Attachment 3b - B721 Limited Hazardous Materials Survey Report.pdf

PDF 10 MB Posted

Attached to
Abate hazardous materials, historic buildings, WA
Solicitation number
140P8320R0008
Issued by

About this file

This is a request for proposals for hazardous materials abatement services at several historic buildings located at Fort Vancouver National Historic Site in Vancouver, Washington. The National Park Service seeks to abate asbestos, lead, mercury, PCBs, and wildlife excrement, perform selective demolition and minor repairs. Offerors must visit SAM.gov for solicitation documents and amendments. Proposals are due by the date specified in Block 13 of the SF1442. The contract is set aside for small businesses and has an estimated value between $250,000 to $1 million. The performance period is 180 days. The contractor must provide payment and performance bonds and liability insurance. Site visits will be held on August 13, 2020.

View the file

Other files

File Type Posted
Attachment 10 Final Clarifications_0003.pdf PDF
Sol_140P8320R0008_Amd_0003.pdf PDF
Sol_140P8320R0008_Amd_0002.pdf PDF
Sol_140P8320R0008_Amd_0001.pdf PDF
forms to return with proposal - revised 140P8320R0008_0001.docx DOCX document
Attachment 9 Site visit notes_0001.pdf PDF
Attachment 7a Revised Wage Determination_0001.pdf PDF
Attachment 3e - B748 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3a - B410 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3j - B786 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 6 Building Floor Plans_20200723.pdf PDF
Attachment 4c - B991 and B993 Asbestos Survey Field Notes.pdf PDF
Attachment 3g - B752 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3f - B749 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4b - B993 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 3c - B725 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3i - B754 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3h - B753 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3d - B746 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4a - B991 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 5 Building Descriptions.pdf PDF
forms to return with proposal 140P8320R0008.docx DOCX document
Attachment 1 Statement of Work.pdf PDF
Sol_140P8320R0008.pdf PDF
Attachment 2 Task List for each building.pdf PDF
FAQs for RFP 140P8320R0008.pdf PDF
Attachment 7 Wage Determination 7-3-20.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134 Phone 206-381-1128 Toll Free 800-666-2959 Fax 206-254-4279

Environmental Consulting Hazardous Materials Management Industrial Hygiene Services Construction Management Indoor Air Quality

LIMITED HAZARDOUS MATERIALS SURVEY REPORT

NATIONAL PARK SERVICE

FORT VANCOUVER NATIONAL HISTORIC SITE

BUILDING 721

East Vancouver Barracks Building 721

Vancouver, Washington 98661

October 31st, 2019

Prepared For:

Mary Hazell National Park Service 612 East Reserve Street Vancouver, WA 98661 ii

Limited Hazardous Materials Survey Report

National Park Service Fort Vancouver Historic Site

East Vancouver Barracks Building 721 Vancouver, Washington 98661

EHSI Project No.: # 11295

The material and data in this report were prepared under the supervision and direction of the undersigned.

Rory Peterson Lead AHERA Building Inspector

Derica Escamilla Principal of Hazardous Materials Services iii

TABLE OF CONTENTS

Acronym List ..................................................................... iv

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

1.2 EXTENT OF CURRENT SURVEY

1.3 ACM MATERIALS FOUND

1.4 OPINIONS AND RECOMMENDATIONS

1.5 LIMITATIONS/DISCLAIMER

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

2.2 BUILDING DESCRIPTION

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

2.3.2 Lead-Containing Paint/Lead-Containing Materials

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

2.4.2 Lead-Containing Paint and Building Materials

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

2.4.4 Polychlorinated Biphenyls

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs

and thermostats

3.0 LIMITATIONS

4.0 STANDARD OF CARE

5.0 CERTIFIED AHERA BUILDING INSPECTORS

APPENDICES

A ........................ Asbestos Laboratory Reports and Field Data Forms B ........................ Lead Laboratory Reports and Field Data Forms C ........................ Toxicity Characteristic Leaching Procedure (TCLP) Laboratory

Reports and Field Data Forms D ........................ Certified AHERA Building Inspector Certificates E ........................ Laboratory Certifications for Asbestos, Lead, and TCLP Analysis F ........................ Sample Location Drawings for Asbestos, Lead, and TCLP iv

ACRONYM LIST

ACM .......................Asbestos-Containing Material AHERA ....................Asbestos Hazard Emergency Response Act AHU .......................Air Handling unit AIHA ......................American Industrial Hygiene Association CAB ........................Cement Asbestos Board CFL ........................Compact Fluorescent Light CFR ........................Code of Federal Regulations DOSH .....................Washington State Department of Labor and Industries, Division of

Occupational Safety and Health EA ..........................Each Ecology ...................Washington State Department of Ecology EHSI .......................EHS-International, Inc.

ELLAP .....................Environmental Lead Laboratory Accreditation Program GWB .......................Gypsum Wall Board Hg ..........................Mercury HID ........................High Intensity Discharge JC ..........................Joint Compound LCM ........................Lead-Containing Material LCP ........................Lead-Containing Paint L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter N/A ........................Not Applicable ND .........................None Detected NVL ........................NVL Laboratories, Inc.

NVLAP ....................National Voluntary Laboratory Accreditation Program OD .........................Outside Diameter OSB........................Oriented Strand Board OSHA .....................US Occupational Safety and Health Administration Pb ..........................Lead PCBs .......................Polychlorinated Biphenyls PLM ........................Polarized Light Microscopy ppm .......................Parts per Million QA .........................Quality Assurance RCW .......................Revised Code of Washington SACT ......................Suspended Acoustical Ceiling Tile SAT ........................Seattle Asbestos Test, LLC SF ..........................Square Feet SVF ........................Sheet Vinyl Flooring SWCAA ...................Southwest Clean Air Agency TCLP .......................Toxicity Characteristic Leaching Procedure TSI .........................Thermal System Insulation VAT ........................Vinyl Asbestos Tile VCT ........................Vinyl Composite Tile WAC .......................Washington Administrative Code

wt. .........................Weight w/ ..........................With XRF ........................x-ray fluorescence

Fort Vancouver National Historic Site – B721

EHSI Project 11295

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

The National Park Service (NPS) plans to renovate Building 721 (B721) at the Fort Vancouver National Historic Site (FV NHS) located at 612 E. Reserve Street, Vancouver, Washington. The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of B721 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.

1.2 EXTENT OF CURRENT SURVEY

EHSI inspected accessible interior and exterior suspect ACM that may be potentially impacted by future projects. Accessible suspect materials were sampled including, but not limited to:

interior and exterior wall systems, window systems, and mechanical systems. The LCP and LCM survey was limited to the interior of the building only. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment) suspect materials were assumed to be ACM.

1.3 ACM MATERIALS FOUND

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 721

ASBESTOS MATERIAL DESCRIPTION LOCATION

Non-ACM 12”x12” Beige VCT (w/ tan streaks) on ACM black mastic on non-ACM OSB on non-ACM red SVF w/ paint on non- ACM black paper backing w/ non-ACM black/brown mastic on non- ACM painted wood floor [Sample #s 01 & 12]

1st Floor, Rooms 101, 102, Closet 13, C-3, and the Entry Stair Landing

Non-ACM 12”x12” Beige VCT (w/ tan streaks) on ACM black mastic on non-ACM OSB on non-ACM old mastic on non-ACM hard wood floor [Sample # 04]

Throughout Mezzanine

Non-ACM 12”x12” Brown/gray VCT (w/ tan and beige streaks) on ACM orange/tan/ yellow mastic w/ old ACM black mastic on non-ACM OSB on non-ACM red SVF w/ paint on non-ACM black paper backing w/ non-ACM black/brown mastic on non-ACM painted wood floor [Sample #s 10 & 14]

1st Floor Entry Lobby, Room C-2

ACM 9”x9” Green VAT on ACM black mastic with ACM 9”x9” Black VAT on ACM black mastic (in checkered pattern) and ACM 1’x2’ black VAT on ACM black mastic (on concrete) [Sample #s 25, 26, & 27]

Basement Room C-

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 721

ASBESTOS MATERIAL DESCRIPTION LOCATION

ACM hard gray window glazing putty (2’10”x1’4” transom windows) [Sample #61] 1st Floor Room 101

Gray CAB panels w/ paint [Sample #s 127 & 128] Basement, Room 9 2’7”x2’8”x4’4” Natural gas boiler w/ assumed ACM internal components, sealants, and or insulation Basement, Room 4

1’5”x1’5”x9” Boiler control panel w/ assumed ACM internal components

Basement, Room 4

2’6” OD x 5’ old hot water heater w/ assumed ACM sealants and/or insulation

Basement, Room 1

1’6” OD x 1’6” hot water heater w/ assumed ACM sealants and/or insulation

Basement, Toilet Room 2

2’4”x4’10”x2’8” Raznor AHU w/ assumed ACM internal components, sealants, and/or insulation

1st Floor, Kitchen Storage Room 105

Electrical panels w/ assumed ACM internal components (1-6 SF in size)

1st Floor, Room 1 and Kitchen Dishwashing Area

Control panels w/ assumed ACM internal components (1-6 SF in size)

Throughout Kitchen

Large 3’ OD vent hoods w/ assumed ACM roof penetration sealant Roof KEY: ACM = asbestos containing material, AHU = air handling unit, CAB = cement asbestos board, OD = outside diameter, OSB = oriented strand board, SF = square feet, SVF = sheet vinyl flooring, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with

1.4 OPINIONS AND RECOMMENDATIONS

EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to any renovation and demolition activities.

Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.

Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will disturb the LCP, the contractor will need to perform an initial exposure assessment and lead awareness training in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).

A select number of fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology) Dangerous Waste. All fluorescent tubes and lamps contain mercury; any fluorescent lamps/tubes to be disturbed during the project must be recycled as (Ecology) Universal Waste.

1.5 LIMITATIONS/DISCLAIMER

This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint.

This report and accompanying appendices include the supporting information for this executive summary.

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: identification of all suspect materials; a determination of whether suspect materials were: ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.

On August 27th and 28th, 2019, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest Clean Air Agency (SWCAA).

2.2 BUILDING DESCRIPTION

Building 721 (B721) is located at East Vancouver Barracks, Vancouver, Washington and part of the Fort Vancouver National Historic Site. B721 was originally constructed between 1904 and 1905. The building was constructed on a stone foundation with a daylight basement and partial second floor. The wood-framed structure was originally built as a gymnasium, but later used as an event space and kitchen. The building’s envelope is made of wood siding, wood windows and doors with a composite shingle roof. The interior of the building includes hard wood flooring, vinyl composite tile (VCT), painted concrete, wood base, vinyl base, plaster and gypsum wallboard (GWB) walls and ceilings, tin ceiling panels. Heat was provided by a forced-air system in the kitchen area and was once heated by a coal fired boiler and hydronic radiators throughout. Light is provided by fluorescent light fixtures and natural light through the windows.

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix D. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October 1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.

EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and

Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary Laboratory Accreditation Plan (NVLAP). Laboratory NVLAP certifications are included in Appendix E. Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.

2.3.2 Lead-Containing Paint/Lead-Containing Materials

EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.

Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).

Copies of laboratory reports and field data forms for lead are in Appendix B.

All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

One hundred and fifty (150) bulk samples of suspect ACM were collected as part of the survey.

Limited destructive inspection was conducted to identify hidden and/or concealed materials.

Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos sample location drawings are provided in Appendix F. Asbestos sampling information including sample number, material description, sample location, and analytical results are summarized in Table 1. The ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-01

Mezzanine, Room 201

Layer 1: 12”x12” Beige VCT (w/ tan streaks) Layer 2: Black mastic Layer 3: OSB (on sample #02)

L1: ND

L2: 3%

L3: ND

N/A

Chrysotile

11295- B721-02

Mezzanine, Room 201

Layer 1: Blue paint layers Layer 2: Black/yellow mastic/coating Layer 3: Hard wood flooring (on sample #03)

ND

(All Layers)

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-03

Mezzanine, Room 201

Black/gray paper slip/sheet vapor barrier (under hardwood flooring on wood sub floor)

ND N/A

11295- B721-04

Mezzanine, Room 202

Layer 1: 12”x12” Beige VCT (w/ tan streaks) Layer 2: Black mastic Layer 3: OSB (on sample #05)

11295- B721-05

Mezzanine, Room 202

Layer 1: Gray paint layers Layer 2: Black/yellow mastic/coating w/ debris Layer 3: Hard wood flooring (on sample #06)

ND

(All Layers)

N/A (All Layers)

11295- B721-06

Mezzanine, Room 202

Black/gray paper slip/sheet vapor barrier (under hardwood flooring on wood sub floor)

ND N/A

11295- B721-07

Mezzanine, Stairs

Layer 1: Brown rubber stair tread (w/ beige streaks) Layer 2: Brown mastic Layer 3: Wood stairs

ND

(All Layers)

N/A (All Layers)

11295- B721-08

1st Floor, Stairs to

Mezzanine

Layer 1: Brown rubber stair tread (w/ beige streaks) Layer 2: Brown mastic w/ paint Layer 3: Wood stairs

ND

(All Layers)

N/A (All Layers)

11295- B721-

09QA

1st Floor, Stairs to

Mezzanine

Layer 1: 4” Black cove base Layer 2: Brown mastic w/ paint (on wood backboard)

ND

(All Layers)

N/A (All Layers)

11295- B721-10

1st Floor, Entry Lobby

Layer 1: 12”x12” Brown/beige/ tan VCT (w/ tan streaks) Layer 2: Orange/tan mastic on old black mastic Layer 3: OSB (on sample #11)

11295- B721-11

1st Floor, Entry Lobby

Layer 1: Red SVF w/ yellow paint Layer 2: Black paper backing w/ black/brown mastic Layer 3: Hard wood floor

ND

(All Layers)

N/A (All Layers)

11295- B721-12

1st Floor, Room 102

Layer 1: 12”x12” Beige VCT (w/ tan streaks) Layer 2: Black mastic Layer 3: OSB (on sample #13)

11295- B721-13

1st Floor, Room 102

Layer 1: Red SVF Layer 2: Black paper backing w/ black/brown mastic Layer 3: Hard wood floor

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-14

1st Floor, Entry Stair

Landing

Layer 1: 12”x12” Brown/gray VCT (w/ tan and beige streaks) Layer 2: Orange/tan/yellow mastic on old black mastic Layer 3: OSB Layer 4: Red SVF w/ paint Layer 5: Black paper backing w/ black/brown mastic Layer 6: Painted wood floor

L4: ND

L5: ND

L6: ND

B721-

15QA

1st Floor, Entry Stairs

Layer 1: Brown stair tread Layer 2: Tan/brown mastic w/ paint Layer 3: Older brown/beige mastic w/ paint on wood stairs

ND

(All Layers)

N/A (All Layers)

11295- B721-16

Basement, Entry Stairs

Layer 1: Dark brown stair tread Layer 2: Off-white mastic Layer 3: Black mastic Layer 4: Painted wood stairs

ND

(All Layers)

N/A (All Layers)

11295- B721-17

Basement, Entry Stairs

Layer 1: Dark brown stair tread Layer 2: Off-white mastic Layer 3: Black mastic Layer 4: Painted wood stairs

ND

(All Layers)

N/A (All Layers)

11295- B721-18

1st Floor, Kitchen 104

Gray door weather stripping caulking ND N/A

11295- B721-19

1st Floor, Kitchen 104

Layer 1: Newer 12”x12” off-white VCT (w/ tan and white streaks) Layer 2: Yellow mastic Layer 3: Plywood (on sample #20)

ND

(All Layers)

N/A (All Layers)

11295- B721-

20QA

1st Floor, Kitchen 104

Layer 1: Off-white/light gray SVF (w/ small broken rock pattern) Layer 2: Gray paper backing w/ beige mastic and debris Layer 3: OSB (on sample #21)

ND

(All Layers)

N/A (All Layers)

11295- B721-

21QA

1st Floor, Kitchen 104

Layer 1: Beige/gray SVF (w/ small stone pattern) Layer 2: Beige/tan/gray paper backing w/ beige mastic Layer 3: Wood floor

ND

(All Layers)

N/A (All Layers)

11295- B721-22

1st Floor, Main Hall 103

Black/gray paper slip sheet/ vapor barrier (between hard wood floor and wood sub floor)

ND N/A

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-23

1st Floor, Main Hall 103

Black/gray paper slip sheet/ vapor barrier (between hard wood floor and wood sub floor)

ND N/A

11295- B721-24

1st Floor, Main Hall 103

Black/gray paper slip sheet/ vapor barrier (between hard wood floor and wood sub floor)

ND N/A

11295- B721-25

Basement, C-1

Layer 1: 9”x9” Green VAT Layer 2: Black mastic Layer 3: 9”x9” Black VAT Layer 4: Black mastic (in checkered pattern)

L1: 3% L2: 3% L3: 4% L4: 3%

B721-26

Basement, C-1

Layer 1: 9”x9” Green VAT Layer 2: Black mastic Layer 3: 9”x9” Black VAT Layer 4: Black mastic (in checkered pattern)

L1: 3% L2: 3% L3: 3% L4: 3%

B721-27

Basement, C-1

Layer 1: 1’x2’ Black VAT (same as 9”x9” black VAT in #s 25 & 26) Layer 2: Black mastic (on concrete)

L1: 4%

B721-28

Basement, Main Room 1

Layer 1: 16”x16” Brown multi-color carpet squares Layer 2: Beige internal mastic Layer 3: Black asphaltic tile backing Layer 4: White fabric Layer 5: Trace yellow mastic Layer 6: White coating (on concrete)

ND

(All Layers)

N/A (All Layers)

11295- B721-

29QA

Basement, Main Room 1

Layer 1: 16”x16” Brown/gray multi-color carpet squares Layer 2: Beige internal mastic Layer 3: Black asphaltic tile backing Layer 4: White/gray fabric Layer 5: Trace yellow mastic Layer 6: White coating w/ mastic (on concrete)

ND

(All Layers)

N/A (All Layers)

11295- B721-30

Basement, Main Room 1

Layer 1: White coating/paint on red sealant Layer 2: Wood debris (on concrete floor)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-31

Basement, Women’s

Toilet Room 2

Layer 1: Black rubber sink drain gasket Layer 2: Brown/tan putty (on porcelain sink)

ND

(All Layers)

N/A (All Layers)

11295- B721-32

Basement, Men’s Toilet

Room 3

Layer 1: Black rubber sink drain gasket Layer 2: Brown/tan putty (on porcelain sink)

ND

(All Layers)

N/A (All Layers)

11295- B721-33

1st Floor, Kitchen 104

Black undercoating (on stainless steel countertop & dishwashing counter)

ND N/A

11295- B721-34

1st Floor, Kitchen 104

Black undercoating (on stainless steel countertop & dishwashing counter)

ND N/A

11295- B721-35

1st Floor, Kitchen 104

Layer 1: Red sink drain gasket Layer 2: Brown/tan putty (in stainless steel double sink in countertop/dishwashing counter)

ND

(All Layers)

N/A (All Layers)

11295- B721-36

1st Floor, Kitchen 104

Layer 1: Silver paint Layer 2: Hard silver undercoating (on stainless steel kitchen countertops)

ND

(All Layers)

N/A (All Layers)

11295- B721-37

1st Floor, Kitchen 104

Layer 1: Silver paint Layer 2: Hard silver undercoating (on stainless steel kitchen countertops)

ND

(All Layers)

N/A (All Layers)

11295- B721-38

1st Floor, Kitchen 104

Layer 1: Black rubber sink drain gasket Layer 2: Beige putty (on stainless steel triple sink)

ND

(All Layers)

N/A (All Layers)

11295- B721-39

1st Floor, Kitchen 104 White countertop caulking ND N/A

11295- B721-40

1st Floor, Kitchen 104

White/gray countertop caulking ND N/A

11295- B721-41

Basement, Boiler Room 4

Layer 1: Trace silver paint Layer 2: Brown/gray paper vapor barrier (between corrugated metal ceiling and wood framing)

ND

(All Layers)

N/A (All Layers)

11295- B721-42

Basement, Main Room 1

Layer 1: Beige paint Layer 2: Brown/gray paper vapor barrier (between stamped tin ceiling and wood framing)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-43

Basement, Main Room 1

Brown/gray paper vapor barrier (between stamped tin ceiling and wood framing)

ND N/A

11295- B721-44

1st Floor, Above Kitchen

Brown/gray paper vapor barrier (between stamped tin ceiling and wood framing)

ND N/A

11295- B721-45

Mezzanine, Above C-2

Brown/gray paper vapor barrier (between stamped tin ceiling and wood framing)

ND N/A

11295- B721-46

Basement, Boiler Room 4

Layer 1: Silver coating Layer 2: Red brick Layer 3: Gray grout

ND

(All Layers)

N/A (All Layers)

11295- B721-47

Basement, Boiler Room 4

Layer 1: Silver coating Layer 2: GWB wall w/ paper

ND

(All Layers)

N/A (All Layers)

11295- B721-48

Basement, Boiler Room 4

Layer 1: Silver coating Layer 2: GWB wall w/ paper

ND

(All Layers)

N/A (All Layers)

11295- B721-49

Basement, Boiler Room 4

Layer 1: Silver coating Layer 2: Dark gray stone wall Layer 3: Gray grout

ND

(All Layers)

N/A (All Layers)

11295- B721-50

Basement, Boiler Room 4

Layer 1: Silver coating Layer 2: GWB wall w/ paper

ND

(All Layers)

N/A (All Layers)

11295- B721-51

Basement, Boiler Room 4

Layer 1: White paint Layer 2: 2’x4’ Beige/gray SACT w/ brown coating on back (w/ worm track and pin hole pattern)

ND

(All Layers)

N/A (All Layers)

11295- B721-52

Basement, Boiler Room 4

Gray flue penetration grout w/ older white flue penetration grout and debris

ND N/A

11295- B721-53

Basement, Boiler Room 4

Layer 1: White sealant on newer white paper wrap Layer 2: Yellow fiberglass TSI

ND

(All Layers)

N/A (All Layers)

11295- B721-54

Basement, Boiler Room 4

Layer 1: White sealant on newer white paper wrap Layer 2: Yellow fiberglass TSI

ND

(All Layers)

N/A (All Layers)

11295- B721-55

Basement, Boiler Room 4

4” Green pipe flange gasket w/ debris (on old circulation pump) ND N/A

11295- B721-56

Basement, Boiler Room 4

White pipe dope (on newer hot water lines to compressor tank)

ND N/A

11295- B721-57

Basement, Boiler Room 4

Greenish tan/gray pipe dope (on newer hot water lines to compressor tank)

ND N/A

11295- B721-58

Basement, Boiler Room 4

Gray concrete floor seam caulking w/ debris (around old boiler pad)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-59

Basement, Boiler Room 4

Gray concrete floor seam caulking (around old boiler pad) ND N/A

11295- B721-60

Basement, Boiler Room 4

Tan pipe dope w/ plumbing tape (on natural gas line fittings) ND N/A

11295- B721-

61QAX

1st Floor, Room 101

Hard gray window glazing putty w/ paint (2’10”x1’4” transom windows)

4% Chrysotile

11295- B721-62

1st Floor, Room 101

Off-white window glazing putty patch (2’10”x1’4” transom windows)

ND N/A

11295- B721-63

1st Floor, Entry Lobby

Hard gray window glazing putty w/ paint (5’2”x1’4” transom windows)

ND N/A

11295- B721-64

1st Floor, Entry Lobby

Hard gray window glazing putty patch w/ paint (5’2”x1’4” transom windows)

ND N/A

11295- B721-65

1st Floor, Entry Lobby

White window glazing putty patch w/ paint (5’2”x1’4” transom windows)

ND N/A

11295- B721-66

1st Floor, Kitchen 104

Layer 1: JC w/ paint Layer 2: GWB wall w/ paper (corner)

ND

(All Layers)

N/A (All Layers)

11295- B721-67

1st Floor, Kitchen 104

GWB wall w/ paint and paper (mid-wall)

ND N/A

11295- B721-68

1st Floor, Kitchen 104

GWB wall w/ paint and paper (mid-wall)

ND N/A

11295- B721-69

1st Floor, Kitchen 104

Layer 1: JC w/ paint Layer 2: GWB ceiling w/ paper (edge)

ND

(All Layers)

N/A (All Layers)

11295- B721-70

1st Floor, Kitchen 104

GWB ceiling w/ paint (mid-ceiling) ND N/A

11295- B721-71

Mezzanine, Room 202

Layer 1: JC w/ paint Layer 2: JC w/ paper Layer 3: GWB wall w/ paper (corner)

