TR_CB_0173_0542_SSP_075_201.dxf
DXF file 6 MB Posted
- Solicitation number
- 0173-0542
- Issued by
- New Haven County, Bridgeport City, Connecticut
About this file
This is a design file (DXF format) related to a traffic control signal installation and revision project administered by the Connecticut Department of Transportation across eight municipalities in District 3. The project encompasses installation of new traffic signal equipment, pedestrian signal faces with accessible push buttons, mast arm assemblies, video and radar detection systems, LED light standards, concrete and bituminous sidewalk ramps, pavement markings, crosswalks, and emergency vehicle pre-emption equipment at eight signalized intersections located in Branford, Norwalk, Westport, Madison, New Haven, North Bridgeport, East Haven, and Guilford. The scope also includes removal of abandoned equipment, installation of handholes and circuit breakers, and coordination with utility companies including Eversource. Sealed bids are due July 1, 2026 at 2:00 p.m. EDT through the Bid Express platform. Pre-bid questions close at 9:00 a.m. the Monday before bid opening via http://contractsqanda.dot.ct.gov. Connecticut DOT Signal Lab approval is required at least 45 days prior to revision work.
Mast arm assemblies must comply with AASHTO LRFD specifications with drilled shaft foundations (minimum 2-foot diameter, 4,000 PSI concrete, #8 rebar Grade 60) and maintain 16- to 18-foot vertical clearance. All traffic signal equipment must follow CTDOT Traffic Standard Sheets and CTDOT Highway Standard Sheets, with construction specifications governed by Connecticut Department of Transportation Standard Specifications for Roads, Bridges, Facilities and Special Provisions, Form 819 (July 2025). Bidders must be prequalified with CTDOT and submit a bid bond equal to 30 percent of the bid amount in PDF format to dotbid@ct.gov prior to opening. Additionally, bidders must acknowledge all contract addenda, submit a Non-Collusion Statement and OPM Form 1 (Campaign Contribution Certification), and comply with DBE requirements where applicable. Time-based coordination and wireless radio systems for signal synchronization are required at selected locations. Questions regarding the project should be directed to Rebecca Buonocore at 860-594-2231 or Rebecca.Buonocore@ct.gov.
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .