06f-SOW ATCH 6 - 1149302 - Traffic Control Example.pdf
PDF 13 MB Posted
- Attached to
- FY25 Multiple Award Paving Contract (MAPC) - Recompete Federal contract opportunity
- Solicitation number
- FA440725R0001
About this file
This image is a detailed traffic control plan for Phase 1 of Scott Drive Patching, featuring a Google Earth aerial map with multiple road closure and detour markings. The plan includes a comprehensive legend indicating detour routes, message board locations, road closure indicators, construction signage, and barricade placements. Key details include:
The map shows multiple traffic management elements such as Type III Barricades with Road Closed signs, three Type II Barricades at each location, and detour routes with directional arrows. Northern and Southern message boards are strategically positioned with different warnings: the Northern board indicates "SCOTT DR CLOSED AHEAD" and instructs drivers to "USE MARKED DETOUR", while the Southern board displays "ROAD WORK AHEAD" and "USE CAUTION". The map covers approximately 2000 feet of roadway and provides a clear visual guide for traffic redirection during road patching operations.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 1
Scott Drive Patching
Legend
Detour Route
Detour with
Message Board for
Road Closed
Road Construction Ahead
Type III Barricades w/ Rd Clsd Sign
2000 ft
N
N
3 Type II Barricades at Each Location kheisner Stamp kheisner Stamp
File details come from the government source that posted it. Updated .