Revised Bid Sheet XUMU 08-1387C AFCESA SATOC 02 Aug 2010.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
XUMU 08-3187C - Replace Existing HVAC/Install Climate Control, B 8290
Solicitation number
081387C
Issued by

About this file

Attachment 4 - Revised SATOC Bid Sheet

View the file

Other files

File Type Posted
XUMU 08-1387C - Request for Information.docx DOCX document
SITE VISIT ATTENDANCE SHEET.pdf PDF
Revised SOW-B8290-HVAC Replacement 02 Aug 2010.docx DOCX document
081387C-E301.pdf PDF
081387C-S001.pdf PDF
081387C-C201.pdf PDF
081387C-M103.pdf PDF
081387C-E401.pdf PDF
Amendment 2 - RFP Letter XUMU 08-1387B - 4 Aug 2010.pdf PDF
081387C-M601.pdf PDF
081387C-M401.pdf PDF
081387C-G001.pdf PDF
081387C-M201.pdf PDF
081387C-S101.pdf PDF
081387C-S002.pdf PDF
Attachment 5 - Wage Determination.docx DOCX document
01010 03Jun08.pdf PDF
01440 Contractor QC.pdf PDF
081387C-M101.pdf PDF
Spec Cover Sheet.pdf PDF
081387C-E001.pdf PDF
Bldg 8290 Vandenberg Specs 7-14-09.pdf PDF
081387C-M602.pdf PDF
081387C-M502.pdf PDF
081387C-E101.pdf PDF
081387C-C501.pdf PDF
01000 General Requirements.pdf PDF
081387C-M501.pdf PDF
000110 Table of Contents.pdf PDF
081387C-M202.pdf PDF
081387C-M603.pdf PDF
081387C-M104.pdf PDF
081387C-E501.pdf PDF
081387C-E102.pdf PDF
081387C-M001.pdf PDF
081387C-E201.pdf PDF
081387C-C101.pdf PDF
081387C-M102.pdf PDF
081387C-C001.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XUMU 08-1464B

AFCESA BID SHEET - CONSTRUCTION PROJECT

AFCESA Project Number:XUMU 08-1387CNEWB-08-S-2452NEWB-08-S-2452
Project Name:HVAC Renovation, B8290, Vandenberg AFB, CABasewide Facility Repairs, 2008Basewide Facility Repairs, 2008
Contractor:

TOTALS, PER SECTION 2 OF THE STATEMENT OF WORK

Base Bid - HVAC Renovation, Bldg 8290$ - 0
Option Bid - Boiler Replacement and Air Separater$ - 0

TOTAL BID: $ - 0

Fill out the boxes below based on the total bid price.
A) CONSTRUCTION PHASE and CLOSEOUT
CostPercent of
Total CostHours
PRIME Labor: Includes all construction project management, engr support during construction, project controls, on-site inspection, Health & Safety Inspections, admin, CAD, etc. DURING CONSTRUCTION and CLOSEOUT$ - 00.0%0
Subcontracts: Includes inspection, construction, and/or testing subcontractors DURING CONSTRUCTION$ - 00.0%
Prime Contractor Construction Self Performance: Includes self performed construction activities. This is separate from the Labor Portion to include all physical construction activities and equipment that are NOT subcontracted.$ - 00.0%0
Travel/PerDiem: Travel per JTR during the CONSTRUCTION and CLOSEOUT phase$ - 00.0%0
PRIME Materials & ODCs: This does not include Subcontracts$ - 00.0%
Bonding & Taxes$ - 00.0%
SUB-TOTAL$ - 00.0%
B) PROFIT/FEE
CostPercent of

Total Cost PRIME Profit/Fee: This includes ALL markups such as Fee/Profit, PMO, Overhead, etc. $ - 0 0.0%

TOTAL PROJECT COST: $ - 0 0.0%

C) SCHEDULE
Input Projected Start Date:
Input Projected End Date:
Total Calendar Days:0DAYS0

File details come from the government source that posted it. Updated .