Attachment 3h - B753 Limited Hazardous Materials Survey Report.pdf

PDF 4 MB Posted

Attached to
Abate hazardous materials, historic buildings, WA
Solicitation number
140P8320R0008
Issued by

About this file

This request for proposals solicits abatement of hazardous materials including asbestos, lead, mercury, polychlorinated biphenyls, and wildlife excrement in several historic buildings at Fort Vancouver National Historic Site. The National Park Service seeks these services along with associated selective demolition and minor building repairs. Interested parties must hold a small business size per the $22 million average annual gross receipts NAICS code 562910 for Remediation Services. The single firm-fixed-price construction contract requires payment and performance bonds of 100% each and liability insurance. The 180-day performance period begins after award. Proposals are due digitally by the specified date following a site visit on August 13, 2020. The best value selection considers technical capability versus price. The estimated contract value ranges from $250,000 to $1,000,000 depending on option exercises. Maximum opportunities for small businesses including veteran-owned, HUBZone, disadvantaged and women-owned small businesses apply.

View the file

Other files

File Type Posted
Attachment 10 Final Clarifications_0003.pdf PDF
Sol_140P8320R0008_Amd_0003.pdf PDF
Sol_140P8320R0008_Amd_0002.pdf PDF
Sol_140P8320R0008_Amd_0001.pdf PDF
forms to return with proposal - revised 140P8320R0008_0001.docx DOCX document
Attachment 9 Site visit notes_0001.pdf PDF
Attachment 7a Revised Wage Determination_0001.pdf PDF
Attachment 3e - B748 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3a - B410 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3j - B786 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 6 Building Floor Plans_20200723.pdf PDF
Attachment 4c - B991 and B993 Asbestos Survey Field Notes.pdf PDF
Attachment 3g - B752 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3f - B749 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4b - B993 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 3c - B725 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3i - B754 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3d - B746 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 3b - B721 Limited Hazardous Materials Survey Report.pdf PDF
Attachment 4a - B991 Pre-Renovation Asbestos Survey Report.pdf PDF
Attachment 5 Building Descriptions.pdf PDF
forms to return with proposal 140P8320R0008.docx DOCX document
Attachment 1 Statement of Work.pdf PDF
Sol_140P8320R0008.pdf PDF
Attachment 2 Task List for each building.pdf PDF
FAQs for RFP 140P8320R0008.pdf PDF
Attachment 7 Wage Determination 7-3-20.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134 Phone 206-381-1128 Toll Free 800-666-2959 Fax 206-254-4279

• Environmental Consulting

• Hazardous Materials Management

• Industrial Hygiene Services

• Construction Management

• Indoor Air Quality

LIMITED HAZARDOUS MATERIALS SURVEY REPORT

NATIONAL PARK SERVICE

FORT VANCOUVER NATIONAL HISTORIC SITE

East Vancouver Barracks Building 753

Vancouver, Washington 98661

December 24th, 2018

Prepared For:

Kristen Jontos National Park Service 612 East Reserve Street Vancouver, WA 98661 ii

Limited Hazardous Materials Survey Report

National Park Service

Fort Vancouver Historic Site

East Vancouver Barracks Building 753, Vancouver, Washington 98661

EHSI Project No.: # 11176

The material and data in this report were prepared under the supervision and direction of the undersigned.

Rory Peterson Lead AHERA Building Inspector

Derica Escamilla

Principal of Hazardous Materials Services iii

TABLE OF CONTENTS

Acronym List ..................................................................... iv

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

1.2 EXTENT OF CURRENT SURVEY

1.3 ACM MATERIALS FOUND

1.4 OPINIONS AND RECOMMENDATIONS

1.5 LIMITATIONS/DISCLAIMER

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

2.2 BUILDING DESCRIPTION

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

2.3.2 Lead-Containing Paint/Lead-Containing Materials

2.3.3 Ionizing Radiation

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

2.4.2 Lead-Containing Paint and Building Materials

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

2.4.4 Ionizing Radiation

2.4.5 Polychlorinated Biphenyls

2.4.6 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats 14

3.0 LIMITATIONS

4.0 STANDARD OF CARE

5.0 CERTIFIED AHERA BUILDING INSPECTORS

APPENDICES

A ........................ Asbestos Laboratory Reports and Field Data Forms B ........................ Lead Laboratory Reports and Field Data Forms C ........................ Radon Laboratory Report and Field Data Forms

D ........................ Certified AHERA Building Inspector Certificates E ......................... Laboratory Certifications for Asbestos and Lead Analysis

F ......................... Sample Location Drawings for Asbestos, Lead, and Radon G ........................ Hazardous Metals TCLP Laboratory Reports and Field Data Forms iv

ACRONYM LIST

ACM .......................Asbestos-Containing Material

Ag ..........................Silver

AHERA ....................Asbestos Hazard Emergency Response Act

AHU .......................Air Handling unit

AIHA ......................American Industrial Hygiene Association

As ..........................Arsenic

Ba ..........................Barium

Cd ..........................Cadmium

CFL ........................Compact Fluorescent Light

CFR ........................Code of Federal Regulations

Cr ..........................Chromium

DOSH .....................Washington State Department of Labor and Industries, Division of

Occupational Safety and Health

EA ..........................Each

Ecology ...................Washington State Department of Ecology

EHSI .......................EHS-International, Inc.

ELLAP .....................Environmental Lead Laboratory Accreditation Program

GWB .......................Gypsum Wall Board

Hg ..........................Mercury

JC ..........................Joint Compound

LCM ........................Lead-Containing Material

LCP ........................Lead-Containing Paint

L&I .........................Washington State Department of Labor and Industries mg/L ......................Milligrams Per Liter

N/A ........................Not Applicable

ND .........................None Detected

NVL ........................NVL Laboratories, Inc.

NVLAP ....................National Voluntary Laboratory Accreditation Program

OD .........................Outside Diameter

OSHA .....................US Occupational Safety and Health Administration

Pb ..........................Lead

PCBs .......................Polychlorinated Biphenyls

PLM ........................Polarized Light Microscopy ppm .......................Parts per Million

QA .........................Quality Assurance

RCW .......................Revised Code of Washington

SAT ........................Seattle Asbestos Test, LLC

Se ..........................Selenium

SF ..........................Square Feet

SWCAA ...................Southwest Clean Air Agency

TCLP .......................Toxicity Characteristic Leaching Procedure

VCT ........................Vinyl Composite Tile

WAC .......................Washington Administrative Code

wt. .........................Weight w/ ..........................With

XRF ........................x-ray fluorescence

Fort Vancouver National Historic Site – B753

EHSI Project 11176

1.0 EXECUTIVE SUMMARY

1.1 BACKGROUND

The National Park Service (NPS) plans to renovate Building 753 (B753) at the Fort Vancouver

National Historic Site (FV NHS) located in Vancouver, Washington. The NPS has contracted

EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead, Asbestos and Ionizing Radiation Survey of B753 in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), interior lead-containing paint (LCP), other interior lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure (TCLP) sample representative of all materials that may be in the assumed waste stream, characterize ionizing radiation concentrations above background levels, including locations of occurrence, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl (PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by renovation activities.

1.2 EXTENT OF CURRENT SURVEY

EHSI inspected accessible interior and exterior suspect ACM that may be potentially impacted by future projects. Accessible suspect materials were sampled including, but not limited to:

interior and exterior wall systems, window systems, and mechanical systems. The LCP and

LCM survey was limited to the interior of the building only. The assessment of ionizing radiation concentrations and the locations of occurrence was conducted on the interior and exterior of the building. EHSI accomplished a representative destructive inspection; however, in areas inaccessible for inspection (e.g., energized electrical equipment) suspect materials were assumed to be ACM.

1.3 ACM MATERIALS FOUND

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

ASBESTOS MATERIAL DESCRIPTION LOCATION

ACM white/brown/off-white fibrous heat shield

[Sample #: 11176-250]

Utility Store Room, North

Side

Non-ACM white/black/blue jean pipe wrap on ACM white fibrous mag TSI run (6” OD)

[Sample #: 11176-257, 258 , & 259]

Exterior, S.E. Corner

1’x1’9” Electrical panel w/ assumed ACM internal components

Utility Storage Room, North

Side

8”x1’ Electrical panel w/ assumed ACM internal components

Utility Storage Room, East

Side KEY: ACM = asbestos containing material, OD = outer diameter, w/ = with

1.4 OPINIONS AND RECOMMENDATIONS

EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to any renovation and demolition activities.

Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.

Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition or renovation) will disturb the LCP, the contractor will need to perform an initial exposure assessment in accordance with the regulations. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).

The United States Environmental Protection Agency (EPA) recommends mitigation of radon gas if the average of two short-term tests taken in the lowest level of the building suitable for occupancy show radon levels that are equal to or greater than 4.0 picoCuries per liter (pCi/L).

Only one of the two radon canisters submitted for analysis registered at or above the action level and therefore no remedial actions for mitigation of radon gas are recommended at this time.

No fluorescent light fixtures were found in Building 753, all lights are incandescent and do not contain mercury and are not associated with ballasts, either magnetic or electronic. Therefore, no ballasts need to be disposed of as Washington Department of Ecology (Ecology) Dangerous

Waste and no lamps/tubes need to be recycled as (Ecology) Universal Waste.

1.5 LIMITATIONS/DISCLAIMER

This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical equipment were not sampled but were assumed to be ACMs based on the inspector’s experience with similar systems on other projects. This report and accompanying appendices include the supporting information for this executive summary.

2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT

2.1 BACKGROUND

The NPS has contracted EHSI to accomplish a pre-renovation limited hazardous materials survey of the existing structure. For the limited hazardous materials survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including: characterization of ionizing radiation concentrations including locations of occurrence above background levels, identification of all suspect materials; a determination of whether suspect materials were:

ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.

On September 13th, 2018, EHSI conducted a Limited Hazardous Materials Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of

Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington

Administrative Code (WAC) 296-62-07721, and Regulation Section 476-040 of the Southwest

Clean Air Agency (SWCAA).

2.2 BUILDING DESCRIPTION

Building 753 is located at East Vancouver Barracks, Vancouver, Washington. The building is a one-story wood-framed structure. The building was originally constructed on a on brick and mortar pier system, but has since been replaced with a concrete slab foundation. The building’s roof is covered with 3-tab composite shingles. Exterior finishes include painted tongue & groove wood siding. Interior floor finishes include bare concrete with some painted lines. Interior wall finishes include painted tongue & groove wood walls and painted plywood.

Interior ceiling finishes include painted tongue & groove wood roof deck. Windows throughout the building are operable and wood-framed. There is no heating or running water provided to this building. Interior lighting consists of incandescent ceiling fixtures and natural light from the windows.

2.3 SAMPLING METHODOLOGY

2.3.1 Asbestos-Containing Materials

The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of

Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix

D. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October

1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.

EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and

Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary

Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.

Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.

Copies of both laboratories’ NVLAP certifications are included in Appendix E.

2.3.2 Lead-Containing Paint/Lead-Containing Materials

EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3.

Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic

Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial Hygiene

Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP).

Copies of laboratory reports and field data forms for lead are in Appendix B.

All XRF sample shots are representative of that color on that specific substrate and component. The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

2.3.3 Ionizing Radiation

EHSI used a Ludlum 2241 Geiger Counter to measure for the presence of ionizing radiation levels above background on the interior and exterior of the building. Interior measurements were generalized within 16 discrete uniformly sized partitions of the building footprint (roughly

12’x12’ in dimensions) as well as along the length of a crack in the floor foundation running the length of the building. Exterior measurements were generalized over roughly 10’ intervals and were taken along the ground adjacent to the building foundation. A summary of Geiger

Counter readings is provided in Table 6. EHSI used Radon Testing Corporation of America

(RTCA) Professional Radon Test kits, each containing one 4 inch charcoal canister in accordance with the manufacturer’s recommendations to collect a representative measure of the radon level present inside Building 753. After collection, the test kits were submitted to

RTCA, a certified member of the National Radon Safety Board (NRSB) for laboratory analysis.

Copies of the laboratory report and field data forms for radon are in Appendix C.

2.4 SAMPLING RESULTS

2.4.1 Asbestos-Containing Materials

Thirty (30) bulk samples of suspect ACM were collected as part of the survey. Two (2) of those samples were split for quality assurance analyses. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix F. Asbestos sampling information including: sample number, material description, sample location, and analytical results are summarized in Table 1. The

ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. All suspect materials were accessible for sampling.

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 753

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-230

Utility Store

Room, N.

Side

White siding caulking

(sporadically throughout building)

ND N/A

11176-

231QAX

Utility Store

Room, N.

Side

Hard beige/cream colored siding caulking (sporadically throughout building)

ND N/A

11176-232

Utility Store

Room, Office

Tan window glazing putty w/ paint (on 2’3”x2’7” wood-framed windows)

ND N/A

11176-233

Utility Store

Room, Office

Tan window glazing putty w/ paint (on 2’3”x2’7” wood-framed windows)

ND N/A

11176-234 Exterior, N.

Side

Beige window glazing putty w/ paint (on 2’8”x4’5” wood-framed windows)

ND N/A

11176-235 Exterior, N.

Side

Gray window glazing putty w/ paint (on 3’8”x3’4” wood-framed windows)

ND N/A

11176-236

Utility Store

Room, Office

Off-white window glazing putty w/ paint (on 3’8”x3’4” wood-framed windows)

ND N/A

11176-237 Exterior, E.

Side

Tan/gray window glazing putty w/ paint (on 2’11”x4’6” wood-framed windows)

ND N/A

11176-238 Exterior, E.

Side

Gray window glazing putty w/ paint (on 2’11”x4’6” wood-framed windows)

ND N/A

11176-239

Utility Store

Room, S.

Side

Gray window glazing putty w/ paint (on 2’11”x4’6” wood-framed windows)

ND N/A

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 753

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-240

Utility Store

Room, S.

Side

Tan window glazing putty w/ paint (on 3’5”x5’3” wood-framed windows)

ND N/A

11176-241 Exterior, W.

Side

Off-white window glazing putty w/ paint (on 3’5”x5’3” wood-framed window)

ND N/A

11176-242 Exterior, W.

Side

Tan window glazing putty w/ paint (on 2’7”x2’3” wood-framed window)

ND N/A

11176-243 Exterior, W.

Side

Tan window glazing putty w/ paint (on 2’7”x2’3” wood-framed window)

ND N/A

11176-

244QA

Exterior, N.

Side

Tan window glazing putty w/ white/green paint (on 3’x2’ wood-framed window)

ND N/A

11176-245 Exterior, N.

Side

White window frame caulking w/ paint (on all windows)

ND N/A

11176-246 Exterior, N.

Side

White door frame caulking w/ paint (on both doors)

ND N/A

11176-247 Exterior, E.

Side

Layer 1: White window frame caulking w/ paint

Layer 2: Older beige crumbly window frame caulking (on all windows)

ND

(All Layers)

N/A

(All Layers)

11176-248

Utility Store

Room, N.

Side

White/black counterweight rope (on tall windows)

ND N/A

11176-249

Utility Store

Room, S.

Side

Black asphaltic vapor barrier

(on rolling-door header)

ND N/A

11176-

250QAX

Utility

Store

Room, N.

Side

White/brown/off-white fibrous heat shield paper 82% Chrysotile

11176-251 Roof, S.E.

Corner

Layer 1: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 2: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 3: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FORT VANCOUVER BARRACKS – BUILDING 753

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

11176-252 Roof, N.E.

Corner

Layer 1: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 2: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 3: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-253 Roof, W.

Side

Layer 1: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 2: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 3: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-254

Utility Store

Room, S.

Side

Brown fibrous concrete slab seam filler

ND N/A

11176-255 Exterior, S.E. Corner

Layer 1: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 2: Black asphaltic 3-tab roofing w/ granules w/ black asphaltic tar

Layer 3: Black asphaltic vapor barrier (on wood)

ND

(All Layers)

N/A

(All Layers)

11176-256 Exterior, S.E. Corner

Layer 1: Red brick

Layer 2: Gray mortar (well wall)

ND

(All Layers)

N/A

(All Layers)

11176-257 Exterior, S.E. Corner

Layer 1: Blue/white/black jean material wrap

Layer 2: White fibrous mag

TSI run (6” OD)

L1: ND

L2: 3%

8%

N/A

Chrysotile

Amosite

11176-258 Exterior, S.E. Corner

White fibrous mag TSI run

(6” OD)

4%

7%

Chrysotile

Amosite

11176-259 Exterior, S.E. Corner

White fibrous mag TSI run

(6” OD)

4%

8%

Chrysotile

Amosite KEY: ND = non-detect, N/A = not applicable, OD = outer diameter, TSI = thermal system insulation, w/ = with, X When QA lab and primary lab sample results differed, EHSI reported the most restrictive

(e.g., highest % asbestos) in Table 1. Analytical results for all analyses are provided in

Appendix A.

Washington State Department of Labor and Industries Division of Occupational Safety and

Health (L&I DOSH) requires special worker exposure precautions and qualifications when dealing with ACM used on seams and nail holes (refer to L&I DOSH regulations and WISHA

Regional Directives {WRD}).

Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2

Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.

TABLE 2

SUMMARY OF ASBESTOS-CONTAINING MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY

ACM white/brown/off-white fibrous heat shield [Sample #: 11176-250]

Utility Store Room, North Side

20 SF

**Non-ACM white/black/blue jean pipe wrap on

ACM white fibrous mag TSI run (6” OD)

[Sample #: 11176-257, 258 , & 259]

Exterior, S.E. Corner 4 LF*

1’x1’9” Electrical panel w/ assumed ACM internal components

Utility Storage Room, North Side

1 EA

8”x1’ Electrical panel w/ assumed ACM internal components

Utility Storage Room, East Side

1 EA

KEY: ACM = asbestos containing material, EA = each, LF = linear feet, SF = square feet, OD = outer diameter, w/ = with

**EHSI identified approximately 4 LF of ACM TSI inside the utilidor access on the southeast corner of the building. The pipe that was found continues to the southwest. EHSI made no attempt to quantify the entire amount of asbestos-containing insulation beyond Building 753.

ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect

ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building

Inspector. Concealed suspect material may include but is not limited to: spray-applied coatings, asphalt or paper vapor barriers and mastics.

2.4.2 Lead-Containing Paint and Building Materials

Seventy-three (73) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer. Red bolded results indicate materials containing detectable levels of lead and “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation

40CFR745 and Washington State Commerce regulation WAC 365-230. Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.

TABLE 3

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

298 SELF-CALIBRATE N/A N/A N/A N/A 3.71

299 CALIBRATE N/A RED N/A N/A 0.9

300 CALIBRATE N/A RED N/A N/A 0.9

301 CALIBRATE N/A RED N/A N/A 1.0

302 WALL WOOD BEIGE 753 OFFICE 2.4

303 TRIM WOOD BEIGE 753 OFFICE 0.16

304 WALL TRIM WOOD BEIGE 753 OFFICE 1.9

305 WINDOW SILL WOOD BEIGE 753 OFFICE 0.7

306 WINDOW WOOD BEIGE 753 OFFICE 26.0

307 WINDOW WOOD BEIGE 753 OFFICE 0.13

308 WINDOW WOOD BEIGE 753 OFFICE 2.6

309 WINDOW TRIM WOOD BEIGE 753 OFFICE 2.9

310 COUNTER WOOD BEIGE 753 OFFICE 2.2

PASS THROUGH

WINDOW TRIM

WOOD BEIGE 753 OFFICE 2.5

PASS THROUGH

WINDOW SILL

WOOD BEIGE 753 OFFICE 2.4

PASS THROUGH

WINDOW FRAME

WOOD BEIGE 753 OFFICE 3.3

314 WALL WOOD BEIGE 753 OFFICE 3.3

315 CEILING WOOD BEIGE 753 OFFICE 3.1

316 CEILING TRIM WOOD BEIGE 753 OFFICE 4.7

317 DOUBLE DOOR WOOD OFF_WHITE 753 UTILITY STORAGE N < LOD

DOUBLE DOOR

TRIM

WOOD BEIGE 753 UTILITY STORAGE N 1.8

319 WALL WOOD BEIGE 753 UTILITY STORAGE N 2.7

320 WALL STUD WOOD BEIGE 753 UTILITY STORAGE N 0.06

321 WALL WOOD BEIGE 753 UTILITY STORAGE N 2.3

322 WALL SILL WOOD BEIGE 753 UTILITY STORAGE N 0.06

WALL BASE ON

OFFICE WALLS

WOOD BEIGE 753 UTILITY STORAGE N 2.7

324 WALL WOOD BEIGE 753 UTILITY STORAGE N 0.04

325 WALL WOOD BEIGE 753 UTILITY STORAGE N 0.12

326 WALL STUD WOOD BEIGE 753 UTILITY STORAGE N 0.05

327 WINDOW TRIM WOOD BEIGE 753 UTILITY STORAGE N 0.05

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

328 WINDOW WOOD BEIGE 753 UTILITY STORAGE N 0.4

329 WINDOW SILL WOOD BEIGE 753 UTILITY STORAGE N 1.7

330 WINDOW WOOD BEIGE 753 UTILITY STORAGE N 1.3

331 WINDOW TRIM WOOD BEIGE 753 UTILITY STORAGE N 0.06

332 WINDOW FRAME WOOD BEIGE 753 UTILITY STORAGE N 0.05

NUMBERS ON

WALL

CONCRETE WHITE 753 UTILITY STORAGE N < LOD

334 CENTER WALL WOOD GREEN 753 UTILITY STORAGE N 1.6

335 CENTER WALL WOOD BROWN 753 UTILITY STORAGE N 0.13

336 WINDOW WOOD BEIGE 753 UTILITY STORAGE N 0.03

337 WINDOW WOOD BEIGE 753 UTILITY STORAGE N < LOD

338 ROOF JOIST WOOD BEIGE 753 UTILITY STORAGE N 0.03

339 ROOF JOIST WOOD BEIGE 753 UTILITY STORAGE N < LOD

340 ROOF DECKING WOOD BEIGE 753 UTILITY STORAGE N < LOD

341 WALL WOOD BEIGE 753 UTILITY STORAGE S 0.09

342 WALL STUD WOOD BEIGE 753 UTILITY STORAGE S 0.1

343 WINDOW TRIM WOOD BEIGE 753 UTILITY STORAGE S 0.07

344 WINDOW WOOD BEIGE 753 UTILITY STORAGE S 1.3

345 WINDOW SILL WOOD BEIGE 753 UTILITY STORAGE S 1.6

346 WALL WOOD BEIGE 753 UTILITY STORAGE S 2.0

347 WALL STUD WOOD BEIGE 753 UTILITY STORAGE S 0.1

348 WALL STUD WOOD BEIGE 753 UTILITY STORAGE S 0.15

349 WALL WOOD BEIGE 753 UTILITY STORAGE S 0.11

350 SLIDING DOOR WOOD BEIGE 753 UTILITY STORAGE S 0.08

SLIDING DOOR

TRIM

WOOD BEIGE 753 UTILITY STORAGE S < LOD

SLIDING DOOR

RAIL

WOOD BEIGE 753 UTILITY STORAGE S < LOD

353 WINDOW INFILL WOOD TAN 753 UTILITY STORAGE S < LOD

354 ROOF JOIST WOOD BEIGE 753 UTILITY STORAGE S 0.06

355 ROOF DECKING WOOD BEIGE 753 UTILITY STORAGE S 0.04

356 WALL WOOD BEIGE 753 UTILITY STORAGE S 2.2

357 WALL WOOD RED 753 UTILITY STORAGE S 0.13

358 WALL WOOD YELLOW 753 UTILITY STORAGE S 0.04

359 WALL STUD WOOD BEIGE 753 UTILITY STORAGE S 0.11

XRF SAMPLING

SUMMARY OF PAINTED COMPONENTS AND MATERIALS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

Read

Component Substrate Color Building Room

Lead

Conc.

(mg/cm2)

360 WINDOW WOOD BEIGE 753 UTILITY STORAGE S 7.5

WINDOW

TRIM_SILL

WOOD BEIGE 753 UTILITY STORAGE S 0.8

362 WOOD PANELS WOOD TAN 753 UTILITY STORAGE S < LOD

363 CENTER WALL WOOD BLUE 753 UTILITY STORAGE S < LOD

364 CENTER WALL WOOD BROWN 753 UTILITY STORAGE S 0.05

365 CENTER WALL WOOD YELLOW 753 UTILITY STORAGE S < LOD

366 CENTER WALL WOOD RED 753 UTILITY STORAGE S 0.05

367 CENTER WALL WOOD WHITE 753 UTILITY STORAGE S 0.04

368 FLOOR STRIPING CONCRETE YELLOW 753 UTILITY STORAGE S 2.8

369 CALIBRATE N/A RED N/A N/A 0.9

370 CALIBRATE N/A RED N/A N/A 1.0

371 CALIBRATE N/A RED N/A N/A 1.0

Key: N/A = not applicable, <LOD = less than limit of detection

All XRF sample shots are representative of that color on that specific substrate and component.

The report user shall deduce from the data in Table 3 and 4, if certain building materials throughout the entire building contain lead and should not assume that what is detected is only in the specific location identified in the Table.

In addition to the XRF samples, EHSI collected two (2) bulk QA samples for laboratory analysis. Building materials and paint containing detectable levels of lead are considered regulated by DOSH.

Table 4 summarizes bulk QA lead samples, including sample number, material description, substrate, color, location, and analytical results. Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.

TABLE 4

SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

SAMPLE

NUMBER

LOCATION

COMPONENT/

SUBSTRATE

COLOR

RESULTS

% Pb by

WT

11176-Pb09 1st Floor, Utility Storage

Room, North Side

Roof Joints /

Wood Beige 0.17

11176-Pb10 1st Floor, Exterior Wall / Brick and

Mortar Red & Gray 0.0047

Key: Pb = lead

DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.

Since the type of work planned (e.g., sawing, grinding, demolition) may disturb the lead-containing materials, the contractor will need to conduct lead awareness training and perform an initial exposure assessment in accordance with the regulations.

2.4.3 Toxicity Characteristic Leaching Procedure Sampling

At the request of NPS, EHSI accomplished TCLP sampling and analysis of the assumed waste stream for the project and Table 5 summarizes the analytical results. EHSI collected and composited a representative sample of the assumed waste stream for renovation activities that may impact interior building finishes, that included proportionate quantities of all materials expected to be included in the waste stream. Note: Painted metals were not included in the assumed waste stream sampling, because they are expected to be recycled and because there is no limit on metals containing paint on metals being recycled.

Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., hazardous metals-containing paint/hazardous metals-containing materials). Ecology has set a dangerous waste threshold at 5.0 milligrams per liter (mg/L), for arsenic, chromium, lead, and silver, 1.0 Mg/L for cadmium, 100 mg/L for barium and .2 mg/L for mercury.

The TCLP sample for the Project assumed waste stream was analyzed for the USEPA RCRA 8 metals: Lead (Pb), Cadmium (Cd), Chromium (Cr), Silver (Ag), Arsenic (AS), Barium (Ba), Mercury (hg), Selenium (Se), Copper (Cu), Nickel (Ni) and Zinc (Zn). Copies of the analytical laboratory report and field data forms for the TCLP sample are included in Appendix F of this report.

TABLE 5

SUMMARY OF TCLP SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

Sample # Elements RL in mg/L Results in mg/L Results in ppm

11176-

TCLP-

B753-01

Sample Description:

• 38% Painted plywood office walls;

• 37% Painted plywood dividing wall;

• 16% Unpainted wood framing;

• 6% Unpainted fiberboard dividing wall panels; and

• 3% Painted wood trim

Silver (Ag) 0.20 <0.20 <0.20

Arsenic (As) 0.20 <0.20 <0.20

Barium (Ba) 0.20 1.3 1.3

Cadmium (Cd) 0.20 <0.20 <0.20

Chromium (Cr) 0.20 <0.20 <0.20

Mercury (Hg) 0.01 <0.011 <0.011

Lead (Pb) 0.20 3.9 3.9

Selenium (Se) 0.20 <0.20 <0.20 KEY: Ag = silver, As = Arsenic, Ba = Barium, Cd = Cadmium, Cr = Chromium, Cu = Copper, GWB = gypsum wall board, Hg = Mercury, mg/L = milligram per liter, Ni = Nickel, Pb = Lead, ppm = part per million, RL = Reporting Limit, Se = Selenium, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/

= with, Zn = Zinc

It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.

2.4.4 Ionizing Radiation

Ionizing Radiation Above Background (As Measured with a Geiger Counter)

EHSI utilized a Ludlum 2241 Geiger Counter to characterize the concentration and location of ionizing radiation levels measured in microroentgen per hour (µR/h). Exterior levels were observed to range from 6 µR/hr to 20 µR/hr and interior levels were observed to range from

6 µR/hr to 24 µR/hr with a trend for readings closer to the upper end of this range occurring within the southeast portion of the building as well as along the center of the building running the entire length of the structure. Exposure to one Roentgen is approximately equivalent to a one REM dose. These levels of radiation are well below the WA State Department of Health worker permissible exposure limits for x-ray workers of 5 REM/year whole body dose. There is not regulatory standard for ionizing radiation exposure for the general public, but the US

Department of Energy recommends radiation exposure be kept to the “lowest level feasible”.

Radon

Table 6 summarizes radon samples, including canister ID, location, test start time, test stop time, and result. Radon levels were reported at 4.2 Picocuries per liter (pCi/L) and 0.8pCi/L.

The EPA has set a recommended action level for radon at 4.0 pCi/L. Actions available to reduce Radon concentrations in existing buildings include, but are not limited to: Installation of sub-slab venting systems (active and passive) and increasing fresh air ventilation in the building. Copies of the analytical laboratory report is included in Appendix C

TABLE 6

RADON SAMPLING AND ANALYTICAL RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

CANISTER

ID

LOCATION Test Start Test Stop

RESULTS

pCi/L

2670269 Center of building, Interior 09/18/2018 @

09:15

09/20/2018

@ 10:15 4.2

2670273 Northeast corner of building, Interior

09/18/2018 @

09:15

09/24/2018

@ 10:15 0.8

Key: pCi/L = Picocuries per liter

2.4.5 Polychlorinated Biphenyls

Ballasts

No Mercury-Containing fluorescent light tubes were identified in Building 753. All lights were incandescent and had no ballasts (magnetic or electronic) associated with them, therefore there is no danger of magnetic ballasts possibly containing PCBs.

2.4.6 Mercury-Containing Fluorescent Light Tubes, CFL Bulbs, and thermostats

No Mercury-Containing fluorescent light tubes, CFL bulbs, or thermostats were identified in

Building 753. All lights were incandescent bulbs.

TABLE 7

SUMMARY OF LIGHT FIXTURE INSPECTION RESULTS

NATIONAL PARK SERVICE

FORT VANCOUVER BARRACKS – BUILDING 753

LIGHT TYPE FIXTURES

TUBES/

BULBS

MAGNETIC

BALLASTS

All lights are incandescent 0 0 0

BUILDING 753 TOTALS 0 0 0

3.0 LIMITATIONS

This survey was limited to those materials accessible using standard survey methods. Limited representative destructive inspection was accomplished. All suspect materials present were accessible for sampling.

This survey was limited to the chemicals and materials identified herein. No effort was made to identify hazardous materials in soil, water, or air, other than those listed herein. Any survey regardless of how extensive can miss concealed materials. Contractors should be aware of the potential that demolition activities may expose concealed suspect ACM and should have preplanned contingencies for handling these materials when discovered during demolition work. Any concealed, suspect ACM material that was not sampled or that was assumed to be

ACM by this survey report when encountered must be treated as ACM until sampled by a

Certified AHERA Building Inspector and analyzed by a certified laboratory. Energized electrical equipment, elevator equipment, unit heaters, and roof vents at peak of roof were not sampled but were assumed to be present based on the inspector’s experience with similar systems on other projects and are assumed to be ACMs. Exterior lead sampling was excluded from the scope of work. All exterior painted surfaces are assumed to have lead-containing paint.

4.0 STANDARD OF CARE

The recommendations and conclusions contained in this report represent the professional opinions of EHSI. These opinions are derived in accordance with federal, state, and local environmental and health and safety laws and regulations. This survey was accomplished in accordance with applicable federal, state, and local regulations and industry standards in effect at the time. Other than this, no other warranty is implied or intended.

5.0 CERTIFIED AHERA BUILDING INSPECTORS

The Certified AHERA Building Inspectors listed below surveyed Building 753 on September

13th, 2018, in accordance with federal, state, and local requirements.

Rory Peterson Brett Racine

Certified AHERA Building Inspector Certified AHERA Building Inspector

Certificate Number: 169055 Certificate Number: 168604

Expiration Date: August 15, 2019 Expiration Date: July 18, 2019

Appendix A

APPENDIX A

Asbestos Analytical Laboratory Report and Field Data Forms

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

DericaE Rectangle

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

RoryP Line

Matt Macfarlane, Asbestos Lab Supervisor

Client Project: 11176-001 Location: NPS Fort Vancouver Barracks

Dear Mr. Peterson, Enclosed please find test results for the 13 sample(s) submitted to our laboratory for analysis on 9/21/2018.

Examination of these samples was conducted for the presence of identifiable asbestos fibers using polarized light microscopy (PLM) with dispersion staining in accordance with both EPA 600/M4-82-020, Interim Method for the Determination of Asbestos in Bulk Insulation Samples and EPA 600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials.

For samples containing more than one separable layer of materials, the report will include findings for each layer (labeled Layer 1 and Layer 2, etc. for each individual layer). The asbestos concentration in the sample is determined by calibrated visual estimation.

For those samples with asbestos concentrations between 1 and 10 percent based on visual estimation, the EPA recommends a procedure known as point counting (NESHAPS, 40 CFR Part 61). Point counting is a statistically more accurate means of quantification for samples with low concentrations of asbestos.

The detection limit for the calibrated visual estimation is <1%, 400 point counts is 0.25% and 1000 point counts is 0.1%

Samples are archived for two weeks following analysis. Samples that are not retrieved by the client are discarded after two weeks.

Thank you for using our laboratory services. Please do not hesitate to call if there is anything further we can assist you with.

Sincerely, Enc.: Sample Results

September 30, 2018

Rory Peterson EHS International 1011 SW Klickitat Way. Suite 104 Seattle, WA 98134

RE: Bulk Asbestos Fiber Analysis; NVL Batch # 1818557.00

< Client:

Address:

Attention: Mr. Rory Peterson NPS Fort Vancouver Barracks

Client Project #: 11176-001

Samples Received: 13

By Polarized Light Microscopy Bulk Asbestos Fibers Analysis

EHS International 1011 SW Klickitat Way. Suite 104 Seattle, WA 98134

Method: EPA/600/R-93/116

& EPA/600/M4-82-020

Samples Analyzed: 13 Project Location:

Batch #: 1818557.00

Date Received: 9/21/2018

Layer 5 of 5 Description: Black soft asphaltic material on wood flakes Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %

Asphalt/Binder, Wood flakes 5%Glass fibers None Detected ND

18094456Lab ID: Client Sample #:

Location: NPS Fort Vancouver Barracks

11176-227QA

Layer 1 of 1 Description: Brown/black soft asphaltic mastic with thin green coating Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %

Asphalt/Binder, Binder/Filler, Calcareous particles 2%Cellulose None Detected ND

Mastic/Binder 2%Synthetic fibers

18094457Lab ID: Client Sample #:

Location: NPS Fort Vancouver Barracks

11176-231QA

Layer 1 of 1 Description: Cream soft mastic on wood flakes Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %

Fine particles, Mastic/Binder, Wood flakes NDNone Detected None Detected ND

18094458Lab ID: Client Sample #:

Location: NPS Fort Vancouver Barracks

11176-244QA

Layer 1 of 1 Description: Tan putty material with white/green paint Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %

Binder/Filler, Calcareous particles, Paint NDNone Detected None Detected ND

18094459Lab ID: Client Sample #:

Location: NPS Fort Vancouver Barracks

11176-250QA

Layer 1 of 1 Description: Off-white compressed fibrous material Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %

Binder/Filler, Fine particles NDNone Detected Chrysotile 82%

Note: If samples are not homogeneous, then subsamples of the components were analyzed separately. All bulk samples are analyzed using both EPA 600/R-93/116 and 600/M4-82-020 Methods with the following measurement uncertainties for the reported % Asbestos (1%=0-3%, 5%=1-9%, 10%=5-15%, 20%=10-30%, 50%=40-60%). This report relates only to the items tested. If sample was not collected by NVL personnel, then the accuracy of the results is limited by the methodology and acuity of the sample collector. This report shall not be reproduced except in full, without written approval of NVL Laboratories, Inc. It shall not be used to claim product endorsement by NVLAP or any other agency of the US Government

Client Alla PrysyazhnyukAnalyzed by:

Matt MacfarlaneReviewed by:

09/27/2018 Date:

09/30/2018Date:

Sampled by:

Matt Macfarlane, Asbestos Lab Supervisor

EHS International 1818557.00

Company NVL Batch Number

Total Number of Samples

NPS Fort Vancouver Barracks

5 DaysTAT

9/28/2018Due Date 8:00 AMTime

(206) 254-4279Fax roryp@ehsintl.comEmail

Project Manager Mr. Rory Peterson

(206) 381-1128

(425) 766-8342Cell

Phone

Rush Samples

Rush TAT NoAH

11176-001Project Name/Number: Project Location:

Sample ID Description A/RLab ID

ASBESTOS LABORATORY SERVICES

Subcategory

Item Code

PLM Bulk

Metals ASB-02 EPA 600/R-93-116 Asbestos by PLM <bulk>

1011 SW Klickitat Way. Suite 104 Seattle, WA 98134

Address

11176-165QA1 A18094453

11176-208QA2 A18094454

11176-221QA3 A18094455

11176-227QA4 A18094456

11176-231QA5 A18094457

11176-244QA6 A18094458

11176-250QA7 A18094459

11176-269QA8 A18094460

11176-281QA9 A18094461

11176-282QA10 A18094462

11176-307QA11 A18094463

11176-315QA12 A18094464

11176-323QA13 A18094465

Office Use Only Print Name Company Date TimeSignature

Faxed Emailed

Company Date TimeSignature ClientSampled by

Emily SchubertReceived by

ClientRelinquished by

Alla PrysyazhnyukAnalyzed by Results Called by

NVL

NVL

9/21/18 9/27/18

Print Name

Entered By: Emily Schubert

Date: 9/21/2018 Time: 9:05 AM

Special Instructions:

Appendix B

APPENDIX B

Lead Laboratory Reports and Field Data Forms

RE: Metals Analysis; NVL Batch # 1818559.00

Dear Mr. Peterson, September 21, 2018

EHS International Rory Peterson

1011 SW Klickitat Way. Suite 104 Seattle, WA 98134

Enclosed please find the test results for samples submitted to our laboratory for analysis.

Preparation of these samples was conducted following protocol outlined in EPA Method SW 846 -3051 unless stated otherwise. Analysis of these samples was performed using analytical instruments in accordance with U.S. EPA, NIOSH, OSHA and other ASTM methods.

For matrix materials submitted as paint, dust wipe, soil or TCLP samples, analysis for the presence of total metals is conducted using published U.S. EPA Methods. Paint and soil results are usually expressed in mg/Kg which is equivalent to parts per million (ppm). Lead (Pb) in paint is usually expressed in mg/Kg (ppm) , Percent (%) or mg/cm2 by area. Dust wipe sample results are usually expressed in ug/wipe and ug/ft2. TCLP samples are reported in mg/L (ppm). For air filter samples, analyses are conducted using NIOSH and OSHA Methods. Results are expressed in ug/filter and ug/m3. Other matrix materials are analyzed accordingly using published methods or specified by client. The reported test results pertain only to items tested and are not blank corrected.

For recent regulation updates pertaining to current regulatory levels or permissible exposure levels, please call your local regulatory agencies for more details.

This report is considered highly confidential and will not be released without your approval.

Samples are archived for two weeks following analysis. Samples that are not retrieved by the client are discarded after two weeks.

Thank you for using our laboratory services. if you need further assistance please feel free to call us at 206-547-0100 or 1-888-NVLLABS.

Sincerely, Shalini Patel, Lab Supervisor

Analysis Report Total Lead (Pb)

NPS Fort Vancouver Barracks

EHS InternationalClient:

1011 SW Klickitat Way. Suite 104 Seattle, WA 98134

Mr. Rory PetersonAttention:

Address:

Project Location: Samples Received: 13 Samples Analyzed: 13

Client Project #: 11176-001

Batch #: 1818559.00

Date Received: 9/21/2018

Lab ID Client Sample # Sample Weight (g)

Results in mg/Kg

Results in percent

RL in mg/Kg

Matrix: Bulk Method: EPA 3051/7000B

18094468 11176-Pb01 0.2648 38 41000 4.1

18094469 11176-Pb02 0.2722 37 < 37 0.0037<

18094470 11176-Pb03 0.3194 31 < 31 0.0031<

18094471 11176-Pb04 0.3357 30 < 30 0.0030<

18094472 11176-Pb05 0.2942 34 36 0.0036

18094473 11176-Pb06 0.3343 30 < 30 0.0030<

18094474 11176-Pb07 0.2000 50 60000 6.0

18094475 11176-Pb08 0.1934 52 < 52 0.0052<

18094476 11176-Pb09 0.1939 52 1700 0.17

18094477 11176-Pb10 0.2697 37 47 0.0047

18094478 11176-Pb11 0.1936 52 920 0.092

18094479 11176-Pb12 0.3352 30 160000 16

18094480 11176-Pb13 0.1877 53 17000 1.7

ClientSampled by:

Yasuyuki HidaAnalyzed by:

Shalini PatelReviewed by:

09/21/2018Date Analyzed:

09/21/2018Date Issued:

Bench Run No: 2018-0921-4 mg/ Kg =Milligrams per kilogram RL = Reporting Limit Percent = Milligrams per kilogram / 10000 '<' = Below the reporting Limit Note : Method QC results are acceptable unless stated otherwise.

Unless otherwise indicated, the condition of all samples was acceptable at time of receipt.

Shalini Patel, Lab Supervisor

EHS International 1818559.00

Company NVL Batch Number

Total Number of Samples

NPS Fort Vancouver Barracks

5 DaysTAT

9/28/2018Due Date 8:00 AMTime

(206) 254-4279Fax roryp@ehsintl.comEmail

Project Manager Mr. Rory Peterson

(206) 381-1128

(425) 766-8342Cell

Phone

Rush Samples

Rush TAT NoAH

11176-001Project Name/Number: Project Location:

Sample ID Description A/RLab ID

LEAD LABORATORY SERVICES

Subcategory

Item Code

Flame AA (FAA)

Metals FAA-02 EPA 7000B Lead by FAA <paint>

1011 SW Klickitat Way. Suite 104 Seattle, WA 98134

Address

11176-Pb011 A18094468 11176-Pb022 A18094469 11176-Pb033 A18094470 11176-Pb044 A18094471 11176-Pb055 A18094472 11176-Pb066 A18094473 11176-Pb077 A18094474 11176-Pb088 A18094475 11176-Pb099 A18094476 11176-Pb1010 A18094477 11176-Pb1111 A18094478 11176-Pb1212 A18094479 11176-Pb1313 A18094480

Office Use Only Print Name Company Date TimeSignature

Faxed Emailed

Company Date TimeSignature ClientSampled by

Emily SchubertReceived by

ClientRelinquished by

Yasuyuki HidaAnalyzed by Results Called by

NVL

NVL

9/21/18 9/21/18

Print Name

Entered By: Emily Schubert

Date: 9/21/2018 Time: 9:14 AM

Special Instructions:

Appendix C

APPENDIX C

Radon Laboratory Reports and Field Data Forms

Site Radon Inspection Report Date :

Mr. Rory Peterson

EHS INTERNATIONAL

1011 SW Klickitat Way

Suite 104

09/24/2018

PC1809240123

Seattle, WA 98134-

NPS Fort VancouverClient:

Test Location: Building 753

Individual Canister Results Vancouver, WA 98663-

2670269Canister ID# :

Canister Type :

Radon Level :

Test Start :

Test Stop :

Location : First Floor

09/18/2018 @ 09:15 09/20/2018 @ 10:15

4.2 pCi/L

Charcoal Canister 4 inch

Analyzed: 09/24/2018 @ 12:13

Received: 09/24/2018 @ 11:07

Error for Measurement is: + 0.4 pCi/L

2670273Canister ID# :

Canister Type :

Radon Level :

Test Start :

Test Stop :

Location : First Floor

09/18/2018 @ 09:15 09/20/2018 @ 10:15

0.8 pCi/L

Charcoal Canister 4 inch

Analyzed: 09/24/2018 @ 12:13

Received: 09/24/2018 @ 11:07

Error for Measurement is: + 0.3 pCi/L

The results indicate that at least one testing device registered at or above the United States Environmental Protection

Agency (EPA) action level of 4.0 picoCuries per liter of air (pCi/L). The EPA recommends mitigation if the average of two short-term tests taken in the lowest level of the building suitable for occupancy show radon levels that are equal to or greater than 4.0 pCi/L.

For information on how to reduce radon levels in your home, please review the EPA booklet: Consumer's Guide to

Radon Reduction (www.epa.gov/radon/pdfs/consguid.pdf) and contact your state health department. The EPA maintains a radon information website, including copies of its publications, at www.epa.gov/iaq/radon.

For New Jersey clients: Please see the attached guidance document entitled Radon Testing and Mitigation: The

Basics for further information.

For New York clients: If the radon level of one or more testing devices is equal to or exceeds 20 pCi/L please contact the New York State Department of Health, Bureau of Environmental Radiation Protection, for technical advice and assistance at 518-402-7556 or toll free1-800-458-1158.

PLEDGE OF ASSURED QUALITY

All procedures used for generating this report are in complete accordance with the current EPA protocols for the analysis of radon in air

(EPA 402-R-92-004). The analytical results relate only to the samples tested, in the condition received by the lab, and that calculations were based upon the information supplied by client. RTCA and its personnel do not assume responsibility or liability , collectively and individually, for analysis results when detectors have been improperly handled or placed by the consumer, nor does RTCA and its personnel…