About this file

This Request for Proposals (RFP) solicits abatement of hazardous materials in several historic buildings at Fort Vancouver National Historic Site. The National Park Service seeks to abate asbestos, lead, mercury, polychlorinated biphenyls, and wildlife excrement through selective demolition and minor repairs. Offerors must visit SAM.gov for amendments and submit technical and price proposals digitally by the due date. The small business set-aside contract will be firm-fixed-price, last 180 days, and require payment and performance bonds and liability insurance. The estimated value is $250,000 to $1,000,000 depending on options exercised. The site visit is August 13, 2020 at Fort Vancouver NHS; individual visits are prohibited. The NAICS code is 562910 and small business size standard is $22 million average annual gross receipts.

View the file

Other files

File Type Posted
Attachment 10 Final Clarifications_0003.pdf PDF
Sol_140P8320R0008_Amd_0003.pdf PDF
Sol_140P8320R0008_Amd_0002.pdf PDF
Sol_140P8320R0008_Amd_0001.pdf PDF
forms to return with proposal - revised 140P8320R0008_0001.docx DOCX document
Attachment 9 Site visit notes_0001.pdf PDF
Attachment 7a Revised Wage Determination_0001.pdf PDF
Attachment 3e - B748 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3a - B410 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3j - B786 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 6 Building Floor Plans_20200723.pdf PDF
Attachment 4c - B991 and B993 Asbestos Survey Field Notes.pdf PDF
Attachment 3f - B749 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4b - B993 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 3c - B725 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3i - B754 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3h - B753 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3d - B746 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3b - B721 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4a - B991 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 5 Building Descriptions.pdf PDF
forms to return with proposal 140P8320R0008.docx DOCX document
Attachment 1 Statement of Work.pdf PDF
Sol_140P8320R0008.pdf PDF
Attachment 2 Task List for each building.pdf PDF
FAQs for RFP 140P8320R0008.pdf PDF
Attachment 7 Wage Determination 7-3-20.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134 Phone 206-381-1128 Toll Free 800-666-2959 Fax 206-254-4279

• Environmental Consulting

• Hazardous Materials Management

• Industrial Hygiene Services

• Construction Management

• Indoor Air Quality

LIMITED HAZARDOUS MATERIALS SURVEY REPORT

NATIONAL PARK SERVICE

FORT VANCOUVER NATIONAL HISTORIC SITE

BUILDING 752

East Vancouver Barracks, Building 752

Vancouver, Washington 98661

December 24th, 2018, 2018

Prepared For:

Kristen Jontos National Park Service 612 East Reserve Street Vancouver, WA 98661 ii

Limited Hazardous Materials Survey Report

National Park Service

Fort Vancouver Historic Site

Building 752

East Vancouver Barracks, Building 752

Vancouver, Washington 98661

EHSI Project No.: # 11176

The material and data in this report were prepared under the supervision and direction of the undersigned.

Rory Peterson Lead AHERA Building Inspector

Derica Escamilla Principal of Hazardous Materials

Services iii

TABLE OF CONTENTS

Acronym List .............................................................................................. iv

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

1.2 EXTENT OF CURRENT SURVEY

1.3 ACM MATERIALS FOUND

1.4 OPINIONS AND RECOMMENDATIONS

1.5 LIMITATIONS/DISCLAIMER

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

2.2 BUILDING DESCRIPTION

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

2.3.2 Lead-Containing Paint/Lead-Containing Materials

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

2.4.2 Lead-Containing Paint and Building Materials

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

2.4.4 Polychlorinated Biphenyls

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs and thermostats

3.0 LIMITATIONS

4.0 STANDARD OF CARE

5.0 CERTIFIED AHERA BUILDING INSPECTORS

APPENDICES

A ........................ Asbestos Laboratory Reports and Field Data Forms B ........................ Lead Laboratory Reports and Field Data Forms

C ........................ Certified AHERA Building Inspector Certificates D ........................ Laboratory Certifications for Asbestos and Lead Analysis

E ......................... Sample Location Drawings for Asbestos and Lead F ......................... Hazardous Metals TCLP Laboratory Reports and Field Data Forms G ........................ Abatement Cost Estimate iv

ACRONYM LIST

ACM .......................Asbestos-Containing Material

Ag ..........................Silver

AHERA ....................Asbestos Hazard Emergency Response Act

AHU .......................Air Handling unit

AIHA ......................American Industrial Hygiene Association

As ..........................Arsenic

Ba ..........................Barium

Cd ..........................Cadmium

CFL ........................Compact Fluorescent Light

CFR ........................Code of Federal Regulations

Cr ..........................Chromium

DOSH .....................Washington State Department of Labor and Industries, Division of

Occupational Safety and Health

EA ..........................Each

Ecology ...................Washington State Department of Ecology

EHSI .......................EHS-International, Inc.

ELLAP .....................Environmental Lead Laboratory Accreditation Program

GWB .......................Gypsum Wall Board

Hg ..........................Mercury

JC ..........................Joint Compound

LCM ........................Lead-Containing Material

LCP ........................Lead-Containing Paint

LF ..........................Linear Feet

L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter

N/A ........................Not Applicable

ND .........................None Detected

NVL ........................NVL Laboratories, Inc.

NVLAP ....................National Voluntary Laboratory Accreditation Program

OD .........................Outside Diameter

OSHA .....................US Occupational Safety and Health Administration

Pb ..........................Lead

PCBs .......................Polychlorinated Biphenyls

PLM ........................Polarized Light Microscopy ppm .......................Parts per Million

QA .........................Quality Assurance

RCW .......................Revised Code of Washington

SAT ........................Seattle Asbestos Test, LLC

Se ..........................Selenium

SF ..........................Square Feet

SVF ........................Sheet Vinyl Flooring

SWCAA ...................Southwest Clean Air Agency

TCLP .......................Toxicity Characteristic Leaching Procedure

VCT ........................Vinyl Composite Tile

WAC .......................Washington Administrative Code

wt. .........................Weight w/ ..........................With

XRF ........................x-ray fluorescence

Fort Vancouver National Historic Site – B752

EHSI Project 11035

December 24th, 2018

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

The National Park Service (NPS) plans to renovate Building 752 (B752) at the Fort Vancouver

National Historic Site (FV NHS) located at East Vancouver Barracks, Vancouver, Washington.

The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of B752 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.

1.2 EXTENT OF CURRENT SURVEY

EHSI inspected accessible interior and exterior suspect ACM that may be impacted by future projects. Accessible suspect materials were sampled including, but not limited to: interior and exterior wall systems, window systems, and mechanical systems. The LCP and LCM survey was limited to the interior of the building only. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment, elevator equipment, unit heaters, and roof vents at peak of roof) suspect materials were assumed to be ACM.

1.3 ACM MATERIALS FOUND

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

ASBESTOS MATERIAL DESCRIPTION LOCATION

Non-ACM 12”x12” Beige VCT w/ brown, white and orange streaks on ACM black mastic on particle board [Sample # 01 and #21]

1st Floor, NE ½, Main Room

ACM black coating on non-ACM fire penetration sealant on non-ACM brown/red brick (around 8” OD flue penetration into brick chimney) [Sample #27]

1st Floor, NE ½, Furnace

Room 2

Elevator w/ assumed ACM brake pads 1st Floor, Center Room, Elevator Shaft

Assumed ACM elevator car guide rail spacers 1st Floor, Center Room, Elevator Shaft

Assumed ACM elevator motor gaskets 1st Floor, Center Room, Elevator Shaft

1’x1’x16” Ceiling mounted unit heater w/ assumed ACM internal components 1st Floor, SW Main Room

Assumed ACM electrical components in furnace Furnace Room 1 and 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

ASBESTOS MATERIAL DESCRIPTION LOCATION

Electrical panel with assumed ACM components 1st Floor, SW Main Room

Electrical meter w/ assumed ACM components 1st Floor, SW Main Room

3’ OD Attic vent w/ assumed ACM penetration sealant around opening at roof Roof, NE Side and SW Side

8” OD Vent fan w/ assumed ACM penetration sealant around opening at roof Roof, SW Side

2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, SW Side and Center

4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, NE Side

KEY: ACM = asbestos containing material, OD = outer diameter, VCT = vinyl composite tile, w/ = with

1.4 OPINIONS AND RECOMMENDATIONS

EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to any renovation and demolition activities.

Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.

Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will disturb the LCP, the contractor will need to perform an initial exposure assessment in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).

96% of fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology)

Dangerous Waste. All fluorescent tubes and lamps contain mercury; any fluorescent lamps/tubes to be disturbed during the project must be recycled as (Ecology) Universal Waste.

One (1) hydraulic elevator reservoir was identified during the inspection as potentially impacted by the project. Sampling these oil-filled components was not within the scope of this inspection.

All oil filled components should be tested for PCBs or assumed to contain oil containing between

50 parts per million (50 ppm) and 500 ppm PCBs until tested. The oil from PCB-oil containing components (≥ 50 ppm PCBs and < 500 ppm PCBs) must be disposed as Ecology Dangerous

Waste.

1.5 LIMITATIONS/DISCLAIMER

This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical equipment, elevator equipment, unit heaters, and roof vents at peak of roof were not sampled but were assumed to be present based on the inspector’s experience with similar systems on other projects and are assumed to be ACMs. Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint. This report and accompanying appendices include the supporting information for this executive summary.

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: identification of all suspect materials; a determination of whether suspect materials were: ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.

From September 11th to 12th, 2018, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington

Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest

Clean Air Agency (SWCAA).

2.2 BUILDING DESCRIPTION

Building 752 is located at East Vancouver Barracks, Vancouver, Washington. The building is a two-story wood-framed structure with a partial attic/loft. The building sits on a brick and masonry pier foundation. The building’s roof is covered with 3-tab composite shingles. Interior floor finishes include: original tongue and groove hardwood flooring, vinyl composite tile

(VCT), and sheet vinyl flooring (SVF). Interior wall finishes include: original tongue & groove wood walls, painted plywood, painted fibrous wood walls, peg board display wall systems, and gypsum wallboard. Interior ceiling finishes include: textured wood panels, texturing on gypsum wall board (GWB), plywood, and tongue & groove wood planks. Windows throughout the building are operable and wood-framed. Heating is provided by local electric forced air furnaces, electric wall unit heaters and natural gas ceiling mounted unit heaters. There is also evidence that the building was originally heated by wood fired stoves. Hot water is provided by an electric domestic two hot water tanks. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of

Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix

C. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October

1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.

EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and

Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary

Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.

Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.

Copies of both laboratories’ NVLAP certifications are included in Appendix D.

2.3.2 Lead-Containing Paint/Lead-Containing Materials

EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.

Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic

Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene

Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).

Copies of laboratory reports and field data forms for lead are in Appendix B.

All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

Eighty-eight (88) bulk samples of suspect ACM were collected as part of the survey. Five (5) of those samples were split for quality assurance analyses. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix E. Asbestos sampling information including: sample number, material description, sample location, and analytical results are summarized in Table 1. The

ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-

1st Floor, NE

½, Main

Room

Layer 1: 12”x12” Beige VCT

(w/ brown, white, & orange streaks)

Layer 2: Black mastic

Layer 3: Particle board

L1: ND

L2: 3%

L3: ND

N/A

Chrysotile

11176-02

1st Floor, NE

½, Main

Room

Layer 1: 4” Black cove base

Layer 2: Cream/white mastic

Layer 3: Wood fiber wall panel w/ paint

ND

(All Layers)

N/A

(All Layers)

11176-

03QA

1st Floor, NE

½, Furnace

Room

Layer 1: Blue carpet (w/ beige mesh backing)

Layer 2: Beige/gray mastic

Layer 3: Green linoleum

Layer 4: Black asphaltic paper backing

Layer 5: Dark brown mastic

Layer 6: Plywood

ND

(All Layers)

N/A

(All Layers)

11176-04

1st Floor, NE

½, Furnace

Room

Layer 1: Plywood

Layer 2: Black/brown mastic

(w/ dirt on hardwood flooring)

ND

(All Layers)

N/A

(All Layers)

11176-05

1st Floor, NE

½, Main

Room

Layer 1: 4” Black cove base

Layer 2: Brown mastic (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-06

1st Floor, NE

½, Furnace

Room

Layer 1: Brown grout

Layer 2: White material (on flue penetration into chimney, between metal and clay pipe)

ND

(All Layers)

N/A

(All Layers)

11176-07

1st Floor, NE

½, Furnace

Room

Layer 1: Red clay pipe

Layer 2: Trace white powdery material

Layer 3: Trace brown/gray grout (on flue penetration into chimney, between brown grout and brick chimney)

ND

(All Layers)

N/A

(All Layers)

11176-08

1st Floor, NE

½, Furnace

Room

Layer 1: Red chimney brick w/ paint

Layer 2: Gray mortar

ND

(All Layers)

N/A

(All Layers)

11176-09

1st Floor, NE

½, Furnace

Room 2

Layer 1: JC

Layer 2: GWB wall w/ paper

(unpainted, at seam)

ND

(All Layers)

N/A

(All Layers)

11176-10

1st Floor, NE

½, Furnace

Room 2

Layer 1: JC

Layer 2: GWB wall w/ paper

(unpainted, at seam)

ND

(All Layers)

N/A

(All Layers)

11176-11

1st Floor, NE

½, Main

Room

GWB panel w/ paper (covering old window)

ND

(All Layers)

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-12

1st Floor, NE

½, Furnace

Room 2

Layer 1: Red chimney brick

Layer 2: Gray mortar

ND

(All Layers)

N/A

(All Layers)

11176-13

1st Floor, NE

½, Furnace

Room

Layer 1: Trace JC w/ paint

Layer 2: GWB wall (at seam)

ND

(All Layers)

N/A

(All Layers)

11176-14

1st Floor, NE

½, Furnace

Room

Layer 1: Beige/off-white JC w/ joint tape

Layer 2: Beige/off-white JC

Layer 3: GWB ceiling w/ paper

(at seam, unpainted)

ND

(All Layers)

N/A

(All Layers)

11176-15

1st Floor, NE

½, Furnace

Room

Layer 1: Beige/off-white JC

Layer 2: GWB ceiling w/ paper

(at seam, unpainted)

ND

(All Layers)

N/A

(All Layers)

11176-16

1st Floor, NE

½, Main

Room

Layer 1: White popcorn ceiling texturing w/ paint

Layer 2: GWB ceiling w/ paper

(mid ceiling)

ND

(All Layers)

N/A

(All Layers)

11176-17

1st Floor, NE

½, Main

Room

Layer 1: White popcorn ceiling texturing

Layer 2: GWB ceiling w/ paper

(at seam)

ND

(All Layers)

N/A

(All Layers)

11176-18

1st Floor, NE

½, Main

Room

Layer 1: White popcorn ceiling texturing

Layer 2: Wood ceiling panel w/ paint

ND

(All Layers)

N/A

(All Layers)

11176-19

1st Floor, NE

½, Main

Room

White popcorn ceiling texturing w/ paint (on wood beam)

ND N/A

11176-20

1st Floor, NE

½, Main

Room

White popcorn ceiling texturing w/ paint (on 1½’x1’ square metal duct)

ND N/A

11176-

1st Floor, NE

½, Main

Room

Layer 1: 12”x12” Beige VCT

(w/ brown, white, & orange streaks)

Layer 2: Black mastic

Layer 3: Wood particle board

L1: ND

L2: 3%

11176-22

1st Floor, NE

½, Main

Room

Layer 1: Vinyl wall covering w/ paint on JC

Layer 2: GWB wall w/ paper

(wall edge)

ND

(All Layers)

N/A

(All Layers)

11176-23

1st Floor, NE

½, Main

Room

Layer 1: Vinyl wall covering w/ paint on JC skim coat

Layer 2: GWB wall w/ paper

(mid wall)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-24

1st Floor, NE

½, Main

Room

Layer 1: Vinyl wall covering w/ paint w/ yellow material

Layer 2: JC (at wall seam)

ND

(All Layers)

N/A

(All Layers)

11176-

25QA

1st Floor, NE

½, Main

Room

Layer 1: Orange/tan/yellow mastic (associated w/ wood pattern wall panels)

Layer 2: Trace JC

Layer 3: GWB wall w/ paper

ND

(All Layers)

N/A

(All Layers)

11176-26

1st Floor, NE

½, Furnace

Room 2

Tan pipe dope (on natural gas line fitting)

ND N/A

11176-

1st Floor, NE

½, Furnace

Room 2

Layer 1: Black coating

Layer 2: White fire penetration sealant

Layer 3: Brown/red grout (at

8” OD flue penetrations into brick chimney)

L1: 2%

L2: ND

11176-28

1st Floor, NE

½, Furnace

Room 2

4” Beige cove base (1 roll loose on floor)

ND N/A

11176-29

1st Floor, NE

½, Furnace

Room 2

Layer 1: Black duct insulation

Layer 2: Black mastic

ND

(All Layers)

N/A

(All Layers)

11176-30

1st Floor, NE

½, Furnace

Room

Layer 1: Silver foil

Layer 2: Yellow fiberglass insulation

Layer 3: Black mastic (inside furnace)

ND

(All Layers)

N/A

(All Layers)

11176-31

1st Floor, NE

½, Furnace

Room

Tan/brown duct tape (w/ mastic) w/ paint (at connection from furnace to duct)

ND N/A

11176-32

1st Floor, NE

½, Main

Room

Layer 1: Tan window glazing sealant

Layer 2: Black rubber window glazing gasket (on glass doors)

ND

(All Layers)

N/A

(All Layers)

11176-33

1st Floor, NE

½, Exterior

Front Entry

Hard white/off-white door frame caulking w/ paint

(double door)

ND N/A

11176-34

1st Floor, NE

½, Furnace

Room

Dark brown pipe dope (on natural gas pipe fitting)

ND N/A

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-35

1st Floor, SW

½, Men’s

Restroom

Layer 1: White SVF (w/ black specks)

Layer 2: Off-white/gray paper backing w/ mastic

Layer 3: Particle board

Layer 4: Brown paper vapor barrier w/ black mastic (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-36

1st Floor, SW

½, Main

Room

Layer 1: Silver paint

Layer 2: Black asphaltic coating

(on 4” OD hot water line to radiators)

ND

(All Layers)

N/A

(All Layers)

11176-37

1st Floor, SW

½, Main

Room

Layer 1: Silver paint

Layer 2: Beige/tan pipe dope

(on 1¾” OD hot water line to radiators)

ND

(All Layers)

N/A

(All Layers)

11176-38

1st Floor, SW

½, Main

Room

Layer 1: Silver paint

Layer 2: Beige/tan pipe dope

(on 1” OD hot water line to radiators)

ND

(All Layers)

N/A

(All Layers)

11176-39

1st Floor, NE

½, Main

Room

Layer 1: Gray/brown Formica™ countertop

Layer 2: Clear yellow mastic

Layer 3: Wood (on lobby counter)

ND

(All Layers)

N/A

(All Layers)

11176-40

1st Floor, NE

½, Main

Room

Layer 1: White/brown

Formica™ countertop

Layer 2: Clear yellow mastic

Layer 3: Wood (on lobby counter)

ND

(All Layers)

N/A

(All Layers)

11176-

1st Floor, Center Room

Layer 1: JC w/ paint

Layer 2: GWB wall w/ paper

(corner)

L1: 0.5%

L2: ND

11176-42 1st Floor, Center Room

GWB wall w/ paint and paper

(mid wall)

ND N/A

11176-43 1st Floor, Center Room GWB wall w/ paper (mid wall) ND N/A

11176-44

1st Floor, Men’s

Restroom

Layer 1: White bumpy texturing w/ JC w/ paint w/ joint tape

Layer 2: GWB wall w/ paper

(corner)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-45

1st Floor, Men’s

Restroom

Layer 1: White bumpy texturing w/ JC w/ paint

Layer 2: Yellow woven joint tape

Layer 3: GWB wall w/ paper (at seam)

ND

(All Layers)

N/A

(All Layers)

11176-46

1st Floor, Women’s

Restroom

Layer 1: White bumpy texturing w/ paint

Layer 2: Yellow woven joint tape

Layer 3: GWB wall w/ paper

(mid wall)

ND

(All Layers)

N/A

(All Layers)

11176-47

1st Floor, Men’s

Restroom

Layer 1: White bumpy texturing w/ JC w/ paint

Layer 2: GWB ceiling w/ paper

(at seam)

ND

(All Layers)

N/A

(All Layers)

11176-48

1st Floor, Men’s

Restroom

Layer 1: Trace white bumpy texturing w/ paint

Layer 2: GWB ceiling w/ paper

(mid ceiling)

ND

(All Layers)

N/A

(All Layers)

11176-49

1st Floor, Women’s

Restroom

Layer 1: Brown paper vapor barrier w/ black mastic

Layer 2: Pink fiberglass insulation (in wall)

ND

(All Layers)

N/A

(All Layers)

11176-50

1st Floor, Men’s

Restroom

Layer 1: 4” Brown cove base

Layer 2: Yellow/beige mastic

ND

(All Layers)

N/A

(All Layers)

11176-51

1st Floor, SW

½, Main

Room

Beige window counter weight rope w/ paint

ND N/A

11176-52 1st Floor, Center Room

Black asphaltic coating (on

~1’x1’6”x8” metal support post brackets)

ND N/A

11176-53

1st Floor, SW

½, Main

Room

Black asphaltic coating (on

~1’x1’6”x8” metal support post brackets)

ND N/A

11176-54

1st Floor, SW

½, Main

Room

Layer 1: Red brick w/ paint

Layer 2: Gray mortar w/ paint

(on small 2’x2’ chimney)

ND

(All Layers)

N/A

(All Layers)

11176-55

1st Floor, SW

½, Main

Room

Layer 1: Silver foil w/ mastic

Layer 2: Yellow fiberglass insulation (inside 2’x3’x5’ AHU)

ND

(All Layers)

N/A

(All Layers)

11176-56

1st Floor, SW

½, Main

Room

White/off-white pipe dope (on natural gas lines to 2’x3’x5’

AHU)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-57

1st Floor, SW

½, Main

Room

Gray duct seam sealant (on

2’x2’ duct seam sections)

ND N/A

11176-58

1st Floor, SW

½, Main

Room

Gray duct seam sealant (on

1’6”x2’ duct seam sections)

ND N/A

11176-

59QA

2nd Floor, NE

½

Beige/tan window glazing putty w/ paint (in 3’x4’8” wood framed windows)

ND N/A

11176-60 2nd Floor, SW

½

Beige window glazing putty w/ paint (in 3’x4’8” wood framed windows)

ND N/A

11176-61 2nd Floor, SW

½

Black gasket (on knob & tube wiring knobs)

ND N/A

11176-

62QA

2nd Floor, SW

½

Layer 1: White coating/paint

Layer 2: Black asphaltic coating w/ woven fibrous wire wrap

Layer 3: Black rubber wire insulation

Layer 4: Copper wire

ND

(All Layers)

N/A

(All Layers)

11176-63 2nd Floor, SW

½

Layer 1: Black asphaltic coating w/ woven fibrous wire wrap

Layer 2: Black rubber wire insulation

Layer 3: Copper wire

ND

(All Layers)

N/A

(All Layers)

11176-64 2nd Floor, SW

½

Layer 1: Tan flue penetration patch

Layer 2: Red brick chimney

Layer 3: Gray mortar

ND

(All Layers)

N/A

(All Layers)

11176-65 2nd Floor, Center Area

Layer 1: Beige elevator gate rope

Layer 2: Trace white powdery rope core

ND

(All Layers)

N/A

(All Layers)

11176-66 2nd Floor, Center Area

Brown paper vapor barrier w/ blue coating (between hardwood floor and wood subfloor)

ND N/A

11176-67 2nd Floor, NE

½

Brown paper vapor barrier w/ blue coating (between hardwood floor and wood subfloor)

ND N/A

11176-68 2nd Floor, SW

½

Black asphaltic paper vapor barrier (between wood wall and siding)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-69 2nd Floor, NE

½

Black asphaltic paper vapor barrier (between wood wall and siding)

ND N/A

11176-70 2nd Floor, SW

½

Black asphaltic paper vapor barrier (between wood roof decking and wood)

ND N/A

11176-71 2nd Floor, NE

½

Black asphaltic paper vapor barrier (between wood roof decking and wood)

ND N/A

11176-72 2nd Floor, NE

½

Layer 1: Black asphaltic coating w/ woven fibrous wire wrap

Layer 2: Black rubber wire insulation

Layer 3: Copper wire

ND

(All Layers)

N/A

(All Layers)

11176-73

1st Floor, SW

½, Main

Room

Brown paper vapor barrier w/ blue coating (between hardwood floor and wood subfloor)

ND N/A

11176-74 Exterior, NW

Side

10”x10” Black gasket w/ paint

(on natural gas meter)

ND N/A

11176-75 Exterior, NW

Side

6” Black/gray fibrous regulator gasket w/ paint

ND N/A

11176-76 Exterior, NW

Side

Gray and off-white pipe dope w/ paint (on natural gas line fittings, along the side and under building)

ND N/A

11176-77

Exterior, SW

Side

(Restroom

Addition)

Gray window glazing putty (on

3’x3’ windows)

ND N/A

11176-78

Exterior, SW

Side

(Restroom

Addition)

Tan window glazing putty w/ paint (on 3’x3’ wood-framed windows)

ND N/A

11176-79 Exterior, SE

Side

Tan window glazing putty w/ paint (on 3’5”x5’3” wood-framed windows)

ND N/A

11176-80 Exterior, NW

Side

Tan window glazing putty w/ paint (on 3’5”x5’3” wood-framed windows)

ND N/A

11176-81

Exterior, SE

Side, S.

Corner

White window glazing putty patch w/ paint (on 3’5”x5’3” wood-framed windows)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-82

Exterior, Roof, Restroom

Addition

Layer 1: Black asphaltic 3-tab roofing

Layer 2: Black asphaltic tar

Layer 3: Black asphaltic 3-tab roofing

Layer 4: Black asphaltic tar

Layer 5: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-83

Exterior, Roof, Restroom

Addition

Layer 1: Black asphaltic 3-tab roofing

Layer 2: Black asphaltic tar

Layer 3: Black asphaltic 3-tab roofing

Layer 4: Black asphaltic tar

Layer 5: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-84 Exterior, SE

Side

White window frame/trim caulking (on all 3’5”x5’3” wood framed windows)

ND N/A

11176-

85QA

Exterior, SE

Side

White door frame/trim caulking w/ paint (on all side doors)

ND N/A

11176-86 Exterior, Roof-Awning

Layer 1: Black asphaltic 3-tab roofing

Layer 2: Black asphaltic tar

Layer 3: Black asphaltic 3-tab roofing

Layer 4: Black asphaltic tar

Layer 5: Black asphaltic 3-tab roofing

Layer 6: Black asphaltic tar

Layer 7: Black asphaltic vapor barrier

ND

(All Layers)

N/A

(All Layers)

11176-87

Exterior, Roof-Porch

Addition

Layer 1: Black asphaltic rolled down roofing

Layer 2: Thick black asphaltic tar

Layer 3: Black asphaltic vapor barrier

Layer 4: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-88

Exterior, Roof-Porch

Addition

Layer 1: Black asphaltic rolled down roofing

Layer 2: Thick black asphaltic tar

Layer 3: Black asphaltic vapor barrier

Layer 4: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

KEY: AHU = air handling unit, GWB = gypsum wall board, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outer diameter, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with, 1 Point Counted Results. Preliminary analytical reports indicated that various samples contained approximately 2% chrysotile asbestos (Sample #s 11176-41). EHSI re-submitted this sample reported to have greater than 1% asbestos concentration for re-analysis using the more precise

EPA “Point Count” method. The “Point Count” analytical method is recommended by the EPA for samples with less than 10% asbestos. Based on the results of that re-analysis, materials found to contain less than 1% (<1%) asbestos were determined to be a non-ACM (e.g., containing < 1% asbestos fibers) and are therefore not ACM. Materials found to contain greater than 1% asbestos are identified and quantified in Table 2 of this report. Only the “Point Count” re-analysis concentrations are listed in Table 1. Analytical results for all analyses are provided in Appendix A.

Washington State Department of Labor and Industries Division of Occupational Safety and

Health (L&I DOSH) requires special worker exposure precautions and qualifications when dealing with ACM used on seams and nail holes (refer to L&I DOSH regulations and WISHA

Regional Directives {WRD}). Any “dust creating activity”, such as: sanding, sawing, grinding, or drilling of GWB walls or ceilings shall be accomplished by certified asbestos workers using glove-bag, mini-enclosure and/or negative pressure enclosure engineering controls and work practices. As directed by WRD 23.30, for all other demolition or disturbance of GWB walls/ceilings with ACM JC, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC 296-62-07722(5).

Samples containing <1% asbestos fibers are considered to be a non-ACM. Materials that contain

<1% asbestos are not regulated for disposal purpose. However, removal of <1% asbestos materials are considered an unclassified asbestos operation by DOSH. As directed by WRD

23.30, for all other demolition of materials with <1% asbestos, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC

296-62-07722(5).

Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2

Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

Non-ACM 12”x12” Beige VCT w/ brown, white and orange streaks on ACM black mastic on particle board

[Sample # 01 and #21]

1st Floor, NE ½, Main

Room

2,900 SF

ACM black coating on non-ACM fire penetration sealant on non-ACM brown/red brick (around 8” OD flue penetration into brick chimney) [Sample #27]

1st Floor, NE ½, Furnace Room 2

1 LF

Elevator w/ assumed ACM brake pads 1st Floor, Center

Room, Elevator Shaft

2 EA

Assumed ACM elevator car guide rail spacers 1st Floor, Center

Room, Elevator Shaft

6 EA

Assumed ACM elevator motor gaskets 1st Floor, Center

Room, Elevator Shaft

10 EA

1’x1’x16” Ceiling mounted unit heater w/ assumed

ACM internal components

1st Floor, SW Main

Room

2 EA

Assumed ACM small electrical components in furnaces

Furnace Room 1 and

2 EA

Electrical panel with assumed ACM internal components

1st Floor, SW Main

Room

2 EA

Electrical meter w/ assumed ACM internal components

1st Floor, SW Main

Room

1 EA

3’ OD Attic vent w/ assumed ACM penetration sealant around opening at roof

Roof, NE Side and SW

Side

2 EA

8” OD Vent fan w/ assumed ACM penetration sealant around opening at roof Roof, SW Side 1 EA

2’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof

Roof, SW Side and

Center

2 EA

4’x2’ Brick chimney w/ assumed ACM penetration sealant around opening at roof Roof, NE Side 1 EA

KEY: ACM = asbestos containing material, EA = each, SF = square feet, OD = outer diameter, VCT = vinyl composite tile, w/ = with

ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect

ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building

Inspector. Concealed suspect material may include, but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.

2.4.2 Lead-Containing Paint and Building Materials

Ninety-five (95) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer.

Red bolded results indicate materials containing detectable levels of lead and “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation 40CFR745 and

Washington State Commerce regulation WAC 365-230.

Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.

TABLE 3

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

1 SHUTTER CALL N/A N/A BUILDING 752 N/A 3.85

2 CALIBRATION N/A RED BUILDING 752 N/A 1.0

3 CALIBRATION N/A RED BUILDING 752 N/A 0.9

4 CALIBRATION N/A RED BUILDING 752 N/A 0.9

5 DOOR TRIM WOOD DARK BROWN BUILDING 752 1ST FLOOR ENTRY < LOD

6 WALL WOOD WHITE BUILDING 752 1ST FLOOR ENTRY 3.6

7 WALL DRYWALL WHITE BUILDING 752 1ST FLOOR ENTRY 0.06

8 WALL WOOD BEIGE BUILDING 752 1ST FLOOR ENTRY < LOD

9 DISPLAY RACK WOOD BEIGE BUILDING 752 1ST FLOOR ENTRY < LOD

10 COLUMN WOOD OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

5.3

11 WALL WOOD WHITE BUILDING 752

1ST FLOOR EXT OF

FURNACE RM

0.06

12 DOORFRAME WOOD DARK BROWN BUILDING 752

1ST FLOOR FURNACE

RM

< LOD

13 DOOR WOOD

DARK

BROWN_

BLACK

BUILDING 752

1ST FLOOR FURNACE

RM

< LOD

14 CHIMNEY BRICK GREEN BUILDING 752

1ST FLOOR

FURNACE RM

16.3

15 TRIM WOOD GREEN_BLUE BUILDING 752

1ST FLOOR FURNACE

RM

< LOD

16 FURNACE METAL GREEN BUILDING 752

1ST FLOOR

FURNACE RM

0.07

17 WALL DRYWALL GREEN BUILDING 752

1ST FLOOR FURNACE

RM

< LOD

18 DOOR TRIM DRYWALL

BLACK_

BROWN

BUILDING 752

1ST FLOOR MAIN

ROOM

0.04

19 DOOR TRIM WOOD

BLACK_

BROWN

BUILDING 752

1ST FLOOR MAIN

ROOM

0.03

20 WALL WOOD WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

21 COLUMN WOOD WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

22 DISPLAY RACK WOOD BEIGE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

23 BEAM WOOD OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

24 BEAM WOOD OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

25 CABINET DRYWALL OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

26 CABINET DRYWALL OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

27 CEILING WOOD OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

2.3

28 CEILING DRYWALL OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

29 DUCTING METAL OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

0.04

30 UPPER WALL WOOD OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

31 UPPER WALL WOOD OFF WHITE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

DISPLAY

AWNING_TRIM

WOOD BLUE BUILDING 752

1ST FLOOR MAIN

ROOM

< LOD

CHECKOUT

PODIUM

WOOD BLACK BUILDING 752

1ST FLOOR MAIN

ROOM

0.6

34 DOOR WOOD BLACK BUILDING 752

1ST FLOOR FURNACE

RM 2

< LOD

DOOR

TRIM_FRAME

WOOD

BLACK_

BROWN

BUILDING 752

1ST FLOOR FURNACE

RM 2

< LOD

36 FURNACE METAL GREEN BUILDING 752

1ST FLOOR FURNACE

RM 2

< LOD

37 FLOOR WOOD GREEN BUILDING 752

1ST FLOOR

FURNACE RM 2

0.09

38 COLUMN WOOD BEIGE BUILDING 752

1ST FLOOR FURNACE

RM 2

< LOD

39 FLOOR WOOD RED BUILDING 752

1ST FLOOR CENTER

RM

< LOD

WALLS ARND

ELEVATOR

WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

< LOD

WALLS ARND

ELEVATOR

PLYWOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

< LOD

42 TRIM WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

6.5

43 WALL WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

7.0

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

44 WINDOW TRIM WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

7.7

45 WINDOW SILL WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

3.6

46 WINDOW SASH WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

3.8

47 WINDOW SASH WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

3.4

48 COLUMN WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

6.6

49 PEG BOARD WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

< LOD

50 STAIR TREAD WOOD RED BUILDING 752

1ST FLOOR CENTER

RM

0.4

51 STAIR RISER WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

8.4

52 STAIR NUEL POST WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

5.0

53 STAIR RAILING WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

6.6

WOOD

BASEBOARD

WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM

< LOD

BEAM BRACKET

AT TOP OF

COLUMN

WOOD BLACK BUILDING 752

1ST FLOOR CENTER

RM

< LOD

LARGE DR

FRAME

WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM BTWN SW RM

0.09

57 LARGE DR TRIM WOOD WHITE BUILDING 752

1ST FLOOR CENTER

RM BTWN SW RM

0.05

58 FLOOR WOOD GREEN BUILDING 752 1ST FLOOR SW RM < LOD

59 SECURITY PANEL DRYWALL RED BUILDING 752 1ST FLOOR SW RM < LOD

60 FA PANEL METAL RED BUILDING 752 1ST FLOOR SW RM < LOD

ELECTRICAL

PANEL

METAL

LIGHT

BROWN

BUILDING 752 1ST FLOOR SW RM < LOD

ELECTRICAL

PANEL

METAL BLACK BUILDING 752 1ST FLOOR SW RM < LOD

63 COLUMN WOOD WHITE BUILDING 752 1ST FLOOR SW RM 3.4

64 COLUMN WOOD BLACK BUILDING 752 1ST FLOOR SW RM 6.2

65 FLOOR WOOD BEIGE BUILDING 752 1ST FLOOR SW RM < LOD

66 WALL WOOD BLACK BUILDING 752 1ST FLOOR SW RM 8.5

67 LARGE DOOR WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.3

LARGE DOOR

TRIM

WOOD WHITE BUILDING 752 1ST FLOOR SW RM 7.3

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

RADIATOR

PIPING

METAL SILVER BUILDING 752 1ST FLOOR SW RM 0.07

70 RADIATOR METAL SILVER BUILDING 752 1ST FLOOR SW RM 0.4

71 WINDOW GLASS GLASS WHITE BUILDING 752 1ST FLOOR SW RM < LOD

72 WALL WOOD WHITE BUILDING 752 1ST FLOOR SW RM 9.1

73 WINDOW TRIM WOOD WHITE BUILDING 752 1ST FLOOR SW RM 8.1

WINDOW

SASH_SILL

WOOD WHITE BUILDING 752 1ST FLOOR SW RM 6.9

75 LARGE DOOR WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.23

LARGE DOOR

FRAME

WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.18

LARGE DOOR

FRAME

WOOD WHITE BUILDING 752 1ST FLOOR SW RM 0.3

78 LARGE DOOR WOOD BLACK BUILDING 752 1ST FLOOR SW RM 0.11

79 FURNACE METAL

LIGHT

BROWH

BUILDING 752 1ST FLOOR SW RM < LOD

80 BEAM WOOD WHITE BUILDING 752 1ST FLOOR SW RM 4.8

81 BEAM WOOD WHITE BUILDING 752 1ST FLOOR SW RM 5.2

82 DOOR WOOD WHITE BUILDING 752

1ST FLOOR SW RM

TO MENS RR

0.7

83 DOORFRAME WOOD WHITE BUILDING 752

1ST FLOOR SW RM

TO MENS RR

2.0

84 DOOR TRIM WOOD WHITE BUILDING 752

1ST FLOOR SW RM

TO MENS RR

2.9

85 WINDOW WOOD WHITE BUILDING 752

1ST FLOOR SW RM

TO MENS RR

14.8

86 WINDOW TRIM WOOD WHITE BUILDING 752

1ST FLOOR SW RM

TO MENS RR

< LOD

87 WINDOW TRIM WOOD WHITE BUILDING 752

1ST FLOOR SW RM

TO MENS RR

10.8

88 WALL DRYWALL BEIGE_TAN BUILDING 752 1ST FLOOR MENS RR < LOD

89 WALL DRYWALL BEIGE_TAN BUILDING 752

1ST FLOOR

WOMENS RR

< LOD

90 DOOR TRIM WOOD WHITE BUILDING 752

1ST FLOOR

WOMENS RR

< LOD

91 DOOR FRAME WOOD WHITE BUILDING 752

1ST FLOOR

WOMENS RR

4.5

92 DOOR WOOD WHITE BUILDING 752

1ST FLOOR

WOMENS RR

6.8

93 SINK CERAMIC WHITE BUILDING 752

1ST FLOOR

WOMENS RR

< LOD

94 TOILET CERAMIC WHITE BUILDING 752

1ST FLOOR

WOMENS RR

< LOD

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

95 CEILING DRYWALL BEIGE_TAN BUILDING 752 1ST FLOOR MEN RR < LOD

96 WALL WOOD WHITE BUILDING 752

2nd FLOOR

STAIRWELL

6.8

97 WALL WOOD BLACK BUILDING 752

2nd FLOOR

STAIRWELL

10.9

98 WALL WOOD BEIGE BUILDING 752

2nd FLOOR

STAIRWELL

6.9

99 STAIR GATE WOOD WHITE BUILDING 752

2nd FLOOR

STAIRWELL

< LOD

100 STAIR RAILING WOOD WHITE BUILDING 752

2nd FLOOR

STAIRWELL

6.7

101 WALL WOOD BEIGE BUILDING 752

2nd FLOOR

STAIRWELL

< LOD

102 WALL WOOD BEIGE BUILDING 752

2nd FLOOR

STAIRWELL

< LOD

103 WALL WOOD BEIGE BUILDING 752

2nd FLOOR

STAIRWELL

< LOD

104 WALL WOOD BEIGE BUILDING 752

2nd FLOOR

STAIRWELL

< LOD

105 WINDOW WOOD BLUE_GREEN BUILDING 752 2nd FLOOR 4.8

106 WINDOWFRAME WOOD BLUE_GREEN BUILDING 752 2nd FLOOR 3.4

107 WINDOWFRAME WOOD BLUE_GREEN BUILDING 752 2nd FLOOR 6.0

108 COLUMN WOOD BEIGE BUILDING 752 2nd FLOOR 5.5

109 BEAM WOOD BEIGE BUILDING 752 2nd FLOOR 6.6

110 ROOF JOIST WOOD BEIGE BUILDING 752 2nd FLOOR 6.9

UNDERSIDE OF

LOFT FLOOR

WOOD BEIGE BUILDING 752 2nd FLOOR 3.7

112 WALL WOOD BEIGE BUILDING 752 2nd FLOOR 8.8

113 STAIRWELL DR WOOD GREEN_BLUE BUILDING 752 2nd FLOOR 0.05

114 STAIRWELL DR WOOD VARNISH BUILDING 752 2nd FLOOR 0.04

115 STAIRWELL DR WOOD VARNISH BUILDING 752 2nd FLOOR 0.03

116 WALL TRIM WOOD BEIGE BUILDING 752 2nd FLOOR 7.3

117 WALL TRIM WOOD CLEAR BUILDING 752 2nd FLOOR NORTH < LOD

118 WALL TRIM WOOD CLEAR BUILDING 752 2nd FLOOR NORTH < LOD

ELEVATOR

SAFETY GATE

WOOD RED_BROWN BUILDING 752 2nd FLOOR 0.24

120 CALIBRATION N/A RED BUILDING 752 N/A 0.9

121 CALIBRATION N/A RED BUILDING 752 N/A 0.9

122 CALIBRATION N/A RED BUILDING 752 N/A 0.9

Key: N/A = not applicable, <LOD = less than limit of detection

All XRF sample shots are representative of that color on that specific substrate and component.

The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

In addition to the XRF samples, EHSI collected two (2) bulk QA samples for laboratory analysis. Building materials and paint containing detectable levels of lead are considered regulated by DOSH.

Table 4 summarizes bulk QA lead samples, including sample number, material description, substrate, color, location, and analytical results. Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.

TABLE 4

SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

SAMPLE

NUMBER

LOCATION

COMPONENT/

SUBSTRATE

COLOR

RESULTS

% Pb by

WT

11176-Pb01 1st Floor, Furnace

Room Chimney/Brick & Mortar

Green on red & gray brick and mortar

4.1

11176-Pb02 1st Floor, Furnace

Room 2 Chimney/Brick & Mortar Red & Gray <0.0037

11176-Pb07 1st Floor, Storage Wall/Wood White 6.0 Key: Pb = lead

DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.

Since the type of work planned (e.g., sawing, grinding, demolition) may disturb the lead-containing materials, the contractor will need to conduct lead awareness training and perform an initial exposure assessment in accordance with the regulations.

EHSI also identified three (3) lead-acid batteries inside alarm and fire alarm panels on the 1st floor. If lead-acid batteries are impacted by the proposed renovation, they must be recycled by a licensed facility.

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

At the request of NPS, EHSI accomplished TCLP sampling and analysis of the assumed waste stream for the project and Table 5 summarizes the analytical results. EHSI collected and composited a representative sample of the assumed waste stream for renovation activities that may impact interior building finishes, that included proportionate quantities of all materials expected to be included in the waste stream. Note: Painted metals were not included in the assumed waste stream sampling, because they are expected to be recycled and because there is no limit on metals containing paint on metals being recycled.

Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., hazardous metals-containing paint/hazardous metals-containing materials). Ecology has set a dangerous waste threshold at 5.0 milligrams (mg/L), per liter for arsenic, chromium, lead, and silver, 1.0 Mg/L for cadmium, 100 mg/L for barium and .2 mg/L for mercury.

The TCLP sample for the Project assumed waste stream was analyzed for the USEPA RCRA 8 metals: Lead (Pb), Cadmium (Cd), Chromium (Cr), Silver (Ag), Arsenic (AS), Barium (Ba), Mercury (hg), and Selenium (Se)

TABLE 5

SUMMARY OF TCLP SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 752

Sample # Elements RL in mg/L Results in mg/L Results in ppm

11176-

TCLP-

B752-01

Sample Description:

• 25% 12”x12” Beige VCT w/ mastic and wood particle board;

• 23% painted popcorn ceiling texturing and GWB ceilings;

• 18% painted wood pattern wall panels w/ mastic on GWB;

• 10% painted peg board display walls;

• 8% painted bumpy texturing w/ GWB;

• 4% painted GWB walls;

• 3% unpainted GWB walls and ceiling;

• 2% white SVF on particle board;

• 2% painted plywood walls;

• 1% painted vinyl covering w/ GWB;

• 1% painted peg board walls;

• 1% 4” vinyl cove base; and

• 1% carpet on green SVF on plywood

Silver (Ag) 0.20 <0.20 <0.20

Arsenic (As) 0.20 <0.20 <0.20

Barium (Ba) 0.20 0.38 0.38

Cadmium (Cd) 0.20 <0.20 <0.20

Chromium (Cr) 0.20 <0.20 <0.20

Mercury (Hg) 0.01 <0.11 <0.11

Lead (Pb) 0.20 <0.20 <0.20

Selenium (Se) 0.20 <0.20 <0.20 KEY: Ag = silver, As = Arsenic, Ba = Barium, Cd = Cadmium, Cr = Chromium, , GWB = gypsum wall board, Hg = Mercury, mg/L = milligram per liter, Pb = Lead, ppm = part per million, RL = Reporting Limit, Se = Selenium, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with

It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.

2.4.4 Polychlorinated Biphenyls

Ballasts

EHSI inspected every fluorescent light fixture for PCB-containing ballasts. 96% of fixtures were found to contain magnetic ballasts and must be assumed to contain PCB-containing dielectric fluid and may be disposed/recycled as Ecology Dangerous Waste. Electronic ballasts, which contain no dielectric fluid, may be disposed as construction debris. A Summary of PCB-containing ballasts and Hg-containing light tubes, CFL bulbs, and HID lamps is provided in

Table 6.

Equipment with Assumed PCB-containing oil

EHSI identified one (1) oil-containing elevator motor tank that will be removed by the planned project. The oil filled elevator motor reservoir is assumed to contain ≥50 parts per million

(PPM) and ≤500 PPM PCBs. Sampling of oil-filled components was not within the scope of this inspection. All impacted oil filled components should be tested for PCBs or assumed to contain oil containing between 50 ppm and 500 ppm PCBs until tested. The oil from PCB-oil containing components (≥ 50 ppm PCBs and < 500 ppm PCBs) must be disposed/recycled as Ecology

Dangerous Waste in accordance with USEPA regulation 40CFR 761 and Ecology Regulation

WAC 173-303 prior to recycling.

2.4.5 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats

All fluorescent light tubes and CFL bulbs quantified in Table 6 contain Hg. Hg wastes are regulated as “universal wastes” under Ecology’s regulation WAC 173-303.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .