This document provides details for a solicitation seeking rehabilitation services for an automotive repair shop located within Olympic National Park. The solicitation will require removing and replacing an existing diesel fueling system with aboveground tanks, pumps, and piping. Additional work includes constructing a roof canopy over the fuel area, reconfiguring stormwater piping, and rehabilitating the shop including mechanical, plumbing, and electrical upgrades along with replacing the metal roof. The National Park Service is seeking these services through a best value procurement set aside for women-owned small businesses. Offerors must be certified as a WOSB by the SBA. The prime contractor must comply with limitations on subcontracting, and the work will be performed under a single firm-fixed-price construction contract subject to prevailing wage requirements. The period of performance is 240 calendar days after notice to proceed. The solicitation and any amendments will be posted on SAM.gov, with responses due approximately 30 days later. Proposals will include both technical and price components, and award will be made based on best value.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A3.1
A3.1
A3.1
A3.1
ABCDEFGH
11' - 3" 16' - 3" 16' - 0" 16' - 0" 16' - 0" 16' - 3" 36' - 7"
S L O P E
A3.1
S L O P E
S L O P E
L O P E
S L O P E
S L O P E
A5.0
24' - 9"
4 4 4
4 4 4
XB XA
1.1
30' - 8" 18' - 0"
A5.0
ROOF EDGE TO FUEL TANK
15' MIN
A5.0
A5.0
A5.0
A5.0
A5.0
A5.0
A5.0
A5.0
A5.0
A5.0
A5.0
A5.1
A5.1
A5.1
A5.1
5883 REGISTERED
ARCHITECT
STATE OF WASHINGTON
TROY A. AINSWORTH
8 0 8 16
SCALE OF FEET
DESIGNED:
DRAWN:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
DRAWING NO.
PMIS/PKG NO.
DRAWING NO.
D R
A W
IN
G
S T
O B
E P
R
IN
T E
D I
N G
R A
Y S
C A
L E
IF
D
IS
T
IN
C
T S
H A
D E
O F
D O
T S
A R
E N
O T
V
IS
IB
L
E
IN
F O
R M
A T
IO
N
M A
Y B
E M
IS
S
IN
G
OF
A1.3 12/18/2020
TM
AL
TM/AL 149
166287
OLYMPIC NATIONAL PARK
ROOF PLAN
ROOF PLAN
SHEET NOTES
1. INDICATED ROOF SLOPES ARE FOR ESTIMATION
PURPOSES ONLY. EXACT ROOF SLOPE FOR
CONSTRUCTION TO BE VERIFIED BY CONTRACTOR PRIOR
TO COMMENCEMENT OF WORK. DISCREPANCIES TO BE
PROVIDED TO CONTRACTING OFFICER PRIOR TO
COMMENCEMENT OF WORK.
KEYNOTES
1 (N) PAINTED STANDING SEAM METAL ROOF ASSEMBLY,
INCLUDING WEATHER BARRIER, RIGID INSULATION,
DRAINAGE LAYER, PLYWOOD SHEATHING (WHERE
OCCURS), FASCIA-MOUNTED PAINTED METAL GUTTERS,
AND DOWNSPOUTS
2 (N) PAINTED STANDING SEAM METAL ROOF ON
CORRUGATED METAL DECK WITH FASCIA-MOUNTED
PAINTED METAL GUTTERS AND DOWNSPOUTS
3 (E) VENT THROUGH ROOF - SEE PLUMBING DRAWINGS
FOR PIPING CONNECTION
4 (N) DOWNSPOUT - SEE CIVIL DRAWINGS FOR
STORMWATER CONNECTION
5 1/8" DIFFERENCE BETWEEN (N) ROOF SHEATHING (AUTO
REPAIR) AND (E) ROOF SHEATHING (WELDING) THICKNESS
TO BE MADE UP IN RIGID INSULATION LAYER
228422
A OF
GROUND FLOOR
0' - 0"
GROUND FLOOR
0' - 0"
GROUND FLOOR
0' - 0"
EQEQ
GROUND FLOOR
0' - 0"
T.O. PLATE
14' - 6"
MEZZANINE
9' - 6"
4' - 0"
20' - 0"
GROUND FLOOR
0' - 0"
T.O. PLATE
14' - 6"
MEZZANINE
9' - 6"
OPEN
A6.5
6' - 1"
11' - 7"
(N) 3-HR WALL EXTENTS
5883 REGISTERED
ARCHITECT
STATE OF WASHINGTON
TROY A. AINSWORTH
4 0 4 8
SCALE OF FEET
DESIGNED:
DRAWN:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
DRAWING NO.
PMIS/PKG NO.
DRAWING NO.
D R
A W
IN
G
S T
O B
E P
R
IN
T E
D I
N G
R A
Y S
C A
L E
IF
D
IS
T
IN
C
T S
H A
D
F
D O
T S
A R
E N
O T
V
IS
IB
L
E
IN
F O
R M
A T
IO
N
M A
Y B
E M
IS
S
IN
G
OF
A6.0 12/18/2020
Checker
Author
Designer 149
228422
166287
OLYMPIC NATIONAL PARK
INTERIOR ELEVATIONS
STAFF RESTROOM 107 -
NORTH INTERIOR ELEVATION
STAFF RESTROOM 107 -
EAST INTERIOR ELEVATION
STAFF RESTROOM 107 -
SOUTH INTERIOR ELEVATION
STAFF RESTROOM 107 -
WEST INTERIOR ELEVATION
WELDING & FABRICATION 103 - WEST INTERIOR ELEVATION
ELEVATION - MEZZANINE OPENING
KEYNOTES
1 (N) METAL GUARDRAIL, FIXED ATTACHMENT, TYP
2 (N) 4x4x1/4 HSS STRUCTURAL STEEL COLUMN
3 (N) FRP WALL FINISH UP TO 5' HEIGHT, ALL INTERIOR
WALLS AT STAFF RESTROOM 107
4 (N) DOOR PER SCHEDULE
5 (N) 3-HOUR FIRE WALL
6 (N) FRP WALL FINISH, 4' WIDE x 6' HIGH FOR
PROTECTION BEHIND EYEWASH
7 (N) GYPSUM BOARD PROTECTION AT UNDERSIDE OF
ROOF STRUCTURE PER 3-HOUR ASSEMBLY
REQUIREMENTS
8 (E) GYPSUM BOARD CEILING
9 (N) MECHANICAL VENT
, FLOOR TO ROOF SHEATHING, INCLUDING INTO SOFFIT CAVITIES
LEGEND
A OF
ACCESSIBLE TOILET & GRAB BARS ACCESSIBLE LAVATORY & ACCESSORIES
JUMBO TOILET
PAPER DISPENSER
MIRROR
OUTLET OR T-STAT
SOAP DISPENSER
PAPER TOWEL
DISPENSER
C L R
F
.O .F
3'-6" MIN. 1'-0" MAX.
M
IN
T .O
S
E A
T
M
IN
M
IN
8"
M A
X
M
IN
M A
X
M
IN
M A
X
T
R
F
L E
C T
IV
U R
F A
C E
M
IN
M A
X
M A
X . 7
M
IN
NOTE: OPERABLE PART OF ALL
ACCCESSORIES TO BE LOCATED
15" MIN. - 48" MAX. AFF
CL
CL
| A1.3_Roof Plan_rev1 |
| Sheets |
| A1.3 - ROOF PLAN |
| A6.0 Interior Elevations_rev1 |
| Sheets |
| A6.0 - INTERIOR ELEVATIONS |
File details come from the government source that posted it. Updated .