This Request for Proposals (RFP) solicits abatement of hazardous materials in several historic buildings at Fort Vancouver National Historic Site. The National Park Service seeks to abate asbestos, lead, mercury, polychlorinated biphenyls, and wildlife excrement through selective demolition and minor repairs. Offerors must visit SAM.gov for amendments and submit technical and price proposals digitally by the due date. The small business set-aside contract will be firm-fixed-price, last 180 days, and require payment and performance bonds and liability insurance. The estimated value is $250,000 to $1,000,000 depending on options exercised. The site visit is August 13, 2020 at Fort Vancouver NHS; individual visits are prohibited. The NAICS code is 562910 and small business size standard is $22 million average annual gross receipts.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134 Phone 206-381-1128 Toll Free 800-666-2959 Fax 206-254-4279
• Environmental Consulting
• Hazardous Materials Management
• Industrial Hygiene Services
• Construction Management
• Indoor Air Quality
LIMITED HAZARDOUS MATERIALS SURVEY REPORT
NATIONAL PARK SERVICE
FORT VANCOUVER NATIONAL HISTORIC SITE
BUILDING 752
East Vancouver Barracks, Building 752
Vancouver, Washington 98661
December 24th, 2018, 2018
Prepared For:
Kristen Jontos National Park Service 612 East Reserve Street Vancouver, WA 98661 ii
Limited Hazardous Materials Survey Report
National Park Service
Fort Vancouver Historic Site
Building 752
East Vancouver Barracks, Building 752
Vancouver, Washington 98661
EHSI Project No.: # 11176
The material and data in this report were prepared under the supervision and direction of the undersigned.
Rory Peterson Lead AHERA Building Inspector
Derica Escamilla Principal of Hazardous Materials
Services iii
TABLE OF CONTENTS
Acronym List .............................................................................................. iv
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
1.2 EXTENT OF CURRENT SURVEY
1.3 ACM MATERIALS FOUND
1.4 OPINIONS AND RECOMMENDATIONS
1.5 LIMITATIONS/DISCLAIMER
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
2.2 BUILDING DESCRIPTION
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
2.3.2 Lead-Containing Paint/Lead-Containing Materials
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
2.4.2 Lead-Containing Paint and Building Materials
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
2.4.4 Polychlorinated Biphenyls
2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs and thermostats
3.0 LIMITATIONS
4.0 STANDARD OF CARE
5.0 CERTIFIED AHERA BUILDING INSPECTORS
APPENDICES
A ........................ Asbestos Laboratory Reports and Field Data Forms B ........................ Lead Laboratory Reports and Field Data Forms
C ........................ Certified AHERA Building Inspector Certificates D ........................ Laboratory Certifications for Asbestos and Lead Analysis
E ......................... Sample Location Drawings for Asbestos and Lead F ......................... Hazardous Metals TCLP Laboratory Reports and Field Data Forms G ........................ Abatement Cost Estimate iv
ACRONYM LIST
ACM .......................Asbestos-Containing Material
Ag ..........................Silver
AHERA ....................Asbestos Hazard Emergency Response Act
AHU .......................Air Handling unit
AIHA ......................American Industrial Hygiene Association
As ..........................Arsenic
Ba ..........................Barium
Cd ..........................Cadmium
CFL ........................Compact Fluorescent Light
CFR ........................Code of Federal Regulations
Cr ..........................Chromium
DOSH .....................Washington State Department of Labor and Industries, Division of
Occupational Safety and Health
EA ..........................Each
Ecology ...................Washington State Department of Ecology
EHSI .......................EHS-International, Inc.
ELLAP .....................Environmental Lead Laboratory Accreditation Program
GWB .......................Gypsum Wall Board
Hg ..........................Mercury
JC ..........................Joint Compound
LCM ........................Lead-Containing Material
LCP ........................Lead-Containing Paint
LF ..........................Linear Feet
L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter
N/A ........................Not Applicable
ND .........................None Detected
NVL ........................NVL Laboratories, Inc.
NVLAP ....................National Voluntary Laboratory Accreditation Program
OD .........................Outside Diameter
OSHA .....................US Occupational Safety and Health Administration
Pb ..........................Lead
PCBs .......................Polychlorinated Biphenyls
PLM ........................Polarized Light Microscopy ppm .......................Parts per Million
QA .........................Quality Assurance
RCW .......................Revised Code of Washington
SAT ........................Seattle Asbestos Test, LLC
Se ..........................Selenium
SF ..........................Square Feet
SVF ........................Sheet Vinyl Flooring
SWCAA ...................Southwest Clean Air Agency
TCLP .......................Toxicity Characteristic Leaching Procedure
VCT ........................Vinyl Composite Tile
WAC .......................Washington Administrative Code
wt. .........................Weight w/ ..........................With
XRF ........................x-ray fluorescence
Fort Vancouver National Historic Site – B752
EHSI Project 11035
December 24th, 2018
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
The National Park Service (NPS) plans to renovate Building 752 (B752) at the Fort Vancouver
National Historic Site (FV NHS) located at East Vancouver Barracks, Vancouver, Washington.
The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of B752 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.
1.2 EXTENT OF CURRENT SURVEY
EHSI inspected accessible interior and exterior suspect ACM that may be impacted by future projects. Accessible suspect materials were sampled including, but not limited to: interior and exterior wall systems, window systems, and mechanical systems. The LCP and LCM survey was limited to the interior of the building only. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment, elevator equipment, unit heaters, and roof vents at peak of roof) suspect materials were assumed to be ACM.
1.3 ACM MATERIALS FOUND
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
ASBESTOS MATERIAL DESCRIPTION LOCATION
Non-ACM 12”x12” Beige VCT w/ brown, white and orange streaks on ACM black mastic on particle board [Sample # 01 and #21]
1st Floor, NE ½, Main Room
ACM black coating on non-ACM fire penetration sealant on non-ACM brown/red brick (around 8” OD flue penetration into brick chimney) [Sample #27]
1st Floor, NE ½, Furnace
Room 2
Elevator w/ assumed ACM brake pads 1st Floor, Center Room, Elevator Shaft
Assumed ACM elevator car guide rail spacers 1st Floor, Center Room, Elevator Shaft
Assumed ACM elevator motor gaskets 1st Floor, Center Room, Elevator Shaft
1’x1’x16” Ceiling mounted unit heater w/ assumed ACM internal components 1st Floor, SW Main Room
Assumed ACM electrical components in furnace Furnace Room 1 and 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
ASBESTOS MATERIAL DESCRIPTION LOCATION
Electrical panel with assumed ACM components 1st Floor, SW Main Room
Electrical meter w/ assumed ACM components 1st Floor, SW Main Room
3’ OD Attic vent w/ assumed ACM penetration sealant around opening at roof Roof, NE Side and SW Side
8” OD Vent fan w/ assumed ACM penetration sealant around opening at roof Roof, SW Side
2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, SW Side and Center
4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, NE Side
KEY: ACM = asbestos containing material, OD = outer diameter, VCT = vinyl composite tile, w/ = with
1.4 OPINIONS AND RECOMMENDATIONS
EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to any renovation and demolition activities.
Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.
Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will disturb the LCP, the contractor will need to perform an initial exposure assessment in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).
96% of fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology)
Dangerous Waste. All fluorescent tubes and lamps contain mercury; any fluorescent lamps/tubes to be disturbed during the project must be recycled as (Ecology) Universal Waste.
One (1) hydraulic elevator reservoir was identified during the inspection as potentially impacted by the project. Sampling these oil-filled components was not within the scope of this inspection.
All oil filled components should be tested for PCBs or assumed to contain oil containing between
50 parts per million (50 ppm) and 500 ppm PCBs until tested. The oil from PCB-oil containing components (≥ 50 ppm PCBs and < 500 ppm PCBs) must be disposed as Ecology Dangerous
Waste.
1.5 LIMITATIONS/DISCLAIMER
This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical equipment, elevator equipment, unit heaters, and roof vents at peak of roof were not sampled but were assumed to be present based on the inspector’s experience with similar systems on other projects and are assumed to be ACMs. Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint. This report and accompanying appendices include the supporting information for this executive summary.
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: identification of all suspect materials; a determination of whether suspect materials were: ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.
From September 11th to 12th, 2018, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington
Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest
Clean Air Agency (SWCAA).
2.2 BUILDING DESCRIPTION
Building 752 is located at East Vancouver Barracks, Vancouver, Washington. The building is a two-story wood-framed structure with a partial attic/loft. The building sits on a brick and masonry pier foundation. The building’s roof is covered with 3-tab composite shingles. Interior floor finishes include: original tongue and groove hardwood flooring, vinyl composite tile
(VCT), and sheet vinyl flooring (SVF). Interior wall finishes include: original tongue & groove wood walls, painted plywood, painted fibrous wood walls, peg board display wall systems, and gypsum wallboard. Interior ceiling finishes include: textured wood panels, texturing on gypsum wall board (GWB), plywood, and tongue & groove wood planks. Windows throughout the building are operable and wood-framed. Heating is provided by local electric forced air furnaces, electric wall unit heaters and natural gas ceiling mounted unit heaters. There is also evidence that the building was originally heated by wood fired stoves. Hot water is provided by an electric domestic two hot water tanks. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of
Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix
C. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October
1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.
EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and
Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary
Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.
Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.
Copies of both laboratories’ NVLAP certifications are included in Appendix D.
2.3.2 Lead-Containing Paint/Lead-Containing Materials
EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.
Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic
Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene
Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).
Copies of laboratory reports and field data forms for lead are in Appendix B.
All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
Eighty-eight (88) bulk samples of suspect ACM were collected as part of the survey. Five (5) of those samples were split for quality assurance analyses. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix E. Asbestos sampling information including: sample number, material description, sample location, and analytical results are summarized in Table 1. The
ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-
1st Floor, NE
½, Main
Room
Layer 1: 12”x12” Beige VCT
(w/ brown, white, & orange streaks)
Layer 2: Black mastic
Layer 3: Particle board
L1: ND
L2: 3%
L3: ND
N/A
Chrysotile
11176-02
1st Floor, NE
½, Main
Room
Layer 1: 4” Black cove base
Layer 2: Cream/white mastic
Layer 3: Wood fiber wall panel w/ paint
ND
(All Layers)
N/A
(All Layers)
11176-
03QA
1st Floor, NE
½, Furnace
Room
Layer 1: Blue carpet (w/ beige mesh backing)
Layer 2: Beige/gray mastic
Layer 3: Green linoleum
Layer 4: Black asphaltic paper backing
Layer 5: Dark brown mastic
Layer 6: Plywood
ND
(All Layers)
N/A
(All Layers)
11176-04
1st Floor, NE
½, Furnace
Room
Layer 1: Plywood
Layer 2: Black/brown mastic
(w/ dirt on hardwood flooring)
ND
(All Layers)
N/A
(All Layers)
11176-05
1st Floor, NE
½, Main
Room
Layer 1: 4” Black cove base
Layer 2: Brown mastic (on wood)
ND
(All Layers)
N/A
(All Layers)
11176-06
1st Floor, NE
½, Furnace
Room
Layer 1: Brown grout
Layer 2: White material (on flue penetration into chimney, between metal and clay pipe)
ND
(All Layers)
N/A
(All Layers)
11176-07
1st Floor, NE
½, Furnace
Room
Layer 1: Red clay pipe
Layer 2: Trace white powdery material
Layer 3: Trace brown/gray grout (on flue penetration into chimney, between brown grout and brick chimney)
ND
(All Layers)
N/A
(All Layers)
11176-08
1st Floor, NE
½, Furnace
Room
Layer 1: Red chimney brick w/ paint
Layer 2: Gray mortar
ND
(All Layers)
N/A
(All Layers)
11176-09
1st Floor, NE
½, Furnace
Room 2
Layer 1: JC
Layer 2: GWB wall w/ paper
(unpainted, at seam)
ND
(All Layers)
N/A
(All Layers)
11176-10
1st Floor, NE
½, Furnace
Room 2
Layer 1: JC
Layer 2: GWB wall w/ paper
(unpainted, at seam)
ND
(All Layers)
N/A
(All Layers)
11176-11
1st Floor, NE
½, Main
Room
GWB panel w/ paper (covering old window)
ND
(All Layers)
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-12
1st Floor, NE
½, Furnace
Room 2
Layer 1: Red chimney brick
Layer 2: Gray mortar
ND
(All Layers)
N/A
(All Layers)
11176-13
1st Floor, NE
½, Furnace
Room
Layer 1: Trace JC w/ paint
Layer 2: GWB wall (at seam)
ND
(All Layers)
N/A
(All Layers)
11176-14
1st Floor, NE
½, Furnace
Room
Layer 1: Beige/off-white JC w/ joint tape
Layer 2: Beige/off-white JC
Layer 3: GWB ceiling w/ paper
(at seam, unpainted)
ND
(All Layers)
N/A
(All Layers)
11176-15
1st Floor, NE
½, Furnace
Room
Layer 1: Beige/off-white JC
Layer 2: GWB ceiling w/ paper
(at seam, unpainted)
ND
(All Layers)
N/A
(All Layers)
11176-16
1st Floor, NE
½, Main
Room
Layer 1: White popcorn ceiling texturing w/ paint
Layer 2: GWB ceiling w/ paper
(mid ceiling)
ND
(All Layers)
N/A
(All Layers)
11176-17
1st Floor, NE
½, Main
Room
Layer 1: White popcorn ceiling texturing
Layer 2: GWB ceiling w/ paper
(at seam)
ND
(All Layers)
N/A
(All Layers)
11176-18
1st Floor, NE
½, Main
Room
Layer 1: White popcorn ceiling texturing
Layer 2: Wood ceiling panel w/ paint
ND
(All Layers)
N/A
(All Layers)
11176-19
1st Floor, NE
½, Main
Room
White popcorn ceiling texturing w/ paint (on wood beam)
ND N/A
11176-20
1st Floor, NE
½, Main
Room
White popcorn ceiling texturing w/ paint (on 1½’x1’ square metal duct)
ND N/A
11176-
1st Floor, NE
½, Main
Room
Layer 1: 12”x12” Beige VCT
(w/ brown, white, & orange streaks)
Layer 2: Black mastic
Layer 3: Wood particle board
L1: ND
L2: 3%
11176-22
1st Floor, NE
½, Main
Room
Layer 1: Vinyl wall covering w/ paint on JC
Layer 2: GWB wall w/ paper
(wall edge)
ND
(All Layers)
N/A
(All Layers)
11176-23
1st Floor, NE
½, Main
Room
Layer 1: Vinyl wall covering w/ paint on JC skim coat
Layer 2: GWB wall w/ paper
(mid wall)
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-24
1st Floor, NE
½, Main
Room
Layer 1: Vinyl wall covering w/ paint w/ yellow material
Layer 2: JC (at wall seam)
ND
(All Layers)
N/A
(All Layers)
11176-
25QA
1st Floor, NE
½, Main
Room
Layer 1: Orange/tan/yellow mastic (associated w/ wood pattern wall panels)
Layer 2: Trace JC
Layer 3: GWB wall w/ paper
ND
(All Layers)
N/A
(All Layers)
11176-26
1st Floor, NE
½, Furnace
Room 2
Tan pipe dope (on natural gas line fitting)
ND N/A
11176-
1st Floor, NE
½, Furnace
Room 2
Layer 1: Black coating
Layer 2: White fire penetration sealant
Layer 3: Brown/red grout (at
8” OD flue penetrations into brick chimney)
L1: 2%
L2: ND
11176-28
1st Floor, NE
½, Furnace
Room 2
4” Beige cove base (1 roll loose on floor)
ND N/A
11176-29
1st Floor, NE
½, Furnace
Room 2
Layer 1: Black duct insulation
Layer 2: Black mastic
ND
(All Layers)
N/A
(All Layers)
11176-30
1st Floor, NE
½, Furnace
Room
Layer 1: Silver foil
Layer 2: Yellow fiberglass insulation
Layer 3: Black mastic (inside furnace)
ND
(All Layers)
N/A
(All Layers)
11176-31
1st Floor, NE
½, Furnace
Room
Tan/brown duct tape (w/ mastic) w/ paint (at connection from furnace to duct)
ND N/A
11176-32
1st Floor, NE
½, Main
Room
Layer 1: Tan window glazing sealant
Layer 2: Black rubber window glazing gasket (on glass doors)
ND
(All Layers)
N/A
(All Layers)
11176-33
1st Floor, NE
½, Exterior
Front Entry
Hard white/off-white door frame caulking w/ paint
(double door)
ND N/A
11176-34
1st Floor, NE
½, Furnace
Room
Dark brown pipe dope (on natural gas pipe fitting)
ND N/A
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-35
1st Floor, SW
½, Men’s
Restroom
Layer 1: White SVF (w/ black specks)
Layer 2: Off-white/gray paper backing w/ mastic
Layer 3: Particle board
Layer 4: Brown paper vapor barrier w/ black mastic (on wood)
ND
(All Layers)
N/A
(All Layers)
11176-36
1st Floor, SW
½, Main
Room
Layer 1: Silver paint
Layer 2: Black asphaltic coating
(on 4” OD hot water line to radiators)
ND
(All Layers)
N/A
(All Layers)
11176-37
1st Floor, SW
½, Main
Room
Layer 1: Silver paint
Layer 2: Beige/tan pipe dope
(on 1¾” OD hot water line to radiators)
ND
(All Layers)
N/A
(All Layers)
11176-38
1st Floor, SW
½, Main
Room
Layer 1: Silver paint
Layer 2: Beige/tan pipe dope
(on 1” OD hot water line to radiators)
ND
(All Layers)
N/A
(All Layers)
11176-39
1st Floor, NE
½, Main
Room
Layer 1: Gray/brown Formica™ countertop
Layer 2: Clear yellow mastic
Layer 3: Wood (on lobby counter)
ND
(All Layers)
N/A
(All Layers)
11176-40
1st Floor, NE
½, Main
Room
Layer 1: White/brown
Formica™ countertop
Layer 2: Clear yellow mastic
Layer 3: Wood (on lobby counter)
ND
(All Layers)
N/A
(All Layers)
11176-
1st Floor, Center Room
Layer 1: JC w/ paint
Layer 2: GWB wall w/ paper
(corner)
L1: 0.5%
L2: ND
11176-42 1st Floor, Center Room
GWB wall w/ paint and paper
(mid wall)
ND N/A
11176-43 1st Floor, Center Room GWB wall w/ paper (mid wall) ND N/A
11176-44
1st Floor, Men’s
Restroom
Layer 1: White bumpy texturing w/ JC w/ paint w/ joint tape
Layer 2: GWB wall w/ paper
(corner)
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-45
1st Floor, Men’s
Restroom
Layer 1: White bumpy texturing w/ JC w/ paint
Layer 2: Yellow woven joint tape
Layer 3: GWB wall w/ paper (at seam)
ND
(All Layers)
N/A
(All Layers)
11176-46
1st Floor, Women’s
Restroom
Layer 1: White bumpy texturing w/ paint
Layer 2: Yellow woven joint tape
Layer 3: GWB wall w/ paper
(mid wall)
ND
(All Layers)
N/A
(All Layers)
11176-47
1st Floor, Men’s
Restroom
Layer 1: White bumpy texturing w/ JC w/ paint
Layer 2: GWB ceiling w/ paper
(at seam)
ND
(All Layers)
N/A
(All Layers)
11176-48
1st Floor, Men’s
Restroom
Layer 1: Trace white bumpy texturing w/ paint
Layer 2: GWB ceiling w/ paper
(mid ceiling)
ND
(All Layers)
N/A
(All Layers)
11176-49
1st Floor, Women’s
Restroom
Layer 1: Brown paper vapor barrier w/ black mastic
Layer 2: Pink fiberglass insulation (in wall)
ND
(All Layers)
N/A
(All Layers)
11176-50
1st Floor, Men’s
Restroom
Layer 1: 4” Brown cove base
Layer 2: Yellow/beige mastic
ND
(All Layers)
N/A
(All Layers)
11176-51
1st Floor, SW
½, Main
Room
Beige window counter weight rope w/ paint
ND N/A
11176-52 1st Floor, Center Room
Black asphaltic coating (on
~1’x1’6”x8” metal support post brackets)
ND N/A
11176-53
1st Floor, SW
½, Main
Room
Black asphaltic coating (on
~1’x1’6”x8” metal support post brackets)
ND N/A
11176-54
1st Floor, SW
½, Main
Room
Layer 1: Red brick w/ paint
Layer 2: Gray mortar w/ paint
(on small 2’x2’ chimney)
ND
(All Layers)
N/A
(All Layers)
11176-55
1st Floor, SW
½, Main
Room
Layer 1: Silver foil w/ mastic
Layer 2: Yellow fiberglass insulation (inside 2’x3’x5’ AHU)
ND
(All Layers)
N/A
(All Layers)
11176-56
1st Floor, SW
½, Main
Room
White/off-white pipe dope (on natural gas lines to 2’x3’x5’
AHU)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-57
1st Floor, SW
½, Main
Room
Gray duct seam sealant (on
2’x2’ duct seam sections)
ND N/A
11176-58
1st Floor, SW
½, Main
Room
Gray duct seam sealant (on
1’6”x2’ duct seam sections)
ND N/A
11176-
59QA
2nd Floor, NE
½
Beige/tan window glazing putty w/ paint (in 3’x4’8” wood framed windows)
ND N/A
11176-60 2nd Floor, SW
½
Beige window glazing putty w/ paint (in 3’x4’8” wood framed windows)
ND N/A
11176-61 2nd Floor, SW
½
Black gasket (on knob & tube wiring knobs)
ND N/A
11176-
62QA
2nd Floor, SW
½
Layer 1: White coating/paint
Layer 2: Black asphaltic coating w/ woven fibrous wire wrap
Layer 3: Black rubber wire insulation
Layer 4: Copper wire
ND
(All Layers)
N/A
(All Layers)
11176-63 2nd Floor, SW
½
Layer 1: Black asphaltic coating w/ woven fibrous wire wrap
Layer 2: Black rubber wire insulation
Layer 3: Copper wire
ND
(All Layers)
N/A
(All Layers)
11176-64 2nd Floor, SW
½
Layer 1: Tan flue penetration patch
Layer 2: Red brick chimney
Layer 3: Gray mortar
ND
(All Layers)
N/A
(All Layers)
11176-65 2nd Floor, Center Area
Layer 1: Beige elevator gate rope
Layer 2: Trace white powdery rope core
ND
(All Layers)
N/A
(All Layers)
11176-66 2nd Floor, Center Area
Brown paper vapor barrier w/ blue coating (between hardwood floor and wood subfloor)
ND N/A
11176-67 2nd Floor, NE
½
Brown paper vapor barrier w/ blue coating (between hardwood floor and wood subfloor)
ND N/A
11176-68 2nd Floor, SW
½
Black asphaltic paper vapor barrier (between wood wall and siding)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-69 2nd Floor, NE
½
Black asphaltic paper vapor barrier (between wood wall and siding)
ND N/A
11176-70 2nd Floor, SW
½
Black asphaltic paper vapor barrier (between wood roof decking and wood)
ND N/A
11176-71 2nd Floor, NE
½
Black asphaltic paper vapor barrier (between wood roof decking and wood)
ND N/A
11176-72 2nd Floor, NE
½
Layer 1: Black asphaltic coating w/ woven fibrous wire wrap
Layer 2: Black rubber wire insulation
Layer 3: Copper wire
ND
(All Layers)
N/A
(All Layers)
11176-73
1st Floor, SW
½, Main
Room
Brown paper vapor barrier w/ blue coating (between hardwood floor and wood subfloor)
ND N/A
11176-74 Exterior, NW
Side
10”x10” Black gasket w/ paint
(on natural gas meter)
ND N/A
11176-75 Exterior, NW
Side
6” Black/gray fibrous regulator gasket w/ paint
ND N/A
11176-76 Exterior, NW
Side
Gray and off-white pipe dope w/ paint (on natural gas line fittings, along the side and under building)
ND N/A
11176-77
Exterior, SW
Side
(Restroom
Addition)
Gray window glazing putty (on
3’x3’ windows)
ND N/A
11176-78
Exterior, SW
Side
(Restroom
Addition)
Tan window glazing putty w/ paint (on 3’x3’ wood-framed windows)
ND N/A
11176-79 Exterior, SE
Side
Tan window glazing putty w/ paint (on 3’5”x5’3” wood-framed windows)
ND N/A
11176-80 Exterior, NW
Side
Tan window glazing putty w/ paint (on 3’5”x5’3” wood-framed windows)
ND N/A
11176-81
Exterior, SE
Side, S.
Corner
White window glazing putty patch w/ paint (on 3’5”x5’3” wood-framed windows)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-82
Exterior, Roof, Restroom
Addition
Layer 1: Black asphaltic 3-tab roofing
Layer 2: Black asphaltic tar
Layer 3: Black asphaltic 3-tab roofing
Layer 4: Black asphaltic tar
Layer 5: Black asphaltic vapor barrier (on wood)
ND
(All Layers)
N/A
(All Layers)
11176-83
Exterior, Roof, Restroom
Addition
Layer 1: Black asphaltic 3-tab roofing
Layer 2: Black asphaltic tar
Layer 3: Black asphaltic 3-tab roofing
Layer 4: Black asphaltic tar
Layer 5: Black asphaltic vapor barrier (on wood)
ND
(All Layers)
N/A
(All Layers)
11176-84 Exterior, SE
Side
White window frame/trim caulking (on all 3’5”x5’3” wood framed windows)
ND N/A
11176-
85QA
Exterior, SE
Side
White door frame/trim caulking w/ paint (on all side doors)
ND N/A
11176-86 Exterior, Roof-Awning
Layer 1: Black asphaltic 3-tab roofing
Layer 2: Black asphaltic tar
Layer 3: Black asphaltic 3-tab roofing
Layer 4: Black asphaltic tar
Layer 5: Black asphaltic 3-tab roofing
Layer 6: Black asphaltic tar
Layer 7: Black asphaltic vapor barrier
ND
(All Layers)
N/A
(All Layers)
11176-87
Exterior, Roof-Porch
Addition
Layer 1: Black asphaltic rolled down roofing
Layer 2: Thick black asphaltic tar
Layer 3: Black asphaltic vapor barrier
Layer 4: Black asphaltic vapor barrier (on wood)
ND
(All Layers)
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11176-88
Exterior, Roof-Porch
Addition
Layer 1: Black asphaltic rolled down roofing
Layer 2: Thick black asphaltic tar
Layer 3: Black asphaltic vapor barrier
Layer 4: Black asphaltic vapor barrier (on wood)
ND
(All Layers)
N/A
(All Layers)
KEY: AHU = air handling unit, GWB = gypsum wall board, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outer diameter, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with, 1 Point Counted Results. Preliminary analytical reports indicated that various samples contained approximately 2% chrysotile asbestos (Sample #s 11176-41). EHSI re-submitted this sample reported to have greater than 1% asbestos concentration for re-analysis using the more precise
EPA “Point Count” method. The “Point Count” analytical method is recommended by the EPA for samples with less than 10% asbestos. Based on the results of that re-analysis, materials found to contain less than 1% (<1%) asbestos were determined to be a non-ACM (e.g., containing < 1% asbestos fibers) and are therefore not ACM. Materials found to contain greater than 1% asbestos are identified and quantified in Table 2 of this report. Only the “Point Count” re-analysis concentrations are listed in Table 1. Analytical results for all analyses are provided in Appendix A.
Washington State Department of Labor and Industries Division of Occupational Safety and
Health (L&I DOSH) requires special worker exposure precautions and qualifications when dealing with ACM used on seams and nail holes (refer to L&I DOSH regulations and WISHA
Regional Directives {WRD}). Any “dust creating activity”, such as: sanding, sawing, grinding, or drilling of GWB walls or ceilings shall be accomplished by certified asbestos workers using glove-bag, mini-enclosure and/or negative pressure enclosure engineering controls and work practices. As directed by WRD 23.30, for all other demolition or disturbance of GWB walls/ceilings with ACM JC, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC 296-62-07722(5).
Samples containing <1% asbestos fibers are considered to be a non-ACM. Materials that contain
<1% asbestos are not regulated for disposal purpose. However, removal of <1% asbestos materials are considered an unclassified asbestos operation by DOSH. As directed by WRD
23.30, for all other demolition of materials with <1% asbestos, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC
296-62-07722(5).
Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2
Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.
TABLE 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY
Non-ACM 12”x12” Beige VCT w/ brown, white and orange streaks on ACM black mastic on particle board
[Sample # 01 and #21]
1st Floor, NE ½, Main
Room
2,900 SF
ACM black coating on non-ACM fire penetration sealant on non-ACM brown/red brick (around 8” OD flue penetration into brick chimney) [Sample #27]
1st Floor, NE ½, Furnace Room 2
1 LF
Elevator w/ assumed ACM brake pads 1st Floor, Center
Room, Elevator Shaft
2 EA
Assumed ACM elevator car guide rail spacers 1st Floor, Center
Room, Elevator Shaft
6 EA
Assumed ACM elevator motor gaskets 1st Floor, Center
Room, Elevator Shaft
10 EA
1’x1’x16” Ceiling mounted unit heater w/ assumed
ACM internal components
1st Floor, SW Main
Room
2 EA
Assumed ACM small electrical components in furnaces
Furnace Room 1 and
2 EA
Electrical panel with assumed ACM internal components
1st Floor, SW Main
Room
2 EA
Electrical meter w/ assumed ACM internal components
1st Floor, SW Main
Room
1 EA
3’ OD Attic vent w/ assumed ACM penetration sealant around opening at roof
Roof, NE Side and SW
Side
2 EA
8” OD Vent fan w/ assumed ACM penetration sealant around opening at roof Roof, SW Side 1 EA
2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof
Roof, SW Side and
Center
2 EA
4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, NE Side 1 EA
KEY: ACM = asbestos containing material, EA = each, SF = square feet, OD = outer diameter, VCT = vinyl composite tile, w/ = with
ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect
ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building
Inspector. Concealed suspect material may include, but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.
2.4.2 Lead-Containing Paint and Building Materials
Ninety-five (95) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer.
Red bolded results indicate materials containing detectable levels of lead and “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation 40CFR745 and
Washington State Commerce regulation WAC 365-230.
Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
Read
Component Substrate Color Building Room
Lead
Conc.
(mg/cm2)
1 SHUTTER CALL N/A N/A BUILDING 752 N/A 3.85
2 CALIBRATION N/A RED BUILDING 752 N/A 1.0
3 CALIBRATION N/A RED BUILDING 752 N/A 0.9
4 CALIBRATION N/A RED BUILDING 752 N/A 0.9
5 DOOR TRIM WOOD DARK BROWN BUILDING 752 1ST FLOOR ENTRY < LOD
6 WALL WOOD WHITE BUILDING 752 1ST FLOOR ENTRY 3.6
7 WALL DRYWALL WHITE BUILDING 752 1ST FLOOR ENTRY 0.06
8 WALL WOOD BEIGE BUILDING 752 1ST FLOOR ENTRY < LOD
9 DISPLAY RACK WOOD BEIGE BUILDING 752 1ST FLOOR ENTRY < LOD
10 COLUMN WOOD OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
5.3
11 WALL WOOD WHITE BUILDING 752
1ST FLOOR EXT OF
FURNACE RM
0.06
12 DOORFRAME WOOD DARK BROWN BUILDING 752
1ST FLOOR FURNACE
RM
< LOD
13 DOOR WOOD
DARK
BROWN_
BLACK
BUILDING 752
1ST FLOOR FURNACE
RM
< LOD
14 CHIMNEY BRICK GREEN BUILDING 752
1ST FLOOR
FURNACE RM
16.3
15 TRIM WOOD GREEN_BLUE BUILDING 752
1ST FLOOR FURNACE
RM
< LOD
16 FURNACE METAL GREEN BUILDING 752
1ST FLOOR
FURNACE RM
0.07
17 WALL DRYWALL GREEN BUILDING 752
1ST FLOOR FURNACE
RM
< LOD
18 DOOR TRIM DRYWALL
BLACK_
BROWN
BUILDING 752
1ST FLOOR MAIN
ROOM
0.04
19 DOOR TRIM WOOD
BLACK_
BROWN
BUILDING 752
1ST FLOOR MAIN
ROOM
0.03
20 WALL WOOD WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
Read
Component Substrate Color Building Room
Lead
Conc.
(mg/cm2)
21 COLUMN WOOD WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
22 DISPLAY RACK WOOD BEIGE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
23 BEAM WOOD OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
24 BEAM WOOD OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
25 CABINET DRYWALL OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
26 CABINET DRYWALL OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
27 CEILING WOOD OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
2.3
28 CEILING DRYWALL OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
29 DUCTING METAL OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
0.04
30 UPPER WALL WOOD OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
31 UPPER WALL WOOD OFF WHITE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
DISPLAY
AWNING_TRIM
WOOD BLUE BUILDING 752
1ST FLOOR MAIN
ROOM
< LOD
CHECKOUT
PODIUM
WOOD BLACK BUILDING 752
1ST FLOOR MAIN
ROOM
0.6
34 DOOR WOOD BLACK BUILDING 752
1ST FLOOR FURNACE
RM 2
< LOD
DOOR
TRIM_FRAME
WOOD
BLACK_
BROWN
BUILDING 752
1ST FLOOR FURNACE
RM 2
< LOD
36 FURNACE METAL GREEN BUILDING 752
1ST FLOOR FURNACE
RM 2
< LOD
37 FLOOR WOOD GREEN BUILDING 752
1ST FLOOR
FURNACE RM 2
0.09
38 COLUMN WOOD BEIGE BUILDING 752
1ST FLOOR FURNACE
RM 2
< LOD
39 FLOOR WOOD RED BUILDING 752
1ST FLOOR CENTER
RM
< LOD
WALLS ARND
ELEVATOR
WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
< LOD
WALLS ARND
ELEVATOR
PLYWOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
< LOD
42 TRIM WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
6.5
43 WALL WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
7.0
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
Read
Component Substrate Color Building Room
Lead
Conc.
(mg/cm2)
44 WINDOW TRIM WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
7.7
45 WINDOW SILL WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
3.6
46 WINDOW SASH WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
3.8
47 WINDOW SASH WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
3.4
48 COLUMN WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
6.6
49 PEG BOARD WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
< LOD
50 STAIR TREAD WOOD RED BUILDING 752
1ST FLOOR CENTER
RM
0.4
51 STAIR RISER WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
8.4
52 STAIR NUEL POST WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
5.0
53 STAIR RAILING WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
6.6
WOOD
BASEBOARD
WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM
< LOD
BEAM BRACKET
AT TOP OF
COLUMN
WOOD BLACK BUILDING 752
1ST FLOOR CENTER
RM
< LOD
LARGE DR
FRAME
WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM BTWN SW RM
0.09
57 LARGE DR TRIM WOOD WHITE BUILDING 752
1ST FLOOR CENTER
RM BTWN SW RM
0.05
58 FLOOR WOOD GREEN BUILDING 752 1ST FLOOR SW RM < LOD
59 SECURITY PANEL DRYWALL RED BUILDING 752 1ST FLOOR SW RM < LOD
60 FA PANEL METAL RED BUILDING 752 1ST FLOOR SW RM < LOD
ELECTRICAL
PANEL
METAL
LIGHT
BROWN
BUILDING 752 1ST FLOOR SW RM < LOD
ELECTRICAL
PANEL
METAL BLACK BUILDING 752 1ST FLOOR SW RM < LOD
63 COLUMN WOOD WHITE BUILDING 752 1ST FLOOR SW RM 3.4
64 COLUMN WOOD BLACK BUILDING 752 1ST FLOOR SW RM 6.2
65 FLOOR WOOD BEIGE BUILDING 752 1ST FLOOR SW RM < LOD
66 WALL WOOD BLACK BUILDING 752 1ST FLOOR SW RM 8.5
67 LARGE DOOR WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.3
LARGE DOOR
TRIM
WOOD WHITE BUILDING 752 1ST FLOOR SW RM 7.3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
Read
Component Substrate Color Building Room
Lead
Conc.
(mg/cm2)
RADIATOR
PIPING
METAL SILVER BUILDING 752 1ST FLOOR SW RM 0.07
70 RADIATOR METAL SILVER BUILDING 752 1ST FLOOR SW RM 0.4
71 WINDOW GLASS GLASS WHITE BUILDING 752 1ST FLOOR SW RM < LOD
72 WALL WOOD WHITE BUILDING 752 1ST FLOOR SW RM 9.1
73 WINDOW TRIM WOOD WHITE BUILDING 752 1ST FLOOR SW RM 8.1
WINDOW
SASH_SILL
WOOD WHITE BUILDING 752 1ST FLOOR SW RM 6.9
75 LARGE DOOR WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.23
LARGE DOOR
FRAME
WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.18
LARGE DOOR
FRAME
WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.3
78 LARGE DOOR WOOD BLACK BUILDING 752 1ST FLOOR SW RM 0.11
79 FURNACE METAL
LIGHT
BROWH
BUILDING 752 1ST FLOOR SW RM < LOD
80 BEAM WOOD WHITE BUILDING 752 1ST FLOOR SW RM 4.8
81 BEAM WOOD WHITE BUILDING 752 1ST FLOOR SW RM 5.2
82 DOOR WOOD WHITE BUILDING 752
1ST FLOOR SW RM
TO MENS RR
0.7
83 DOORFRAME WOOD WHITE BUILDING 752
1ST FLOOR SW RM
TO MENS RR
2.0
84 DOOR TRIM WOOD WHITE BUILDING 752
1ST FLOOR SW RM
TO MENS RR
2.9
85 WINDOW WOOD WHITE BUILDING 752
1ST FLOOR SW RM
TO MENS RR
14.8
86 WINDOW TRIM WOOD WHITE BUILDING 752
1ST FLOOR SW RM
TO MENS RR
< LOD
87 WINDOW TRIM WOOD WHITE BUILDING 752
1ST FLOOR SW RM
TO MENS RR
10.8
88 WALL DRYWALL BEIGE_TAN BUILDING 752 1ST FLOOR MENS RR < LOD
89 WALL DRYWALL BEIGE_TAN BUILDING 752
1ST FLOOR
WOMENS RR
< LOD
90 DOOR TRIM WOOD WHITE BUILDING 752
1ST FLOOR
WOMENS RR
< LOD
91 DOOR FRAME WOOD WHITE BUILDING 752
1ST FLOOR
WOMENS RR
4.5
92 DOOR WOOD WHITE BUILDING 752
1ST FLOOR
WOMENS RR
6.8
93 SINK CERAMIC WHITE BUILDING 752
1ST FLOOR
WOMENS RR
< LOD
94 TOILET CERAMIC WHITE BUILDING 752
1ST FLOOR
WOMENS RR
< LOD
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
Read
Component Substrate Color Building Room
Lead
Conc.
(mg/cm2)
95 CEILING DRYWALL BEIGE_TAN BUILDING 752 1ST FLOOR MEN RR < LOD
96 WALL WOOD WHITE BUILDING 752
2nd FLOOR
STAIRWELL
6.8
97 WALL WOOD BLACK BUILDING 752
2nd FLOOR
STAIRWELL
10.9
98 WALL WOOD BEIGE BUILDING 752
2nd FLOOR
STAIRWELL
6.9
99 STAIR GATE WOOD WHITE BUILDING 752
2nd FLOOR
STAIRWELL
< LOD
100 STAIR RAILING WOOD WHITE BUILDING 752
2nd FLOOR
STAIRWELL
6.7
101 WALL WOOD BEIGE BUILDING 752
2nd FLOOR
STAIRWELL
< LOD
102 WALL WOOD BEIGE BUILDING 752
2nd FLOOR
STAIRWELL
< LOD
103 WALL WOOD BEIGE BUILDING 752
2nd FLOOR
STAIRWELL
< LOD
104 WALL WOOD BEIGE BUILDING 752
2nd FLOOR
STAIRWELL
< LOD
105 WINDOW WOOD BLUE_GREEN BUILDING 752 2nd FLOOR 4.8
106 WINDOWFRAME WOOD BLUE_GREEN BUILDING 752 2nd FLOOR 3.4
107 WINDOWFRAME WOOD BLUE_GREEN BUILDING 752 2nd FLOOR 6.0
108 COLUMN WOOD BEIGE BUILDING 752 2nd FLOOR 5.5
109 BEAM WOOD BEIGE BUILDING 752 2nd FLOOR 6.6
110 ROOF JOIST WOOD BEIGE BUILDING 752 2nd FLOOR 6.9
UNDERSIDE OF
LOFT FLOOR
WOOD BEIGE BUILDING 752 2nd FLOOR 3.7
112 WALL WOOD BEIGE BUILDING 752 2nd FLOOR 8.8
113 STAIRWELL DR WOOD GREEN_BLUE BUILDING 752 2nd FLOOR 0.05
114 STAIRWELL DR WOOD VARNISH BUILDING 752 2nd FLOOR 0.04
115 STAIRWELL DR WOOD VARNISH BUILDING 752 2nd FLOOR 0.03
116 WALL TRIM WOOD BEIGE BUILDING 752 2nd FLOOR 7.3
117 WALL TRIM WOOD CLEAR BUILDING 752 2nd FLOOR NORTH < LOD
118 WALL TRIM WOOD CLEAR BUILDING 752 2nd FLOOR NORTH < LOD
ELEVATOR
SAFETY GATE
WOOD RED_BROWN BUILDING 752 2nd FLOOR 0.24
120 CALIBRATION N/A RED BUILDING 752 N/A 0.9
121 CALIBRATION N/A RED BUILDING 752 N/A 0.9
122 CALIBRATION N/A RED BUILDING 752 N/A 0.9
Key: N/A = not applicable, <LOD = less than limit of detection
All XRF sample shots are representative of that color on that specific substrate and component.
The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.
In addition to the XRF samples, EHSI collected two (2) bulk QA samples for laboratory analysis. Building materials and paint containing detectable levels of lead are considered regulated by DOSH.
Table 4 summarizes bulk QA lead samples, including sample number, material description, substrate, color, location, and analytical results. Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.
TABLE 4
SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
SAMPLE
NUMBER
LOCATION
COMPONENT/
SUBSTRATE
COLOR
RESULTS
% Pb by
WT
11176-Pb01 1st Floor, Furnace
Room Chimney/Brick & Mortar
Green on red & gray brick and mortar
4.1
11176-Pb02 1st Floor, Furnace
Room 2 Chimney/Brick & Mortar Red & Gray <0.0037
11176-Pb07 1st Floor, Storage Wall/Wood White 6.0 Key: Pb = lead
DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.
Since the type of work planned (e.g., sawing, grinding, demolition) may disturb the lead-containing materials, the contractor will need to conduct lead awareness training and perform an initial exposure assessment in accordance with the regulations.
EHSI also identified three (3) lead-acid batteries inside alarm and fire alarm panels on the 1st floor. If lead-acid batteries are impacted by the proposed renovation, they must be recycled by a licensed facility.
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
At the request of NPS, EHSI accomplished TCLP sampling and analysis of the assumed waste stream for the project and Table 5 summarizes the analytical results. EHSI collected and composited a representative sample of the assumed waste stream for renovation activities that may impact interior building finishes, that included proportionate quantities of all materials expected to be included in the waste stream. Note: Painted metals were not included in the assumed waste stream sampling, because they are expected to be recycled and because there is no limit on metals containing paint on metals being recycled.
Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., hazardous metals-containing paint/hazardous metals-containing materials). Ecology has set a dangerous waste threshold at 5.0 milligrams (mg/L), per liter for arsenic, chromium, lead, and silver, 1.0 Mg/L for cadmium, 100 mg/L for barium and .2 mg/L for mercury.
The TCLP sample for the Project assumed waste stream was analyzed for the USEPA RCRA 8 metals: Lead (Pb), Cadmium (Cd), Chromium (Cr), Silver (Ag), Arsenic (AS), Barium (Ba), Mercury (hg), and Selenium (Se)
TABLE 5
SUMMARY OF TCLP SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
FORT VANCOUVER BARRACKS – BUILDING 752
Sample # Elements RL in mg/L Results in mg/L Results in ppm
11176-
TCLP-
B752-01
Sample Description:
• 25% 12”x12” Beige VCT w/ mastic and wood particle board;
• 23% painted popcorn ceiling texturing and GWB ceilings;
• 18% painted wood pattern wall panels w/ mastic on GWB;
• 10% painted peg board display walls;
• 8% painted bumpy texturing w/ GWB;
• 4% painted GWB walls;
• 3% unpainted GWB walls and ceiling;
• 2% white SVF on particle board;
• 2% painted plywood walls;
• 1% painted vinyl covering w/ GWB;
• 1% painted peg board walls;
• 1% 4” vinyl cove base; and
• 1% carpet on green SVF on plywood
Silver (Ag) 0.20 <0.20 <0.20
Arsenic (As) 0.20 <0.20 <0.20
Barium (Ba) 0.20 0.38 0.38
Cadmium (Cd) 0.20 <0.20 <0.20
Chromium (Cr) 0.20 <0.20 <0.20
Mercury (Hg) 0.01 <0.11 <0.11
Lead (Pb) 0.20 <0.20 <0.20
Selenium (Se) 0.20 <0.20 <0.20 KEY: Ag = silver, As = Arsenic, Ba = Barium, Cd = Cadmium, Cr = Chromium, , GWB = gypsum wall board, Hg = Mercury, mg/L = milligram per liter, Pb = Lead, ppm = part per million, RL = Reporting Limit, Se = Selenium, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with
It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.
2.4.4 Polychlorinated Biphenyls
Ballasts
EHSI inspected every fluorescent light fixture for PCB-containing ballasts. 96% of fixtures were found to contain magnetic ballasts and must be assumed to contain PCB-containing dielectric fluid and may be disposed/recycled as Ecology Dangerous Waste. Electronic ballasts, which contain no dielectric fluid, may be disposed as construction debris. A Summary of PCB-containing ballasts and Hg-containing light tubes, CFL bulbs, and HID lamps is provided in
Table 6.
Equipment with Assumed PCB-containing oil
EHSI identified one (1) oil-containing elevator motor tank that will be removed by the planned project. The oil filled elevator motor reservoir is assumed to contain ≥50 parts per million
(PPM) and ≤500 PPM PCBs. Sampling of oil-filled components was not within the scope of this inspection. All impacted oil filled components should be tested for PCBs or assumed to contain oil containing between 50 ppm and 500 ppm PCBs until tested. The oil from PCB-oil containing components (≥ 50 ppm PCBs and < 500 ppm PCBs) must be disposed/recycled as Ecology
Dangerous Waste in accordance with USEPA regulation 40CFR 761 and Ecology Regulation
WAC 173-303 prior to recycling.
2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats
All fluorescent light tubes and CFL bulbs quantified in Table 6 contain Hg. Hg wastes are regulated as “universal wastes” under Ecology’s regulation WAC 173-303.