PROSPECTIVE BIDDERS - 3.pdf

PDF 81 KB Posted

Attached to
Installation & Revision of Traffic Control Signals - Various Cities/Towns in D3
Solicitation number
0173-0542
Issued by
New Haven County, Bridgeport City, Connecticut

About this file

This is a Prospective Bidders List issued by the Connecticut Department of Transportation for Project 0173-0542, which involves the installation and revision of traffic control signals across multiple municipalities in District 3. The project encompasses work in Bridgeport, East Haven, Guilford, Madison, New Haven, and North Bridgeport, with bids due on July 1, 2026. The scope of work includes new traffic signal equipment, pedestrian signal faces with accessible push buttons, mast arm assemblies, video and radar detection systems, LED light standards, concrete and bituminous sidewalk ramps, pavement markings, crosswalks, and emergency vehicle pre-emption equipment at eight signalized intersections. Work also includes removal of abandoned equipment, installation of handholes and circuit breakers, and coordination with utility companies. All traffic signal equipment must follow Connecticut DOT Traffic Standard Sheets and Highway Standard Sheets, with mast arm assemblies complying with AASHTO LRFD specifications. The construction specifications are governed by Connecticut Department of Transportation Standard Specifications for Roads, Bridges, Facilities and Special Provisions, Form 819 (July 2025).

The prospective bidders list identifies three companies interested in bidding: Ferguson Electric Co., Inc. (Plainville, CT), NY CONN Corp. (Danbury, CT), and Rizzo Electrical Contractors, Inc. (Danbury, CT). Bidders must be prequalified with CTDOT and submit a Bid Proposal Request Form for approval. A bid bond equal to 30 percent of the bid amount is required and must be submitted in PDF format to dotbid@ct.gov prior to bid opening. Bidders must acknowledge all contract addenda, submit a Non-Collusion Statement and OPM Form 1 (Campaign Contribution Certification), and comply with DBE requirements where applicable. Pre-bid questions close at 9:00 a.m. on the Monday before bid opening via the Connecticut DOT Q&A portal. Bidding occurs through the Bid Express (Bidx.com) platform, and interested parties should direct questions to Rebecca Buonocore at 860-594-2231 or Rebecca.Buonocore@ct.gov.

View the file

Other files

File Type Posted
0173-0542_Jun_8_26_solicitation_doc.pdf PDF
TR_CB_0173_0542_SSP_158_210.dxf DXF file
0173-0542_Jul_6_26_solicitation_doc.pdf PDF
TR_CB_0173_0542_SSP_015_230.dxf DXF file
TR_CB_0173_0542_SSP_015_225.dgn —
TR_CB_0173_0542_SSP_043_222_043_239.dgn —
TR_CB_0173_0542_SSP_158_203.dgn —
0173-0542_EEDFileManifest.pdf PDF
TR_CB_0173_0542_SSP_092_225.dgn —
TR_CB_0173_0542_SSP_015_245.dgn —
TR_CB_0173_0542_SSP_158_216.dxf DXF file
TR_CB_0173_0542_SSP_158_209.dxf DXF file
TR_CB_0173_0542_SSP_015_263.dgn —
NTC - New DBE Requirements - Regular Dealer Affirmation Form.pdf PDF
TR_CB_0173_0542_SSP_158_228.dgn —
TR_CB_0173_0542_SSP_043_222_043_239.dxf DXF file
TR_CB_0173_0542_SSP_158_214.dxf DXF file
CTDOT_HIGHWAY_STD.pdf PDF
TR_CB_0173_0542_SSP_098_212.dxf DXF file
TR_CB_0173_0542_SSP_158_213.dxf DXF file
TR_CB_0173_0542_SSP_059_222.dxf DXF file
TR_CB_0173_0542_SSP_158_216.dgn —
TR_CB_0173_0542_SSP_102_286.dgn —
TR_CB_0173_0542_SSP_059_222.dgn —
CTDOT_TRAFFIC_STD.pdf PDF
TR_CB_0173_0542_SSP_158_212.dgn —
TR_CB_0173_0542_SSP_158_251.dgn —
TR_CB_0173_0542_SSP_075_201.dxf DXF file
04-Structures-Mast-Arms.pdf PDF
Bidders Checklist.pdf PDF
TR_CB_0173_0542_SSP_092_286.dgn —
TR_CB_0173_0542_SSP_158_203.dxf DXF file
TR_CB_0173_0542_SSP_158_214.dgn —
PROSPECTIVE BIDDERS - 1.pdf PDF
PROSPECTIVE BIDDERS - 2.pdf PDF
TR_CB_0173_0542_SSP_102_286.dxf DXF file
TR_CB_0173_0542_SSP_158_233.dxf DXF file
TR_CB_0173_0542_SSP_015_225.dxf DXF file
TR_CB_0173_0542_SSP_158_251.dxf DXF file
TR_CB_0173_0542_SSP_158_210.dgn —
TR_CB_0173_0542_SSP_158_233.dgn —
TR_CB_0173_0542_SSP_092_225.dxf DXF file
TR_CB_0173_0542_SSP_158_211.dgn —
Online Q and A Instruction.pdf PDF
TR_CB_0173_0542_SSP_092_286.dxf DXF file
TR_CB_0173_0542_SSP_158_228.dxf DXF file
TR_CB_0173_0542_SSP_015_263.dxf DXF file
0173-0542 CONTRACT SPECIAL PROVISIONS.pdf PDF
TR_CB_0173_0542_SSP_158_213.dgn —
TR_CB_0173_0542_SSP_075_201.dgn —
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CONNECTICUT

DEPARTMENT OF TRANSPORTATION

List of Prospective Bidders

Project Number(s) 0173-0542

Project Description: Installation & Revision of Traffic Control Signals Within Various Cities/Towns in District 3

Project Town(s): Bridgeport, E Haven, Guilford, Madison, New Haven, N Br

Current Bid Open Date 7/1/2026

(860) 747-4566Ferguson Electric Co., Inc. Plainville CT

(203) 744-9206NY CONN Corp., The Danbury CT

(203) 731-3131Rizzo Electrical Contractors, Inc. Danbury CT

Thursday, June 25, 2026

File details come from the government source that posted it. Updated .