About this file

This solicitation is for the design and construction of the P4040 French Creek Ambulatory Care Clinic at Camp Lejeune, North Carolina. The Naval Facilities Engineering Command seeks bids for the design and construction of the ambulatory care clinic through a design-bid-build project delivery method. Interested parties should submit bids by the deadline of August 5, 2021. The selected contractor will be responsible for all aspects of design and construction to deliver a fully functioning clinic. The contractor must follow all applicable federal acquisition regulations and Navy facility design standards.

View the file

Other files

File Type Posted
N4008521R2524P00006.pdf PDF
AMEND 06 ATTACHMENT E PRICE PROPOSAL FORM.docx DOCX document
AMD 5 ATTACH 2 Site Visit 6.17.21.pdf PDF
AMD 5 ATTACH 1 P4040 PPIs VER2.xlsx XLSX spreadsheet
N4008521R2524P0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 Attachment (1) NC20210038 WGDET.pdf PDF
Amendment 0003 Attachment (2) PPIs.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
MP501.pdf PDF
Interim MCMH French Creek_Drawing Set_Compiled.pdf PDF
Amendment 0001 Continuation Sheet.pdf PDF
N4008521R2524P00001.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
1430035dwg10of20_Architectural.pdf PDF
1430035dwg06of20_Civil.pdf PDF
1430035dwg15of20_FireSup.pdf PDF
1430035dwg20of20_Comm.pdf PDF
1430035dwg19of20_Electrical.pdf PDF
ATTACHMENT E PRICE PROPOSAL FORM.docx DOCX document
ATTACHMENT D SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
1430035dwg02of20_LifeSafety.pdf PDF
RFP N4008521R2524.pdf PDF
1430035dwg16of20_FireAlarm.pdf PDF
1430035dwg07of20_Landscape.pdf PDF
1430035dwg09of20_Architectural.pdf PDF
1430035dwg12of20_Architectural.pdf PDF
1430035dwg04of20_Hazmat.pdf PDF
Attachment A - PPI Inquiry Log.xls XLS spreadsheet
1430035dwg14of20_Equipment.pdf PDF
1430035spc02of03.pdf PDF
1430035dwg13of20_Interiors.pdf PDF
ATTACHMENT C Past Performance Questionnaire.pdf PDF
1430035dwg11of20_Architectural.pdf PDF
1430035dwg05of20_Borings.pdf PDF
1430035dwg03of20_Phasing.pdf PDF
1430035spc03of03.pdf PDF
1430035dwg08of20_Structural.pdf PDF
1430035dwg17of20_Plumbing.pdf PDF
1430035dwg01of20_General.pdf PDF
1430035dwg18of20_Mechanical.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

UNCLASSIFIED/FOR OFFICIAL USE ONLY

kjw Image

FRENCH CREEK AMBULATORY CARE CLINIC ADDITION/ALTERATION 16029

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 16.00 50 CUTTING AND PATCHING PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 60 00.00 22 REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 78 30.00 22 GIS DATA DELIVERABLES

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 43 13.00 50 SLOTTED CHANNEL EQUIPMENT SUPPORT FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

06 64 00.00 50 PLASTIC PANELING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 16 16.00 50 CRYSTALLINE WATERPROOFING

07 17 00 BENTONITE WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 13.00 50 MODIFIED BITUMINOUS SHEET AIR BARRIERS

07 27 26.00 50 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 52 13.26 50 MODIFIED BITUMINOUS MEMBRANE ROOFING REPAIR

07 60 00 FLASHING AND SHEET METAL

07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING

07 72 00.00 50 ROOF ACCESSORIES

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 00.00 50 EXPANSION CONTROL

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 13.00 50 ACCESS DOORS AND FRAMES

08 32 13.01 50 ALUMINUM SLIDING SYSTEMS

08 33 13.00 50 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 71 13.00 50 AUTOMATIC DOOR OPERATORS

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 CEMENT STUCCO

09 29 00 GYPSUM BOARD

09 30 10 TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 65 66 RESILIENT ATHLETIC FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

PROJECT TABLE OF CONTENTS Page 2

10 21 13 TOILET COMPARTMENTS

10 21 23.16 CUBICLE TRACK AND HARDWARE

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 00.00 50 FIRE EXTINGUISHERS AND CABINETS

10 90 00.00 50 MISCELLANEOUS SPECIALTIES

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 35 70 HEALTHCARE CASEWORK

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 21 48 PREFABRICATED AUDIOMETRIC ROOMS

13 49 19 X-RAY SHIELDING

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 70 PLUMBING, HEALTHCARE FACILITIES

22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR

OUTPUT)

23 64 11 WATER CHILLERS, AIR COOLED TYPE

23 64 26 CHILLED AND HEATING HOT WATER PIPING SYSTEMS

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 75 POWER SYSTEM STUDY

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 ELECTRICITY METERING

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 55 80.00 20 SURGICAL LIGHTING FIXTURES

PROJECT TABLE OF CONTENTS Page 3

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

27 52 32.00 10 NURSE CALL TONE-VISUAL (NCTV) SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 10 00 BITUMINOUS CONCRETE PAVEMENT

32 13 13.06 PORTLAND CEMENT CONCRETE FOR PAVEMENT AND SITE FACILITIES

32 16 15 CONCRETE BLOCK PAVEMENTS

32 17 23.00 20 PAVEMENT MARKINGS, TACTILE WARNING MATERIAL & SIGNAGE

32 31 13 CHAIN LINK FENCES AND GATES

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 34 - TRANSPORTATI ON

34 71 13.19 VEHICLE BARRIERS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

FRENCH CREEK AMBULATORY CARE CLINIC RLF 16029

ADDITION/ALTERATION

SEALS PAGE FINAL CONSTRUCTION DOCUMENTS

SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect David W. Boldt

B. Civil Engineer C. Allan Bamforth

C. Landscape Architect Karina Veaudry

SEALS PAGE FINAL CONSTRUCTION DOCUMENTS

D. Structural Engineer Justin D. Trent

E. Electrical Engineer Nick Zubrzycki

F. Registered Communications Distribution Designer Donald R. Sellers

SEALS PAGE FINAL CONSTRUCTION DOCUMENTS

G. Mechanical Engineer Jacob A. Anderson

H. Interior Designer Cynthia M Elkin

I. Plumbing Engineer

SEALS PAGE FINAL CONSTRUCTION DOCUMENTS

Jacob A. Anderson

J. Fire Protection Engineer Jennifer Lovett

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

SHEET

NUMBER NAVFAC Number SHEET NAME

GI000 12760419 COVER SHEET

GI001 12760420 INDEX OF DRAWINGS

GI002 12760421 INDEX OF DRAWINGS

GI010 12760422 SYMBOLS AND ABBREVIATIONS

GI011 12760423 "REGIONAL, VICINITY, AND LOCATION MAPS"

GC001 12760424 LIFE SAFETY CODE ANALYSIS AND SYMBOLS

GC100 12760425 CODE COMPLIANCE SITE PLAN

GC101 12760426 "ARCHITECTURAL LIFE SAFETY PLAN, COMPOSITE"

PH101 12760427 COMPOSITE PHASING PLAN - PHASE 1

PH102 12760428 COMPOSITE PHASING PLAN - PHASE 2

PH103 12760429 COMPOSITE PHASING PLAN - PHASE 3

HD001 12760430 HAZARDOUS ABATEMENT GENERAL NOTES

HD101 12760431 HAZARDOUS MATERIALS FLOOR PLAN

B-001 12760432 "SOIL BORING LOGS - LEGEND, NOTES & LAB TEST RESULTS"

B-101 12760433 SOIL BORING LOGS

B-102 12760434 SOIL BORING LOGS

B-103 12760435 SOIL BORING LOGS

B-104 12760436 SOIL BORING LOGS

B-105 12760437 SOIL BORING & CONE PENETRATION TEST LOGS

B-106 12760438 SOIL TESTING LOCATION PLAN

C-001 12760439 LEGEND AND NOTES

C-002 12760440 KEY PLAN

C-003 12760441 BASE BID PLAN

C-004 12760442 PLAN WITH OPTION ITEMS NO.1 AND NO. 2

C-005 12760443 OVERALL UTILITY PLAN

C-006 12760444 OVERALL PHASING PLAN (EXISTING CONDITIONS)

C-007 12760445 OVERALL PHASING PLAN (IMPROVEMENTS)

CD101 12760446 EXISTING CONDITIONS PLAN

CD102 12760447 EXISTING CONDITIONS PLAN

CD103 12760448 EXISTING CONDITIONS PLAN

CD104 12760449 EXISTING CONDITIONS PLAN

CD105 12760450 EXISTING CONDITIONS PLAN

CD106 12760451 EXISTING CONDITIONS PLAN

CD107 12760452 DEMOLITION / EROSION CONTROL PLAN

CD108 12760453 DEMOLITION / EROSION CONTROL PLAN

CD109 12760454 DEMOLITION / EROSION CONTROL PLAN

DOCUMENT 00 01 15 Page 1 Conformed Specs

CD110 12760455 DEMOLITION / EROSION CONTROL PLAN

CD111 12760456 DEMOLITION / EROSION CONTROL PLAN

CD112 12760457 DEMOLITION / EROSION CONTROL PLAN

CS101 12760458 LAYOUT AND UTILITIES PLAN

CS102 12760459 LAYOUT AND UTILITIES PLAN

CS103 12760460 LAYOUT AND UTILITIES PLAN

CS104 12760461 LAYOUT AND UTILITIES PLAN

CS105 12760462 LAYOUT AND UTILITIES PLAN

CS106 12760463 LAYOUT AND UTILITIES PLAN

CS401 12760464 ENLARGED JOINT PLAN

CG101 12760465 GRADING AND DRAINAGE PLAN

CG102 12760466 GRADING AND DRAINAGE PLAN

CG103 12760467 GRADING AND DRAINAGE PLAN

CG104 12760468 GRADING AND DRAINAGE PLAN

CG105 12760469 GRADING AND DRAINAGE PLAN

CG106 12760470 GRADING AND DRAINAGE PLAN

C-301 12760471 PROFILES

C-302 12760472 PROFILES

C-303 12760473 PROFILES

C-304 12760474 PROFILES

C-305 12760475 PROFILES

C-501 12760476 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS

C-502 12760477 EROSION AND SEDIMENT CONTROL DETAILS

C-503 12760478 DETAILS

C-504 12760479 DETAILS

C-505 12760480 DETAILS

C-506 12760481 DETAILS

C-507 12760482 DETAILS

C-508 12760483 DETAILS

C-509 12760484 DETAILS

C-601 12760485 EXISTING UTILITY SCHEDULES

C-602 12760486 UTILITY SCHEDULES

LH101-1 12760487 HARDSCAPE PLAN

LH101-2 12760488 HARDSCAPE PLAN

LH101-3 12760489 HARDSCAPE PLAN

LH101-4 12760490 HARDSCAPE PLAN

LH101-5 12760491 HARDSCAPE PLAN

LH101-6 12760492 HARDSCAPE PLAN

LH501 12760493 HARDSCAPE DETAILS

LH502 12760494 HARDSCAPE DETAILS

LH503 12760495 HARDSCAPE DETAILS

LH504 12760496 EDUCATIONAL SIGNS

LP001 12760497 LANDSCAPE NOTES AND REQUIREMENTS

LP002 12760498 EXISTING TREE PROTECTION DETAIL AND NOTES

LP003 12760499 TREE MITIGATION PLAN

LP101 12760500 BASE BID LANDSCAPE PLAN

LP201 12760501 OPTION 1 - PARKING AREA LANDSCAPE PLAN

LP301 12760502 OPTION 3 FULL LANDSCAPE PLAN PLANT SCHEDULE & NOTES

LP301-1 12760503 OPTION 3 - FULL LANDSCAPE PLAN

LP301-2 12760504 LANDSCAPE PLAN ENLARGEMENT

LP301-3 12760505 LANDSCAPE PLAN ENLARGEMENT

LP301-4 12760506 LANDSCAPE PLAN ENLARGEMENT

LP301-5 12760507 LANDSCAPE PLAN ENLARGEMENT

LP301-6 12760508 LANDSCAPE PLAN ENLARGEMENT

LP501 12760509 LANDSCAPE INSTALLATION DETAILS

S-001 12760510 GENERAL NOTES

S-002 12760511 GENERAL NOTES

DOCUMENT 00 01 15 Page 2

S-100 12760512 DIMENSION PLAN

S-101 12760513 FOUNDATION PLAN - SECTOR 1

S-102 12760514 FOUNDATION PLAN - SECTOR 2

S-103 12760515 FOUNDATION PLAN - SECTOR 3

S-104 12760516 FOUNDATION PLAN - SECTOR 4

S-105 12760517 ROOF FRAMING PLAN - SECTOR 1

S-106 12760518 ROOF FRAMING PLAN - SECTOR 2

S-107 12760519 ROOF FRAMING PLAN - SECTOR 3

S-108 12760520 ROOF FRAMING PLAN - SECTOR 4

S-301 12760521 SECTIONS

S-302 12760522 SECTIONS

S-303 12760523 SECTIONS

S-501 12760524 TYPICAL DETAILS

S-502 12760525 TYPICAL DETAILS

S-503 12760526 TYPICAL DETAILS

S-504 12760527 TYPICAL DETAILS

S-505 12760528 TYPICAL DETAILS

AD101 12760529 "DEMOLITION / PHASING PLAN, COMPOSITE"

AD101-2 12760530 "DEMOLITION PLAN, SECTOR 2"

AD101-3 12760531 "DEMOLITION PLAN, SECTOR 3"

AD101-4 12760532 "DEMOLITION PLAN, SECTOR 4"

AD102 12760533 "DEMOLITION PLAN, ROOF, COMPOSITE"

AD200 12760534 "DEMOLITION, BUILDING ELEVATIONS"

AD901 12760535 EXISTING CONDITIONS PHOTOS - EXTERIOR

AD902 12760536 EXISTING AND DEMOLITION PHOTOS - EXTERIOR

AD903 12760537 EXISTING CONDITIONS PHOTOS - ROOF

AD904 12760538 EXISTING CONDITIONS PHOTOS - INTERIOR

AD905 12760539 EXISTING CONDITIONS PHOTOS - MECHANICAL ROOM

AD906 12760540 EXISTING CONDITIONS PHOTOS - STRUCTURAL AND WINDOWS

AS100 12760541 ARCHITECTURAL SITE PLAN

AS420 12760542 "SITE ENLARGED PLANS, ELEVATIONS, SECTIONS & DETAILS"

AE101 12760543 "FLOOR PLAN, COMPOSITE"

AE101-1 12760544 "FLOOR PLAN, SECTOR 1"

AE101-2 12760545 "FLOOR PLAN, SECTOR 2"

AE101-3 12760546 "FLOOR PLAN, SECTOR 3"

AE101-4 12760547 "FLOOR PLAN, SECTOR 4"

AE101D-1 12760548 "DIMENSIONAL / PARTITION TYPE PLAN, SECTOR 1"

AE101D-2 12760549 "DIMENSIONAL / PARTITION TYPE PLAN, SECTOR 2"

AE101D-3 12760550 "DIMENSIONAL / PARTITION TYPE PLAN, SECTOR 3"

AE102 12760551 "ROOF PLAN, COMPOSITE"

AE111-1 12760552 "REFLECTED CEILING PLAN, SECTOR 1"

AE111-2 12760553 "REFLECTED CEILING PLAN, SECTOR 2"

AE111-3 12760554 "REFLECTED CEILING PLAN, SECTOR 3"

AE111-4 12760555 "REFLECTED CEILING PLAN, SECTOR 4"

AE201 12760556 BUILDING ELEVATION - WEST

AE202 12760557 BUILDING ELEVATIONS - NORTH AND SOUTH

AE203 12760558 BUILDING ELEVATION - EAST

AE301 12760559 BUILDING SECTIONS

AE321 12760560 WALL SECTIONS

AE322 12760561 WALL SECTIONS

AE401 12760562 ENLARGED FLOOR PLANS

AE402 12760563 ENLARGED FLOOR PLANS

AE411 12760564 STAIR AND LADDER PLANS AND SECTIONS

AE461 12760565 ENLARGED CEILING PLANS

AE462 12760566 ENLARGED CEILING PLANS

AE501 12760567 EXTERIOR PLAN DETAILS

DOCUMENT 00 01 15 Page 3

AE511 12760568 EXTERIOR SECTION DETAILS

AE512 12760569 EXTERIOR SECTION DETAILS

AE513 12760570 EXTERIOR SECTION DETAILS

AE514 12760571 EXTERIOR SECTION DETAILS

AE520 12760572 ROOF DETAILS

AE521 12760573 ROOF DETAILS

AE522 12760574 ROOF DETAILS

AE541 12760575 INTERIOR PLAN DETAILS

AE542 12760576 INTERIOR PLAN DETAILS

AE543 12760577 INTERIOR PLAN DETAILS

AE544 12760578 INTERIOR PLAN DETAILS

AE551 12760579 INTERIOR SECTION DETAILS

AE561 12760580 TYPICAL CEILING DETAILS

AE562 12760581 CEILING DETAIL

AE571 12760582 STAIR AND RAILING DETAILS

AE601 12760583 DOOR SCHEDULE

AE611 12760584 "DOOR, DOOR FRAME, INTERIOR STOREFRONT, AND WINDOW

TYPES"

AE612 12760585 EXTERIOR STOREFRONT ELEVATIONS

AE615 12760586 EXTERIOR STOREFRONT DETAILS

AE616 12760587 EXTERIOR STOREFRONT DETAILS

AE621 12760588 EXTERIOR DOOR DETAILS

AE622 12760589 INTERIOR DOOR DETAILS

AE623 12760590 INTERIOR DOOR AND WINDOW DETAILS

AE801 12760591 PARTITION TYPES

AE802 12760592 PARTITION TYPES

AE811 12760593 TYPICAL PARTITION DETAILS

AE821 12760594 LEAD SHIELDING DETAILS

AE822 12760595 LEAD SHIELDING DETAILS

AE831 12760596 FIRE RATED PENETRATIONS

AF601 12760597 FINISH SCHEDULE

AF602 12760598 FINISH SCHEDULE

AF610 12760599 FINISH IDENTIFICATION SCHEDULES

AF611 12760600 FINISH IDENTIFICATION SCHEDULES

AG100 12760601 SITE SIGNAGE PLAN

AG101-1 12760602 "SIGNAGE PLAN, SECTOR 1"

AG101-2 12760603 "SIGNAGE PLAN, SECTOR 2"

AG101-3 12760604 "SIGNAGE PLAN, SECTOR 3"

AG501 12760605 INTERIOR SIGN ELEVATIONS

AG502 12760606 INTERIOR SIGN ELEVATIONS

AG503 12760607 INTERIOR SIGN ELEVATIONS

AG504 12760608 INTERIOR AND EXTERIOR SIGN ELEVATIONS

AG505 12760609 EXTERIOR SIGN ELEVATIONS

AG506 12760610 EXTERIOR SIGN ELEVATIONS

AG601 12760611 SIGN MESSAGE SCHEDULE

AG602 12760612 SIGN MESSAGE SCHEDULE

IN101-1 12760613 "FLOOR PATTERN PLAN, SECTOR 1"

IN101-2 12760614 "FLOOR PATTERN PLAN, SECTOR 2"

IN101-3 12760615 "FLOOR PATTERN PLAN, SECTOR 3"

IN111-1 12760616 "WALL PATTERN PLAN, SECTOR 1"

IN111-2 12760617 "WALL PATTERN PLAN, SECTOR 2"

IN111-3 12760618 "WALL PATTERN PLAN, SECTOR 3"

IN201 12760619 INTERIOR ELEVATIONS

IN202 12760620 INTERIOR ELEVATIONS

IN401 12760621 ENLARGED FLOOR FINISH PLANS

IN402 12760622 ENLARGED FLOOR FINISH PLANS

IN403 12760623 ENLARGED FLOOR FINISH PLANS

IN501 12760624 INTERIOR SECTIONS AND DETAILS

DOCUMENT 00 01 15 Page 4

IN502 12760625 INTERIOR SECTIONS AND DETAILS

QH101-1A 12760626 "EQUIPMENT PLAN, AREA 1A"

QH101-1B 12760627 "EQUIPMENT PLAN, AREA 1B"

QH101-2A 12760628 "EQUIPMENT PLAN, AREA 2A"

QH101-2B 12760629 "EQUIPMENT PLAN, AREA 2B"

QH101-3A 12760630 "EQUIPMENT PLAN, AREA 3A"

QH101-3B 12760631 "EQUIPMENT PLAN, AREA 3B"

QH200 12760632 TYPICAL MOUNTING HEIGHTS

QH201 12760633 EQUIPMENT ELEVATIONS

QH250 12760634 MILLWORK ELEVATIONS

QH251 12760635 MILLWORK ELEVATIONS

QH501 12760636 EQUIPMENT DETAILS

QH502 12760637 EQUIPMENT DETAILS

QH503 12760638 EQUIPMENT DETAILS

QH550 12760639 MILLWORK DETAILS

QH551 12760640 MILLWORK DETAILS

QH601 12760641 EQUIPMENT AND CASEWORK SCHEDULE

FX001 12760642 FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS

FD110 12760643 FIRE SUPPRESSION DEMOLITION PLAN

FX110 12760644 FIRE SUPPRESSION RENOVATION PLAN

FX501 12760645 FIRE SUPPRESSION DETAILS

FA001 12760646 FIRE ALARM LEGEND AND SEQUENCE OF OPERATION MATRIX

FD101 12760647 "ELECTRICAL PLANS, DEMOLITION - FIRE ALARM"

FA101-1 12760648 "FIRE ALARM, SECTOR 1"

FA101-2 12760649 "FIRE ALARM, SECTOR 2"

FA101-3 12760650 "FIRE ALARM, SECTOR 3"

FA101-4 12760651 "FIRE ALARM, SECTOR 4"

FA601 12760652 FIRE ALARM AND MASS NOTIFICATION SYSTEM RISER DIAGRAM

PP001 12760653 PLUMBING SYMBOLS AND GENERAL NOTES

PP002 12760654 PLUMBING ABBREVIATIONS

PD101-2 12760655 WASTE AND VENT DEMOLITION PLAN- SECTOR 2

PD101-3 12760656 WASTE AND VENT DEMOLITION PLAN - SECTOR 3

PD111-2 12760657 DOMESTIC WATER DEMOLITION PLAN - SECTOR 2

PD111-3 12760658 DOMESTIC WATER DEMOLITION PLAN - SECTOR 3

PD121-2 12760659 MEDICAL GAS DEMOLITION PLAN - SECTOR 2

PD121-3 12760660 MEDICAL GAS DEMOLITION PLAN - SECTOR 3

PD121-4 12760661 MEDICAL GAS DEMOLITION PLAN - SECTOR 4

PP101-1 12760662 WASTE AND VENT RENOVATIONS PLAN - SECTOR 1

PP101-2 12760663 WASTE AND VENT RENOVATION PLAN - SECTOR 2

PP101-3 12760664 WASTE AND VENT RENOVATION PLAN - SECTOR 3

PP111-1 12760665 DOMESTIC WATER RENOVATION PLAN - SECTOR 1

PP111-2 12760666 DOMESTIC WATER RENOVATION PLAN - SECTOR 2

PP111-3 12760667 DOMESTIC WATER RENOVATION PLAN - SECTOR 3

PP121-2 12760668 MEDICAL GAS RENOVATIONS PLAN - SECTOR 2

PP121-4 12760669 MEDICAL GAS RENOVATIONS PLAN - SECTOR 4

PP501 12760670 PLUMBING DETAILS

PP502 12760671 PLUMBING DETAILS

PP503 12760672 PLUMBING DETAILS

PP504 12760673 PLUMBING DETAILS

PP601 12760674 PLUMBING SCHEDULES

PP611-1 12760675 SANITARY RISER DIAGRAM

PP611-2 12760676 SANITARY RISER DIAGRAM

PP611-3 12760677 SANITARY RISER DIAGRAM

PP611-4 12760678 SANITARY RISER DIAGRAM

PP621-1 12760679 RAINWATER RISER DIAGRAM

DOCUMENT 00 01 15 Page 5

PP621-2 12760680 RAINWATER RISER DIAGRAM

PP621-3 12760681 RAINWATER RISER DIAGRAM

PP631-1 12760682 DOMESTIC WATER RISER DIAGRAM

PP631-2 12760683 DOMESTIC WATER RISER DIAGRAM

PP631-3 12760684 DOMESTIC WATER RISER DIAGRAM

PP631-4 12760685 DOMESTIC WATER RISER DIAGRAM

PP651-1 12760686 NATURAL GAS RISER DIAGRAM

MH001 12760687 MECHANICAL ABBREVIATIONS AND NOTES

MH002 12760688 MECHANICAL SYMBOLS

MD101-2 12760689 DUCTWORK DEMOLITION PLAN - SECTOR 2

MD101-3 12760690 DUCTWORK DEMOLITION PLAN - SECTOR 3

MD101-4 12760691 DUCTWORK DEMOLITION PLAN - SECTOR 4

MD102 12760692 HVAC DEMOLITION ROOF PLAN

MD401 12760693 ENLARGED MECHANICAL DEMOLITION PLAN

MH101-1 12760694 DUCTWORK RENOVATION PLAN - SECTOR 1

MH101-2 12760695 DUCTWORK RENOVATION PLAN - SECTOR 2

MH101-3 12760696 DUCTWORK RENOVATION PLAN - SECTOR 3

MH101-4 12760697 DUCTWORK RENOVATION PLAN - SECTOR 4

MP101-1 12760698 PIPING RENOVATION PLAN - SECTOR 1

MP101-2 12760699 PIPING RENOVATION PLAN - SECTOR 2

MP101-3 12760700 PIPING RENOVATION PLAN - SECTOR 3

MH102 12760701 HVAC RENOVATION ROOF PLAN

MH301 12760702 MECHANICAL SECTIONS

MH302 12760703 MECHANICAL SECTIONS

MH303 12760704 MECHANICAL SECTIONS

MH304 12760705 MECHANICAL SECTIONS

MH401 12760706 ENLARGED MECHANICAL PLAN

MH402 12760707 AIR HANDLER COMPONENT LAYOUTS

MH501 12760708 DUCTWORK DETAILS

MH502 12760709 DUCTWORK DETAILS

MH503 12760710 DUCTWORK DETAILS

MH504 12760711 DUCTWORK DETAILS

MH505 12760712 DUCTWORK DETAILS

MP501 12760713 PIPING DETAILS

MP502 12760714 PIPING DETAILS

MP503 12760715 PIPING DETAILS

MP504 12760716 PIPING DETAILS

MH601 12760717 MECHANICAL SCHEDULES

MH602 12760718 MECHANICAL SCHEDULES

MH603 12760719 MECHANICAL SCHEDULES

MH604 12760720 MECHANICAL SCHEDULES

MP601 12760721 SCHEMATIC FLOW DIAGRAM - CHILLED WATER SYSTEM

MP602 12760722 SCHEMATIC FLOW DIAGRAM - HEATING WATER SYSTEM

MI701 12760723 CONTROLS SYMBOLS AND NOTES

MI702 12760724 DDC ARCHITECTURE

MI703 12760725 CONTROLS - CHILLED WATER SYSTEM

MI704 12760726 SEQUENCE OF OPERATIONS - CHILLED WATER SYSTEM

MI705 12760727 CONTROLS - HEATING HOT WATER SYSTEM

MI706 12760728 SEQUENCE OF OPERATIONS - HEATING HOT WATER SYSTEM

MI707 12760729 CONTROLS - AHU/1

MI708 12760730 CONTROLS - AHU/2

MI709 12760731 SEQUENCE OF OPERATIONS - AHU

MI710 12760732 CONTROLS - TERMINAL EQUIPMENT

MI711 12760733 SEQUENCE OF OPERATIONS - TERMINAL EQUIPMENT

MI712 12760734 CONTROLS - TERMINAL EQUIPMENT

MI713 12760735 SEQUENCE OF OPERATIONS - TERMINAL EQUIPMENT

EG001 12760736 ELECTRICAL LEGEND AND ABBREVIATIONS

DOCUMENT 00 01 15 Page 6

EG002 12760737 ELECTRICAL LEGEND

EG003 12760738 ELECTRICAL LEGEND

ES100 12760739 "SITE PLAN, ELECTRICAL DEMOLITION"

ED101 12760740 DEMOLITION - POWER AND LIGHTING

ED102 12760741 DEMOLITION - COMMUNICATIONS

ES101 12760742 "SITE PLAN, ELECTRICAL, POWER & TELECOMMUNICATIONS"

ES102 12760743 "SITE PLAN, ELECTRICAL, LIGHTING"

ES501 12760744 ELECTRICAL SITE DETAILS

ES502 12760745 ELECTRICAL SITE DETAILS

ES503 12760746 ELECTRICAL SITE DETAILS

EL101-1 12760747 "LIGHTING PLAN, SECTOR 1"

EL101-2 12760748 "LIGHTING PLAN, SECTOR 2"

EL101-3 12760749 "LIGHTING PLAN, SECTOR 3"

EL501 12760750 LIGHTING FIXTURE DETAILS

EL502 12760751 LIGHTING FIXTURE DETAILS

EL503 12760752 LIGHTING FIXTURE DETAILS

EL701 12760753 LIGHTING CONTROL DIAGRAMS AND SCHEDULES

EL801 12760754 LIGHTING FIXTURE SCHEDULE

EP101-1 12760755 "POWER PLAN, SECTOR 1"

EP101-2 12760756 "POWER PLAN, SECTOR 2"

EP101-3 12760757 "POWER PLAN, SECTOR 3"

EP101-4 12760758 "POWER PLAN, SECTOR 4"

EP103 12760759 "POWER PLAN, ROOF, OVERALL"

EP401 12760760 ENLARGED PLANS - POWER

EP402 12760761 ENLARGED PLANS - POWER

EP501 12760762 ELECTRICAL DETAILS

EP502 12760763 ELECTRICAL DETAILS

EP600 12760764 SINGLE LINE DIAGRAM - DEMOLITION

EP601 12760765 SINGLE LINE DIAGRAM

EP602 12760766 ELECTRICAL GROUNDING DIAGRAMS

EP701 12760767 ELECTRICAL SCHEDULES

EP801 12760768 ELECTRICAL PANEL SCHEDULES

EP802 12760769 ELECTRICAL PANEL SCHEDULES

EP803 12760770 ELECTRICAL PANEL SCHEDULES

EQ103 12760771 LIGHTNING PROTECTION

EQ501 12760772 LIGHTNING PROTECTION DETAILS

EQ502 12760773 LIGHTNING PROTECTION DETAILS

ET101 12760774 "COMMUNICATIONS, CABLE TRAY"

ET101-1 12760775 "COMMUNICATION PLAN, SECTOR 1"

ET101-2 12760776 "COMMUNICATION PLAN, SECTOR 2"

ET101-3 12760777 "COMMUNICATION PLAN, SECTOR 3"

ET101-4 12760778 "COMMUNICATION PLAN, SECTOR 4"

ET401 12760779 ENLARGED PLANS - COMMUNICATIONS

ET501 12760780 COMMUNICATIONS DETAILS

ET502 12760781 COMMUNICATIONS DETAILS

ET503 12760782 COMMUNICATIONS DETAILS

ET504 12760783 COMMUNICATIONS DETAILS

ET701 12760784 VOICE/DATA BACKBONE RISER DIAGRAM

ET702 12760785 COMMUNICATIONS RISER DIAGRAM

ET703 12760786 PUBLIC ADDRESS SYSTEM RISER DIAGRAMS

ET704 12760787 NURSE CALL SCHEDULE AND RISER DIAGRAM

EY101-1 12760788 "ELECTRONIC SECURITY PLAN, SECTOR 1"

EY101-2 12760789 "ELECTRONIC SECURITY PLAN, SECTOR 2"

EY101-3 12760790 "ELECTRONIC SECURITY PLAN, SECTOR 3"

EY101-4 12760791 "ELECTRONIC SECURITY PLAN, SECTOR 4"

EY501 12760792 ELECTRONIC SECURITY SYSTEM DETAILS

EY502 12760793 ELECTRONIC SECURITY SYSTEM DETAILS

EY503 12760794 ELECTRONIC SECURITY SYSTEM DETAILS

EY504 12760795 ELECTRONIC SECURITY SYSTEM DETAILS

DOCUMENT 00 01 15 Page 7

EY701 12760796 ELECTRONIC SECURITY SYSTEM RISER DIAGRAM

-- End of Document --

DOCUMENT 00 01 15 Page 8

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes the following:

CLIN 0001AA. Price for the entire work for Facility in accordance with the drawings and specifications, but excluding work described in Contract Line Items (CLIN) 0002, 0003 and 0004.

CLIN 0001AB. Price for work in connection with Electronic Security System (ESS), Community Antenna Television (CATV) and Automated Access Control System (AACS), complete in accordance with drawings and specifications.

CLIN 0001AC. Price for demolition and excavation of buried concrete and debris that is encountered within planned excavation limits and not identified in the Contract Documents for demolition, greater than 0.5 c.y. in size, complete, in accordance with drawings and specifications and in accordance with the following schedule:

CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR

CLIN 0001AC (UNIT

PRICE X NO. UNITS)

0001AC Buried Concrete and Debris

Tons $_______ 100 $__________

For CLIN 0001AC, unit price for providing demolition and excavation of buried concrete and debris that is encountered within planned excavation limits and not identified in the Contract Documents for demolition, greater than 0.5 c.y. in size. Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 0.5 c.y. in size shall be considered to be incidental to the work. Unit price shall include all work in connection with buried concrete and debris removal and disposal and replacement with clean imported structural backfill. Unit price shall include removal and disposal of buried concrete and debris encountered within planned excavations at a permitted licensed disposal facility and backfilling with excavation with compacted clean imported structural backfill.

Unit price shall include handling and transportation. The volume of buried concrete and debris removed will be based on approved truck

DOCUMENT 00 22 13.00 20 Page 1 scale measurement and the quantity will be approved by the Contracting Officer.

CLIN 0002 Option Item No. 1 - Price includes the following:

Price for adding work in connection with providing parking as indicated, complete in accordance with drawings and specifications.

CLIN 0003 Option Item No. 2 - Price includes the following:

Price for adding work in connection with providing driveway/drop-off at front door/plaza as indicated, complete in accordance with drawings and specifications.

CLIN 0004 Option Item No. 3 - Price includes the following:

Price for adding work in connection with providing landscaping items indicated, complete in accordance with drawings and specifications.

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of CLIN 0001AA and CLIN 0001AB,, plus the sum of the extension under CLIN 0001AC. For CLIN 0001AC, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003 and CLIN 0004 to the Contractor at the proposed price within 30 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003 and CLIN 0004. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains the same.

c. Evaluation of Options (JUL 1990): Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001.

In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If Contract Line Items (CLIN) 0002, 0003 and 0004 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

PART 2 PRODUCTS

Not used.

DOCUMENT 00 22 13.00 20 Page 2

PART 3 EXECUTION

Not used.

-- End of Document --

DOCUMENT 00 22 13.00 20 Page 3

SECTION 01 11 00

SUMMARY OF WORK

07/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-200-01 (2013) General Building Requirements

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan; G

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

The work includes construction of a single-story Branch Medical Clinic Addition/Alteration at French Creek, Marine Corps Base (MCB) Camp Lejeune and incidental related work.

1.3.2 Location

The work is located at MCB Camp Lejeune, which is located directly on the Atlantic Ocean, approximately 60 miles north and east of Wilmington and immediately south and east of and adjacent to Jacksonville, North Carolina approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3.3 Phasing

a. Phasing for this Project is outlined below and described in detail on the Drawings.

1. Phase 1 - Medical Clinic Addition

2. Phase 2 - Medical Clinic Renovation

3. Phase 3 - Dental Clinic Alterations

4. Phase 4 - Civil Work

SECTION 01 11 00 Page 1

b. There will be four (4) phasing meetings, one (1) to occur prior to the start of each of the above 4 phases.

c. For Phase 3, all work in the dental area will be limited to 30 calendar days, to occur as agreed upon and coordinated with the facility user. During that time the dental clinic will be fully accessible to complete fire alarm, HVAC and other miscellaneous infrastructure items. All materials for work within the dental clinic must be on site prior to the start of this 30-day time frame.

1.4 BUILDING CODE

Except as indicated otherwise, or as modified by UFC 1-200-01 , use ICC IBC

1.5 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

c. Contractor shall review the Pre-Construction Risk Assessment (ICRA/PCRA) form attached to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS in preparation to submit a plan to the Safety and Infection Control Officer prior to construction. The plan will be reviewed by the Safety and Infectious Control Department. The Contractor shall be required to sign and comply with the PCRA/ICRA during the course of the construction contract.

1.6 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation by contacting the Contracting Officer 15 calender days in advance..

Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, or paved surface where existing underground utilities are discovered.

Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.6.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

SECTION 01 11 00 Page 2

1.7 CONTRACT DOCUMENTS

Drawings and Specifications are complementary. Drawings are graphic representations of the Work and show the quantitative extent and relationships of elements to one another. Specifications define the requirements for products, materials, and workmanship and requirements for administration and performance of the project. The Specifications and notations on Drawings are written in imperative mood (i.e. the verb that defines the action becomes the first word in the sentence) and indicative mood (i.e. passive voice requiring the use of the words shall, will, must or to) denoting Work that is the sole responsibility of the Contractor.

1.8 GOVERNMENT TELECOMMUNICATIONS CONTRACTOR COORDINATION REQUIREMENTS

1.8.1 Government Telecommunications Contractor Access

Allow the Government Telecommunications Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plan (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the Government Telecommunications Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the Goverment Telecommunications Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

1.9 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

1.10 WORK RESCHEDULING

See Section 01 14 00 WORK RESTRICTIONS.

1.11 ON-SITE PERMITS

1.11.1 Utility Outage Requests and Utility Connection Requests

See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS and Section 01 14 00 WORK RESTRICTIONS.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 11 00 Page 3

-- End of Section --

SECTION 01 11 00 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

07/16

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

1.2 SPECIAL SCHEDULING REQUIREMENTS

Government Telecommunications Contractor Access: The Government Telecommunications Contractor must be allowed access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. The contractor will be required to coordinate their efforts with the Government Telecommunications contractor to facilitate joint use of building spaces during the final phases of construction and work the coordination effort into the construction schedule. Requirements for Government Telecommunications are specified in the contract documents.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours 6:30 to 8:00 a.m. and 3:30 to 5:00 p.m. unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Identification Badges and Installation Access

Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS) also referred to as RAPIDGATE, or by obtaining passes each

SECTION 01 14 00 Page 1 day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor.

One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge. Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.

a. NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.

The Government performs background screening and credentialing.

Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.

b. One-Day Passes: Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation.

The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.

1.3.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.3 Working Hours

Regular working hours shall consist of an 8 1/2 hour period established by the Contracting Officer, Monday through Friday, excluding Government holidays.

1.3.4 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving

SECTION 01 14 00 Page 2 the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and medical gas shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."

d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.3.6 Burning on Government property

Burning of materials will not be permitted on Government property.

1.4 SECURITY REQUIREMENTS

Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:

1.4.1 Business Access Security Requirements, Camp Lejeune, NC

1.4.1.1 Business Access Definition

Contractor/subcontractor employees requiring installation access to MCB, Camp Lejeune, NC must obtain a Business Access Identification Badge for that particular installation. Regularly scheduled delivery personnel, to include FEDEX, UPS, pick-up and deliveries, should also follow the Business Access guidelines described below. Personnel requiring Business Access Identification Badges shall submit all documentation listed below.

Badges are not required if the contracted position requires the employee to obtain Common Access Card (CAC) which will be identified separately within the Government contract.

1.4.1.2 Installation Security Access Requirements

Accomplish the security requirements below within 10 days after award or prior to performance under the contract.

SECTION 01 14 00 Page 3

1.4.1.3 Business Access Identification Badge Requirement

In order to obtain a Business Access Identification Badge for access to MCB, Camp Lejeune, NC, all personnel providing services under this contract shall be required to present the documentation below to the following offices, as applicable:

a. MCB, Camp Lejeune, NC and its satellite activities. Report as follows:

1. Identification Card Center, 60 Molly Pitcher Road for badge (910-451-8444).

1.4.1.4 Documentation

a. Photo ID:

Valid state or federal issued picture identification card. Acceptable documents include state drivers license, DMV issued photo identification, or alien registration card.

b. Proof of Employee Citizenship or Legal Alien Stats:

Acceptable documents include birth certificate, Social Security Cards, Immigration and Naturalization Service (INS) forms and passports.

c. Poor of Criminal Records Check:

Proof of a criminal records check from the county or state where the employee has resided for the previous two years (or length of legal residence for foreign nationals in the U.S. for less than two years). Criminal background records checks must be from a credible source. Many credible sources exist, but some examples include the County Courthouse, Infolink Screening Service, Inc.

(www.infolinkscreening.com), IntegraScan Criminal Records Checks (www.integrascan.com), Intlius Employee Screening (www.Intelius.com), and Castle Branch www.castlebranch.com).

Subsequent to the initial criminal background records checks, local criminal records checks shall be conducted annually prior to renewal of badges for reevaluation.

d. Letter Provided by Contracting Officer Indicating Contract:

Letter provided by Contracting Officer indicating contract, contract period and prime contractor. Proof of employment on a valid Government contract (e.g., a letter on company letterhead from the prime contractor including contract number and term).

1.4.1.5 Denial of Access

Installation access shall be denied if it is determined that an employee:

a. Is on the National Terrorist Watch List.

b. Is illegally present in the United States.

c. Is subject to an outstanding warrant.

d. Has knowingly submitted an employment questionnaire with false or fraudulent information.

SECTION 01 14 00 Page 4

e. Has been issued a debarment order and is currently banned from military installations.

f. Is a Registered Sexual Offender, or has any Felony Conviction within the past two years.

1.4.1.6 Appeal Process

All appeals should be directed to the Base Inspector's Office for any individual that has been denied access to the Base.

1.4.1.7 Display and Disposition of Badges

Contractors/subcontractors will prominently display their badges on their person at all times. Upon completion/termination of this contract or an individual's employment, collect and turn into the Pass & ID Office all badges. If the Contractor fails to obtain the employee's badge, the Pass & ID Office shall be notified within 24 hours. During the contract performance period contractors will immediately report instances of lost or stolen badges to the issuing pass and identification office.

1.4.1.8 Contractor and Subcontractor Vehicle Requirements

Each vehicle to be used in contract performance shall show the Contractor's or subcontractor's name so that it is clearly visible and shall always display a valid state license plate and safety inspection sticker. To obtain a vehicle decal, which will be valid for one year or contract period, which is shorter, Contractor or subcontractor vehicle operators shall provide to the Vehicle Registration Office, 60 Molly Pitcher Road for vehicle decal (910-451-1158):

a. An installation sponsor request forwarded to provost Marshall office.

b. A valid form of Federal or state government I.D.

c. If driving a motor vehicle, a valid driver's license, vehicle registration and proof of insurance.

Upon completion/termination of this contract or an individual's employment, the Contractor shall collect and turn into Vehicle Registration all Government vehicle decals. If any are not collected, notify the Vehicle Registration Office within 24 hours.

1.4.1.9 Security Checks

Contractor personnel and vehicles shall only be present in locations relevant to contract performance. All Contractor personnel entering the base shall conform to all Government regulations and are subject to such checks as may be deemed necessary to ensure that violations do not occur.

Employees shall not be permitted on base when such a check reveals that their presence would be detrimental to the security of the base. Subject to security regulations, the Government will allow access to an area for servicing equipment and/or performing required services. Upon request, submit to the Contracting Officer questionnaire and other forms as may be required for security purposes.

SECTION 01 14 00 Page 5

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 14 00 Page 6

SECTION 01 20 00.00 20

PRICE AND PAYMENT PROCEDURES

09/15

PART 1 GENERAL

1.1 RELATED REQUIREMENTS

A completed NAVMED 6700/12 or NAVMED 6700/13 (both forms are attached to this Section) is required on all CAT A medical and dental equipment. The NAVMED 6700/12 is for medical and dental equipment with a unit price of $100,000 or more. The NAVMED 6700/13 is for medical and dental equipment with a unit price of less than $100,000. Once completed, the forms will be submitted to the NAVMED East (NME) Equipment Planner for processing.

No medical and dental equipment are to be procured without approval from the respective specialty leaders. The NME Equipment Planner will let the Contractor and Contracting Officer know if the medical and dental equipment have been approved for procurement.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report; G

1.4 EARNED VALUE REPORT

1.4.1 Data Required

This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedule.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .