1305M326Q0455 Inquiries and Answers Amend 0003.pdf

PDF 59 KB Posted

Attached to
AOML HVAC and BAS Controls Upgrade Project
Solicitation number
1305M326Q0455
Issued by

About this file

This is a Solicitation Inquiries and Answers document for federal contract opportunity 1305M326Q0455.

The document addresses a single inquiry regarding the scope of HVAC work under Amendment 0002, SOW Revision 1. The contractor asked whether replacement of the existing central chiller is required in the base quotation and, if so, whether a like-kind chiller from a manufacturer other than Daikin would be acceptable, provided it meets all applicable capacity, performance, controls, and connection requirements. The government clarified that central chiller replacement is not required in the base quotation, thereby eliminating the need to address alternative manufacturer options.

View the file

Other files

File Type Posted
Attachment 1 - Statement of Work AOML HVAC 1305M326Q0455 Revision 2.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0003.pdf.pdf PDF
Exhibit 12 - Project Construction Progress Schedule.pdf PDF
Exhibit 1 - 12.1 FCU Chiller RM 406 Magic Aire Model HBB20ABAAAAAB6CB5BAABBM.pdf PDF
REQUIREMENTS-26-4251 HVAC Brand Name Justification BAS System_Redacted.pdf PDF
Exhibit 5 - 12.5 DOAS AOML Hurricane Repairs -100_Drawings July 2019.pdf PDF
1305M326Q0455 Inquiries and Answers_Amend 0002.pdf PDF
Exhibit 13 - Section 019100 Total Building Commissioning.pdf PDF
Exhibit 3 - 12.3 Chiller Room Refrigerant Detector Evacuation Unit Information.pdf PDF
Exhibit 8 - 12.8 FCU Basement Unit.pdf PDF
Exhibit 6 - 12.6 1st Floor Conference Room Split Unit.pdf PDF
Exhibit 14 - BUILDER_Inventory_Update_Form_Template.xlsx XLSX spreadsheet
Attachment 2-Davis Bacon Act WDFL20260215 Mod 1_5182026.pdf PDF
Exhibit 4 - 12.4 Drawings 1st Floor VAV 33-35 Mechanical and Electrical Drawings Hallway and Lab.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0002.pdf PDF
Exhibit 11 - 12.11 Drawings 1st Floor VAV 18-32 Mechanical and Electrical Drawings PHOD area.pdf PDF
Exhibit 7 - 12.7 Submittals for VAVs 33-67.pdf PDF
Attachment 1 - Statement of Work _AOML HVAC_1305M326Q0455 Revision 1.pdf PDF
Exhibit 2 - 12.2 Sherlock Infrared Refrigerant Gas Sensor and Evacuation System.pdf PDF
Exhibit 10 - 12.10 Drawings 1st Floor VAV 1-17 Mechanical Admin Area.pdf PDF
Exhibit 9 - 12.9 Drawings VAV 36-67 AOML Hurricane Repairs -100_Drawings July 2019.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0001.pdf PDF
2. Attachment 1 - Statement of Work, AOML HVAC.pdf PDF
1. RFQ (CSS) 1305M326Q0455.pdf PDF
6. Attachment 2-Davis Bacon Act WD#FL20260215 Mod 1, 5.18.2026.pdf PDF
5. SOW Exhibit 3-BUILDER_Inventory_Update_Form_Template.xlsx XLSX spreadsheet
3. SOW Exhibit 1-Project Construction Progress Schedule.pdf PDF
4. SOW Exhibit 2-Section 019100 Total Building Commissioning.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1305M326Q0455 Solicitation Inquiries and Answers

1) Amendment 0002, SOW Revision 1 strikes through the detailed central-chiller replacement item, while retaining references to a new HVAC chiller. Please confirm whether replacement of the existing central chiller is required in the base quotation. If so, may we propose a like-kind chiller from a manufacturer other than Daikin, provided it meets all applicable capacity, performance, controls, and connection requirements?

Government Response: No, replacement of the existing central chiller is not required in the quote.