05-PPI.pdf

PDF 142 KB Posted

Attached to
FY25 Multiple Award Paving Contract (MAPC) - Recompete Federal contract opportunity
Solicitation number
FA440725R0001
Issued by
Department of the Air Force Air Mobility Command

About this file

This document is a Past Performance Information (PPI) form template for a federal contract opportunity. The form is designed for contractors to provide detailed information about their previous contract experiences, including contract specifics, completion dates, customer points of contact, and how their past performance relates to the current solicitation. The template requires comprehensive details such as contracting agency, contract number, contract type, period of performance, contract value, completion dates, and key personnel information. Contractors are instructed to provide frank, concise comments about their performance and highlight portions most relevant to the current acquisition, with limitations on the number and length of citations submitted.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Paving Contract (MAPC) - Recompete, newest first.
File Type Posted
Solicitation Amendment FA440725R00010002.pdf PDF
03-Section L (v3).pdf PDF
05a-FY25 MAPC PPQ v2.pdf PDF
04-Section M (v4).pdf PDF
Sign-In Sheet - MAPC Seed Project_Site Visit.pdf PDF
RFI Log Responses - FY25 MAPC Seed Project_Scott Drive.pdf PDF
Solicitation Amendment FA440725R00010001.pdf PDF
01c-ATCH C Scott AFB IFS 9-6-19 reduced.pdf PDF
11-Scott AFB Climogram_Feb 2025.pdf PDF
05a-FY25 MAPC PPQ.pdf PDF
01b-MAPC Gen Rqmts 15 Apr 25.pdf PDF
09-NAF Standard Clauses_1 May 2024.pdf PDF
16-Maximum Allowable Concentrations.pdf PDF
06f-SOW ATCH 6 - 1149302 - Traffic Control Example.pdf PDF
06b-SOW ATCH 2 - 1149302 - Contaminated Soils.pdf PDF
06g-SOW ATCH 7 - 1149302 - Contractor Requirements.pdf PDF
02-TO Procedures.pdf PDF
04-Section M (v3).pdf PDF
01a-ATCH A Scott AFB Map 3-4-25 reduced.pdf PDF
06-SOW - 1149302 REPAIR Full Depth Roadway Patching Along Scott Drive.pdf PDF
12-Real ID.pdf PDF
03-Section L (v2).pdf PDF
14-Table 6-1. Fixed Wing Aprons.pdf PDF
15-Soil Testing and Disposal Procedure.pdf PDF
01-SOW 2025 MAPC.pdf PDF
13-DOD Safe.pdf PDF
06e-SOW ATCH 5 - 1149302 - SWPPP.pdf PDF
10-WD IL20250017 - 3.21.2025.pdf PDF
07-Construction_cost_estimate_breakdown.xlsx XLSX spreadsheet
06c-SOW ATCH 3 - 1149302 - Boring Results.pdf PDF
06d-SOW ATCH 4 - 1149302 - Utility Map.pdf PDF
06a-SOW ATCH 1 -1149302 - Work Areas.pdf PDF
08-Schedule_material_submittals.xlsx XLSX spreadsheet
Solicitation - FA440725R0001.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA440725R0001

Attachment 05

PAST PERFORMANCE INFORMATION

Provide the information requested in this form for each contract/program (citation) being described.

Provide frank, concise comments regarding your performance on the contracts you identify. Provide a separate completed form for each contract/program submitted. Limit the number of citations submitted and the length of each submission to the limitations set forth at paragraph L-2.2.2.1 of Section L – Instructions to Offerors of this solicitation.

A. Offeror Name (Company/Division): ___________________________________________________

Unique Entity Identifier (UEI):____________________

DUNS Number:____________________

(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes. Refer to the "Organizational Structure Change History" you provided as part of your Past Performance Volume).

B. Program Title:__________________________________________________________________

C. Contract Specifics:

1. Contracting Agency or Customer _____________________________________________

2. Contract Number__________________________________________________________

3. Contract Type __________________________

4. Period of Performance __________________________

5. Original Contract $ Value _________________ (Do not include unexercised options)

6. Current Contract $ Value _________________ (Do not include unexercised options)

7. If Amounts for 5 and 6 above are different, provide a brief description of the reason

D. Brief Description of Effort as __ Prime or __ Subcontractor

(Please indicate whether it was development and/or production, or other acquisition phase (or Service) and highlight portions considered most relevant to current acquisition)

E. Completion Date:

1. Original date: ____________________

2. Current Schedule: ____________________

3. Estimate at Completion: ____________________

4. How Many Times Changed: ____________________

5. Primary Causes of Change: _______________________________________________________

F. Primary Customer Points of Contact: (For Government contracts provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles).

1. Program Manager and/or Site Manager:

Name ____________________

Office ____________________

Address________________________________________

Telephone__________________

Email_______________

2. Contracting Officer:

Name ____________________

Office ____________________

Address________________________________________

Telephone__________________

Email_______________

3. Administrative Contracting Officer:

Name ____________________

Office ____________________

Address________________________________________

Telephone__________________

Email_______________

G. Address any technical (or other) area about this contract/program considered unique.

H. For each of the applicable sub-factors under the Performance factor in Section M, illustrate how your experience on this program applies to that sub-factor.

I. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions.

L. Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor, or a corporate division related to the prime (define relationship).

File details come from the government source that posted it. Updated .