The document is a Boring Log for geotechnical investigation for the Scott Drive Planning project at Scott Air Force Base, Illinois. The logs detail two soil borings (B-6 and B-18) conducted on May 19 and 24, 2021, respectively, as part of a site investigation for a potential paving contract.

The boring logs reveal consistent subsurface conditions, with both locations showing similar soil stratification: 4-5 inches of asphalt concrete surface, followed by layers of fill material, fat clay (gray and brown), and lean clay. Boring B-6 has 7 inches of Portland Cement Concrete and no crushed rock, while B-18 has 2 inches of Portland Cement Concrete and 5 inches of crushed rock. The borings were terminated at 11 feet depth, with each borehole sealed with bentonite chips and a concrete patch. The project number is 2020-1034.10, and the investigation was performed by Roberts Environmental Drilling, Inc. using a geologic continuous sampler.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Paving Contract (MAPC) - Recompete, newest first.
File Type Posted
Solicitation Amendment FA440725R00010002.pdf PDF
RFI Log Responses - FY25 MAPC Seed Project_Scott Drive.pdf PDF
Solicitation Amendment FA440725R00010001.pdf PDF
03-Section L (v3).pdf PDF
05a-FY25 MAPC PPQ v2.pdf PDF
04-Section M (v4).pdf PDF
Sign-In Sheet - MAPC Seed Project_Site Visit.pdf PDF
06e-SOW ATCH 5 - 1149302 - SWPPP.pdf PDF
10-WD IL20250017 - 3.21.2025.pdf PDF
07-Construction_cost_estimate_breakdown.xlsx XLSX spreadsheet
06d-SOW ATCH 4 - 1149302 - Utility Map.pdf PDF
06a-SOW ATCH 1 -1149302 - Work Areas.pdf PDF
08-Schedule_material_submittals.xlsx XLSX spreadsheet
Solicitation - FA440725R0001.pdf PDF
01c-ATCH C Scott AFB IFS 9-6-19 reduced.pdf PDF
11-Scott AFB Climogram_Feb 2025.pdf PDF
05a-FY25 MAPC PPQ.pdf PDF
01b-MAPC Gen Rqmts 15 Apr 25.pdf PDF
09-NAF Standard Clauses_1 May 2024.pdf PDF
16-Maximum Allowable Concentrations.pdf PDF
06f-SOW ATCH 6 - 1149302 - Traffic Control Example.pdf PDF
06b-SOW ATCH 2 - 1149302 - Contaminated Soils.pdf PDF
06g-SOW ATCH 7 - 1149302 - Contractor Requirements.pdf PDF
02-TO Procedures.pdf PDF
04-Section M (v3).pdf PDF
01a-ATCH A Scott AFB Map 3-4-25 reduced.pdf PDF
06-SOW - 1149302 REPAIR Full Depth Roadway Patching Along Scott Drive.pdf PDF
12-Real ID.pdf PDF
03-Section L (v2).pdf PDF
05-PPI.pdf PDF
14-Table 6-1. Fixed Wing Aprons.pdf PDF
15-Soil Testing and Disposal Procedure.pdf PDF
01-SOW 2025 MAPC.pdf PDF
13-DOD Safe.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATCH 3

Boring Results

Boring Asphalt Concrete (AC) (inches)

Portland Cement Concrete (PCC) (inches)

Crushed Rock Thickness (inches)

B-6 4 7 0

B-18 5 2 5