01-General.pdf

PDF 3 MB Posted

Attached to
Installation & Revision of Traffic Control Signals - Various Cities/Towns in D3
Solicitation number
0173-0542
Issued by
New Haven County, Bridgeport City, Connecticut

About this file

This is a title sheet and drawing index for a Connecticut Department of Transportation (CTDOT) traffic control signals installation and revision project located in District 3. The project encompasses traffic signal work across eight municipalities: Branford, Norwalk, Westport, Madison, New Haven, North Bridgeport, East Haven, and Guilford. The project is identified as State Project Number 0173-0542 and is classified as a maintenance project. The contract plans are organized into multiple subsets with the general subset (01-General) containing ten detailed estimate sheets (G-1 through G-10) that outline the scope of work and cost estimates. The drawing package references CTDOT Traffic Standard Sheets, CTDOT Highway Standard Sheets, and Structures-Mast Arms standards as applicable specifications for construction. The plans were prepared by Designer/Drafter FunariGN and checked by CTDOT personnel, with final approval recommended by Principal Engineer Lisa N. Conroy, P.E., and approved by Engineering Administrator Mark F. Carlino, P.E. and Division Chief Matthew C. Blume, P.E. as of May 2026.

The project construction specifications are governed by the Connecticut Department of Transportation Standard Specifications for Roads, Bridges, Facilities and Special Provisions, Form 819 (dated July 2025). The survey work was completed by CTDOT District 3 Surveys using the North American Datum (N.A.D. 1983) and Vertical Datum based on the NAVD 1988 system with a 400-foot grid based on Connecticut Coordinate system. No Federal Aid Project Number is noted for this project. The plans include a location map showing the geographic distribution of project locations within District 3 and reference standard survey conventions and drawing symbols applicable to CTDOT projects. The file does not contain specific information regarding bidding deadlines, contract award dates, pricing, or contract term details.

View the file

Other files

File Type Posted
0173-0542_Jun_8_26_solicitation_doc.pdf PDF
TR_CB_0173_0542_SSP_158_210.dxf DXF file
0173-0542_Jul_6_26_solicitation_doc.pdf PDF
TR_CB_0173_0542_SSP_015_230.dxf DXF file
TR_CB_0173_0542_SSP_015_225.dgn —
TR_CB_0173_0542_SSP_043_222_043_239.dgn —
TR_CB_0173_0542_SSP_158_203.dgn —
0173-0542_EEDFileManifest.pdf PDF
TR_CB_0173_0542_SSP_092_225.dgn —
TR_CB_0173_0542_SSP_015_245.dgn —
TR_CB_0173_0542_SSP_158_216.dxf DXF file
TR_CB_0173_0542_SSP_158_209.dxf DXF file
TR_CB_0173_0542_SSP_015_263.dgn —
NTC - New DBE Requirements - Regular Dealer Affirmation Form.pdf PDF
TR_CB_0173_0542_SSP_158_228.dgn —
TR_CB_0173_0542_SSP_043_222_043_239.dxf DXF file
TR_CB_0173_0542_SSP_158_214.dxf DXF file
CTDOT_HIGHWAY_STD.pdf PDF
TR_CB_0173_0542_SSP_098_212.dxf DXF file
TR_CB_0173_0542_SSP_158_213.dxf DXF file
TR_CB_0173_0542_SSP_059_222.dxf DXF file
TR_CB_0173_0542_SSP_158_216.dgn —
TR_CB_0173_0542_SSP_102_286.dgn —
TR_CB_0173_0542_SSP_059_222.dgn —
CTDOT_TRAFFIC_STD.pdf PDF
TR_CB_0173_0542_SSP_158_212.dgn —
TR_CB_0173_0542_SSP_158_251.dgn —
TR_CB_0173_0542_SSP_075_201.dxf DXF file
PROSPECTIVE BIDDERS - 3.pdf PDF
04-Structures-Mast-Arms.pdf PDF
Bidders Checklist.pdf PDF
TR_CB_0173_0542_SSP_092_286.dgn —
TR_CB_0173_0542_SSP_158_203.dxf DXF file
TR_CB_0173_0542_SSP_158_214.dgn —
PROSPECTIVE BIDDERS - 1.pdf PDF
PROSPECTIVE BIDDERS - 2.pdf PDF
TR_CB_0173_0542_SSP_102_286.dxf DXF file
TR_CB_0173_0542_SSP_158_233.dxf DXF file
TR_CB_0173_0542_SSP_015_225.dxf DXF file
TR_CB_0173_0542_SSP_158_251.dxf DXF file
TR_CB_0173_0542_SSP_158_210.dgn —
TR_CB_0173_0542_SSP_158_233.dgn —
TR_CB_0173_0542_SSP_092_225.dxf DXF file
TR_CB_0173_0542_SSP_158_211.dgn —
Online Q and A Instruction.pdf PDF
TR_CB_0173_0542_SSP_092_286.dxf DXF file
TR_CB_0173_0542_SSP_158_228.dxf DXF file
TR_CB_0173_0542_SSP_015_263.dxf DXF file
0173-0542 CONTRACT SPECIAL PROVISIONS.pdf PDF
TR_CB_0173_0542_SSP_158_213.dgn —
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NO.

SHEET NO.

STATE PROJECT NO.

Plans For

CONNECTICUT DEPARTMENT OF TRANSPORTATION

IN DISTRICT 3

OF TRAFFIC CONTROL SIGNALS

INSTALLATION AND REVISION

BRANFORD, NORWALK, WESTPORT

MADISON, NEW HAVEN, NORTH

BRIDGEPORT, EAST HAVEN GUILFORD,

0173-0542 G-1

12CTDOT TRAFFIC STANDARD SHEETS

7CTDOT HIGHWAY STANDARD SHEETS

4STRUCTURES - MAST ARMS #04

52TRAFFIC#03

1REVISIONS#02

10GENERAL#01

G-2 TO G-10DETAILED ESTIMATE SHEETS

G-1TITLE SHEET

Plans For

Town(s)/City

SUBSET TITLESUBSET NO.

DRAWING TITLE DRAWING NO.

SHEET COUNT

*SUBSET

LIST OF SUBSETS

NOT INCLUDE ADDENDUM AND CHANGE ORDERS

*THE INITIAL SUBSET SHEET COUNT DOES

SUBSET 01 - GENERAL

LIST OF DRAWINGS

6 2

NEW

BRITAIN

WOODSTOCK

THOMPSON

ASHFORD EASTFORD

POMFRET

BROOKLYN

HAMPTONCHAPLIN

MANSFIELD

PUTNAM

STERLINGPLAINFIELD

CANTERBURY

SCOTLAND

WINDHAM

LEBANON

HEBRON

EAST

HAMPTON COLCHESTER

GRISWOLD

STONINGTON

STONINGTON

NORTH

LEDYARD

WATERFORD

MONTVILLE

BOZRAH

FRANKLIN

EAST

LYME

SALEM

SPRAGUE

LISBON

EAST HADDAM

LYMECHESTER

ESSEX

OLD

CLINTON

COLUMBIA

HADDAM

KILLINGWORTH

WESTBROOK

DEEP RIVER

LYME

M A R

LBO

R O

U G

H

VOLUNTOWN

PORTLAND

PRESTON

REDDING

NEW

FAIRFIELD

BETHEL

NEWTOWN

BROOKFIELD

ROXBURY

SOUTHBURY

OXFORD

WOODBURY

SHERMAN

NEW

MILFORD

KENT

SHARON GOSHEN

WARREN

WASHINGTON

BETHLEHEM

MORRIS

LITCHFIELD

HARWINTON

WATERTOWN

CANAAN

NORTH

NORFOLK

CORNWALL

COLEBROOK

WINCHESTER

HARTLAND

BARKHAMSTED

NEW

HARTFORD

CANTON

GRANBY

SUFFIELD

EAST

GRANBY

SIMSBURY

AVON

SEYMOUR

ANSONIA

DERBY

PROSPECT

PLYMOUTH

BURLINGTON

FARMINGTON

CANAAN

RIDGEFIELD

SALISBURY

WALLINGFORD

W O

O D

B R

ID

G E

BETHANY

HAMDEN

SHELTON

MONROE

EASTON

WESTON

WILTON

CANAAN

NEW

GREENWICH

DARIEN

WESTPORT

FAIRFIELD

ORANGE

MILFORD

ST

R A

TF

O

R

DBRIDGEPORT

E A

ST

H

A V E N

BRANFORD

GUILFORD

NORTH

BRANFORD

HAVEN

NORTH

NAUGATUCK

MIDDLEBURY

MADISON

NORWALK

W E

ST

H

A V E N

SAYBROOK

OLD

LONDON

NEW

WATER

BRIDGE-

FALLS

BEACON

MIDDLETOWN

MERIDEN

CHESHIRE

SOUTHINGTONWOLCOTT

BRISTOL PLAINVILLE

CROMWELLBERLIN

BOLTON

GLASTONBURY

ANDOVER

MANCHESTER

HARTFORD

HARTFORD

WEST EAST

BLOOMFIELD

WINDSOR

SOUTH

WINDSOR

WINDSOR

EAST

ENFIELD SOMERS STAFFORD UNION

WILLINGTON

TOLLAND

ELLINGTON

VERNON

COVENTRY

DURHAM

N E

W

IN

G

TO

N

LOCKS

WINDSOR

FIELD

MIDDLE-

WETHERSFIELD

TORRINGTON KILLINGLY

GROTON

STAMFORD

DANBURY

WATERBURY

STATE OF CONNECTICUT

M A S S A C H U S E T T S

R H

O D

E

I

S L

A N

D

N

E

W

Y

O

R

K

D E

P A

R T

M E

N

T

OF TRAN

S

P O

R T

A T I

O N

C

O

NNECTIC

U T

HAVEN

NEW

HARTFORD

NORWICH

THOMASTON

HILL

ROCKY

DISTRICT 1 DISTRICT 2

DISTRICT 3

DISTRICT 4

IN DISTRICT 3

TRAFFIC CONTROL SIGNALS

INSTALLATION AND REVISION OF

Town(s)/City of

NORWALK, WESTPORT

HAVEN, NORTH BRANFORD,

GUILFORD, MADISON, NEW

BRIDGEPORT, EAST HAVEN,

GENERAL NOTES:

MAINTENANCE

PROJECT #RESPONSIBILITY F.A.P. #

0173-0542 STATEN/A

LOCATION PLAN

NOT TO SCALE

SUBMITTED BY: TRANSPORTATION PRINCIPAL ENGINEER - LISA N. CONROY, P.E.

APPROVED BY: TRANSPORTATION ENGINEERING ADMINISTRATOR - MARK F. CARLINO, P.E.

DIVISION CHIEF - MATTHEW C. BLUME, P.E.TRANSPORTATIONAPPROVAL RECOMMENDED BY:

BEEN PERSONALLY CHECKED BY THE UNDERSIGNED.

NOT TO BE CONSTRUED TO MEAN THAT ALL ASPECTS OF THE DESIGN HAVE

THE DESIGN APPEARS TO CONFORM TO APPLICABLE CRITERIA. APPROVAL IS

5. Surveyed By: CTDOT District 3 Surveys

4. VERTICAL DATUM BASED ON NAVD 1988

SYSTEM N.A.D. 1983

3. 400 FOOT GRID BASED ON CONNECTICUT COORDINATE

and Special Provisions and Incidental Construction, Form 819 dated July 2025; for Roads, Bridges, Facilities

Connecticut Department of Transportation, Standard Specifications

2. CONSTRUCTION SPECIFICATIONS:

1. FEDERAL AID PROJECT NO. N/A

DISCLAIMER:

INCOMPLETE AND/OR INACCURATE INFORMATION.

MAY BE LIABLE FOR CLAIMS RESULTING FROM THE DISSEMINATION OF UNOFFICIAL,

AVAILABLE BY ANY MEANS ARE NOT AUTHORIZED BY THE DEPARTMENT TO DO SO AND

PERSONS AND/OR ENTITIES WHICH REPRODUCE AND/OR MAKE SUCH INFORMATION

FROM OFFICIAL SOURCES WITHIN THE DEPARTMENT.

PARTIES TO OBTAIN ALL BIDDING RELATED INFORMATION AND DOCUMENTS

IT IS THE RESPONSIBILITY OF EACH BIDDER AND ALL OTHER INTERESTED

STANDARD EXISTING SURVEY CONVENTIONS

Edge of Road

Concrete Pavement

Dirt Road

Bit. Conc. Curb

Granite Curb

Guide Rail

Concrete Median Barrier

Bit. Walk

Conc. Sidewalk

Railroad Tracks

Chain Link Fence

Rustic Fence

Pipe Fence

Board Fence

Edge of Water

Ditch

Swamp

Building

Town Line

Highway Line

Street Line

Property Line

Lot Line

State Line

Easement Line

Stone Wall

Ledge Outcrop

State Wetland Limits

Under Ground Power Line

Transmission Tower

Riprap

Retaining Wall

Evergreen Tree

Shrub

Tree Line

Hedge Row

North Arrow

Deciduous Tree

C

O R

D

IN

A T

E G

R

ID

C

N N

E C

T

IC

U T

Over Head Power Line

State/Federal Wetland Limits

Ordinary High Water ydobret aW fo egdE

ANSONIA

DERBY

WALLINGFORD

W O

O D

B R

ID

G E

BETHANY

HAMDEN

SHELTON

MONROE

EASTON

WESTON

WILTON

CANAAN

NEW

GREENWICH

DARIEN

WESTPORT

FAIRFIELD

ORANGE

MILFORD

ST

R A

TF

O

R

DBRIDGEPORT

E A

ST

H

A V E N

BRANFORD

GUILFORD

NORTH

BRANFORD

HAVEN

NORTH

MADISON

NORWALK

W E

ST

H

A V E N

FALLS

BEACON

STAMFORD

STATE OF CONNECTICUT

HAVEN

NEW

DISTRICT 3

GENERAL NOTES:

01.01

GNF NCW

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-2

TOWN(S):

BRANFORD, NORWALK, WESTPORT

MADISON, NEW HAVEN, NORTH

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

0173-0542

DESIGNER/DRAFTER: CHECKED BY:

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

DETAILED ESTIMATE SHEET

01.02

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-3

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.03

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-4

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.04

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-5

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.05

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-6

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.06

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-7

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.07

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-8

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.08

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-9

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.09

SHEET NO.:

3/25/2026

SIGNATURE BLOCK: DRAWING TITLE:

G-10

BRIDGEPORT, EAST HAVEN, GUILFORD,

SIGNALS IN DISTRICT 3

INSTALLATION AND REVISION OF TRAFFIC CONTROL

PLOTTED DATE:

C:\Users\funarign\State of Connecticut\0173-0542 - Design\Traffic\Contract_Plans\Subsets\TR_CP_0173-0542_Blank DES.dgn FILE NAME: FunariGN LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

01.10

01-GeneralCover_0173-0542
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
TR_CP_0173-0542_Blank DES
2026-05-13T09:22:48-0400
Mark F. Carlino, P.E.
I am approving this document
2026-05-07T10:56:22-0400
Matthew C. Blume, P.E., PTOE
2026-05-05T07:45:01-0400
Lisa N. Conroy, P.E.

File details come from the government source that posted it. Updated .