About this file

This document package includes construction phasing plans and a solicitation for a design-bid-build construction project.

The construction phasing plans outline a four-phase plan for renovations and additions to the French Creek Ambulatory Care Clinic at Camp Lejeune, North Carolina. Phase 1 involves building an addition, with Phase 2 renovating the existing medical clinic. Phase 3 includes miscellaneous infrastructure work and replacing storefronts. Phase 4 covers remaining civil and site work. The plans provide details on installing temporary partitions, maintaining building systems, infection control protocols, and sequencing work between phases.

The solicitation is issued by the Naval Facilities Engineering Command for the construction project described in the plans. Offerors are sought to provide design and construction services. The anticipated award date is March 2022, with work to be completed within 730 calendar days of award. The total projected cost is between $10-15 million. The solicitation includes standard federal clauses and provides instructions for preparing and submitting proposals by the January 2022 closing date.

View the file

Other files

File Type Posted
N4008521R2524P00006.pdf PDF
AMEND 06 ATTACHMENT E PRICE PROPOSAL FORM.docx DOCX document
AMD 5 ATTACH 2 Site Visit 6.17.21.pdf PDF
AMD 5 ATTACH 1 P4040 PPIs VER2.xlsx XLSX spreadsheet
N4008521R2524P0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 Attachment (1) NC20210038 WGDET.pdf PDF
Amendment 0003 Attachment (2) PPIs.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
MP501.pdf PDF
Interim MCMH French Creek_Drawing Set_Compiled.pdf PDF
Amendment 0001 Continuation Sheet.pdf PDF
N4008521R2524P00001.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
1430035dwg10of20_Architectural.pdf PDF
1430035dwg06of20_Civil.pdf PDF
1430035dwg15of20_FireSup.pdf PDF
1430035dwg20of20_Comm.pdf PDF
1430035dwg19of20_Electrical.pdf PDF
ATTACHMENT E PRICE PROPOSAL FORM.docx DOCX document
ATTACHMENT D SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
1430035spc01of03.pdf PDF
1430035dwg02of20_LifeSafety.pdf PDF
RFP N4008521R2524.pdf PDF
1430035dwg16of20_FireAlarm.pdf PDF
1430035dwg07of20_Landscape.pdf PDF
1430035dwg09of20_Architectural.pdf PDF
1430035dwg12of20_Architectural.pdf PDF
1430035dwg04of20_Hazmat.pdf PDF
Attachment A - PPI Inquiry Log.xls XLS spreadsheet
1430035dwg14of20_Equipment.pdf PDF
1430035spc02of03.pdf PDF
1430035dwg13of20_Interiors.pdf PDF
ATTACHMENT C Past Performance Questionnaire.pdf PDF
1430035dwg11of20_Architectural.pdf PDF
1430035dwg05of20_Borings.pdf PDF
1430035spc03of03.pdf PDF
1430035dwg08of20_Structural.pdf PDF
1430035dwg17of20_Plumbing.pdf PDF
1430035dwg01of20_General.pdf PDF
1430035dwg18of20_Mechanical.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTROL / RECORDS

x117

ORAL DIAG SUPV

x115

GEN DTR

x122

TEAM DTR

x134

CORR

x140

GEN DTR

x135

TEAM DTR

x136

CONSULT

x137

GEN DTR

x138

GEN DTR

x139

CONSULT

x132

GEN DTR

x133

CORR

x142

FEC

FEC

FEC

FEC

PHASE 1

ADDITION

PHASE 1

ADDITION

EXISTING

MEDICAL CLINIC

EXISTING

DENTAL CLINIC

4 5

6 7 7

PHASE 1:

BUILDING ADDITION

PHASE 2:

EXISTING BUILDING RENOVATION

PHASE 3:

MISCELLANEOUS INFRASTRUCTURE WORK ON THE DENTAL CLINIC

PHASE 4:

CIVIL / SITE WORK

(REFER TO SHEET C-007 FOR CIVIL / SITE WORK PHASING)

IROLFF

A R C H

I T E

C

R E

G I S

T E R E D

AR0011911

D

S

TA TE O

AD

T

A

V

W. B O

L D

T

DI

KEY NOTES 00

KEYPLAN

KEYPLAN

KEYPLAN

0 10'

1/16" = 1'-0" GRAPHIC SCALE

20' 40' 60'

NPROJECT

NORTH

KEYPLAN

KEYPLAN

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F R

E N

C H

C R

E E

K A

M B

U

LA

T O

R Y

C A

R E

C

LI

N

IC

A D

D

IT

IO

N

A

LT

E

R A

T

IO

N

V

IR

G

IN

IA

A V

E N

U E

JA

C

K S

O N

V

IL

LE

, N

C

N O

R F

O

LK

, V

IR

G

IN

IA

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

, A T

LA

N

T

IC

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

D

M A

R

IN

E C

O R

P S

B A

S E

C A

M P

L E

JE

U

N E

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1430035

DRAWFORM REVISION: 10 MARCH 2009

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

FOR OFFICIAL USE ONLY

4750 New Broad Street

Orlando, Florida 32814 www.rlfae.com

LICENSE #AA C000564 #EB 0000629

TBD

JGG / RSF

EJA

Approved by JOANNE KRAUSE, Director of Medical Facilities

Program Office, via Email

C :\U se rs

\m ec

\D oc um en ts \4

0-

B

LD

G -1

-P

H _r

_m ec rlf ae

.c om

.rv t

/2

9/

:4 1:

P

M

1/16" = 1'-0"

C O

M P

O S

IT

E

P H

A S

IN

G

P

LA

N

P H

A S

E

PH101

TJH MEC CTR

12760427

11/18/20

SCALE: 1/16" = 1'-0" B4

COMPOSITE PLAN - PHASE 1

A REFER TO SHEETS GI010 FOR GENERAL ABBREVIATIONS AND ARCHITECTURAL

SYMBOLS.

B REFER TO DRAWING SERIES AD FOR DEMOLITION NOTES AND PLANS.

C REFER TO HAZARDOUS MATERIAL REPORT, DRAWINGS, AND SPECIFICATIONS

PRIOR TO DEMOLITION.

D REFER TO CIVIL DRAWINGS FOR CIVIL/SITE WORK PHASING PLANS AND NOTES.

E REFER TO PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS FOR ADDITIONAL

PHASING INFORMATION.

F THE PLAN ON THIS SHEET IS SHOWN FOR DIAGRAMMATIC AND PHASING

PURPOSES ONLY. DO NOT SCALE OR OTHERWISE USE TO TAKE-OFFS.

G REFER TO PROJECT SCHEDULE FOR SPECIFIC REQUIREMENTS AND/OR

INFORMATION PERTINENT TO THE FOUR (4) PRIMARY AREAS OF THIS PROJECT:

PHASING NOTES:

ICRA NOTES:

I PRIOR TO COMMENCEMENT OF CONSTRUCTION INSTALL INTERIOR TEMPORARY PARTITIONS TO PREVENT DUST

POLLUTION OF SURROUNDING AREAS. PROVIDE PARTITIONS IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS AND AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING PLANS. IF A DOOR IS SHOWN, PROVIDE A 20 MIN, SOLID CORE TEMPORARY DOOR WITH CLOSER AND LATCHING. FOR INTERIOR

TEMPORARY PARTITIONS, USE PARTITION TYPE "T" AS SPECIFIED ON SHEET AE802.

J TEMPORARY PARTITIONS AND BARRIERS TO REMAIN UNTIL ALL THE WORK IS COMPLETED AND/OR APPRAVAL IS GRANTED BY THE INFECTION CONTROL OFFICER. UPON REMAVAL OF TEMPORARY PARTITIONS, PREP/PATCH TO

MATCH ADJACENT CONSTRUCTION.

K ENSURE AT ALL TIMES, UNINTERRUPTED HEATING, COOLING, PLUMBING, ELECTRICAL, COMMUNICATION, AND FIRE PROTECTIONS SERVICES WITHIN THE BOUNDARIES OF THE PROJECT SERVING PORTION OF THE FACILITY REMAINING IN SERVICE. COORDIANTE ANY REQUIRED INTERRUPTIONS OF SERVICE WITH THE OWNER TO

MINIMIZE INTERFERENCE WITH OWNER'S OPERATIONS.

L OBTAIN APPROVAL FROM OWNER PRIOR TO SHUTDOWN OF AIR SYSTEMS FOR EQUIPMENT AND DUCTWORK REMOVAL. PROVIDE NOTIFICATIONS PRIOR TO INTENDED ACTION PER THE SPECIFICATIONS AND INCLUDE A LIST

OF SERVICES AFFECTED, SCHEDULE OR WORK, AND PLANNED START DATE.

M ESTABLISH A SEALED AITIGHT PERIMETER PRIOR TO CONTRUCTION. PROVIDE TEMPORARY VENTILATION AND HEPA FILTERS TO MAINTAIN CONSTRUCTION AREA UNDER NEGATIVE PRESSURE TO OCCUPIED AREAS. PROVIDE

TEMPORARY FILTERS AT RETURN GRILLES ADJACENT TO CONSTRUCTION ZONE.

N PROVIDE DIFFERENTIAL PRESSURE MONITORS AT ALL ENTRANCES TO AREAS OF WORK TO CONFIRM NEGATIVE

PRESSURE WITH RESPECT TO NON-CONSTRUCTION AREAS.

O REFER TO MECHANICAL DRAWINGS FOR BALANCING OF EXISTING RETURN REGISTERS TO PRESSURIZE

OCCUPIED SPACES ADJACENT TO CONSTRUCTION ZONE.

A COMPLY WITH THE INFECTION CONTROL PERMIT AND ICRA/PCRA POLICY / PROCEDURES PER CAMP LEJEUNE'S

PRE-CONSTRUCTION RISK ASSESSMENT ICRA/PCRA FORM (EC.02.06.05, LS.01.02.01).

B PROVIDE ONGOING MAINTENANCE AND MONITORING OF PRECAUTIONS FOR INFECTION CONTROL RISK

ASSESSMENT.

C ENSURE FREE AND UNOBSTRUCTED ACCESS TO EMERGENCY DEPARTMENT/SERVICES AND FOR EMERGENCY

RESPONSE PERSONNEL.

D ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT IMPAIRED. PROVIDE A TEMPORARY, BUT EQUIVALENT SYSTEM, WHEN ANY FIRE SYSTEM IS IMPAIRED.

E ENSURE FREE AND UNOBSTRUCTED EGRESS AND EMERGENCY EGRESS FOR AREAS OCCUPIED DURING CONSTRUCTION AND FOR AREAS UNDER CONSTRUCTION IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS

REQUIREMENTS. PROVIDE SIGNAGE IDENTIFYING ALTERNATE EXISTS AS REQUIRED.

F PROVIDE TMEPORARY LIFE SAFETY LIGHTING AND EXIT LIGHTS IN ACCORDANCE WITH FIRE PROTECTION AND

EGRESS REQUIREMENTS AND AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING PLANS.

G PROVIDE EXTERIOR TEMPORARY WALLS ARE REQUIRED. EXTERIOR TEMPORARY WALL CONSTRUCTION: 6-INCH METAL STUD WITH (1) LAYER OF EXTERIOR GRADE PLYWOOD (FASTENED PER IBC TABLE 2304.9.1), COVERED BY

(2) LAYERS OF 30 LB. FELT (STAGGER JOINTS WITH 6-INCH OVERLAP), MECHANICALLY FASTENED WITH GALVANIZED NAILS AND DISK CAPS AT 16" O.C. EACH WAY. PROVIDE UNFACED BLANKET INSULATION IN THE STUD CAVITY. PROVIDE (1) LAYER OF 5/8" GLASS MAT FACED GYPSUM BOARD ON THE INTERIOR SIDE.

H PRIOR TO COMMENCEMENT OF CONSTRUCTION SEAL EXISTING DOOR OPENINGS AIR TIGHT, ON EXISTING WALL TO BE USED AS TEMPORARY PARTITIONS, WITH FIRE RETARDANT VISQUEEN BARRIER TAPED TO DOOR FRAME.

1 TEMPORARY PARTITION TO REMAIN THRU THE COMPLETION OF

ADDITION/RENOVATION.

2 CONSTRUCT BRICK CAVITY WALL BASE AND TEMPORARY EXTERIOR WALL,

ROOF STRUCTURAL SUPPORT, AND INSTALL STANDING SEAM METAL ROOF.

REMOVE TEMPORARY WALL PRIOR TO THE INSTALLATION OF THE NEW

STOREFRONT DURING PHASE 3.

3 EXISTING 1-HR FIRE RATED PARTITION TO SERVE AS TEMPORARY PARTITION

THRU THE DURATION OF THE ADDITION/RENOVATION PROJECT. ENSURE

THAT PARTITION EXTENDS TO BOTTOM OF DECK AND ALL PENETRATIONS

ARE PROPERLY SEALED PRIOR TO START OF DEMOLITION/CONSTRUCTION

WORK.

4 PHASE 1A – CONSTRUCT THE ADDITION’S SHELL

5 PHASE 1B – INTERIOR ROUGH INS

6 BLANK OUT EXISTING EXIT SIGN

7 MODIFY EXISTING EXIT SIGN AS SHOWN.

8 SEAL EXISTING DOOR OPENING AIR TIGHT WITH FIRE RETARDANT VISQUEEN

BARRIER TAPED TO DOOR FRAME.

DJD

mec Text Box

DSN

PHASE 1

ADDITION

PHASE 1

ADDITION

PHASE 2

MEDICAL CLINIC

RENOVATION

EXISTING

DENTAL CLINIC

7 8

PHASE 1:

BUILDING ADDITION

PHASE 2:

EXISTING BUILDING RENOVATION

PHASE 3:

MISCELLANEOUS INFRASTRUCTURE WORK ON THE DENTAL CLINIC

PHASE 4:

CIVIL / SITE WORK

(REFER TO SHEET C-007 FOR CIVIL / SITE WORK PHASING)

IROLFF

A R C H

I T E

C

R E

G I S

T E R E D

AR0011911

D

S

TA TE O

AD

T

A

V

W. B O

L D

T

DI

KEY NOTES 00

KEYPLAN

KEYPLAN

0 10'

1/16" = 1'-0" GRAPHIC SCALE

20' 40' 60'

NPROJECT

NORTH

KEYPLAN

KEYPLAN

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F R

E N

C H

C R

E E

K A

M B

U

LA

T O

R Y

C A

R E

C

LI

N

IC

A D

D

IT

IO

N

A

LT

E

R A

T

V

IR

G

IN

IA

A V

E N

U E

JA

C

K S

O N

V

IL

LE

, N

C

N O

R F

O

LK

, V

IR

G

IN

IA

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

, A T

LA

N

T

IC

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

R

IN

E C

O R

P S

B A

S E

C A

M P

L E

JE

U

N E

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1430035

DRAWFORM REVISION: 10 MARCH 2009

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

FOR OFFICIAL USE ONLY

4750 New Broad Street

Orlando, Florida 32814 www.rlfae.com

LICENSE #AA C000564 #EB 0000629

TBD

JGG / RSF

EJA

Approved by JOANNE KRAUSE, Director of Medical Facilities

Program Office, via Email

C :\U se rs

\m ec

\D oc um en ts \4

0-

B

LD

G -1

-P

H _r

_m ec rlf ae

.c om

.rv t

/2

9/

:4 1:

P

M

1/16" = 1'-0"

C O

M P

O S

IT

E

P H

A S

IN

G

P

LA

N

P H

A S

E

PH102

TJH MEC CTR

12760428

11/18/20

SCALE: 1/16" = 1'-0" B4

COMPOSITE PHASING PLAN - PHASE 2

A REFER TO SHEETS GI010 FOR GENERAL ABBREVIATIONS AND ARCHITECTURAL

SYMBOLS.

B REFER TO DRAWING SERIES AD FOR DEMOLITION NOTES AND PLANS.

C REFER TO HAZARDOUS MATERIAL REPORT, DRAWINGS, AND SPECIFICATIONS

PRIOR TO DEMOLITION.

D REFER TO CIVIL DRAWINGS FOR CIVIL/SITE WORK PHASING PLANS AND NOTES.

E REFER TO PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS FOR ADDITIONAL

PHASING INFORMATION.

F THE PLAN ON THIS SHEET IS SHOWN FOR DIAGRAMMATIC AND PHASING

PURPOSES ONLY. DO NOT SCALE OR OTHERWISE USE TO TAKE-OFFS.

G REFER TO PROJECT SCHEDULE FOR SPECIFIC REQUIREMENTS AND/OR

INFORMATION PERTINENT TO THE FOUR (4) PRIMARY AREAS OF THIS PROJECT:

I PRIOR TO COMMENCEMENT OF CONSTRUCTION INSTALL INTERIOR TEMPORARY PARTITIONS TO PREVENT DUST POLLUTION OF SURROUNDING AREAS. PROVIDE PARTITIONS IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS AND AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING PLANS. IF A DOOR IS SHOWN, PROVIDE A 20 MIN, SOLID CORE TEMPORARY DOOR WITH CLOSER AND LATCHING. FOR INTERIOR

TEMPORARY PARTITIONS, USE PARTITION TYPE "T" AS SPECIFIED ON SHEET AE802.

J TEMPORARY PARTITIONS AND BARRIERS TO REMAIN UNTIL ALL THE WORK IS COMPLETED AND/OR APPRAVAL IS GRANTED BY THE INFECTION CONTROL OFFICER. UPON REMAVAL OF TEMPORARY PARTITIONS, PREP/PATCH TO

MATCH ADJACENT CONSTRUCTION.

K ENSURE AT ALL TIMES, UNINTERRUPTED HEATING, COOLING, PLUMBING, ELECTRICAL, COMMUNICATION, AND FIRE PROTECTIONS SERVICES WITHIN THE BOUNDARIES OF THE PROJECT SERVING PORTION OF THE FACILITY REMAINING IN SERVICE. COORDIANTE ANY REQUIRED INTERRUPTIONS OF SERVICE WITH THE OWNER TO

MINIMIZE INTERFERENCE WITH OWNER'S OPERATIONS.

L OBTAIN APPROVAL FROM OWNER PRIOR TO SHUTDOWN OF AIR SYSTEMS FOR EQUIPMENT AND DUCTWORK REMOVAL. PROVIDE NOTIFICATIONS PRIOR TO INTENDED ACTION PER THE SPECIFICATIONS AND INCLUDE A LIST

OF SERVICES AFFECTED, SCHEDULE OR WORK, AND PLANNED START DATE.

M ESTABLISH A SEALED AITIGHT PERIMETER PRIOR TO CONTRUCTION. PROVIDE TEMPORARY VENTILATION AND HEPA FILTERS TO MAINTAIN CONSTRUCTION AREA UNDER NEGATIVE PRESSURE TO OCCUPIED AREAS. PROVIDE

TEMPORARY FILTERS AT RETURN GRILLES ADJACENT TO CONSTRUCTION ZONE.

N PROVIDE DIFFERENTIAL PRESSURE MONITORS AT ALL ENTRANCES TO AREAS OF WORK TO CONFIRM NEGATIVE

PRESSURE WITH RESPECT TO NON-CONSTRUCTION AREAS.

O REFER TO MECHANICAL DRAWINGS FOR BALANCING OF EXISTING RETURN REGISTERS TO PRESSURIZE

OCCUPIED SPACES ADJACENT TO CONSTRUCTION ZONE.

A COMPLY WITH THE INFECTION CONTROL PERMIT AND ICRA/PCRA POLICY / PROCEDURES PER CAMP LEJEUNE'S

PRE-CONSTRUCTION RISK ASSESSMENT ICRA/PCRA FORM (EC.02.06.05, LS.01.02.01).

B PROVIDE ONGOING MAINTENANCE AND MONITORING OF PRECAUTIONS FOR INFECTION CONTROL RISK

ASSESSMENT.

C ENSURE FREE AND UNOBSTRUCTED ACCESS TO EMERGENCY DEPARTMENT/SERVICES AND FOR EMERGENCY

RESPONSE PERSONNEL.

D ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT IMPAIRED. PROVIDE A TEMPORARY, BUT EQUIVALENT SYSTEM, WHEN ANY FIRE SYSTEM IS IMPAIRED.

E ENSURE FREE AND UNOBSTRUCTED EGRESS AND EMERGENCY EGRESS FOR AREAS OCCUPIED DURING CONSTRUCTION AND FOR AREAS UNDER CONSTRUCTION IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS

REQUIREMENTS. PROVIDE SIGNAGE IDENTIFYING ALTERNATE EXISTS AS REQUIRED.

F PROVIDE TMEPORARY LIFE SAFETY LIGHTING AND EXIT LIGHTS IN ACCORDANCE WITH FIRE PROTECTION AND

EGRESS REQUIREMENTS AND AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING PLANS.

G PROVIDE EXTERIOR TEMPORARY WALLS ARE REQUIRED. EXTERIOR TEMPORARY WALL CONSTRUCTION: 6-INCH METAL STUD WITH (1) LAYER OF EXTERIOR GRADE PLYWOOD (FASTENED PER IBC TABLE 2304.9.1), COVERED BY

(2) LAYERS OF 30 LB. FELT (STAGGER JOINTS WITH 6-INCH OVERLAP), MECHANICALLY FASTENED WITH GALVANIZED NAILS AND DISK CAPS AT 16" O.C. EACH WAY. PROVIDE UNFACED BLANKET INSULATION IN THE STUD CAVITY. PROVIDE (1) LAYER OF 5/8" GLASS MAT FACED GYPSUM BOARD ON THE INTERIOR SIDE.

H PRIOR TO COMMENCEMENT OF CONSTRUCTION SEAL EXISTING DOOR OPENINGS AIR TIGHT, ON EXISTING WALL TO BE USED AS TEMPORARY PARTITIONS, WITH FIRE RETARDANT VISQUEEN BARRIER TAPED TO DOOR FRAME.

ICRA NOTES:

PHASING NOTES:

1 BRICK CAVITY WALL BASE AND TEMPORARY EXTERIOR WALL. REMOVE

TEMPORARY WALL PRIOR TO THE INSTALLATION OF THE NEW STOREFRONT

DURING PHASE 3.

2 TEMPORARY PARTITION FOR PHASE 1 AND PHASE 2. REMOVE TEMPORARY

PARTITION AT THE START OF PHASE 3’S STOREFRONT REPLACEMENT.

3 TEMPORARY PARTITION TO REMAIN THRU THE COMPLETION OF

ADDITION/RENOVATION.

4 EXISTING 1-HR FIRE RATED PARTITION TO SERVE AS TEMPORARY PARTITION

THRU THE DURATION OF THE ADDITION/RENOVATION PROJECT. ENSURE

THAT PARTITION EXTENDS TO BOTTOM OF DECK AND ALL PENETRATIONS ARE

PROPERLY SEALED PRIOR TO START OF DEMOLITION/CONSTRUCTION WORK.

5 PHASE 2 RENOVATION WORK TO BEGIN AFTER THE ADDITION’S SHELL HAS

BEEN CONSTRUCTED AND THE ADDITION’S INTERIOR ROUGH INS HAVE

BEGAN.

6 THE INTERIOR BUILD OUT OF PHASE 1 RUNS CONCURRENTLY WITH PHASE 2

AND PHASE 3.

7 BLANK OUT EXISTING EXIT SIGN

8 SEAL EXISTING DOOR OPENING AIR TIGHT WITH FIRE RETARDANT VISQUEEN

BARRIER TAPED TO DOOR FRAME.

DJDDJD

mec

FEC

FEC

FEC

FEC

FEC

PHASE 1

ADDITION

PHASE 1

ADDITION

PHASE 2

MEDICAL CLINIC

RENOVATION

PHASE 3

DENTAL CLINIC ALTERATIONS

3 4

7 8

7 8

PHASE 1:

BUILDING ADDITION

PHASE 2:

EXISTING BUILDING RENOVATION

PHASE 3:

MISCELLANEOUS INFRASTRUCTURE WORK ON THE DENTAL CLINIC

PHASE 4:

CIVIL / SITE WORK

(REFER TO SHEET C-007 FOR CIVIL / SITE WORK PHASING)

A.

B.

SEE PHASING NOTES ON C-007

SITE / CIVIL PHASES 2C AND 3 TO BE WORKED CONCURRENTLY WITH

INTERIOR WORK IN THE DENTAL CLINIC (PHASE 3 ON THIS SHEET). SITE /

CIVIL PHASE 2C TO BE COMPLETED WITHIN THE SAME 30-DAY TIME PERIOD

AS THE INTERIOR DENTAL CLINIC WORK (SEE KEYNOTE 7).

IROLFF

A R C H

I T E

C

R E

G I S

T E R E D

AR0011911

D

S

TA TE O

AD

T

A

V

W. B O

L D

T

DI

KEY NOTES 00

KEYPLAN

KEYPLAN

KEYPLAN

0 10'

1/16" = 1'-0" GRAPHIC SCALE

20' 40' 60'

NPROJECT

NORTH

KEYPLAN

KEYPLAN

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F R

E N

C H

C R

E E

K A

M B

U

LA

T O

R Y

C A

R E

C

LI

N

IC

A D

D

IT

IO

N

A

LT

E

R A

T

V

IR

G

IN

IA

A V

E N

U E

JA

C

K S

O N

V

IL

LE

, N

C

N O

R F

O

LK

, V

IR

G

IN

IA

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

, A T

LA

N

T

IC

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

R

IN

E C

O R

P S

B A

S E

C A

M P

L E

JE

U

N E

FP ENGINEER

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1430035

DRAWFORM REVISION: 10 MARCH 2009

NOTE:

IF THIS DRAWING IS LESS THAN 34" X 22"

IT IS A REDUCED SIZE DRAWING

FOR OFFICIAL USE ONLY

4750 New Broad Street

Orlando, Florida 32814 www.rlfae.com

LICENSE #AA C000564 #EB 0000629

TBD

JGG / RSF

EJA

Approved by JOANNE KRAUSE, Director of Medical Facilities

Program Office, via Email

C :\U se rs

\m ec

\D oc um en ts \4

0-

B

LD

G -1

-P

H _r

_m ec rlf ae

.c om

.rv t

/2

9/

:4 1:

P

M

1/16" = 1'-0"

C O

M P

O S

IT

E

P H

A S

IN

G

P

LA

N

P H

A S

E

PH103

TJH MEC CTR

12760429

11/18/20

SCALE: 1/16" = 1'-0" B4

COMPOSITE PHASING PLAN - PHASE 3

A REFER TO SHEETS GI010 FOR GENERAL ABBREVIATIONS AND ARCHITECTURAL

SYMBOLS.

B REFER TO DRAWING SERIES AD FOR DEMOLITION NOTES AND PLANS.

C REFER TO HAZARDOUS MATERIAL REPORT, DRAWINGS, AND SPECIFICATIONS

PRIOR TO DEMOLITION.

D REFER TO CIVIL DRAWINGS FOR CIVIL/SITE WORK PHASING PLANS AND NOTES.

E REFER TO PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS FOR ADDITIONAL

PHASING INFORMATION.

F THE PLAN ON THIS SHEET IS SHOWN FOR DIAGRAMMATIC AND PHASING

PURPOSES ONLY. DO NOT SCALE OR OTHERWISE USE TO TAKE-OFFS.

G REFER TO PROJECT SCHEDULE FOR SPECIFIC REQUIREMENTS AND/OR

INFORMATION PERTINENT TO THE FOUR (4) PRIMARY AREAS OF THIS PROJECT:

I PRIOR TO COMMENCEMENT OF CONSTRUCTION INSTALL INTERIOR TEMPORARY PARTITIONS TO PREVENT DUST POLLUTION OF SURROUNDING AREAS. PROVIDE PARTITIONS IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS REQUIREMENTS AND AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING PLANS. IF A DOOR IS SHOWN, PROVIDE A 20 MIN, SOLID CORE TEMPORARY DOOR WITH CLOSER AND LATCHING. FOR INTERIOR

TEMPORARY PARTITIONS, USE PARTITION TYPE "T" AS SPECIFIED ON SHEET AE802.

J TEMPORARY PARTITIONS AND BARRIERS TO REMAIN UNTIL ALL THE WORK IS COMPLETED AND/OR APPRAVAL IS GRANTED BY THE INFECTION CONTROL OFFICER. UPON REMAVAL OF TEMPORARY PARTITIONS, PREP/PATCH TO

MATCH ADJACENT CONSTRUCTION.

K ENSURE AT ALL TIMES, UNINTERRUPTED HEATING, COOLING, PLUMBING, ELECTRICAL, COMMUNICATION, AND FIRE PROTECTIONS SERVICES WITHIN THE BOUNDARIES OF THE PROJECT SERVING PORTION OF THE FACILITY REMAINING IN SERVICE. COORDIANTE ANY REQUIRED INTERRUPTIONS OF SERVICE WITH THE OWNER TO

MINIMIZE INTERFERENCE WITH OWNER'S OPERATIONS.

L OBTAIN APPROVAL FROM OWNER PRIOR TO SHUTDOWN OF AIR SYSTEMS FOR EQUIPMENT AND DUCTWORK REMOVAL. PROVIDE NOTIFICATIONS PRIOR TO INTENDED ACTION PER THE SPECIFICATIONS AND INCLUDE A LIST

OF SERVICES AFFECTED, SCHEDULE OR WORK, AND PLANNED START DATE.

M ESTABLISH A SEALED AITIGHT PERIMETER PRIOR TO CONTRUCTION. PROVIDE TEMPORARY VENTILATION AND HEPA FILTERS TO MAINTAIN CONSTRUCTION AREA UNDER NEGATIVE PRESSURE TO OCCUPIED AREAS. PROVIDE

TEMPORARY FILTERS AT RETURN GRILLES ADJACENT TO CONSTRUCTION ZONE.

N PROVIDE DIFFERENTIAL PRESSURE MONITORS AT ALL ENTRANCES TO AREAS OF WORK TO CONFIRM NEGATIVE

PRESSURE WITH RESPECT TO NON-CONSTRUCTION AREAS.

O REFER TO MECHANICAL DRAWINGS FOR BALANCING OF EXISTING RETURN REGISTERS TO PRESSURIZE

OCCUPIED SPACES ADJACENT TO CONSTRUCTION ZONE.

A COMPLY WITH THE INFECTION CONTROL PERMIT AND ICRA/PCRA POLICY / PROCEDURES PER CAMP LEJEUNE'S

PRE-CONSTRUCTION RISK ASSESSMENT ICRA/PCRA FORM (EC.02.06.05, LS.01.02.01).

B PROVIDE ONGOING MAINTENANCE AND MONITORING OF PRECAUTIONS FOR INFECTION CONTROL RISK

ASSESSMENT.

C ENSURE FREE AND UNOBSTRUCTED ACCESS TO EMERGENCY DEPARTMENT/SERVICES AND FOR EMERGENCY

RESPONSE PERSONNEL.

D ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT IMPAIRED. PROVIDE A TEMPORARY, BUT EQUIVALENT SYSTEM, WHEN ANY FIRE SYSTEM IS IMPAIRED.

E ENSURE FREE AND UNOBSTRUCTED EGRESS AND EMERGENCY EGRESS FOR AREAS OCCUPIED DURING CONSTRUCTION AND FOR AREAS UNDER CONSTRUCTION IN ACCORDANCE WITH FIRE PROTECTION AND EGRESS

REQUIREMENTS. PROVIDE SIGNAGE IDENTIFYING ALTERNATE EXISTS AS REQUIRED.

F PROVIDE TMEPORARY LIFE SAFETY LIGHTING AND EXIT LIGHTS IN ACCORDANCE WITH FIRE PROTECTION AND

EGRESS REQUIREMENTS AND AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING PLANS.

G PROVIDE EXTERIOR TEMPORARY WALLS ARE REQUIRED. EXTERIOR TEMPORARY WALL CONSTRUCTION: 6-INCH METAL STUD WITH (1) LAYER OF EXTERIOR GRADE PLYWOOD (FASTENED PER IBC TABLE 2304.9.1), COVERED BY

(2) LAYERS OF 30 LB. FELT (STAGGER JOINTS WITH 6-INCH OVERLAP), MECHANICALLY FASTENED WITH GALVANIZED NAILS AND DISK CAPS AT 16" O.C. EACH WAY. PROVIDE UNFACED BLANKET INSULATION IN THE STUD CAVITY. PROVIDE (1) LAYER OF 5/8" GLASS MAT FACED GYPSUM BOARD ON THE INTERIOR SIDE.

H PRIOR TO COMMENCEMENT OF CONSTRUCTION SEAL EXISTING DOOR OPENINGS AIR TIGHT, ON EXISTING WALL TO BE USED AS TEMPORARY PARTITIONS, WITH FIRE RETARDANT VISQUEEN BARRIER TAPED TO DOOR FRAME.

PHASING NOTES:

ICRA NOTES:

1 TEMPORARY PARTITION TO REMAIN THRU THE COMPLETION OF

ADDITION/RENOVATION.

2 EXISTING 1-HR FIRE RATED PARTITION TO SERVE AS TEMPORARY PARTITION

THRU THE DURATION OF THE ADDITION/RENOVATION PROJECT. ENSURE

THAT PARTITION EXTENDS TO BOTTOM OF DECK AND ALL PENETRATIONS ARE

PROPERLY SEALED PRIOR TO START OF DEMOLITION/CONSTRUCTION WORK.

3 PHASE 3A – REMOVAL AND REPLACEMENT OF STOREFRONT (AT VESTIBULE

AND CORRIDOR EXTENSION AT ADDITION)

4 PHASE 3B – FIRE ALARM, HVAC, AND OTHER MISCELLANEOUS

INFRASTRUCTURE WORK ON THE DENTAL CLINIC.

5 THE INTERIOR BUILD OUT OF PHASE 1 AND PHASE 2 RUN CONCURRENTLY

WITH PHASE 3.

6 SEAL EXISTING DOOR OPENING AIR TIGHT WITH FIRE RETARDANT VISQUEEN

BARRIER TAPED TO DOOR FRAME.

7 ALL WORK WITHIN THE DENTAL CLINIC MUST BE COMPLETED WITHIN 30

CALENDAR DAYS. ALL MATERIALS FOR WORK IN THE DENTAL CLINIC MUST BE

ON SITE PRIOR TO THE START OF THE 30-DAY TIME PERIOD.

8 SEQUENCE OF SITE / CIVIL PHASE WORK WITHIN THE DENTAL CLINIC:

DJD

mec

PH101 - COMPOSITE PHASING PLAN - PHASE 1
PH102 - COMPOSITE PHASING PLAN - PHASE 2
PH103 - COMPOSITE PHASING PLAN - PHASE 3
2021-01-08T11:03:43-0500
Orlando, FL
David Boldt
I am signing to certify the authenticity of this document.
2021-01-08T11:04:12-0500
Orlando, FL
David Boldt
I am signing to certify the authenticity of this document.
2021-01-08T11:04:12-0500
Orlando, FL
David Boldt
I am signing to certify the authenticity of this document.
2021-01-16T16:16:43-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-01-16T16:17:26-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-01-16T16:17:33-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-01-16T16:17:59-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-01-16T16:18:18-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-01-16T16:18:18-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .