Taylor Road Bridge Rehabilitation (Bridge #794009 over Spruce Creek)

Closed State & local contract opportunity Posted

Solicitation number
26-B-28SR
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Volusia County, Florida, through its Department of Public Works, Road & Bridge Division, is seeking a qualified contractor for the Taylor Road Bridge Rehabilitation project (Bridge #794009) over Spruce Creek in Port Orange. The project involves fabricating and installing a crutch bent to remove weight restrictions from the bridge, including comprehensive site work such as channel excavation, pile installation, concrete and steel work, and erosion control measures. Contractors must provide all labor, materials, equipment, permitting, traffic control, functional checks, operations and maintenance manuals, and as-built surveys and drawings. Bidders are required to hold FDOT Prequalification in Bascule Bridge Rehabilitation and submit responsive bids on all line items. The bid submission deadline is January 15, 2026, at 3:01 p.m., with questions due by January 1, 2026, at 11:59 p.m. Evaluation will focus on selecting the lowest responsive and responsible bidder based on conformance with bid requirements, performance capability, experience, and subcontractor qualifications.

The procurement offers local business preference considerations, providing a three percent preference for bidders with a permanent location in specified Florida counties (Lake, Orange, Osceola, Seminole, Brevard, or Volusia) for at least six months prior to bid closing, or a two percent preference if subcontractors performing 51% or greater of the work qualify as local businesses. Contractors must submit a five percent bid bond, provide proof of insurance, and demonstrate experience with at least three similar projects completed for entities other than Volusia County. The project requires comprehensive insurance coverage, including Workers' Compensation, Commercial General Liability, Auto Liability, and Excess/Umbrella Liability, with specific minimum coverage amounts. The engineer's estimated project cost is $649,542.00, with a contract duration of 120 days (90 days for substantial completion and 30 days for final work). Successful bidders must obtain all necessary permits, comply with environmental regulations, and adhere to specific requirements from agencies including the U.S. Army Corps of Engineers and St. Johns River Water Management District.

Opportunity text

The County of Volusia, Department of Public Works, Road & Bridge Division, is seeking a single, responsive and responsible bidder for Taylor Road Bridge Rehabilitation (Bridge No. 794009 over Spruce Creek) project in Port Orange, Florida. The project consists of the fabrication and installation of a crutch bent to remove weight restriction posting. The lowest responsive and responsible bidder shall be responsible for all applicable permitting, labor, materials, equipment, tools, transportation, services, and incidentals necessary to complete all Work required by the specifications and as shown on the drawings. Bidders shall bid on all items in order to be considered responsive.

The Contractor shall provide a complete job, including all labor, materials, and equipment, removal and disposal of materials for installation of fabric formed concrete revetment, including but not limited to: traffic control, functional checks, O & M manuals, and as-built surveys/drawings.

Files

File Type Posted
Taylor_Road_Bridge_Rehabilitation_(Bridge_#794009_over_Spruce_Creek).pdf PDF
Exhibit_F,_General_Notes_Supplement,_26-B-28SR.pdf PDF
Attachment_A,_Scope_of_Work_and_General_Notes,_26-B-28SR_(REVIEW).pdf PDF
Exhibit_A,_General_Conditions,_26-B-28SR.pdf PDF
Exhibit_C,_Bid_Price_Sheet,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).xls XLS spreadsheet
Exhibit_E,_Construction_Plans,_26-B-28SR.pdf PDF
Exhibit_G,_ACOE_VerificationLetter,_26-B-28SR.pdf PDF
Exhibit_H,_SJWRMD_Permit,_26-B-28SR.pdf PDF
Exhibit_C,_PRIME-SUB_FORM,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).xls XLS spreadsheet
Exhibit_C,_Required_Bid_Documents,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).pdf PDF
C2062,_Construction_Contract,_26-B-28SR_(REVIEW).pdf PDF
Exhibit_B,_Special_Conditions,_26-B-28SR.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-28SR_(REVIEW).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-28SR.pdf PDF
6.ACOE_Taylor_Rd_Bridge_20250930_NWP_Verification_Letter_SAJ-2025-02491.pdf PDF
4.Construction_Plans_Taylor_Rd_Bridge_No._794009_Submittal_2025_11_04.pdf PDF
3.General_Notes_Supplement_Taylor_Rd_Bridge_No_794009.pdf PDF
5.Bid_Price_Sheet_Taylor_Rd_Bridge_794009_Rehab.xls XLS spreadsheet
2.Scope_of_Work_and_General_Notes_Taylor_Rd_Bridge_No_794009.pdf PDF
1.Construction_Bid_Request_Taylor_Rd_Bridge_Rehab.pdf PDF
7.SJWRMD_Taylor_Rd_Bridge_General_Permit_240910-1.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(1).xls XLS spreadsheet
Show all 22

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors