This document is a set of architectural and mechanical engineering plans for a commercial building renovation project. The drawings include a first floor mechanical plan with Variable Air Volume (VAV) box layout, an enlarged mechanical plan with HVAC details, a first floor power and special systems plan with electrical riser information, and a reduced architectural drawing showing the overall first floor layout.

The mechanical scope includes replacement of an existing air handling unit (AHU) with a new matching capacity unit featuring a 2 HP variable-speed capable motor, with provisions for interlock VAV controls to the existing AHU-4 and VFD expansion. The VAV box schedule specifies 16 variable air volume units with supply and return capacities ranging from 45 to 115 CFM, all utilizing TITUS DREV-4 OR approved equivalent equipment. The electrical systems plan details power distribution with a 1LA2 panel serving multiple Unit Air Handlers (UAH) throughout the space numbered 1-24. The grille schedule includes six diffuser and return grille locations sized 24"x24" and 16"x20" for ceiling mounting. Design notes specify requirements for scaled double duct layouts, VAV installation coordination with all trades, and contractor responsibility for providing detailed drawings. The document indicates this is a 50% Coordinate Draft Submittal dated 06/12/15, with project identification 13124-P and drawing designation M1.1, M1.0, E1.1, and A-C1.

View the file

Other files

File Type Posted
Attachment 1 - Statement of Work AOML HVAC 1305M326Q0455 Revision 2.pdf PDF
1305M326Q0455 Inquiries and Answers Amend 0003.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0003.pdf.pdf PDF
Exhibit 12 - Project Construction Progress Schedule.pdf PDF
Exhibit 1 - 12.1 FCU Chiller RM 406 Magic Aire Model HBB20ABAAAAAB6CB5BAABBM.pdf PDF
REQUIREMENTS-26-4251 HVAC Brand Name Justification BAS System_Redacted.pdf PDF
Exhibit 5 - 12.5 DOAS AOML Hurricane Repairs -100_Drawings July 2019.pdf PDF
1305M326Q0455 Inquiries and Answers_Amend 0002.pdf PDF
Exhibit 13 - Section 019100 Total Building Commissioning.pdf PDF
Exhibit 3 - 12.3 Chiller Room Refrigerant Detector Evacuation Unit Information.pdf PDF
Exhibit 8 - 12.8 FCU Basement Unit.pdf PDF
Exhibit 6 - 12.6 1st Floor Conference Room Split Unit.pdf PDF
Exhibit 14 - BUILDER_Inventory_Update_Form_Template.xlsx XLSX spreadsheet
Attachment 2-Davis Bacon Act WDFL20260215 Mod 1_5182026.pdf PDF
Exhibit 4 - 12.4 Drawings 1st Floor VAV 33-35 Mechanical and Electrical Drawings Hallway and Lab.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0002.pdf PDF
Exhibit 11 - 12.11 Drawings 1st Floor VAV 18-32 Mechanical and Electrical Drawings PHOD area.pdf PDF
Exhibit 7 - 12.7 Submittals for VAVs 33-67.pdf PDF
Attachment 1 - Statement of Work _AOML HVAC_1305M326Q0455 Revision 1.pdf PDF
Exhibit 2 - 12.2 Sherlock Infrared Refrigerant Gas Sensor and Evacuation System.pdf PDF
Exhibit 9 - 12.9 Drawings VAV 36-67 AOML Hurricane Repairs -100_Drawings July 2019.pdf PDF
RFQ (CSS) 1305M326Q0455 Amend 0001.pdf PDF
2. Attachment 1 - Statement of Work, AOML HVAC.pdf PDF
1. RFQ (CSS) 1305M326Q0455.pdf PDF
6. Attachment 2-Davis Bacon Act WD#FL20260215 Mod 1, 5.18.2026.pdf PDF
5. SOW Exhibit 3-BUILDER_Inventory_Update_Form_Template.xlsx XLSX spreadsheet
3. SOW Exhibit 1-Project Construction Progress Schedule.pdf PDF
4. SOW Exhibit 2-Section 019100 Total Building Commissioning.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1st floor Admin VAV Schedule M1.1

1st Floor Mechanical plan M1.0
1st Floor Power and special systems plan E1.1
AOML Original 1st Floor Mechanical Drawing

File details come from the government source that posted it. Updated .