Attachment 3j - B786 Limited Hazardous Materials Survey Report.pdf
PDF 7 MB Posted
- Solicitation number
- 140P8320R0008
About this file
This request for proposals solicits abatement of hazardous materials including asbestos, lead, mercury, polychlorinated biphenyls, and wildlife excrement in several historic buildings at Fort Vancouver National Historic Site in Vancouver, Washington. The National Park Service seeks a contractor to perform hazardous material abatement, selective demolition, and minor repairs to the buildings. The single award contract will be firm-fixed-price with performance and payment bonds required. The estimated value is between $250,000 and $1,000,000 depending on optional items. The North American Industry Classification System code is 562910 for remediation services and the small business size standard is $22 million average annual gross receipts. The period of performance is 180 days from award. Site visits will be held and proposals are due on the date specified in the solicitation published on SAM.gov where any amendments will also be posted.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134
Phone 206-381-1128
Toll Free 800-666-2959
Fax 206-254-4279
• Environmental Consulting
• Hazardous Materials Management
• Industrial Hygiene Services
• Construction Management
• Indoor Air Quality
LIMITED HAZARDOUS MATERIALS SURVEY REPORT
NATIONAL PARK SERVICE
FORT VANCOUVER NATIONAL HISTORIC SITE
BUILDING 786
East Vancouver Barracks, Building 786
Vancouver, Washington 98661
December 24th, 2018
Prepared For:
Kristen Jontos National Park Service 612 East Reserve Street Vancouver, WA 98661 ii
Limited Hazardous Materials Survey Report
National Park Service
Fort Vancouver Historic Site
Building 786
East Vancouver Barracks, Building 786, Vancouver, Washington 98661
EHSI Project No.: # 11176
The material and data in this report were prepared under the supervision and direction of the undersigned.
Rory Peterson Lead AHERA Building Inspector
Derica Escamilla
Principal of Hazardous Materials Services iii
TABLE OF CONTENTS
Acronym List .............................................................................................. iv
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
1.2 EXTENT OF CURRENT SURVEY
1.3 ACM MATERIALS FOUND
1.4 OPINIONS AND RECOMMENDATIONS
1.5 LIMITATIONS/DISCLAIMER
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
2.2 BUILDING DESCRIPTION
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
2.3.2 Lead-Containing Paint/Lead-Containing Materials
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
2.4.2 Lead-Containing Paint and Building Materials
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
2.4.4 Polychlorinated Biphenyls
2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs and thermostats
3.0 LIMITATIONS
4.0 STANDARD OF CARE
5.0 CERTIFIED AHERA BUILDING INSPECTORS
APPENDICES
A ........................ Asbestos Laboratory Reports and Field Data Forms B ........................ Lead Laboratory Reports and Field Data Forms
C ........................ Certified AHERA Building Inspector Certificates D ........................ Laboratory Certifications for Asbestos and Lead Analysis
E ......................... Sample Location Drawings for Asbestos and Lead F ......................... Hazardous Metals TCLP Laboratory Reports and Field Data Forms iv
ACRONYM LIST
ACM .......................Asbestos-Containing Material
Ag ..........................Silver
AHERA ....................Asbestos Hazard Emergency Response Act
AHU .......................Air Handling unit
AIHA ......................American Industrial Hygiene Association
As ..........................Arsenic
Ba ..........................Barium
Cd ..........................Cadmium
CFL ........................Compact Fluorescent Light
CFR ........................Code of Federal Regulations
Cr ..........................Chromium
DOSH .....................Washington State Department of Labor and Industries, Division of
Occupational Safety and Health
EA ..........................Each
Ecology ...................Washington State Department of Ecology
EHSI .......................EHS-International, Inc.
ELLAP .....................Environmental Lead Laboratory Accreditation Program
GWB .......................Gypsum Wall Board
Hg ..........................Mercury
JC ..........................Joint Compound
LCM ........................Lead-Containing Material
LCP ........................Lead-Containing Paint
LF ..........................Linear Feet
L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter
N/A ........................Not Applicable
ND .........................None Detected
NVL ........................NVL Laboratories, Inc.
NVLAP ....................National Voluntary Laboratory Accreditation Program
OD .........................Outside Diameter
OSHA .....................US Occupational Safety and Health Administration
Pb ..........................Lead
PCBs .......................Polychlorinated Biphenyls
PLM ........................Polarized Light Microscopy ppm .......................Parts per Million
QA .........................Quality Assurance
RCW .......................Revised Code of Washington
SAT ........................Seattle Asbestos Test, LLC
Se ..........................Selenium
SF ..........................Square Feet
SVF ........................Sheet Vinyl Flooring
SWCAA ...................Southwest Clean Air Agency
TCLP .......................Toxicity Characteristic Leaching Procedure
VAT ........................Vinyl Asbestos Tile
VCT ........................Vinyl Composite Tile
WAC .......................Washington Administrative Code
wt. .........................Weight w/ ..........................With
XRF ........................x-ray fluorescence
Fort Vancouver National Historic Site – B786
EHSI Project 11035
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
The National Park Service (NPS) plans to renovate Building 786 (B786) at the Fort Vancouver
National Historic Site (FV NHS) located at East Vancouver Barracks, Vancouver, Washington.
The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of B786 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.
1.2 EXTENT OF CURRENT SURVEY
EHSI inspected accessible interior and exterior suspect ACM potentially impacted by future projects. Accessible suspect materials were sampled including, but not limited to: interior and exterior wall systems, window systems, and mechanical systems. The LCP and LCM survey was limited to the interior of the building only. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment and roof vents at peak of roof) suspect materials were assumed to be ACM.
1.3 ACM MATERIALS FOUND
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
ASBESTOS MATERIAL DESCRIPTION LOCATION
Non-ACM Red SVF w/ non-ACM black asphaltic paper backing on ACM black mastic on painted plywood & hardwood flooring on non-ACM brown paper vapor barrier w/ blue coating (on wood subfloor) [Sample
# 91 and #92]
1ST Floor, Storage Room
ACM 9”x9” Dark brown/black VAT on ACM black mastic on Non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #94]
2nd Floor, Carpenter Shop
ACM 9”x9” Dark green VAT on ACM black mastic on
Non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #95]
2nd Floor, Carpenter Shop
ACM 6”x24” Dark green VAT on ACM black mastic on
Non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #96]
2nd Floor, Carpenter Shop
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
ASBESTOS MATERIAL DESCRIPTION LOCATION
ACM off-white/gray heat-shield paper w/ paint (around penetration into chimney) [Sample #139, #148 and 150]
2nd Floor Toilet Room 2nd
Floor Engineer Storage Room, and Attic
Black asphaltic tar/sealant (around chimney at roof penetration) [Sample #151] Attic
Small electrical disconnect w/ assumed ACM internal components
1st Floor, Shop
Electrical panel with assumed ACM internal components 1st Floor, Shop and Barber
Shop
Electrical meter w/ assumed ACM internal components 1st Floor, Shop
1’x2’ Box and panels w/ assumed ACM electrical components Boiler Room
2”-4” OD vent pipe penetration w/ assumed ACM penetration sealant around opening at roof Roof, above toilet room
3’ OD Vent fan w/ assumed ACM penetration sealant around opening at roof Roof, East and West Side
2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, North and South Side
4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, East and West Side
KEY: ACM = asbestos containing material, SVF = sheet vinyl flooring, OD = outer diameter, VAT = vinyl asbestos tile, w/ = with
1.4 OPINIONS AND RECOMMENDATIONS
EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to renovation and demolition activities.
Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.
Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will disturb the LCP, the contractor will need to perform an initial exposure assessment in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).
All of the fluorescent light fixture ballasts were inspected. 84% of the fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology) Dangerous Waste. All fluorescent tubes and lamps contain mercury; any fluorescent lamps/tubes to be disturbed during the project must be recycled as (Ecology) Universal Waste.
1.5 LIMITATIONS/DISCLAIMER
This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical equipment and roof vents at peak of roof were not sampled but were assumed to be present based on the inspector’s experience with similar systems on other projects and are assumed to be ACMs.
Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint. This report and accompanying appendices include the supporting information for this executive summary.
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: identification of all suspect materials; a determination of whether suspect materials were: ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.
From September 12th to 13th, 2018, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington
Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest
Clean Air Agency (SWCAA).
2.2 BUILDING DESCRIPTION
Building 786 is located at East Vancouver Barracks, Vancouver, Washington. The building is a two-story, wood-framed structure with an attic. The building sits on a brick and masonry pier foundation. The building’s roof is covered with 3-tab composite shingles. The exterior walls are covered with wood siding. Interior floor finishes include: original tongue and groove hard wood flooring, vinyl composite tile (VCT), vinyl asbestos tile (VAT), carpet, fibrous wood panels, and sheet vinyl flooring (SVF). Interior wall finishes include: original tongue & groove wood walls, painted plywood, plaster, and gypsum wallboard (GWB). Interior ceiling finishes include: wood panels, fibrous wood panels, GWB, and suspended acoustic ceiling tile (SACT).
Windows throughout the building are operable and wood-framed. Heating is provided by a local electric forced air furnace. There is also evidence that the building was originally heated by a coal fired system and wood fired stoves. Hot water is provided by electric hot water tanks. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of
Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix
C. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October
1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.
EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and
Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary
Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.
Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.
Copies of both laboratories’ NVLAP certifications are included in Appendix D.
2.3.2 Lead-Containing Paint/Lead-Containing Materials
EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.
Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic
Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene
Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).
Copies of laboratory reports and field data forms for lead are in Appendix B.
All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
Ninety-two (92) bulk samples of suspect ACM were collected as part of the survey. Five (5) of those samples were split for quality assurance analyses. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix E. Asbestos sampling information including: sample number, material description, sample location, and analytical results are summarized in Table 1. The
ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-89 1st Floor, Shop Office
Layer 1: Blue carpet
Layer 2: Beige mastic
Layer 3: White mesh backing
Layer 4: Purple/multi-color carpet pad)
ND
(All Layers)
N/A
(All Layers)
11176-90
1st Floor, Area Under
Stairs
Brown paper vapor barrier w/ blue coating (under hardwood floor on wood subfloor)
ND N/A
11176-91
1st Floor, E.
Storage
Room
Layer 1: Red SVF
Layer 2: Black asphaltic paper backing
Layer 3: Black mastic
Layer 4: Painted Plywood & hardwood flooring
Layer 5: Brown paper vapor barrier w/ blue coating (on wood subfloor)
L1: ND
L2: ND
L3: 2%
L4: ND
L5: ND
N/A
Chrysotile
11176-92
1st Floor, E.
Storage
Room
Layer 1: Red SVF
Layer 2: Black asphaltic paper backing
Layer 3: Black mastic
Layer 4: Painted Plywood & hardwood flooring
Layer 5: Brown paper vapor barrier w/ blue coating (on wood subfloor)
L1: ND
L3: 2%
L5: ND
11176-93QA
1st Floor, Stairs to 2nd
Floor
Black asphaltic mastic (on wood stairs)
ND N/A
11176-94
2nd Floor, Carpenter
Shop
Office
Layer 1: 9”x9” Dark brown/black VAT
Layer 2: Black mastic
Layer 3: Black asphaltic vapor barrier
Layer 4: Trace brown mastic
(on wood)
L1: 3%
L2: 2%
L3: ND
11176-95
2nd Floor, Carpenter
Shop
Office
Layer 1: 9”x9” Dark green
VAT
Layer 2: Black mastic
Layer 3: Black asphaltic vapor barrier
Layer 4: Trace brown mastic
(on wood)
L1: 3%
L2: 3%
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-
96QAX
2nd Floor, Carpenter
Shop
Office
Layer 1: 6”x24” Black VAT
Layer 2: Black mastic
Layer 3: Black asphaltic vapor barrier
Layer 4: Brown mastic (on wood)
L1: 4%
L2: 3%
11176-97
Carpenter
Shop
Layer 1: 3’x4’ Fiberboard floor panel
Layer 2: Black mastic (on hardwood floor)
ND
(All Layers)
N/A
(All Layers)
11176-98
2nd Floor, Engineer
Storage
Room
Layer 1: 3’x4’ Fiberboard floor panel
Layer 2: Black mastic (on hardwood floor)
ND
(All Layers)
N/A
(All Layers)
11176-99 2nd Floor, Toilet Room
Layer 1: Black SVF/vapor barrier
Layer 2: Black mastic (on hard wood flooring)
ND
(All Layers)
N/A
(All Layers)
11176-100 2nd Floor, Toilet Room
Layer 1: Black SVF/vapor barrier
Layer 2: Black mastic
Layer 3: Hard wood flooring
ND
(All Layers)
N/A
(All Layers)
11176-
101QA
2nd Floor, Toilet Room
Shower
Layer 1: Black asphaltic vapor barrier
Layer 2: Black asphaltic vapor barrier (under metal shower floor)
ND
(All Layers)
N/A
(All Layers)
11176-102 1st Floor, Shop Office
Layer 1: Bumpy white texturing w/ paint on JC w/ paper
Layer 2: GWB wall w/ paper
(corner wall)
ND
(All Layers)
N/A
(All Layers)
11176-103 1st Floor, Shop Office
Layer 1: Bumpy white texturing w/ paint
Layer 2: GWB wall w/ paper
(middle wall)
ND
(All Layers)
N/A
(All Layers)
11176-104 1st Floor, Shop Office
Layer 1: Bumpy white texturing w/ paint
Layer 2: GWB wall w/ paper
(middle wall)
ND
(All Layers)
N/A
(All Layers)
11176-105 1st Floor, Shop
Layer 1: JC patch on older JC w/ paint
Layer 2: GWB wall w/ paper (at seam)
ND
(All Layers)
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-106 1st Floor, Shop
Layer 1: JC w/ paper
Layer 2: GWB wall w/ paper (at seam, unpainted w/ no skim coat)
ND
(All Layers)
N/A
(All Layers)
11176-107
1st Floor, Furnace
Room
GWB wall w/ paper (middle wall, on unfinished GWB panels w/ no JC)
ND N/A
11176-108
1st Floor, E.
Storage
Room
Layer 1: Trace JC w/ paint
Layer 2: GWB wall w/ paper
(corner wall)
ND
(All Layers)
N/A
(All Layers)
11176-109
1st Floor, E.
Storage
Room
GWB wall w/ paint and paper
(middle wall)
ND N/A
11176-110
1st Floor, E.
Storage
Room
GWB wall w/ paint and paper
(middle wall)
ND N/A
11176-111
1st Floor, E.
Storage
Room
Layer 1: JC
Layer 2: GWB wall w/ paper (at seam)
ND
(All Layers)
N/A
(All Layers)
11176-112
1st Floor, E.
Storage
Room
GWB wall w/ paper (middle wall)
ND N/A
11176-113 1st Floor, Shop
Layer 1: Red brick
Layer 2: Gray mortar
(column/small chimney)
ND
(All Layers)
N/A
(All Layers)
11176-114
2nd Floor, Engineer
Storage
Room
Layer 1: White skim coat w/ paint
Layer 2: Gray plaster wall (on small chimney)
ND
(All Layers)
N/A
(All Layers)
11176-115
2nd Floor, Engineer
Storage
Room
Layer 1: White skim coat w/ paint
Layer 2: Gray plaster wall (on small chimney)
ND
(All Layers)
N/A
(All Layers)
11176-116
2nd Floor, Engineer
Storage
Room
Layer 1: White skim coat w/ paint
Layer 2: Gray plaster wall (on small chimney)
ND
(All Layers)
N/A
(All Layers)
11176-117 1st Floor, Boiler Room
Layer 1: Red brick
Layer 2: Gray mortar (main boiler chimney)
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-118 1st Floor, Shop
Layer 1: Black asphaltic tar
Layer 2: Black asphaltic 3-tab roofing w/ sand
Layer 3: Black asphaltic tar
Layer 4: Clear plastic vapor barrier (in piles on floor)
ND
(All Layers)
N/A
(All Layers)
11176-119 1st Floor, Shop
Layer 1: Black asphaltic tar
Layer 2: Black asphaltic 3-tab roofing w/ sand (small variety)
Layer 3: Black asphaltic tar
Layer 4: Clear plastic vapor barrier (in piles on floor)
ND
(All Layers)
N/A
(All Layers)
11176-120 1st Floor, Shop
Black asphaltic vapor barrier
(in a roll on floor)
ND N/A
11176-121
2nd Floor, Engineer
Storage
Room
Black asphaltic rolled-down roofing w/ sand (in a roll-on floor)
ND N/A
11176-122
2nd Floor, Engineer
Storage
Room
Black asphaltic vapor barrier
(in a roll on floor)
ND N/A
11176-123
2nd Floor, Engineer
Storage
Room
2’x4’ Light brown/gray fibrous
SACT w/ paint w/ worm track and pin hole pattern (stacked on floor)
ND N/A
11176-124
2nd Floor, Engineer
Storage
Room
2’x4’ Beige/gray fibrous SACT w/ paint w/ worm track and pin hole pattern (stacked on floor)
ND N/A
11176-125
1st Floor, Furnace
Room
Layer 1: Clear plastic
Layer 2: Beige cloth tape (on 2’
OD circular duct)
ND
(All Layers)
N/A
(All Layers)
11176-126
1st Floor, Furnace
Room
Brown pipe dope (on natural gas line connecting to furnace)
ND N/A
11176-127
1st Floor, Furnace
Room
Brown/black fibrous insulation
(inside furnace)
ND N/A
11176-128
1st Floor, Furnace
Room
Layer 1: Trace white material
Layer 2: Brown material (inside furnace)
ND
(All Layers)
N/A
(All Layers)
11176-129 1st Floor, Shop
Red sink drain gasket w/ paint
(on large ceramic sink)
ND N/A
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-130
2nd Floor, Engineer
Storage
Room
Layer 1: Older black asphaltic
3-tab roofing w/ red roofing granules
Layer 2: Black asphaltic tar
Layer 3: Trace brown fibrous material (in stack on floor)
ND
(All Layers)
N/A
(All Layers)
11176-131
2nd Floor, Engineer
Storage
Room
Layer 1: Brown/tan paper vapor barrier w/ mastic and woven fibrous interior
Layer 2: Silver foil
Layer 3: Yellow fiberglass TSI runs (in boxes)
ND
(All Layers)
N/A
(All Layers)
11176-132
1st Floor, Shop Office
Storage
4” Brown cove base (in roll) ND N/A
11176-133 1st Floor, Shop
12”x12” Brown VCT (w/ tan and brown streaks) (in box)
ND N/A
11176-
134QA
1st Floor, Shop
Layer 1: Clear glass
Layer 2: Beige/off-white window glazing putty w/ paint
(in 3’5”x6” wood-framed windows)
ND
(All Layers)
N/A
(All Layers)
11176-135
1st Floor, Shop
Layer 1: Black asphaltic coating on black fibrous wire wrap
Layer 2: Wire
ND
(All Layers)
N/A
(All Layers)
11176-136
1st Floor, Shop
Layer 1: Black asphaltic coating on black fibrous wire wrap
Layer 2: Wire
ND
(All Layers)
N/A
(All Layers)
11176-137 1st Floor, Shop
Black/red nail gaskets (on knob and tube wiring system)
ND N/A
11176-138
1st Floor, Furnace
Room
4” Off-white cove base (in roll) ND N/A
11176-139
2nd Floor, Toilet
Room
Off-white/gray heat-shield paper w/ paint (around penetration into chimney)
68% Chrysotile
11176-140
2nd Floor, Carpenter
Shop Office
Layer 1: Beige window glazing putty w/ paint (on 3’x4’7” wood framed windows)
Layer 2: Wood
ND
(All Layers)
N/A
(All Layers)
11176-141 2nd Floor, Toilet Room
Layer 1: Tan window glazing putty w/ paint (on 3’x4’7” wood framed windows)
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
Layer 2: Trace brown mastic
(on 3’x4’7” wood framed windows)
11176-142 2nd Floor, Toilet Room
Layer 1: White window glazing putty patching compound w/ paint (on 3’x4’7” wood-framed windows)
Layer 2: Wood
ND
(All Layers)
N/A
(All Layers)
11176-143
1st Floor, E.
Storage
Room
Layer 1: JC w/ paint
Layer 2: GWB ceiling w/ paper
(ceiling edge)
ND
(All Layers)
N/A
(All Layers)
11176-144
1st Floor, E.
Storage
Room
GWB ceiling w/ paint and paper
(middle ceiling)
ND N/A
11176-145
1st Floor, E.
Storage
Room
Layer 1: Wood debris
Layer 2: Black mastic (on countertop)
ND
(All Layers)
N/A
(All Layers)
11176-146 1st Floor, Shop Office
2’x4’ Beige/gray SACT w/ paint w/ worm track and pin hole pattern
ND N/A
11176-147
2nd Floor, Engineer
Storage
Room
Layer 1: White chimney sealant
Layer 2: Trace gray brick mortar
ND
(All Layers)
N/A
(All Layers)
11176-
148QAX
2nd Floor, Engineer
Storage
Room
Off-white fibrous heat-shield paper (6” OD, 12”
OD)
73% Chrysotile
11176-149
2nd Floor, Carpenter
Shop
Layer 1: Gray chimney flue penetration sealant
Layer 2: Gray brick mortar
ND
(All Layers)
N/A
(All Layers)
11176-150 2nd Floor, Attic
Layer 1: Off-white fibrous heat-shield paper
Layer 2: Trace gray brick mortar (between chimney and wood framing)
L1: 56%
11176-151
Attic
Black asphaltic tar/sealant
(around chimney at roof penetration)
3% Chrysotile
11176-152 2nd Floor, Attic
Black asphaltic vapor barrier
(under roofing on wood decking)
ND N/A
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-153 2nd Floor, Attic
Black asphaltic vapor barrier
(under roofing on wood decking)
ND N/A
11176-154 2nd Floor, Attic
Tan/brown pipe dope (on vent pipe fittings)
ND N/A
11176-155 Exterior, N.
Side
Layer 1: White door frame/trim caulking w/ paint
Layer 2: Gray door frame caulking (on all doors)
ND
(All Layers)
N/A
(All Layers)
11176-156 Exterior, N.
Side
White window frame/trim caulking w/ paint (on all windows)
ND N/A
11176-157 Exterior, S.
Side
6” Black natural gas regulator gasket w/ gray paint
ND N/A
11176-158 Exterior, W.
Side
Beige window glazing putty w/ paint (on 3’5”x6’ wood-framed windows)
ND N/A
11176-159 Exterior, S.
Side
Beige window glazing putty w/ paint (on 3’5”x6’ wood-framed windows)
ND N/A
11176-160 Exterior, S.
Side
White siding seam caulking w/ paint (throughout)
ND N/A
11176-161 Exterior, S.
Side
Layer 1: White door infill caulking
Layer 2: White foam
Layer 3: Trace wood debris
ND
(All Layers)
N/A
(All Layers)
11176-162
Exterior, S.
Side (Under
Building)
Layer 1: Brown paper vapor barrier/wrap w/ black mastic between paper layers
Layer 2: Yellow fiberglass TSI
(on 1” OD water line)
ND
(All Layers)
N/A
(All Layers)
11176-163
Exterior, S.
Side (Under
Building)
Layer 1: Brown paper vapor barrier/wrap w/ black mastic between paper layers
Layer 2: Yellow fiberglass TSI
(on 1” OD water line)
ND
(All Layers)
N/A
(All Layers)
11176-164
Exterior, S.
Side (Under
Building)
Thick black asphaltic wrap (on insulation on 1” OD water line)
ND N/A
11176-
165QA
Exterior, S.
Side
Layer 1: Brown paper vapor barrier
Layer 2: Black asphaltic tar/mastic (behind wood siding on wood)
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-166 Exterior, S.
Side
Layer 1: White pipe dope
Layer 2: Trace gray pipe dope
(on natural gas line fittings)
ND
(All Layers)
N/A
(All Layers)
11176-167
2nd Floor, Engineer
Storeroom
Beige window glazing putty (on
2’ x 2’ window in off white/beige painted door)
ND N/A
11176-168
2nd Floor, Engineer
Storeroom
Beige window glazing putty w/ paint (on 3’ x 3’ wood-framed windows, loose on floor)
ND N/A
11176-169
2nd Floor, Engineer
Storeroom
Gray window glazing putty patch w/ paint (on 3’ x 3’ wood-framed windows, loose on floor)
ND N/A
11176-170
2nd Floor, Engineer
Storeroom
Beige window glazing putty w/ paint (on 3’5” x 3’ wood-framed windows, loose on floor)
ND N/A
11176-171 1st Floor, Barber Shop
Layer 1: 12” x 12” Tan VCT (w/ brown and beige streaks)
Layer 2: Orange/yellow mastic
(on OSB)
ND
(All Layers)
N/A
(All Layers)
11176-172 1st Floor, Barber Shop
Layer 1: 12” x 12” Tan VCT (w/ brown and beige streaks)
Layer 2: Orange/yellow mastic
(on OSB)
ND
(All Layers)
N/A
(All Layers)
11176-173
1st Floor, Barber Shop
Restroom
Layer 1: 12” x 12” Beige VCT
(w/ tan and beige streaks)
Layer 2: Yellow mastic
Layer 3: Trace white edge caulking
Layer 4: Trace wood debris
ND
(All Layers)
N/A
(All Layers)
11176-174
1st Floor, Barber Shop
Restroom
Layer 1: 4” Dark brown cove base
Layer 2: Beige mastic
Layer 3: GWB wall w/ paint and paper
ND
(All Layers)
N/A
(All Layers)
11176-175
1st Floor, Barber Shop
Restroom
Layer 1: 4” Beige cove base
Layer 2: White mastic
Lauer 3: White caulking
Layer 4: White mastic
Layer 5: Brown GWB paper
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER NHS – BUILDING 786
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-176
1st Floor, Barber Shop
Restroom
Layer 1: White caulking
Layer 2: JC
Layer 3: GWB wall w/ paper
(corner wall)
ND
(All Layers)
N/A
(All Layers)
11176-177
1st Floor, Barber Shop
Restroom
GWB wall w/ paper (middle wall)
ND N/A
11176-178
1st Floor, Barber Shop
Restroom
2’ x 2’ Beige/gray SACT w/ white paint w/ worm track and pinhole pattern
ND N/A
11176-179
1st Floor, Barber Shop
Restroom
White wall penetration sealant ND N/A
11176-180
1st Floor, Barber Shop
Restroom
2” Black/brown sink drain gasket (on single ceramic sink)
ND N/A
KEY: GWB = gypsum wall board, ID = inside diameter, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outer diameter, OSB= oriented strand board, SACT = suspended acoustic ceiling tile, SVF = sheet vinyl flooring, TSI = thermal system insulation, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with, Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2
Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.
TABLE 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY
Non-ACM red SVF w/ non-ACM black asphaltic paper backing on ACM black mastic on painted plywood & hardwood flooring on non-ACM brown paper vapor barrier w/ blue coating (on wood subfloor) [Sample # 91 and #92]
1ST Floor, Storage
Room
725 SF
9”x9” Dark brown/black VAT, 9”x9” green VAT, and 6”x24” edge VAT all w/ ACM black mastic on non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #94, 95, & 96]
2nd Floor, Carpenter
Shop
500 SF
ACM off-white/gray heat-shield paper w/ paint
(around penetration into chimney) [Sample #139, #148 and 150]
2nd Floor Toilet Room
2nd Floor Engineer
Storage Room, and
Attic
3 SF
TABLE 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY
Black asphaltic tar/sealant (around chimney at roof penetration) [Sample #151] Attic 8 SF
Small electrical disconnect w/ assumed ACM internal components
1st Floor, Shop
3 EA
Electrical panel with assumed ACM internal components
1st Floor, Shop and
Barber Shop
3 EA
Electrical meter w/ assumed ACM internal components 1st Floor, Shop 1 EA
1’x2’ Box and panels w/ assumed ACM electrical components Boiler Room 1 EA
2”-4” OD vent pipe penetration w/ assumed ACM penetration sealant around opening at roof
Roof, above toilet room
2 EA
3’ OD Vent fan w/ assumed ACM penetration sealant around opening at roof
Roof, East and West
Side
2 EA
2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof
Roof, North and
South Side
2 EA
4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof
Roof, East and West
Side
2 EA
KEY: ACM = asbestos containing material, EA = each, SF = square feet, SVF = sheet vinyl flooring, OD = outer diameter, VAT = vinyl asbestos tile, w/ = with
ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect
ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building
Inspector. Concealed suspect material may include, but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.
2.4.2 Lead-Containing Paint and Building Materials
One hundred thirty-two (132) samples were analyzed for lead using the X-Ray fluorescence
(XRF) analyzer. Red Bolded results indicate materials containing detectable levels of lead and “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation
40CFR745 and Washington State Commerce regulation WAC 365-230. Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
1 SHUTTER CALL N/A N/A BUILDING 786 N/A 4.01
2 CALIBRATION N/A RED BUILDING 786 N/A 0.9
3 CALIBRATION N/A RED BUILDING 786 N/A 0.9
4 CALIBRATION N/A RED BUILDING 786 N/A 0.9
WINDOW ON
FLOOR
WOOD BEIGE BUILDING 786 1ST FLOOR BOILER RM 0.11
6 SAFETY RAILING METAL BLACK BUILDING 786 1ST FLOOR BOILER RM 0.04
WOOD PANEL ON
STAIRS
METAL OFF WHITE BUILDING 786 1ST FLOOR BOILER RM < LOD
OLD WOOD
WALL
WOOD BEIGE BUILDING 786 1ST FLOOR BOILER RM 15.9
9 DOOR HANDLE METAL BEIGE BUILDING 786 1ST FLOOR BOILER RM 2.2
10 OLD WATER PIPE METAL BLACK BUILDING 786 1ST FLOOR BOILER RM 0.3
11 DOORFRAME WOOD
BLUE
GREEN
BUILDING 786 1ST FLOOR BOILER RM 6.8
12 WALL WOOD WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
0.13
13 WALL WOOD YELLOW BUILDING 786
1ST FLOOR SHOP
OFFICE
14 WALL WOOD RED BUILDING 786
1ST FLOOR SHOP
OFFICE
0.26
15 COLUMN WOOD WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
0.05
16 WINDOW WOOD GREEN BUILDING 786
1ST FLOOR SHOP
OFFICE
0.5
17 WALL WOOD WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
18 WALL WOOD WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
19 WINDOW TRIM WOOD WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
0.4
20 WINDOW SASH WOOD WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
0.29
21 DOORFRAME WOOD BEIGE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
22 DOOR METAL BEIGE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
23 BASEBOARD METAL BEIGE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
24 WINDOW TRIM WOOD BEIGE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
25 WINDOW SILL WOOD BEIGE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
26 WINDOW SASH WOOD BEIGE BUILDING 786
1ST FLOOR SHOP
OFFICE
0.06
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
27 WALL DRYWALL OFF WHITE BUILDING 786
1ST FLOOR SHOP
OFFICE
< LOD
28 WALL DRYWALL GREEN BUILDING 786 1ST FLOOR SHOP < LOD
29 WALL DRYWALL WHITE BUILDING 786 1ST FLOOR SHOP < LOD
30 WALL WOOD GRAY BUILDING 786 1ST FLOOR SHOP < LOD
31 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD
32 DOOR WOOD WHITE BUILDING 786 1ST FLOOR SHOP 2.6
33 DOOR WOOD GREEN BUILDING 786 1ST FLOOR SHOP < LOD
34 DOOR TRIM WOOD GREEN BUILDING 786 1ST FLOOR SHOP 0.04
35 DOOR TRIM WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.06
36 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.04
37 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.03
38 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD
39 WALL WOOD GREEN BUILDING 786 1ST FLOOR SHOP < LOD
40 WALL WOOD GREEN BUILDING 786 1ST FLOOR SHOP 0.06
41 WINDOW TRIM WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.03
42 WINDOW TRIM WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD
43 WINDOW WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD
44 WINDOW WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.03
45 WINDOW SILL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.09
46 WINDOW SILL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.06
47 WALL WOOD WHITE BUILDING 786
1ST FLOOR SHOP SINK
AREA
0.2
48 WALL WOOD GRAY BUILDING 786
1ST FLOOR SHOP SINK
AREA
0.2
49 TRIM WOOD GRAY BUILDING 786
1ST FLOOR SHOP SINK
AREA
0.1
50 TRIM WOOD WHITE BUILDING 786
1ST FLOOR SHOP SINK
AREA
0.11
51 SINK CERAMIC WHITE BUILDING 786
1ST FLOOR SHOP SINK
AREA
20.9
52 TOILET CERAMIC WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD
53 TOILET CERAMIC WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD
54 DOORFRAME WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM 4.4
55 WALL WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM 4.8
56 WALL WOOD GRAY BUILDING 786 1ST FLOOR RESTROOM 4.8
57 CABINET WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
58 CEILING WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD
59 FLOOR WOOD GRAY BUILDING 786 1ST FLOOR SHOP < LOD
60 FLOOR WOOD GRAY BUILDING 786 1ST FLOOR SHOP 0.06
61 FLOOR STRIPING WOOD YELLOW BUILDING 786 1ST FLOOR SHOP 2.2
ELECTRICAL
PANEL
METAL DARK GRAY BUILDING 786 1ST FLOOR SHOP < LOD
ELECTRICAL
PANEL
METAL
LIGHT
GRAY
BUILDING 786 1ST FLOOR SHOP < LOD
ELECTRICAL
PANEL
METAL WHITE BUILDING 786 1ST FLOOR SHOP < LOD
65 SECURITY PANEL METAL RED BUILDING 786 1ST FLOOR SHOP < LOD
ELECTRICAL
SWITCH
METAL WHITE BUILDING 786 1ST FLOOR SHOP < LOD
ELECTRICAL
SWITCH
METAL DARK GRAY BUILDING 786 1ST FLOOR SHOP < LOD
68 DOOR METAL GRAY BUILDING 786 1ST FLOOR SHOP < LOD
69 DOORFRAME WOOD LIGHT BLUE BUILDING 786 1ST FLOOR SHOP < LOD
70 FURNACE METAL
LIGHT
BROWN
BUILDING 786
1ST FLOOR CENTER
STORAGE
< LOD
71 DOOR TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD
72 DOOR WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 16.8
73 DOORFRAME WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 18.6
74 WINDOW TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 7.9
75 WINDOW SILL WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 7.1
76 WINDOW SASH WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 9.7
77 WINDOW SASH WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 0.23
78 WINDOW SILL WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 0.05
79 WINDOW TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD
80 WINDOW TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD
81 WALL DRYWALL BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD
82 WALL DRYWALL BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD
83 WALL DRYWALL OFF WHITE BUILDING 786 1ST FLOOR E STORAGE < LOD
84 COLUMN WOOD OFF WHITE BUILDING 786 1ST FLOOR E STORAGE 0.09
85 BEAM WOOD OFF WHITE BUILDING 786 1ST FLOOR E STORAGE < LOD
STAIRWELL
WALLS
WOOD OFF WHITE BUILDING 786 2ND FLOOR STAIRWELL 6.6
87 DOOR TRIM WOOD OFF WHITE BUILDING 786 2ND FLOOR STAIRWELL 4.8
88 DOOR FRAME WOOD OFF WHITE BUILDING 786 2ND FLOOR STAIRWELL 3.7
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
DOOR WINDOW
INFILL
METAL TAN BUILDING 786 2ND FLOOR STAIRWELL 2.4
90 STAIR TREAD WOOD BLACK BUILDING 786 2ND FLOOR STAIRWELL 0.11
91 WINDOW WOOD OFF WHITE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
4.7
92 WINDOW TRIM WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
1.2
93 WALL TRIM WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
1.4
94 WALL TRIM WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.8
95 WINDOW TRIM WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.9
LOWER WALL
PANEL
WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
1.1
LOWER WALL
PANEL
WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
LOWER WALL
PANEL
WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.7
99 TANK METAL SILVER BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.11
WALL_BACK SIDE
TO TOILET RM
WOOD WHITE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
2.5
101 WINDOW WOOD OFF WHITE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
102 COLUMN WOOD
CLEAR
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.08
103 COLUMN TRIM WOOD
GREENISH
STAIN
BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.8
CHIMNEY
ENCLOSURE
PLASTER BEIGE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
105 CEILING WOOD FIBER BEIGE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
2.4
106 WALL WOOD BEIGE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
2.1
107 WALL WOOD GRAY BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
STAIRWELL
ENCLOSURE
WOOD WHITE BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
< LOD
109 WALL WOOD CLEAR BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.06
110 WALL WOOD CLEAR BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.05
111 WALL WOOD CLEAR BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.05
112 WALL WOOD CLEAR BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.06
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
113 COLUMN WOOD CLEAR BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.09
114 WINDOW WOOD OFF WHITE BUILDING 786
2ND FLOOR
CARPENTER SHOP
2.5
115 WINDOW TRIM WOOD GREENISH BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.6
LOWER WALL
PANEL
WOOD GREENISH BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.8
117 WALL TRIM WOOD GREENISH BUILDING 786
2ND FLOOR
CARPENTER SHOP
1.5
118 COLUMN TRIM WOOD GREENISH BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.8
119 COLUMN WOOD CLEAR BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.1
120 BEAM WOOD CLEAR BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.05
121 CEILING WOOD FIBER BEIGE BUILDING 786
2ND FLOOR
CARPENTER SHOP
4.3
122 CEILING TRIM WOOD BEIGE BUILDING 786
2ND FLOOR
CARPENTER SHOP
4.7
123 WALL STUD WOOD WHITE BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.06
124 OLD DR FRAME WOOD OFF WHITE BUILDING 786
2ND FLOOR
CARPENTER SHOP
9.3
125 CEILING VENT METAL BLACK BUILDING 786
2ND FLOOR
CARPENTER SHOP
0.17
126 WALL WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 16.3
127 WALL WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 13.6
128 WALL WOOD GRAY BUILDING 786 2ND FLOOR TOILET RM 15.7
129 CEILING WOOD GRAY BUILDING 786 2ND FLOOR TOILET RM 16.4
130 WINDOW TRIM WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 13.8
131 WINDOW WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 10.5
132 CABINET WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 13.4
133 CHIMNEY BRICK OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 17.1
134 SINK CERAMIC WHITE BUILDING 786 2ND FLOOR TOILET RM 36.1
LOOSE DOORS
STACKED
WOOD MISC BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
0.17
LOOSE DOORS
STACKED
WOOD GREEN BUILDING 786
2ND FLOOR ENGINEER
STOREROOM
28.4
137 CALIBRATION N/A RED BUILDING 786 N/A 1.0
138 CALIBRATION N/A RED BUILDING 786 N/A 1.0
138 CALIBRATION N/A RED BUILDING 786 N/A 1.0
Key: N/A = not applicable, <LOD = less than limit of detection
All XRF sample shots are representative of that color on that specific substrate and component.
The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.
In addition to the XRF samples, EHSI collected two (2) bulk QA samples for laboratory analysis. Building materials and paint containing detectable levels of lead are considered regulated by DOSH.
Table 4 summarizes bulk QA lead samples, including sample number, material description, substrate, color, location, and analytical results. Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.
TABLE 4
SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
SAMPLE
NUMBER
LOCATION
COMPONENT/
SUBSTRATE
COLOR
RESULTS
% Pb by
WT
11176-Pb03 1st Floor, Shop Column/Chimney
/Brick & Mortar Red & Gray <0.0031
11176-Pb04 1sr Floor, Boiler Room Main Chimney Red & Gray <0.0030
11176-Pb08 1st Floor, Barber Shop Wall/GWB Yellow on
Blue on White <0.0052
Key: Pb = lead
DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.
Since the type of work planned (e.g., sawing, grinding, demolition) may disturb the lead-containing materials, the contractor will need to conduct lead awareness training and an initial exposure assessment in accordance with the regulations.
EHSI also identified three (3) lead-acid batteries inside alarm and fire alarm panels on the 1st floor. If lead-acid batteries are impacted by the proposed renovation, they must be recycled by a licensed facility.
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
At the request of NPS, EHSI accomplished TCLP sampling and analysis of the assumed waste stream for the project and Table 5 summarizes the analytical results. EHSI collected and composited a representative sample of the assumed waste stream for renovation activities that may impact interior building finishes, that included proportionate quantities of all materials expected to be included in the waste stream. Note: Painted metals were not included in the assumed waste stream sampling, because they are expected to be recycled and because there is no limit on metals containing paint on metals being recycled.
Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., hazardous metals-containing paint/hazardous metals-containing materials). Ecology has set a dangerous waste threshold at 5.0 milligrams (mg/L), per liter for arsenic, chromium, lead, and silver, 1.0 Mg/L for cadmium, 100 mg/L for barium and .2 mg/L for mercury.
The TCLP sample for the Project assumed waste stream was analyzed for the USEPA RCRA 8 metals: Lead (Pb), Cadmium (Cd), Chromium (Cr), Silver (Ag), Arsenic (AS), Barium (Ba), Mercury (hg), Selenium (Se), Copper (Cu), Nickel (Ni) and Zinc (Zn).
TABLE 5
SUMMARY OF TCLP SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
Sample # Elements RL in mg/L Results in mg/L Results in ppm
11176-
TCLP-
B786-01
Sample Description:
• 26% Painted plywood floors;
• 26% painted GWB walls and ceiling;
• 10% unpainted GWB walls;
• 6% painted 2’x4’ SACT;
• 6% painted wood walls and ceiling;
• 5% painted bumpy texturing on GWB walls;
• 5% 12”x12” VCT w/ mastic;
• 5% red SVF w/ backing;
• 4% 3’x4’ fiberboard floor panels;
• 3% VAT w/ black vapor barrier;
• 2% carpet; and
• 1% black SVF w/ vapor barrier
Silver (Ag) 0.20 <0.20 <0.20
Arsenic (As) 0.20 <0.20 <0.20
Barium (Ba) 0.20 2.10 0.37
Cadmium (Cd) 0.20 <0.20 <0.20
Chromium (Cr) 0.20 <0.20 <0.20
Mercury (Hg) 0.01 <0.01 <0.011
Lead (Pb) 0.20 <0.20 2.7
Selenium (Se) 0.20 <0.20 <0.20 KEY: Ag = silver, As = Arsenic, Ba = Barium, Cd = Cadmium, Cr = Chromium, GWB = gypsum wall board, Hg = Mercury, mg/L = milligram per liter,, Pb = Lead, ppm = part per million, RL = Reporting Limit, SACT = suspended acoustic ceiling tile, Se = Selenium, SVF = sheet vinyl flooring, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with
It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.
2.4.4 Polychlorinated Biphenyls
Ballasts
EHSI inspected all fluorescent fixtures for PCB-containing ballasts. 84% of fixtures inspected were found to contain magnetic ballasts and must be assumed to contain PCB containing dielectric fluid and may be disposed/recycled as Ecology Dangerous Waste. Electronic ballasts, which contain no dielectric fluid, may be disposed as construction debris. A Summary of PCB-containing ballasts and Hg-containing light tubes, CFL bulbs, and HID lamps is provided in
Table 6.
2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats
All fluorescent light tubes and CFL bulbs quantified in Table 6 contain Hg. Hg wastes are regulated as “universal wastes” under Ecology’s regulation WAC 173-303. Hg-containing building materials must be recycled or disposed of as hazardous waste. One (1) Hg-containing switches or thermostats were identified in the structure.
TABLE 6
SUMMARY OF LIGHT FIXTURE INSPECTION RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 786
LIGHT TYPE FIXTURES
TUBES/
BULBS
MAGNETIC
BALLASTS
6” x 4’ Mounted light fixture w/ 2 bulbs and
1 electronic ballast 4 8 0
1’x4’ Mounted light fixture w/ 2 bulbs and 1 magnetic ballast 15 30 15
1’x4’ Mounted light fixture w/ 2 bulbs and 1 electronic ballast 1 2 0
2’x4’ Recessed light fixture w/ 3 bulbs and 1 electronic ballast 6 18 0
2’x4’ Recessed light fixture w/ 4 bulbs and 2 magnetic ballasts 10 40 10
6”x8’ Mounted light fixture w/ 1 8’ bulb and
1 large magnetic ballast 6 6 6
1’x8’ Mounted light fixture w/ 2 8’ bulbs and
1 large…
This is the start of the file's text. The full file is on GovTribe.