17-Addendum No7 20261022.pdf

PDF 3 MB Posted

Attached to
Schuylkill County - Emergency Training Facility (0325-900015.01)
Solicitation number
US.251947
Issued by
Somerset County, Pennsylvania

About this file

This is Addendum No. 7 to the bidding documents for the Schuylkill County Emergency Training Facility construction project in Pennsylvania. The project is divided into four separate prime contracts: Contract No. 1 for General Construction, Contract No. 2 for Plumbing Construction, Contract No. 3 for HVAC Construction, and Contract No. 4 for Electrical Construction. Sealed bids were to be received online through the PennBid Program by the Schuylkill County Controller by October 21, 2026, at 9:00 AM. Bid results were to be made available online at http://PennBid.bonfirehub.com following a Board of Commissioners meeting, with a tentative award date of October 28, 2026. All bidding documents were available at no cost through the PennBid portal, with technical support available from PennBid via email at info@pennbid.net or telephone at 610-693-4769.

Each bid submission required a certified check, bank draft, or satisfactory Bid Bond payable to Schuylkill County in an amount equal to 10 percent of the total bid price. The successful bidder was required to furnish Performance and Payment Bonds, each in the amount of 100 percent of the contract price with a corporate surety approved by the owner. Davis-Bacon Wage Rates apply to all contracts under this project. The owner reserves the right to waive any informality, reject any or all items or portions thereof, or waive any technicalities in the bid as deemed in the owner's best interest. Contractors must comply with non-discrimination requirements regarding employees and applicants for employment based on race, age, color, religion, sex, national origin, or handicap.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

400 One Norwegian Plaza

Pottsville, PA 17901 www.benesch.com

P 570-622-4055

Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum

7\Addendum No7_20261020-FINAL.docx

ADDENDUM NO. 7

To: All Perspective Bidders

Date: October 22, 2026

From: Kevin Marmas, P.E. Benesch

Subject: Schuylkill County – Emergency Training Facility

Addendum No. 7 – Project No. 0325-900015.01

Bid Receipt: Bid will be received online via the PennBid Program by the Schuylkill County Controller until

Monday, November 2, 2026, at 9:00 AM, (prevailing time).

This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated September

2026 as follows:

1. Pennsylvania Prevailing Wage Requirements - The Bidding Documents are hereby amended to incorporate the applicable Pennsylvania Department of Labor & Industry Prevailing Wage Determination for this Project, which shall replace the Davis-Bacon wage rate document previously provided in the bidding documents.

a. The Project is subject to the requirements of the Pennsylvania Prevailing Wage Act, 43 P.S. §

165-1 et seq., as amended.

b. The applicable Pennsylvania Prevailing Wage Determination, including all classifications and wage rates, is attached to and made part of the Bidding Documents. Bidders shall include all costs associated with compliance with the Prevailing Wage Act in their bids.

c. The successful contractor shall pay all laborers, workmen, and mechanics employed on the

Project not less than the applicable prevailing minimum wage rates and fringe benefits established by the Pennsylvania Department of Labor & Industry for the classifications of work performed.

d. The successful contractor shall incorporate the prevailing wage requirements into all subcontracts and shall require all subcontractors to comply with the Pennsylvania Prevailing

Wage Act.

e. The successful contractor shall maintain payroll records and submit certified payroll documentation as required by the Pennsylvania Prevailing Wage Act and any applicable funding agency requirements.

f. The prevailing wage determination shall be posted at the Project site and remain available for inspection throughout the duration of construction.

g. Failure to comply with prevailing wage requirements may result in withholding of payments, contract remedies, or other actions authorized by law.

2. Pennsylvania Prevailing Wage Determination Serial No. 26-09208 – This document included in this

Addendum 7, is attached to and incorporated into the Bidding Documents by reference.

3. RACP Funding and Grant Compliance Requirements:

a. This Project is being funded, in part, through the Commonwealth of Pennsylvania

Redevelopment Assistance Capital Program (RACP). As a condition of bidding on and performing work under this Contract, bidders shall comply with all applicable requirements of the RACP program and all other federal, state, and local laws and regulations applicable to the Project.

Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum

ADDENDUM NO. 7

b. By submitting a bid, the Bidder acknowledges that it has reviewed the attached grant compliance requirements, understands the obligations imposed by the funding source, and agrees to comply with all applicable grant, procurement, reporting, labor standards, domestic content, record retention, audit, and contract administration requirements associated with the

Project. The Bidder further agrees to incorporate all applicable grant requirements into its subcontracts and to obtain compliance from all subcontractors and lower-tier subcontractors performing work on the Project.

c. Failure to comply with applicable grant requirements may result in withholding of payment, rejection of costs for reimbursement, termination for default, or other remedies available to the

Owner and funding agencies.

4. RACP Key Compliance Guidelines – This document included in this Addendum 7, is attached to and incorporated into the Bidding Documents by reference.

5. RACP Steel Guidance - This document included in this Addendum 7, is attached to and incorporated into the Bidding Documents by reference.

a. Note: Additional requirement for steel due to RACP program funding, Build America, Buy

America Act also still applies.

6. BABAA Best Practices – Documenting Compliance with Build America, Buy America Act (BABAA)

Requirements – Procurement Disaster Assistance Team (PDAT) January 2023: This attached document

(BABAA Best Practices – Documenting Compliance with Build America, Buy America Act (BABAA)

Requirements – Procurement Disaster Assistance Team (PDAT) January 2023) is attached to and incorporated into the Bidding Documents by reference.

a. Also refer to the following link for additional information on BABAA requirements and guidelines: FEMA BABAA FAQs: https://www.fema.gov/fact-sheet/build-america-buy-america-act-frequently-asked-questions-faqs#requirements [linkprotect.cudasvc.com].

7. Project Manual – Wage Rates – Replace Davis-Bacon wage rate document in its entirety with the

Commonwealth of Pennsylvania Department of Labor and Industry’s Bureau of Labor Law Compliance

Prevailing Wages Project Rates (Serial No. 26-09208) that is included with this Addendum 7.

8. Project Manual – RACP Key Compliance Guidelines – The attached “Redevelopment Assistance Capital

Program (RACP) Key Compliance Guidelines” shall be included in the “Bidding Requirements” section of the Project Manual.

9. Project Manual – RACP Steel Guidance – The attached “Redevelopment Assistance Capital Program

(RACP) Steel Guidance” shall be included in the “Bidding Requirements” section of the Project Manual.

10. Project Manual – BABAA Best Practices – Documenting Compliance with Build America, Buy America

Act (BABAA) Requirements – Procurement Disaster Assistance Team (PDAT) January 2023 – The attached “BABAA Best Practices – Documenting Compliance with Build America, Buy America Act

(BABAA) Requirements – Procurement Disaster Assistance Team (PDAT) January 2023” shall be included in the “Bidding Requirements” section of the Project Manual.

11. Project Manual – Table of Contents – Table of Contents shall be revised as follows by reference:

a. Under “Bidding Requirements”, replace “Davis Bacon Wage Rates” with “Commonwealth of

Pennsylvania Department of Labor and Industry’s Bureau of Labor Law Compliance Prevailing

Wages Project Rates (Serial No. 26-09208)”.

b. Under “Bidding Requirements”, add “RACP Key Compliance Guidelines”.

c. Under “Bidding Requirements”, add “RACP Steel Guidance”.

Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum

ADDENDUM NO. 7

d. Under “Bidding Requirements”, add “BABAA Best Practices – Documenting Compliance with

Build America, Buy America Act (BABAA) Requirements – Procurement Disaster Assistance Team

(PDAT) January 2023”.

12. Section 01010 - Summary of Work: - Revise Subsection 1.3.D.4.a.2 to add the following sentence: The gate arm should be a 12' long aluminum round arm, with DOT tape on both sides and should be compatible with the operator specified.

13. Section 06100 – Rough Carpentry: - Delete Subsection 1.5.B – “Forest Certification” in its entirety.

14. Section 06202 – Interior Finish Carpentry: Delete Subsection 1.5.A – “Forest Certification” in its entirety.

15. Section 08360 – Insulated Sectional Steel Doors – Revise Subsection 2.2.A to read: Insulated Steel

Sectional Overhead Doors: Model 592 Thermacore Insulated Steel Doors by Overhead Door Corporation or Clopay Commercial Model 3720 Energy Series Doors. Units shall have the following characteristics:

16. Item 10 in Addendum 5 - Delete Item 10 in Addendum 5 in its entirety because HVAC Specification

Section 230900 – HVAC Control Systems, Part 1 - Section 1.2, “Summary”, Subsection F, was previously deleted in its entirety in Addendum 3, and this section (HVAC Specification Section 230900 – HVAC

Control Systems, Part 1 - Section 1.2, “Summary”, Subsection F) shall remain deleted in its entirety.

Nexgen Automation updated contacts are now provided separate from specifications and only for reference as a response to a bid question.

As a further clarification, the following subsections E.1 through E.3 were added to HVAC Specification

Section 230900 – HVAC System Controls, Part 2 - Section 2.1 in Addendum 3, and Subsection E.4 was added in Addendum 4 and all shall remain in place and applicable:

E. Subject to compliance requirements, provide a Tridium Niagara 4 control system, with products finished, engineered, and installed by one of the following:

1. Advanced Enviromation, Fleetwood PA.

2. Nexgen Automation, Harrisburg, PA.

3. OAE Systems, Harrisburg, PA.

4. The Trane Company, Harrisburg PA

17. Drawing Changes:

a. Electrical Plans - Drawing E.2.2, Floor Plan – Power; Refer to Garage 300, provide thermal switch adjacent to each garage door motor (doors 300/E, 300/F, 300/G, 300/H, total of 4 motors) and run 2 #12 & #12G-3/4” conduit from each switch to panel ‘GP’ (dedicated circuit per door motor) and connect to spare 20 amp, 1-pole breaker (circuits 15,17,19,21). Make final connection to each motor thru switch. Refer to Drawing A.1 for exact location of doors. E.C.

shall install devices furnished with each overhead door motor, including but not limited to, control stations, limit switches, safety devices, emergency release, chain hoist, etc. and provide all control wiring per manufacturer’s recommendations.

b. Electrical Plans - Drawing E.5.3, Panel Schedules; Refer to schedule ‘GP’, add (3) 20 amp, 1-pole circuit breakers in panel and label as spare.

c. Structural Plans (Revision 1) – Drawings S.1 – S.11 attached – See redline Revision 1 items on attached Sheets S.2, S.3, S.6, S.9, S.10, and S.11.

d. Architectural Drawings – Drawing A.1 – Revise “Interior Wall Types” Walls A through G to specify 5/8” Gyp. Wall Board instead of ½” Gyp. Wall Board.

Y:\Pennsylvania\03XX-90S\0325-900015.01\Construction_Management\2026.0903_Bid Package - PennBid (2nd Bidding)\Addenda\Addendum

ADDENDUM NO. 7

e. Architectural Drawings – Drawing A.1 – Revise “Interior Wall Types” to specify either 3-1/2”

Steel Studs or 3-5/8” Steel Studs can be used for Walls A, B, and D.

f. Architectural Drawings – Drawing A.1 – Revise the interior partition between Storage Room 205 and Mechanical Room 211 to be Wall Type B instead of Wall Type H. The interior partitian between Mechanical Room 211 and Electrical Room 212 through door opening 212 should be specified as Wall Type B. The partitian between Men's 206 and Storage 205 shall remain as Wall

Type F as indicated on the drawing.

18. Load Transfer Platform (LTP) Recommendations & Flexible Pavement Allowance – Please note, the attached document (Letter prepared by Barry Isett & Associates Inc. dated October 15, 2026, RE:

Schuylkill County ESTF – LTP Recommendations & Flexible Pavement Allowance) is attached to and incorporated into the Bidding Documents by reference.

19. Garage Door Opener: Both manual chain hoist and electric operated garage door opener to be included.

Update electric operated garage door opener requirement to be ceiling mounted Trolley type electric opener, 115 volt, single phase (1/2 HP), photocell reversing mechanism and one interior surface mounted wall control station.

20. Questions asked on PennBid: Please note, the attached (PENNBID Public Q&A) questions and the official responses are officially included as part of the bid documents.

This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.

The Bidder shall acknowledge receipt of this Addendum in the appropriate space on PennBID.

End of Addendum No. 7

Project Name: Schuylkill County Emergency Operations Center & Training Facility

General Description: Construction of a new emergency operations facility that will include approximately 5,120 SF of emergency management offices, operations center, IT room, restrooms and showers; approximately 5,760 SF of training facilities; and approximately 3,200 SF for an emergency vehicles garage

Project Locality Frackville

Awarding Agency: PEMA

Contract Award Date: 11/15/2026

Serial Number: 26-09208

Project Classification: Building/Highway

Determination Date: 10/19/2026

Assigned Field Office: Scranton

Field Office Phone Number: (570)963-4577

Toll Free Phone Number: (877)214-3962

Project County: Schuylkill County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 10/20/2026 Page 1 of 6

Project: 26-09208 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Asbestos & Insulation Workers 6/29/2026 $43.50 $31.11 $74.61

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $37.86 $24.27 $62.13

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $36.84 $22.69 $59.53

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $36.84 $24.94 $61.78

Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50

Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50

Cement Masons 5/1/2025 $34.65 $22.95 $57.60

Drywall Finisher 5/1/2025 $33.24 $25.08 $58.32

Drywall Finisher 5/1/2026 $35.08 $25.49 $60.57

Electricians 9/1/2025 $46.02 $28.39 $74.41

Electricians 8/31/2026 $48.02 $29.46 $77.48

Elevator Constructor 1/1/2026 $64.06 $46.01 $110.07

Glazier 5/1/2024 $39.48 $23.81 $63.29

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2026 $40.51 $33.88 $74.39

Laborers (Class 01 - See notes) 5/1/2025 $29.27 $17.84 $47.11

Laborers (Class 01 - See notes) 5/1/2026 $30.12 $18.49 $48.61

Laborers (Class 02 - See notes) 5/1/2025 $31.27 $17.84 $49.11

Laborers (Class 02 - See notes) 5/1/2026 $32.12 $18.49 $50.61

Laborers (Class 03 - See notes) 4/27/2025 $29.84 $17.84 $47.68

Laborers (Class 03 - See notes) 5/1/2026 $30.84 $18.49 $49.33

Laborers (Class 04 - See notes) 4/27/2025 $31.34 $17.84 $49.18

Laborers (Class 04 - See notes) 5/1/2026 $32.34 $18.49 $50.83

Laborers (Class 05 - See notes) 5/1/2025 $31.27 $17.84 $49.11

Laborers (Class 05 - See notes) 5/1/2026 $32.12 $18.49 $50.61

Laborers (Class 06 - See notes) 5/1/2025 $30.62 $17.84 $48.46

Laborers (Class 06 - See notes) 5/1/2026 $31.47 $18.49 $49.96

Marble Mason 5/1/2025 $37.20 $19.24 $56.44

Marble Mason 5/1/2026 $39.15 $19.24 $58.39

Millwright 6/1/2025 $43.00 $22.95 $65.95

Millwright 6/1/2026 $44.97 $22.95 $67.92

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/20/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $31.32 $24.44 $55.76

Painters Class 1 (see notes) 5/1/2026 $32.69 $24.82 $57.51

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $35.58 $25.08 $60.66

Painters Class 3 (see notes) 5/1/2025 $42.67 $25.09 $67.76

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 5/1/2023 $35.93 $23.96 $59.89

Plumbers and Steamfitters 12/1/2024 $51.49 $24.67 $76.16

Plumbers and Steamfitters 12/1/2025 $51.69 $27.67 $79.36

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 5/1/2025 $37.30 $32.31 $69.61

Sheet Metal Workers 5/1/2026 $39.42 $33.94 $73.36

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Finisher 5/1/2026 $37.12 $22.76 $59.88

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Grinder 5/1/2026 $37.93 $22.76 $60.69

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Mechanics 5/1/2026 $38.06 $24.51 $62.57

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/20/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30

Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25

Tile Setter 5/1/2025 $37.20 $19.24 $56.44

Tile Setter 5/1/2026 $39.15 $19.24 $58.39

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/20/2026 Page 4 of 6

Project: 26-09208 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 5/1/2026 $37.63 $21.18 $58.81

Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56

Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56

Cement Finishers 5/1/2016 $26.40 $22.48 $48.88

Electric Lineman 9/1/2025 $68.06 $32.29 $100.35

Electric Lineman 8/30/2026 $69.90 $34.20 $104.10

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Millwright 6/1/2025 $45.46 $23.33 $68.79

Millwright 6/1/2026 $47.52 $23.33 $70.85

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/20/2026 Page 5 of 6

Project: 26-09208 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2024 $34.16 $24.75 $58.91

Painters Class 2 (see notes) 5/1/2026 $37.19 $25.47 $62.66

Painters Class 3 (see notes) 5/1/2024 $41.01 $24.75 $65.76

Painters Class 3 (see notes) 5/1/2026 $44.04 $25.47 $69.51

Pile Driver Divers (Building, Heavy, Highway) 1/1/2022 $56.40 $20.50 $76.90

Piledrivers 5/1/2025 $36.87 $20.49 $57.36

Piledrivers 5/1/2026 $37.63 $21.18 $58.81

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $54.39 $44.73 $99.12

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 10/20/2026 Page 6 of 6

[Type here] [Type here] [Type here]

Redevelopment Assistance Capital Program

(RACP)

Key Compliance Guidelines

November 2024

RACP Key Compliance Guidelines

P a g e | 1 November 2024

Contents

KEY COMPLIANCE GUIDELINES

COMPETITIVE BIDDING REQUIREMENTS

PENNSYLVANIA STEEL PRODUCTS PROCUREMENT ACT

TRADE PRACTICES ACT

PUBLIC WORKS CONTRACTORS’ BOND LAW (PAYMENT & PERFORMANCE BONDS)

PA PREVAILING WAGE ACT (PWA)

AMERICANS WITH DISABILITIES ACT (ADA)

FIDELITY BONDS

INSURANCE REQUIREMENTS

RESTRICTIONS ON GOVERNMENTAL ENTITIES SELLING RACP PROJECTS

P a g e | 2 November 2024

KEY COMPLIANCE GUIDELINES

It is suggested that a copy of this complete document be given to your Project, Construction Manager, and/or Architect so that they are fully aware of the RACP requirements related to each. This document should be included in your bid packages and should be made an addendum to any and all construction contracts, plans and specifications related to the RACP project.

Compliance with all RACP requirements, including the key items in these guidelines will be monitored frequently throughout the construction phase of your project and will be reviewed once more during the legislatively mandated close-out audit.

COMPETITIVE BIDDING REQUIREMENTS

The sole and exclusive bidding requirement for RACP projects is in the Capital Facilities Debt Enabling Act (Act 67 of 2004), which states "Notwithstanding any other provision of law, the solicitation of a minimum of three written bids for all contracted construction work on redevelopment assistance capital projects shall be the sole requirement for the composition, solicitation, opening and award of bids on such projects.” Unless the terms of the law change, the Office of the Budget cannot grant waivers for bidding requirements to Grantees.

RACP projects are not subject to separation of trades. You are REQUIRED to solicit a minimum of three

(3) bids for "all generally contracted work" being performed within the RACP defined scope of work.

You are not required to receive three (3) bid responses. However, you should provide documentation to prove that at least three bids were solicited by providing copies of the solicitation letters (preferably on letterhead of the bidding entity) used in the bidding process. You are not required to select the lowest bidder, but if you do not, you will have to provide a brief written justification for your selection. Note:

there is NO threshold level under the RACP program regardless of the size or dollar amount associated with the work to be performed. You need to show that you solicited a minimum of three (3) bids for any contract to be eligible for RACP.

Bidding is acceptable at either the general contractor level (described in option a. below) or at the sub-contractor level (described in option b. below):

• General Contractor (GC) Level - If you chose to bid at the GC level, please note that the bid should encompass the entire RACP scope of work to be performed including all associated construction work. The dollar amount bid on the project must include 100% of the work to be performed by the GC and the sub-contractors. Bidding at the GC level will require submission of bidding and construction related documents at the GC level only (see Sub-Contractor level below for a distinction)

• Sub-Contractor Level - If you choose not to solicit three bids for a General Contractor, then you are required to solicit a minimum of three bids for EACH Sub-Contractor covering all trades involved in the project. Note that any self-performed work by a non-bid GC is NOT an eligible cost for reimbursement OR match purposes. Bidding at the Sub-Contractor level will require submission of bidding and construction related documents at the sub level…meaning proof of

P a g e | 3 November 2024 bidding, construction contracts, payment and performance bonds, insurance etc. will need to be provided for every sub-contractor in the RACP scope.

Professional Services: Professional services associated with the project are not required to be bid as these associated costs are only eligible as match.

Change Orders: Grantees and/or Sub-Grantees are not required to competitively bid out change orders as long as the work was within the RACP scope of the original bid and is less than 20% of the total contract. If a change order is for work beyond the RACP scope of work originally bid, the Grantee will be required to competitively bid out the new scope of work in order to be considered RACP eligible.

PENNSYLVANIA STEEL PRODUCTS PROCUREMENT ACT

The Office of the Budget (OB) cannot grant waivers to the Pennsylvania Steel Products Procurement Act (SPPA) unless the terms of the law change. All RACP Grantees must comply with the SPPA. If a Grantee/RACP project fails to abide by the SPPA, it does so at its own risk.

A full explanation on the RACP steel requirements is available as a PDF download.

Up to 2011, OB only accepted the ST-4 Form (justification for the use of foreign steel) that the Department of General Services (DGS) had exclusively devised to address exceptions linked to the requirements of the SPPA, when it was necessary. Since 2011, OB has approved the acceptability of two more DGS ST Forms (ST-2, ST-3) with some caveats, providing that the forms are properly filled out. The ST-1 Form will not be accepted by OB. It is not necessary for the ST-2, ST-3, and ST-4 Forms to be notarized.

Since 2013, OB has utilized the DGS Exempt Machinery and Equipment Steel Products listings as part of the RACP steel policy. DGS published a Statement of Policy - Steel Products Procurement in the Pennsylvania Bulletin Volume 43, Number 6 dated February 9, 2013 (See PA Bulletin #43, pages 85-86) that discussed their production of an annual list, based on their analysis of submitted ST-4 forms, which exempts certain steel products not produced domestically in sufficient quantity. DGS publishes an updated "Exemption List" annually.

Please be aware that ST forms are acceptable only in cases where nonstructural steel needs to be addressed. The DGS ST forms do not replace the steel certification forms associated with structural steel. OB will continue to require the submission of steel mill certifications to demonstrate compliance with the steel requirements for structural steel.

The PDF copies of the three acceptable ST Forms for RACP listed below can be obtained from the RACP website:

• ST-2 Steel Origin Certification: Non-Identifiable, Non-Structural Steel

• ST-3 75% U.S. Manufacture Certification

• ST-4 Not Domestically Manufactured: Prime Contractor (only to be used when requesting items to be exempted that are not found on the current year's List of Exempt Machinery and Equipment Steel Products) https://www.pa.gov/content/dam/copapwp-pagov/en/budget/documents/programs-and-services/racp/racp-main/steel%20guidance.pdf https://www.pa.gov/content/dam/copapwp-pagov/en/budget/documents/programs-and-services/racp/racp-main/st-2%20fillable.pdf https://www.pa.gov/content/dam/copapwp-pagov/en/budget/documents/programs-and-services/racp/racp-main/st-3%20fillable.pdf https://www.pa.gov/content/dam/copapwp-pagov/en/budget/documents/programs-and-services/racp/racp-main/st-4%20fillable.pdf

P a g e | 4 November 2024

It is suggested that the certifications be collected at the time any steel for the project is purchased and delivered to ease the collection process.

Be advised that OB DOES NOT need to approve the ST forms prior to the start of the construction period. The ST forms need to be submitted to demonstrate that compliance, when and where necessary, has been met.

We shall deem as ineligible all contracts that are unable to demonstrate compliance via the submission of steel certifications for Structural Steel and for Non-structural Steel the submission of steel certifications and/or ST forms and/or DGS Exempt Machinery and Equipment Steel Products List.

Therefore, the value of construction contracts associated with non-compliant steel will be removed (both materials and labor costs) from the scope of the project, which may in turn affect the project's ability to leverage their full grant amount (project may not receive its full grant).

Recycled products, melted from previously used steel, are acceptable, providing that adequate documentation from the supplier has been furnished. The supplier shall certify that the recycled steel product was produced in the USA.

TRADE PRACTICES ACT

In accordance with the Trade Practices Act of July 23, 1968, P.L. 686 (71 P.S. § 773.101 et seq.), the Grantee cannot and shall not use or permit to be used in the work any aluminum or steel products made in a foreign country which is listed below as a foreign country which discriminates against aluminum or steel products manufactured in Pennsylvania. The countries of Argentina, Brazil, South Korea, and Spain have been found to discriminate against certain products manufactured in Pennsylvania. Therefore, the purchase or use of those countries' products, as listed below, is not permitted:

• Argentina: carbon steel wire rod and cold-rolled carbon steel sheet.

• Brazil: welded carbon steel pipes and tubes; carbon steel wire rod; tool steel; certain stainless steel products, including hot-rolled stainless steel bar; stainless steel wire rod and cold-formed stainless steel bar; pre-stressed concrete steel wire strand; hot-rolled carbon steel plate in coil;

hot-rolled carbon steel sheet; and cold-rolled carbon steel sheet.

• South Korea: welded carbon steel pipes and tubes; hot-rolled carbon steel plate; hot-rolled carbon steel sheet; and galvanized steel sheet.

• Spain: certain stainless steel products, including stainless steel wire rod, hot-rolled stainless steel bars; and cold-formed stainless steel bars; pre-stressed concrete steel wire strand; and certain steel products, including hot-rolled steel plate, cold-rolled carbon steel plate, carbon steel structural shapes; galvanized carbon steel sheet, hot-rolled carbon steel bars, and cold-formed carbon steel bars.

Penalties for violation of the above paragraphs may be found in the Trade Practices Act, which penalties include becoming ineligible for public works contracts for a period of three years.

This provision in no way relieves the Grantee of responsibility to comply with those provisions which prohibit the use of foreign-made steel and cast iron products.

P a g e | 5 November 2024

PUBLIC WORKS CONTRACTORS’ BOND LAW (PAYMENT & PERFORMANCE BONDS)

The requirement for 100% payment and performance (P&P) bonds is a state law; the Office of the Budget cannot waive this requirement.

A performance bond must be obtained at 100% of the contract amount, conditioned upon the faithful performance of the contract in accordance with the plans, specifications, and conditions of the contract.

Such bond shall be solely for the protection of the contracting body which awarded said contract.

A payment bond must be obtained at 100% of the contract amount. Such bond shall be solely for the protection of claimants supplying labor or materials to the Grantee, its contractor or to any of its subcontractors, in the prosecution of the work provided for in such contract, and shall be conditioned for the prompt payment of all such material furnished or labor supplied or performed in the prosecution of the work. "Labor or materials" shall include public utility services and reasonable rentals of equipment, but only for periods when the equipment rented is actually used at the site.

PA PREVAILING WAGE ACT (PWA)

The Office of the Budget cannot grant waivers for the PA Prevailing Wage Act. All Grantees must comply with the act. Grantees that fail to abide by the Prevailing Wage Act do so at their own risk. Please do not assume that PA Prevailing Wage is always consistent with your local union wages.

All projects should apply for a wage determination letter prior to the start of construction by registering the project with the PA Department of Labor and Industry to obtain the prevailing wage rates relevant to your project. This determination sheet will provide the necessary trade classifications for the project, along with their corresponding hourly wage and hourly fringe rates that are required for the certified payrolls required as part of RACP. The wage determination should be obtained within 120 days of the award of construction contracts. If necessary, the Department of Labor and Industry can issue determinations letters after construction has begun.

The prevailing wage information and forms can be found on the PA Department of Labor & Industry website.

AMERICANS WITH DISABILITIES ACT (ADA)

Typically your architect should provide a letter stating the plans and specs are in compliance with ADA regulations. Additionally, the Grantee agrees to comply with the General Prohibitions Against Discrimination, 28 C.F.R. § 35.130, and all other regulations promulgated under Title II of The Americans with Disabilities Act which are applicable to all benefits, services, programs, and activities provided by the commonwealth through contracts.

https://www.pa.gov/agencies/dli/resources/compliance-laws-and-regulations/labor-management-relations/labor-law/prevailing-wage.html https://www.pa.gov/agencies/dli/resources/compliance-laws-and-regulations/labor-management-relations/labor-law/prevailing-wage.html

P a g e | 6 November 2024

FIDELITY BONDS

The Grantee shall procure and furnish evidence to OB, of fidelity bonds with coverage to be maintained under the administrative title of the position, in amounts and for such positions as are reasonably determined by OB. Fidelity Bonding is also commonly known as "Employee Dishonesty Insurance."

Grantees should submit certificates of insurance to support fidelity bond coverage is in effect and the coverage amount meets or exceeds the RACP grant amount, or the coverage amount meets or exceeds the monthly project funding schedule contained in Appendix C of the grant agreement. For Grantees with multiple projects and/or grants larger than $5,000,000 the coverage amount can be the lesser of either $1,000,000 or 20% of the RACP grant amount(s).

INSURANCE REQUIREMENTS

• Worker’s Compensation Insurance - The Grantee shall provide Worker's Compensation Insurance where required, and shall accept full responsibility for the payment of premiums for Worker's Compensation Insurance and Social Security, as well as income tax withholding and any other taxes or payroll deductions required by law for its employees who are performing services related to the project.

• General Liability & Property Damage Insurance - The Grantee will provide and maintain comprehensive general liability and property damage insurance in the minimum amount of $250,000.00 per person for injury and death in a single occurrence; $1,000,000.00 per occurrence for injury or death of more than one (1) person in a single occurrence; and $500,000.00 for a single occurrence of property damage, and which shall be endorsed to protect the commonwealth.

• Flood Insurance – If the project is wholly or partially within a floodplain, proof of sufficient flood insurance coverage must be provided. In any case, a project is required to provide a copy of a floodplain map of the project area, with the project site being delineated thereon.

Identify Commonwealth as Additional Insured: The commonwealth shall be listed on the above insurance policies as an additional insured. Upon request, the Grantee shall furnish proof of insurance as required by this section to OB.

RESTRICTIONS ON GOVERNMENTAL ENTITIES SELLING RACP PROJECTS

Article 8 of the RACP Grant Agreement spells out sale price restrictions for a governmental entity that sells property that was acquired and/or improved with RACP funds. The restrictions are required to insure that the Grantees CANNOT sell the property for a net gain or even recoup the value of the grant in the sale price. A PDF download is available that contains more information on Article 8.

https://www.pa.gov/content/dam/copapwp-pagov/en/budget/documents/programs-and-services/racp/racp-main/article%208%20guidance.pdf

RACP Steel Guidance

P a g e | 1 November 2024

Redevelopment Assistance Capital Program

(RACP)

Steel Guidance

November 2024

P a g e | 2 November 2024

GUIDANCE ON STEEL CERTIFICATION

The following guidance is a clarification from the Office of the Budget (OB) regarding the requirements associated with the Pennsylvania Steel Products Procurement Act (SPPA) relative to the RACP program whose statutes are regulated under Act 1 of 1999, as amended. In the past, many grantees have inquired about specific cases and we were able to provide each individual project with specific directions.

Additionally, we had only accepted the ST-4 form that the Department of General Services (DGS) had exclusively devised to address exceptions linked to the requirements of the SPPA in the handling of special cases or exceptions. Please note that cost consideration (or convenience) is not an acceptable justification that the ST-4 form can address. Filled out ST-4 forms premised on cost consideration will not be accepted by OB.

OB accepts two DGS ST forms (ST-2 and ST-3) with some caveats, providing that the forms are properly filled out. The ST-1 form is NOT a valid option and shall NOT be accepted by OB. It is not necessary for the ST-2, ST-3, and ST-4 forms to be notarized. Please, be advised that this guidance is specifically tailored to suit the published and programmatic needs of OB as the overseer of RACP program. This is not a commonwealth-wide policy. Any attempt to impose this guidance on other state agencies is strongly discouraged.

Please, be aware that the aforementioned ST forms are acceptable only in cases where non- structural steel needs to be addressed. The DGS ST forms do not replace the steel certification forms associated with structural steel. It remains the responsibility of the project representatives to provide documented evidence that a non-structural steel product is not domestically produced in sufficient quantities.

OB shall continue to require that steel mill certifications be submitted to demonstrate compliance with the steel requirements. Please, be further advised that OB DOES NOT need to approve the ST forms prior to the start of the construction period. The ST forms need to be submitted to demonstrate that compliance, when and where necessary, has been met. The ST forms exceptions are displayed below.

Please submit questions to RA-OBRACP-Steel-Cost@pa.gov.

It is suggested that the certifications be collected at the time any steel for the project is purchased and delivered to ease the collection process.

Since 2013, OB has utilized the DGS Exempt Machinery and Equipment Steel Products listings as part of the RACP steel policy. DGS published a Statement of Policy - Steel Products Procurement in the Pennsylvania Bulletin Volume 43, Number 6 dated February 9, 2013 (See PA Bulletin #43, pages 85-86) that discussed their production of an annual list, based on their analysis of submitted ST-4 forms, which exempts certain steel products not produced domestically in sufficient quantity.

No other changes in RACP steel policy resulted from this new adjustment; consequently, the use of steel certificates for structural steel will still be required. Please note that the use of ST 2, 3, and 4, as requested for other steel products, will still be utilized unless an exemption based on the list has been formulated and forwarded to OB.

OB’s guidance is to make sure the Grantee/Subgrantee’s are aware that it’s their responsibility to certify all applicable steel components incorporated within RACP projects. In some instances, mailto:RA-OBRACP-Steel-Cost@pa.gov

P a g e | 3 November 2024

OB/RACP staff and/or the state assigned consultant may limit their compliance analysis to significant steel components. The projects’ architect/engineers are responsible for preparing/providing a significant steel component listing, not the RACP assigned consultant.

Two distinct approaches are presented below for steel products that are structural and/or have a significant building component.

Structural Steel Products

Pursuant to the SPPA, OB will require a mill certificate containing the statement "milled, melted, and manufactured in the USA" for all structural steel products used on RACP projects. We shall deem as ineligible all contracts that are unable to demonstrate compliance via the submission of steel certifications. Therefore, the value of construction contracts associated with non-compliant steel will be removed (both materials and labor costs) from the scope of the project.

Non-Structural Steel Products

Pursuant to the SPPA, OB will require, either a mill certificate containing the statement "milled, melted, and manufactured in the USA" or the appropriate ST form or an Exemption Request to utilize the DGS current years' Final List of Exempt Machinery and Equipment Steel Products to demonstrate compliance associated with the non-structural steel products used on RACP projects. OB shall deem as ineligible all contracts that are unable to demonstrate compliance via the submission of steel certifications /ST forms/Exemption Request based on the DGS Exempt Machinery and Equipment Steel Products listing. Therefore, the value of construction contracts associated with non-compliant steel will be removed (both materials and labor costs) from the scope of the project.

Recycled products, melted from previously used steel, are acceptable, providing that adequate documentation from the supplier has been furnished. The supplier shall certify that the recycled steel product was produced in the USA.

Furthermore, the burden of proof for all non-structural steel products not produced domestically in sufficient quantities is still the project's responsibility to provide.

Please be aware that the acceptance of ST forms is contingent upon the form being fully filled in and compliant with the submission guidelines for steel certifications for DGS projects with the following exceptions:

• It is not necessary for the forms to be notarized; however, all ST forms must be signed. Original signatures or electronic signatures through Adobe fill/sign, DocuSign, or Nuance (program which allows electronic signature similar to Adobe fill/sign) are acceptable.

• Any questions regarding steel certification submissions and/or compliance with the Act shall be submitted to the OB Steel Resource Account (RA-OBRACP-Steel-Cost@pa.gov).

• The Steel certification forms do NOT need to be submitted and approved by OB before the steel product arrives on site so as not to interfere with the project construction schedule.

• OB assumes responsibility for acceptance of the DGS ST forms in accordance with this policy.

P a g e | 4 November 2024

Completion of the ST-2, ST-3, and ST-4 forms shall follow the DGS directions attached to the form with the following exceptions:

• ST forms do NOT need to be submitted and approved by OB before the steel product arrives on site so as not to interfere with the construction schedule.

• RACP ME# assigned to the project shall be inserted in all areas requiring the DGS contract number (Line#5).

• RACP official project name shall be inserted in all areas requiring the contract title (Line #6).

Note:

Acceptance of each ST form shall be determined by OB at its sole discretion. All documents and other information to be delivered in order to demonstrate compliance with the steel requirements shall be and are, in form, content and substance, subject to the approval of OB, which approval may be withheld or delayed at OB's discretion. OB reserves the right to reject all improperly filled out or unsupported ST forms.

Below are links to PDF copies of the three acceptable ST Forms that can be obtained from the RACP website:

• ST-2 Steel Origin Certification: Non-Identifiable, Non-Structural Steel

• ST-3 75% U.S. Manufacture Certification

• ST-4 Not Domestically Manufactured: Prime Contractor (only to be used when the items requested to be exempted are not found on the appropriate year's List of Exempt Machinery and Equipment Steel Products [see section below entitled "Year of DGS Exemption Listing to Use"])

To implement the RACP policy on Non-structural Steel Exemption Request utilizing the DGS's current years' Final List of Exempt Machinery and Equipment Steel Products, referred to as the "Exemption List", please follow the below requirements:

• The Project must be under "active" construction (workers on site) on or AFTER 1/01/2013 (RACP effective date) to use the "Exemption List".

• "Active" construction does not include performance of just "punch list" items.

• Effective date is based on the "active" construction date and not the date the machinery and equipment were purchased.

• There is no retroactive application of utilization of the "Exemption List".

• No ST-4 form is required for a RACP Exemption Request based on the "Exemption List".

• RACP Exemption Request (to utilize the "Exemption List") must come from a contractor involved in the construction of the project and be:

o On Construction Company Letterhead.

o Dated and signed by appropriate company official (does not need to be notarized).

o Should be addressed to Office of Budget o Should contain RACP project name and/or ME # o Lists any/all machinery and equipment that the Company is requesting to have exempted from ST-4 documentation.

o All items listed on RACP Exemption Request letter must clearly match-up to an item on the appropriate year's "Exemption List" and the Exemption List year should be notated for each item.

https://www.pa.gov/content/dam/copapwp-pagov/en/budget/documents/programs-and-services/racp/racp-main/st-2%20fillable.pdf…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .