This federal solicitation requests proposals to rehabilitate an automotive repair shop and fueling system at Olympic National Park in Washington. Key details include rehabilitating the shop building including mechanical, plumbing and electrical upgrades, replacing the metal roof, and removing the existing diesel fuel tanks and pump to install new aboveground tanks and controls. The work must be completed within 240 calendar days of award.

This is a best value procurement set aside for women-owned small businesses. The NAICS code is 236220 for commercial and institutional building construction. Proposals are due approximately 30 days after posting of the solicitation on SAM.gov. The contractor must provide payment and performance bonds as well as liability insurance. The site visit will take place on January 19, 2021 and attendance is strongly encouraged. The National Park Service Pacific West Region is the contracting agency.

View the file

Other files

File Type Posted
Attachment 18 Clarifications 4 140P8321R0001_0005.pdf PDF
Sol_140P8321R0001_Amd_0005.pdf PDF
Attachment 19 New and Revised Specification Sections_0005.pdf PDF
Sol_140P8321R0001_Amd_0004.pdf PDF
Attachment 16 NEPA and NHPA Auto Shop Report_0004.pdf PDF
Attachment 15 Revised Sheets A1.3 and A6.0_0004.pdf PDF
Attachment 14 Clarifications 3 140P8321R0001_0004.pdf PDF
Attachment 12 Truck Lift Construction Drawings_1988 OLYM_149_60060_0003.pdf PDF
Attachment 13 Revised Sections 14 46 00 and 22 15 19_0003.pdf PDF
Sol_140P8321R0001_Amd_0003.pdf PDF
Attachment 11 Clarifications 2 140P8321R0001_0003.pdf PDF
Sol_140P8321R0001_Amd_0002.pdf PDF
Attachment 9 Site visit notes_clarifications_and attendees 140P8321R0001_0001.pdf PDF
Revised clauses and provisions with Amd 1 140P8321R0001_0001.pdf PDF
Attachment 10 Section 22 12 13 - Facility Fuel-Oil Pumps_revised_0001.pdf PDF
Sol_140P8321R0001_Amd_0001.pdf PDF
Attachment 2 Drawings OLYM Fuel Tank and Auto Shop.pdf PDF
Attachment 7 Spill Prevention Control and Countermeasures Plan -reduced.pdf PDF
Attachment 4 Topographic Survey of Maintenance Compound 2020.pdf PDF
FAQs for RFP 140P8321R0001.pdf PDF
Attachment 5 Auto Shop Hazmat Report 2020.pdf PDF
form to return with proposal - Limitations on Subcontracting compliance.xlsx XLSX spreadsheet
Sol_140P8321R0001.pdf PDF
Attachment 8 Wage Determination WA44 1-1-2021.pdf PDF
Attachment 3 Auto Shop Original Construction Drawings 1957.pdf PDF
forms to return with proposal 140P8321R0001 - mandatory.docx DOCX document
forms to return with proposal 140P8321R0001 - optional templates.docx DOCX document
Attachment 6 NPDES Inspection Report_EPA.pdf PDF
Attachment 1 Specifications OLYM Fuel Tank and Auto Shop.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 14 46 00 - MATERIAL LIFTS

OLYM - 228422 14 46 00 - 1

MATERIAL LIFTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Wall mounted material lift.

1.02 RELATED SECTIONS

A. Section 06 10 00 - Rough Carpentry

B. Section 09 21 16 - Gypsum Board Assemblies

C. Section 26 28 16 - Disconnect Switches and Individual Motor Controllers

1.03 SUBMITTALS

A. See Section 01 33 23 Submittal Procedures, for submittal procedures.

B. General and Structural Notes on the Structural Drawings

C. Product Data: Show product data of proposed product, including required structural support and electrical connection power loads. Indicate any related code required features to be provided by others.

D. Shop Drawings: Include layout in building space in plan, section, and elevation integrated with existing construction; loading height, details of equipment connection to floor, wall;

bracing requirements, special conditions; operating controls locations.

E. Manufacturer's Installation Instructions.

F. Maintenance and Operations: Manufacturer's printed operation and maintenance requirements and recommendations. Include name and contact information of nearest service representative.

G. Warranty: Manufacturer's warranty

1.04 WARRANTY

A. Manufacturer's standard 24 month material and operational warranty. Make any repairs or adjustments required in warranty period.

Revision 2. Significant changes to 2.01 B paragraphs; minor changes elsewhere.

OLYM - 228422 14 46 00 - 2

MATERIAL LIFTS

PART 2 PRODUCTS

2.01 GENERAL

A. Code Compliance: System must comply with any local, state, or federal codes governing such a system.

B. Description: Wall mounted material lift system, consisting of, but not limited to, the following, to provide a complete operable system:

1. Capacity: A minimum of 150 pounds of load

2. Stops: Two floors.

3. Rise: A minimum of ten (12) feet between stops.

4. Speed: 1-1/2 feet per second.

5. Motor: 3/4 horsepower, 220 volt.

6. Wall mounted frame: Welded tubing and panel infill assembly of steel components, to support the control, operating and moving parts of the system.

7. Material platform: Approximately 24 inches by 24 inches by 30 inches high, or larger.

8. Finish: Manufacturer's standard powder coat or PVDF coating system.

a. Frame and infill panel color: PNT-4 per Section 09 91 23.

b. Moving material platform color: Safety yellow.

9. Operations:

a. Electrical geared, hydraulic, or mixed hydraulic and cable/pully system per manufacturer's standard.

10. Controls:

a. Two station, manual, call/send buttons, door interlocks, door safety switches, and emergency safety stop switch.

11. Products: Basis of Design:

a. 2 STOP MEZ-LIFT 100. www.dumbwaiters.com

b. Substitutions: See Section 01 67 00 – Product Requirements

PART 3 EXECUTION

3.01 INSTALLATION

A. Install per manufacturer's instruction and approved shop drawings.

3.02 ADJUSTMENT

A. Adjust equipment for smooth operation.

OLYM - 228422 14 46 00 - 3

MATERIAL LIFTS

3.03 TRAINING:

A. Provide a minimum of one hour of orientation and training for Owner's personnel.

END OF SECTION

part 1 general
1.01 section includes
A. Wall mounted material lift.
1.02 related sections
A. Section 06 10 00 - Rough Carpentry
B. Section 09 21 16 - Gypsum Board Assemblies
C. Section 26 28 16 - Disconnect Switches and Individual Motor Controllers
1.03 submittals
A. See Section 01 33 23 Submittal Procedures, for submittal procedures.
B. General and Structural Notes on the Structural Drawings
C. Product Data: Show product data of proposed product, including required structural support and electrical connection power loads. Indicate any related code required features to be provided by others.
D. Shop Drawings: Include layout in building space in plan, section, and elevation integrated with existing construction; loading height, details of equipment connection to floor, wall; bracing requirements, special conditions; operating controls loca...
E. Manufacturer's Installation Instructions.
F. Maintenance and Operations: Manufacturer's printed operation and maintenance requirements and recommendations. Include name and contact information of nearest service representative.
G. Warranty: Manufacturer's warranty
1.04 Warranty
A. Manufacturer's standard 24 month material and operational warranty. Make any repairs or adjustments required in warranty period.
PART 2 PRODUCTS
2.01 general
A. Code Compliance: System must comply with any local, state, or federal codes governing such a system.
B. Description: Wall mounted material lift system, consisting of, but not limited to, the following, to provide a complete operable system:
1. Capacity: A minimum of 150 pounds of load
2. Stops: Two floors.
3. Rise: A minimum of ten (12) feet between stops.
4. Speed: 1-1/2 feet per second.
5. Motor: 3/4 horsepower, 220 volt.
6. Wall mounted frame: Welded tubing and panel infill assembly of steel components, to support the control, operating and moving parts of the system.
7. Material platform: Approximately 24 inches by 24 inches by 30 inches high, or larger.
8. Finish: Manufacturer's standard powder coat or PVDF coating system.
a. Frame and infill panel color: PNT-4 per Section 09 91 23.
b. Moving material platform color: Safety yellow.
9. Operations:
a. Electrical geared, hydraulic, or mixed hydraulic and cable/pully system per manufacturer's standard.
10. Controls:
a. Two station, manual, call/send buttons, door interlocks, door safety switches, and emergency safety stop switch.
11. Products: Basis of Design:
a. 2 STOP MEZ-LIFT 100. www.dumbwaiters.com
b. Substitutions: See Section 01 67 00 – Product Requirements
PART 3 EXECUTION
3.01 Installation
A. Install per manufacturer's instruction and approved shop drawings.
3.02 Adjustment
A. Adjust equipment for smooth operation.
3.03 Training:
A. Provide a minimum of one hour of orientation and training for Owner's personnel.