ND

(All Layers)

N/A (All Layers)

11295- B721-72

Mezzanine, Room 202

GWB wall w/ paint and paper (mid-wall) ND N/A

11295- B721-73

Mezzanine, Room C-2

GWB wall w/ paint and paper (mid-wall)

ND N/A

11295- B721-741 1st Floor, C-5

Layer 1: Trace JC w/ paint Layer 2: Tan JC w/ paint Layer 3: Light pink GWB wall w/ paper (corner)

L1: ND

L2: 0.5%

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-75

1st Floor, C-5 Light pink GWB wall w/ paint and paper on light pink GWB wall (mid-wall)

ND N/A

11295- B721-76

1st Floor, C-5 Layer 1: JC w/ paint Layer 2: Light pink GWB wall w/ paper (mid-wall at seam)

ND

(All Layers)

N/A (All Layers)

11295- B721-77

Attic, West Side

Red paper vapor barrier w/ debris (loose in attic, associated w/ roofing)

ND N/A

11295- B721-78

Attic, West Side

Layer 1: Metal weld Layer 2: Trace yellow duct seam sealant (on 10” OD ducting)

ND

(All Layers)

N/A (All Layers)

11295- B721-79

Attic, Center

Layer 1: Trace metal weld Layer 2: Trace yellow duct seam sealant (on 10” OD ducting)

ND

(All Layers)

N/A (All Layers)

11295- B721-80

Attic, East Side

Layer 1: Metal weld Layer 2: Trace yellow duct seam sealant (on 10” OD ducting)

ND

(All Layers)

N/A (All Layers)

11295- B721-81

Attic, East Side

Red paper vapor barrier w/ debris (loose in attic, associated with roofing)

ND N/A

11295- B721-82 Attic, Center

Layer 1: Black asphaltic outer fibrous wrap Layer 2: White coated black asphaltic wire insulation Layer 3: Brown paper insulation Layer 4: Black coated black asphaltic wire insulation

ND

(All Layers)

N/A (All Layers)

11295- B721-

83QA

Attic, Center

Layer 1: Black asphaltic outer fibrous wrap Layer 2: White coated black asphaltic wire Layer 3: Brown paper insulation Layer 4: Black coated black asphaltic wire insulation

ND

(All Layers)

N/A (All Layers)

11295- B721-84

Attic, West Side

Layer 1: Black asphaltic outer fibrous wrap Layer 2: White/black rubber wire insulation Layer 3: Brown paper insulation Layer 4: Black rubber wire insulation

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-

85QA

Attic, West Side

Layer 1: Black asphaltic outer fibrous wrap Layer 2: White/black rubber wire insulation Layer 3: Brown paper insulation Layer 4: Black rubber wire insulation

ND

(All Layers)

N/A (All Layers)

11295- B721-86

Mezzanine, C-

White caulking at seam w/ paint (between tin ceiling and GWB wall)

ND N/A

11295- B721-87

Mezzanine, C-

White caulking at seam w/ paint (between tin ceiling and GWB wall)

ND N/A

11295- B721-88

Mezzanine, Room 201

Layer 1: Light brown mastic Layer 2: Gray plaster wall w/ paint

ND

(All Layers)

N/A (All Layers)

11295- B721-89

Mezzanine, Room 201

Light brown mastic w/ trace paint (on plaster wall)

ND N/A

11295- B721-90

1st Floor, Room 102

Layer 1: White sandy plaster topcoat w/ paint Layer 2: Beige plaster wall w/ fibers and wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-91

1st Floor, Room 101

Layer 1: White sandy plaster topcoat w/ paint Layer 2: Beige plaster wall w/ fibers and wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-92

1st Floor, Room 103 Northwest

Layer 1: White sandy plaster topcoat w/ paint Layer 2: Beige plaster wall w/ fibers and wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-93

1st Floor, Room 103 Northeast

Layer 1: White sandy plaster topcoat w/ paint Layer 2: Beige plaster wall w/ fibers and wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-94

1st Floor, Room 103 Southeast

Layer 1: White sandy plaster topcoat w/ paint Layer 2: Beige plaster wall w/ fibers and wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-95

1st Floor, Room 103

South

Layer 1: White sandy plaster topcoat w/ paint Layer 2: Beige plaster wall w/ fibers and wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-96

1st Floor, Room 101

White fibrous rope (for window counterweight on both sides of each window)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-97

1st Floor, Main Hall 103

White fibrous rope (for window counterweight on both sides of each window)

ND N/A

11295- B721-98

Basement, Main Room 1

White fibrous rope w/ debris (for window counterweight on both sides of each window)

ND N/A

11295- B721-99

Exterior, 1st Floor North

Side

Hard gray window glazing putty w/ paint (on 2’6”x5’6” wood-framed windows in 5’6”x8’ system)

ND N/A

11295- B721-100

Exterior, 1st Floor Level North Side

Hard dark gray window glazing putty w/ paint (on 5’6”x2’ upper wood-framed windows in 5’6”x8’ system)

ND N/A

11295- B721-101

Exterior, 1st Floor Level North Side West Half

Hard white/beige window glazing putty patch w/ paint (on 2’6”x5’6” wood-framed windows in 5’6”x8’ system)

ND N/A

11295- B721-102

Exterior, 1st Floor Level North Side East Half

Layer 1: Soft beige window glazing putty patch w/ paint (on 2’6”x5’6” wood-framed windows in 5’6”x8’ system) Layer 2: Wood

ND

(All Layers)

N/A (All Layers)

11295- B721-103

Exterior, 1st Floor Level North Side East Half

Hard dark gray window glazing putty w/ paint (on 5’6”x2’ upper wood-framed windows in 5’6”x8’ system)

ND N/A

11295- B721-104

Exterior, 1st Floor Level North Side East Half

Light gray window glazing putty patch w/ paint (on 2’6”x5’6” upper wood-framed windows in 5’6”x8’ system)

ND N/A

11295- B721-105

Exterior, 1st Floor Level South Side

Soft beige window glazing putty patch w/ paint (on 2’6”x5’6” upper wood-framed windows in 5’6”x8’ system)

ND N/A

11295- B721-106

Exterior, 1st Floor Level South Side

Hard white/beige window glazing putty patch w/ paint (on 5’6”x2’ upper wood-framed windows in 5’6”x8’ system)

ND

(All Layers)

N/A (All Layers)

11295- B721-107

Exterior, 1st Floor Level South Side

Hard white/beige window glazing putty patch w/ paint (on 2’6”x5’6” upper wood-framed windows in 5’6”x8’ system)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-108

Exterior, 1st Floor Level East Side

Layer 1: White door frame caulking Layer 2: Wood

ND

(All Layers)

N/A (All Layers)

11295- B721-109

Basement, Room 1

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall w/ red brick

ND

(All Layers)

N/A (All Layers)

11295- B721-110

Basement, Room 1

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall w/ wood debris Layer 3: Trace red brick

ND

(All Layers)

N/A (All Layers)

11295- B721-111

Basement, Room 1

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall w/ red brick w/ wood debris

ND

(All Layers)

N/A (All Layers)

11295- B721-112

Basement, Room 1

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall w/ wood debris (on wood lath on concrete)

ND

(All Layers)

N/A (All Layers)

11295- B721-113

Basement, Room 2

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall (on wood lath on concrete)

ND

(All Layers)

N/A (All Layers)

11295- B721-114

Basement, Room 1

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall w/ wood debris Layer 3: Red brick

ND

(All Layers)

N/A (All Layers)

11295- B721-115

Basement, Room 9

Layer 1: White topcoat w/ paint Layer 2: Beige fibrous plaster wall w/ wood debris (on wood lath on concrete)

ND

(All Layers)

N/A (All Layers)

11295- B721-116

Exterior, Basement

Level South Side

Gray door frame caulking w/ gray wall grout w/ paint and debris (on double door to boiler room)

ND N/A

11295- B721-117

Exterior, 1st Floor Level Southeast

Corner

Hard white/gray siding caulking w/ paint and debris (at base of siding between siding and baseboard)

ND N/A

11295- B721-118

Exterior, Basement

Level South Side

Black window glazing putty (in double door to boiler room)

ND N/A

11295- B721-119

Exterior, 1st Floor Level West Side

White caulking w/ debris (between column and stone wall)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-

120QA

Exterior, 1st Floor Level West Side

Hard white caulking w/paint and debris (between column and stone wall)

ND N/A

11295- B721-121

Exterior, 1st Floor Level Northeast

Corner

Layer 1: White building trim caulking w/ paint (between siding and trim) Layer 2: Wood trim

ND

(All Layers)

N/A (All Layers)

11295- B721-122

Exterior, Basement Level West

Side

White/beige window glazing putty patch w/ paint (on 4’8”x3’4” wood-framed windows [same material as 1st floor windows])

ND N/A

11295- B721-123

Exterior, Basement Level West

Side

Hard gray window glazing putty patch w/ paint (on 4’8”x3’4” wood-framed windows [same material as 1st floor windows])

ND N/A

11295- B721-124

Exterior, Basement

Level South Side

Layer 1: Hard beige/tan window glazing putty patch w/ paint Layer 2: White window glazing putty (on 4’8”x3’4” wood-framed windows [same material as 1st floor windows]) Layer 3: Wood

ND

(All Layers)

N/A (All Layers)

11295- B721-125

Exterior, 1st Floor Level

West Corner

Brown on gray/black vent frame caulking w/ debris (on 4’8”x3’6” vents)

ND N/A

11295- B721-126

Exterior, 1st Floor Level East Corner

Brown on gray/black vent frame caulking w/ debris (on 4’8”x3’6” vents)

ND N/A

11295- B721-127

Basement, Room 9

Gray CAB panels w/ paint 18% Chrysotile

11295- B721-128

Basement, Room 9 Gray CAB panels w/ paint 15% Chrysotile

11295- B721-

129QA

1st Floor, Entry Lobby

Layer 1: 4” Brown cove base Layer 2: Beige mastic on old brown mastic w/ paint Layer 3: Trace gray brittle material

ND

(All Layers)

N/A (All Layers)

11295- B721-130

1st Floor, Entry Lobby

Layer 1: 4” Brown cove base w/ silver materials Layer 2: Beige mastic on old brown mastic

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-131

Exterior, Basement

Level South Side

12”x14” Square black gasket w/ paint (on natural gas meter/valve)

ND N/A

11295- B721-132

Exterior, Basement

Level South Side

10” OD Black gasket w/ paint (on natural gas meter/valve)

ND N/A

11295- B721-133

Exterior, Basement

Level South Side

White & gray tread putty/tape w/ paint and debris (on natural gas piping)

ND N/A

11295- B721-134

Exterior, Basement

Level South Side

Black hanger bushing w/ paint ND N/A

11295- B721-135

Basement, Room 1

Layer 1: Off-white paint Layer 2: Silver paint Layer 3: Trace black paint (on 4” OD main water radiator pipe)

ND

(All Layers)

N/A (All Layers)

11295- B721-136

Basement, Room 1

Layer 1: Off-white paint Layer 2: Silver paint Layer 3: Trace black paint (on 4” OD main water radiator pipe)

ND

(All Layers)

N/A (All Layers)

11295- B721-137

Basement, Room 1

Layer 1: Off-white paint Layer 2: Silver paint Layer 3: Trace black paint (on 4” OD main water radiator pipe)

ND

(All Layers)

N/A (All Layers)

11295- B721-138

Basement, Room 1

Layer 1: Tan duct tape Layer 2: Clear/yellow mastic Layer 3: Silver foil Layer 4: Tan paper w/ mastic Layer 5: Yellow fiberglass Layer 6: Gray duct seam sealant

ND

(All Layers)

N/A (All Layers)

11295- B721-139

Basement, Room 1

Layer 1: Silver foil Layer 2: Tan paper w/ mastic Layer 3: Yellow fiberglass Layer 4: Gray duct seam sealant (on 10” OD duct)

ND

(All Layers)

N/A (All Layers)

11295- B721-140 1st Floor, C-2

Layer 1: Beige glazing putty w/ paint Layer 2: Wood window frame (1/2 oval transom 11’x3’3”)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 721

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B721-141

Exterior, 1st Floor Level

C-2

Beige/white/tan paint on tan/beige/white glazing putty w/ paint and debris (2’x4’4” side light window)

ND N/A

11295- B721-142

Exterior, 1st Floor Level

C-2

Layer 1: Multiple layers of paint on tan/beige caulking (around entry door system) Layer 2: Wood

ND

(All Layers)

N/A (All Layers)

11295- B721-143

Exterior, 1st Floor Level

C-2

Layer 1: Tan/beige paint on tan glazing putty (11’x3’3” transom window) Layer 2: Wood

ND

(All Layers)

N/A (All Layers)

11295- B721-1441

1st Floor, Kitchen Room

Layer 1: 4” Light brown/tan cove base Layer 2: Light yellow mastic Layer 3: Tan JC w/ paint Layer 4: White paper

L2: ND

L3: 0.75%

N/A

11295- B721-1451

1st Floor, Kitchen Room

Layer 1: 4” Light brown/tan cove base Layer 2: Light yellow mastic Layer 3: Tan JC w/ paint Layer 4: White paper

L2: ND

L3: 0.75%

N/A

11295- B721-146

Exterior, 1st Floor Level South Side

Red paper vapor barrier (behind wood siding on wood)

ND N/A

11295- B721-147

Exterior, 1st Floor Level North Side

Red paper vapor barrier (behind wood siding on wood)

ND N/A

11295- B721-148

1st Floor, Kitchen Room

Black rubber flex duct w/ fibrous layer w/ paint (18”x24”)

ND N/A

11295- B721-149

1st Floor, Kitchen Room

Layer 1: Silver duct seam tape w/ paint Layer 2: Clear mastic

ND

(All Layers)

N/A (All Layers)

11295- B721-

150QA

1st Floor, Kitchen Room

Layer 1: Old gray/silver duct tape Layer 2: Tan/yellow/beige mastic

ND

(All Layers)

N/A (All Layers)

KEY: CAB = cement asbestos board, GWB = gypsum wall board, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outer diameter, OSB = oriented strand board, SACT = suspended acoustic ceiling tile, SVF = sheet vinyl flooring, TSI = thermal system insulation, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with

X When QA lab and primary lab sample results differed, EHSI reported the most restrictive (e.g., highest % asbestos) in Table 1. Analytical results for all analyses are provided in Appendix A.

1 Point Counted Results. Preliminary analytical reports indicated that various samples contained approximately 2% to 3% chrysotile asbestos (Sample #s 74, 144, 145). EHSI re-submitted the samples reported to have greater than 1% asbestos concentration for re-analysis using the more precise EPA “Point Count” method. The “Point Count” analytical method is recommended by the EPA for samples with less than 10% asbestos. Based on the results of that re-analysis, materials found to contain less than 1% (<1%) asbestos were determined to be a non-ACM (e.g., containing < 1% asbestos fibers) and are therefore not ACM. Materials found to contain greater than 1% asbestos are identified and quantified in Table 2 of this report.

Only the “Point Count” re-analysis concentrations are listed in Table 1. Analytical results for all analyses are provided in Appendix A.

Samples containing <1% asbestos fibers are considered to be a non-ACM. Materials that contain <1% asbestos are not regulated for disposal purpose. However, removal of <1% asbestos materials are considered an unclassified asbestos operation by DOSH. As directed by WRD 23.30, for all other demolition of materials with <1% asbestos, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC 296-62-07722(5). A list of materials with <1% asbestos is provided below.

<1% ACM JC on non-ACM GWB walls throughout building

Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2 Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 721

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

Non-ACM 12”x12” Beige VCT (w/ tan streaks) on ACM black mastic on non-ACM OSB on non-ACM red SVF w/ paint on non-ACM black paper backing w/ non-ACM black/brown mastic on non-ACM painted wood floor [Sample #s 01 & 12]

1st Floor, Rooms 101, 102, Closet 13, C-3, and the Entry Stair Landing

580 SF

Non-ACM 12”x12” Beige VCT (w/ tan streaks) on ACM black mastic on non-ACM OSB on non-ACM old mastic on non-ACM hard wood floor [Sample # 04]

Throughout Mezzanine 700 SF

Non-ACM 12”x12” Brown/gray VCT (w/ tan and beige streaks) on ACM orange/tan/ yellow mastic w/ old ACM black mastic on non-ACM OSB on non-ACM red SVF w/ paint on non-ACM black paper backing w/ non-ACM black/brown mastic on non-ACM painted wood floor [Sample #s 10 & 14]

1st Floor Entry Lobby, Room C-2 100 SF

ACM 9”x9” Green VAT on ACM black mastic with ACM 9”x9” Black VAT on ACM black mastic (in checkered pattern) and ACM 1’x2’ black VAT on ACM black mastic (on concrete) [Sample #s 25, 26, & 27]

Basement Room C-1

100 SF

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 721

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

ACM hard gray window glazing putty (2’10”x1’4” transom windows) [Sample #61]

1st Floor Room

2 EA

Gray CAB panels w/ paint [Sample #s 127 & 128] Basement, Room

9 240 SF

2’7”x2’8”x4’4” Natural gas boiler w/ assumed ACM internal components, sealants, and or insulation

Basement, Room

1 EA

1’5”x1’5”x9” Boiler control panel w/ assumed ACM internal components

Basement, Room

1 EA

2’6” OD x 5’ old hot water heater w/ assumed ACM sealants and/or insulation

Basement, Room

1 1 EA

1’6” OD x 1’6” hot water heater w/ assumed ACM sealants and/or insulation

Basement, Toilet Room 2 1 EA

2’4”x4’10”x2’8” Raznor AHU w/ assumed ACM internal components, sealants, and/or insulation

1st Floor, Kitchen Storage Room

1 EA

Electrical panels w/ assumed ACM internal components (1-6 SF in size)

1st Floor, Room 1 and Kitchen Dishwashing Area

3 EA

Control panels w/ assumed ACM internal components (1-6 SF in size)

Throughout Kitchen 104

3 EA

Large 3’ OD vent hoods w/ assumed ACM roof penetration sealant

Roof 2 EA

KEY: ACM = asbestos containing material, AHU = air handling unit, CAB = cement asbestos board, EA = each, OD = outside diameter, OSB = oriented strand board, SF = square feet, SVF = sheet vinyl flooring, VAT = vinyl asbestos tile, VCT = vinyl composite tile, w/ = with

ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building Inspector. Concealed suspect material may include but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.

2.4.2 Lead-Containing Paint and Building Materials

One-hundred seventy (170) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer. Results marked with “<LOD” are less than the limit of detection. XRF sample results ranged from 40.4 milligrams of lead per square centimeter (mg Pb/cm2) to < LOD.

Items in Tables 3 and 4 that are bolded in red font will trigger a negative exposure assessment and lead awareness training per WAC 296-155-17609.

Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.

TABLE 3

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

VANCOUVER BARRACKS – BUILDING 721

Read # Component Substrate Color Floor Room

Lead Conc.

(mg/cm2)

SELF-

CALIBRATION N/A N/A N/A N/A 2.52

2 CALIBRATION N/A RED N/A N/A 1.0

3 CALIBRATION N/A RED N/A N/A 1.0

4 CALIBRATION N/A RED N/A N/A 1.0

5 DOOR FRAME WOOD LIGHT BROWN FIRST ENTRY STAIRS 8.7

6 DOOR WOOD BROWN FIRST ENTRY STAIRS < LOD

7 DOOR INFILL WOOD LIGHT BROWN FIRST ENTRY STAIRS 2.9

8 TRIM WOOD LIGHT BROWN FIRST ENTRY STAIRS 2.7

9 WALL PLASTER WHITE FIRST ENTRY STAIRS < LOD

10 WALL PLASTER LIGHT BROWN FIRST ENTRY STAIRS < LOD

11 WALL PLASTER WHITE FIRST ENTRY STAIRS 15.1

12 NEWEL POST WOOD WHITE FIRST ENTRY STAIRS 9.5

13 RAILING WOOD LIGHT BROWN FIRST ENTRY STAIRS 2.9

14 BANNISTER WOOD WHITE FIRST ENTRY STAIRS 2.6

15 RISER WOOD BLACK FIRST ENTRY STAIRS 0.18

DOOR

TRIM/FRAME

WOOD LIGHT BROWN FIRST ENTRY STAIRS 10.4

17 DOOR TRANSOM WOOD LIGHT BROWN FIRST ENTRY STAIRS 9.6

18 CEILING PLASTER WHITE FIRST ENTRY STAIRS 11.6

19 CHAIR RAIL WOOD LIGHT BROWN FIRST ENTRY STAIRS 6.4

20 CHAIR RAIL WOOD WHITE MEZZANINE STAIRS 11.7

21 WALL PLASTER WHITE MEZZANINE STAIRS 23.6

22 STAIR STRINGER WOOD BLACK MEZZANINE STAIRS 4.8

23 STAIR STRINGER WOOD WHITE MEZZANINE STAIRS 4.1

24 STAIR RISER WOOD BLACK MEZZANINE STAIRS 8.7

25 WALL WOOD WHITE MEZZANINE STAIRS 5.1

26 RAILING WOOD WHITE MEZZANINE STAIRS 6.7

27 NEWEL POST WOOD WHITE MEZZANINE STAIRS 7.6

28 WALL TRIM WOOD WHITE MEZZANINE STAIRS 11.0

29 DOORWAY TRIM WOOD WHITE MEZZANINE STAIRS 6.5

30 WALL WOOD WHITE MEZZANINE RM 39 7.8

31 WALL WOOD WHITE MEZZANINE RM 39 9.3

32 DOOR TRIM WOOD WHITE MEZZANINE RM 39 8.1

33 CEILING METAL WHITE MEZZANINE RM 39 17.4

34 LARGE WINDOW

SILL/ TRIM

WOOD WHITE MEZZANINE RM 39 6.8

35 DOOR WOOD WHITE MEZZANINE RM 201 7.1

36 DOOR

TRIM_FRAME

WOOD WHITE MEZZANINE RM 201 6.7

37 WINDOW TRIM WOOD WHITE MEZZANINE RM 201 3.5

38 WINDOW WOOD WHITE MEZZANINE RM 201 4.6

39 WINDOWSILL WOOD WHITE MEZZANINE RM 201 6.1

40 CEILING METAL WHITE MEZZANINE RM 201 18.8

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

VANCOUVER BARRACKS – BUILDING 721

Read

Component Substrate Color Floor Room Lead Conc.

(mg/cm2)

41 WALL PLASTER WHITE MEZZANINE C-2 1.5

42 WALL WOOD WHITE MEZZANINE C-2 5.2

43 WALL TRIM WOOD WHITE MEZZANINE C-2 5.0

44 DOOR WOOD WHITE MEZZANINE C-2 6.2

DOOR

TRIM/FRAME WOOD WHITE MEZZANINE C-2 5.9

DOOR

TRIM/FRAME

WOOD WHITE MEZZANINE RM 202 < LOD

47 WALL WOOD WHITE MEZZANINE RM 202 4.9

48 WALL TRIM WOOD WHITE MEZZANINE RM 202 4.3

49 WALL BASE WOOD WHITE MEZZANINE RM 202 4.7

50 WALL WOOD WHITE FIRST RM 102 0.05

51 WALL WOOD LIGHT BLUE FIRST RM 102 0.05

52 WALL TRIM WOOD LIGHT BLUE FIRST RM 102 2.2

53 DOOR WOOD LIGHT BLUE FIRST RM 102 2.4

DOOR

TRIM/FRAME

WOOD LIGHT BLUE FIRST RM 102 2.2

55 WALL DRYWALL LIGHT BLUE FIRST RM 102 0.05

56 WALL DRYWALL WHITE FIRST RM 102 0.03

57 WALL PLASTER WHITE FIRST RM 102 3.8

58 WALL PLASTER LIGHT BLUE FIRST RM 102 3.2

59 WINDOW TRIM WOOD LIGHT BLUE FIRST RM 102 7.7

60 WINDOW WOOD LIGHT BLUE FIRST RM 102 2.2

CROWN

MOLDING

WOOD LIGHT BLUE FIRST RM 102 1.4

62 CEILING PLASTER WHITE FIRST RM 102 0.11

63 DOOR WOOD LIGHT BLUE FIRST RM 102 2.1

64 DOOR WOOD LIGHT BROWN FIRST RM 102 1.9

65 WALL PLASTER WHITE FIRST RM 101 16.3

66 WALL PLASTER LIGHT BLUE FIRST RM 101 0.04

67 DOOR WOOD LIGHT BLUE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .