This document is Section J of a federal contract specification for electrical systems at Naval Research Laboratory (NRL). It provides definitions, references, and system descriptions for the electrical infrastructure requiring preventive maintenance (PM) program development and implementation.

The contractor must develop and implement a comprehensive PM program covering all electrical systems and mechanically/electrically interlocked components, including auxiliary generators, batteries, battery chargers, breakers, cables, capacitors, circuit interrupters, control panels, disconnects, duct banks, insulators, inverters, meters and metering systems, overcurrent protection devices, overhead and underground lines, poles, rectifiers, relays, switchboards, substations, SCADA systems, switchgear, transformers, and monitoring/controls systems. NRL receives electric power from PEPCO through three feeders at 13.8 kilovolts (KV) from the Main Base delivery point, with monthly consumption ranging from 7.4 to 11.3 million kWh. The electrical distribution infrastructure consists of four 13.8 KV distribution substations, pad-mounted switching enclosures, unit substations, distribution transformers, electromechanical and solid-state relay protection schemes, and extensive underground and above-ground infrastructure networks. The document includes definitions of key terms (preventive maintenance, repair, replacement, restoration, sustainment), relevant acronyms, and references to applicable technical standards including UFC criteria, NAVFAC guidelines, and Army Corps of Engineers technical manuals addressing electrical engineering, power distribution, and electrical safety operations and maintenance.

View the file

Other files

File Type Posted
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1503060 C Pavement Clearance.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf PDF
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-11 MAXIMO Data Reporting.pdf PDF
Attachment J-0200000-15 ELINs Blank.xlsx XLSX spreadsheet
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-01 Definitions and Acronyms.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J – 1602000 Electrical

Attachment Number Attachment Title

J-1602000-01 Definitions and Acronyms J-1602000-02 References and Technical Documents J-1602000-03 Electrical Power and Distribution System Description and Inventory J-1602000-04 Electrical Meter Inventory

Attachment J-1602000-01 Definitions and Acronyms

DEFINITION/ACRONYM DESCRIPTION

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal Property

Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed after erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

High Voltage Transmission Transmission of electrical loads greater than 69 kilovolts (KV).

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Low Voltage Distribution Distribution of electrical loads less than or equal to 600 volts (V).

Maintenance, Preventive Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.

Medium Voltage Distribution

Distribution of electrical loads ranging from greater than 600 V up to and including

69 KV.

NEC National Electrical Code NFPA National Fire Protection Association Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance.

This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.

Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.

Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Attachment J-1602000-01 Definitions and Acronyms

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

SCADA A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of remote stations as well as data acquisition from those stations over a bidirectional communications link.

Title Description AC Alternating Current (electricity) ANSI American National Standards Institute ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers ASME American Society of Mechanical Engineers High Voltage Transmission

Transmission of electrical loads greater than 69 kilovolts (KV).

Low Voltage Distribution

Distribution of electrical loads less than or equal to 600 volts (V).

Medium Voltage Distribution

Distribution of electrical loads ranging from greater than 600 V up to and including 69

KV.

NEC National Electrical Code NFPA National Fire Protection Association SCADA Supervisory Control and Data Acquisition SOP Standard Operating Procedure UFC Unified Facilities Criteria UPV Unfired Pressure Vessel

Attachment J-1602000-02

References and Technical Documents

Reference Title MO-209 Engineering Criteria UFC 3-430-02FA Central Steam Boiler Plants UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired

Pressure Vessels UFC 3-430-08N Central Heating Plants UFC 3-501-01 Electrical Engineering UFC 3-550-01 Exterior Electrical Power Distribution UFC 3-560-01 Electrical Safety O&M NAVFAC P-307 Management of Weight Handling Equipment TM 5-811-6 Electric Power Plant Design TM 5-815-1 Air Pollution Control Systems Boilers and Incinerators

Attachment J-1602000-03 Electrical Power Generation Plant and Transmission and Distribution System Description

The Contractor shall develop and implement an PM program for the Electrical Systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the Electrical Systems; such as: auxiliary generators, batteries, battery chargers, breakers, buss work, cables, capacitors, circuit interrupters, control panels, disconnects, duct banks, hand holes, hardware, insulators, inverters, manholes, meters and metering systems, meter bases, overcurrent protection devices (including fiber optics), overhead and undergrounds lines, poles, rectifiers, regulators, relays, secondary service drops, switchboards, substations, supervisory control and data acquisition (SCADA) systems, switchgear, switches, towers, transformers, wiring, monitoring and controls systems, etc.

Naval Research Laboratory is supplied electric power from PEPCO through three feeders. The majority (99.9%) of electric power is purchased at 13.8 KV from PEPCO through the Main Base delivery point located near the Potomac River side of the Installation. NRL’s electric consumption ranges from 7.4 million kWh per month to

11.3 kWh per month. NRL’s electrical distribution system components include:

Four 13.8 KV distribution substations, pad-mounted switching enclosures, a diverse fleet of unit substations and distribution transformers, comprehensive electromechanical and solid-state relay protection schemes, and a vast underground and above ground infrastructure network. See the Excel File J-1602000-03 Electrical Power and Distribution System Inventory attached separately.