contractor shall provide control wiring for connection to building automation system.
5. Any other wiring connections and/or equipment required shall be furnished and installed by the General Contractor.
END OF SECTION 220030
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 1
SECTION 220500 - COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes materials and methods that are common to various Plumbing Systems.
1.3 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
F. The following are industry abbreviations for rubber materials:
1. EPDM: Ethylene-propylene-diene terpolymer rubber.
2. NBR: Acrylonitrile-butadiene rubber.
1.4 SUBMITTALS
A. Product Data: For the following:
1. Mechanical sleeve seals.
2. Escutcheons.
3. Access Doors.
B. Welding certificates.
1.5 QUALITY ASSURANCE
A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code-- Steel."
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 2
B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code:
Section IX, "Welding and Brazing Qualifications”.
1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping”.
2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.
C. Electrical Characteristics for Plumbing Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.
1.7 COORDINATION
A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for plumbing installations.
B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.
C. Coordinate requirements for access panels and doors for all system items requiring access that are concealed behind finished surfaces.
PART 2 - PRODUCTS
2.1 PIPE, TUBE, AND FITTINGS
A. Refer to individual Division 22 piping Sections for pipe, tube, and fitting materials and joining methods.
B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.
2.2 JOINING MATERIALS
A. Refer to individual Division 22 piping Sections for special joining materials not listed below.
B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch (3.2-mm) maximum thickness unless thickness or specific material is indicated.
a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.
b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.
2. AWWA C110, rubber, flat face, 1/8 inch (3.2 mm) thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.
C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 3
D. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.
E. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8, BAg1, silver alloy for refrigerant piping, unless otherwise indicated.
F. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
2.3 DIELECTRIC FITTINGS
A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder-joint, plain, or weld-neck end connections that match piping system materials.
B. Insulating Material: Suitable for system fluid, pressure, and temperature.
C. Dielectric Unions: Factory-fabricated, union assembly, for 250-psig minimum working pressure at 180 deg F.
1. Manufacturers:
a. Capitol Manufacturing Co.
b. Epco Sales, Inc.
c. Hart Industries, International, Inc.
d. Watts Industries, Inc.; Water Products Div.
e. Zurn Industries, Inc.; Wilkins Div.
D. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150 minimum working pressure as required to suit system pressures.
1. Manufacturers:
a. Capitol Manufacturing Co.
b. Epco Sales, Inc.
c. Watts Industries, Inc.; Water Products Div.
E. Dielectric-Flange Kits: Companion-flange assembly for field assembly. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or polyethylene bolt sleeves, phenolic washers, and steel backing washers.
1. Manufacturers:
a. Advance Products & Systems, Inc.
b. Calpico, Inc.
c. Pipeline Seal and Insulator, Inc.
2. Separate companion flanges and steel bolts and nuts shall have 150 psi minimum working pressure where required to suit system pressures.
F. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining; plain, threaded, or grooved ends; and 300-psig (2070-kPa) minimum working pressure at 225 deg F (107 deg C).
1. Manufacturers:
a. Perfection Corp.
b. Precision Plumbing Products, Inc.
c. Sioux Chief Manufacturing Co., Inc.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 4
2.4 MECHANICAL SLEEVE SEALS
A. Description: Pipe wall penetration seals to be of the modular link type. Seals shall consist of a series of interlocking, molded synthetic rubber links, with heavy-duty plastic pressure plates, and corrosion resistant nuts and bolts. Seals to be designed to provide a hydrostatic seal between the pipe and wall penetration. Seals shall be sized and selected per manufacturer recommendations. Mechanical pipe seals shall be fabricated of an EPDM elastomer for general service and a Nitrile/ Buna-N for hydrocarbon/petroleum-based applications.
Provide stainless steel hardware as required.
B. Steel wall sleeve: Cast in place concrete wall sleeves to be fabricated from galvanized heavy wall welded or seamless carbon steel pipe. All sleeves to have a 2" wide, full perimeter water stop, welded on both sides.
C. Mechanical pipe seals and wall sleeves shall be manufactured by The Metraflex Company®, or Flexicraft Industries.
2.5 SLEEVES
A. Galvanized-Steel Sheet: 0.0239-inch (0.6-mm) minimum thickness; round tube closed with welded longitudinal joint.
B. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends.
C. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral water stop, unless otherwise indicated.
D. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.
2.6 ROOF PENETRATIONS
A. Provide pre-fabricated roof cub with piping portal for all pipe gas piping penetrations through the roof. Curbs to be manufactured by the Pate Co. or equal.
B. Roof Curbs with Pipe Portals: Provide prefabricated galvanized steel roof curbs fabricated from minimum 16-gauge steel with welded corners. Curbs to be internally reinforced, factory insulated with 1.5” thick 3 lb. Density fiberboard insulation. Where required provide curbs with wood nailers fastened from the underside of the wood nailer.
C. Refer to drawing details for the type of curb required for the specified roofing system. Provide curbs with an integral metal cant, stepped integral metal cant raised the thickness of roof insulation or no integral cant, as required to suit the details. Provide curbs to meet the installed curb height as detailed on the drawings.
D. Pipe portal curb cover furnished with a laminated acrylic coated ABS plastic curb cover with pre-punched holes and molded sealing ring on a collared opening, and an EPDM compression molded cap with stainless steel snap lock clamps. Curbs covers shall be resistant to ozone and ultraviolet rays and shall have a serviceable temperature range of -40 degrees F to positive 250 degrees F. The molded sealing ring on the collared opening and the groove in the rubber cap shall be installed to assure a weather-tight pressure and mechanical seal. The protective rubber caps shall have a serviceable temperature range of -60 degrees F to positive 250 degrees F and shall be resistant to ozone and ultraviolet rays. The conical shaped steps of the nipple shall provide a weatherproof seal around the penetration. The stainless-steel snap lock clamps shall provide added protection to guarantee the seal.
2.7 ESCUTCHEONS
A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 5
B. One-Piece, Cast-Brass Type: With set screw.
C. Finish: Polished chrome-plated and rough brass.
2.8 GROUT
A. Description: ASTM C 1107, Grade B, nonshrink and nonmetallic, dry hydraulic-cement grout.
1. Characteristics: Post-hardening, volume-adjusting, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications.
2. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength.
3. Packaging: Premixed and factory packaged.
2.9 CONCRETE EQUIPMENT BASES
A. Minimum compressive strength: 3500 p.s.i. at 28 days.
B. Minimum cementitious material content: 520 lb/cu. Yd.
2.10 ACCESS DOORS
A. Manufacturers: Subject to review, provide access doors manufactured by Milcor, Inc or equal.
B. Description: Steel access doors and frames for installation in masonry and/or drywall/gypsum board assemblies. Provide fire rated access doors when doors are installed in a fire rated assembly.
C. Frames: minimum 16 gage steel with exposed nominal 1” flange around the perimeter of the unit. Where doors are to be installed in drywall/gypsum board assemblies provide frames with a drywall bead. Doors to be installed in masonry shall be furnished with adjustable metal masonry anchors.
D. Flush Panel Doors: minimum 14 gage steel with concealed spring or piano hinge(s) with a minimum swing of 175 degrees. Finish to be a factory-applied primer, suitable for field painting. Provide flush cylinder lock with key. Key all locks alike.
E. Access door schedule: In addition to access door shown on the drawings provide the following access doors to be installed where directed by the architect or engineer:
1. Five 16” x 16” to be installed in drywall/ gypsum construction.
2. Five 16” x 16” to be installed in masonry construction.
2.11 FIRESTOPPING
A. The contractor shall be responsible for providing permanent, UL approved firestopping systems for all penetrations through fire rated floor or fire rated wall assemblies. All firestopping shall meet the requirements of ASTM E-814 and UL 1479.
B. Subject to compliance with project requirements, firestopping materials may be provided by one of the following manufacturers:
1. Specified Technologies Inc. (STI) Somerville, NJ.
2. Tremco, Beechwood, OH.
3. 3M, St. Paul MN.
C. Submit for review the following product data
1. Product data sheets.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 6
2. UL System drawings for each firestopping application
3. Manufacturer’s Certificates of Compliance for their products.
PART 3 - EXECUTION
3.1 PIPING SYSTEMS - COMMON REQUIREMENTS
A. Install piping according to the following requirements and Division 22 Sections specifying piping systems.
B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems.
Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.
D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise. Maintain unobstructed passageway of not less than 42” in width and 80” minimum head clearance as required by code.
E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal. Install piping to permit valve servicing. Install piping at indicated slopes. Install piping free of sags and bends.
F. Install fittings for changes in direction and branch connections.
G. Install piping to allow application of insulation.
H. Select system components with pressure rating equal to or greater than system operating pressure.
I. Install escutcheons for penetrations of walls, ceilings, and floors.
J. Sleeves are not required for core-drilled holes.
K. Permanent sleeves are not required for holes formed by removable sleeves.
L. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches (50 mm) above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.
2. Install sleeves in new walls and slabs as new walls and slabs are constructed.
3. Install sleeves that are large enough to provide 1/4-inch (6.4-mm) annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:
a. Steel Pipe Sleeves: For pipes smaller than NPS 6 (DN 150).
b. Steel Sheet Sleeves: For pipes NPS 6 (DN 150) and larger, penetrating gypsum-board partitions.
c. Stack Sleeve Fittings: For pipes penetrating floors with membrane waterproofing. Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches (50 mm) above finished floor level. Refer to Division 07 Section "Sheet Metal Flashing and Trim" for flashing.
1) Seal space outside of sleeve fittings with grout.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 7
4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using joint sealants appropriate for size, depth, and location of joint.
M. Seal annular space between sleeve or opening and pipe or pipe insulation, using sealants appropriate for size, depth, and location of joint.
N. Aboveground and Underground, Exterior-Wall Pipe Penetrations: Provide Mechanical Sleeve Seal and wall sleeve.
1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and sized per manufacturer’s recommendations. Position the pipe in center of sleeve.
Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
O. Corrosion Protection: Pipes passing through concrete walls and/or floors and through block walls shall be protected against external corrosion by a protective sheathing or wrapping that will withstand any reaction from wall or floor material.
P. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at all pipe penetrations. Where required seal all pipe penetrations with fire stop materials.
Q. Roof penetrations: provide roof curbs with pipe portals at all locations where gas piping penetrates the roof.
R. Verify final equipment locations for roughing-in.
S. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.
3.2 PIPING JOINT CONSTRUCTION
A. Join pipe and fittings according to the following requirements and Division 22 Sections specifying piping systems.
B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.
F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 8
3.3 PIPING CONNECTIONS
A. Make connections according to the following, unless otherwise indicated:
1. Install unions, in piping NPS 2 (DN 50) and smaller, adjacent to each valve and at final connection to each piece of equipment.
2. Install flanges, in piping NPS 2-1/2 (DN 65) and larger, adjacent to flanged valves and at final connection to each piece of equipment.
3. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.
3.4 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.
Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
B. Install equipment to maintain unobstructed passageway of not less than 42” in width and 80” minimum head clearance as required by code.
C. Install plumbing equipment to facilitate service, maintenance, and repair or replacement of components.
Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.
D. Install equipment to allow right of way for piping installed at required slope.
3.5 CONCRETE EQUIPMENT BASES
A. Provide concrete bases for all floor mounted mechanical equipment unless otherwise noted on the contract drawings.
1. Construct concrete bases with a minimum height of 6” and extend bases not less than 6” larger, in all directions, than supported equipment.
2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of the base.
3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.
4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
5. Install anchor bolts to elevations required for proper attachment to supported equipment and according to anchor-bolt manufacturer's written instructions.
6. Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project when applicable.
3.6 GROUTING
A. Mix and install grout for plumbing equipment base bearing surfaces, pump and other equipment base plates, and anchors. Clean surfaces that will come into contact with grout.
B. Provide forms as required for placement of grout. Avoid air entrapment during placement of grout. Place grout, completely filling equipment bases. Place grout on concrete bases and provide smooth bearing surface for equipment.
C. Place grout around anchors. Cure placed grout.
COMMON WORK REQUIREMENTS - PLUMBING CONSTRUCTION 220500 - 9
3.7 INSTALLATION OF PIPING UNDER EXISITNG FLOORS
A. Where the drawings indicate new piping is to be installed under existing slab-on-grade construction, the installing contractor will be required to verify the location(s) of any existing pipes, conduits or any other system components, that are required to remain in service, before saw cutting existing slabs.
3.8 ACCESS DOORS
A. Comply with manufacturer's written instructions for installing access doors and frames. Set frames accurately in position and attach securely to supports with plane of face panels aligned with adjacent finish surfaces. Install doors flush with adjacent finish surfaces or recessed to receive finish material.
B. Adjust doors and hardware after installation for proper operation. Remove and replace doors and frames that are warped, bowed, or otherwise damaged.
END OF SECTION 220500
EXCAVATION FOR PLUMBING CONSTRUCTION 220510 - 1
SECTION 220510 - EXCAVATION FOR PLUMBING CONSTRUCTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General Conditions and other Division-22 Specification Sections, apply to this Section.
1.2 DESCRIPTION OF WORK
A. Excavation, backfill and compaction associated with utility construction including such related features as protection of adjacent utilities and structures, maintenance and protection of traffic, cutting paved surfaces, support of excavation, control of excavated materials, de-watering, piping, bedding, disposal of excavated materials, and all work related to providing excavation, backfill and compaction for all utilities and structures in connection with the plumbing systems.
1.3 QUALITY ASSURANCE
A. Testing Agent: Compaction testing for this Work shall be performed by the contractor's Testing Agency.
Where compaction testing is specified, such compaction testing shall be performed by a soils testing agent engaged and paid for by the Contractor and approved by the Architect.
B. Reference Standards:
1. Pennsylvania Department of Transportation:
a. Regulations Governing Occupancy of Highways by Utilities (67 PA Code, Chapter 459)
b. Publication 408 Specifications Pennsylvania Test Method, PTM 106 Pennsylvania Test Method, PTM 402
c. Publication 203, Work Zone Traffic Control
2. American Society for Testing and Materials (ASTM):
a. ASTM D698 Test Method for Laboratory Compaction characteristics of Soil Using Standard Effort (12,400 ft.-lbf/ft3)
b. ASTM D2922 Standard Test Method for Density of Soil and Soil - Aggregate in Place by Nuclear Methods (Shallow Depth).
C. Compaction Testing:
1. Compaction shall be by the testing procedure contained in ASTM D2922 based on previously determined compaction curve data as established by ASTM D698.
1.4 SUBMITTALS
A. Certificates: Submit certification attesting that the composition analysis of pipe embedment and select material stone backfill materials meet specification requirements.
1.5 JOB CONDITIONS
A. Permits: Obtain and pay for all permits and inspections required for the work under this Section.