C223 - A/E Replace Fire-Smoke Dampers
DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Asheville VA Medical Center at 1100 Tunnel Road, Asheville, NC 28805. This requirement is being executed under a 100% Set-Aside to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Interested firms should submit their current SF-330, Parts I and II, to Shirley.Gregory@va.gov. The SF-330s are due no later than 8:00 AM, EST, March 17, 2019.
SCOPE OF WORK: This project requires the services of an architectural engineering firm (AE) having special knowledge of hospital design. The AE must have experience with Fire Protection and a Mechanical Engineering with regards to HVAC Ductwork.
Intent
This project is intended for the design of the removal and/or replacement of approximately 120 fire dampers, smoke dampers, or combination dampers at the Charles George VAMC, Asheville, NC. A/E will investigate the existing conditions at the Main Building (Building 47), review documents, review the latest NFPA code and VA Fire Safety code, and determine which dampers need to be removed. The dampers that need to remain per NFPA code shall be designed to be replaced with a new fire damper. No smoke dampers will be required, all are intended to be replaced with fire dampers. All dampers are located within the existing HVAC ductwork.
Requirements
The AE selected is expected to:
Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and conceptual design which includes site investigation for mechanical, plumbing, and environmental hazards, such as suspect ACM, other hazardous materials. Work will consist of A/E personnel crawling in crawlspaces, removing ceiling tile and tracing ductwork above ceilings, and tracing ductwork in the building penthouse. Perform project site investigation in accordance with the Site Investigations section of the scope of work.
Physically survey as well as review record drawings of the existing building. Inform CO/COR of supplemental information gathering that may be required.
Conduct on-site work session with User Group and other members of the Integrated Project Team to discuss conceptual options.
Describe all measures available to achieve the project objectives, including the benefits and drawbacks of each measure, to guide decisions by the facility during schematic design. The decision of which alternatives to select for the construction project rests with the VA.
Develop and describe a construction strategy that allows existing functions to continue during Construction. Develop this strategy in development of construction documents.
Participate in a conference call after VA has completed Schematic Design review
AE shall review needs identified by the IPT for the area under consideration for design and provide recommendations. In addition, the project shall be phased to minimize the impact to the Medical Center operations and patient care. Prior to submission of schematic design material, the AE shall meet with the VAMC s COR to discuss proposed phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what VA constraints will exist that will influence the Contractor's approach to the construction project. The AE shall be responsible for documenting the phasing requirements.
The AE shall make site visits as required to determine existing as-built conditions affecting this project. Information, including drawings and other documentation, provided to the AE shall be used as reference only. The AE is responsible for verifying all existing site conditions to include but not be limited to: crawling in crawlspaces, looking above ceilings and the building penthouse.
Coordinate visits with the COR as assigned at the NTP. The AE shall arrange for and oversee the performance of such investigations necessary for the proper design of the project. AutoCAD background drawings shall be provided by the VA upon request if available and shall be used as reference only. The AE shall field verify every aspect that relates to the project.
Perform Photographic Documentation during Investigative Services; files are to be maintained for future reference of existing conditions for construction documents and unforeseen unit costing basis.
The Contractor shall prepare digital photo documentation of construction work, including sites, buildings, and field activities. Digital photos shall be submitted in JPEG format to the project website, and to a resolution sufficient and appropriate for the type of work photographed. The Contractor shall provide an index for each set of photographs submitted identifying the contractor, base, facility, project number, date, and a brief description. The Contractor shall coordinate photography of any kind through the COR.
The AE shall complete all necessary site investigations prior to the 15% Schematic Design submission.
Part Ib Preparation of Contract Drawings and Specifications Design Development: Preparation and submission of construction bid documents, interim design document submittals, and the final construction bid documents at the completion of the design development process in accordance with the Design Package Submission Schedule section. Design document packages shall contain a complete set of documents as specified in the Design Requirements/ Submissions section of this scope of work. The AE shall develop a design necessary to meet the requirements in the Project Scope section of the scope of work. Design shall include engineering services rendered necessary by the VA at the end of Part Ia Investigative Services within the construction cost parameters.
Design and produce construction documents for implementation of the selected alternatives.
Submittals must include the components listed on the A/E Submission Instructions for Minor and NRM Construction Program https://www.cfm.va.gov/ til/ ae/ aesubmin.doc.
Submittal Register - Provide a list to the VA of technical submittals that will be required.
Intended for long-term use, the project design specifications must provide, to the maximum extent practicable, a final product of enduring quality; Energy and water efficient; Environmentally conscious; Functional and requiring low maintenance; Durable; Flexible for changing uses; Universally accessible; Sustainable; Operationally cost effective; Compliant with appropriate codes, statutes, and VHA requirements.
Construction documents must be complete, clear, specific, accurate, coordinated between disciplines, quantifiable, and explicit in quality expectations for suitable materials, systems, and workmanship.
Throughout the design phases of the project, the A/E shall work closely with the COR and Integrated Project Team to ascertain and confirm all project requirements.
The Contractor shall attend meetings and teleconferences to discuss technical requirements, issues, and project progress and status as required. The Contractor shall prepare, and submit for review, presentation materials for meetings and an agenda. The Contractor shall be responsible for taking meeting minutes, prepare and submit minutes for all meetings attended no later than 3 business days, with the exception of the IPT meetings as discussed in previous paragraph, after the meeting has occurred. The minutes shall be sent to the Contracting Officer and COR for coordination and approval prior to distribution.
The AE shall provide an evaluation, cost estimate and conceptual plans to determine the feasibility of completing the project within project budget. Disadvantages and advantages shall be provided including impacts to patient care/medical center operations and order of magnitude cost estimates (with cost of patient care factored into the economy/feasibility)
Part II - Construction Period Services (Optional CLIN): Review and provide concise recommendations on all submittals, shop drawings, product data, samples, RFI s (Questions & Clarification Requests), change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall include third party asbestos monitoring, if needed, that will be performed during construction by a NC DHEC Certified Asbestos Air Sampler. Services shall include providing record drawings based on finalized contractor red-line as-builts.
Assist in answering questions and provide clarifications as deemed necessary by the Contracting Officer or COR during solicitation and issuing any addendums, revise drawings/Specifications, etc. necessary to fully and completely address questions any and all questions submitted by the COR, Contracting Officer and awarded Construction Contractor.
Serve as an advisor and provide assistance to the VA to determine whether the contractor or subcontractor meets technical qualification requirements, assist in the review of contractor proposals for technical acceptability, support by written recommendations of any problems or litigation encountered in past performance based on first-hand knowledge.
Review all submissions and provide concise direction to the VA. Provide direction within 5 business days upon request for shop drawings, product data, installation instructions, samples, etc. Provide direction within 5 business days for RFI s and change order proposals. Changes to contract documents based on errors and omissions in design will be at no cost to the VA to include cost estimates for the change. The CO shall make the final determination on what is or is not an error or omission.
Provide a CIH to function as the VPIH/CIH to monitor during construction period services in accordance with VA Master Specification 02 82 13. Services shall include third party asbestos monitoring that will be performed during construction by a NC DHEC Certified Asbestos Air Sampler. (if determined the need from the design)
Provide Commissioning for all affected systems.
Prepare record drawings based on contractor red-line as-built drawings with correspondence performed during construction. The AE shall provide a set of updated drawings and specifications on CD within 20 business days of construction contract completion to the COR.
The AE shall function as the commissioning agent for all necessary commissioning actions. The AE shall provide testing, inspection and reporting services during construction. The AE must conduct a site visit, at least once a month, during each phase of the project, and must be present for every test or inspection and to document the outcome.
Part III Construction Period Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in the scope of work. The AE shall respond on site within an 8-hour period when requested. The total number of site visits during the construction period is estimated to be 5 for this project, which may be finalized after selection of the AE and during negotiation of the proposal. Each site visit shall be documented through a field report denoting the purpose and results of the site visit.
Make site visits on requests of the VA and prepare documented field reports denoting the purpose and results of the site visit, to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.
Participate in partial/final acceptance inspections (in-wall, above ceiling, and final) as scheduled and generate punch list items for completion. Inspections shall cover quality of installations and locations/placement of items in accordance with the contract documents. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.).
Attend the pre-bid and pre-construction conference to review and confirm project scope.
During construction, allow for a minimum of site visits as negotiated for the contract, as directed and scheduled by the COR.
OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA:
The submitted SF-330s will be evaluated on the following criteria:
This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.601-1. The
following evaluation criteria will be used to evaluate SF 330 technical proposals:
The A/E must demonstrate its qualifications with respect to the published evaluation criteria for
all services. Evaluation Criteria (1) through (4) are considered the most important and listed in descending
order of importance; Criteria (5) is of significantly less importance than (1) through (4) but the associated value of 1 through 4 are in a declining value and order of importance. Criterion (1) is the highest with Criterion (5) being the lowest.
(1) Professional qualifications necessary for satisfactory performance of required services;
(2) Specialized experience and technical competence in the type of work required, including,
where appropriate, experience in energy conservation, pollution prevention, waste reduction, and
the use of recovered materials;
(3) Capacity to accomplish the work in the required time;
(4) Past performance on contracts with Government agencies and private industry in terms of cost
control, quality of work, and compliance with performance schedules;
(5) Location in the general geographical area of the project and knowledge of the locality of the
project; if application of this criterion leaves an appropriate number of qualified firms,
given the nature and size of the project.
Criterion 1 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Mechanical Engineering, Fire Protection Engineer.
Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G.
Criterion 2 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical Facility HVAC Design and Fire Protection, waste reduction, and the use of recovered materials. Offerors will be evaluated on specialized experience and technical competence in the performance of services like those anticipated under this contract about:
Special knowledge of HVAC design in Medical Facilities
Special knowledge of Fire Protection Design
Experience working in and around an operational Hospital
Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team.
Â
Submission requirements: Provide up to six (6) projects completed or substantially completed within the past ten (10) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description, the contract period of performance, award contract value, current contract value, and summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. Additionally, Firms are required to return and submit the Attachment B titled Criterion 2 Format, which will clearly demonstrate specific experiences and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Specifically list similar scoped projects covering the previous 10 years and clearly show participation. (See SF330 Part I Section G, but not excluding other information provided on the SF330 and supporting documentation.)
NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of six (6) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated.
Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower.
All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 2, Section F in evaluating Criterion 2.
Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time.
Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Additionally, Prospective contractors are required to provide a list of current projects with a design fee of greater than $25,000 currently being designed in the firms office. Indicate the availability of the proposed project team (including sub-consultants) for the specified contract performance period in terms of: (1.) both the average and maximum number of projects being worked simultaneously for the previous twelve (12) month period, for each key personnel member, (2.) the number of projects currently being worked by each key personnel member identified in the SF330, and (3.) the number of projects that could be added to workload, given size and complexity.
Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1.
Project Recency: A project will be considered recent only if performance was completed within five (5) years of the date of issuance of this public announcement. Ongoing projects will not be considered as no accurate performance record can exist for work not yet completed.
Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Submit no less than three (3) and no more than five (5) past performance references for recent and relevant projects identified on SF330 Part I Section F. Completed PPQs should be submitted with your SF-330. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) if it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 6, Attn: Shirley Gregory via email at Shirley.Gregory@va.gov prior to the response date. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Criterion 5 - Location in the general geographical area (Asheville, NC) and knowledge of the (Asheville, NC); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract.
Submission requirements: Indicate firms/teams location, including main offices, branch offices and any sub consultants offices and demonstrate how this will be advantageous to the Government.
Criterion 6 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
SELECTION PROCESS: The agency has convened an evaluation board for the evaluation of responses to this notice. Responses will be evaluated in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6. Specifically, SF 330 submissions will be evaluated to identify the most highly qualified firms, using the selection criteria identified above. Discussions will be held with at least three (3) of the most highly qualified firms. Interviews may be conducted. The processes at FAR 36.602-4 and FAR 36.606 will then be followed.
SELECTION INTERVIEW:
Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews will be asked a series of established questions. Elaborate presentations are not desired.
GENERAL INFORMATION:
All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. Contractor is responsible for all cleanups and refuse disposal throughout the construction period. The A-E firm will prepare drawings and specifications in enough detail such that qualified outside General Contracting companies can prepare accurate and timely proposals for the desired construction work. Microsoft Project scheduling and management software will be used by both the A-E and Contractors to allow for regular tracking of schedules and work by the VA Medical Center. Schedules with MS Project will be regularly sent to the COR upon project initiation and whenever significant changes occur in the schedule. The estimated magnitude of construction is between $100,000 and $250,000. The A-E will provide an initial estimate of cost to perform the above work and will design only those items that can be provided within the cost limitation. The Estimated Cost of Construction (ECC) shall only be provided to the Contractor in which a formal proposal is sought for the purposes of providing a proposal. The Medical Center must remain operational throughout the construction period and a detailed sequence of work will be provided by the A-E to minimize impact of the construction. The A-E will provide documents at each submission as indicated in the statement of work. The NAICS code for this procurement will be 541330, Engineering Services. The current small business size standard for 541330 is $16.5 million.
DESIGN COSTS: All offerors are advised that in accordance with VAAR 836.606-73(a) the total cost of the architect or engineer services contracted for must not exceed six percent (6%) of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR 52.236-22 Design Within Funding Limitations, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated A-E firm(s) selected in accordance with the outlined process.
LIMITATIONS ON SUBCONTRACTING: In accordance with VAAR 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside and 13 CFR 125.6, a service disabled veteran-owned small business concern (SDVOSB) agrees that, in the performance of the contract, it will not pay more than 50% of the amount paid by the government to firms that are not similarly situated. Firms that are similarly situated are those that are also CVE-registered SDVOSBs.
Requirement for Electronic Submission
Unless paper offers are specifically authorized, all responses to this pre-solicitation notice must be submitted electronically as described below. The only acceptable paper form for this requirement is the receipt of past performance questionnaires. Failure to comply with this requirement may jeopardize the possibility of receiving an award for the contract due to non-compliance with the terms of the solicitation. You must submit your electronic offer, and any supplemental information (such as spreadsheets, backup data, technical information), using any of the electronic formats and media described below.
In addition, contractors are notified of the award via an electronic Notice of Award e-mail. The award document will be attached to the Notice of Award e-mail.
Acceptable Electronic Formats (Software) for Submission of Offers
Files readable using the current Microsoft* Office version Products: Word, Excel, PowerPoint, or Access. Spreadsheet documents must be sent in a format that includes all formulas, macro, and format information. Print or scan images of spreadsheets are not acceptable.  Please see security note below for caution regarding use of macros. When submitting construction drawings contractors are required to submit one set in AutoCAD and one set in Adobe PDF. (Purpose: contracting can open the PDF version and engineering can open AutoCAD files)
Files in Adobe* PDF (Portable Document Format) Files:Â When scanning documents scanner resolution should be set to 200 dots per inch, or greater.
Another electronic format.  If you wish to submit an offer using another format than those described in these instructions, e-mail the Contracting Officer/Specialist who issued the solicitation. Please submit your request at least five (5) calendar days before the scheduled closing date of the solicitation.  Request a decision as to the format acceptability and make sure you receive approval of the alternate format before using it to send your offer.
Please note that we can no longer accept .zip files due to increasing security concerns.
E-mail Submission Procedures: For simplicity in this guidance, all submissions in response to a solicitation will be referred to as offers.
Subject Line:Â Include the solicitation number, name of company, and closing
date of solicitation. Â
Size: Maximum size of the e-mail message shall not exceed ten (10) megabytes. The SF330, in its entirety, shall not exceed one email of 5MB. The SF330 (not including past performance questionnaires) are limited to 20 pages. If the page limits are exceeded, the pages in excess of the limit will not be read nor considered. Only one email is permitted unless otherwise stated in this paragraph or in writing by the Contract Officer submitting the solicitation. Due to VA IT Security protocols, email submissions are limited to 10Mb per email. Furthermore, it is the sole responsibility of the prospective firms to confirm receipt of their submission in its entirety prior to the closing date & time of their submission in response to this synopsis.
The Microsoft Outlook © Email time/date stamp will be used to date and time stamp offers for the official record of receipt for the submission. The date and time stamp in recipients inbox is the official record of receipt.
Security Issues, Late Bids, Unreadable Offers
Late submission of offers is outlined at FAR Parts 52.212-1(f), 52.214-7, and 52.215-1(c)(3). Attention is warranted to the portion of the provision that relates to the timing of submission.Â
Â
Please see FAR 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.
Â
To avoid rejection of an offer, vendors must make every effort to ensure their electronic submission is virus-free. Submissions or portions thereof submitted and which the automatic system detects the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR Parts 14.406 and FAR 15.207(c ).
The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an e-mail message or an e-mail attachment may cause the e-mail offer to be quarantined. You may send both the spreadsheet and the spreadsheet saved in PDF format to ensure that your proposal is readable.
Password protecting your submission is not permitted. The Contracting Officer will file the offer electronically which will allow access only by designated individuals.
Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.70 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status, offerors must be both VISIBLE and VERIFIED by the Department of Veterans Affairs Center for Verification and Evaluation prior to contract award. Failure to be both VERIFIED by CVE and VISIBLE on VetBiz prior to contract award will result in the offeror s proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so.
852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED
SMALL BUSINESS SET-ASIDE (Nov 2020) (DEVIATION)
(a) Definition. For the Department of Veterans Affairs, Service-disabled Veteran-owned small business concern or SDVOSB :
(1) Means a small business concern
(i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR 802.201, Surviving Spouse definition);
(ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been verified for ownership and control pursuant to 38 CFR part 74 and is listed in VA s Vendor Information Pages (VIP) database; and
(v) The business will comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size and government contracting programs at 13 CFR part 121 and 125, provided that any reference therein to a service-disabled veteran-owned small business concern (SDVO SBC), is to be construed to apply to a VA verified and VIP-listed SDVOSB unless otherwise stated in this clause.
(2) Service-disabled Veteran means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
(3) The term small business concern has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632).
(4) The term small business concern owned and controlled by Veterans with service-connected disabilities has the meaning given the term small business concern owned and controlled by service-disabled Veterans under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)), except that for a VA contract the firm must be listed in the VIP database (see paragraph (a)(1)(iv) above).
(b) General.
(1) Offers are solicited only from VIP-listed SDVOSBs. Offers received from entities that are not VIP-listed SDVOSBs at the time of offer shall not be considered.
(2) Any award resulting from this solicitation shall be made to a VIP-listed SDVOSB who is eligible at the time of submission of offer(s) and at the time of award.
(3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences.
(c) Representation. Pursuant to 38 U.S.C. 8127(e), only VIP-listed SDVOSBs are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible SDVOSB as defined in this clause, 38 CFR part 74, and VAAR subpart 819.70.
(d) Agreement. When awarded a contract action, including orders under multiple award contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting requirements in 13 CFR 121.406(b) and 125.6. Unless otherwise stated in this clause, a requirement in 13 CFR part 121 and 125 that applies to an SDVO SBC, is to be construed to also apply to a VIP-listed SDVOSB. For the purpose of limitations on subcontracting, only VIP-listed SDVOSBs (including independent contractors) shall be considered eligible and/or similarly situated (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to the following:
(1) Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
(2) Supplies or products.
(i) In the case of a contract for supplies or products (other than from a nonmanufacturer of such supplies), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
(ii) In the case of a contract for supplies from a non-manufacturer, it will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted.
(3) General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
(4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime may be paid to firms that are not VIP-listed SDVOSBs.
(5) Subcontracting. An SDVOSB must meet the NAICS size standard assigned by the prime contractor and be listed in VIP to count as similarly situated. Any work that a first tier VIP-listed SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For contracts referenced in (d)(2), (3), and (4) the cost of materials is excluded and are not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small businesses do not provide them. For additional information and more specific requirements on the limitations on subcontracting, refer to 13 CFR 125.6.
(e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows:
__X__ By the end of the base term of the contract or order, and then by the end of each subsequent option period; or
_____ By the end of the performance period for each order issued under the contract.
(f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture is listed in VIP and complies with the requirements in 13 CFR 125.18(b), provided that any requirement therein that applies to an SDVO SBC is to be construed to apply to a VIP-listed SDVOSB. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.
(g) Precedence. Any inconsistencies between the requirements of the SBA Program for SDVO SBCs, and the VA Veterans First Contracting Program, as defined in VAAR subpart 819.70 and this clause, the VA Veterans First Contracting Program takes precedence.
(h) Misrepresentation. Pursuant to 38 USC 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406, Debarment).
(End Clause)
36C24621R0060 Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6
Pre-Solicitation 1/1
3/5/21, 11:35 AM C223--PROJECT TITLE/NUMBER: NRM A/E Design - Project # 521-21-105 Replace MAU-1
36C24719R0020
This request and procurement is 100% restricted to Service-Disabled, Veteran-Owned Small Businesses (SDVOSB)
THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR SF 330'S ARCHITECT/ENGINEER QUALIFICATION PACKAGES ONLY.
ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED.
THERE WILL BE NO SITE VISITS ARRANGED DURING THIS PHASE OF THE REQUIREMENT.
THIS PROJECT IS SUBJECT TO AVAILABILITY OF FUNDS. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.
Federal Acquisitions Regulation (FAR) 36.6 selection procedures apply. Firms that design or prepare specifications in conjunction with this contract are prohibited from participating on any future contracts based on those documents.
GENERAL INFORMATION:
The Department of Veterans Affairs, Atlanta Veterans Administration Medical Center (VAMC), is seeking sources and intends to award a firm fixed-price contract for Architect/Engineering (A/E) services for the development of complete construction documents, which include working drawings, specifications, reports, and construction period services, for Project 508-19-104 Correct Electrical and Nurse Call System Deficiencies Building 1 . The A/E Services listed herein is being procured in accordance with the Federal Acquisition Regulation (FAR) 36.6 and VAAR 836.6. All submissions will be evaluated in accordance with the evaluation selection criteria as specified herein.
Point of Contact: Evonne Huggins, Contracting Officer Email: Evonne.Huggins@va.gov
PROJECT INFORMATION
The NAICS Code for this procurement is 541330 Engineering Services and the annual small business size standard is $15M. The projected award date for the anticipated A/E contract is on or before July 7, 2019.
The anticipated period of performance for completion of design is 301 calendar days after Notice to Proceed.
The NAICS code for the anticipated Construction project is projected to be 236220 and magnitude of construction is predicted to be between $1,000,000 and $2,000,000. The anticipated award date of the construction phase of the project is projected to be by Oct 16, 2020
An Architect & Engineer (A/E) contract will be negotiated for the development of complete construction documents which include working drawings, specifications, reports, and construction period services. The A/E will be given written information; participate in project planning meetings, pre-proposal meeting, and pre-construction meeting as required; communicate with VA personnel via telephone or e-mail; and is expected to coordinate so that the final documents include all requirements in accordance with industry standard practices, VA standards, VA design manuals, and review comments.
STATEMENT OF TASK/SCOPE OF WORK
GENERAL SCOPE OF WORK:
IMPORTANT: The Architect/Engineer (A/E) WILL BE SOLELY RESPONSIBLE and LIABLE for the professional engineering, architectural and technical accuracy and coordination of the construction contract documents among the various engineering/architectural disciplines, a detailed cost estimate, and other services and documentation furnished under this contract.
NOTE: The Department of Veterans Affairs (hereinafter the VA ) WILL NOT be responsible and accountable for performing engineering/architectural design services.
The A/E consultant shall provide services of professional architects and engineers to accomplish the scope of work described herein. The prime consultant shall be an architectural firm licensed to provide professional architectural services. The prime consultant shall have documented direct experience on at least 3 healthcare projects similar in scope and complexity within the past 5 years. Services shall include providing comprehensive architectural and engineering services to produce complete contract construction drawings and specifications that are appropriate for competitive bidding in an open market environment. The consultant shall also provide thorough site investigation services to document existing conditions, space and equipment planning services, technical reports, cost estimates, construction administration services and other related professional services as noted.
Scope of Work:
The purpose of this project is to complete needed critical electrical deficiency corrections for Building 1 (main hospital). Project will correct identified failing Nurse Call/Int/TV conditions identified as "F's" or "D's" per the most recent FCA report. This project location is across floors within building 1 (main hospital), including level 1, 2, 3, 4, 8, 10, and 11. This replace/update electrical project will address problematic, outdated, and non-operational nurse call systems in critical patient areas including the Emergency Room, SICU, and other patient service areas. Functions included in the project directly include nursing, critical patient care units, and maintenance, however all aspects of patient care will be impacted by the correction of identified issues with the current nurse call systems. The project will not create any new, renovated, or demolished space. Additionally, no additional parking spaces are included in the project (surface or structure). The project will greatly impact the VA Medical Center by addressing significant nurse call system issues that directly have an impact on patient care and patient safety as identified by the most recent FCA report. Correction of such failing conditions will ensure ongoing use of existing space and alleviate patient and staff safety concerns.
The FCA deficiencies to be corrected within this project include the following:
FCA Record Number: 8699, Building Number: 1D, System: Electrical, Subsystem: Nurse Call/Int/TV,
FCA Record Number: 8648, Building Number: 1C, System: Electrical, Subsystem: Nurse Call/Int/TV,
FCA Record Number: 337827, Building Number: 1C, System: Electrical, Subsystem: Nurse Call/Int/TV,
FCA Record Number: 122870, Building Number: 1C, System: Electrical, Subsystem: Nurse Call/Int/TV,
FCA Record Number: 8618, Building Number: 1B, System: Electrical, Subsystem: Nurse Call/Int/TV,
It shall be the responsibility of the A/E to advise the Government promptly when, in the A/E s judgment: the budgetary limitations prohibit design in conformance with the approved construction project scope. If the A/E estimated cost of the project exceeds the amount indicated on the VA form, sufficient options shall be recommended by the A/E at the time of the 25% Review to establish the cost within the amount indicated on the project description. Some of the agreed upon options may include additives in the final bid documents prepared by the A/E if the Contracting Officer and the A/E agree that it would be reasonable to do so.
The construction document submitted by the A/E shall represent the most economical engineering solution possible for the scope of work with A/E contract. The construction document shall be in accordance and comply with current criteria, guides, and specifications established by the Department of Veteran s Affairs and shall be in accordance with the best Engineering practices. In addition, the A/E s design shall comply with the latest OSHA, NFPA, TJC requirements and all federal, state, and local codes.
The A/E is responsible for producing a complete set of drawings, design narrative/analysis, calculations, and edited VA specifications in accordance with professional standard practices. The A/E shall outline the phasing requirements of the project. The phasing requirements shall describe the general sequence of construction work, the estimated phase duration, and the Government constraints that will influence the construction contractor s execution and completion of work. The A/E shall be responsible for recording the phase requirements.
Information, including drawings and other documentation, provided to the A/E shall be used as reference only. The A/E shall field verify everything and shall not use any drawings provided for plan or elevation views. The final drawings submitted by the A/E shall be of original design and shall be the result of field verifications, and shall not be take-offs, or tracings, of any drawings or other information provided.
Construction scheduling, i.e., sequence of events and time of construction, shall be submitted for all projects. The A/E shall use the Microsoft Project software or equivalent for submitting construction schedule. For projects which involve interruptions of existing building operations or major utility interruptions, it shall be the A/E s, responsibility to discuss the required outages with the COTR/Contracting Officer, and establish a construction schedule for these interruptions in the construction contract document. The A/E must also show the requirements of the anticipated in the construction contract document. Where these outages and interruptions adversely impact the project costs or time for completion, the A/E must notify the Contracting Officer immediately. A brief description of the restrictions and their basis will be required. The time estimate shall include allowances for mobilization, lead time for materials, phasing of work, time to perform work, and allowances for weather.
In an effort to reduce construction change orders due to design errors and omissions, the A/E shall develop, execute, and demonstrate that the project plans and specifications have gone through a rigorous review and coordination effort. A/E shall submit a detailed QA/QC plan describing each step that will be taken during the development of the various phases of design. Each should have an appropriate space where a senior member of the firm can initial and date when the action has been completed.
The following Investigative Work shall be included Within the Scope of this Project:
Provide any civil, structural, architectural, electrical, environmental, fire protection, mechanical and low voltage systems investigative, (as applicable) work of existing systems necessary to insure the accuracy of your design.
Prepare any measured drawings of existing systems or facility required to insure the accuracy of your design.
Fire and Life Safety Peer Review:
Provide the services of an independent Fire Protection (FP) engineer not affiliated with the prime consultant to conduct Fire and Life Safety Peer reviews of 50%, 75% and 100% submissions. FP engineer shall submit reports summarizing each review directly to the VA COTR/Contracting Officer.
Other:
Complete review of all RFI, shop drawings or samples and all pieces of supporting documentation (manufacturers information, test reports, field reports, daily reports, installation recommendations, etc.).
15 site visits based on an 8 hour-man-day per visit (within the hours of government business at the facility, including the final inspection and commissioning/activation. IMPORTANT: Field/site visits must be identified as eight-hour (8-hr) visit per $-amount in the A/E services Schedule of Values . The VA will control and authorize each field/site visit and/or reject unwarranted field/site visit including the final inspection.
Fire Safety Peer Review of the 50%, 75%, and 100% submissions.
Reproduction costs - The cost of reproducing drawings and specifications and all other supporting documentation, and delivery to the VA Contracting Officer shall be itemized and documentation within the A/E Schedule of Values. Provide these estimates.
3. A/E SELECTION PROCESS:
Responsive firms submitting SF 330 s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for initial selection evaluation. Following initial evaluation, no less than three firms that are selected as the most highly qualified based on the selection criteria responses, will be selected for interviews. Selected firms will be notified by telephone or email of selection and provided further instructions.
Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF330 must be completed by the office/branch/individual team member actually performing the work under this contract.
4. SELECTION CRITERIA: Evaluation and selection of firms will be based on submissions and direct responses to the following criteria which are numbered in descending order of importance:
1) Professional qualifications necessary for satisfactory performance of required service and working together as a team (in-house and/or consultants(s)). Provide brief resumes of proposed team members who will specifically serve as the Project Managers and Designers of Record. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline. Each resume shall include a minimum of two (2) specific completed projects that best illustrate the individual team members experience relevant to this contract scope.
2) Specialized experience and technical competence in the type of work required, including, where appropriate on similar projects: experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials (include Government and private Experience). Technical competence includes design quality management procedures, CADD, equipment resources, and laboratory requirements of the prime firm and any subcontractors. In addition, provide information on the effectiveness of the proposed project team (including management structure; coordination of disciplines, offices and/or subcontractors; and prior working relationships).
3) Capacity to accomplish work in the required time. This factor evaluates firm's experience with similar size projects and the available capacity of key disciplines when evaluating the capacity of a firm to perform the work in the required time. The general workload and staffing capacity of the design office will be evaluated. List current projects with similar design fee being designed in the firms office. Indicate the firms present workload and the availability of the project team (including sub-consultants) for the specified contract performance period; Describe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates
4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. VISN7 will evaluate past performance on recent and relevant contracts with government agencies (emphasis on VA work) and private industry in terms of cost control, quality of work, compliance with performance schedules and a record of significant claims against the firm due to improper or incomplete engineering services (references required).
Recent is defined as performance occurring within 5 years of the date of this Sources Sought, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Sources Sought.
Relevancy is defined as performance of work on projects that are similar in scope to the types of projects anticipated under the resultant contracts.
Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.
Submission Requirements:
Submit a minimal of three (3) references; any of the following evaluations are acceptable:
A-E Contractor Appraisal Support System (ACASS),
Contractor Performance Assessment Report System (CPARS), or
Past Performance Questionnaire (PPQ) evaluation for each project submitted under Criterion 2.
If a completed CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed ACASS/CPARS evaluation, the PPQ included with this notice is provided for the Offeror or its team members to submit for each project included in criterion (2). If a PPQ is submitted, but an official ACASS/CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If an ACASS/CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference. Completed PPQs should be submitted with your SF330. If the A-E is unable to obtain a completed PPQ from a contract customer/reference for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and point of contact information for the respective projects.
A-Es should follow-up with references to ensure timely submittal of questionnaires. At the reference s request, questionnaires may be submitted directly to the Governments Point of Contact, Department of Veterans Affairs (10N7NLO), Attn: Evonne Huggins Contracting via email at Evonne.Huggins@va.gov , prior to the response date. A-Es shall not incorporate by references into their response ACASS/CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted ACASS/CPARS and PPQ evaluations will not be counted as part of the 30 page limitation and shall be attached to the SF330, behind the SF330 Part II document
5) Location in general geographical area of the project and knowledge of the locality of the project; The area of consideration for offeror is a 200-mile driving radius between offeror location and the Atlanta VA Medical Center, located at 1670 Clairmont Rd, Decatur, GA 30033 (Determination of mileage eligibility will be based on www.mapquest.com)
(provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project)
PER VAAR 836.602-1
6) Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Awards, Letters of Recommendation, Outstanding Merits, Evaluations, Letters from past clients, Etc.
7) Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
8) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team.
The selected A/E must have previous experience in the design of renovation within Medical facilities. The A/E must provide documentation of at least two designs of renovations within
Medical Facilities of equal scope and magnitude. The design experience submitted under this criterion must have been completed within the past two (2) years and must contain references with names, and phone numbers, and submitted along with the SF330.
4. SUBMISSION CRITERIA/REQUIREMENTS:
Interested firms having the capabilities to perform this work must submit:
ONE (1) ELECTRONIC SF 330, including Parts I and II, and attachments (if any) electronically to Evonne.Huggins@va.gov no later than 9:00 a.m. Eastern Standard Time on Jan 3, 2019.
Interested firms are responsible for ensuring electronic delivery of submission by the time and the date specified. It is highly recommended interested firms confirm electronic submissions have been received by the Contracting Officer.
Size limits of e-mails are restricted to 5MB. If more than one email is sent, please number emails in Subjects as 1 of n . (Example: SF330 Submission, # 36C24719R0014 Project 508-19-106 Correct Main Tower Window Deficiencies Bldg. 1 (1 of n, 2 of n, etc.).
AND
MAIL THREE (3) HARDCOPIES of SF 330, including Parts I and II, and attachments to:
Department of Veterans Affairs
2008 Weems Road
Tucker, GA 30084
ATTN: Evonne Huggins
All SF330 submissions shall be clearly indicated in subject line, displaying the procurement number and project title (abbreviated or shortened is okay).
Interested firms are responsible for ensuring delivery of submission.
All SF 330 submissions must include the following information either on the SF 330 or by accompanying document:
1) Cage Code
2) Dun & Bradstreet Number
3) Tax ID Number
4) The E-mail address and Phone number of the Primary Point of Contact
5) A copy of the firms VetBiz Registry
6) SF 330 MUST INDICATE THE PERCENTAGE of the contract performance cost that will be expended by the prime firm s employees and in which discipline(s) and subcontracted percentage of contract performance cost to be expended (and in what disciplines). Any subcontracted or otherwise business entity must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc.). This is in order to assure compliance with FAR Clause 52.219-14(b)(1) Limitations on Subcontracting. Failure to provide this information may deem the Firm as nonresponsive and preclude SF 330 submittal from being included further in the evaluation process.
7) References noted in Selection Criteria 9
REQUESTS FOR INFORMATON ON THIS PRESOLICITATION NOTICE: All RFIs shall be submitted to Evonne.Huggins@va.gov.
The firm and or AE on staff representing the project must follow State of Georgia guidelines under State law for all licensing requirements to sign and seal drawings.
Examples of information resources are:
Architects - State of Georgia:
http://www.stateofgeorgia.com/architects1.html
NCARB rules for all States and PR/VI on architectural Licensing:
http://www.ncarb.org/en/~/link.aspx?_id=23ECD0D1498C44FDA1D6FCBF2F06E42D&_z=z
NOTE: In order for a Service-Disabled Veteran Owned Small Business (SDVOSB) to be considered as a proposed contractor, the firm must be verified and visible by VETbiz (www.vetbiz.gov) and registered in the System For Award Management (SAM) database (www.sam.gov) at time of submission of their qualifications AND at time of award. Failure of a proposed SDVOSB to be verified by the CVE at the time the SF 330 is submitted shall result in elimination from consideration as a proposed contractor.
All Joint Ventures must be CVE verified at time of submission and submit agreements that comply with 13CFR 125.15 prior to contract award.
Each respondent must be able to demonstrate the ability to comply with FAR Clause 52.219-14, Limitations on Subcontracting.
Electronic submittals received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be considered. All information must be included in the SF330 submission package.
It is the offeror s responsibility to check the Federal Business Opportunities website at: www.fbo.gov for any revisions to this announcement prior to submission of SF330s.
36C24721R0019 Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7
Pre-Solicitation 1/1
11/13/20, 8:58 AM