Attachment 3c - B725 Limited Hazardous Materials Survey Report.pdf

PDF 8 MB Posted

Attached to
Abate hazardous materials, historic buildings, WA
Solicitation number
140P8320R0008
Issued by

About this file

This Request for Proposals solicits abatement of hazardous materials, selective demolition, and minor repairs at several historic buildings located at Fort Vancouver National Historic Site in Vancouver, Washington. Services required include asbestos, lead, mercury, and polychlorinated biphenyl abatement. The National Park Service will award a single firm-fixed-price construction contract for up to $1,000,000 to the offeror representing the best value as determined by technical capability and price. Proposals are due by the date specified in the solicitation, which will be posted on SAM.gov along with any amendments. The contract is set aside for small businesses and has a 180-day period of performance following award.

View the file

Other files

File Type Posted
Attachment 10 Final Clarifications_0003.pdf PDF
Sol_140P8320R0008_Amd_0003.pdf PDF
Sol_140P8320R0008_Amd_0002.pdf PDF
Sol_140P8320R0008_Amd_0001.pdf PDF
forms to return with proposal - revised 140P8320R0008_0001.docx DOCX document
Attachment 9 Site visit notes_0001.pdf PDF
Attachment 7a Revised Wage Determination_0001.pdf PDF
Attachment 3e - B748 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3a - B410 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3j - B786 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 6 Building Floor Plans_20200723.pdf PDF
Attachment 4c - B991 and B993 Asbestos Survey Field Notes.pdf PDF
Attachment 3g - B752 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3f - B749 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4b - B993 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 3i - B754 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3h - B753 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3d - B746 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3b - B721 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4a - B991 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 5 Building Descriptions.pdf PDF
forms to return with proposal 140P8320R0008.docx DOCX document
Attachment 1 Statement of Work.pdf PDF
Sol_140P8320R0008.pdf PDF
Attachment 2 Task List for each building.pdf PDF
FAQs for RFP 140P8320R0008.pdf PDF
Attachment 7 Wage Determination 7-3-20.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134 Phone 206-381-1128 Toll Free 800-666-2959 Fax 206-254-4279

Environmental Consulting Hazardous Materials Management Industrial Hygiene Services Construction Management Indoor Air Quality

LIMITED HAZARDOUS MATERIALS SURVEY REPORT

NATIONAL PARK SERVICE

FORT VANCOUVER NATIONAL HISTORIC SITE

BUILDING 725

East Vancouver Barracks Building 725

Vancouver, Washington 98661

October 31st, 2019

Prepared For:

Mary Hazell National Park Service 612 East Reserve Street Vancouver, WA 98661 ii

Limited Hazardous Materials Survey Report

National Park Service Fort Vancouver Historic Site

East Vancouver Barracks Building 746 Vancouver, Washington 98661

EHSI Project No.: # 11295

The material and data in this report were prepared under the supervision and direction of the undersigned.

Rory Peterson Lead AHERA Building Inspector

Derica Escamilla Principal of Hazardous Materials Services iii

TABLE OF CONTENTS

Acronym List ..................................................................... iv

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

1.2 EXTENT OF CURRENT SURVEY

1.3 ACM MATERIALS FOUND

1.4 OPINIONS AND RECOMMENDATIONS

1.5 LIMITATIONS/DISCLAIMER

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

2.2 BUILDING DESCRIPTION

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

2.3.2 Lead-Containing Paint/Lead-Containing Materials

2.4 SAMPLING RESULTS

2.4.1Asbestos-Containing Materials

2.4.2 Lead-Containing Paint and Building Materials

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

2.4.4 Polychlorinated Biphenyls

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and

Thermostats

3.0 LIMITATIONS

4.0 STANDARD OF CARE

5.0 CERTIFIED AHERA BUILDING INSPECTORS

APPENDICES

A ........................ Asbestos Analytical Laboratory Reports and Field Data Forms B ........................ Lead Analytical Laboratory Reports and Field Data Forms C ........................ Toxic Characteristics Leaching Procedure (TCLP) Analytical .......................... Laboratory Reports and Field Data Forms D ........................ Certified AHERA Building Inspector Certificates E ........................ Laboratory Certifications for Asbestos, Lead, and TCLP Analysis F ........................ Sample Locations Drawings for Asbestos, Lead, and TCLP iv

ACRONYM LIST

ACM .......................Asbestos-Containing Material AHERA ....................Asbestos Hazard Emergency Response Act AIHA ......................American Industrial Hygiene Association CFL ........................Compact Fluorescent Light CFR ........................Code of Federal Regulations Dia. ........................Diameter DOSH .....................Washington State Department of Labor and Industries, Division of

Occupational Safety and Health EA ..........................Each Ecology ...................Washington State Department of Ecology EHSI .......................EHS-International, Inc.

ELLAP .....................Environmental Lead Laboratory Accreditation Program GWB .......................Gypsum Wall Board Hg ..........................Mercury HID ........................High Intensity Discharge JC ..........................Joint Compound LCM ........................Lead-Containing Material LCP ........................Lead-Containing Paint LF ..........................Linear Feet L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter N/A ........................Not Applicable ND .........................None Detected NVL ........................NVL Laboratories, Inc.

NVLAP ....................National Voluntary Laboratory Accreditation Program OD .........................Outside Diameter OSB........................Orient Strand Board OSHA .....................US Occupational Safety and Health Administration Pb ..........................Lead PCBs .......................Polychlorinated Biphenyls PLM ........................Polarized Light Microscopy ppm .......................Parts per Million QA .........................Quality Assurance RCW .......................Revised Code of Washington SAT ........................Seattle Asbestos Test, LLC SF ..........................Square Feet SVF ........................Sheet Vinyl Flooring SWCAA ...................Southwest Clean Air Agency TCLP .......................Toxicity Characteristic Leaching Procedure TSI .........................Thermal System Insulation VCT ........................Vinyl Composite Tile WAC .......................Washington Administrative Code

wt. .........................Weight w/ ..........................With XRF ........................x-ray fluorescence

Fort Vancouver National Historic Site – B725

EHSI Project 11295

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

The National Park Service (NPS) plans to renovate Building 725 (B725) at the Fort Vancouver National Historic Site (FV NHS) located at 612 E. Reserve Street, Vancouver, Washington. The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of B725 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.

1.2 EXTENT OF CURRENT SURVEY

EHSI inspected accessible interior and exterior suspect ACM that may be potentially impacted by future projects. Accessible suspect materials were sampled including, but not limited to:

interior and exterior wall systems, window systems, and mechanical systems. The LCP and LCM survey was limited to the interior of the building only. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment) suspect materials were assumed to be ACM.

1.3 ACM MATERIALS FOUND

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 725

ASBESTOS MATERIAL DESCRIPTION LOCATION

Non-ACM green SVF (w/ small stone pattern) w/ ACM gray paper backing w/ non-ACM beige/tan mastic on non-ACM white leveling compound on non-ACM OSB on hard wood flooring on wood subfloor [Sample #02]

Toilet Room 5

Non-ACM 12”x12” beige VCT (w/ brown, tan & off-white streaks) w/ ACM black mastic on non-ACM OSB on non-ACM thick brown SVF w/ non-ACM burlap and paper backing w/ non-ACM coatings and mastics on hard wood floor [Sample #s 04 & 06]

Throughout Building

Non-ACM 12”x12” beige VCT patch (w/ brown, blue, tan & off-white streaks) w/ ACM yellow mastic on ACM old black mastic on non- ACM OSB on non-ACM thick brown SVF w/ non-ACM burlap and paper backing w/ non-ACM coatings and mastics on hard wood floor [Sample #s 08 & 09]

Sporadically Throughout Building

ACM beige/white fibrous duct penetration tape (around 1’x2’ duct through walls) [Sample #s 58, 59, & 60]

Rooms 2, 4, ;8, & 9

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 725

ASBESTOS MATERIAL DESCRIPTION LOCATION

ACM white fibrous backing board/heat shield (on N. wall) [Sample #s 61, 62, & 63]

Room 15 (Old Boiler Room)

ACM off-white fibrous corrugated paper TSI debris (w/ assumed ACM hard-mudded elbows) [Sample #87]

Throughout Crawlspace

Electrical panel w/ assumed ACM internal components (1-6 SF in size) Room 12

~1’6”x2’ Mirrors w/ assumed ACM mastic Toilet Rooms 5 & 6

Old 1’6” Dia. X 2’6” hot water heater w/ assumed ACM internal components, sealants, and/or insulation

Toilet Room 5

1’6”x2’4’x3’2” natural gas furnace w/ assumed ACM internal components, sealants, and/or insulation Room 8

2’ Dia. vent w/ assumed ACM penetration sealant Roof Assumed ACM chimney penetration sealant (at connection between roof and chimney)

Roof

KEY: ACM = asbestos containing material, Dia. = diameter, OSB = oriented strand board, SF = square feet, SVF = sheet vinyl flooring, TSI = thermal system insulation, VCT = vinyl composite tile, w/ = with

1.4 OPINIONS AND RECOMMENDATIONS

EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to any renovation and demolition activities.

Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.

Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will likely disturb the LCP, the contractor will need to perform an initial exposure assessment and lead awareness training in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).

A representative number of fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid.

Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology) Dangerous Waste. All fluorescent tubes and lamps contain mercury; any fluorescent lamps/tubes to be disturbed during the project must be recycled as (Ecology) Universal Waste.

1.5 LIMITATIONS/DISCLAIMER

This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint.

This report and accompanying appendices include the supporting information for this executive summary.

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: identification of all suspect materials; a determination of whether suspect materials were: ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.

On August 28th and 29th, 2019, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest Clean Air Agency (SWCAA).

2.2 BUILDING DESCRIPTION

B725 is in Vancouver, Washington at the Fort Vancouver National Historic site and part of the East Barracks portion of the site. B725 was originally constructed in 1914 with alterations made to the interior and exterior of the building as the uses of the structure changed throughout its history. The building is a single-story wood-framed structure with wood siding, wood windows and wood doors. The building sits on a brick and mortar pier foundation. The interior finishes include; vinyl composite tile (VCT), wood and vinyl base, plaster and gypsum wallboard (GWB) walls and ceilings. The building is now heated by a forced air system but was previously heated by a coal fired boiler. Lighting is provided fluorescent light fixtures throughout.

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix D. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October 1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.

EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary Laboratory Accreditation Plan (NVLAP). Laboratory NVLAP certifications are included in Appendix E. Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.

2.3.2 Lead-Containing Paint/Lead-Containing Materials

EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.

Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).

Copies of laboratory reports and field data forms for lead are in Appendix B.

All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

Eighty-seven (87) bulk samples of suspect ACM were collected as part of the survey. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos sample location drawings are provided in Appendix F. Asbestos sampling information including sample number, material description, sample location, and analytical results are summarized in Table

1. The ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-

01QA

Toilet Room

Layer 1: Off-white SVF (w/ small broken rock pattern w/ blue accents) Layer 2: Gray/off-white paper backing Layer 3: Beige/tan mastic Layer 4: OSB (on hard wood flooring on wood subfloor)

N/A (All Layers)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-

02QAX

Toilet Room 5

Layer 1: Green/pale green SVF (w/ small stone pattern) Layer 2: Gray paper backing Layer 3: Beige/tan/clear mastic w/ debris Layer 4: White leveling compound Layer 5: OSB (on hard wood flooring on wood subfloor)

L1: ND

L2: 46%

L3: ND

L4: ND

L5: ND

N/A

Chrysotile

11295- B725-03

Toilet Room

Layer 1: Beige/tan mastic Layer 2: White leveling compound (on OSB)

N/A (All Layers)

ND

(All Layers)

11295- B725-

04QAX

Room 9

Layer 1: 12”x12” Beige VCT (w/ brown, tan & off-white streaks) Layer 2: Black mastic Layer 3: OSB (on sample # 05)

L2: 3%

11295- B725-

05QA

Room 9

Layer 1: Thick brown SVF (linoleum) Layer 2: Brown/tan burlap backing Layer 3: Thick gray paper backing w/ trace mastic Layer 4: Off-white coating Layer 5: Brown mastic (on hard wood floor)

N/A (All Layers)

ND

(All Layers)

11295- B725-06

Room 3

Layer 1: 12”x12” Beige VCT (w/ brown, tan, & off-white streaks) Layer 2: Black mastic Layer 3: OSB (on sample # 05)

L2: 3%

11295- B725-07

Room 3

Layer 1: Light blue paint Layer 2: Thick brown SVF Layer 3: Brown burlap backing Layer 4: Thick gray paper backing Layer 5: Off-white coating Layer 6: Brown mastic (on hard wood floor)

N/A (All Layers)

ND

(All Layers)

11295- B725-08

Room 12

Layer 1: 12”x12” Beige VCT patch (w/ blue, tan & off-white streaks) Layer 2: Yellow mastic Layer 3: Old black mastic Layer 4: OSB debris

L2: 2% L3: 3%

N/A

11295- B725-09

Corridor 6 Entry

Layer 1: 12”x12” Beige VCT patch (w/ brown, tan & off-white streaks) Layer 2: Yellow mastic Layer 3: Old black mastic Layer 4: OSB debris

L2: 2% L3: 3%

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-10

Toilet Room

Layer 1: Tan sink drain putty w/ paint Layer 2: Hard red sink drain gasket (on porcelain sink)

N/A (All Layers)

ND

(All Layers)

11295- B725-11

Toilet Room

Black rubber sink drain gasket w/ paint (on porcelain sink)

N/A ND

11295- B725-12

Room 1 Layer 1: Wood strips Layer 2: Brown mastic (on wood wall panels)

N/A (All Layers)

ND

(All Layers)

11295- B725-13

Room 1 Layer 1: Wood strips Layer 2: Brown mastic (on wood wall panels)

N/A (All Layers)

ND

(All Layers)

11295- B725-14

Room 1 Layer 1: Wood strips Layer 2: Brown mastic (on wood wall panels)

N/A (All Layers)

ND

(All Layers)

11295- B725-15

Exterior, E.

Side

Layer 1: Hard beige window glazing putty w/ paint Layer 2: Wood window frame debris (on 3’x1’9” wood-framed transom window)

N/A (All Layers)

ND

(All Layers)

11295- B725-16

Exterior, E.

Side

Hard beige window glazing putty w/ paint (on 3’x1’9” wood-framed transom window)

N/A ND

11295- B725-17

Exterior, S.

Side

White window glazing putty patch w/ paint (on 2’8”x1’8” wood-framed window)

N/A ND

11295- B725-18

Exterior, S.

Side

White window glazing putty patch w/ paint (on 2’8”x1’8” wood-framed window)

N/A ND

11295- B725-19

Exterior, E.

Side

White transom window frame caulking (also on windows, door trim, base boards, and siding)

N/A ND

11295- B725-20

Exterior, E.

Side

White transom window frame caulking (also on windows, door trim, base boards, and siding)

N/A ND

11295- B725-21

Exterior, SW Corner

White building trim caulking (also on windows, door trim, base boards, and siding)

N/A ND

11295- B725-

22QA

Exterior, N.

Side, Bay

Area

Hard beige/tan window glazing putty w/ multiple layers of paint (on 2’7”x2’4” wood-framed bay windows)

N/A ND

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-23

Exterior, N.

Side, Bay

Area

Hard beige window glazing putty w/ multiple layers of paint (on 2’7”x2’4” wood-framed bay windows)

N/A ND

11295- B725-24

Exterior, N.

Side, Bay

Area

Beige window glazing putty patch w/ multiple layers of paint (on 2’7”x2’4” wood-framed bay windows)

N/A ND

11295- B725-25

Exterior, N.

Side, Bay

Area

Beige window glazing putty patch w/ multiple layers of paint (on 2’7”x2’4” wood-framed bay windows)

N/A ND

11295- B725-26

Exterior, N.

Side

Hard beige window glazing putty w/ multiple layers of paint (on 2’9”x5’3” wood-framed windows)

N/A ND

11295- B725-27

Exterior, N.

Side

White window glazing putty patch w/ paint (on 2’9”x5’3” wood-framed windows)

N/A ND

11295- B725-28

Exterior, E.

Side

Hard beige window glazing putty w/ multiple layers of paint (on 2’9”x5’3” wood-framed windows)

N/A ND

11295- B725-29

Exterior, S.

Side

Hard beige window glazing putty w/ multiple layers of paint (on 2’9”x5’3” wood-framed windows)

N/A ND

11295- B725-30

Room 15 (Old Boiler

Shed)

Layer 1: Silver paint Layer 2: GWB wall w/ paper

N/A (All Layers)

ND

(All Layers)

11295- B725-31

Room 15 (Old Boiler

Shed)

Layer 1: Silver paint Layer 2: GWB wall w/ paper

N/A (All Layers)

ND

(All Layers)

11295- B725-32

Room 15 (Old Boiler

Shed)

Layer 1: Silver paint Layer 2: GWB ceiling w/ paper

N/A (All Layers)

ND

(All Layers)

11295- B725-33

Room 4 Layer 1: 4” Black cove base Layer 2: Dark brown mastic (on wood wall panels)

N/A (All Layers)

ND

(All Layers)

11295- B725-34

Room 1 Layer 1: 4” Black cove base Layer 2: Dark brown mastic (on plywood wall panels)

N/A (All Layers)

ND

(All Layers)

11295- B725-35

Room 10 Layer 1: 4” Black cove base Layer 2: Dark brown mastic (on GWB walls)

N/A (All Layers)

ND

(All Layers)

11295- B725-36

Corridor 6 Entry

Layer 1: JC w/ paint Layer 2: Pink GWB wall w/ paint and paper (corner)

N/A (All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-37

Room 3 Layer 1: JC w/ paint Layer 2: Pink GWB wall w/ paper (at seam)

N/A (All Layers)

ND

(All Layers)

11295- B725-38 Room 3

Pink GWB w/ bumpy textured paint and paper (mid-wall) N/A ND

11295- B725-39

Corridor 6 Layer 1: JC skim coat w/ paint Layer 2: Pink GWB w/ paper (mid-wall)

N/A (All Layers)

ND

(All Layers)

11295- B725-40

Corridor 6 Layer 1: JC skim coat w/ paint Layer 2: Pink GWB w/ paper (mid-wall)

N/A (All Layers)

ND

(All Layers)

11295- B725-41

Corridor 6 GWB wall w/ paint and paper (mid-wall)

N/A ND

11295- B725-42

Room 13 GWB wall w/ paint and paper (mid-wall)

N/A ND

11295- B725-43 Room 13

GWB wall w/ paint and paper (mid-wall) N/A ND

11295- B725-441

Composite Result <1%

Room 13

Layer 1: JC w/ paint Layer 2: JC w/ paper Layer 3: GWB wall w/ paper (at seam)

L1: ND

L2: 0.25%

B725-451

Composite Result <1%

Room 14

Layer 1: JC w/ paint Layer 2: JC w/ paper Layer 3: GWB wall w/ paper (corner)

L1: ND

L2: 0.5%

B725-46

Room 2

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster wall (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-47 Room 3

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster wall (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-48

Room 8

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster wall (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-49

Room 14

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster wall (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-50

Room 11

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster wall (on wood lath)

N/A (All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-51

Corridor 6, By Toilets

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster ceiling (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-52

Corridor 6 Entry

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster ceiling (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-53

Room 11

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster ceiling (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-54 Room 3

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster ceiling (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-55

Room 2

Layer 1: Smooth white topcoat w/ multiple layers of paint Layer 2: Gray plaster ceiling (on wood lath)

N/A (All Layers)

ND

(All Layers)

11295- B725-56 Room 6

Layer 1: Silver foil duct seam tape Layer 2: Orange mastic (at duct connection to newer furnace)

N/A (All Layers)

ND

(All Layers)

11295- B725-57 Room 6

Layer 1: Silver foil duct seam tape Layer 2: Orange mastic (at duct connection to newer furnace)

N/A (All Layers)

ND

(All Layers)

11295- B725-

58QAX

Room 6

Beige/white/off-white fibrous duct penetration tape w/ paint (around 1’x2’ duct through walls)

75% Chrysotile

11295- B725-59

Room 4 Beige/white fibrous duct penetration tape (around 1’x2’ duct through walls)

43% Chrysotile

11295- B725-60

Room 9 Beige/white fibrous duct penetration tape (around 1’x2’ duct through walls)

46% Chrysotile

11295- B725-61

Room 15, (Old Boiler

Room)

White fibrous backing board/heat shield (on N. wall)

50% Chrysotile

11295- B725-62

Room 15, (Old Boiler

Room)

White fibrous backing board/heat shield (on N. wall)

54% Chrysotile

11295- B725-63

Room 15, (Old Boiler

Room)

White fibrous backing board/heat shield (on N. wall)

52% Chrysotile

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-641

Room 15, (Old Boiler

Room)

Tan pipe dope (on natural gas line fittings)

0.75% Chrysotile

11295- B725-651

Room 15, (Old Boiler

Room)

Tan pipe dope (on natural gas line fittings)

0.5% Chrysotile

11295- B725-66

Room 15, (Old Boiler

Room)

Layer 1: Gray flue penetration sealant/light-weight concrete Layer 2: Light gray sealant/light-weight concrete Layer 3: Dark gray sealant/light-weight concrete (at penetration in chimney)

N/A (All Layers)

ND

(All Layers)

11295- B725-67

Room 15, (Old Boiler

Room)

Layer 1: Gray flue penetration sealant/light-weight concrete Layer 2: Light gray sealant/light-weight concrete Layer 3: Dark gray sealant/light-weight concrete (at penetration in chimney)

N/A (All Layers)

ND

(All Layers)

11295- B725-68

Room 15, (Old Boiler

Room)

Layer 1: Red brick Layer 2: Light gray mortar

N/A (All Layers)

ND

(All Layers)

11295- B725-69

Exterior, W.

Side

8” OD Black regulator gasket w/ paint (on natural gas line to natural gas meter)

N/A ND

11295- B725-70

Exterior, W.

Side

10” OD Tan natural gas meter gaskets (3 on natural gas meter)

N/A ND

11295- B725-71

Exterior, W.

Side

10” OD Tan natural gas meter gaskets (3 on natural gas meter) N/A ND

11295- B725-72

Exterior, W.

Side

Tan pipe dope w/ paint (on natural gas lines)

N/A ND

11295- B725-73

Exterior, S.

Side

Black asphaltic paper vapor barrier (behind wood siding on wood)

N/A ND

11295- B725-

74QA

Exterior, N.

Side

Black asphaltic paper vapor barrier (behind wood siding on wood)

N/A ND

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-75

Roof, SE Corner

Layer 1: Black asphaltic composite roofing shingles Layer 2: Black asphaltic felt vapor barrier layer Layer 3: Black asphaltic tar Layer 4: Black asphaltic composite roofing shingles Layer 5: Black asphaltic felt vapor barrier layer Layer 6: Black asphaltic tar Layer 7: Black asphaltic felt vapor barrier Layer 8: Black asphaltic tar Layer 9: Wood roof deck

N/A (All Layers)

ND

(All Layers)

11295- B725-76

Roof, S.

Side

Layer 1: Black asphaltic composite roofing shingles Layer 2: Black asphaltic felt vapor barrier layer Layer 3: Black asphaltic tar Layer 4: Black asphaltic composite roofing shingles Layer 5: Black asphaltic felt vapor barrier layer Layer 6: Black asphaltic tar Layer 7: Black asphaltic felt vapor barrier Layer 8: Black asphaltic tar Layer 9: Wood roof deck

N/A (All Layers)

ND

(All Layers)

11295- B725-77

Roof, N.

Side

Layer 1: Black asphaltic composite roofing shingles Layer 2: Black asphaltic felt vapor barrier layer Layer 3: Black asphaltic tar Layer 4: Black asphaltic composite roofing shingles Layer 5: Black asphaltic felt vapor barrier layer Layer 6: Black asphaltic tar Layer 7: Black asphaltic felt vapor barrier Layer 8: Black asphaltic tar Layer 9: Wood roof deck

N/A (All Layers)

ND

(All Layers)

11295- B725-78

Roof, N.

Side Bay

Area

Layer 1: Gray penetration caulking/sealant Layer 2: Black asphaltic tar (on 1’ OD furnace exhaust duct)

N/A (All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-79

Roof, N.

Side Bay

Area

Layer 1: Gray penetration caulking/sealant Layer 2: Black asphaltic tar (on 1’ OD furnace exhaust duct)

N/A (All Layers)

ND

(All Layers)

11295- B725-

80QA

Roof, N.

Side Bay

Area

Black/dark gray rubber penetration caulking/sealant (on 1’ OD furnace exhaust duct)

N/A ND

11295- B725-81

SW Awning Roof

Layer 1: Black asphaltic composite roofing shingles Layer 2: Black asphaltic felt vapor barrier layer Layer 3: Black asphaltic tar Layer 4: Black asphaltic composite roofing shingles Layer 5: Black asphaltic felt vapor barrier layer Layer 6: Black asphaltic tar Layer 7: Thick black asphaltic felt vapor barrier Layer 8: Black asphaltic felt vapor barrier (on wood decking)

N/A (All Layers)

ND

(All Layers)

11295- B725-

82QA

SE Awning Roof

Layer 1: Black asphaltic composite roofing shingles Layer 2: Black asphaltic felt vapor barrier layer Layer 3: Black asphaltic tar Layer 4: Black asphaltic composite roofing shingles Layer 5: Black asphaltic felt vapor barrier layer Layer 6: Black asphaltic tar Layer 7: Thick black asphaltic felt vapor barrier Layer 8: Black asphaltic felt vapor barrier (on wood decking)

N/A (All Layers)

ND

(All Layers)

11295- B725-83

Roof, N.

Side

Gray flashing seam sealant w/ paint

N/A ND

11295- B725-84

Roof on Old Boiler Room

Gray flashing seam sealant w/ paint N/A ND

11295- B725-85

Crawlspace, NW Corner

Layer 1: Silver foil Layer 2: White paper wrap w/ mastic (on small bore fiberglass TSI under building)

N/A (All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11295- B725-

86QA

Crawlspace, NW Corner

Layer 1: Brown/tan paper wrap/TSI Layer 2: Black mastic (on older small bore piping)

N/A (All Layers)

ND

(All Layers)

11295- B725-

87QAX

Crawlspace

, NW

Corner

Off-white fibrous corrugated paper TSI debris (w/ assumed ACM hard-mudded elbows throughout crawlspace)

82% Chrysotile

KEY: GWB = gypsum wallboard, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outside diameter, OSB = oriented strand board, SVF = sheet vinyl flooring, TSI = thermal system insulation, VCT = vinyl composite tile, w/ = with

X When QA lab and primary lab sample results differed, EHSI reported the most restrictive (e.g., highest % asbestos) in Table 1. Analytical results for all analyses are provided in Appendix A.

1 Point Counted Results. Preliminary analytical reports indicated that various samples contained approximately 2% to 3% chrysotile asbestos (Sample #s 11295-B725-44, 45, 64, and 65).

EHSI re-submitted the samples reported to have greater than 1% asbestos concentration for re-analysis using the more precise EPA “Point Count” method. The “Point Count” analytical method is recommended by the EPA for samples with less than 10% asbestos. Based on the results of that re-analysis, materials found to contain less than 1% (<1%) asbestos were determined to be a non-ACM (e.g., containing < 1% asbestos fibers) and are therefore not ACM. Materials found to contain greater than 1% asbestos are identified and quantified in Table 2 of this report. Only the “Point Count” re-analysis concentrations are listed in Table 1. Analytical results for all analyses are provided in Appendix A.

Samples containing <1% asbestos fibers are considered to be a non-ACM. Materials that contain <1% asbestos are not regulated for disposal purpose. However, removal of <1% asbestos materials are considered an unclassified asbestos operation by DOSH. As directed by WRD 23.30, for all other demolition of materials with <1% asbestos, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC 296-62-07722(5). A list of materials with <1% asbestos is provided below.

<1% JC on non-ACM GWB walls

<1% Tan pipe dope on natural gas line fittings

Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2 Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 725

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

Non-ACM green SVF (w/ small stone pattern) w/ ACM gray paper backing w/ non-ACM beige/tan mastic on non-ACM white leveling compound on non-ACM OSB on hard wood flooring on wood subfloor [Sample #02]

Toilet Room 5 40 SF

Non-ACM 12”x12” beige VCT (w/ brown, tan & off-white streaks) w/ ACM black mastic on non-ACM OSB on non-ACM thick brown SVF w/ non-ACM burlap and paper backing w/ non-ACM coatings and mastics on hard wood floor [Sample #s 04 & 06]

Throughout Building

1,800 SF

Non-ACM 12”x12” beige VCT patch (w/ brown, blue, tan & off-white streaks) w/ ACM yellow mastic on ACM old black mastic on non-ACM OSB on non-ACM thick brown SVF w/ non-ACM burlap and paper backing w/ non-ACM coatings and mastics on hard wood floor [Sample #s 08 & 09]

Sporadically Throughout Building

Included in quantity directly above

ACM beige/white fibrous duct penetration tape (around 1’x2’ duct through walls) [Sample #s 58, 59, & 60]

Rooms 2, 4, ;8, &

9 36 LF

ACM white fibrous backing board/heat shield (on N. wall) [Sample #s 61, 62, & 63]

Room 15 (Old Boiler Room) 40 SF

ACM off-white fibrous corrugated paper TSI debris (w/ assumed ACM hard-mudded elbows) [Sample #87]

Throughout Crawlspace 1,800 SF

Electrical panel w/ assumed ACM internal components (1-6 SF in size)

Room 12 1 EA

~1’6”x2’ Mirrors w/ assumed ACM mastic Toilet Rooms 5 & 6 2 EA Old 1’6” Dia. X 2’6” hot water heater w/ assumed ACM internal components, sealants, and/or insulation

Toilet Room 5 1 EA

1’6”x2’4’x3’2” natural gas furnace w/ assumed ACM internal components, sealants, and/or insulation

Room 8 1 EA

2’ Dia. vent w/ assumed ACM penetration sealant Roof 1 EA Assumed ACM chimney penetration sealant (at connection between roof and chimney)

Roof 6 LF

KEY: ACM = asbestos containing material, Dia. = diameter, EA = each, LF = linear feet, OSB = oriented strand board, SF = square feet, SVF = sheet vinyl flooring, TSI = thermal system insulation, VCT = vinyl composite tile, w/ = with

ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building Inspector. Concealed suspect material may include but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.

2.4.2 Lead-Containing Paint and Building Materials

Seventy-six (76) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer. Results marked with “<LOD” are less than the limit of detection. XRF sample results ranged from 31.4 milligrams of lead per square centimeter (mg Pb/cm2) to 1.0. Items in Tables 3 and 4 that are bolded in red font will trigger a negative exposure assessment and lead awareness training per WAC 296-155-17609.

Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.

TABLE 3

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

VANCOUVER BARRACKS – BUILDING 725

Read

Component Substrate Color Floor Room Lead Conc.

(mg/cm2)

1 SELF-CALIBRATION N/A N/A N/A N/A 2.21

2 CALIBRATION N/A RED N/A N/A 0.9

3 CALIBRATION N/A RED N/A N/A 1.0

4 CALIBRATION N/A RED N/A N/A 1.0

5 WINDOW WOOD MAROON FIRST 1 4.0

6 WINDOW SILL WOOD MAROON FIRST 1 3.4

7 WINDOW TRIM WOOD MAROON FIRST 1 4.0

8 DOOR TRIM WOOD MAROON FIRST 1 3.9

9 DOOR TRANSOM WOOD MAROON FIRST 1 3.1

10 DOOR FRAME WOOD BEIGE FIRST 1 12.7

11 DOOR WOOD BEIGE FIRST 1 8.8

12 WALL WOOD OFF-WHITE FIRST 1 2.3

13 WALL PLASTER OFF-WHITE FIRST 1 3.0

14 WALL PLASTER OFF-WHITE FIRST 1 3.5

15 WALL DRYWALL OFF-WHITE FIRST 1 < LOD

16 SM DOOR TRIM DRYWALL MAROON FIRST 1 < LOD

17 DOOR WOOD OFF-WHITE FIRST 1 3.6

18 DOOR FRAME WOOD OFF-WHITE FIRST 1 < LOD

19 WALL WOOD OFF-WHITE FIRST 2 4.4

20 WALL FRAMING WOOD OFF-WHITE FIRST 2 3.2

21 CHAIR RAIL WOOD OFF-WHITE FIRST 2 4.2

22 DUCT METAL OFF-WHITE FIRST 2 < LOD

23 CROWN MOLDING WOOD OFF-WHITE FIRST 2 3.3

24 DOOR WOOD BROWN FIRST 2 3.5

25 WALL BASE WOOD TAN FIRST 2 3.2

26 WINDOW TRIM WOOD OFF-WHITE FIRST 4 3.0

27 WINDOW SILL WOOD OFF-WHITE FIRST 4 2.1

28 WALL WOOD OFF-WHITE FIRST 4 0.03

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

VANCOUVER BARRACKS – BUILDING 725

Read # Component Substrate Color Floor Room

Lead Conc.

(mg/cm2)

29 DOOR WOOD OFF-WHITE FIRST 4 < LOD

30 DOOR FRAME WOOD OFF-WHITE FIRST 4 < LOD

31 WALL PLASTER OFF-WHITE FIRST 6 CORRIDOR 3.6

32 WALL DRYWALL OFF-WHITE FIRST 6 CORRIDOR < LOD

33 WALL TRIM WOOD OFF-WHITE FIRST 6 CORRIDOR 4.9

34 WALL BASE WOOD OFF-WHITE FIRST 6 CORRIDOR 4.2

35 DOOR TRIM WOOD MAROON FIRST 6 CORRIDOR 3.5

36 SINK CERAMIC OFF-WHITE FIRST 6 TOILET 31.4

37 TOILET CERAMIC OFF-WHITE FIRST 6 TOILET < LOD

38 HOT WATER TANK METAL OFF-WHITE FIRST 6 TOILET < LOD

39 WALL PLASTER OFF-WHITE FIRST 6 TOILET 8.8

40 SHELF WOOD OFF-WHITE FIRST 6 TOILET 0.11

41 DOOR WOOD OFF-WHITE FIRST 6 TOILET 4.2

42 MIRROR FRAME WOOD OFF-WHITE FIRST 6 TOILET 0.16

43 WINDOW WOOD OFF-WHITE FIRST 5 3.5

44 WALL WOOD OFF-WHITE FIRST 5 FURNACE 5.5

45 WINDOW TRIM WOOD OFF-WHITE FIRST 5 FURNACE 3.2

46 WINDOW WOOD OFF-WHITE FIRST 5 FURNACE 17.5

47 WALL PLASTER OFF-WHITE FIRST 5 FURNACE 3.7

48 FURNACE METAL TAN FIRST 5 FURNACE < LOD

49 DUCT METAL OFF-WHITE FIRST 5 FURNACE < LOD

50 FA PANEL METAL RED FIRST 5 FURNACE < LOD

51 DOOR TRIM WOOD MAROON FIRST 9 < LOD

52 DOOR FRAME WOOD OFF-WHITE FIRST 9 < LOD

53 WALL PLASTER OFF-WHITE FIRST 9 5.7

54 WALL DRYWALL OFF-WHITE FIRST 9 < LOD

55 WALL DRYWALL OFF-WHITE FIRST 13 < LOD

56 WALL PLASTER OFF-WHITE FIRST 13 10.1

57 WALL BASE WOOD OFF-WHITE FIRST 13 0.19

58 WINDOW WOOD OFF-WHITE FIRST 13 4.2

59 WINDOW TRIM WOOD OFF-WHITE FIRST 13 5.7

60 DOOR TRIM WOOD OFF-WHITE FIRST 13 < LOD

61 SM WINDOW TRIM WOOD OFF-WHITE FIRST 13 < LOD

62 WALL WOOD OFF-WHITE FIRST 6 CORRIDOR 6.8

63 WALL TRIM DRYWALL OFF-WHITE FIRST 6 CORRIDOR < LOD

64 WALL BASE WOOD OFF-WHITE FIRST 6 CORRIDOR 6.5

65 DOOR WINDOW WOOD BEIGE FIRST 6 CORRIDOR 11.4

66 DOOR WINDOW WOOD BEIGE FIRST 6 CORRIDOR 13.3

67 WALL PLASTER OFF-WHITE FIRST 11 6.8

TACK BOARD

FRAME WOOD OFF-WHITE FIRST 11 1.1

69 DOOR WOOD OFF-WHITE FIRST 11 < LOD

70 DOOR TRIM WOOD OFF-WHITE FIRST 11 6.3

71 DOOR WOOD OFF-WHITE FIRST 12 3.6

72 WALL DRYWALL OFF-WHITE FIRST 12 < LOD

73 ELECTRICAL PANEL METAL GRAY FIRST 12 < LOD

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

VANCOUVER BARRACKS – BUILDING 725

Read # Component Substrate Color Floor Room

Lead Conc.

(mg/cm2)

TRIM AROUND

ELECTRICAL PANEL WOOD OFF-WHITE FIRST 12 < LOD

75 CEILING PLASTER OFF-WHITE FIRST 6 CORRIDOR 4.3

76 WALL DRYWALL SILVER FIRST 15 < LOD

77 CEILING DRYWALL SILVER FIRST 15 < LOD

78 WALL WOOD SILVER FIRST 15 < LOD

79 DOOR FRAME WOOD SILVER FIRST 15 0.05

80 DOOR WOOD LIGHT GRAY FIRST 15 < LOD

81 CALIBRATION N/A RED N/A N/A 1.0

82 CALIBRATION N/A RED N/A N/A 1.0

83 CALIBRATION N/A RED N/A N/A 1.0

Key: N/A = not applicable, <LOD = less than limit of detection

All XRF sample shots are representative of that color on that specific substrate and component.

The report user shall deduce from the data in Table 3, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

In addition to the XRF samples, EHSI collected three (3) bulk QA samples for laboratory analysis. The bulk sample results ranged from 0.012 to 1.4 percent lead by weight (%Pb/wt.).

Building materials and paint containing detectable levels of lead are considered regulated by

DOSH.

Table 4 summarizes bulk QA lead sample, including sample number, material description, substrate, color, location, and analytical results. Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.

TABLE 4

SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 725

SAMPLE NUMBER LOCATION

COMPONENT/

SUBSTRATE COLOR

RESULTS

% Pb by

WT

11295-B725-

Pb01 1st Floor, Room 2 Wall / Plaster Off-white 1.4

11295-B725- Pb02

1st Floor, Room 2 Wall / Plywood

Off-white on

Multiple Colors

1.3

11295-B725- Pb03

1st Floor, Room 15 (Old Boiler Room)

Chimney / Brick & Mortar

Red & Gray

0.012

Key: Pb = lead, WT = weight

L&I DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.

Since the type of work planned (e.g., sawing, grinding, select demolition) may disturb the lead-containing materials, the contractor will need to conduct lead awareness training and perform an initial exposure assessment in accordance with the regulations.

In addition to XRF and bulk samples, EHSI observed two (2) lead-acid batteries inside the fire alarm control panel and three (3) lead vent pipes on the roof during the inspection. These batteries and lead vent pipes must be disposed of in accordance with the Washington State Department of Ecology (Ecology) dangerous waste regulations or recycled at an approved facility.

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

At the request of NPS, EHSI accomplished TCLP sampling and analysis of the assumed waste stream for the project and Table 5 summarizes the analytical results. EHSI collected and composited a representative sample of the assumed waste stream for renovation activities that may impact interior building finishes, that included proportionate quantities of all materials expected to be included in the waste stream. Note: Painted metals were not included in the assumed waste stream sampling, because they are expected to be recycled and because there is no limit on metals containing paint on metals being recycled.

Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., hazardous metals-containing paint/hazardous metals-containing materials). Ecology has set a dangerous waste threshold at 5.0 milligrams per liter (mg/L), for arsenic, chromium, lead, and silver, 1.0 Mg/L for cadmium, 100 mg/L for barium and .2 mg/L for mercury.

The TCLP sample for the Project was analyzed for Lead (Pb) only. Copies of the analytical laboratory report and field data forms for the TCLP sample are included in Appendix C of this report.

TABLE 5

SUMMARY OF TCLP SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 725

Sample # Elements RL in mg/L Results in mg/L Results in ppm

11295- B725-

TCLP-01

Sample Description:

40% Composite Roofing;

34 % 12”x12” Beige floor tile on OSB on old SVF 7% Painted wood building skirt;

5% Painted wood building siding;

5% Painted plaster walls & ceilings & cove base 3% Painted wood porch deck;

2% Painted GWB walls;

2% Painted plywood walls;

1% Off-white & green SVF on OSB; and 1% Painted wood windowsill & trim

Lead (Pb) 0.5 1.8 1.8 KEY: GWB = gypsum wall board, mg/L = milligram per liter, OSB = oriented strand board, Pb = Lead, ppm = part per million, RL = Reporting Limit, SVF = sheet vinyl flooring, w/ = with

Based on the representative waste stream that was submitted for TCLP by EHSI, this waste stream passed TCLP testing for lead (did not exceed the threshold of 5.0 ppm). If the client were to have a waste stream with similar percentages as indicated above, the waste stream would likely pass.

It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.

2.4.4 Polychlorinated Biphenyls

Ballasts

EHSI inspected a representative number of each type of fluorescent fixture for PCB-containing ballasts. A select number of fixtures inspected were found to contain magnetic ballasts and must be assumed to contain PCB-containing dialectic fluid containing > 2 ppm PCBs;

therefore, they must be disposed/recycled as Ecology Dangerous Waste. Additional fluorescent light fixtures were found to contain electronic ballasts, which contain no dialectic fluid and may be disposed as general construction debris. A Summary of ballasts and Hg-containing light tubes is provided in Table 6.

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats

All fluorescent light tubes quantified in Table 6 are assumed to contain Hg. Hg wastes are regulated as “universal wastes” under Ecology’s regulation WAC 173-303. Hg-containing building materials must be recycled or disposed of as hazardous waste. Hg-containing fluorescent light tubes are quantified in Table 6.

TABLE 6

SUMMARY OF LIGHT FIXTURE INSPECTION RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 725

LIGHT TYPE FIXTURES

LIGHT TUBES/

BULBS

MAGNETIC

BALLASTS

16”x4’ Suspended light fixture w/ 4 bulbs and 2 magnetic ballasts 1 4 2

16”x4’ Mounted light fixture w/ 4 bulbs and 2 magnetic ballasts 1 4 2

1’x4’ Suspended light fixture w/ 2 bulbs and 1 magnetic ballast

34 68 34

1’x4’ Suspended light fixture w/ 2 bulbs and 1 electronic ballast

2 4 0

HID light fixture w/ 1 magnetic ballast 5 5 5

TOTAL IMPACTED 43 85 43

Key: HID = high-intensity discharge, w/ = with

3.0 LIMITATIONS

This survey was limited to those materials accessible using standard survey methods. Limited representative destructive inspection was accomplished. All suspect materials present were accessible for sampling.

This survey was limited to the chemicals and materials identified herein. No effort was made to identify hazardous materials in soil, water, or air, other than those listed herein. Any survey regardless of how extensive can miss concealed materials. Contractors should be aware of the potential that demolition activities may expose concealed suspect ACM and should have preplanned contingencies for handling these materials when discovered during demolition work. Any concealed, suspect ACM material that was not sampled or that was assumed to be ACM by this survey report when encountered must be treated as ACM until sampled by a Certified AHERA Building Inspector and analyzed by a certified laboratory. Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint.

4.0 STANDARD OF CARE

The recommendations and conclusions contained in this report represent the professional opinions of EHSI. These opinions are derived in accordance with federal, state, and local environmental and health and safety laws and regulations. This survey was accomplished in accordance with applicable federal, state, and local regulations and industry standards in effect at the time. Other than this, no other warranty is implied or intended.

5.0 CERTIFIED AHERA BUILDING INSPECTORS

The Certified AHERA Building Inspectors listed below surveyed Building 725 on September 4th and 5th, 2019, in accordance with federal, state, and local requirements.

Rory Peterson Brett Racine Certified AHERA Building Inspector Certified AHERA Building Inspector Certificate Number: 174271 Certificate Number: 173936 Expiration Date: August 7, 2020 Expiration Date: July 10, 2020

Appendix A

APPENDIX A

Asbestos Analytical Laboratory Report and Field Data Forms

Matt Macfarlane, Asbestos Lab Supervisor

Client Project: 11295-01 Location: NPS Fort Vancouver B725

Dear Mr. Peterson, Enclosed please find test results for the 11 sample(s) submitted to our laboratory for analysis on 9/5/2019.

Examination of these samples was conducted for the presence of identifiable asbestos fibers using polarized light microscopy (PLM) with dispersion staining in accordance with both EPA 600/M4-82-020, Interim Method for the Determination of Asbestos in Bulk Insulation Samples and EPA 600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials.

For samples containing more than one separable layer of materials, the report will include findings for each layer (labeled Layer 1 and Layer 2, etc. for each individual layer). The asbestos concentration in the sample is determined by calibrated visual estimation.

For those samples with asbestos concentrations between 1 and 10 percent based on visual estimation, the EPA recommends a procedure known as point counting (NESHAPS, 40 CFR Part 61). Point counting is a statistically more accurate means of quantification for samples with low concentrations of asbestos.

The detection limit for the calibrated visual estimation is <1%, 400 point counts is 0.25% and 1000 point counts is 0.1%

Samples are archived for two weeks following analysis. Samples that are not retrieved by the client are discarded after…