1800000 M EV Eval Factors.pdf

PDF 13 KB Posted

Attached to
Water Testing Services - Naval Submarine Base New London
Solicitation number
N4008521R2561
Issued by

View the file

Other files

File Type Posted
RFI PART III Clarifications.pdf PDF
Amendment 0008.pdf PDF
RFI Responses Part III.pdf PDF
Amendment 0007.pdf PDF
SIU GP 20210524 - DRAFT 3.pdf PDF
Amendment 0006.pdf PDF
RFI Responses Part II.docx DOCX document
1800000-C Water Testing PWS.pdf PDF
RFI RESPONSES Part I.pdf PDF
J-0200000-02 Wage Determ.pdf PDF
Amendment 0005.pdf PDF
0200000 C Management and Admin.pdf PDF
Amendment 0004.pdf PDF
SIU GP Reg Final.pdf PDF
J-0200000-08 ELINs Amended.xls XLS spreadsheet
Water Testing Bid Schedule - Amended.xls XLS spreadsheet
Amendment 0003.pdf PDF
NPDES Permit CT0003921.pdf PDF
GP COMP CTCSW0034.pdf PDF
GP Comprehensive Permit.pdf PDF
ARDM Discharge Photo 2.jpg JPG image
Off-Base Maps.pdf PDF
ARDM Discharge Photo.jpg JPG image
Site Visit Information.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
J-0200000-02 Wage Determ.pdf PDF
Nautilus Park - 2019 DDBPR.pdf PDF
J-0200000-5C Contractor Incident Report.pdf PDF
1800000-C Water Testing PWS.pdf PDF
J-0200000-07 Installation Spill Control Plan.pdf PDF
Trident Park-2019 DDBPR.pdf PDF
Drinking Water Example Report.pdf PDF
Trident Park - 2019 RTCR.pdf PDF
Industrial Stormwater SMR Example.pdf PDF
EEP Permitting Fact Sheet.pdf PDF
Cert-141.pdf PDF
Drinking Water Testing Actuals.pdf PDF
NEPA.pdf PDF
N4008521R2561.pdf PDF
Form 5512-1 Base Access.pdf PDF
Conning Towers 2019 RTCR.pdf PDF
Trident Park-2019 LCR.pdf PDF
GP SIU DMR EXAMPLE.pdf PDF
Water Testing Bid Schedule.xls XLS spreadsheet
J-0200000-5A On-Site Labor Summary Report.xls XLS spreadsheet
Main Base - 2019 LCR.pdf PDF
J-0200000-5B Quality Inspection and Surveillance Report.xls XLS spreadsheet
Base Map.pdf PDF
Nautilus Park 2019 RTCR.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1800000 – Environmental

SECTION M: EVALUATION FACTORS FOR AWARD

1 The Industrial Storm water permit has Quarterly, Semi-annual, and Annual collection requirements. Given the uncertainty of rain events, compounded with sample hold times and lab delivery, what steps would you take to ensure successful collection within each timeframe?

2 The wastewater program, including SUBASENLON’s NPDES and two General Permits for discharges to surface water, groundwater, and the sanitary sewer, currently include almost 40 registered discharges with a variety of monitoring parameters, frequencies and exemptions. The Water Monitoring Plan required to be developed and submitted by the contractor shall comprehensively capture these components (and more) to ensure sample collection and analysis achieves regulatory compliance. How will staff be trained and sampling be scheduled in order to accommodate this program’s vast and various needs, known and unanticipated, in order to meet the requirements set forth by each of the permits?

3 Please describe the process and actions that you will take if you find out that total coliforms were detected in a water sample that you just took as part of your routine bacteriological sampling under the scope of the contract. Please clearly provide what immediate actions you will take in regards to Navy notification, as well as any required additional sampling actions. Information should include any relevant time-sensitive parameters.

4 Please provide detail on how the quality control program will be conducted and monitored during the course of the contract.

File details come from the government source that posted it. Updated .