1-PRIME-SUB_Form_Canal_Armoring.xls

XLS spreadsheet 55 KB Posted

Attached to
CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for Volusia County's CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction project (Contract No. C-2014, ITB No. 25-B-##XX). The form requires bidders to list all proposed subcontractors and their respective work disciplines, with the prime contractor held responsible for ensuring all subcontractors maintain appropriate licensure. The project encompasses stormwater management infrastructure improvements along Corbin Park Road, including installation of storm drainage pipes ranging from 12 to 48 inches in diameter, storm structures, inlets, manholes, utility relocations, and pavement restoration across approximately 8,600 linear feet. The non-mandatory pre-bid meeting is scheduled for December 1, 2025, at 3:00 pm with virtual participation available via Microsoft Teams. Questions must be submitted electronically through the County's eProcurement Portal by December 9, 2025, at 11:59 pm, with bid submissions due December 23, 2025, at 3:01 pm. The project has a substantial completion period of 600 days with final completion required 30 days thereafter. Any changes to subcontractors during project completion require prior approval from the County Project Manager, and the County reserves the right to seek clarification regarding subcontractors without allowing changes to the total submitted base bid pricing.

The estimated total construction cost is $8,451,220, with the contract awarded to the lowest responsive and responsible bidder. The project is subject to federal labor standards including Davis-Bacon Act prevailing wage requirements and Copeland Act anti-kickback provisions, mandating weekly certified payroll reporting. Bidders must demonstrate compliance with Section 3 requirements, with 25 percent of total labor hours to be performed by Section 3 workers and 5 percent by Targeted Section 3 workers, including low-income individuals, employees of Section 3 Business Concerns, or YouthBuild participants. M/WBE participation is emphasized as part of the procurement requirements. Bidders must provide a 5 percent bid bond and obtain Payment and Performance Bonds equal to 100 percent of the contract price. Additional requirements include E-Verify registration, comprehensive insurance coverage, and federal bonding compliance under 24 CFR 85.36. Liquidated damages are assessed at $3,813 per day for delays beyond the substantial completion date. The project is funded through a HUD Community Development Block Grant for Disaster Recovery and addresses hurricane damage sustained during Hurricane Ian in September 2022.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .