11_2_2022_-_Landfill_GW_flow_calculation_0002.pdf

PDF 73 KB Posted

Attached to
Environmental Services Contract Federal contract opportunity
Solicitation number
140D0422R0077
Issued by
Department of the Interior Departmental Offices Interior Business Center

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Services Contract, newest first.
File Type Posted
Attachment_No__3_-_Bid_Schedule_MASTER_20221108_0003.xlsx XLSX spreadsheet
11_2_2022_-_PAFB_NPDES_MS4_(FLR04E074)_FDEP_YR_2_Audit_Report_-_Feb_2021_0002.pdf PDF
11_2_2022_-_CCSFS_-_Air_Assessment_Report_0002.pdf PDF
11_2_2022_-_Attachment_No__9_-_Evaluation_0002.pdf PDF
11_2_2022_-_2022_Patrick_ISS_F2F_CDRL_List_20221027_0002.XLSX XLSX spreadsheet
11_2_2022_-_220410_FAC_5895_Incident_Report_-_Unplanned_Outage_0002.pdf PDF
Attachment_No__8_-_Instruction_to_Offerors_Amend__No_1_0001.pdf PDF
Attach__No__1B_-_Sample_Level_2_EA.pdf PDF
Attach_No__1B_-_Tasker_Map_Mechanical_Cut_2.pdf PDF
Attach_No__1B_-_MalfunReportTempCCAFS.pdf PDF
Attach__No__1B_-_Tasker_Example_Mechanical_Cut.xlsx XLSX spreadsheet
Attach__No__1B_-_Product_Map__Mechanical_Cut.pdf PDF
Attach__No__1B_-_Patrick_AFB_AEI.pdf PDF
Attach__No__1B_-_Sample_Level_1_EA.pdf PDF
Attach__No__1B_-_InvaSpeciesMgmtPlanMacDillAFB.docx DOCX document
Attach__No__1B_-_IntegratedSolidWastMngtPlybook.pdf PDF
Attach__No__1B_-_INRMP_T-EMP.pdf PDF
Attach__No__1B_-_NEMCONWasteMgmtSamplingPlan.pdf PDF
Attach__No__1B_-_MacDill_AFB_INRMP.pdf PDF
Attach__No__1B_-_F__Eastern_Processing_Facility.pdf PDF
Attach__No__1B_-_I__Beach_Nourishment.pdf PDF
Attach__No__1B_-_D3CCAFSUplandBorrowSourceAmd3.pdf PDF
Attach__No__1B_-_E-3Skid_Strip_Mod.pdf PDF
Attach__No__1B_-_E-1Skid_Strip_Mods_Amd1.PDF PDF
Attach__No__1B_-_E__Skid_Strip_Modifications.pdf PDF
Attach__No__1B_-_CCAFS_SEBM_Occup_Survey.pdf PDF
Attach__No__1B_-_Burn_MOU_15E-2-54_KCA-4205.pdf PDF
Attach__No__1B_-_af103_rev.pdf PDF
Attach__No__1B_-_B__SEBM_Routine_Land_Disturb_.pdf PDF
Attach__No__1B_-_Asbestos_Ops_Plan.pdf PDF
Sol_140D0422R0077.pdf PDF
Attach__No__1B_-_EIAP_Playbook.pdf PDF
Attach__No__1B_-_SLD45EnvSampling_ReqTracking.xlsx XLSX spreadsheet
Attach_No__1B_-_Tasker_Map_Mechanical_Cut_1.pdf PDF
Attach_No__1B_-_Tasker_Example_Mechanical_Cut_2.xlsx XLSX spreadsheet
Attach__No__1B_-_PSFB_SWMP.pdf PDF
Attach__No__1B_-_K__Archaeological_Surveys.pdf PDF
Attach__No__1B_-_NShorelineStabilizationSLC46.pdf PDF
Attach__No__1B_-_ERP_CCAFSPatrol_Rd_Permit.pdf PDF
Attach__No__1B_-_ERP_CCAFS_Centaur_Permit.pdf PDF
Attach__No__1B_-_G1_SpaceX_Land__CX13_Amd1.pdf PDF
Attach__No__1B_-_GopherTorto_Cand_Conserv_Agreem.pdf PDF
Attach__No__1B_-_G_SpaceX_Land__CX13_Amd2.pdf PDF
Attach__No__1B_-_EMS_Consolidated_Playbook.pdf PDF
Attach__No__1B_-_CCSFS_AEI.pdf PDF
Attach__No__1B_-_CCAFS_Drinking_H2O_ESAM_Plan.pdf PDF
Attach__No__1B_-_D_F_CCAFS__Centaur_Permit.pdf PDF
Attach__No__1B_-_APIMS_Data_Procedures_CCAFS.pdf PDF
Attach__No__1B_-_af332.pdf PDF
Attach__No__1B_-_Avon_Park_HWMP.pdf PDF
Show all 50

Environmental Services Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Semi-annual Water Quality Monitoring Report

March 2022 Sampling

C-1

Appendix C

GROUNDWATER FLOW CALCULATION

CALCULATION SHEET

Page: 1 of 2

Client: US Space Force Project No.

Project: Semiannual Permit Compliance Monitoring Report - Prepared By: LAS Date: 05/03/2021

Landfill facilities Reviewed By: JDM Date: 05/03/2021

Subject: Shallow Horizontal Hydraulic Gradient & Average Linear Velocity

Objective

Calculate the horizontal hydraulic gradient at the US Space Force Station for March 2022 Landfill groundwater sampling event for shallow wells. Gradients to be used in subsequent calculations of average linear groundwater flow velocity.

Calculations

Horizontal Hydraulic Gradient

Ih=Δhh/Δlh

Where:

Ih = Horizontal hydraulic gradient

Δhh = Difference in water elevation along flow lines labeled on the attached flow map

Δlh = Length (distance) between the respective contours long labeled flow line

Distance Along Difference in Elevation Horizontal

Gradient (feet/foot) Flow line (feet) (ft. MSL)

Flowline A 640 2.25 – 1.5 = 0.75 0.0012

Flowline B 456 2.25 – 1.25 = 1.0 0.0022

Flowline C 508 1.75 – 0.75 = 1.0 0.0019

March 2022 shallow average horizontal hydraulic gradient is 0.0018 feet/foot

CALCULATION SHEET

Page: 2 of 2

Client: US Space Force Project No.

Project: Semiannual Permit Compliance Monitoring Report - Prepared By: LAS Date: 05/03/2021

Landfill facilities Reviewed By: JDM Date: 05/03/2021

Subject: Shallow Horizontal Hydraulic Gradient & Average Linear Velocity

Average Linear Velocity

V=K lh/ne

Where:

K = Hydraulic Conductivity (236.2 ft/day); average of slug tests performed by

ESE Consultants, Inc. in 1988

Ih = Average Horizontal hydraulic gradient (0.0018 feet/foot) ne = Effective porosity (0.25); estimated

The calculated shallow average linear velocity at the site, is 1.70 ft/day.