This document is a set of mechanical schedules and equipment specifications for HVAC systems in a commercial facility renovation project, presented as architectural drawings and supporting schedules. The project involves the installation and integration of multiple types of heating, ventilation, and air conditioning (HVAC) equipment including fan coil units, split system VRF (Variable Refrigerant Flow) units, CRAC (Computer Room Air Conditioning) units, variable air volume (VAV) boxes, and associated ductwork and controls.

The specifications detail specific equipment models and operational parameters across multiple schedules: an air handling unit schedule, cooling coil specifications, fan coil unit schedule, grille and diffuser schedule, split system indoor and outdoor units for both VRF and CRAC configurations, a fan schedule, VAV box schedules (both standard and insertion type), and an insertion type VAV retrofit kit schedule. A Trane unit with model number BCHD054G2L0A4G04Z00000 and specific electrical ratings (460V, 3-phase, 60Hz, 3.1 amps minimum circuit capacity) is documented. Key operational requirements include phase monitors for three-phase equipment to prevent phase loss and system imbalances, interlock connections with the building management system, and compliance with existing facility automation protocols. Contractor responsibilities include verifying all units upon completion, coordinating unit tags with building management systems, and ensuring proper power supply and control panel accessibility for all VAV boxes and controls.

View the file

Other files

File Type Posted
Attachment 1 - Statement of Work AOML HVAC 1305M326Q0455 Revision 2.pdf PDF
1305M326Q0455 Inquiries and Answers Amend 0003.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0003.pdf.pdf PDF
Exhibit 12 - Project Construction Progress Schedule.pdf PDF
Exhibit 1 - 12.1 FCU Chiller RM 406 Magic Aire Model HBB20ABAAAAAB6CB5BAABBM.pdf PDF
REQUIREMENTS-26-4251 HVAC Brand Name Justification BAS System_Redacted.pdf PDF
1305M326Q0455 Inquiries and Answers_Amend 0002.pdf PDF
Exhibit 13 - Section 019100 Total Building Commissioning.pdf PDF
Exhibit 3 - 12.3 Chiller Room Refrigerant Detector Evacuation Unit Information.pdf PDF
Exhibit 8 - 12.8 FCU Basement Unit.pdf PDF
Exhibit 6 - 12.6 1st Floor Conference Room Split Unit.pdf PDF
Exhibit 14 - BUILDER_Inventory_Update_Form_Template.xlsx XLSX spreadsheet
Attachment 2-Davis Bacon Act WDFL20260215 Mod 1_5182026.pdf PDF
Exhibit 4 - 12.4 Drawings 1st Floor VAV 33-35 Mechanical and Electrical Drawings Hallway and Lab.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0002.pdf PDF
Exhibit 11 - 12.11 Drawings 1st Floor VAV 18-32 Mechanical and Electrical Drawings PHOD area.pdf PDF
Exhibit 7 - 12.7 Submittals for VAVs 33-67.pdf PDF
Attachment 1 - Statement of Work _AOML HVAC_1305M326Q0455 Revision 1.pdf PDF
Exhibit 2 - 12.2 Sherlock Infrared Refrigerant Gas Sensor and Evacuation System.pdf PDF
Exhibit 10 - 12.10 Drawings 1st Floor VAV 1-17 Mechanical Admin Area.pdf PDF
Exhibit 9 - 12.9 Drawings VAV 36-67 AOML Hurricane Repairs -100_Drawings July 2019.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0001.pdf PDF
2. Attachment 1 - Statement of Work, AOML HVAC.pdf PDF
1. RFQ (CSS) 1305M326Q0455.pdf PDF
6. Attachment 2-Davis Bacon Act WD#FL20260215 Mod 1, 5.18.2026.pdf PDF
5. SOW Exhibit 3-BUILDER_Inventory_Update_Form_Template.xlsx XLSX spreadsheet
3. SOW Exhibit 1-Project Construction Progress Schedule.pdf PDF
4. SOW Exhibit 2-Section 019100 Total Building Commissioning.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAN

SUPPI.YA!ROVTSIDE

C™ =

""" 1.RTVSHALLBEINTERNALLYfUSEDFORSINGLEPOINTCOhtfECTl()N.

2.UNITSS!W.l.BEVERTIC,I.LCO...IGORATIONOOU8lEWAU.Alll&

AIR HANDLING UNIT SCHEDULE

COOLING COIL

ctlLLEOWATEII - ~ IW..F..cE

VEL.FPM I NOTES

FAN COIL UNIT SCHEDULE GRILLE AND DIFFUSER SCHEDULE

UNIT

CON>ENSINGl>IITI I "·" ,.

COOLING COIL

SPLIT SYSTEM INDOOR UNITS (VRF)

SPLIT SYSTEM OUTDOOR UNITS (VRF)

SPLIT SYSTEM INDOOR UNITS (CRAC)

-IMOCPI~

ALL THREE PHASE EQUIPMENT SHALL BE EOUIPPEO WJTI-1 PHASE MONITORS

TO PROTECT AGAINST PHASE LOSS, UNB,\l,J\NCE, OR REVERSAL WITH ALARM INTERFACE TO BUILDING MANAGEMENT SYSTEM AND Al/TO

RESTART.

CONTRACTOR SHAU. VERIFY THAT, UPON COMPLETION OF WORK, ALL

EXISTING AND NEW UNITS ARE INTERLOCKED WITH THE BUILDING

MANAGEMENT SYSTEM ANO MATCH THE NEW/REVISED UNIT TAGS

INOICATEOWITHIN THESE OOCUMENTS.

UNIT COOLING I FAN I COMPRESSOR I POWER

COtOENSINGl,NTI I "·"

SPLIT SYSTEM OUTDOOR UNITS (CRAC)

cu-CAAC-1DA.TACE~ - :ru>FLI <1111,eool.o-F l 85·Fla.o 151.-1- 2 I •0.331tP I COMPU-A.IREKCl,l)"2,TU..WOR.oPPROVEOEQU,t,l.

FAN SCHEDULE

I'' I = I. FANSHAl.1-BEIN'TERLOCKEDWITHBUI..Dl'IG -..OEMENT SY$TEM. FAN$1W1-0PERATION SHALLBECONTROU.ED8YWALLSWITCH'MTHOYERRlllEANDSCHEDI.UNGCN'"81LJTIES FROM ~·· 2 FANSlw.l.BEEQOIPl'EO .... THSOU)SlATE8PEEOCOtlTROL..,.OSPRltlG(ORRIJ88ER)J80!..ATORSFOROOSPENOEOltlSTM.IATIONAPl'UCATION.PIIOYIOEALLJ<ECESSAA'l'ACCESSORIES, REL,tY$,WIIUNG,EIUFORA00-.cTEANJWORKINOSTSTEMMEETWOREOOREMEr.r1110FDRAWJ<GSN<DA1'1'1.ICABLE8PECIFICATIONSEenot<S

VARIABLE AIR VOLUME BOX SCHEDULE

~COl'ITAOl.3CONTAACTOASlw.l.6ERESPOflSl8LEFORPAOVIOING2'<\10l.TPOWERTOAl.l.V/,VeoxESFOR.<Cfl.l.O.TORl\tll)COtlfROI.S

:. ~;=-~~:w:=~CONTRACT:::;ORDERING80XE8TOORDERCONTROL~ONAC<::ESSIILE81CEOFV1'.V80X(AFTERflOW_DOCTWORKLAYOUTIWI

I I

INSERTION TYPE VAV SCHEDULE

~AREAScRVEll~y~

~~~'FF=EF~:::::::~~::aro OROERCOtlTROI.PAIEI.SONN:;C£.SSIILE8DEOfASSEMBLY(AFTERFIOW.DOCTWORl(lAYOUT

3. =s!a.i.~~.::~J:.iEFCLLOWNGFV.Tl.R£8:

:a'IVCOtlTROI.TRANSFORNER llUSTTIOHTE..CWSUFll:SE1'.L DISCON>ECTSWITCl-l

-= '- CONTROI.LERTOltlfERf-'CETOEXISTINGfl-CUTYBllUllNGNJTOM1'.TIOtlSYSTEW.

$. REFERTOMEQWIICALPI.Nl811t1DEMLARGEDMECtW<ICALROOM!ll£E18FORDUCT81ZE&

MECHANICAL LEGEND

DUCTWORK CAP (SEAL AIRTIGHT)

tfll EXISTING SUPPi. y DIFFUSER l2] EXISTING RETlJRN GRIUE

IEl .,.

-fl

INSERTIONTYPEVAVRETROFJTKIT

(TITUS OCV - BASIS OF DESIGN)

RECTANGULAR LOW PRESSURE OUCTWORK

(EXTERNALLY WRAPPED)

RECTANGULAR MEOIUM PRESSURE OUCTWORK

(DUCTMATE CONNECTIONS) \EXTERNALLY WRAPPED)

TEIM'ERATURESENSORANDIOR

THERMOSTAT

MOTORIZED DAMPER (UNLESS NOTED OTHERWISE)

A.oc•"' D.,,,, G,oo,. l,c.

3909Wesr Congress. . ·stree1,Su1te201 Lo1o)l$tte,l.ovlsiano70506 Phone: [337)23'-5710 Emal : odgnc:Oadgnc.org a,~~E.E?!- ~---"' ... _.,.,,_Ul.~,.,,.., .,,.,.,.,, ... _to __ _ ., ____ .,..~ o.Cro,g~ •--"'-..mlll:I

ADG Project No. C>o>,!01.S..., - i.:-o<o.2m

13124-AO

A-'1,tn?v Global, LLC

...J z

~ 0 i=z ~ -i:o ~ z-w~ ...J en 0a: ~ a: I- ...

wen 0 ;;;

:::E- < ~~ :::iE?;

o:::E I- en Q

(.) cc 00 < cc 0

u. <{ w _J

02 Cf) "'u.

a: (.)-"

I- a: < >-zW <( a:,W wI z"' :::iE a. a.. !!:!~ i-cn w (.)~ a:O -(!l

<i::::!E a: cc cc 0.1- w O> w<i: M-

Oo!! z ... j

< < cnu j w- 0 1-z <{ <{ a: 1-w a: cn0 oO ::::, w :r:

z

J<Jy29.2019

Checked II'(

1312-4--AOM601.ct,,,g

T [)'ov,lngll'le:

MECHANICAL SCHEDULES

M-601

Poinsettia.Byrd Highlight

Poinsettia.Byrd Highlight

12.6 DOAS AOML Hurricane Repairs -100_Drawings July 2019
DOAS AOML Hurricane Repairs -100_Drawings July 2019
DOAS E AOML Hurricane Repairs -100_Drawings July 2019
DOAS Specs
DOAS CHW valve actuator

DOAS Schedule AOML Hurricane Repairs -100_Drawings July 2019

File details come from the government source that posted it. Updated .