Attachment 3j - B786 Limited Hazardous Materials Survey Report.pdf

PDF 7 MB Posted

Attached to
Abate hazardous materials, historic buildings, WA
Solicitation number
140P8320R0008
Issued by

About this file

This request for proposals solicits abatement of hazardous materials including asbestos, lead, mercury, polychlorinated biphenyls, and wildlife excrement in several historic buildings at Fort Vancouver National Historic Site in Vancouver, Washington. The National Park Service seeks a contractor to perform hazardous material abatement, selective demolition, and minor repairs to the buildings. The single award contract will be firm-fixed-price with performance and payment bonds required. The estimated value is between $250,000 and $1,000,000 depending on optional items. The North American Industry Classification System code is 562910 for remediation services and the small business size standard is $22 million average annual gross receipts. The period of performance is 180 days from award. Site visits will be held and proposals are due on the date specified in the solicitation published on SAM.gov where any amendments will also be posted.

View the file

Other files

File Type Posted
Attachment 10 Final Clarifications_0003.pdf PDF
Sol_140P8320R0008_Amd_0003.pdf PDF
Sol_140P8320R0008_Amd_0002.pdf PDF
Sol_140P8320R0008_Amd_0001.pdf PDF
forms to return with proposal - revised 140P8320R0008_0001.docx DOCX document
Attachment 9 Site visit notes_0001.pdf PDF
Attachment 7a Revised Wage Determination_0001.pdf PDF
Attachment 3e - B748 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3a - B410 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 6 Building Floor Plans_20200723.pdf PDF
Attachment 4c - B991 and B993 Asbestos Survey Field Notes.pdf PDF
Attachment 3g - B752 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3f - B749 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4b - B993 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 3c - B725 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3i - B754 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3h - B753 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3d - B746 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3b - B721 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4a - B991 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 5 Building Descriptions.pdf PDF
forms to return with proposal 140P8320R0008.docx DOCX document
Attachment 1 Statement of Work.pdf PDF
Sol_140P8320R0008.pdf PDF
Attachment 2 Task List for each building.pdf PDF
FAQs for RFP 140P8320R0008.pdf PDF
Attachment 7 Wage Determination 7-3-20.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134

Phone 206-381-1128

Toll Free 800-666-2959

Fax 206-254-4279

• Environmental Consulting

• Hazardous Materials Management

• Industrial Hygiene Services

• Construction Management

• Indoor Air Quality

LIMITED HAZARDOUS MATERIALS SURVEY REPORT

NATIONAL PARK SERVICE

FORT VANCOUVER NATIONAL HISTORIC SITE

BUILDING 786

East Vancouver Barracks, Building 786

Vancouver, Washington 98661

December 24th, 2018

Prepared For:

Kristen Jontos National Park Service 612 East Reserve Street Vancouver, WA 98661 ii

Limited Hazardous Materials Survey Report

National Park Service

Fort Vancouver Historic Site

Building 786

East Vancouver Barracks, Building 786, Vancouver, Washington 98661

EHSI Project No.: # 11176

The material and data in this report were prepared under the supervision and direction of the undersigned.

Rory Peterson Lead AHERA Building Inspector

Derica Escamilla

Principal of Hazardous Materials Services iii

TABLE OF CONTENTS

Acronym List .............................................................................................. iv

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

1.2 EXTENT OF CURRENT SURVEY

1.3 ACM MATERIALS FOUND

1.4 OPINIONS AND RECOMMENDATIONS

1.5 LIMITATIONS/DISCLAIMER

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

2.2 BUILDING DESCRIPTION

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

2.3.2 Lead-Containing Paint/Lead-Containing Materials

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

2.4.2 Lead-Containing Paint and Building Materials

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

2.4.4 Polychlorinated Biphenyls

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs and thermostats

3.0 LIMITATIONS

4.0 STANDARD OF CARE

5.0 CERTIFIED AHERA BUILDING INSPECTORS

APPENDICES

A ........................ Asbestos Laboratory Reports and Field Data Forms B ........................ Lead Laboratory Reports and Field Data Forms

C ........................ Certified AHERA Building Inspector Certificates D ........................ Laboratory Certifications for Asbestos and Lead Analysis

E ......................... Sample Location Drawings for Asbestos and Lead F ......................... Hazardous Metals TCLP Laboratory Reports and Field Data Forms iv

ACRONYM LIST

ACM .......................Asbestos-Containing Material

Ag ..........................Silver

AHERA ....................Asbestos Hazard Emergency Response Act

AHU .......................Air Handling unit

AIHA ......................American Industrial Hygiene Association

As ..........................Arsenic

Ba ..........................Barium

Cd ..........................Cadmium

CFL ........................Compact Fluorescent Light

CFR ........................Code of Federal Regulations

Cr ..........................Chromium

DOSH .....................Washington State Department of Labor and Industries, Division of

Occupational Safety and Health

EA ..........................Each

Ecology ...................Washington State Department of Ecology

EHSI .......................EHS-International, Inc.

ELLAP .....................Environmental Lead Laboratory Accreditation Program

GWB .......................Gypsum Wall Board

Hg ..........................Mercury

JC ..........................Joint Compound

LCM ........................Lead-Containing Material

LCP ........................Lead-Containing Paint

LF ..........................Linear Feet

L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter

N/A ........................Not Applicable

ND .........................None Detected

NVL ........................NVL Laboratories, Inc.

NVLAP ....................National Voluntary Laboratory Accreditation Program

OD .........................Outside Diameter

OSHA .....................US Occupational Safety and Health Administration

Pb ..........................Lead

PCBs .......................Polychlorinated Biphenyls

PLM ........................Polarized Light Microscopy ppm .......................Parts per Million

QA .........................Quality Assurance

RCW .......................Revised Code of Washington

SAT ........................Seattle Asbestos Test, LLC

Se ..........................Selenium

SF ..........................Square Feet

SVF ........................Sheet Vinyl Flooring

SWCAA ...................Southwest Clean Air Agency

TCLP .......................Toxicity Characteristic Leaching Procedure

VAT ........................Vinyl Asbestos Tile

VCT ........................Vinyl Composite Tile

WAC .......................Washington Administrative Code

wt. .........................Weight w/ ..........................With

XRF ........................x-ray fluorescence

Fort Vancouver National Historic Site – B786

EHSI Project 11035

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

The National Park Service (NPS) plans to renovate Building 786 (B786) at the Fort Vancouver

National Historic Site (FV NHS) located at East Vancouver Barracks, Vancouver, Washington.

The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of B786 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.

1.2 EXTENT OF CURRENT SURVEY

EHSI inspected accessible interior and exterior suspect ACM potentially impacted by future projects. Accessible suspect materials were sampled including, but not limited to: interior and exterior wall systems, window systems, and mechanical systems. The LCP and LCM survey was limited to the interior of the building only. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment and roof vents at peak of roof) suspect materials were assumed to be ACM.

1.3 ACM MATERIALS FOUND

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

ASBESTOS MATERIAL DESCRIPTION LOCATION

Non-ACM Red SVF w/ non-ACM black asphaltic paper backing on ACM black mastic on painted plywood & hardwood flooring on non-ACM brown paper vapor barrier w/ blue coating (on wood subfloor) [Sample

# 91 and #92]

1ST Floor, Storage Room

ACM 9”x9” Dark brown/black VAT on ACM black mastic on Non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #94]

2nd Floor, Carpenter Shop

ACM 9”x9” Dark green VAT on ACM black mastic on

Non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #95]

2nd Floor, Carpenter Shop

ACM 6”x24” Dark green VAT on ACM black mastic on

Non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #96]

2nd Floor, Carpenter Shop

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

ASBESTOS MATERIAL DESCRIPTION LOCATION

ACM off-white/gray heat-shield paper w/ paint (around penetration into chimney) [Sample #139, #148 and 150]

2nd Floor Toilet Room 2nd

Floor Engineer Storage Room, and Attic

Black asphaltic tar/sealant (around chimney at roof penetration) [Sample #151] Attic

Small electrical disconnect w/ assumed ACM internal components

1st Floor, Shop

Electrical panel with assumed ACM internal components 1st Floor, Shop and Barber

Shop

Electrical meter w/ assumed ACM internal components 1st Floor, Shop

1’x2’ Box and panels w/ assumed ACM electrical components Boiler Room

2”-4” OD vent pipe penetration w/ assumed ACM penetration sealant around opening at roof Roof, above toilet room

3’ OD Vent fan w/ assumed ACM penetration sealant around opening at roof Roof, East and West Side

2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, North and South Side

4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, East and West Side

KEY: ACM = asbestos containing material, SVF = sheet vinyl flooring, OD = outer diameter, VAT = vinyl asbestos tile, w/ = with

1.4 OPINIONS AND RECOMMENDATIONS

EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to renovation and demolition activities.

Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.

Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will disturb the LCP, the contractor will need to perform an initial exposure assessment in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).

All of the fluorescent light fixture ballasts were inspected. 84% of the fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology) Dangerous Waste. All fluorescent tubes and lamps contain mercury; any fluorescent lamps/tubes to be disturbed during the project must be recycled as (Ecology) Universal Waste.

1.5 LIMITATIONS/DISCLAIMER

This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical equipment and roof vents at peak of roof were not sampled but were assumed to be present based on the inspector’s experience with similar systems on other projects and are assumed to be ACMs.

Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint. This report and accompanying appendices include the supporting information for this executive summary.

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: identification of all suspect materials; a determination of whether suspect materials were: ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.

From September 12th to 13th, 2018, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington

Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest

Clean Air Agency (SWCAA).

2.2 BUILDING DESCRIPTION

Building 786 is located at East Vancouver Barracks, Vancouver, Washington. The building is a two-story, wood-framed structure with an attic. The building sits on a brick and masonry pier foundation. The building’s roof is covered with 3-tab composite shingles. The exterior walls are covered with wood siding. Interior floor finishes include: original tongue and groove hard wood flooring, vinyl composite tile (VCT), vinyl asbestos tile (VAT), carpet, fibrous wood panels, and sheet vinyl flooring (SVF). Interior wall finishes include: original tongue & groove wood walls, painted plywood, plaster, and gypsum wallboard (GWB). Interior ceiling finishes include: wood panels, fibrous wood panels, GWB, and suspended acoustic ceiling tile (SACT).

Windows throughout the building are operable and wood-framed. Heating is provided by a local electric forced air furnace. There is also evidence that the building was originally heated by a coal fired system and wood fired stoves. Hot water is provided by electric hot water tanks. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of

Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix

C. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October

1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.

EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and

Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary

Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.

Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.

Copies of both laboratories’ NVLAP certifications are included in Appendix D.

2.3.2 Lead-Containing Paint/Lead-Containing Materials

EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.

Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic

Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene

Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).

Copies of laboratory reports and field data forms for lead are in Appendix B.

All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

Ninety-two (92) bulk samples of suspect ACM were collected as part of the survey. Five (5) of those samples were split for quality assurance analyses. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix E. Asbestos sampling information including: sample number, material description, sample location, and analytical results are summarized in Table 1. The

ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-89 1st Floor, Shop Office

Layer 1: Blue carpet

Layer 2: Beige mastic

Layer 3: White mesh backing

Layer 4: Purple/multi-color carpet pad)

ND

(All Layers)

N/A

(All Layers)

11176-90

1st Floor, Area Under

Stairs

Brown paper vapor barrier w/ blue coating (under hardwood floor on wood subfloor)

ND N/A

11176-91

1st Floor, E.

Storage

Room

Layer 1: Red SVF

Layer 2: Black asphaltic paper backing

Layer 3: Black mastic

Layer 4: Painted Plywood & hardwood flooring

Layer 5: Brown paper vapor barrier w/ blue coating (on wood subfloor)

L1: ND

L2: ND

L3: 2%

L4: ND

L5: ND

N/A

Chrysotile

11176-92

1st Floor, E.

Storage

Room

Layer 1: Red SVF

Layer 2: Black asphaltic paper backing

Layer 3: Black mastic

Layer 4: Painted Plywood & hardwood flooring

Layer 5: Brown paper vapor barrier w/ blue coating (on wood subfloor)

L1: ND

L3: 2%

L5: ND

11176-93QA

1st Floor, Stairs to 2nd

Floor

Black asphaltic mastic (on wood stairs)

ND N/A

11176-94

2nd Floor, Carpenter

Shop

Office

Layer 1: 9”x9” Dark brown/black VAT

Layer 2: Black mastic

Layer 3: Black asphaltic vapor barrier

Layer 4: Trace brown mastic

(on wood)

L1: 3%

L2: 2%

L3: ND

11176-95

2nd Floor, Carpenter

Shop

Office

Layer 1: 9”x9” Dark green

VAT

Layer 2: Black mastic

Layer 3: Black asphaltic vapor barrier

Layer 4: Trace brown mastic

(on wood)

L1: 3%

L2: 3%

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-

96QAX

2nd Floor, Carpenter

Shop

Office

Layer 1: 6”x24” Black VAT

Layer 2: Black mastic

Layer 3: Black asphaltic vapor barrier

Layer 4: Brown mastic (on wood)

L1: 4%

L2: 3%

11176-97

Carpenter

Shop

Layer 1: 3’x4’ Fiberboard floor panel

Layer 2: Black mastic (on hardwood floor)

ND

(All Layers)

N/A

(All Layers)

11176-98

2nd Floor, Engineer

Storage

Room

Layer 1: 3’x4’ Fiberboard floor panel

Layer 2: Black mastic (on hardwood floor)

ND

(All Layers)

N/A

(All Layers)

11176-99 2nd Floor, Toilet Room

Layer 1: Black SVF/vapor barrier

Layer 2: Black mastic (on hard wood flooring)

ND

(All Layers)

N/A

(All Layers)

11176-100 2nd Floor, Toilet Room

Layer 1: Black SVF/vapor barrier

Layer 2: Black mastic

Layer 3: Hard wood flooring

ND

(All Layers)

N/A

(All Layers)

11176-

101QA

2nd Floor, Toilet Room

Shower

Layer 1: Black asphaltic vapor barrier

Layer 2: Black asphaltic vapor barrier (under metal shower floor)

ND

(All Layers)

N/A

(All Layers)

11176-102 1st Floor, Shop Office

Layer 1: Bumpy white texturing w/ paint on JC w/ paper

Layer 2: GWB wall w/ paper

(corner wall)

ND

(All Layers)

N/A

(All Layers)

11176-103 1st Floor, Shop Office

Layer 1: Bumpy white texturing w/ paint

Layer 2: GWB wall w/ paper

(middle wall)

ND

(All Layers)

N/A

(All Layers)

11176-104 1st Floor, Shop Office

Layer 1: Bumpy white texturing w/ paint

Layer 2: GWB wall w/ paper

(middle wall)

ND

(All Layers)

N/A

(All Layers)

11176-105 1st Floor, Shop

Layer 1: JC patch on older JC w/ paint

Layer 2: GWB wall w/ paper (at seam)

ND

(All Layers)

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-106 1st Floor, Shop

Layer 1: JC w/ paper

Layer 2: GWB wall w/ paper (at seam, unpainted w/ no skim coat)

ND

(All Layers)

N/A

(All Layers)

11176-107

1st Floor, Furnace

Room

GWB wall w/ paper (middle wall, on unfinished GWB panels w/ no JC)

ND N/A

11176-108

1st Floor, E.

Storage

Room

Layer 1: Trace JC w/ paint

Layer 2: GWB wall w/ paper

(corner wall)

ND

(All Layers)

N/A

(All Layers)

11176-109

1st Floor, E.

Storage

Room

GWB wall w/ paint and paper

(middle wall)

ND N/A

11176-110

1st Floor, E.

Storage

Room

GWB wall w/ paint and paper

(middle wall)

ND N/A

11176-111

1st Floor, E.

Storage

Room

Layer 1: JC

Layer 2: GWB wall w/ paper (at seam)

ND

(All Layers)

N/A

(All Layers)

11176-112

1st Floor, E.

Storage

Room

GWB wall w/ paper (middle wall)

ND N/A

11176-113 1st Floor, Shop

Layer 1: Red brick

Layer 2: Gray mortar

(column/small chimney)

ND

(All Layers)

N/A

(All Layers)

11176-114

2nd Floor, Engineer

Storage

Room

Layer 1: White skim coat w/ paint

Layer 2: Gray plaster wall (on small chimney)

ND

(All Layers)

N/A

(All Layers)

11176-115

2nd Floor, Engineer

Storage

Room

Layer 1: White skim coat w/ paint

Layer 2: Gray plaster wall (on small chimney)

ND

(All Layers)

N/A

(All Layers)

11176-116

2nd Floor, Engineer

Storage

Room

Layer 1: White skim coat w/ paint

Layer 2: Gray plaster wall (on small chimney)

ND

(All Layers)

N/A

(All Layers)

11176-117 1st Floor, Boiler Room

Layer 1: Red brick

Layer 2: Gray mortar (main boiler chimney)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-118 1st Floor, Shop

Layer 1: Black asphaltic tar

Layer 2: Black asphaltic 3-tab roofing w/ sand

Layer 3: Black asphaltic tar

Layer 4: Clear plastic vapor barrier (in piles on floor)

ND

(All Layers)

N/A

(All Layers)

11176-119 1st Floor, Shop

Layer 1: Black asphaltic tar

Layer 2: Black asphaltic 3-tab roofing w/ sand (small variety)

Layer 3: Black asphaltic tar

Layer 4: Clear plastic vapor barrier (in piles on floor)

ND

(All Layers)

N/A

(All Layers)

11176-120 1st Floor, Shop

Black asphaltic vapor barrier

(in a roll on floor)

ND N/A

11176-121

2nd Floor, Engineer

Storage

Room

Black asphaltic rolled-down roofing w/ sand (in a roll-on floor)

ND N/A

11176-122

2nd Floor, Engineer

Storage

Room

Black asphaltic vapor barrier

(in a roll on floor)

ND N/A

11176-123

2nd Floor, Engineer

Storage

Room

2’x4’ Light brown/gray fibrous

SACT w/ paint w/ worm track and pin hole pattern (stacked on floor)

ND N/A

11176-124

2nd Floor, Engineer

Storage

Room

2’x4’ Beige/gray fibrous SACT w/ paint w/ worm track and pin hole pattern (stacked on floor)

ND N/A

11176-125

1st Floor, Furnace

Room

Layer 1: Clear plastic

Layer 2: Beige cloth tape (on 2’

OD circular duct)

ND

(All Layers)

N/A

(All Layers)

11176-126

1st Floor, Furnace

Room

Brown pipe dope (on natural gas line connecting to furnace)

ND N/A

11176-127

1st Floor, Furnace

Room

Brown/black fibrous insulation

(inside furnace)

ND N/A

11176-128

1st Floor, Furnace

Room

Layer 1: Trace white material

Layer 2: Brown material (inside furnace)

ND

(All Layers)

N/A

(All Layers)

11176-129 1st Floor, Shop

Red sink drain gasket w/ paint

(on large ceramic sink)

ND N/A

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-130

2nd Floor, Engineer

Storage

Room

Layer 1: Older black asphaltic

3-tab roofing w/ red roofing granules

Layer 2: Black asphaltic tar

Layer 3: Trace brown fibrous material (in stack on floor)

ND

(All Layers)

N/A

(All Layers)

11176-131

2nd Floor, Engineer

Storage

Room

Layer 1: Brown/tan paper vapor barrier w/ mastic and woven fibrous interior

Layer 2: Silver foil

Layer 3: Yellow fiberglass TSI runs (in boxes)

ND

(All Layers)

N/A

(All Layers)

11176-132

1st Floor, Shop Office

Storage

4” Brown cove base (in roll) ND N/A

11176-133 1st Floor, Shop

12”x12” Brown VCT (w/ tan and brown streaks) (in box)

ND N/A

11176-

134QA

1st Floor, Shop

Layer 1: Clear glass

Layer 2: Beige/off-white window glazing putty w/ paint

(in 3’5”x6” wood-framed windows)

ND

(All Layers)

N/A

(All Layers)

11176-135

1st Floor, Shop

Layer 1: Black asphaltic coating on black fibrous wire wrap

Layer 2: Wire

ND

(All Layers)

N/A

(All Layers)

11176-136

1st Floor, Shop

Layer 1: Black asphaltic coating on black fibrous wire wrap

Layer 2: Wire

ND

(All Layers)

N/A

(All Layers)

11176-137 1st Floor, Shop

Black/red nail gaskets (on knob and tube wiring system)

ND N/A

11176-138

1st Floor, Furnace

Room

4” Off-white cove base (in roll) ND N/A

11176-139

2nd Floor, Toilet

Room

Off-white/gray heat-shield paper w/ paint (around penetration into chimney)

68% Chrysotile

11176-140

2nd Floor, Carpenter

Shop Office

Layer 1: Beige window glazing putty w/ paint (on 3’x4’7” wood framed windows)

Layer 2: Wood

ND

(All Layers)

N/A

(All Layers)

11176-141 2nd Floor, Toilet Room

Layer 1: Tan window glazing putty w/ paint (on 3’x4’7” wood framed windows)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

Layer 2: Trace brown mastic

(on 3’x4’7” wood framed windows)

11176-142 2nd Floor, Toilet Room

Layer 1: White window glazing putty patching compound w/ paint (on 3’x4’7” wood-framed windows)

Layer 2: Wood

ND

(All Layers)

N/A

(All Layers)

11176-143

1st Floor, E.

Storage

Room

Layer 1: JC w/ paint

Layer 2: GWB ceiling w/ paper

(ceiling edge)

ND

(All Layers)

N/A

(All Layers)

11176-144

1st Floor, E.

Storage

Room

GWB ceiling w/ paint and paper

(middle ceiling)

ND N/A

11176-145

1st Floor, E.

Storage

Room

Layer 1: Wood debris

Layer 2: Black mastic (on countertop)

ND

(All Layers)

N/A

(All Layers)

11176-146 1st Floor, Shop Office

2’x4’ Beige/gray SACT w/ paint w/ worm track and pin hole pattern

ND N/A

11176-147

2nd Floor, Engineer

Storage

Room

Layer 1: White chimney sealant

Layer 2: Trace gray brick mortar

ND

(All Layers)

N/A

(All Layers)

11176-

148QAX

2nd Floor, Engineer

Storage

Room

Off-white fibrous heat-shield paper (6” OD, 12”

OD)

73% Chrysotile

11176-149

2nd Floor, Carpenter

Shop

Layer 1: Gray chimney flue penetration sealant

Layer 2: Gray brick mortar

ND

(All Layers)

N/A

(All Layers)

11176-150 2nd Floor, Attic

Layer 1: Off-white fibrous heat-shield paper

Layer 2: Trace gray brick mortar (between chimney and wood framing)

L1: 56%

11176-151

Attic

Black asphaltic tar/sealant

(around chimney at roof penetration)

3% Chrysotile

11176-152 2nd Floor, Attic

Black asphaltic vapor barrier

(under roofing on wood decking)

ND N/A

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-153 2nd Floor, Attic

Black asphaltic vapor barrier

(under roofing on wood decking)

ND N/A

11176-154 2nd Floor, Attic

Tan/brown pipe dope (on vent pipe fittings)

ND N/A

11176-155 Exterior, N.

Side

Layer 1: White door frame/trim caulking w/ paint

Layer 2: Gray door frame caulking (on all doors)

ND

(All Layers)

N/A

(All Layers)

11176-156 Exterior, N.

Side

White window frame/trim caulking w/ paint (on all windows)

ND N/A

11176-157 Exterior, S.

Side

6” Black natural gas regulator gasket w/ gray paint

ND N/A

11176-158 Exterior, W.

Side

Beige window glazing putty w/ paint (on 3’5”x6’ wood-framed windows)

ND N/A

11176-159 Exterior, S.

Side

Beige window glazing putty w/ paint (on 3’5”x6’ wood-framed windows)

ND N/A

11176-160 Exterior, S.

Side

White siding seam caulking w/ paint (throughout)

ND N/A

11176-161 Exterior, S.

Side

Layer 1: White door infill caulking

Layer 2: White foam

Layer 3: Trace wood debris

ND

(All Layers)

N/A

(All Layers)

11176-162

Exterior, S.

Side (Under

Building)

Layer 1: Brown paper vapor barrier/wrap w/ black mastic between paper layers

Layer 2: Yellow fiberglass TSI

(on 1” OD water line)

ND

(All Layers)

N/A

(All Layers)

11176-163

Exterior, S.

Side (Under

Building)

Layer 1: Brown paper vapor barrier/wrap w/ black mastic between paper layers

Layer 2: Yellow fiberglass TSI

(on 1” OD water line)

ND

(All Layers)

N/A

(All Layers)

11176-164

Exterior, S.

Side (Under

Building)

Thick black asphaltic wrap (on insulation on 1” OD water line)

ND N/A

11176-

165QA

Exterior, S.

Side

Layer 1: Brown paper vapor barrier

Layer 2: Black asphaltic tar/mastic (behind wood siding on wood)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-166 Exterior, S.

Side

Layer 1: White pipe dope

Layer 2: Trace gray pipe dope

(on natural gas line fittings)

ND

(All Layers)

N/A

(All Layers)

11176-167

2nd Floor, Engineer

Storeroom

Beige window glazing putty (on

2’ x 2’ window in off white/beige painted door)

ND N/A

11176-168

2nd Floor, Engineer

Storeroom

Beige window glazing putty w/ paint (on 3’ x 3’ wood-framed windows, loose on floor)

ND N/A

11176-169

2nd Floor, Engineer

Storeroom

Gray window glazing putty patch w/ paint (on 3’ x 3’ wood-framed windows, loose on floor)

ND N/A

11176-170

2nd Floor, Engineer

Storeroom

Beige window glazing putty w/ paint (on 3’5” x 3’ wood-framed windows, loose on floor)

ND N/A

11176-171 1st Floor, Barber Shop

Layer 1: 12” x 12” Tan VCT (w/ brown and beige streaks)

Layer 2: Orange/yellow mastic

(on OSB)

ND

(All Layers)

N/A

(All Layers)

11176-172 1st Floor, Barber Shop

Layer 1: 12” x 12” Tan VCT (w/ brown and beige streaks)

Layer 2: Orange/yellow mastic

(on OSB)

ND

(All Layers)

N/A

(All Layers)

11176-173

1st Floor, Barber Shop

Restroom

Layer 1: 12” x 12” Beige VCT

(w/ tan and beige streaks)

Layer 2: Yellow mastic

Layer 3: Trace white edge caulking

Layer 4: Trace wood debris

ND

(All Layers)

N/A

(All Layers)

11176-174

1st Floor, Barber Shop

Restroom

Layer 1: 4” Dark brown cove base

Layer 2: Beige mastic

Layer 3: GWB wall w/ paint and paper

ND

(All Layers)

N/A

(All Layers)

11176-175

1st Floor, Barber Shop

Restroom

Layer 1: 4” Beige cove base

Layer 2: White mastic

Lauer 3: White caulking

Layer 4: White mastic

Layer 5: Brown GWB paper

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER NHS – BUILDING 786

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-176

1st Floor, Barber Shop

Restroom

Layer 1: White caulking

Layer 2: JC

Layer 3: GWB wall w/ paper

(corner wall)

ND

(All Layers)

N/A

(All Layers)

11176-177

1st Floor, Barber Shop

Restroom

GWB wall w/ paper (middle wall)

ND N/A

11176-178

1st Floor, Barber Shop

Restroom

2’ x 2’ Beige/gray SACT w/ white paint w/ worm track and pinhole pattern

ND N/A

11176-179

1st Floor, Barber Shop

Restroom

White wall penetration sealant ND N/A

11176-180

1st Floor, Barber Shop

Restroom

2” Black/brown sink drain gasket (on single ceramic sink)

ND N/A

KEY: GWB = gypsum wall board, ID = inside diameter, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outer diameter, OSB= oriented strand board, SACT = suspended acoustic ceiling tile, SVF = sheet vinyl flooring, TSI = thermal system insulation, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with, Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2

Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

Non-ACM red SVF w/ non-ACM black asphaltic paper backing on ACM black mastic on painted plywood & hardwood flooring on non-ACM brown paper vapor barrier w/ blue coating (on wood subfloor) [Sample # 91 and #92]

1ST Floor, Storage

Room

725 SF

9”x9” Dark brown/black VAT, 9”x9” green VAT, and 6”x24” edge VAT all w/ ACM black mastic on non-ACM asphaltic vapor barrier on non-ACM brown mastic (on wood) [Sample #94, 95, & 96]

2nd Floor, Carpenter

Shop

500 SF

ACM off-white/gray heat-shield paper w/ paint

(around penetration into chimney) [Sample #139, #148 and 150]

2nd Floor Toilet Room

2nd Floor Engineer

Storage Room, and

Attic

3 SF

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

Black asphaltic tar/sealant (around chimney at roof penetration) [Sample #151] Attic 8 SF

Small electrical disconnect w/ assumed ACM internal components

1st Floor, Shop

3 EA

Electrical panel with assumed ACM internal components

1st Floor, Shop and

Barber Shop

3 EA

Electrical meter w/ assumed ACM internal components 1st Floor, Shop 1 EA

1’x2’ Box and panels w/ assumed ACM electrical components Boiler Room 1 EA

2”-4” OD vent pipe penetration w/ assumed ACM penetration sealant around opening at roof

Roof, above toilet room

2 EA

3’ OD Vent fan w/ assumed ACM penetration sealant around opening at roof

Roof, East and West

Side

2 EA

2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof

Roof, North and

South Side

2 EA

4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof

Roof, East and West

Side

2 EA

KEY: ACM = asbestos containing material, EA = each, SF = square feet, SVF = sheet vinyl flooring, OD = outer diameter, VAT = vinyl asbestos tile, w/ = with

ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect

ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building

Inspector. Concealed suspect material may include, but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.

2.4.2 Lead-Containing Paint and Building Materials

One hundred thirty-two (132) samples were analyzed for lead using the X-Ray fluorescence

(XRF) analyzer. Red Bolded results indicate materials containing detectable levels of lead and “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation

40CFR745 and Washington State Commerce regulation WAC 365-230. Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.

TABLE 3

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

Read

Component Substrate Color Building Room

Lead Conc.

(mg/cm2)

1 SHUTTER CALL N/A N/A BUILDING 786 N/A 4.01

2 CALIBRATION N/A RED BUILDING 786 N/A 0.9

3 CALIBRATION N/A RED BUILDING 786 N/A 0.9

4 CALIBRATION N/A RED BUILDING 786 N/A 0.9

WINDOW ON

FLOOR

WOOD BEIGE BUILDING 786 1ST FLOOR BOILER RM 0.11

6 SAFETY RAILING METAL BLACK BUILDING 786 1ST FLOOR BOILER RM 0.04

WOOD PANEL ON

STAIRS

METAL OFF WHITE BUILDING 786 1ST FLOOR BOILER RM < LOD

OLD WOOD

WALL

WOOD BEIGE BUILDING 786 1ST FLOOR BOILER RM 15.9

9 DOOR HANDLE METAL BEIGE BUILDING 786 1ST FLOOR BOILER RM 2.2

10 OLD WATER PIPE METAL BLACK BUILDING 786 1ST FLOOR BOILER RM 0.3

11 DOORFRAME WOOD

BLUE

GREEN

BUILDING 786 1ST FLOOR BOILER RM 6.8

12 WALL WOOD WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

0.13

13 WALL WOOD YELLOW BUILDING 786

1ST FLOOR SHOP

OFFICE

14 WALL WOOD RED BUILDING 786

1ST FLOOR SHOP

OFFICE

0.26

15 COLUMN WOOD WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

0.05

16 WINDOW WOOD GREEN BUILDING 786

1ST FLOOR SHOP

OFFICE

0.5

17 WALL WOOD WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

18 WALL WOOD WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

19 WINDOW TRIM WOOD WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

0.4

20 WINDOW SASH WOOD WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

0.29

21 DOORFRAME WOOD BEIGE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

22 DOOR METAL BEIGE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

23 BASEBOARD METAL BEIGE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

24 WINDOW TRIM WOOD BEIGE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

25 WINDOW SILL WOOD BEIGE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

26 WINDOW SASH WOOD BEIGE BUILDING 786

1ST FLOOR SHOP

OFFICE

0.06

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

Read

Component Substrate Color Building Room

Lead Conc.

(mg/cm2)

27 WALL DRYWALL OFF WHITE BUILDING 786

1ST FLOOR SHOP

OFFICE

< LOD

28 WALL DRYWALL GREEN BUILDING 786 1ST FLOOR SHOP < LOD

29 WALL DRYWALL WHITE BUILDING 786 1ST FLOOR SHOP < LOD

30 WALL WOOD GRAY BUILDING 786 1ST FLOOR SHOP < LOD

31 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD

32 DOOR WOOD WHITE BUILDING 786 1ST FLOOR SHOP 2.6

33 DOOR WOOD GREEN BUILDING 786 1ST FLOOR SHOP < LOD

34 DOOR TRIM WOOD GREEN BUILDING 786 1ST FLOOR SHOP 0.04

35 DOOR TRIM WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.06

36 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.04

37 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.03

38 WALL WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD

39 WALL WOOD GREEN BUILDING 786 1ST FLOOR SHOP < LOD

40 WALL WOOD GREEN BUILDING 786 1ST FLOOR SHOP 0.06

41 WINDOW TRIM WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.03

42 WINDOW TRIM WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD

43 WINDOW WOOD WHITE BUILDING 786 1ST FLOOR SHOP < LOD

44 WINDOW WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.03

45 WINDOW SILL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.09

46 WINDOW SILL WOOD WHITE BUILDING 786 1ST FLOOR SHOP 0.06

47 WALL WOOD WHITE BUILDING 786

1ST FLOOR SHOP SINK

AREA

0.2

48 WALL WOOD GRAY BUILDING 786

1ST FLOOR SHOP SINK

AREA

0.2

49 TRIM WOOD GRAY BUILDING 786

1ST FLOOR SHOP SINK

AREA

0.1

50 TRIM WOOD WHITE BUILDING 786

1ST FLOOR SHOP SINK

AREA

0.11

51 SINK CERAMIC WHITE BUILDING 786

1ST FLOOR SHOP SINK

AREA

20.9

52 TOILET CERAMIC WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD

53 TOILET CERAMIC WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD

54 DOORFRAME WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM 4.4

55 WALL WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM 4.8

56 WALL WOOD GRAY BUILDING 786 1ST FLOOR RESTROOM 4.8

57 CABINET WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

Read

Component Substrate Color Building Room

Lead Conc.

(mg/cm2)

58 CEILING WOOD WHITE BUILDING 786 1ST FLOOR RESTROOM < LOD

59 FLOOR WOOD GRAY BUILDING 786 1ST FLOOR SHOP < LOD

60 FLOOR WOOD GRAY BUILDING 786 1ST FLOOR SHOP 0.06

61 FLOOR STRIPING WOOD YELLOW BUILDING 786 1ST FLOOR SHOP 2.2

ELECTRICAL

PANEL

METAL DARK GRAY BUILDING 786 1ST FLOOR SHOP < LOD

ELECTRICAL

PANEL

METAL

LIGHT

GRAY

BUILDING 786 1ST FLOOR SHOP < LOD

ELECTRICAL

PANEL

METAL WHITE BUILDING 786 1ST FLOOR SHOP < LOD

65 SECURITY PANEL METAL RED BUILDING 786 1ST FLOOR SHOP < LOD

ELECTRICAL

SWITCH

METAL WHITE BUILDING 786 1ST FLOOR SHOP < LOD

ELECTRICAL

SWITCH

METAL DARK GRAY BUILDING 786 1ST FLOOR SHOP < LOD

68 DOOR METAL GRAY BUILDING 786 1ST FLOOR SHOP < LOD

69 DOORFRAME WOOD LIGHT BLUE BUILDING 786 1ST FLOOR SHOP < LOD

70 FURNACE METAL

LIGHT

BROWN

BUILDING 786

1ST FLOOR CENTER

STORAGE

< LOD

71 DOOR TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD

72 DOOR WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 16.8

73 DOORFRAME WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 18.6

74 WINDOW TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 7.9

75 WINDOW SILL WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 7.1

76 WINDOW SASH WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 9.7

77 WINDOW SASH WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 0.23

78 WINDOW SILL WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE 0.05

79 WINDOW TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD

80 WINDOW TRIM WOOD BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD

81 WALL DRYWALL BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD

82 WALL DRYWALL BEIGE BUILDING 786 1ST FLOOR E STORAGE < LOD

83 WALL DRYWALL OFF WHITE BUILDING 786 1ST FLOOR E STORAGE < LOD

84 COLUMN WOOD OFF WHITE BUILDING 786 1ST FLOOR E STORAGE 0.09

85 BEAM WOOD OFF WHITE BUILDING 786 1ST FLOOR E STORAGE < LOD

STAIRWELL

WALLS

WOOD OFF WHITE BUILDING 786 2ND FLOOR STAIRWELL 6.6

87 DOOR TRIM WOOD OFF WHITE BUILDING 786 2ND FLOOR STAIRWELL 4.8

88 DOOR FRAME WOOD OFF WHITE BUILDING 786 2ND FLOOR STAIRWELL 3.7

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

Read

Component Substrate Color Building Room

Lead Conc.

(mg/cm2)

DOOR WINDOW

INFILL

METAL TAN BUILDING 786 2ND FLOOR STAIRWELL 2.4

90 STAIR TREAD WOOD BLACK BUILDING 786 2ND FLOOR STAIRWELL 0.11

91 WINDOW WOOD OFF WHITE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

4.7

92 WINDOW TRIM WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

1.2

93 WALL TRIM WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

1.4

94 WALL TRIM WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.8

95 WINDOW TRIM WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.9

LOWER WALL

PANEL

WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

1.1

LOWER WALL

PANEL

WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

LOWER WALL

PANEL

WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.7

99 TANK METAL SILVER BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.11

WALL_BACK SIDE

TO TOILET RM

WOOD WHITE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

2.5

101 WINDOW WOOD OFF WHITE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

102 COLUMN WOOD

CLEAR

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.08

103 COLUMN TRIM WOOD

GREENISH

STAIN

BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.8

CHIMNEY

ENCLOSURE

PLASTER BEIGE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

105 CEILING WOOD FIBER BEIGE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

2.4

106 WALL WOOD BEIGE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

2.1

107 WALL WOOD GRAY BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

STAIRWELL

ENCLOSURE

WOOD WHITE BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

< LOD

109 WALL WOOD CLEAR BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.06

110 WALL WOOD CLEAR BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.05

111 WALL WOOD CLEAR BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.05

112 WALL WOOD CLEAR BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.06

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

Read

Component Substrate Color Building Room

Lead Conc.

(mg/cm2)

113 COLUMN WOOD CLEAR BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.09

114 WINDOW WOOD OFF WHITE BUILDING 786

2ND FLOOR

CARPENTER SHOP

2.5

115 WINDOW TRIM WOOD GREENISH BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.6

LOWER WALL

PANEL

WOOD GREENISH BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.8

117 WALL TRIM WOOD GREENISH BUILDING 786

2ND FLOOR

CARPENTER SHOP

1.5

118 COLUMN TRIM WOOD GREENISH BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.8

119 COLUMN WOOD CLEAR BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.1

120 BEAM WOOD CLEAR BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.05

121 CEILING WOOD FIBER BEIGE BUILDING 786

2ND FLOOR

CARPENTER SHOP

4.3

122 CEILING TRIM WOOD BEIGE BUILDING 786

2ND FLOOR

CARPENTER SHOP

4.7

123 WALL STUD WOOD WHITE BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.06

124 OLD DR FRAME WOOD OFF WHITE BUILDING 786

2ND FLOOR

CARPENTER SHOP

9.3

125 CEILING VENT METAL BLACK BUILDING 786

2ND FLOOR

CARPENTER SHOP

0.17

126 WALL WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 16.3

127 WALL WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 13.6

128 WALL WOOD GRAY BUILDING 786 2ND FLOOR TOILET RM 15.7

129 CEILING WOOD GRAY BUILDING 786 2ND FLOOR TOILET RM 16.4

130 WINDOW TRIM WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 13.8

131 WINDOW WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 10.5

132 CABINET WOOD OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 13.4

133 CHIMNEY BRICK OFF WHITE BUILDING 786 2ND FLOOR TOILET RM 17.1

134 SINK CERAMIC WHITE BUILDING 786 2ND FLOOR TOILET RM 36.1

LOOSE DOORS

STACKED

WOOD MISC BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

0.17

LOOSE DOORS

STACKED

WOOD GREEN BUILDING 786

2ND FLOOR ENGINEER

STOREROOM

28.4

137 CALIBRATION N/A RED BUILDING 786 N/A 1.0

138 CALIBRATION N/A RED BUILDING 786 N/A 1.0

138 CALIBRATION N/A RED BUILDING 786 N/A 1.0

Key: N/A = not applicable, <LOD = less than limit of detection

All XRF sample shots are representative of that color on that specific substrate and component.

The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

In addition to the XRF samples, EHSI collected two (2) bulk QA samples for laboratory analysis. Building materials and paint containing detectable levels of lead are considered regulated by DOSH.

Table 4 summarizes bulk QA lead samples, including sample number, material description, substrate, color, location, and analytical results. Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.

TABLE 4

SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

SAMPLE

NUMBER

LOCATION

COMPONENT/

SUBSTRATE

COLOR

RESULTS

% Pb by

WT

11176-Pb03 1st Floor, Shop Column/Chimney

/Brick & Mortar Red & Gray <0.0031

11176-Pb04 1sr Floor, Boiler Room Main Chimney Red & Gray <0.0030

11176-Pb08 1st Floor, Barber Shop Wall/GWB Yellow on

Blue on White <0.0052

Key: Pb = lead

DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.

Since the type of work planned (e.g., sawing, grinding, demolition) may disturb the lead-containing materials, the contractor will need to conduct lead awareness training and an initial exposure assessment in accordance with the regulations.

EHSI also identified three (3) lead-acid batteries inside alarm and fire alarm panels on the 1st floor. If lead-acid batteries are impacted by the proposed renovation, they must be recycled by a licensed facility.

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

At the request of NPS, EHSI accomplished TCLP sampling and analysis of the assumed waste stream for the project and Table 5 summarizes the analytical results. EHSI collected and composited a representative sample of the assumed waste stream for renovation activities that may impact interior building finishes, that included proportionate quantities of all materials expected to be included in the waste stream. Note: Painted metals were not included in the assumed waste stream sampling, because they are expected to be recycled and because there is no limit on metals containing paint on metals being recycled.

Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., hazardous metals-containing paint/hazardous metals-containing materials). Ecology has set a dangerous waste threshold at 5.0 milligrams (mg/L), per liter for arsenic, chromium, lead, and silver, 1.0 Mg/L for cadmium, 100 mg/L for barium and .2 mg/L for mercury.

The TCLP sample for the Project assumed waste stream was analyzed for the USEPA RCRA 8 metals: Lead (Pb), Cadmium (Cd), Chromium (Cr), Silver (Ag), Arsenic (AS), Barium (Ba), Mercury (hg), Selenium (Se), Copper (Cu), Nickel (Ni) and Zinc (Zn).

TABLE 5

SUMMARY OF TCLP SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

Sample # Elements RL in mg/L Results in mg/L Results in ppm

11176-

TCLP-

B786-01

Sample Description:

• 26% Painted plywood floors;

• 26% painted GWB walls and ceiling;

• 10% unpainted GWB walls;

• 6% painted 2’x4’ SACT;

• 6% painted wood walls and ceiling;

• 5% painted bumpy texturing on GWB walls;

• 5% 12”x12” VCT w/ mastic;

• 5% red SVF w/ backing;

• 4% 3’x4’ fiberboard floor panels;

• 3% VAT w/ black vapor barrier;

• 2% carpet; and

• 1% black SVF w/ vapor barrier

Silver (Ag) 0.20 <0.20 <0.20

Arsenic (As) 0.20 <0.20 <0.20

Barium (Ba) 0.20 2.10 0.37

Cadmium (Cd) 0.20 <0.20 <0.20

Chromium (Cr) 0.20 <0.20 <0.20

Mercury (Hg) 0.01 <0.01 <0.011

Lead (Pb) 0.20 <0.20 2.7

Selenium (Se) 0.20 <0.20 <0.20 KEY: Ag = silver, As = Arsenic, Ba = Barium, Cd = Cadmium, Cr = Chromium, GWB = gypsum wall board, Hg = Mercury, mg/L = milligram per liter,, Pb = Lead, ppm = part per million, RL = Reporting Limit, SACT = suspended acoustic ceiling tile, Se = Selenium, SVF = sheet vinyl flooring, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with

It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.

2.4.4 Polychlorinated Biphenyls

Ballasts

EHSI inspected all fluorescent fixtures for PCB-containing ballasts. 84% of fixtures inspected were found to contain magnetic ballasts and must be assumed to contain PCB containing dielectric fluid and may be disposed/recycled as Ecology Dangerous Waste. Electronic ballasts, which contain no dielectric fluid, may be disposed as construction debris. A Summary of PCB-containing ballasts and Hg-containing light tubes, CFL bulbs, and HID lamps is provided in

Table 6.

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats

All fluorescent light tubes and CFL bulbs quantified in Table 6 contain Hg. Hg wastes are regulated as “universal wastes” under Ecology’s regulation WAC 173-303. Hg-containing building materials must be recycled or disposed of as hazardous waste. One (1) Hg-containing switches or thermostats were identified in the structure.

TABLE 6

SUMMARY OF LIGHT FIXTURE INSPECTION RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 786

LIGHT TYPE FIXTURES

TUBES/

BULBS

MAGNETIC

BALLASTS

6” x 4’ Mounted light fixture w/ 2 bulbs and

1 electronic ballast 4 8 0

1’x4’ Mounted light fixture w/ 2 bulbs and 1 magnetic ballast 15 30 15

1’x4’ Mounted light fixture w/ 2 bulbs and 1 electronic ballast 1 2 0

2’x4’ Recessed light fixture w/ 3 bulbs and 1 electronic ballast 6 18 0

2’x4’ Recessed light fixture w/ 4 bulbs and 2 magnetic ballasts 10 40 10

6”x8’ Mounted light fixture w/ 1 8’ bulb and

1 large magnetic ballast 6 6 6

1’x8’ Mounted light fixture w/ 2 8’ bulbs and

1 large…

This is the start of the file's text. The full file is on GovTribe.