08-Schedule_material_submittals.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
FY25 Multiple Award Paving Contract (MAPC) - Recompete Federal contract opportunity
Solicitation number
FA440725R0001
Issued by
Department of the Air Force Air Mobility Command

About this file

The file is a Material Submittals Schedule template for tracking contract documentation and approvals. This Excel spreadsheet provides a comprehensive tracking mechanism for various types of technical submittals, including shop drawings, certificates of compliance, manufacturer's warranties, catalog data, technical data, and test reports. The template includes columns for tracking submission dates, review processes, approval status, and resubmittal requirements, allowing detailed documentation management for a federal contract project.

The related federal contract opportunity is a Multiple Award Paving Contract (MAPC) for Scott Air Force Base, Illinois, issued by the Department of the Air Force Air Mobility Command. The solicitation (FA440725R0001) is a total small business set-aside targeting eight contract awards, with a two-year base period and three two-year option periods. The contract has a minimum guarantee of $500 per awardee, with individual project magnitudes between $250,000 and $500,000, and a total aggregate ceiling value of $45,000,000 for the entire contract period.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Paving Contract (MAPC) - Recompete, newest first.
File Type Posted
Solicitation Amendment FA440725R00010002.pdf PDF
03-Section L (v3).pdf PDF
Sign-In Sheet - MAPC Seed Project_Site Visit.pdf PDF
05a-FY25 MAPC PPQ v2.pdf PDF
04-Section M (v4).pdf PDF
RFI Log Responses - FY25 MAPC Seed Project_Scott Drive.pdf PDF
Solicitation Amendment FA440725R00010001.pdf PDF
01c-ATCH C Scott AFB IFS 9-6-19 reduced.pdf PDF
11-Scott AFB Climogram_Feb 2025.pdf PDF
05a-FY25 MAPC PPQ.pdf PDF
01b-MAPC Gen Rqmts 15 Apr 25.pdf PDF
09-NAF Standard Clauses_1 May 2024.pdf PDF
16-Maximum Allowable Concentrations.pdf PDF
06-SOW - 1149302 REPAIR Full Depth Roadway Patching Along Scott Drive.pdf PDF
12-Real ID.pdf PDF
03-Section L (v2).pdf PDF
05-PPI.pdf PDF
14-Table 6-1. Fixed Wing Aprons.pdf PDF
15-Soil Testing and Disposal Procedure.pdf PDF
01-SOW 2025 MAPC.pdf PDF
13-DOD Safe.pdf PDF
06f-SOW ATCH 6 - 1149302 - Traffic Control Example.pdf PDF
06b-SOW ATCH 2 - 1149302 - Contaminated Soils.pdf PDF
06g-SOW ATCH 7 - 1149302 - Contractor Requirements.pdf PDF
02-TO Procedures.pdf PDF
04-Section M (v3).pdf PDF
01a-ATCH A Scott AFB Map 3-4-25 reduced.pdf PDF
06e-SOW ATCH 5 - 1149302 - SWPPP.pdf PDF
10-WD IL20250017 - 3.21.2025.pdf PDF
07-Construction_cost_estimate_breakdown.xlsx XLSX spreadsheet
06c-SOW ATCH 3 - 1149302 - Boring Results.pdf PDF
06d-SOW ATCH 4 - 1149302 - Utility Map.pdf PDF
06a-SOW ATCH 1 -1149302 - Work Areas.pdf PDF
Solicitation - FA440725R0001.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
[ enter here ]Project Title:
[ enter here ]Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25